Loading...
HomeMy WebLinkAbout12-12-2012 Parks and Recreation CommissionAGENDA PARKS AND RECREATION COMMISSION 5:00 p.m. WEDNESDAY, DECEMBER 12, 2012 RECREATION CENTER MEETING ROOM B 5:00 p.m. Call to order Approval of minutes fi•om meeting of November 14, 2012 5:03 p.m. Public discussion of any item not on the agenda 5:05 p.m. Election of Officers 5:10 p.m. After School Program — Aaron Krohmer 5:20 p.m. Budget Review 5:30 p.m. Chadek Property Discussion 5:40 p.m. Approval of Parks & Recreation Fees & Charges 5:45 p.m. Neighborhood Open Space Review 5:50 p.m. Recreation Division Report 5:55 p.m. Parks Division Report 6:00 p.m. Directors Report • TTRA Update -Vision Iowa • Ashton House Update6:15 p.m. 6:10 p.m. Chairs Report 6:15 p.m. Commission Time/Suggestions for Future Agenda Items 6:30 p.m. Adjournment MINUTES DRAFT PARKS AND RECREATION COMMISSION NOVEMBER 14, 2012 ROBERT A. LEE COMMUNITY RECREATION CENTER — MEETING ROOM B Members Present: David Bourgeois, Clay Claussen, Maggie Elliott, Allie Gnade, Cara Hamann, Lucie Laurian, John Westefeld, Joe Younker Members Absent: Aaron Krohmer Staff Present: Mike Moran, Chad Dyson, Terry Robinson, Beth Ann Bitner Others Present: Becky Couch, Lorna Fesler, Jeannette Fulton, Gregg Geerdes, Dell Holland, David Minehart, Jeff Schabilion CALL TO ORDER The meeting was called to order at 5:00 p.m. by Chairman Claussen. RECOMMENDATIONS TO COUNCIL: (to become effective only after separate Council action): OTHER FORMAL ACTION TAKEN: PUBLIC DISCUSSION: Gregg Geerdes, resident at 890 Park Place in the Normandy Drive area, shared with Commission that the City Council accepted the executive summary of the Flood Mitigation Study Alternatives Report at their October 23 meeting. The Council will make a decision regarding the options at their November 27 meeting. Geerdes encouraged the Commission, as stewards of city parks and other recreational facilities, to take a stand against the proposals and let their position be known. He noted that his two main concerns are the aesthetics of a flood wall and its effects on City Park and the neighboring properties. Chairman Claussen then invited the Commission to discuss further. Laurian noted that it is her theory that levees do not work, that they are all eventually breached. Claussen also noted that it is his belief that if water is contained in once place, it will eventually PARKS AND RECREATION COMMISSION November 14, 2012 Page 2 of 6 make its way to the other. Younker asked Moran Council of concerns that a flood wall could encro, along Taft Speedway. Moran said that there was input. Elliot questioned whether this project is Claussen noted that while which option is chosen aesthetics of the park certainly are. if there was any discussion at City ch on bikers, walkers, and runners not and he was not asked for any the purview of the Commission. as flood mitigation may not be, the The general consensus of the Commission was there should be no buildings in flood zones and all levees eventually are breached. of flood mitigation. Motion passed with 6 approved, 2 opposed, 1 absence. CHADEK PROPERTY DISCUSSION At the September 11, 2012 Commission meeting members made a motion to consider a partnership with the Friends of Chadek Park and Community Gardens to purchase the Chadek property as parkland with part of the funds coming from the City and the remaining funds from fundraising with a price to be determined based on new appraisal of the property. Moran noted that if Commission agrees to this arrangement, they would have to go to City Council to ask for a $280,000 commitment. Moran, Minehart and Jehle met with City Attorney Eleanor Dilkes who stated that there would have to be a contractual agreement between the City and the Friends group. Bourgeois said he would like to see the funds raised first. Haman expected there to be another appraisal done prior to Commission making any motion. Moran stated that getting an appraisal is an option. Claussen noted that if a price is agreed upon, an appraisal will not be necessary. Minehart has held off on the 501(c)(3) application until he finds out what Council's decision is. The groups' deadline to raise the funds is three years with the option to extend six months. Lorna Fesler noted that she thought that these two parts (funds from the City and from the Friends group) needed to go hand in hand as they would not want to raise the money without a commitment from Council. Moran said that if Commission decides to move forward, that he would ask for a commitment from Council prior to a contract being written. Gnade raised a concern that it was her understanding that there was some conflict within the group regarding the purchase price, that some were not aware that there was such a spread between the City's initial appraisal and the Chadek family's appraisal. Younker asked Moran if he had any concerns of another better project,coming up where this amount of money may be better spent. Moran stated that the Chadek property is ideal for a park, that it fits well into the neighborhood and that there is a need for parkland in this area. He doesn't see it as a concern. Elliott asked if the Commission was in agreement on the purchase price, noting Krohmer's concerns brought up at the September meeting. Moran noted that this is the price that has been agreed upon by the Chadek family. Becky Couch noted that she too thought there was PARKS AND RECREATION COMMISSION November 14, 2012 Page 3 of 6 going to be an appraisal available at tonight's meeting. Claussen noted that the City may still ask for another appraisal. Gnade noted that she would like to see another appraisal prior to agreeing on an asking price. Younker asked that there be an amendment to the proposal laying out the idea that the City matches funds in the amount of $280,000 from the City and $280,000 from the nonprofit group. approved 2 opposed and 1 absence. Moran noted that he will request the presence of Minehart and Jehle at the Council Meeting when this is discussed. DEPARTMENT REVENUES Moran stated that the proposed revenues for the Parks and Recreation Department will be presented to Council at their December meeting. The City Manager has noted that he would like to see the Farmers Market become completely self-supporting. Therefore, the vendor fees would likely need to be increased to cover the percentage of Tammy's time and salary that is dedicated to the market. Moran noted that the revenues from the market will likely decrease as the Grant Wood Market will be held in March and April only and not throughout the winter as it was last year. Moran noted that he would recommend that shelter rental fees be increased again this season. He also noted that the City Park Rides projected revenue will be added to this report prior to presenting to Council. He mentioned that there will be discussion at a future meeting of staffing option for the City Park Rides. In the past, the ride employees have been contracted through various organizations. The department will be looking at whether it may be more cost-effective to hire their own staff to run the rides. Dyson noted that the department is looking at increasing the self -proposed mandate of recovering 50% percent of its costs through registration fees. NEIGHBORHOOD OPEN SPACE: While there were no projects to speak of this month, Moran distributed a copy of the neighborhood open space policy along with a map of the districts. He explained to Commission that when a new subdivision goes in, a portion of the property has to be designated as parkland. The City then has the option of accepting the land or fees in lieu of land. If choosing fees, this money has to be spent within a certain time frame or it will go back to the developer. PARKS AND RECREATION COMMISSION November 14, 2012 Page 4 of 6 Moran also distributed to Commission a copy of a community block grant map. The highlighted red areas are the census tract where CDBG funds could be spent..He pointed out that the Chadek property falls within