Loading...
HomeMy WebLinkAbout06-11-2014 Parks and Recreation CommissionAGENDA PARKS AND RECREATION COMMISSION 5:00 p.m. WEDNESDAY, JUNE 11, 2014 MEETING ROOM B 5:00 p.m. Call to order Approval of minutes from meeting of May 14, 2014 5:01 p.m. Public discussion of any item not on the agenda 5:05 p.m. Transportation Services Coordinator, Chris O'Brien 5:30 p.m. DogPAC Report • Dog Wash — Dave Bourgeois 5:35 p.m. Friends of Hickory Hill Park Report 5:40 p.m. Neighborhood Open Space Review 5:45 p.m. Farmers Market Report 5:55 p.m. Recreation Division Report • Affiliate Groups 6:05 p.m. Parks Division Report • Review of snow/mowing routes/obligations & Standards • Hickory Trail Playground/Shelter Update • Riverside Festival Stage Maintenance/Upgrades • City Park Into Sign • Maintenance Update of Various Parks/Fields 6:20 p.m. Directors Report • Ashton House Report • TTRA Report • Staffing • Mobile Vending 6:30 p.m. Chairs Report 6:35 p.m. Commission Time/Suggestions for Future Agenda Items 6:45 p.m. Adjournment MINUTES DRAFT PARKS AND RECREATION COMMISSION MAY 14, 2014 ROBERT A. LEE COMMUNITY RECREATION CENTER — MEETING ROOM B Members Present: Suzanne Bentler, David Bourgeois, Larry Brown, Clay Claussen, Maggie Elliott, Cara Hamann, Katie Jones, Lucie Laurian, Joe Younker Members Absent: None Staff Present: Mike Moran, Chad Dyson, Zac Hall Others Present: Angela Pitkin, DogPAC CALL TO ORDER Chairman Claussen called the meeting to order at 5 p.m. RECOMMENDATIONS TO COUNCIL: (to become effective only after separate Council action): None OTHER FORMAL ACTION: Moved by Bourgeois, seconded by Jones to approve the April 9, 2014 minutes as written. Motion passed 9-0. PUBLIC DISCUSSION: None FRIENDS OF HICKORY HILL PARK REPORT: Moran reminded commission members of the Hickory Hill Park plant sale to be held at the South Hickory Hill shelter the weekend following this meeting. Moran reported that the prairie burn that was done last fall at the park was proven successful in promoting new growth which is evident this season. DogPAC REPORT: Angela Pitkin, Vice President of the DogPAC board was present. She announced that DogPAC is very pleased to donate $5000 towards the new animal shelter and $1000 towards new water fountains at Rita's Ranch. Pitkin said that the group is very interested in working with Parks and Recreation in the possible development of a 10-acre dog park in the future Riverfront Crossings area. PARKS AND RECREATION COMMISSION May 14, 2014 Page 2 of 7 Pitkin announced that the board welcomes new member, Pat Peterson who is from a Chicago suburb. She will be researching the possibility of having a summertime dog festival in 2015 for the purposes of fundraising. The desire is to make this a large event and hold it in or near Downtown Iowa City. One activity they are hoping to include, which tends to draw large crowds is called "Dock Dogs." Dock Dogs is a dock jumping and diving sport for dogs. It is a very popular sport in the U.S. and has been featured on ESPN. Moran suggested that they speak with the summer of the Arts coordinators to discuss getting on their calendar, or perhaps trying it at Thornberry Off -Leash Dog Park. Some of the other ideas include "Meet the Police Dog," and possible vendor booths. DogPAC believes this would be a very popular event with the high population of dogs in the area. They will keep the commission informed of any plans as they progress. Brown asked if there is information available somewhere for people that are interested in joining DogPAC. Bourgeois noted that this information is available on their website at www.icdoqpac.org. Claussen noted that dog parks are of great interest to many who are thinking of moving to the area. Laurian stated that she has some issue with dedicating 10 of the 35 acres of land planned for Riverfront Crossings for a dog park. Bentler noted that urban dog parks are generally smaller, Elliott asked who would approve such a request. Moran noted it would be up to City Council. There would likely be a lot of neighborhood involvement as well. NEIGHBORHOOD OPEN SPACE REVIEW First and Rochester. Part One: This is for a development of an 11-unit building that offers no land for park use. It consists of steep slopes and the sidewalks don't meet trail needs and Ryerson's Woods is nearby. Moved by Elliott seconded by Bourgeois to accept fees in lieu of land for the First and Rochester Part One Development. Motion passed 9-0. Walden Hills/Rohret Road Preliminary Sensitive Areas Site Development Plan: This is a proposal for a 14-unit apartment complex which is bordered by trees. Staff does not want to remove trees to provide green space for a park as they serve as a sound barrier from Highway 218. Moved by Elliott seconded by Younker, to accept fees in lieu of land for the Walden Hills/Rohret Road Sensitive Areas Site Development Plan. Motion passed 9-0. Prairie Hill: This includes the land swap proposal by the City to the Iowa City Cohousing LLC. The City proposes to swap 3 acres to the south of the park for some wooded land to the west of the park for use by the cohousing group for access to Benton Street. The idea is to provide a more open space to the community within the park. The Prairie Hill Development offers an open space that doesn't have much for trees so could provide space for a playground or splash pad. PARKS AND RECREATION COMMISSION May 14, 2014 Page 3 of 7 Staff does have some questions about this property yet concerning storm water drainage, having no alley -way etc., which will be discussed at the May 20, 2014 Joint Staff Meeting. Moran feels that the property swap is a good idea if issues can be worked out. This is an informational item only, no vote by commission necessary at this time. RECREATION DIVISION REPORT: Napoleon Softball Lighting: Dyson reported that he was contacted when the lights went off too early at Napoleon recently. He explained that in 2008 Musco Lighting put in an automatically controlled lighting system at five of the fields at Napoleon as well as Mercer Park fields. This allows Musco to monitor the efficiency of the system, to check for issues, to change lamps when they go out which then provides the City with an extended warranty on the system. On the second night that this new system was in place, there was a scheduling error at Napoleon and the lights went off prematurely. That has been resolved