Loading...
HomeMy WebLinkAbout10-08-2014 Parks and Recreation CommissionAGENDA PARKS AND RECREATION COMMISSION 4:00 p.m. WEDNESDAY, OCTOBER 8, 2014 Meeting Room B Robert A. Lee Community Recreation Center 4:00 p.m. Call to order Approval of minutes from meeting of September 10, 2014 4:02 p.m. Public Discussion of any item not on the agenda. 4:05 p.m. Neighborhood Open Space • Prairie Hill (pending) 4:15 p.m. Depart for tour MINUTES DRAFT PARKS AND RECREATION COMMISSION SEPTEMBER 10, 2014 ROBERT A. LEE COMMUNITY RECREATION CENTER — MEETING ROOM B Members Present: Suzanne Bentler, David Bourgeois, Larry Brown, Clay Claussen, Maggie Elliott, Cara Hamann, Katie Jones, Lucie Laurian, Joe Younker Members Absent: None Staff Present: Mike Moran, Zac Hall, Chad Dyson Others Present: Connie Peterson, Steve Schuette, Temple Hiatt, Rob Rindels, Del Holland CALL TO ORDER Chairman Claussen called the meeting to order at 5 p.m. Lucie Laurian introduced Jan Crawford, Director of Planning Consultants Ltd., who is visiting from Auckland, New Zealand. Commission welcomed her. RECOMMENDATIONS TO COUNCIL: (to become effective only after separate Council action): None OTHER FORMAL ACTION: PUBLIC DISCUSSION: None. FRIENDS OF HICKORY HILL PARK Moran is working to find a point of contact for the Friends of Hickory Hill to report to the Commission. He noted that they have made their request to the City Council to move up their funding for improvements to the park. DogPAC: Connie Peterson reported that DogPAC signs for the dog parks and been approved and complete and are currently in production. These signs will allow for the removal of some redundant signs throughout the parks. She also announced that DogPAC has passed two resolutions over the past month. One resolution is a request to include a dog park in the River Front Crossings Plan and the other is a request to allow 10 acres of the park land be PARKS AND RECREATION COMMISSION September 10, 2014 Page 2 of 7 dedicated as a dog park. Peterson asked Commission where they are in terms of conversations about the Riverfront Crossings plan. Moran stated that there has been very little discussion to date but expects there to be a concept plan available for Commission review in October. A public meeting will be scheduled in either late October or early November. He further noted that the consultant has created two design plans, one of which is a more passive park and the other includes a 19-acre water park. Moran did state that he does not believe that a 10-acre dog park would be approved as this would incorporate over half of the planned park space. AFFILIATE GROUP DISCUSSION: Claussen noted that the department and commission are working on a directive from the City to get more funding from our affiliate groups while creating something that works for both the department and the affiliate groups. Dyson said that as the department heads into the budget planning process, they will revisit ways to maintain the 50% cost recovery goal while keeping sustainable service. He met with the Iowa City Kickers Board as well as Iowa City Girls Softball who will attend the November Commission meeting. Tonight Luke Villhauer and Rob Rindels were present representing Iowa City Boys Baseball. Villhauer noted that their biggest concern is that they price themselves out of the boundaries for some families and may start to lose some participants. He stated that numbers have been declining over the last few years noting many outside factors such as video games and cable TV and many kids no longer grow up with baseball as an only option anymore. He said there were fewer than 300 enrolled in the spring and has 185 for the fall. Fees are currently $85 per participant per season. Claussen asked if Boy's Baseball offers a scholarship program. Villhauer said that they do and that there are a few that take advantage of that. He said that they are reliant on word of mouth, returning participants and communication through the Virtual Backpack (online newsletter put out by the school district). Many of the schools will not let them post flyers. There seems to be no one great way to get information out there anymore. Getting in front of the parents is tough. Brown asked what the rationale is of the school district for no allowing flyers etc. Dyson said that he and Temple Hiatt met with Dr. Murley, Superintendent of Schools, a couple of years ago. He said that it had become too much work for the schools to sort flyers and that they were beginning the process of going paperless. Information is allowed to be in the Virtual Backpack for one month only. Brown expressed his concern for those families who don't have access to computers at home and said that as a community there needs to be a better way to get the word out there. Younker suggested that it is not the Commission's place to get involved in school policy but would be good to see the policy. Dyson noted that the district does still allow for the Recreation Center to send out hard copies of the program guide through the schools. The general contact information for the affiliate groups is included within the guide. Moran noted that there have been discussions about making this publication available online only as well. Laurian asked if more information regarding these affiliate programs could be included in the guide. Dyson agreed