this area. RECREATION DIVISION REPORT: Dyson reported that the department has nearly completed its training on new registration software. The department will begin using this new program on December 3 in preparation for the January 9 registration. Dyson noted that the construction is reaching near completion on the east side of the Recreation building. The replacement of the pool deck will start in December. The pool will be closed for approximately 10 days during this process. Dyson introduced Beth Ann Bitner to the Commission. She is doing a work experience project through the VA. She started in August and will be working in the department through the end of April. She has been working in the social cultural area of Recreation for the most part so far. She will also be working part-time at the Senior Center. PARKS DIVISION REPORT: Robinson reported that there will soon be a request for proposal completed for the construction of shelter #6 at City Park. He also reported that the good weather has provided time for the department to complete some landscaping repairs such as areas around trails etc. He reported that the Napoleon softball field renovation looks great with just the placement of a fence left. Some discussion ensued about the sweaters on trees in the downtown area. Robinson said he has some concern that if the sweaters become wet they may freeze the trees. He will be evaluating them on a weekly basis. DIRECTORS REPORT: TTRA Update: Moran met with Vision Iowa today to ask for a six month extension on raising the necessary funds to secure the grant received from them for the construction of TTRA. He distributed to Commission a copy of an updated master plan for the project. Moran and staff are meeting to create a plan for rentals at the TTRA Lodge and the Ashton House. He hopes to have something to present to Commission in January. At this time, Fin & Feather is planning on offering winter rentals of winter sports items should the weather permit. PARKS AND RECREATION COMMISSION November 14, 2012 Page 5 of 6 Moran is hoping for a Memorial Day 2013 opening of TTRA. NORMANDY DRIVE IMPROVEMENTS: This project contract started on October 24 and is slated to be a 100 day project. COURT HILL SCOTT TRAIL UPDATE: This project is very near completion. Moran recommended a ribbon cutting be scheduled for next spring. BUDGET UPDATE: Moran noted that budget hearings will likely take place in January and encouraged Commission to attend if possible. There will not be an opportunity for boards and commissions to present to Council this year as in years past. FAIRMEADOWS SPLASHPAD: Moran is hoping that this project will go out to bid in December. He reminded Commission that the CDBG funds must be spent by May 1. CHAIRS REPORT: Claussen attended a Blue Zones meeting. He noted that there is a proposal to designate Iowa City to be a Blue Zone city. The idea is that the schools, businesses, individuals, etc. all pull together and commit to live healthier lifestyles. He noted that people may go online to participate as a citizen. He encouraged Commission members to do so. Claussen announced that election of officers will take place at the December meeting. COMMISSION TIME/SUGGESTIONS FOR FUTURE AGENDA ITEMS: Laurian noted that she will be out of the country on a professional leave from January through July. She will be able to attend the January Commission meeting. Elliott would like to see the Commission do more with the Blue Zones project. Dyson noted that the City is involved and that he is the City liaison. The Chamber is leading the initiative. There are 12 cities in the second round and 6 more will be named in January. Dyson noted that if Iowa City is designated, work continues towards certification. Will continue towards certification. Westefeld thanked staff for the park tour in October stating that he learns something new every year. He also noted that he sees an increased use of the Court Hill Scott Trail every day. Bourgeois noted that the Court Hill Scott Trail has added to the attendance at Rita's Ranch Dog Park. ADJOURNMENT: PARKS AND RECREATION COMMISSION November 14, 2012 Page 6 of 6 PARKS AND RECREATION COMMISSION ATTENDANCE RECORD YEAR 2012 NAME N M o N o a N TERM EXPIRES David 1/1/15 X X O/E X X X X LQ X LQ X Bourgeois Clay 1/1/14 X X X X X X X LQ X LQ X Claussen Maggie 1/1/13 X O/E X X X X O/E LQ X LQ X Elliott Allison 1/1/14 X X X O/E X X X LQ X LQ X Gnade Cara 1/1/16 X X X X X X X LQ X LQ X Hamann Aaron 1/1/13 0 O 0 O O O** X LQ X LQ O Krohmer Lucie 1/1/15 X X X X X X O/E LQ X LQ X Laurian John 1/1/14 X X X X O/E X X LQ X LQ X Westefeld Joe 1/1/16 X X X X O/E X X LQ X LQ X Younker KEY: X = Present O = Absent O/E = Absent/Excused NM = No meeting LQ = No meeting due to lack of quorum * = Not a member at this time **=Member was listed as absentlexcused status January through May. These have been changed to absent status. city of iowa city PARKS AND RECREATION DEPARTMENT 220 S. Gilbert Street TO: Michael Moran FROM: Chad Dyson DATE: December 6, 2012 RE: November 2012 Monthly Report S.P.I. SPI Special Olympics Winter Sports training began with 39 athletes who have been entered to compete and are preparing for the upcoming Winter Games in Dubuque. The SPI "Santa's Workshop" craft program began as well with full class registration. (Master Plan: Enhance Program Development) New programs were developed for the next sessions, in particular, a Zomba dance program for persons with special needs. (Master Plan: Enhance Program Development) Staff members were involved in the ActivieNet triaining sessions in preparation for the upcoming Winter/Spring sessions. (Master Plan: Enhance Program Development, Maximize the Planning Process and Provide Staff with Education development Opportunities) The Recreation Division had 8 Special Olympics bowlers who advanced from the area competition to the State Special Olympics Bowling Tournament. Athletes from Iowa City were also involved in the Global Messenger Workshop hosted by Special Olympics Iowa. (Master Plan: Enhance Program Development) PRESCHOOL/JR./SR. HIGH ACTIVITIES - SCANLON GYM Started offering Sports Parties along with Rollerskating Parties at the Grant Wood Gym. Moved an inflatbable to grant wood for an extra as well. Goal 10: Plan for Continued Equitable Level of Service as Community Grows The second session of the Fall ICRD Youth Sports programs began. Held a coach/ supervisor meeting to discuss program goals and expectations. Goal 3: Enhance Program Development I i Held Family Fun at the Mercer Aquatic Center Scanlon, both events were free. Goal 10: Plan for Continued Equitable Level of Service as Community Grows Normal Monthly Including: Promotions of programs and activities through rec ware, article manager, e-subscription, (Goal #6: Increase Awareness of Program Offerings) Conduct post on -rental evaluations. (Goal #5: Solicit Community Involvement and Feedback)Send out weekly updates to part time staff regarding policies and upcoming information. (Goal #1: Maximize the Planning Process) Recreation Division November 2012 Page 2 of 3 SPORTS/WELLNESS Staff is working on learning the new modules of Active Network registration / reservation system, particularly the interactive maps. (Goal 44 — Pursue Comprehensive Service Delivery). Staff posted upcoming program information on the three slide -show monitors in the RAL Recreation Center. Slides about our E-newsletter, Adult Sports registration deadlines, and 2013 Dog Park Passes are just a few of the new ones. (Goal # 6—Increase Awareness of Program Offerings). Staff posted upcoming program information on the department's web page. Staff also posted articles on the department's website regarding the upcoming holiday facility schedules and the new Active Network system. (Goal # 6 — Increase Awareness of Program Offerings). 