and there have had no issues since. Dyson further noted that he has received a quote to add this type of lighting to the City Park tennis courts as well. As far as the City Park ball diamonds are concerned, the existing lighting cannot be retrofitted for this automated system. City Park Pool Project: Dyson announced that due to weather related delays, the City Park Pool will now open on June 7 rather than the expected May 24 date. He noted that the project is looking great and that there will be a substantial increase in the amount of deck and green space provided. This delay may impact some of the regular lap swimmers who prefer City Park Pool, however, should not impact the community as much as it could with the delay in the school year ending. Blue Zones: Dyson is once again serving on the leadership board for Blue Zones and will keep Commission informed of upcoming events. Affiliate Groups: Dyson reported that staff will likely be discussing fees for use of the city facilities with affiliate groups. Some of the affiliate groups are reporting that their numbers are down this year. For example, Kickers reports being down 200 registrants, boys baseball is down three to four teams and girls softball numbers are declining as well. Some thoughts for this decline include lack of transportation and the growing popularity of U-trip teams. Dyson noted that as stated in the memorandum of understanding that the department has with affiliate groups, that they be invited to attend a commission meeting once per year. He would like to begin this process. He would likely schedule sports groups separate from those who rent rooms etc. Bourgeois suggested that the Iowa City EELS Swim Club be met with separately. Dyson agreed based on their unique relationship with the department, that they be met with separately as well. Dyson suggested beginning these meetings as the groups are wrapping up their seasons. Moran suggested that perhaps they all be brought in as one group to announce that we are reviewing fees etc., and then schedule them in smaller groups at a later time to discuss on an individual level. PARKS AND RECREATION COMMISSION May 14, 2014 Page 4 of 7 Brown asked if there was any way to provide bus service to some of these areas where there currently is none. Moran is going to speak with Chris O'Brien, Director of Transportation and see if he can attend a future Commission meeting to discuss. Dyson will bring to the Commission in June what we currently provide for these affiliate groups. Moran noted that this action was attempted in the past, however, many of the groups came back showing the money they had given to the City etc., and it was dropped. At that time there was discussion of a sliding scale fee for these groups. Moran noted that while the City is extremely grateful for their generosity in the past, the expenses to keep these facilities running is increasing and the City has to recoup these expenses. Jones asked what other cities do to recoup their costs. Moran explained that they are run by parent boards. Parents do the chalking of fields, mowing etc. It eventually becomes difficult for them to find people to maintain these venues. PARKS DIVISION REPORT: Hall and Moran will present a plan to council regarding Emerald Ash Borer. Hall noted that at last count the city has about 1200 ash trees, and about 600 more in the parks. Staff did not count Hickory Hill Park or Ryerson's due to the heavy forestation. Ash trees will not be removed from these two parks. Hall will share a plan with Commission in a couple of months. There will be a systematic plan for taking these trees down. They will not have to be burned as senate has passed a bill so that they can be taken to the landfill but do have to be chipped to 1" x 1" size prior to doing so. The University of Iowa uses chips for power so the department may look at selling them to the University for fuel, or see if they would come and get them for no cost. Elliott asked if the trees are taken down before being infested. Moran said that yes they are in an attempt to be proactive rather than reactive. Hall noted that the lifecycle of the ash bore is one year and they will decimate a tree within that time frame. Moran further stated that the plan will include replacing the trees that are removed with another. Bentler asked if replacement of trees will promote diversity of species. Hall said yes. Moran noted that in the past the department has given landowners options of five or six types of trees to choose from. Jones asked if any of the options would include edible trees. Moran said no as this usually invites more birds which will make more of a mess around the tree. Jones suggested that even so, since the landowner would get to choose, perhaps they should have an option of an edible tree DIRECTORS REPORT: Ashton House: Moran noted that most of the parking lot has been backfilled. Staff is still waiting on a permanent ramp and hope to have that in by the end of the month. Project GREEN will begin working on the gardens over the Memorial Day weekend. TTRA: The Lodge is very busy with reservations. The park has become very popular for many walks as it provides a perfect 5K route (from the park to Napoleon and back). Moran noted that some of the trees that were planted last year did not survive the winter. They will be replaced. He also noted that a Herky statue has been placed at the park. This particular statue is named "Wood Grain Herky" and sets in front of the lodge. PARKS AND RECREATION COMMISSION May 14, 2014 Page 5 of 7 Social Services Agency Transportation: At the previous commission meeting it was suggested that some social services agencies be invited to a future meeting to discuss some of the challenges they are seeing when it comes to getting kids involved in recreational activities. Moran asked for a better definition of what the Commission would like to see done. He does not want to invite them, offer ideas and then find out that the City cannot provide the services suggested. Brown said that unfortunately those that he has spoken with do not really have any concrete ideas to offer. Moran said that he will contact Chris O'Brien, the City's Director of Transportation for input. Younker suggested that O'Brien be invited to a future meeting to get a sense of what the options are. Bentler suggested that someone also might want to speak with