that if dates and times are available they could look at this as a possibility. Jones agreed that since these books go out in hard copy that perhaps this idea would be the best way to get the information out. Temple noted that timing is critical and that since these books go out three times a year, one of those times being December, and with registration not starting until February for baseball/softball, many forget about it. Brown stated that he would further investigate the rationale of the School District when it comes to distributing information to families. PARKS AND RECREATION COMMISSION September 10, 2014 Page 3 of 7 Moran asked Villhauer how Boys Baseball is doing financially. He stated that it is financially sound but would like to see more participation. The more we can keep the costs reasonable for them the better. Claussen reiterated that the City has been told that they are going to have less contribution towards programs so have to find a way to increase revenue or decrease expenses. Claussen suggested that perhaps these groups look at hiring a professional fundraiser, noting that of course this would be an additional cost for them but may be a worthwhile potential. Claussen, on behalf of the commission and staff, expressed his gratitude for all that these affiliate groups do for the community. Villhauer said that he would provide the department with a financial report and Dyson can share this with the Commission at the October meeting. Dyson noted that after the November Commission Meeting, he will put together a recommendation for the Commission to review. NEIGHBORHOOD OPEN SPACE REVIEW: Prairie Hill: As per the Staff Report prepared by Bob Miklo, this is a proposal to develop a co -housing community. This property is adjacent to Benton Hill Park. City will transfer 1.97 acres of the 7.8 acre site along Miller Avenue to the City of Iowa City in exchange for 1.85 acres of the western part of Benton Hill Park for an access road to Benton Street. Of that, 1.12 acres to the west of the access road will be protected by a conservation easement and continue to provide public access, but will be owned and maintained by the Iowa City Cohousing community. The neighborhood open space requirements were satisfied with the approval of Ruppert Hills final plat in 2003. That plat included the dedication of Outlot A Ruppert Hills, which later became the eastern part of Benton Hill Park. Commission reviewed and approved the proposed trade of land of the western portion of Benton Hill Park for Outlot A. Staff has determined that Outlot A is more conducive to use as a neighborhood park and supports the trade. This will go to Planning and Zoning Commission on 9/18 and then to Council. RECREATION DIVISION REPORT: Dyson noted that staff is continuing plans for the Robert A. Lee Community Recreation Centers 501i anniversary celebration scheduled for Saturday, October 4. He encouraged all to attend. PARKS DIVISION REPORT: Hall reported that staff is wrapping up the rest of the flood work and met with FEMA today. They are starting the process of project worksheets and passing those on to FEMA. Hall continues to work with many volunteer organizations. The University of Iowa Law School had 50 students who came out and assisted with the repurposing of 30 dump truck loads of sand that was removed from City Park and used at the Terry Trueblood Recreation Area (TTRA) to shore up the south boat launch. Hall reported a total of 400 volunteer hours. At FEMA's rate of $17.55/hr. that totals approximately $7000 in work last month. PARKS AND RECREATION COMMISSION September 10, 2014 Page 4 of 7 Hall reported that the benches are in place at the dog parks. These benches are of a new style and made of composite material. Six new benches and six new trash receptacles were placed at the dog parks. Parks staff will be installing a dog statue at one of the parks that was purchased years ago by Terry Trueblood. Hall said that staff has placed Prairie in Progress signs at TTRA due to a number or calls that have been coming in. Hall said that they have a shelter in storage that was purchased a number of years ago. They are in the process of installing this at Pheasant Hill. He said this shelter will tie in very well with this park and its other unique features. Hall stated that there have been no more Emerald Ash Borer reports of late. He had received two reports after the first positively identified bug. However, these two reports proved not to be Emerald Ash Borer. Moran and Hall will go to Council on October 7 to give a preliminary assessment and plan. Jones noted that she was happy to see the Prairie in Progress signs placed at TTRA. She suggested that perhaps there be signs put in at Wetherby Park noting the edible forest. DIRECTORS REPORT: Ashton House: Moran stated that the handicap ramp is in. There is a temporary railing in place at this time to be replaced with permanent railing soon. Project GREEN is continuing their work on landscaping. Tower Court: Moran met with the Tower Court Neighborhood. There is $72,000 in Neighborhood Open Space funds available to enhance this park. Willow Creek Neighborhood Meeting: Moran will be meeting with the Willow Creek Neighborhood on September 18. The firm that was hired to redesign the park will be in attendance. They will then come back to staff with a