10,192 people were recorded on the hourly attendance in the month of November at the RAL Recreation Center. (October 2012- 10,012. November 2011- 10,111) (Goal 42 — Track Performance Measures). The fall softball leagues ended on Sunday, November 4. Results are available upon request. (Goal #2 — Track Performance Measures). SOCIAL/CULTURAL WINTER BREAK CAMP materials were released through the schools. See attached flyer for details of this year's activities. Staff expect an estimated 60-70 children to participate each day. WINTER/SPRING ACTIVITY GUIDE information was entered into the new ActiveNet system and we are navigating our way through all the new programs and reports. (Master plan: communicate offerings to the public) Staff met with BACKYARD ABUNDANCE representatives to discuss the PLANT SALE and ABUNDANT SAFARI programs, supported in part by the Parks and Recreation Department. Abundant Safari information is attached and we would encourage you to sign in to peruse the program. This is yet another great way to get kids and their parents outdoors and into our parks. (Master plan: Collaborate with community organizations and develop programs related to new trends) You may or may not realize, but we placed three GEOCACHES in our parks this past summer. This activity is much more popular than we expected as we receive notices nearly daily when people "find" the caches. We have begun looking at ways to expand Geocache sites at no additional cost to the department. (Master plan: Enhance program development, continue to provide high level of environmental education, and assure programming in all sectors of the city, and develop programs related to new trends) The Parks and Recreation Department has signed on to the National Recreation and Parks Association and National Wildlife Federation' s new initiative, "10 MILLION KIDS OUTDOORS." Over the next three years we can expect information of best practices and Recreation Division November 2012 Page 3 of 3 chances to participate in pilot programs. We'll keep you posted but in the meantime.... take a child outdoors this week! (Master plan: Enhance program development, assure programming in all geographic sectors, collaborate and build new partnerships). Did you know IOWA ARTS FEST TURNS 30 this year?! Thirty years ago this Department, the Downtown Association, and Iowa State Bank along with many forward thinking business people and artists formed a coalition to produce an arts festival to take place in downtown Iowa City. Now, thirty years later, Iowa Arts Fest is stronger than ever, merged under the Summer of the Arts umbrella with Jazz Fest, the Friday Night Concert Series, Saturday Night Music and Movies and more. Keep your eyes open as this event celebrates this landmark birthday! (Master Plan: Collaborate with community organizations and businesses) AQUATICS This November the aquatics department decided to make a switch in how we coordinate our swim lesson programs. Traditionally we utilized separate coordinators for each facility; one for Mercer, one for the Robert A. Lee Recreation Center and one for City Park Pool. With the recent changes in the union contract we decided to take an objective look at this coordination process. It has always been my desire to have one individual take on all three of these roles in a permanent, full time capacity. Given the current circumstances this is just not feasible. Our next best option is to assign Mercer and the Rec Center to one individual and City Park to another. This coming January we will enact this change. The advantages of this change are higher efficiency, increased accountability, and an overall improvement in our program. Higher efficiency: a single individual is more capable of knowing exactly what the needs of our instructors are and the facilities. Increased Accountability: this individual can better separate themselves from the friendship nature with instructors and hold them to a very high standard. Improved Program: higher efficiency and more accountability will translate to a better product that we are offering 1 am looking forward in seeing how this development will play out in the corning months. Grades I<-6 PROGRAM HOURS Activities take placefront 9 am - 4 pm Bring your own lunch. Morning & afternoon snacks will be provided. FREE SUPERVISED PLAY Children may check in anytime from 7:30 - 9:00 AM for indoor games and roller skating. Children remaining after 4 pro will be treated to a movie, crafts and games in the Social Hall. Children may be checked out from 4 - 5:30 PM. There is no additional fee for Supervised Play. WHAT TO BRING EVERYDAY "'Lunch ✓Swunsuit & towel when noted ✓Tennis shoes & socks ✓Appropriate clothing for each day (hat, gloves, boots, etc. for outdoor activities) CULINARY CREATIONS Thursday, December 20th, 9am to 4prn: Bring your appetite and get ready to make some yummy creations! Everything from decorating cookies to building banana snowmen. Kids will learn a variety of techniques for preparing fun and healthy snacks. Fruit painting will wrap up the morning, and then we will enjoy an afternoon swim at the Mercer Park Aquatics Center. Please send swimsuits & towels. GET IN THE GAME! Friday, December 21st, 9am to 4prn: This day is all about indoor sport fun! In the morning we will be spending our time in the gym playing a variety of games including scooter races, obstacle courses, kickball, volleyball, and more! In the afternoon we will have some fun playing mire -golf and bowling at Cotowiat LAwes! Be sure to bring socks for bowling! SHIVER ME TIMBERS Thursday, December 2 7th, 9am to 4prn: Get out your eye patch and parrot, because we're going to have a "Parrrrty." Activities will include a treasure hunt around the recreation center, a game of Capture the Flag, and the opportunity to create your own pirate accessories! In the afternoon, all hands will be on deck at the recreation center pool! Please send swimsuits & towels. Sponsored by: Iowa City Parks £d Recreation Department (319) 356-5100 FEES Residents of lorva City: $40 eacli festival day Non-residents: $45 each festival day Registration forms are available at Robert A. Lee Recreation Center 220 S. Gilbert Street AND Mercer/Scanlon Gym 2701 Bradford Drive. Registration begins December 3, 2012. Sorry - no online registration for this program, but please go to www.icgov.org/pr for a printable registration form SOUNDS OF THE SEASON Friday, December 28th, 9am to 4prn: Join us for a day full of music! We will be heading to the public library in the morning for their "Funky Blues Music" show, as well as having some special guest musicians visit to teach campers about an array of instruments. We will wrap up the day by swimming at either the Mercer facility or the recreation center pool. Please send swimsuits & towels! IT'S A SNOWDAY! Wednesday January 2nd, 9am to 4prn: Let it snow, let it snow, let it snow! Today is all about celebrating winter weather. We will be starting the day off with some snow themed crafts including scarves and snow globes, as well as having a snowball fight! After lunch we will cool down with some homemade ice cream. Then it's off to the Coral Ridge Matt to ice skate! Be sure to briny socks for ice skating! Q E � E s c k4- n /1 T � Y� n Q V C -D N b bf) ° —° u n O g ,�� m +9 0 3 Q u � —10 'o 3 " Cl .y - ;§ ( \\{ \ \ )\ {_«�;-:;_ /{ !! ;� - MEMO 92 �^ \\)E4±)\zz}= ; { \ : \ \\} \ «� ! )) moll 4(/} INS b city of Iowa city PARKS AND RECREATION DEPARTMENT 220 S. Gilbert Street TO: Mike Moran, Acting Director FROM: Kurt Schultz, Cemetery DATE: December 6, 2012 RE: Monthly Report (November) AMOUNT I. OPERATING A. Interments (7 ) 1. Adult Residents $2400.00 2. Cremation, Res. $200.00 1 @$200.00 3. Cremation, Non-resident $300.00 1 & $300 4. Adult, Resident Weekend Rate $800.00 1 @ $800 INCOME FROM INTERMENTS $3700.00 B. Lot sales (10) 1. Resident, adult monument space, 7 @ $700.00 $4900.00 2. Resident, adult flat stone space, $1200.00 2 @ $600 3. Non-resident, adult flat stone space 1 @ 900 $900.00 INCOME FROM LOT SALES $7000.00 TOTAL CEMETERY INCOME $10,700.00 II. CEMETERY MAINTENANCE HOURS A. Funerals 75.5 B. Grounds maintenance 108.5 C. Equipment repair & maintenance 65.5 D. Cemetery Plantings 