the affiliate groups to get their input. Perhaps parents and coaches could put together a carpool system. Hamann suggested that perhaps staff involve the Off Road Riders Program involved. This group does an annual fundraiser. Last year they were able to provide six to seven bicycles to kids and this year as many as 30 were distributed. The fundraiser this spring rose over $10,000. Brown asked what happens to bikes that the police pick up. Moran noted that they are auctioned off to bigger cities. He said that there may be some regulations in place that would not allow them to distribute through the City, but he will look into this. After more discussion Claussen asked members to send any ideas for other resources etc. to Brown. Moran and other staff can work with Brown to identify people/groups to meet with. Moran again stated that he believes step one is to have the Director of Transportation speak at a future commission meeting. Park Tour: Moran reminded members that last month there was some discussion about holding the annual park tour earlier in the year. These are generally scheduled for September or October. Bourgeois suggested that perhaps one be done in the spring and one in the fall. Willow Creek/Kiwanis Park: Moran handed out a proposed concept plan for the Willow Creek stream channel. The stream corridors and water quality need to be addressed in Willow Creek. The creek is eroding as well as the trails. He noted that the first step will be to hold public meetings. He will likely schedule a neighborhood meeting sometime in June. The estimated cost for construction at Willow Creek and Kiwanis Park is about $320,000. Ryerson's Wood Park: This park has been designated as a state forest preserve. The Governor will come to the park and make an announcement in mid to late June. The State Forest Preserve naming will protect the parkland from the cutting down of trees, plants, or anything else done around the area. Also, this will help when applying for future grants or funding for the park. City Park Parking: The department has begun selling parking passes for constructions workers that are working at Hancher and using the park to park their vehicles. They will pay $60/month from May through November. Staff has designated two parking lots for them. The money for these tags will go back into the City Park account. PARKS AND RECREATION COMMISSION May 14, 2014 Page 6 of 7 CHAIRS REPORT: Claussen asked Tammy Neumann to provide a report to the commission about the Farmers Market. Neumann will report in June. COMMISSION TIME/SUGGESTIONS FOR FUTURE AGENDA ITEMS: saurian hopes to see efforts of the City to build better relationships with the schools in the future. She does not feel that there is a good relationship that exists at this time. Younker reported on the ad hoc Senior Services Committee. The first meeting was mostly for organizational purposes. He stated it consists of a good diverse group. He will keep this commission apprised of developments through this committee. Hamann suggested that perhaps the Blue Zones committee be involved in some of the transportation issues to be discussed. ADJOURNMENT: Moved by Bourgeois seconded by Bentler to adjourn the meeting at 6:45 p.m. Motion passed 9-0. PARKS AND RECREATION COMMISSION May 14, 2014 Page 7 of 7 PARKS AND RECREATION COMMISSION ATTENDANCE NAME TERM c� o v N EXPIRES �O n oo m a N M a in Suzanne 1/1/17 * * X X X NM X X X O/E X X Bentler David 1/1/15 X LQ X X X X NM X X X X X X Bourgeois Larry 1/1/18 * * * * * * X X DIE X X Brown Clay 1/1/14 X LQ X X X X NM X X X X X X Claussen Maggie 111/13 X LQ X X X X NM X X X 01E X X Elliott Allison 1/1/14 X LQ X DIE O/E X NM X Gnade Cara 1/1/16 X LQ X X X X NM X X X X X- X Hamann Katie 1/1/18 * * * * * * * X X X X X Jones Lucie 1/1/15 DIE LQ DIE O/E X X NM X OIE X X X X Laurian Alex 1/1/16 X Taylor John 1/1/14 X LQ X X X X NM X * * X Westefeld Joe 1/1/16 X LQ X X X O/E NM X X O/E X X- ..X... Younker KEY: X = Present O = Absent O/E = Absent/Excused NM = No meeting LQ = No meeting due to lack of quorum = Not a member at this time city of iowa city PARKS AND RECREATION DEPARTMENT TO: Michael Moran FROM: Chad Dyson DATE: June 6, 2014 RE: May 2014 Monthly Report S.P.I. 220 S. Gilbert Street The Special Olympics State Summer Games were held in Ames on the Iowa State University campus. The athletes competed in soccer, swimming, track and field events, bocce and tennis. In addition to the competitions, Special Olympics Iowa hosted the Opening Ceremonies, the Celebration Dance at Hilton Coliseum and the Olympic Festival. (Master Plan: Enhance Program Development) Staff met with parents to discuss their vision of developing a nonprofit corporation called a Village Community in this area for their children with special needs. (Master Plan: Collaborate with Community Organizations and Businesses) New staff members were hired and attended training sessions in preparation for the opening of the City Park rides. (Master Plan: Enhance Program Development) New volunteers were interviewed and placed in upcoming summer programs. (Enhance Program Development, Expand Department Volunteer Opportunities) The Recreation Division's Special Olympics Unified Softball team has started their season for the year. They play each week in a league at Ellis Park in Cedar Rapids. Special Olympics Unified Softball teams are comprised of players with and without special needs. (Master Plan: Enhance Program Development) PRESCHOOL/JR./SR. HIGH ACTIVITIES - SCANLON GYM • Held a coach meeting for Volunteer and ICRD Coaches for summer Tee Ball. Received 25 volunteers and 3 team sponsorships. (Goal #1: Maximize the Planning Process) ( Goal 7: Assure Financial Sustainability). • Installed an additional tee ball backstop at Mercer Park, creating 4 additional teams. (Goal #10: Plan for Continued Equitable Level of Service as Community Grows) • The ICRD held the Local Hershey Track Meet at City High Track on May 30. 