concept plan. This project will go to bid this winter with construction beginning in the spring. Parks Tour: Moran reminded Commission that they will go on their annual parks tour in October. This meeting will start at 4 p.m. (rather than the usual 5 p.m. start time). The Commission will have a short meeting and will then board the bus for the tour at 4:30 p.m. Some of the sites on the list to visit include City Park Pool, Sand Prairie Park, South Hickory Hill Park Bridge, Ashton House, Benton Hill and Wetherby parks and the Chadek Property. A meal will be provided. Snow Routes: With the ongoing budget cutbacks, staff will be reviewing their current snow routes. One possibility is the decision to not do any snow removal on weekends unless it is a very serious snow event. The department spends a lot of money in overtime wages during these events. Staff will meet with the Streets Superintendent as well as the Public Works Director to discuss. Elliott was concerned about liability and asked if there are more trails that are more appropriate for cross-country trails. Moran noted that criteria for neighboring PARKS AND RECREATION COMMISSION September 10, 2014 Page 5 of 7 cities are any trails that are connected to schools must be cleaned. Elliott suggested that signs be put up letting people well in advance so that people are not surprised when the trails are not cleaned. Bentler recalled that in looking at the snow routes last year there were a number of places that shouldn't be Parks jurisdiction anyway. Moran stated that this is an ongoing debate. He stated that there is an agreement with the DOT that Parks staff clean some bridges and also an agreement to clean some Public Works Property. Staff has already made some changes to mowing routes. Laurian asked if staff has considered a no - mow approach. Hall said that they are looking at more prairies for less mowing. Elliott said that in terms of public areas, not cleaning them is not a good idea on weekends. Hall said he could get winter trail use numbers from MPO staff. Brown noted that he does a lot of walking in the winter and prefers that the trails be snow covered rather than the ice that can be created by cleaning, melting and refreezing. Naming Policy: After receiving a proposal to name a street in City Park the Hughes Memorial Drive, Moran revisited the city's Naming Policy. The policy states that a person must be deceased for two years before such a request can be approved. CHAIRS REPORT: None COMMISSION TIME/SUGGESTIONS FOR FUTURE AGENDA ITEMS: Jones asked when prairie burns are done how it affects the turtle population. Moran said they would likely avoid that particular area. Laurian noted that they do prairie burns at Kent Park in the areas where turtles live and it does not seem to affect them. Hamann asked if there were any updates regarding the Chadek Property. Moran said that the purchase agreement will go before Council on October 7. The environmental study has been complete and Terracon said they look very clean. Moran should receive a final report from Terracon on 9/15. Younker reported that the Ad Hoc Senior Services Committee will be scheduling some additional meetings so he may be absent from some future Commission meetings. He further stated that the Committee is making progress and that he appreciates any input from Commission and staff. Bourgeois said that he approached both Iowa City Landscaping and Quality Care and both have agreed to design and maintain the entrances to the dog parks. Elliott noted that she appreciates the prairie signs at TTRA. Jones asked how the joint agreements are going with the schools. Moran noted that staff has not heard back from them in some time. He anticipates they will develop a 28E agreement similar to what is currently in place between Grant Wood and Mercer. Jones said that the Iowa Public Health and American Heart Association are very interested in joint agreements so would like to see what the schools have. Moran said that he can give her a copy of what has been proposed so far. PARKS AND RECREATION COMMISSION September 10, 2014 Page 6 of 7 Laurian asked if transportation can give Commission trail use reports that would include a map of trails including intersections of major roads as well as any accident data. Moran noted that Kris Ackerson with MPO was in attendance at a recent commission meeting. Laurian said she does not recall that they looked at where the major concerns are. Moran will talk to MPO for data and will revisit at the November Commission meeting. ADJOURNMENT: Moved by Bourgeois, seconded by Brown to adjourn the meeting at 6:23 p.m. Motion passed 9-0. PARKS AND RECREATION COMMISSION September 10, 2014 Page 7 of 7 PARKS AND RECREATION COMMISSION ATTENDANCE RECORD NAME TERM.c- EXPIRES Suzanne 1/1/17 X X NM X X X O/E X --X X X X X Bentler David 1/1/15 X X NM X X X X -- X X X X X X Bourgeois Larry 1/1/18 X X O/E X X X Brown Clay 1/1/14 X X NM X X X X X X X X X X -- Claussen --- - - — M- 1/1/13— X X NM X X X O/E X -- -ag—gie-- X- O/E X X X Elliott Allison 1/1l14 O/E X NM X Gnade -- Cara 1/1/16 X X NM - X-- X X X X X X X X X Hamann Katie 1/1/18 * * * X X X X X X X X X Jones --. -- __--- - - -----_ ..