2 E. Building Maintenance 17 Page 2 of 2 Cemetery November 2012 Report F. Mow Cemetery/Mulch 76.5 G. Funeral O.T. 9.5 H. Monument Repair 2 I. Safety Meeting 3.5 J. Lot Locations 4 K. Lot Sales 8 L. Office hours 100 M. Leaves with pay 146 N. Rest Periods 32 TOTAL CEMETERY MAINTENANCE 650 November Week 1 Week 2 Week 3 Week 4 lWeek 5 Total Ground Litter CBD plaza 18 67 34 281 30 177 CBD StScp 23 76 24.5 30.251 20 173.75 Parks 0 Hazardous Clean Up CBD 2 0.5 23 25.5 Parks 0 Designed Flower Bed Maintenance CBD 6 2 8 Parks 0 Planting CBD 2.5 13 6 21.5 Parks 0 Watering CBD 4 2 5 11 Parks 0 Fertilizing CBD 2 3 5 Parks 0 Mulching CBD 0 Parks 8 33 20 22 83 Pruning CBD 1 6 3 10 Parks 40 40 Weeding CBD 1 8 7 1 17 Parks 22 65 60 21 149 Mow/Cord Trim CBD 4 4 Parks 0 Equip Repair & Maintenance CBD 4 21 2 11 38 Parks 0 Event Prep/Cleanup CBD 0 Parks 0 Graffiti Removal CBD 0 Parks 0 Vandalism Repair CBD 0 Parks 0 Play Equipment/Surface Maintenance CBD 0 Parks 0 Plaza Fountain Maintenance CBD 0 Parks 0 Construction CBD 4 6 6 10 26 Parks 0 Art Sculptures/Literary Plaques CBD 0 Parks 0 Ash Urns CBD 1 1 Parks 0 Benches CBD 21 6 6 14 Parks 1 0 Bike Racks/Bikes CBD 41 6 6 16 Parks 0 Drinking Fountains CBD 00 Parks Light Poles/Outlets CBD 0 Parks 0 Posting Pillars/Kiosks I CBD 6 18 181 13 4 59 Parks I 1 0 Recycle Units CBD 4 4 Parks 0 Trash Receptacles CBD 6 7 13 Parks 0 Tree Grates CBD 0 Parks 0 Water Hydrants/Hose Bibs CBD 0 Parks 0 Landfill CBD 17 12 7 2 38 Parks 0 Cleaning/organizing CBD 6 15 21 Parks 0 Snow Removal CBD p Parks 0 Holiday Decor CBD 12 12 Parks 0 Administrative CBD 16 46 28.25 5 32 127.25 Parks 0 Misc CBD 41 1 1 3 8 Parks 0 Monthly Total CBD 119.51 302 163.25 88.25 1571 830 Parks 701 98 801 241 0 272 Monthly Total Grand Total Parks 25% Grand Total CBD Grand Total Grand Total Parks CBD 75% DEPARTMENT Of PARKS & RECREATION DIVISION Of PARI(S, FORESTRY, ANd CBD Date : December 4, 2012 To : Michael Moran, Director From: Terry Robinson, Superintendent RE : Forestry Monthly Report — November 2p12 I FIELD OPERATION / SERVICE REQUESTS HOURS A. SERVICE REQUESTS: 13 Trees Primed = 12 Trees L2emoved = 2 81 B, PARKS & SPECIAL REQUESTS: 11 Trees Pruned = 16 Removals= 2 41 C, ICPD REQUESTS: 1 Trees Pruned = 4 Trees Removed = 0 6 Denbigh D. STREETS DIVISION: 1 Trees Pruned = 1 Trees Removed = 0 4 E, ENGINEERING DIVISION: 1 Trees Pruned = 0 Trees Removed= 0 3 R H.I.S.: i Trees Pruned= 2 Trees Removed = 0 2 Russell Drive II FIELD OPERATIONS/ GENERAL A. ROUTINE STREET MAINT; Trees Pruned = 24 Trees Removed = 0 19 Small Tree Pruning: Templin, Oakridge, Manor, Eastmoor, Normandy Other Pruning; Grant, Sheridan, Muscatine, Church and S Lucas B, ROUTINE PARK MAINT: Trees Pruned = 55 Trees Removed = 0 50 See Attached List C. TRAIL MAINTENANCE: 68 See Attached List D. SPECIAL PROJECTS 57 Hanging Holiday Decorations and Crow Balls in Central Business District E. NURSERY Pruning, Staking, Clean out Shed and Inventory 29 F. SNOW REMOVAL 6 Review snow routes with new employee. G. TREES REMOVED Size Distribution CLASS I = 2 CLASS 11= I CLASS III = 4 III. MAINTENANCE OPERATIONS A. CHAIN SAW/ HAND TOOL MA1NT 38 Saws & chains 21 firs. Hand tools 17 firs. B. EQUIPMENT TRANSFER/ EQUIP MAINT, 54 Transfers 1 firs. Maintenance 53 firs. C. SHOP TIME 18 Cleaning 14 firs. Misc. Errands 4 firs. D. DUMP CHIPS/ FUEL TRUCKS 5 IV. ADMINSTRATION A. Meetings 19 B. Contract Prep & Checking 8 C. New Service requests 35 D. Planting Prep 3 F. Private Trim Notices 10 G. Sidewalk Inspections 2 H.Other - 27 Office Work new Employee Paperwork 16 Logs 11 FORESTY WORK COMPLETED IN VARIOUS PARKS, RIGHT OF WAYS AND GREENSPACES Month: November 2012 Location _ Trims Removal Class Work Hours Chipping Only Other Na oleon Ball Fields 2 X Huntington Drive Park 2/1 3 Hunters Run Park 1 / III 12 Reno Street Park 4 Tree ID City Park 2 Log Measure Sand Prairie 27 Burn TOTAL 2 / 1 & 1 / 111 50 TRAIL MAINP) NAN E> Na roleon Trail 4.5 Creekside Trail 38.5 Hickor Hill Trail 3 Scott Park Trail 13 Windsor Rid a Trail 3 Lindermann Trail 4 Willow Creek trail 2 TOTALS (g DEPARTMENT Of PARks & RECREATION DIVISION Of PARks, FORESTRY, ANd CBD Date: December 4, 2012 To: Michael Moran, Director from: Terry Robinson, Superintendent Re: Parks Monthly Report — November 2012 1. GENERAL OPERATIONS A. Equipment Repair and Maintenance Includes time installing snow equipment on trucks B. Mowing and Mulching C. Parks Security Duties D.Playground Maintenance Replacement of Sand for Playmate Safety Fiber E. Facility Repairs F. Burn Off Prairie — Sand Hill Park G. Ground Repairs H. Clemflpg Restroom & Shelters I. Cleaning Shops and Sheds J. Construction K. Pick Up and Drop Off Materials and Equipment L, Dog Park Pick Up Money 6 Stir, Pump and Winterize Tanks 37 M. Clean Out Chip Bin at Equipment Lot N. Sign — Construction 0.Seeding P. Electrical & Plumbing Repairs Q. Physical Therapy and Doctor Appointments R. Tree Pruning Hours 372 330 317 314 165 151 137 130 78 74 44 42 36 32 26 22 21 19 Parks Monthly Report (Cont,) S. Assist in Office T. Miscellaneous Tasks 15 it U. Prepare Trails and Walkways for Snow Routes to ---------- -6 -E E C! q _C3 -(5 -C� C� Z C5 CT CD W -c� c5 c; Z -c� -Z� ci Z -E� -,3 Z O -Zj -Z� Z 7o -Z; -E Z -6 z z -Z3 2L 2 Mil ji-- I'LL O a is A, C, O 12 Im MN — — — — — — — O — — — — — — — — — — — — Po E F '16 c , 0 R L t; ?: o C3 �j SVPd splaij ollalqlv N � S 1° O r 0 O 0 o 0 o 0 O 0 O 0 M 0 O oori00 6 O N 0 0 0 0 0 0 d d o d o 0 a r c v w N O� _ tl _ L �. y N Np `�-' Vp1 N` LL 6 L Q � N cv L4a 4-1 ❑ ® @ ❑ O W 9 L v N Q — c li L ❑ ❑ ® ❑ ❑ i3 Hickory Hill Park Master Plan Sub -Committee Meeting Minutes Summary for 10/23/12 and 10/30/12 Attendees: Ryan Maas, John Kai -dos, John Thomas, Pete Kollasch (10/30/12 only) Prepared by: John Thomas, 11/19/12 1. Review of Hickory Hill Park, Trail and Bridge Study (Fall 2011) This is the closest thing we have ever had to a comprehensive management plan for the park. Any proposed infrastructure improvements will require a "memorandum of understanding" clearly defining the maintenance responsibilities of the City of Iowa City and Friends of Hickory Hill Park See also Board email comments from February 2012. a. Trail network General Comment: Most of the trail alignments are acceptable in their current location. Exceptions to consider would be where trails are prone to frequent flooding or erosion. Comments: • Consider access from Hickory Heights • Consider closing some of the unofficial trails • Provide access to/within Dickens property • Stepping stone crossings at low -flow streams is a good idea, especially when in locations of low accessibility • Consider relocating the trail along the creek in the park's west side b. Trail profile concept The proposed concept includes crowning the trail surface, and concentrating storm water runoff in swales. The swales direct the runoff to 12"-diameter concrete culverts, which convey it down slope. Limestone boulders are placed at the culvert outlet for erosion protection (see pages 26-27 of the report). Comments: • The proposal is an expensive system to install (trail reconstruction is estimated at $458,000). • The swales will require maintenance to function properly. • The concept does not acknowledge that the quarry fines currently used to pave the trails are prone to erosion and does not provide a firm and stable surface, especially on sloped trail sections. • Since the scope of trail reconstruction covers almost three miles, we need to be sure the design will work well and not require high maintenance • Existing water bars were installed as a short-term solution until a long-term remedy to trail erosion was identified C. Forest management General comment: Recommendations addressing woodland health, which include selective thinning and fire management (see page 25 of the report), are an excellent idea. 2. Park Management Plan: Additional Work Scope General Continent: The emphasis of the current plan is on 1) trail and bridge improvements, and 2) forest management. Additional park improvements should also be considered. Comments: • Site furnishings: Park entry signs; trail/interpretive signage; benches at rest stops and vista points (benches at the park interior should have a rustic character, in contrast to the benches at the park entrances) • North entrance and Bloomington entrance, which are more park -like in character, could be further developed. The FHHP Board has already endorsed a plan for the Bloomington entrance. • Structures: Consider building a structure out of natural materials in the park interior. Structure could include interpretive information, seating, sheltering roof. • Creek/stream improvements (Pete noted that flood mitigation is primarily achieved by the existing flood control structure). Storm water runoff from parking lot and lawn areas at Bloomington entrance could be detained. 