153 athletes, born 2000-2005 participated in this free national event. • Due to weather, the ICRD spring sports season concluded 2 weeks later than originally scheduled. • Assisted in offering CPR to ICRD employees. Nearly 40 employees were certified. • Continued promotion of upcoming youth sports through "youth sports page" on ICRD website, activenet and flyers. (Goal 6: Increase Awareness of Program Offerings) Continue to do on line post rental evaluations for all rentals at the Mercer Aquatic Center Scanlon Gym. (Goal #5: Solicit Community Involvement and Feedback) Recreation Division May 2014 Monthly Report Page 2 of 4 SPORTS/WELLNESS Summer softball registration concluded on May 2. There are 93 teams total (35 CoRec teams on Sundays, 21 Men's teams on Mondays, 10 CoRec teams on Tuesdays, 11 Men's teams on Wednesdays and 16 Men's teams on Thursdays). The season was delayed until June I" due to a FEMA flood recovery project at the University's Hawkeye Softball Complex. (Goal 42 — Track Performance Measures). All the equipment in the new fitness room is in working order at the RAL Recreation Center. We are working with an architect and the City Engineer to hopefully get a glass wall installed around the fitness room. (Goal 49 — Continue to Provide Equitable LOS in Existing Parks and Facilities). Staff posted articles on the department's website and updated the website content regarding the summer program registrations and the upcoming facilities schedules. (Goal #6 — Increase Awareness of Program Offerings). Staff posted upcoming program information on the three slide -show monitors in the RAL Recreation Center. Slides about the department's participation in the World's Largest Swim Lesson, Parties in the Park, and consignment theme park tickets are just a few of the new ones. (Goal # 6 — Increase Awareness of Program Offerings). 8,420 people were recorded on the hourly attendance in the month of May at the RAL Recreation Center. (April 2014- 7,698, May 2013- 9,057) (Goal #2 — Track Performance Measures). SOCIAL/CULTURAL No report. Will include with next month's report. AQUATICS Goal 42: Track Performance Measures Establish service standards for all community services activities: o Programs: ■ We currently track percentage of swim lesson capacity vs. utilized/ filled, and are working on more effective ways to keep each offering at Rill capacity. We are experimenting with varied times to see what is most effective. We are finding that earlier time slots are preferable. We have begun offering a small 530pm private lesson session. This was received well; however we must maintain a balance of lap swim time and lesson times. ■ We have made a large push for increased communication between instructors and parents. This seems to be working very well, establishing a relationship with our participants allows for constant feedback at the most front line level. The evaluations distributed at the end of each session were very positive this round. o Facilities We have assigned lifeguard staff to a set clean up time just before the start of evening lessons. One of our largest complaints has been locker room/ shower room cleanliness. This new assignment seems to be helping. Recreation Division May 2014 Monthly Report Page 3 of 4 The City Park Pool Renovation project is nearly complete. At this point the new fence line is complete, the new wading pool is complete and the new accessible picnic area is 90% complete. We are several weeks behind schedule due to a main waste line repair that was needed. Sometime during the deck renovations the main waste line was damaged making it impossible to fill the main pool. The repair is completed and we are now filling. It is our hope to have the facility up and running by Saturday June 14`h. MPAC Avg. Attendance Average Attendance 160 u A 44 a 7 oa�eo°cP d'�o°01cpeo°q�a°e1o°e���e`r�Q��Ql 0' 1n�0• �,�0• 9,�6 xp q+� ^-+- +- ,�o• 4. .61 „�. ,�O• ,�, gyp. Time 14.0 12.0 10.0 10.7 11.1 11. 8.0 6.0 6.7 4.0 4.8 2.0 0.0 Recreation Division May 2014 Monthly Report Page 4 of 4 Rea Ctr. Avg. Attendance Average Attendance 100 - E 7.0 E 7,0 1 50 — 5.0 5 3.0 6 3 1 3.5 a 2.0 5 i.0 0.0 c4 ft4 fc4 f,4 #A° q° A° c4 c4 c4 c4 c4 c4 c4 Time `m►��, ` June 6, 2014— CITY OF IOWA CITY 410 East Washington Street Iowa City, Iowa S2240-1826 (319) 356-5000 (319) 356-SO09 FAX www.Icgov.org MONTHLY FACILITIES REPORT MONTH REPORTED: May 2014 PREPARED BY: Scott Justason, Facilities Manager June 6, 2014 Page 2 1. ENERGY PERFORMANCE TRENDS 1.1 Electrical Usage: Facilities Electric Charges Jan Feb Mar Apr City Hall $5,348.54 $5,099.39 $4,906.87 $4,923.86 RALRC $2,707.53 $2,599.24 $2,558.89 $2,478.20 Mercer/Scanlon $4,783.33 $4,535.49 $4,610.40 $4,496.95 TTRA- Lodge $323.40 $323.84 $284.22 $352.51 TTRA-Marina $136.64 $132.42 $116.83 $114.99 Fire Dept - Station #2 $1,124.53 $1,107.49 $958.25 $793.60 Fire Dept -Station #3 $310.44 $263.18 $250.85 Fire Dept - Station #4 $1,348.25 $1,200.46 $891.64 Senior Center $2,050.88 $1,893.74 $2,345.50 Ashton $101.99 d$2,037.78 $76.81 $53.86 TOTAL $18,235.53 $16,869.65 $16,701.96 June 6, 2014 Page 3 City Hall xam _ — am69 )s9ro )mm bop Yn fen Mar ,w Y B6If0 )91ro ]36L 9M. Ashton House Imo 60 u II_ ° 1. I FA _ — MarNa, YlNfl 1H9 I°M 81° Syl' TTRA Lodge 50.V 9m° ° u - 3CW 1°YJ 31n fen Mar �r u RWN 3%3 356a � 3116 3fi 5_ -- Fire Station #2 fsaoo ISN. J�r.a smo �Y6wx� fa356 � fRl) � 133n � 1°I__ Fire Station #4 :6669 _ 1'ft0 Im°] YMWII ]Ib19 lfl3m 1)Xq - fi3� RAL Recreation Center 9Y1m1 95m° —_ 46 — 43 4= — 9f°m 1 3TN 3Blm lan fe0 A ap YMNI N910 41ad1 � W)M a31Y1 Mercer/Swnion 9SAV gam amm _ 7S JIXN. Un F6 M /p .m 69110 a])MI 651M ]�% TTRA Marina 35m 3m° 99 �m 1609 Itlp ° _� fM ff Mar aP `YCWN ]6)6 1fB5 _ 9% 6g5 Fire Station#3 9m9 3000 ]mo Imo ° — 3 fm fee alY M. YMWN 911E 3691 3pS ]�0 Senior Center 35°m — 2=Y 1`Am fmm smo AV YIM'H ]538J 3K(° - ]IW 3I9p June 6, 2014 Page 4 Parks Electric Charges Jan Feb Mar Apr W. Benton St Park $24.19 $24.19 $24.20 $24.20 Napoleon Maintenance Garage $14.93 $14.40 $14.23 $15.19 Napoleon Concessions $54.81 $49.38 $49.99 $44.73 Rocky Shore Dr $11.07 $11.07 $11.07 $11.07 Green Mtn Dr Pheasant Hill $13.12 $13.12 $13.12 $13.13 550 Greenwood Dr $26.74 $28.60 $28.34 $27.20 City Park Pool $13.70 $12.65 $12.91 $16.15 City Park Stage $62.35 $52.88 $53.85 $78.04 City Park Boys B-ball Lot#8 $12.74 $12.21 $12.30 $12.38 City Park Boys B-ball Lights $30.88 $25.80 $25.77 $27.20 City Park Boys B-ball Clubhouse $23.08 $20.36 $20.54 $28.43 City Park Security Light $64.25 $64.27 $64.27 $64.27 City Park Cabins $11.07 $11.07 $11.07 $11.07 City Park Flagpole $11.07 $11.07 $11.07 $11.07 City Park Shelter#2 $16.94 $15.63 $20.01 $15.45 City Park Shelter#4 $11.07 $11.07 $11.07 $11.33 City Park Shelter#5 $11.07 $11.07 $11.07 $11.07 City Park Shelter#6 $16.68 $15.72 $15.80 $16.15 City Park Shelter#8 $24.57 $22.38 $21.06 $22.47 City Park Grey Brick $17.47 $16.15 $16.24 $40.79 City Pa rk Red Brick $55.16 $49.90 $44.03 $35.97 City Park Tennis Building $11.25 $11.25 $14.14 $154.83 City Park Tennis Shed Lts $83.78 $83.80 $83.81 $83.83 City Park Machine Shed $264.41 $220.75 $215.76 $92.24 City Park Shop $97.15 $91.10 $82.60 $71.99 City Park Pond $135.02 $110.30 $24.13 $11.07 June 6, 2014 Page 5 Taylor Or light $146.02 $82,42 $80.50 $65.07 Fairchild St Lights $74.10 $52.18 $53,50 $42.63 N Dubuque Terrell Mill Lts $156.59 $121.08 $111.62 $114.25 Bloomington St Gazebo $11.07 $11.07 $11.07 $11.07 Bloomington St Light $33.44 $31.97 $32.14 $33.63 Harrison Hill Light $13.81 $13.81 $27.64 $13.82 7th Ave Ct $21.15 $19.92 $20.54 $20.10 Dover St Tennis Court $11.33 $11,25 $17.64 $54.72 Dover St Storage $18.61 $22.29 $18.08 $26.32 Dover St Light Mercer $28.40 $18.08 $21.39 $38.92 Dover St Shelter $39.96 $37.18 $38.22 $46.90 Dover St Pump $42.10 $41.84 $37.63 $28.51 DoverSt Diamonds 3&4Lts $12.03 $12.03 $11.95 $14.58 Reno St Shelter $21.94 $19.49 $13.52 $11.07 Dodge St Light College Green $104.52 $83.39 $77.95 $73.83 Brown St Shelter $32.68 $31.81 $32.08 $32.44 Page St Security Light $12.63 $25.27 $12.64 Myrtle Ave Security Light $13.12 $26.25 $13.13 Court Hill Park Shelter#2 $17.38 $32.57 $16.15 Miami Or Light $12.63 $25.27 $12.64 Conklin Ln Shelter $11.07 $11.07 $11.42 $11.51 1st Ave Peninsula Bridge $57.35 $48.59 $45,61 $44.73 1117 Teg Or Shelter $35.70 $33.34 $31.51 $30.99 TOTAL $2,072.23 $1,739.12 $1,794.80 $1,999.54 June 6, 2014 Page 6 1.2 Gas Consumption: Facilities Gas Charges Jan Feb Mar Apr City Hall $3,871.39 $4,103.29 $3,829.63 $1,651.91 RALRC $5,274.54 $5,861.75 $5,574.98 $4,138.68 Mercer/Scanlon $6,938.92 $6,673.31 $4,775.09 $5,905.52 TTRA-Lodge $345.93 $396.22 $184.95 $162.94 TTRA- Marina(LP) $1,744.02 $487.10 $316.02 Fire Dept -Station N2 $118.54 $136.06 $103.68 $65.70 Fire Dept -Station p3 $473.41 $560.98 $290.67 $100.52 Fire Dept -Station 44 $612.38 $1,030.18 $634.16 $100.96 Senior Center $2,922.05 $2,889.16 $1,892.66 $1,220.73 Ashton $561.89 $497.97 $499.71 $209.39 TOTAL $21,119.05 $23,892.94 i $18,272.63 $13,872.37 City Hall rm caoo .aoo foul a Hn FW Mal pp ' ' IMn1n 6138 PSU .Ells I� Ashton House lam am mo .m 1m 0 Jr Feb Mn tyr N1. M 178 4% IM TTRA Lodge sao 4m 3m 1m fro 0 fan Feb Mar pG IDxmF 4% 432 to 149 Fire Station H3 eoo cm — - .m �m 0 fan Feb 61a, pp 'Thar. 627 603 161 m Senior Center Sapp 90p 3ma lob Imo a m Feb Mx p Ilene .I16 3. ]H19 I13l RAL Recreation Center IafN emo — uao .pp lm0 0 1>n fM Mx yv Ma/ ' 1M— Bwf 8141 6I30 jbf9 3pI9 Mercer/Scanlon 3YY➢ 1a0m sma 0 fan Feb Mm Ap • mums In69 11169 9916 lma Fire Station H2 2m Im 1m so 0 lap Feb Mai ppr Tlb ps IMF tll 87 53 Fire Station N4 1500 sm 0 I,n Feb We M The'. 7% 1110 591 a June 6, 2014 Page 8 Parks Gas Charges Jan Feb Mar Apr Lower City Park $426.36 $428.25 $384.32 $240.09 City Park Shelterk8 $100.28 $104.33 $93.12 $47.46 City Park Red Brick $157.15 $165.85 $153.20 $91.34 City Park Zoo $116.63 $128.94 $111.14 $52.80 TOTAL $800.42 $827.37 $741.78 $431.69 1.3 Water Use: June 6, 2014 Page 9 City Hall bY.O Ittl lan I� My lan iM Mr .GE6w Imm m00 em0 Ashton House I`D -- so - Ma{ n T7 Mx •Gallwu ]55 3I 65 TTRA Lodge so � o� JEW Mx bn ieb IAar •GabM I50 m 110 Fire Station ®2 sm n FA - J M. �.cEous I6s sal vro 1 Senior Center Im reE Mx •GEMm JSNI 1Yq 6M 1.3 .1 RALCRC excessive water consumption: RAIL Recreation Center s Iro T l0.tll Mercer/Scanlon -- mm' 1>n Mu •4Nbns 9500 )d00 - - ]Cm TTRA Marina — .am 1 -- zmo � --- Mr Fire Station #4 0 / Mn J IM Ma Mn e �� .ceewn an aeo 614 I Water readings are received quarterly. The next set of readings will help to determine the next course of action. June 6, 2014 Page 10 2. BAS/FMCS (BUILDING AUTOMATION SYSTEM/ENERGY MANAGEMENT CONTROL SYSTEM) These systems control facility HVAC (Heating, Ventilation, and Air Conditioning) equipment along with the associated mechanical and electrical components. In some facilities the BAS will control lighting as well. This section contains a brief explanation of existing conditions and some justification to bring the City of Iowa City BAS/FMCS systems up to modern standards. Upgrading the BAS system would have a significant positive impact on energy consumption and conservation as well as reduce unnecessary controls and equipment failures.. Many of our city facilities are using newer BAS controls (2-10yrs) that may or may not require simple software upgrades in order to maintain system compatibility with ITS servers. Energy rebates are also available for many projects of this type. Consideration should be taken to consolidate systems so that the city uses one manufacturer for all BAS/FMCS systems city wide. This strategy would have the potential for significant savings in many areas including software licensing, installation and maintenance costs as well as discounted service calls and future upgrades. 2.1 BAS Operating Summary: City Hall — There are 3 separate systems controlling this facility. A Trane Tracer system installed around 1992 handles the North Court section of the building. There is a very old pneumatic control system that is completely stand- alone and inefficient. Some of the pneumatics have been converted to DDC via a Barber Coleman DMS system that has become unreliable over the years. The conversion was never completed. Most of the issues with City Hall BAS are in progress to be corrected with the project discussed in section 4.1 City Hall HVAC Replacement Project and 4.2 Project to Upgrade Building Automation System (BAS) to Connect Three Buildings. Some equipment will still remain under older controls and will need to be addressed accordingly. RALCRC - Old pneumatics are controlling approximately 50% of field devices such as valves and dampers while the remaining half have been converted to DDC via a Barber Coleman DMS system that has become unreliable over the years. This conversion was never completed. This system is also not compatible with new computer software and cannot be accessed remotely. Manual changes to valves and controllers must be made seasonally. The system is unreliable. With the project discussed in section 4.2 Project to Upgrade Building Automation System (BAS) to Connect Three Buildings, remote connectivity will be established making it possible to access the system and troubleshoot on a somewhat limited basis until