__----X----__ Lucie 1/1/15 X X NM X OIE X X X O/E Laurian John 1/1/14 X X NM X X Westefeld Joe 1/1/16 X O—IE NM X X O/E X X X 0/E X X X Younker KEY: X = Present O = Absent O/E = Absent/Excused NM = No meeting LQ = No meeting due to lack of quorum = Not a member at this time city of iowa city PARKS AND RECREATION DEPARTMENT 220 S. Gilbert Street TO: Michael Moran PROM: Chad Dyson DATE: October 1, 2014 RE: September 2014 Monthly Report S.P.I. New staff members were hired and attended SPI orientation sessions in preparation for the fall programs. (Master Plan: Enhance Program Development and Maximize the Planning Process) SPI Pall Session I Special Olympics programs had high registration numbers with 57 participants in Track & Field, 54 in Bocce, 21 in Flag Football, and 27 in Soccer. The SPI "Delicious Delectables" cooking class had 30 participants. (Master Plan: Enhance Program Development and Track Performance Measures) 76 Recreation Division Special Olympics athletes competed in the SO Area Bowling Tournament in Cedar Rapids. (Master Plan: Enhance Program Development) Staff met with music therapists from West Music to discuss the possibility of collaborating with the Recreation Division to co-sponsor the SoundReach program for persons with special needs. The choral group has grown and a larger practice and performance space is needed. Many SoundReach members are also participants in the SPI programs. (Master Plan: Enhance Program Development and Collaborate with Community Organizations and Businesses) To provide leadership, network with other professionals, and to learn about new trends in parks and recreation, staff attended the IPRA Pall Workshop in Dubuque. (Master Plan: Provide Staff with Education Development Opportunities) Staff gave a presentation about the Special Populations Involvement program to the UI Introduction to Therapeutic Recreation class. In addition, staff is working with Ul faculty on an Inclusive Recreation class being offered in the spring. (Master Plan: Increase Awareness of Program Offerings) I - SCANLONI First session of Youth Sports started: K-61s grade flag football, Preschool soccer, Taekwondo, Youth Skateboarding and 3rd-6'h grade volleyball. An ICRD Staff and volunteer coach meeting was conducted prior to each program. (Goal 1: Maximize the Planning Process). This fall all Football and Soccer programs are parent coached, unfortunately no team sponsorships. (Goal 7: Assure Financial Sustainability) Recreation Division September 2014 Monthly Report Page 2 of 3 • The MPASCG has extended howl for pickle ball this fall by 4 hours. It includes Mondays and Wednesdays 12-3 pill and Thursdays 12-2 pm. (Goal 10: Plan for Continued Equitable Level of Service as Community Grows) • The MPASCG held Friday Fun Night on Friday, September 12. Friday Fun Nights replaced Family Fun Nights. Goal was to focus on age groups 3-12 and families instead of just 3-6. For $5 per child activities include, swimming, 3 inllatables, roller-skating, craft project, light space wall and more. 27 youth attended the event in September. (Goal 10: Plan for Continued Equitable level of Service as Community Grows) • Continue to do on line post rental evaluations for all rentals at the Mercer Aquatic Centel - Scanlon Gym. (Goal 45: Solicit Community Involvement and Feedback) Continue promotion of upcoming youth sports through "youth sports page" on ICRD website, active net and flyers. (Goal 6: Increase Awareness of program Offerings) Continue to do on line post rental evaluations for all rentals at the Mercer Aquatic Center Scanlon Gym. (Goal 45: Solicit Community Involvement and Feedback) SPORTS/WELLNESS Staff posted upcoming program information on the department's web page. Staff also posted an article on the department's website regarding the facilities hours during the Labor Day holiday. (Goal # 6 — Increase Awareness of Program Offerings). Staff is working with the City Engineers Office in getting bids for a glass wall around the fitness room. (Goal #9 — Continue to Provide Equitable LOS in Existing Parks and Facilities). Staff posted upcoming program information on the three slide -show monitors in the RAL Recreation Center. Slides about youth basketball, gymnastics session #2, and the I lalloween Parade are just a few of the new ones. (Goal # 6— Increase Awareness of Program Offerings). Fall volleyball registration ended September 19. There are 8 teams on Sunday and 12 on Tuesday. 2013 total: 10 on Sunday and 15 on Tuesday. (Goal # 6 — Increase Awareness of Program Offerings and Goal #2 —Track Performance Measures). Fall softball runs through the end of October (weather permitting). (Goal # 6 — Increase Awareness of Program Otferings and Goal #2 -- Track Performance Measures). SOCIAL/CULTURAL Much of September was spent preparing for the IIALLOWEEN PARADE AND CARNIVAL. which is to be held Friday, October 20i. HILLS BANK AND TRUST has graciously donated $500.00 again this year to help offset the cost of this free event. (Master Plan: pursue alternative funding and reach out to those in financial need, collaborate with community organizations and business) Three preschools visited the DISCOVERY GARDEN this month. This continues to be a popular destination for parents with young children, preschools and daycares. (Master Plan: Collaborate with community organizations and solicit community input) Recreation Division September 2014 Monthly Report Page 3 of 3 ROLLER SKATING opened mid -month for the school year. Usually September is