3. Action Plan General: the Board needs to advocate for implementation of the plan. Comments: a. Long-term Improvement Plan • The project may need to be broken down into phases, whether due to funding or to cause less park disruption. • Project phasing could be as follows: Phase I (Calendar years to be determined) 1. Capital improvements: Select consultant; Develop project scope with City of Iowa City and consultant; Prepare construction documents 2. Forest Management: Prepare Forest Management Plan Phase II: 1. Capital Improvements: Trail/Bridge construction; signage and site furnishings 2. Implement forest management plan Phase III: 1. Capital improvements: North entry and Bloomington entry; structure in park interior 2. On -going implementation of forest management plan Phase IV: 1. Creek/stream restoration 2. On -going implementation of forest management plan b. Short -tern Improvement Plan • Install rustic benches in park interior • Install impervious paving at Bloomington entrance and north entrance • Test alternative methods/materials for trail improvements: considerations include trail profile; paving material; and erosion characteristics on longitudinal trail sections (traversing and perpendicular to slope) and switchbacks. CITY OF IOWA CITY, IOWA CAPITAL IMPROVEMENT PROJECTS Project Summary by Name Activity Prior Years 2013 2014 2015 2016 2017 Total Expense Total 540,000 540,000 4130 - Parks Annual Improvements /t4aint. Annual appropriation for maintenance and improvments in parks. FYO8 includes $700,000 for potential trails allocation by City Council. 334900 Other State Grants 13,936 13,936 362100 Contrib & Donations 19,127 19,127 369100 Reimb of Expenses 41635 4,635 393410 From FY12 GO Bonds 200,000 200,000 393411 From FY13 GO Bonds 194,590 200,000 394,59D 393412 From 2015 GO Bonds 140,882 80,000 220,882 393413 From FY14 GO Bonds 80,000 80,000 393114 From 05 GO Bonds 400,000 400,000 393416 From 07 GO Bonds 200,000 200,000 393417 From 08 GO Bonds 200,000 200,000 393410 From 09 GO Bonds 61,954 61,954 393419 From 10 GO Bonds 73,701 73,701 393420 From 11 GO Bonds 7,511 96,467 103,978 393426 From FY16 GO bonds 80,000 80,000 393427 From 2017 G 0 Bond 80,000 80,000 Receipts Total 1,316,336 496,467 80,000 80,000 80,000 80,000 2,132,803 441820 Parks Operations & Maintenance 34,669 34,669 441070 Parks Capital Acquisition/CIP 1,281,057 496,467 80,000 80,000 801000 80,000 2,097i524 Expense Total 1,315,726 496,467 80,000 80,000 80,000 80,000 2,132,193 4136 - Hickory Hill Park Safe/Restroom Construct a saferoom/rest room and replace oldest pedestrian bridge in Hickory Hill Park, approximately 50'. A federal hazard mitigation grant of $172,000, state grant of $23,000 and our share of. this project will be $34,000. 334810 State'Disaster Assistance 195,000 195,000 334900 Other State Grants 810 810 393413 From FY14 GO Bonds 34,000 34,000 393414 From 05 GO Bonds 10,810 10,810 393420 From 11 GO Bonds 3,792 145,398 149,190 Receipts Total 15,422 145,398 229,000 389,810 441870 Parks Capital Acquisition/CIP 15,412 145,398 229,000 389,810 Expense Total 15,412 145,398 229,000 369,610 4137 - Frauenholtz-Miller Park Development Develop newly acquired parkland on Lower Wear Branch Rd adjacent to St Patrick's church site. 369100 Reimb of Expenses 16,650 16,650 393426 From FY16 GO bonds 223,ODO 2.23,000 Receipts Total 16,650 223,000 239,650 441870 Parks Capital Acquisition/CIP 16,650 223,000 239,650 Expense Total 16,650 223,000 239,650 4145 - Cemetery Resurfacing Resurface specified roadways within Oakland Cemetery as part of the city-wide biennial asphalt resurfacing program. 393410 From FY12 GO Bonds 50,000 50,000 393413 From FY14 GO Bonds 50,000 50,000 CITY OF IOWA CITY, IOWA CAPITAL IMPROVEMENT PROJECTS Project Summary by Name Activity Prior Years 2013 2014 2015 2016 2017 Total 393419 From 30 GO Bonds 46,398 3,602 393426 From PY16 GO bonds 50,000 Receipts Total 46,390 53,602 50,000 50,000 50,000 50,000 200,000 441870 Parks Capital Acquisition/CIP 96,500 53,602 50,000 50,000 Expense Total 961800 53,602 50,000 50,000 250,102 250,102 4152 - Terry Trueblood Recreation Area This project provides for the phased development,in accordance with the concept plan, of the newly acquired Sand Lake Recreation Area (forner S & G Materials site). The area will include both recreation and conservation components. An Iowa Community Attraction and Tourism grant application will be submitted. 334900 Other State Grants 459,027 1,740,973 362100 Contrib & Donations 550,000 2,200,000 393140 General Fund CIP Funding 591,833 550,000 393410 From PY12 GO Bonds 500,000 591,833 393411 From FY13 GO Bonds 2, 000,000 00,000 5500,000 393416 From 07 GO Bonds 500,000 208,409 2, 393417 From 08 GO Bonds 499,999 708708 ,40 9 393419 From 10 GO Bonds 6061388 499999 393420 Prom 11 GO Bonds 250,000 606,,40,388 Receipts Total 3,407,247 4,499,302 000 7,906,629 441100 Parks & Pee Admin 1,051 991870 Parks Capital Acquisition/CIP 3,758,996 4,455,365 1, 051 Expense Total 3,759,997 4,455,365 8,214,311 8,215,362 4153 - Soccer Park Improvements This project provides for the continued development and improvement to the Iowa City Kickers Soccer Park. Planned improvements include a system of trails to enhance accessibility, and to create a more park -like .atmosphere in the open space areas,of the facility. 393416 From 07 GO Bonds 13,914 393126 From FY16 GO bonds 13,914 Receipts Total 13,914 250,000 250,000 250,000 263,914 441870 Parks Capital Acquisition/CIP 84,809 Expense Total 84,809 - 250,000 334,809 250,000 334, 009 4160 - Iowa River Corridor Trail -Peninsula Park to ;1aterworks Prair This project is a meandering trail along riparian corridor of the Iowa River extending from Peninsula Park(and Thornberry Bog Park) towards waterworks Prairie Park. The trail will access to trail users, including persons with disabilities. This project also includes interpretive signage and benches. The 2,950 linear foot trail project will be part one of a two part project in linking these two park systems, A Resource Enhancement and Protection (REAP) grant was applied for and granted for $200,000. 334900 Other State Grants 200,000 Receipts Total 200,000 200,000 200,000 441870 Parks.Capital Acquisition/CIP 200,000 Expense Total 200,000 200,000 200,000 4163 - Napoleon Softball Field Renovation Regrade and relocate fields 3 and 4 to provide better drainage and more spectator space batween these fields and fields 1 and 2, CITY OF IOWA CITY, IOWA CAPITAL IMPROVEMENT PROJECTS Project Summary by Name Activity Prior Years 2013 2014 2015 2016 2017 Total 393410 From 09 GO Bonds 3,818 176,183 180,001 Receipts Total 3,810 176,103 180,OOi 441870 Parks Capital Acquisition/CIP 3,818 176,183 180,001 Expense Total 3,818 176,183 180,001 4170 - Court Hill Park Restroom Construct a restroom in Court Hill Park. 393420 From 11 GO Bonds 44,999 50,001 95,000 Receipts Total 44,999 50,001 - 95,000 441870 Parks Capital Acquisition/CIP 44,999 50,001 95,000 Expense Total 44,999 50,001 95,000 4177 - Lower City Park Secondary Access Road Extend the Lower City Park Access Road along ball diamonds and into Normandy Drive to create a secondary access road for better traffic flow and emergency access. 