the existing controls can be upgraded. Mercer/Scanlon — This facility is currently using some of the oldest pneumatics controls in the state. Serious consideration to upgrade the controls to this facility is urgently needed. As the controls fail, upgrades will be required on an emergency basis. This makes repairs and upgrades unnecessarily expensive. Field devices and controllers are obsolete and can't be obtained. The same Barber Coleman DDC system as City Hall and RALCRC operates portions June 6, 2014 Page 11 of the facility. There is also no remote connectivity. This is the 3`d building discussed in section 4.2 Project to Upgrade Building Automation System (BAS) to Connect Three Buildings. TTRA — A new facility with what is basically considered residential HVAC equipment still under warranty. There is a DDC system by Andover Controls "Continuum" that controls 1 ERU (Energy Recovery Unit). Continuum is connected via the city network and is controlled from the Facilities office. Fire Stations — Station 2 has a fairly new DDC "Metasys" by Johnson Controls. Installed in 2009, it needs to have a simple "maintenance" update in order to allow system connectivity to the city server upgrades. Station 4 has a newer DDC "Metasys" by Johnson Controls. The BAS has connectivity and is operating as designed. The Center — has a fairly new DDC "Niagara" system by Schneider Electric. Installed in 2009, it needs to have a simple "maintenance" update in order to allow system connectivity to the city server upgrades. Other City Facilities — there are several facilities throughout the city with HVAC equipment operating via a BAS system that has not yet been viewed by the Facilities Manager. As the departments/divisions and building operators become acquainted with the position of Facilities Manager and the role it involves, and opportunity presents itself to review the system controls, system summaries and status reports will be incorporated into the monthly report. 2.2 BAS controlled Equipment Operating in a Manual, Operator, or Failure Mode: City Hall, RALRC and Mercer/Scanlon have several devices, valves and other equipment components operating manually. This is mainly due to equipment age and system capability. 2.3 Overrides to Sequences of Operations in Effect: Several pumps and fans are overridden "on" or "off' under various circumstances. In some cases, this has become the norm. This is primarily due to lack of functionality and age of BAS systems. It also causes energy waste. 3 ADDITIONAL SERVICES WORK 3.1 Contractor Service Calls: Prime Mechanical was called to various sites for several issues. One of which was to make an emergency repair to the City Park Pool main drain. A 10" cast iron pipe incurred some damage and the pool could not be filled until the leak was repaired. It is unclear at this time how the pipe was damaged. There has been construction in the immediate area with the new wading pool being installed. Valu-con was contracted to repair steps and make a partial sidewalk repair on the east side of City Hall. June 6, 2014 Page 12 3.2 Contractor Service Contract Work: We are currently working with the Purchasing Department to develop an RFP for a new HVAC Preventive Maintenance contract. HVAC equipment lists are completed for the entire city and the process continues to move forward. 3.3 Work Status and Projected Completion: We are currently developing schedules and assignments for maintenance and custodial staff in an effort to reach higher standards of facilities appearance and public perception. MW staff has been given the opportunity to participate in a voluntary mechanical aptitude test with 4 staff members responding. The test will be taken next month. The results are expected to aid in forming staff training and development goals. 3.4 Project Requests: 3.4a Pool temperature control/automation — a new heat exchanger has been ordered and will be scheduled for installation during the next pool shutdown period. A proposal for the automation portion came in at $11,391. We are looking at other options to reduce the cost. Automating the pool control will have a significant energy saving impact and reduce operating costs long term. 3.4b Technology Plan — We are working with contractors and technicians in developing a Technology Plan that will outline a long term course of action to upgrade and retrofit BAS/EMCS systems city-wide. The 5year plan is intended to aide in requesting capital for CIP funding to bring the City of Iowa City energy management, building HVAC, lighting and other equipment to modern standards. The 151 phase of the plan has started with the projects outlined in section 4 of this report. 4. PROJECT STATUS REPORTS 4.1 City Hall HVAC Replacement Project: PHI PD/FD RTU replacement —Substantial completion was 2 days late due to unforeseen circumstances. No liquidated damages were incurred since the weather was cool enough not to require cooling in the spaces concerned. A punch list was submitted to Day Mechanical to be addressed before they're pay app is approved. PH2 North Court RTU replacement — A 95% DID meeting was held. It is anticipated to set a public hearing and go before council in June. 4.2 Project to Upgrade Building Automation System (BAS) to Connect Three Buildings. This project is underway. The software is installed and Baker Group is building graphics. Scheduled completion is he week of June 9. We may also be extending this project to include connectivity to Fire Stations 2 and 4 along with the Senior Center as mentioned in section 2.1 BAS Operating Summary. Costs should be minimal with details to follow. June 6, 2014 Page 13 5. WORK FLOW 5.1 CMMS (Computerized Maintenance Management Software) This software maintains a database of information for maintenance operations. This information is designed to enhance the productivity of maintenance workers. It also helps the management team make informed decisions, such as calculating the cost of machine breakdown repair versus preventive maintenance or outright replacement, which leads to better allocation of resources. Any asset, be it equipment or personnel performance can easily be tracked and adjusted accordingly. 