a very slow but not this year. Apparently some skaters have been waiting for us to reopen. Skating staff will be hosting a "60's Game Night" for the Anniversary of the Robert A Lee Community Recreation Center on Oct 4, the same night as the Twist and Shout Dance. (Master Plan: fun and communicate Department offerings to the public) Staff attended the VISIONING meeting held by BACKYARD ABUNDANCE to discuss the updating of the Recreation Center landscape. The plan will be unveiled also on October 4"' in celebration of the building's 50 years. (Collaborate with Community organizations) TASTE OF MARKET and KIDS DAY events at Farmer's Market were well received as usual. Hundreds enjoy these special events offered to celebrate Market and the people who shop there. (Master Plan: Fun) First session of ART, DANCE and NATURE CLASSES opened mid -September. By far, most popular are the dance classes. Youth art and nature programs also experienced satisfactory registration but adult programming fell in other than ceramic programs, AQUATICS With the winter season fast approaching we are looking into ways to develop the private lesson program. Winter is an excellent opportunity for us to experiment with times, numbers, and overall schedules. We will be resuming our Saturday private lessons this winter. They are very successful and usually fill. Due to this success we will be looking to expand these offerings, we hope that this expansion will alleviate some of the evening session's congestion. We have implemented an upgraded training regimen this past month. The new system allows for greater accountability, more efficient training times, and expanded training options. Training is something we take very seriously and our staff seems to be responding positively. JGtN US FOR SGME SPOO I CULAR HRLLOwEEN FUM COSTUME PARADE Friday, Oct. 24 . 6:15 to 6:30 pm At 6 p.m., gather at the Weatherdance Fountain on the Ped Mall Downtown. Parade: 6:15 to 6:30 p.m. No fee! ` HALLO WEEN CARNIVAL Friday, Oct. 24 . 6:30 to 8 pm At Robert A. Lee Recreation Center. All ages and abilities invited. No fee! TRICK OR TREAT NW T In Iowa City, trick -or -treating is Friday, Oct. 31 from dusk to 8 pm FOR MERE INFO 319.356.5100 . www.icgov.org/pr rp�ilkrea%on October 2, 2014 CITY OF IOWA CITY 410 East Washington Street Iowa City, Iowa 52240- 1826 (319) 356-5000 (319) 356-5009 FAX mv1v.I Cgo v. o rg MONTHLY FACILITIES REPORT MONTH REPORTED: September 2014 PREPARED BY: Scott Justason, Facilities Manager October 2, 2014 Page 2 1. ENERGY PERFORMANCE TRENDS 1.1 Electrical Usage: Electric Total Gas Total Total Calandar year 2014 Facilities Total .• Parks Total Total Calandaryear 2014 October 2, 2014 Page 3 RAL Recreation Center ssoao � - aaa gaoao xaa I(CN ° 1sn rm `:Ma< I Aw enay 1un Wt :{ a<re OKYM 5asm 1 mego sWa' 43080' njgo te9m a6{p{ avAD ' Mercer/Scanlon facto � H°ao i I 6pp0o i aaro � Saa YI(Wll 894W j HI)3° ; 851Y0 )fEN I >Nkl 881f0' 4Tyk1 �: $d$fA : TFRA Marina 3NJ Sao 1W I" soo °i1 Ianf&A+>< n " tan I Wn Iw I Aug I'. j 91(NN ]g)6 2 Say 9W 8& IM I815 1378:: ]S56 Fire Station#3 4" 30.tl { 2" j 1(Po IJ ° 1an Feb j M 1 Apr MaY I Wn fi+l j twg �'. (uxMN 414: ` JMi �IHIS }Mo ' 33� q°Sz 3az'; 6a) Senior Center gma f0000 f ° ( 1 H I feb My RIN Mry I 14a lul L Au8 � yuKvw' Isxeo xsa v4eo' 3x4Ho ^ 3�io tam j Isltoi acm �:: October 2, 2014 Page 4 Parks Electric Charges Jan Feb Mar Apr May Jun Jul Aug W.Benton St Park $24.19 $24.19 $24.20 $24.19 $24.20 $22.87 $24.05 $23.01 Napoleon Maintena nce Ga rage $14.93 $14.40 $14.23 $15.19 $18.61 $25.57 $22.59 $25.72 Na poleon B-FLD Light $26.03 $26.12 $78.98 $278.58 $598.24 $273.78 $28.13 $216.70 Napoleon Concessions $54.81 $49.38 $49.99 $44.73 $118.89 $284.69 $113.30 $161.30 Rocky Shore Dr $11.07 $11.07 $11.07 $11.07 $11.07 $11.07 $10.33 $10.00 Green Mtn Dr Pheasant Hill $13.12 $13.12 $13.12 $13.13 $13.12 $13.12 $13.01 $13.01 550 Greenwood Dr $26.74 $28.60 $28.34 $27.20 1 $31.09 $32.49 $31.02 $27.58 City Park Pool $13.70 $12.65 $12.91 $16.15 $21.50 $34.09 1 $34.18 $28.49 City Park Stage $62.35 $52.88 $53.85 $78.04 $99.78 $200.16 $106.64 $111.03 City Pa rk Boys B-ball Lot 98 $12.74 $12.21 $12.30 $12.38 $12.30 $12.46 $10.80 $12.30 City Pa rk Boys B-ball Lights $30.88 $25.80 $25.77 $27.20 $99.96 $154.75 Credit JW e7) Crma(5 e) City Park Boys B-ba ll Clubhouse $23.08 $20.36 $20.54 $28.43 $110.83 $175.33 Creit(2s74) $122.08 City Park Security Light $64.25 $64.27 $64.27 $64.27 $64.29 $64.27 $63.36 $63.06 City Pa rk Cabins $11.07 $11.07 $11.07 $11.07 1 $11.07 $11.07 $10.37 $10.00 City Pa rk Flagpole $11.07 $11.07 $11.07 $11.07 $11.07 $11.07 1 $10.37 $10.00 City Pa rk Shelter#2 $16.94 $15.63 $20.01 $15.45 $15.80 $20.66 $17.17 $20.63 City Park Shelter#4 $11.07 $11.07 $11.07 $11.33 $11.51 $11.07 $10.37 $10.00 City Park Shelter#5 $11.07 $11.07 $11.07 $11.07 $11.25 $11.28 $10.34 $10.23 CityPark ShelterJl6 $16.68 $15.72 $15.80 $16.15 $16.33 $16.51 $9.35 $16.01 City Pa rk Shelter#8 $24.57 $22.38 $21.06 $22.47 $21.24 $22.48 $24.71 $4.57 City Pa rk Grey Brick $17.47 $16.15 $16.24 $40.79 $25.71 $36.55 $13.05 $36.12 City Park Red Brick $55.16 $49.90 $44.03 $35.97 $56.80 $34.84 $5.87 $28.14 City Park Tennis Building $11.25 $11.25 $14.14 $354.83 $111.00 $190.57 $226.28 Creait(4382) City Pa rk Tennis Shed Us $83.78 $83.80 $83.81 $83.83 $83.81 $83.82 creait(ea) $81.93 City Park Machine Shed $264.41 $220.75 $215-76 $92.24 $61.91 $49.66 $57.33 $1.19 City Park Shop $97.15 $91.10 $82.60 $71.99 $62.00 $63.83 $74.38 $60.51 City Park Pond $135.02 $110,30 $24.13 $71.07 $11.07 $11.28 $11.28 $10.00 October 2, 2014 Page 5 Taylor Dr Light $146.02 $82.42 $80.50 $52.63 $110.55 $65.45 $64.00 $69.76 Fairchild St Lights $74.10 $52.18 $53.50 $42.63 $31.23 $31.11 $27.18 $34.86 N Dubuque Terrell Mill Lts $156.59 $121.08 $111.62 $114.25 $102.41 $116.27 $111.45 $149.36 Bloomington St Gazebo $11.07 $11.07 $11.07 $11.07 $11.07 $11.07 $10.45 $10.00 Bloomington St Light $33.44 $31.97 $32.14 $33.63 No invoice since April $214.06 aeaa(5vo.47) Ha rrison Hi l Light $13.81 $13.81 $27.64 $13.82 $13.82 $13.82 $13.79 $13.80 7th Ave Ct $21.15 1 $19.92 $20.54 1 $20.10 $24.57 $28.98 $26.14 1 $29.42 DoverSt Tennis Court $11.33 $11.25 $17.64 $54.72 $81.46 $142.50 $181.94 $98.55 Dover5t5torage $18.61 $22.29 $18.08 $26.32 $16.24 $18.42 $17.44 $20.63 Dover St Light Mercer $28.40 $18.08 $21.39 $38.92 $45.94 $460.54 $78.36 $47.02 Dover St Shelter $39.96 $37.18 $38.22 $46.90 $112.56 $191.61 $145.35 $154.05 Dover St Pump $42.10 $41.84 $37.63 $28.51 $22.20 1 $37.82 $18.77 $16.48 Dover St Diamonds 3 & 4 Lts $12.03 $12.03 $11.95 $14,58 $179.46 1 $278.40 $29.61 $28.37 Reno St Shelter $21.94 $19.49 $13.52 1 $11.07 No invoice since April $54.12 neit iW5.71 Dodge St Light Col lege Green $104.52 $83.39 $77.95 $73.83 No invoice since April $330.51 aeait(btaaa.q Brown St Shelter $32.68 $31.81 $32.08 $32.44 No invoice since April $165,45 ae]it(572.95) Page St Security Light $12.63 $25.27 $12.64 $12.64 $12.64 $12.71 $12.84 Myrtle Ave Security Light $13.12 $26.25 $13.13 $13.12 $13.12 1 $13.03 $13.01 Court Hill Park Shelter#2 $17.38 $32.57 $16.15 $16.15 $17.89 $17.68 $21.09 Miami Dr Light $12,63 $25.27 $12.64 $12.64 $12.64 $12.71 $12.84 Conklin Ln Shelter $11.07 $11.07 $11.42 1 $11.51 $12.21 $14.27 $11.54 $12.08 1st Ave Peninsula Bridge $57.35 $48.59 $45.61 $44.73 $39.65 $41.66 $48.38 $40.12 1117 Teg Dr Shelter $35.70 $33.34 $31.51 $30.99 1 $34.75 $42.04 $40.23 $41.30 TOTAL $2,072.23 $1,739.12 $1,794.90 $1,987.10 $2,627.12 1 $3,429.59 1 $2,583.18 $1,961.20 October 2, 2014 Page 6 1.2 Gas Consumption: Facilities Total Parks Total $102,002.58 $2,977.15 Total Calandar year 2014 $104,979.73 Facilities Gas Charges Ian Feb Mar Apr May Jun Jul Aug City Hall $3,871.39 $4,103.29 $3,829.63 $1,651.91 $1,318.58 $1,256.49 $1,421.96 $1,196.49 RALRC $5,274.54 $5,861.75 $5,574.98 $4,138.68 $1,564.00 $941.64 $663.65 $762.68 Mercer/Scanlon $6,938.92 $6,673.31 $4,775.09 $5,905.52 $4,294.71 $3,147.87 $3,474.40 $1,622.89 TTRA-1-odge $345.93 $396.22 $184.95 $162.94 $47.58 $39,71 $30.66 $32.52 TTRA-Marina(LP) $1,744.02 $487.10 $316.02 0 0 0 0 Fire Dept-Station#2 $118.54 $136.06 $103.68 $65.70 $44.72 $39.40 $39.22 $34.12 Fire Dept-Station#3 $473.41 $560.98 1 $290.67 $100.52 1 $41.49 $31,23 $31.75 $28.60 Fire Dept -Station #4 $612.38 $1,030.18 $634.16 $100.96 $50.37 $48.93 $48.33 $46,04 Senior Center $2,922.05 $2,889.16 $1,892.66 $1,220.73 $798.16 $669.30 $608.48 $443.33 Ashton $561.89 $497.97 $499.71 $209.39 $16.29 $10.00 0 TOTAL $21,119.05 $23,892.94 $18,272.63 $13,872.37 $8,159.61 $6,190.86 $6,328.45 $4,166.67 ' City Hall gWo - eapn aaoa 2000 0 lan (eb Ma Op Mry hm IW Au8 ' Ra rts 6f ag SRO d313 I., IS. ,RO 1318 lyld Ashton House ,ao9 dW Sm O Ivy Rb My µa M+Y AJul 6 TTRA Lodge Sm aW 3m zm , am Mn (cE My W Ma, lun NI Aug ]Irelim 45 431 IW la9 37 28 19 73 Fire Station #2 Lm ,m Im 1]n ((L Mx Ap A1ay un lul Aug Hp •-1Mrm 1. aP .1 1] . 18 . 14 19 Fire Station #4 am IWO �� San0 WMM-1 1.fM Mar Apl May Sun AS Aar, • =1]rtarm 7% no S91 m 39 38 36 39 RAL Recreation Center 1r� gin mW 2. Wa 0 Nn (M My Ap May lun full h8 -maw My 1ue1 A3xO 3Me lY3] 9os gze ]ss Mercer/Scanlon ISGV1 IWOJ SttV 0 Nn (e0 My M11 May lun Jul Iwg j!. InSa Ill. 9916 12I8 51]a 3649 41. "IS TTRA Marina aW ca 2. J. o bn In, Mir Ap May lun IW pug Laken ]m 2309 319.1 114 0 0 0 0 Fire Station #3 cW .m m �•. 0 aA (M Mar 0.q Ma, � IW Aug IM,n .1 m3 IS, . 31 1$O 10 19 Senior Center sau9 4000 30m 2" 1' 0 Nn frb Mar AV May Ron Jul Aug October 2, 2014 Page 8 Parks Gas Charges Jan Feb Mar Apr May Jun Jul Aug Lower City Park $426.36 $428.25 $384.32 $240.09 $14.14 $12.15 $13.12 $13.39 City Park Shelter#8 $100,28 $104.33 $93.12 $47.46 $10.00 $10.00 $10.00 $10.00 City Park Red Brick $157.15 $165.85 $153.20 $91.34 $10.00 $10.00 $10.00 $10.00 City Park Zoo $116.63 $128.94 $111.14 $52.80 $13.09 $10.00 $10.00 $10.00 TOTAL $800.42 $827.37 $741.78 $431.69 $47.71 $42.15 $43.12 $43.39 October 2, 2014 Page 9 1.3 Water Usage: City Hall 9m9 lan feb Ma lan FM Mr Nn Fi Yp •Garora 14m° bAm bp0° 9p0° ],m° B.mO bp9° 42G ]pm Ashton House 1m It — m1—_, M Aft Sep M iM Ma Nn M •fiaBonf 155 3] 65 55 Si Is ]al eC 111 TTRA Lodge eeo - 6N L(V I( m ® I G a>1Q Mn hb M. W �d San i fz6 f r Nn M aza . '0 M 310 1 5'A 1 )m 6m 91. TTRA Marina 6of 9000 Fire Station #2 --tilM-10-1 y9 Se9 m A yMM M Nz 4.n RAL Recreation Center --- fig400 — — - -- -- ° Wx IAan F1 AV My /Mr MaY M IM Nq Sy lan Feb Ma Nn NI •GaYgn S],dA )4°m 249m 1 3),°m 1 9A 1 13 It- I64� 61,°D Mercer/Scanlon fmm _ �� MarMa ma M Mry M Id y9 lan fey Mal Nn NI •6alkn 9YM )am )<W b,W 19,K° 6,35° 9pO !,1]J 9,L'0 TTRA Lodge Irrigation - emo 6¢19 1� I Mry lul � M AY �Gatl}u kQ) 1 352 9,117 4,653 Senior Center � Sep lan fey Ma Nn M •Gaflw 74° )fM I 6Tq li 8,65° 6,a5° 4556 14Htl 7,35° 