393413 From PY14 GO Bonds 270,000 270,000 393420 From 11 GO Bonds 128 128 Receipts Total 128 270,000 270,128 441870 Parks Capital Acquisition/CIP 128 270,000 2.70,128 Expense Total 228 270,000 270,120 4178 - Normandy Drive Restoration Project Design and development of parkland in the Normandy Drive areas where housing he been removed due to flooding. This project is a two year phased project and will also include the repurposing of the toed Ashton House. 393411 From PY13 GO Bonds 4", 050 409,050 393413 From FY14 GO Bonds 409,051 409, 051 39342.0 From 11 GO Bonds 12,454 12,454 Receipt. Total 12,464 409,050 409,051 830,555 441870 Parks Capital Acquisition/CIP 12,454 409,051 409,050 830,555 Expense Total 12,454 409,051 409,050 830,555 4179 - Sand Prairie Enhancement " 393426 From PY16 GO bonds 273,000 273, 000 Receipt. Total 273,000 273,000 441970 Parks Capital Acquisition/CIP 273, 000 273,000 Expense Total 273,000 273,000 4180 - Fairmeadows Park Restroom and Splash Pad This project consist. of a restroom that will be build adjacent to the new splash pad. The splash pad will be funded by a $330,0000 Community Development Block Grant. 331100 Federal Grants 330,000 330,000 393413 From FY14 GO Bonds 95,000 95,000 Receipts Total 425,000 425,000 CITY OF IOWA CITY, IOWA CAPITAL IMPROVEMENT PROJECTS Project Summary by Name Activity Prior Years 2013 2014 2015 2016 2017 Total 441.870 Parks Capital Acquisition/CIP 425,000 425, 000 Expense Total 425,000 425,000 4181 - Master Park Plan and Construction Develop a master plan for parks and construct facilities at an older park. 393413 From FY14 GO Bonds 250,000 250,000 Receipts Total 250,000 250,000 411870 Parks Capital Acquisition/CIP 250,000 2.50,000 Expense Total 250,000 250,000 4203 - Pedestrian Bridge Rocky Shore to Peninsula Construct pedestrian bridge over the Iowa River to connect the Iowa River Trail to the Peninsula parkland trails, and to provide better access to the dog park and disc golf course. This project is contingent on outside funding. 331100 Federal Grants 1,240,000 1,240,000 393426 From FY16 GO bonds 260,000 260,000 Receipts Total 1,500,000 11500,000 441680 Trail Construction - 11500,000 11500,000 Expense Total 1,50D,000 1,500,000 4206 - Intra-City Bike Trails Annual appropriation for the construction or repair of bike trails. 393150 Road Use Tax 68,110 68,110 393411 From PY13 GO Bonds 50,000 50,000 393412 From 2015 GO Bonds 50,000 50,000 393413 From PY14 GO Bonds 50,000 50,000 393426 From FY16 GO bonds 50,000 - 50,000 393427 From 2017 G 0 Bond 50,000 501000 Receipts Total 60,110 50,000 $0,000 50,000 50,000 50,000 318,110 441870 Parks Capital Acquisition/CIP 2,362 2,362 441880 Trail Construction 65,748 50,000 50,000 50,000 50,000 50,000 315,748 Expense Total 60,110 $0,000 5D,000 50,00D 50,000 50,000 318,110 4217 - Butler Bridge Pedestrian Trail Construction of a separate pedestrian bridge on widened piers on the Butler Bridge, allowing for separated pedestrian and bicycle travel. This project will be utilizing Federal SIP grant funds. 334900 Other State Grants 440,000 440,000 336110 Johnson County 70,000 70,000 393419 From 10 GO Bonds 82,500 02,500 393420 From 11 GO Bonds 367,500 367,500 Receipts Total 460,000 510,000 960,000 441880 Trail Construction 905,590 54,000 959,590 Expense Total 905,590 54,000 959,590 4219 - Scott Park Development & Trail (incl court Hill Trail Ph 3) Development of Scott Park into a neighborhood/regional park, some excavation to the detention basin, and the construction of a new trail to connect with other trails in east Iowa City. Restroon included. CITY OF IOWA CITY, IOWA CAPITAL IMPROVEMENT PROJECTS Project Summary by Name Activity Prior Years 2013 2014 2015 2016 2017 Total 331100 Federal Grants 416,159 393290 From Stormwater 108,779 916416 ,15 9 393411 From FY13 GO Bonds 363,841 108,157799 Receipts Total 108,779 780,000 , 841 808,779 441880 Trail Construction 108,779 780,000 Bxpenee Total 108,779 700,000 888,779 808,779 4221 - Terry Trueblood Rec Area Trail Connection Construct an extension of the Iowa River Corridor Trail from Napoleon park to Terry Trueblood Recreation Area. 334900 Other State Grants 180,000 363150 Copies/Computer Queries 525 180,000 393420 From 11 GO Bonds 94,000 525 525 Receipts Total 94,525 180,000 99, 000 274,525 441880 Trail Construction 241,053 Expense Total 241,053 241,053 291,053 4222 - Highway 1 Sidewalk/Trail-Riverside Arive to Sunset Construct a 10 foot wide sidewalk along IA Hwy 3 between Riverside Drive (Old 218) and sunset. 393410 From PY12 GO Bonds 170,279 829,721 393416 From 07 GO Bonds 120,000 11000,000 Receipts Total 170,279 949,721 120,000 11120,000 441880 Trail Construction 170,279 949,721 Expense Total 170,279 949,721 1,1201000 1,120,000 4316 - Recreation Center Improvements Rebuild east entrance to Robert A. Lee Center including accessible ramp, railing, fencing, steps, and lighting. Also, enclose the pool balcony so it can be used and enjoyed by center patrons. 393420 From 11 GO Bonds 46,195 160,000 Receipts Total 46,195 160,000 206,195 206,195 445100 Culture & Recreation Capital Acqui 46,195 160,000 Expense Total 46,195 160,000 206,195 206,195 4320 - North Market Square Park Redevelopment Work with the Northside Neighborhood Association and Horace Mann School to redevelop the park. 363150 Copies/Computer Queries 475 369200 Reimbursement of Damages 18,178 475 393418 From 09 GO Bonds 84,763 18,178 393420 From 11 GO Bonds 306,097 51000 84,763 Receipt& Total 409,513 51000 , 11097 J1,097 513 134710 Roads 161 441870 Parks Capital Acquisition/CIP 409,352 51000 161 Expense Total 409,513 51000 414,352 414,513 CITY OF IOWA CITY, IOWA CAPITAL IMPROVEMENT PROJECTS Project Summary by Name Activity Prior Years 2013 2014 2015 2016 2017 Total 4321 - City Park blaster Plan & Pool Upgrade This project will bring City Park Pool into compliance with the Americans with Disablilities Act by the removal of the wading pool and construction of a splash pad. The project also includes an expansion of the lawn area surrounding the pool to allow for more seating and picnic areas. In addition, we will conduct a Park Easter Plan to ensure the long term stability of this park area and amenities. The pool improvements are estimated at $575,000 and the park master plan is estimated to cost $75,000. 393413 From FY14 GO Bonds 650,000 650,000 Receipts Total 650,000 650,000 445100 Culture & Recreation Capital Acqui 650,000 650,000 Expense Total 650,000 650,000 4322 - Willow Creek/Kiwania Park Master Plan and Splash Pad This project will have the Parks & Recreation Department develop a master plan for these two parks and include the construction fo a Splash Pad for the residents on the west side of Iowa City, 393412 From 2015 GO Bonds 350,000 350,000 Receipts Total 350,000 350,000 441870 Parks Capital ACquisition/CIP 350,000 350,000 Expense Total 350,000 350,000 4323 - Recreation Center Elevator Replacement Replace the elevator car, hydraulics, and controls on the elevator at the Recreation Center. 393418 From 09 GO Bonds 45,131 45,131 393419 From 30 GO Bonds 77,303 77,303 393420 From 11 GO Bonds 1,092 10,000 11,092 Receipts Total 123,526 10,000 133,526 445100 Culture & Recreation Capital Acqui 123,526 10,000 133,526 Expense Total 123,526 10,000 133,526 4328 - Library Public Space Remodelling Implementation of consultants' recommendations to improve public use areas of the library, including improved efficiency of public service desks, additional self-service options, and a new teen space. 