5.2 Antero — the CMMS database We have spent several months gathering equipment lists and other pertinent data to enter into the system. A maintenance staff member is being trained on the system and assists with some data entry duties to help expedite the process moving forward. We are nearly ready to run a test batch of recurring work orders for auto generation. We are excited to be having this software very close to implementation. 5.3 Completed Work Order Summary: Work orders are being completed using a temporary format which will be in place until staff is trained on Antero is functional enough to enter work orders manually. Work orders are kept on file. City Hall — There were 121 work orders completed. Normal daily maintenance/custodial routine = 64 Building occupant requests = 40 In-house maintenance repairs = 15 Service calls to contractors = 2 RALRC - There were 140 work orders completed. Normal daily maintenance/custodial routine = 88 Building occupant requests = 31 In-house maintenance repairs = 21 Service calls to contractors = 0 Aquatics = 0 Mercer/Scanlon - There were 70 work orders completed. Normal daily maintenance/custodial routine = 41 Building occupant requests = 0 In-house maintenance repairs = 10 Service calls to contractors = 2 Aquatics = 17 Other Aquatics Facilities - There were 25 work orders completed. Normal daily maintenance/custodial routine = 8 Building occupant requests = 0 In-house maintenance repairs =16 June 6, 2014 Page 14 Service calls to contractors = 1 Aquatics = 0 TTRA - There were work 5 orders completed. Normal daily maintenance/custodial routine = 2 Building occupant requests = 1 Service calls to contractors = 2 Ashton House - There were 4 work orders completed. Normal daily maintenance/custodial routine = 1 Building occupant requests = 3 Service calls to contractors = 0 Fire Stations - There were 2 work orders completed. Building occupant requests = 0 In-house maintenance repairs = 2 Service calls to contractors = 0 The Center — There were 0 work orders completed. Normal daily maintenance/custodial routine = 0 Building occupant requests = 0 In-house maintenance repairs = 0 Service calls to contractors = 0 5.4 Staffing An MW1 at Mercer has been placed on medical leave under the FMLA for a non -work related injury. A temporary custodian position has been posted to fill in while short-handed. 5.5 Miscellaneous Upon request of the fire department, we have taken the lead in monitoring and controlling fire stations 2 and 4 HVAC equipment. June 6, 2014 Page 15 Boiler and Chiller water chemical levels were reported normal at last sample submitted to Aqua Technologies Inc., (ATI). 7.1 A plan to address pool leaks at RALRC is under development. 7.2 RALCRC Gilbert St handicap ramp has incurred some damage from the winter. Engineering will review for modifications to ensure ADA compliance. An initial cost estimate to replace the ramp is $8500. 8.1 TTRA- Tricon was asked to look at the 14' bay doors at the marina. They are heavy and difficult to operate. A temporary solution to add a trailer jack has been installed. The building design team has taken the issue under review. 8.2 Ashton House — a clogged floor drain in the basement custodial closet has uncovered the issue of concrete plugging the trap under the floor. ISC will address. 9. LOST TIME ACCIDENTS, SAFETY PROBLEMS, OR HAZMAT INCIDENTS: No issues to report for May. 10. MAJOR EQUIPMENT OUT OF SERVICE: No equipment outages to report for May. To: Mike Moran From: Russell Buffington Date: June 6, 2014 Re: Monthly Report for May 2014 of low, c � }yl 1� C-f^.uY3 <r 1, s y� OA1311d i" _Cern tern a non-perpettml carer cemetery established in 1843 I. OPERATING AMOUNT A. Interments ( 1 1) 1. Cremation, Resident 2 tr $200.00 $400.00 2. Cremation, Resident w/ tent 2 @ $280.00 $560.00 3. Cremation, Resident, Weekend w/ tent 1 a $460.00 $460.00 4. Cremation, Non-resident 3 @ $300.00 $900.00 5. Niche Cremation, Resident I @ $200.00 $200,00 6. Adult Full Burial, Resident I a $600.00 $600.00 7. Adult Full Burial, Non-resident, Tent, Lowering Device, No -vault maintenance fee 1 @ $1,280.00 $1,280.00 INCOME FROM INTERMENTS $4,400.00 B. Lot Sales 1. Resident, Columbarium Niche 3 rt $700.00 $2,100.00 2. Resident, Adult Monument Space I a $700.00 $700.00 3. Resident, Adult Flush Monument Space 2 @ $600.00 $1,200.00 INCOME FROM LOT SALES $4,000.00 TOTAL INCOME FROM INTERMENTS AND LOT SALES $8,400.00 Alvlm, Adaw,n : Phone (319) 3�6 5105 L v ation: 410 E,rst 1-Virsivngtor Strcrt Fes (31'97 3°I-41;9 1000Btozon sh"Of Iowa Cth/, 1A SZ2d4132u lower Chl, IA 52240 II. CEMETERY MAINTENANCE HOURS A. Funerals 68.5 B. Grounds Maintenance 71 C. Equipment Repair & Maintenance 45.5 D. Building Maintenance 16 E. Cemetery Plantings 32 F. Mow Cemetery 174 G. Trim Cemetery 158 TOTAL CEMETERY MAINTENANCE 565 HOURS III. BUDGETED & SPECIAL PROJECTS HOURS A. Lot Locating 9 B. Lot Sales 3 C. Meetings 6 D. Genealogy Requests I E. FuneralOT 7 F. Monument Repair 0 G. Grave Repair 0 H. Safety Training 0 1. Memorial Day Hours 8 J. Mow Cemetery OT 4_5 TOTAL BUDGETED & SPECIAL PROJECTS 38.5 HOURS IV. ADMINISTRATION & OFFICE DUTIES 112.5 HOURS V. OUTSIDE MAINTENANCE HOURS A. Mow Outside Cemetery 2 B. Trim Outside Cemetery 2 TOTAL OUTSIDE MAINTENANCE 4 HOURS TOTAL CEMETERY HOURS 855 HOURS *total hours include the following 1. Leaves with pay 2. Rest periods 3. Supervisor x 1 4. PFT x 2 5. Seasonal Full Time x 2 bfailiug Addwss: Phone (319) 356-5105 La'ation: 410 East W 5hington Sheet Fax 019) 342411-9 1000 Emunl Street Iowa City, L 52240-1826 lumoz 011. M 52240 DEPARTMENT Of PARkS & RECREATION DIVISION Of PARks, FORESTRY, ANd CBD Date: June 3, 2014 To: Michael Moran, Director From: Zac Hall, Superintendent Re: Parks Monthly Report — May 2014 I. GENERAL OPERATIONS a, Mowing b. Parks Security c. Shelter and Restroom Cleaning, d. Construction e. Construction — Hickory Trail Park f. Garbage g. Equipment Repair & Maintenance h. Playground Maintenance i. Carnival j. Miscellaneous k. Facility Repair I. Meetings/Office Work m. Plumbing/Electrical Repairs n. Hauling o. Weed Eating/Mulching p. Pick up and Drop off Materials q. Cleaning 1 HOURS 1081.5 358 344 213.5 190.5 178.5 134 127.5 111 29.5 66.5 57.5 53 52 48 39.5 26.5 r. Ground Repair s. Picnic Table Repair t. Remove Homeless Camp u. Spraying v. Vandalism Repair w. Dog Park x. Hearing Test y. Seeding z. Replace Fire Extinguisher 21 17.5 9 9 9 8 3 2 1.5 DEPARTMENT Of PARks & RECREATION DIVISION Of PARks, FORESTRY, ANd CBD Date: June 4, 2014 To : Michael Moran, Director From: Zac Hall, Superintendent RE : Forestry Monthly Report — May 2014 1. FIELD OPERATION / SERVICE REQUESTS HOURS A. SERVICE REQUESTS: 21 Trees Pruned = 10 Trees Removed = 11 144 8 hours for posting "No Parking " signs EAB Requests 18 hours removal of 1-11I included B. PARKS/ SPECIAL REQUESTS:9 Trees Pruned= 11 Tress Removed =9 41 EAP Prep and Inspection 16 hours includes removal of 1 — III includes C. ENGINEERING DEPT 2< 'frees pruned 6 Trees Removed= 2 26 Wade Street wind Orchard Street II FIELD OPERATIONS/ GENERAL A. ROUTINE STRE1 TMAINT Trees Pruned =71 `frees Removed = 10 129 Watering Street Trees = 29.5 hours EAB Prep = 58:5 hours Removal of 1-B and 3-111 included B. ROUTINE PARK MAINT: Trees Pruned = 42 Trees Removed = 17 147 Watering Park trees - 2hours EAB Prep — 6 hours removal of 1 —B included See Attached detail C. 