45m Fire Station #3 xo fan iey Mar M Mry M Jul Ar W. Rb �Ga9ole L6m Ip0aP AMT. AIAm October 2, 2014 Page 10 Fire Station #4 mul f'W - Sry 1> 1 n Ma M m aGaewa W W 6U M W 4a ;)14 5M W City Park Pool 1'IICN ----- --- Mu � MN lun p-� a0 5a9 Is fen Ma M lul W •GaOqu 0 0 0 Ml f;6501H,5 I;IW BaaW )4)SO City Park Rest Rooms a6o --- 0 !M ran Ma pM MN W-� M lai i My AW MN M I 5M �WOora 0 0 0 0 350 LN 3'A 0 0 0 0 350 1.3 .1 Excessive water consumption: There is no excessive usage. City Park Pool Irrigation 2W Ma MN l Ian fen' Ma M .cawn o 0 0 0 0 :so City Park Bali Park mam --- lan reb Ma AP M- �'l aGWWAR, 1z 2. BAS/EMCS (BUILDING AUTOMATION SYSTEM/ENERGY MANAGEMENT CONTROL SYSTEM) These systems control facility HVAC (Heating, Ventilation, and Air Conditioning) equipment along with the associated mechanical and electrical components. In some facilities the BAS will control lighting as well. This section contains a brief explanation of existing conditions and some justification to bring the City of Iowa City BAS/EMCS systems up to modern standards. Upgrading the BAS system would have a significant positive impact on energy consumption and conservation as well as reduce unnecessary controls and equipment failures. Many of our city facilities are using newer BAS controls (2-10yrs) that may or may not require simple software upgrades in order to maintain system compatibility with ITS servers. Energy rebates are also available for many projects of this type. Consideration should be taken to consolidate systems so that the city uses one manufacturer for all BAS/EMCS systems city wide. This strategy would have the potential for significant savings in many areas including software licensing, installation and maintenance costs as well as discounted service calls and future upgrades. October 2, 2014 Page 11 2.1 BAS/EMCS Technology Plan/ Energy Strategy Master Plan: We have developed a BAS/EMCS Technology Plan/ Energy Strategy Master Plan. The plan along with a memorandum of introduction is located on the T drive. T:\REC\Facilities Manager. 2.2 BAS Operating Summary: City Hall — There are 3 separate systems controlling this facility. A Trane Tracer system installed around 1992 handles the North Court section of the building. There is a very old pneumatic control system that is completely stand- alone and inefficient. Some of the pneumatics have been converted to DDC via a Barber Coleman DMS system that has become unreliable over the years. The conversion was never completed. Most of the issues with City Hall BAS are in progress to be corrected with the project discussed in section 4.1 City Hall HVAC Replacement Project and 4.2 Project to Upgrade Building Automation System (BAS) to Connect Three Buildings. Some equipment will still remain under older controls and will need to be addressed accordingly. RALCRC - Old pneumatics are controlling approximately 50% of field devices such as valves and dampers while the remaining half have been converted to DDC via a Barber Coleman DMS system that has become unreliable over the years. This conversion was never completed. This system is also not compatible with new computer software and cannot be accessed remotely. Manual changes to valves and controllers must be made seasonally. The system is unreliable. With the project discussed in section 4.2 Project to Upgrade Building Automation System (BAS) to Connect Three Buildings, remote connectivity will be established making it possible to access the system and troubleshoot on a somewhat limited basis until the existing controls can be upgraded. Mercer/Scanlon — This facility is currently using some of the oldest pneumatics controls in the state. Serious consideration to upgrade the controls to this facility is urgently needed. As the controls fail, upgrades will be required on an emergency basis. This makes repairs and upgrades unnecessarily expensive. Field devices and controllers are obsolete and can't be obtained. The same Barber Coleman DDC system as City Hall and RALCRC operates portions of the facility. There is also no remote connectivity. This is the 3`d building discussed in section 4.2 Project to Upgrade Building Automation System (BAS) to Connect Three Buildings. TTRA — There is a DDC system by Andover Controls "Continuum" that controls 1 ERU (Energy Recovery Unit). Continuum is connected via the city network and is controlled from the Facilities office. A Honeywell Gateway device was installed by Affordable Heating and Cooling. This allows remote connectivity to the HVAC thermostats to control the building temperatures remotely. After considering options for a complete BAS integration that would cost $12-15K and the cost of the gateway devices of $1800, this was found to be the best means to accomplish operational goals. This option also gave us temperature control of both the lodge and marina where the BAS would only control the lodge. Fire Stations — Station 2 has a fairly new DDC "Metasys" by Johnson Controls. Installed in 2009, it needs to have a simple "maintenance" update in order to allow system connectivity to the city server upgrades. Station 4 has a newer DDC "Metasys" by Johnson Controls. The BAS has connectivity and is operating as designed. October 2, 2014 Page 12 The Center — has a fairly new DDC "Niagara" system by Schneider Electric. Installed in 2009, it needs to have a simple "maintenance" update in order to allow system connectivity to the city server upgrades. Other City Facilities — there are several facilities throughout the city with HVAC equipment operating via a BAS system that has not yet been viewed by the Facilities Manager. As the departments/divisions and building operators become acquainted with the position of Facilities Manager and the role it involves, and opportunity presents itself to review the system controls, system summaries and status reports will be incorporated into the monthly report. 