362100 Centric & Donations 100,000 100,000 200,000 393140 General Fund CIP Funding 21886 21686 393411 From FY13 GO Bonds 100,000 100,000 393413 From FY14 GO Bonds 100,000 100,000 Receipts Total 2,086 200,000 200,000 402,886 442700 Library Capital Acquisition/CIP 2,086 200,000 200,000 402,886 Expense Total 2,886 200,000 200,000 402,866 4329 - Recreation Center Phase 2 Improvements 393426 From FY16 GO bonds 225,000 225,000 Receipts Total 225,000 225,000 � r December 7, 2012 CITY OF IOWA CITY Honorable Members of the Iowa General Assembly: On behalf of the City Council, we wish to express our sincere appreciation for your continued efforts on our commurrity's behalf. Iowa City and our neighboring jurisdictions are fortunate to have an experienced group of advocates that are actively working on our behalf to expand economic opportunities and improve the quality of life or Eastern Iowa and throughout the state. Included in this packet are statements on the City Council's formally adopted 2013 legislative priorities. These statements aim to provide you with the City's position on key issues, as well as inform you of relevant facts and statistics about our community that will help provide local context to these important topics. As always, we are committed to providing you additional information upon request or as these and other issues are discussed during the session. Outside of the City's legislative priorities, we are committed to improving our communication with you. The City Council has approved for a second year the hiring of the Davis Brown Law Firm for contracted lobbying services. Mr. Tom Stanberry and Ms. Kate Carlucci will be working on our behalf throughout the legislative session. Please do not hesitate to engage Tom or Kate at any time. Of course, you may also contact us or the assistants in the City Manager's Office directly at any time. Included in this packet is contact information for our contracted representatives as well as the staff in the City Manager's Office. As needed, the City Manager's Office can connect you with other staff members that may have expertise on a particular issue. On our end, we will endeavor to reach out to you frequently either through direct contacts or through our contracted lobbyists. Again, thank you for your contoured representation of the Iowa City community. We look forward to strengthening our relationship and working with you on the key issues in the upcoming session. Sincerely, Matt Hayek Tom Mzrkr s Mayor City Manager City of Iowa City Legislative Contact Directory City Staff Tom Markus, City Manager Email: tom-markus@iowa-city.org Office: (319) 356-5012 Cell: (319) 400-4018 Geoff Fruin, Assistant to the City Manager Email: geoff-fruin@iowa-city.org Office: (319) 356-5013 Cell: (319) 333-4823 Adam Bentley, Administrative Assistant to the City Manager Email: adam-bentley@iowa-city org Office: (319) 356-5010 Cell: (319) 321-8053 City Council Representative Matt Hayek, Mayor Email: Matt-Hayek@iowa-city.org Cell: (319) 321-6598 Davis Brown Law Firm Representatives Tom Stanberry Email: ThomasStanberry@davisbrownlaw.com Office: (515) 246-7897 Cell: (515) 720-3614 Kate Carlucci Email: katecarlucci@davisbrownlaw.com Office: (515) 246-7847 Cell: (515) 802-6908 City of Iowa City, Iowa -�ti - - -- - The State of Iowa must elect whether to accept a 2010 federal grant in the amount of $87 million, part of a $230 million grant with the State of Illinois, that would establish regional passenger rail service connecting to Chicago. A robust passenger rail network is rapidly growing in the Midwest and it is imperative to Iowa's economic future that it be included in this initiative. Establishing service to Iowa City is the first step in a long-term strategy to connect the major population centers in Iowa. Without this first step, Iowa will be placed at a significant economic disadvantage as the surrounding states will continue to leverage this major transportation network advantage. Over the last decade, Amtrak has experienced record ridership and greatly improved on -time performance. Expanding this transportation alternative will provide a significant economic boost both locally in Eastern Iowa and throughout the entire State. A Critical Statewide Economic Investment The map on the right illustrates the expansive passenger rail network that is being developed in Illinois, Missouri, Michigan, Indiana, Ohio, Wisconsin and Minnesota. If Iowa does not accept this federal grant, we will find ourselves at a significant regional economic disadvantage for decades to come. Leveraging today's available federal funds is the only feasible way to initiate this important project that can be expanded in the future to connect Grinnell, Des Moines, Atlantic and Council Bluffs. As the route develops, bus feeder service can be initiated to serve Cedar Rapids, Cedar Falls, Ames, Fort Dodge and Sioux City. Illinois has begun work to extend the line from Chicago to Moline using their portion of the federal grant. If Iowa rejects the federal funds, those dollars will be redirected to other states and exacerbate Iowa's economic disadvantage. � I Y Hb Cr 5.9:a AM1:rvm fry jRLI 'n •• Benefits to Eastern Iowa • Expansion and diversification of the regional transportation network (including the quad Cities and Cedar Rapids areas) • Enhanced tourism opportunities for the region • Aid in the recruitment and retention efforts of the University of Iowa, the region's largest economic driver • Provide safe, reliable and affordable business and personal travel options • Infill transit oriented economic development catalyst in Iowa City's Riverfront Crossings Area A rapidly growing affordable, transportation option for Iowans Amtrak Ridership Growth • 49%increase In ridership FY2000-FY2012 • New annual ridership record set in 9 of the last 32,000,°a0 10 31,000.000 years °c,°ao,000 _ ._...._ ___.. ...._ _ • All-time record of more than 31, 2 million zo,o°°.o°° passengers in FY2012 r z•'°°°°°° -- -- - - ---- -- - — ----- • 25 of 44 routes set ridershiprecords in FY2012: zz,000.°°o i .... ..... __. o Chicago to St. Louis $ _ --�--- ---_ --- - - o Chicago to Milwaukee 24.000,000 o Chicago to Port Huron 2310001°w - __ . _ .. _ _. _._ _._-. o St. Louis to Kansas City 22,000,°00 31'0 - - ___..._._.. __. V Amtrak's on -time performance is83%,which .Wo - �� - - - - - --- is the highest level in 12 years and rivals the zo,°ooaoo air industry. On -time performanceon regional 13-^ le routes such as the Chicago to Council Bluffs/ Final Year o souaa Y g Omaha line is often considerably hi her. Regional routes have fewer delays than cross- country routes Passenger Rail Success in other Midwestern University Communities: Carbondale, IL Southern Illinois Univ. 114,000 riders 310 miles to Chicago 6 Trains Daily Average Fare: $42 Normal, IL Illinois State Univ. 209,000 riders 124 miles to Chicago 10 Trains Daily Average Fare:$21 Ann Arbor, MI University of Michigan 138,000 riders 243 miles to Chicago 6 Trains Daily Average Fare:$36 Note: the distance from Iowa City to Chicago is approximately 220 miles Champaign, IL University of Illinois 140,000 riders 129 miles to Chicago 6 Trains Daily Average Fare: $27 East Lansing, MI Michigan State Univ. 62,000 riders 208 miles to Chicago 6 Trains Daily Average Fare: $30 Iowa City is an advocate for property tax relief that does not impact the ability of local governments to provide necessary services and infrastructure or that necessitates a tax shift to residential taxpayers. Iowa City is strongly opposed to the reclassification of multiple family residential units from commercial to residential. This change will have a disproportionate impact to Iowa City and other university communities and will not yield significant savings to renters in those areas, where vacancy rates are consistently low. If tax reform is pursued in a manner that impacts local governments, then consideration should be given to alternative revenue sources that would give cities flexibility to protect against service cuts or tax shifts. Additional local taxing authority has been granted to home rule cities in other states with success. Such authority may include increased flexibility in hotel/motel taxes and sales taxes, or it could include new sources such as food and beverage or liquor taxes. Local taxing decisions can reduce property tax burdens, while allowing for a greater portion of taxes to be captured from out-of-state visitors. Iowa City General Fund by the Numbers: Property taxes make up over 60% of the General Fund revenue • Approximately 75% of the General