'FRAIL MAINTENANCE: 23 D. TRANSPLANTING & HAND PLANTING 48 S Hickory Hill Park — Memorial tree —1 Purple Birch Lindennnann Green Space — 6 Crabapples E. NURSERY 77 Planting bare root stock, staking trees and watering trees E, TREES REMOVED Size Distribution CLASS 1 =24 CLASS II = 18 CLASS III = 12 III. MAINTENANCE OPERATIONS A. CIIMN SAW/ HAND TOOL MAINT 32 Saws & chains 23 hrs Hand tools 9 hrs B. EQUIPMENT TRANSFER/ EQUIP MAINT. 29 Transfers 26 hrs Maintenance 3 hrs C. SHOP TIME 14 Cleaning 12 hrs Errands 2 hrs. D. DUMP CHIPS/ Ft1EL TRUCKS IV. ADMINSTRATION i A. New Service requests 69 B. Contract Prep (Stamp) 5 C, Planting Prep 12 D. Workshops & Training 12 E. Office Work, Logs & Meetings 28 F. Other 29 Parks Garbage Run— 5 hrs, CDLTesting— 19hrs EAB — 5 hrs. FORESTRY WORK COMPLETED IN VARIOUS PARKS, RIGHT OF WAYS & GREENSPACES LOCATION Trims Removal Class Work Hours Chipping Only Other City Park 1/III 18 Hauling wood Court Hill Park 3 Cutting Poison Ivy Wetherby Park 1 1 Stu is Ferry Park 3 1/I 2 Ashton House 23 Flood Lots ( Normandy Dr) TTRA 4/I, 3/II, 1/]11 47 Plus trail work _ 34 31 Napoleon Ball Field Parking Lot _ 4 2 _ - Napoleon Park Shop Brush Pile 4 Hauling off landfill Lindemann Green Space 6/I 8 Various Parks 8 Watering S Et\B PreP TOTALS 42 11/I, 3/II, 2/III 147 hours 'frail Maintenance Napoleon Trail 5 7 Veg Vegetation Removal Hickory Hill Trail - 6 --- - Vegetation Removal Hwy # 6 Trail 23 S/I 8 East of Gilbert St Cumberland Trail 2 Vegetation Removal TOTALS 28 S/I 23 Hours City of Iowa City PARKS AND RECREATION DEPARTMENT 220 S. Gilbert Street To: Nlike tNIormn, Director FROM: Joe Wagner, Turf Specialist DATE: June 4" 2014 R1 : Athletic Facilities May Report Events for May 2014 are at 1,015 compared to 1,081 for May 2013 and 1,045 for May 2012. These numbers seem to be an average for the Month of May over the past few years. We did have 3.4 rain clays in May 2014 which can result in 25 less events per day. 2. Labor hours for May 2014 are at 2,569 compared to 2,311 for May 2013 and 1,974 for May 2012. Total labor hours are up for May 2014 compared to previous years but we have staff doing projects in facilities and on rainy days we have staff still working oil projects, In previous years we have sent staff home during rain events or have had them come in late. 3. Soccer events for May 2014 are at 378 compared to 518 for May 2013 and 284 for May 2012.Youth soccer ended May 181" this ,year and this is why soccer is down this May but was up in April 2014. Baseball events for May 2014 are at 343 compared to 240 in May 2013 and 397 for May 2012. Rain dates again have this number down compared to previous years, Softball events for May 2014 are at 239 compared to 258 for May 2013 and 284 for May 2012. The Iowa city Girls Softball league does not have as many teams/players as previous years and this is part of the reason the numbers are lower. The Co-ed Ree league oil Sunday evenings did not start ill May due to construction at the University of Iowa Softball Complex so that delayed the start of this program on Sundays evenings at Mercer. Pat,]( and this has dropped softball events as well. 4. Mowing inours are up 1'0, May 2014 at 350 hours compared to 186.5 fo, May 2013 and 237.5 for May 2012, Staff is now trinnning at Cite facilities as to park staff doing this in the past years. We are hying to free up pork staff for projects as well. 5. Irrigation hour are dorm in May 2014 at 55 compared to 117 in May 2013 and 190 in May 2012. Timely rains in may has caused its to not use it as much o repair it as much this past year. G. Seeding hours are at 74 for May of 2014 compared to 10 in May 2013 and 17.5 in May 2012. We had lost a lot of turf over the winter due to the subzero temps and have been working bard to repair and regrow the Turf on the fields and this is why this number is up. -cT -cT c� -c� 0 0 0 0 0 0 o M,3o -�T c� M -15 ul" CD TA -In CT O O cl u� ul o 0 0 0 o m CR C! q 6 4 6 "i 6 6 616 6 r� of 6 o6l6i 4 6 6 06 4 4 4 6 r� '61 06 6 Ti O In O to N,m 4 oj Id 7" jr O c 0 p 0r 0-- 0 0 H-6- w u 0 m U h � m to LL O ® 0 O ❑ C W 0 x m 0 H 0 n 0 N 0 v 0 r o 0 111 m vi m �1 o N 0 0 0 0 0 0 m n a vi in of m o vi .i C N J W N D N 40 = m I, S O o May Ground Litter CBD StScp _ 21 515 40,5 43 .' 29,5 1855 Parks CBD 3 5 2.5 6 2.5 . Hazardous Clean Up Parks Designed Flower Bed CBD , ,.. =77--77 5 49 r�2 I Maintenance Parks 25 5 26 5PlantingCBD Parks CBD 4 4 Watering Parks 0 CBD 0 Fertilizing Parks CBD 3f 120 104 44 19,5 323.5 Mulching Parks 0 CBD 2 4 "'1 7 14 Pruning Parks 0 CBD $ 16 13 25 4 15,5 53.75 Weeding Parks 17 2.5 19:5 CBD $ 12 20 0 15.5 65.5 Mow/Cord Trim parks 0 Equip Repair & CBD S,x 165 6 " ' 3 37:75 Maintenance Parks i 0 Event Prep/Cleanup CBD 1.5 1.5 Parks 0 CBD 7 6 6 24 Graffiti Removal Parks 0 0 Vandalism RepaiVace 0 Play Equipment/SurCBD 1 1 Maintenance Plaza Fountain 1 1 2 Maintenance 0 9 Construction 0 Art Sculptures/Liter 0 Plaques0 3 3 Ash Urns Parks 0 CBD 0 Benches Parks 777777 -0 Bike Racks/Bikes CBD 77777777 1 1 Parks 77777 0 CBD 1 77 1,5 2.5 Drinking Fountains Parks77777 77777 0 Light Poles/Outlets CBD 77777- 0 Parks 0 CBD 2 2 Posting Pillars/Kiosks Parks 1 0 CBD Recycle Units parks 9 CBD 0.5 Trash Receptacles Parks 0 CBD 77777777 0 Tree Grates parks 0 Water Hydrants/Hose CBD 777777777 1 Bibs Parks 0 CBD 7 —'2 2 11 Landfill Parks 0 CBD 2 - 8 Cleaning/Organizing Parks A CBD _ 0 Snow Removal Parks CBD 0 Holiday DBcor Parks 0 CBD �$ 525 16��A$ 112:5 Administrative Parks 1,5 1i5 CBD db 1,5 625 5 S,5 33.5 Misc Parks 7= 1 3 Grand Taal Par 69 Monthly Total a Grand Total CBD a Grand Total Parks