Fund expenses are personnel -related costs Service cuts prompted by property tax revenue loss will negatively impact personnel levels within the City or cause costly tax shifts to residential property owners. Financial Impact of Property Tax Reform ■ Rollback of Commercial Rates A multi -year phased rollback approach that reduces the commercial rates 3% per year equates to an annual loss of property tax revenue totaling approximately $620,000. Note: Any phased rollback approach would lead to a compounding of these numbers, exacerbating the need for dramatic service cuts or tax shifts. $620,000 equates to the equivalent of approximately 8.5 newly hired police officers. TT'1'1 �TTT I� Without service cuts, the City tax rate would have to increase approximately $.20 per year of the rollback to compensate for the revenue loss. The owner of a house assessed at $200,000 would pay approximately $21 more in City taxes each year. After five years, the homeowner would be paying over $105 in additional taxes each subsequent year (assuming FY2013 tax rates and rollback figures). ■ Reclassifying Multiple Family Buildings Reclassifying multiple family buildings from commercial to residential will have a devastating effect on Iowa City and necessitate deep service cuts and tax shifts without providing any real benefit to renters. A fully implemented reclassification would result in property tax loss of $2.6 million to the City of Iowa City and approximately $6 million to the community when considering other local taxing jurisdictions (e.g. school district and county). $2.6 million equates to nearly one third of the Iowa City Fire Department budget. In FY2013, the Iowa City City Council reduced the property tax levy by $.57, which was the largest reduction among the ten most populated cities in the state. It is estimated that the FY2014 budget will include another reduction in the levy. Combined, these rates will produce a significant savings for commercial property owners without any mandated tax reform. The Iowa City City Council is committed to property tax relief through well -planned local decision -making. City of Iowa City; Iowa 3"';S. Cities depend on road use tax funding to support a healthy road and bridge infrastructure that serves the local taxpayers and businesses. Due to increased fuel economy, lower vehicle ownership rates and the expansion of alternative travel options, growth in road use tax revenues have not kept pace with the rising costs of labor, materials and construction costs. As a result, cities are deferring more maintenance projects and are shifting the financial burden to property taxes. Without an increase in the road use tax there will be continued deterioration of our road and bridge network and increasing pressures on property tax paying residents and businesses. This issue directly impacts Iowa's ability to maintain and expand our local and statewide economies. The increases in road use tax revenue have not sufficiently kept up with the costs of labor and construction. As a result, an increasing number of projects are deferred or funded with property taxes through general obligation bonds. While it is not fiscally prudent to sell general obligation bonds to perform maintenance work, the alternative —deferred maintenance — is by no means in the tax payer's interest. Deferred maintenance significantly shortens pavement life and ultimately increases lifecycle cost. Iowa City Pavement Condition Trend Pavement Condition 2005 % of System 2009 % of System % Increase or Decrease Excellent 2% 4% +2% Good 32% 23% -9% Fair 34% 33% -1% Poor 22116 25% +3% Very Poor Iowa City's pavement management data (collected by the [DOT) shows that conditions are trending from the "fair & good" categories to the "poor & very poor' categories, confirming the impact of deferred maintenance. This results in more reconstruction and major maintenance projects, financed by general obligation bonds. This shifts the cost of road maintenance and finance costs to the property tax payer and not necessarily the users of the roadways. Distribution of Road Use Tax Revenue Iowa City advocates that additional revenues generated by an increase be distributed by the means that are already in place. Considerable study has gone Into evaluating the distribution of Iowa's road use tax revenues. Time and again It has been shown that how the pie Is cut is not the problem. The pie simply has not grown as fast as inflation. Altering the distribution method will create winners and losers, making legislative passage more difficult. An increase in the fuel tax will leverage funds from out-of- state travelers and reduce local property tax pressures on Iowans and the business community. Without an increase in this funding source, the deferred maintenance on our trans- portation network will continue to grow and create a tremen- dous financial and economic burden for the State. Iowa City urges the legislature to explore mechanisms to increase funding for critical road and bridge infrastructure projects. City Of Iowa City, Iowa Cities that are required to participate in the State's Municipal Fire & Police Retirement System of Iowa (MFPRSI) pension program are experiencing rapidly growing costs. Since FY2011, Iowa City's contribution into the pension system has grown by 62%, or approximately $1,000,000. These rapidly increasing costs are inflating local property tax rates. The State should carefully examine the long-term financial feasibility of this system and consider reforms that protect taxpayers and ensure that our public safety employees have fair benefits that can be sustained and counted on in their retirement years. Without sustainable reform, it is unlikely that communities will be able to continue to meet their obligations to our public safety personnel without significant service cuts or tax increases. i r � Yu�S2for�`�l Current Pension Contribution Rates: IPERS vs. MFPRSI* FY2014 Projection IPERS I MFPRSI Employee Rate 5.78% 9.4% Employer Rate 8.67% 130.12% 'Unlike IPERS, all increased costs in the pension system are the responsibility of cities and not shared with employees. Active members in MFPRSI are less than 50%of all the system participants, with a decreasing trend. With the baby boomer generation retiring, it is likely that trend will continue, forcing even greater financial contributions from cities to support the pension burden. The continued underperformance of the investment portfolio, relative to actuarial assumptions, will also drive municipal contributions higher in future years. Last year, the MFPRSI rate of return was 1.08%, far below the assumptions that are generally used. t7 �Af llsl� l ,1,. h',��Y���� i�r �����i i',e ���P�) ��i I/.�. � t ,��if.tt �,Y� ���!�� �'i ,d y�� •� $4,000,000 City Of 1OWca City $3,500,000 M F P RS I $3,000,000 Contributions $2,500,000 $2,000,000 $1,500,000 $1,000,000 $500,000 FY 2011 FY 2012 FY 2013" FY 2014' FY 2015` FY 2016` ■ City of Iowa City MFPRSI Contributions $1,653,589 $2,277,292 $2,462,514 $2,677,851 $3,140,553 $3,404,373 ■ Percent Increase 38% 8%° 9% 17% * - estimate based on State of Iowa projections. • Over the six year period from FY2011 to FY2016, the overall increase in Iowa City's MFPRSI contribution is expected to total $1.75 million, an increase of 106%. • The estimated one-year increase in the FY2014 MFPRSI contribution for Iowa City is $215,000, which accounts for approximately $.07 on the City tax levy. Over the six year period from FY2011 to FY2016, the estimated increase equates to a $.56 increase in the City tax levy. A $.56 increase in the tax rate equates to approximately $58 dollars in additional Iowa City property taxes for a homeowner with property assessed at $200,000 (assuming 2013 tax rates and rollbacks). While Iowa City supports the MFPRSI Board's recommendation to have the State contribute to the pension system, we believe structural reform is necessary to ensure the sustainability of the program and to provide an equitable environment among Iowa cities.