2.3 BAS controlled Equipment Operating in a Manual, Operator, or Failure Mode: City Hall, RALRC, Mercer/Scanlon and Senior Center have several devices, valves and other equipment components operating manually. This is mainly due to equipment age and system capability. 2.4 Overrides to Sequences of Operations in Effect: Several pumps and fans are overridden "on" or "off' under various circumstances. In some cases, this has become the norm. This is primarily due to lack of functionality and age of BAS systems. It also causes energy waste. 3 ADDITIONAL SERVICES WORE( 3.1 Contractor Service Calls: Prime Mechanical was called to various sites for plumbing service issues. 3.2 Contractor Service Contract Work: We are currently working on a new HVAC Preventive Maintenance contract. Bids were submitted to the city and a contract will be awarded to AAA Mechanical of Iowa City. 3.3 Work Status and Projected Completion: 3.4 Project Requests: 3.4a Pool temperature control/automation — Due to other projects we have placed this project on hold. October 2, 2014 Page 13 4.1 City Hall HVAC Replacement Project: PHI PD/FD RTU replacement has been completed. PH2 North Court RTU replacement — Attended preconstruction meeting re city hall north court RTU replacement. We discussed scheduling and lead time for unit arrival,it does not ship until 11/21. Contractor will try to get Daikin to expedite. Baker has begun to work on VAVs pulling wire. They are having an issue with damper controls on vays. We may have added expense to change type of damper from plunger type to blade. 4.2 Project to Upgrade Building Automation System (BAS) to Connect Three Buildings. Completed. 4.3 Animal Shelter — Construction is to begin in fall. We will need to watch controls contractors to insure they comply with the standards set in the BAS/EMCS Technology Plan/ Energy Strategy Master Plan. 4.4 Robert A Lee Recreation Center Fitness Room Enclosure — Pre -bid meeting set for August 12. Bid opening October 2, 2014. 5. WORK FLOW 5.1 CMMS (Computerized Maintenance Management Software) This software maintains a database of information for maintenance operations. This information is designed to enhance the productivity of maintenance workers. It also helps the management team make informed decisions, such as calculating the cost of machine breakdown repair versus preventive maintenance or outright replacement, which leads to better allocation of resources. Any asset, be it equipment or personnel performance can easily be tracked and adjusted accordingly. 5.2 Antero — the CMMS database We have spent several months gathering equipment lists and other pertinent data to enter into the system. A maintenance staff member is being trained on the system and assists with some data entry duties to help expedite the process moving forward. We are nearly ready to run a test batch of recurring work orders for auto generation. We are excited to be having this software very close to implementation. Update: The assigned staff member has resigned his position with the city. This will delay implementation of Antero until an acceptable replacement is found. October 2, 2014 Page 14 5.3 Completed Work Order Summary: Work orders are being completed using a temporary format which will be in place until staff is trained on Antero is functional enough to enter work orders manually. Work orders are kept on file. City Hall — There were 173 work orders completed. Normal daily maintenance/custodial routine = 103 Building occupant requests = 42 In-house maintenance repairs = 25 Service calls to contractors = 3 RALRC - There were 70 work orders completed. Normal daily maintenance/custodial routine = 30 Building occupant requests = 12 In-house maintenance repairs = 15 Service calls to contractors = 4 Aquatics = 0 Mercer/Scanlon - There were 83 work orders completed. Normal daily maintenance/custodial routine = 45 Building occupant requests = 0 In-house maintenance repairs = 2 Service calls to contractors = 1 Aquatics = 29 Other = 6 Other Aquatics Facilities - There were 15 work orders completed. Normal daily maintenance/custodial routine = 0 Building occupant requests = 0 In-house maintenance repairs =0 Service calls to contractors = 0 Aquatics = 15 TTRA - There were work 5 orders completed. Normal daily maintenance/custodial routine = 4 Building occupant requests = 0 Service calls to contractors = 0 Ashton House - There were 1 work orders completed. Normal daily maintenance/custodial routine = 4 Building occupant requests = 0 Service calls to contractors = 1 Fire Stations - There were 2 work orders completed. Building occupant requests = 2 In-house maintenance repairs = 0 Service calls to contractors = 0 October 2, 2014 Page 15 The Center — There were 0 work orders completed. Normal daily maintenance/custodial routine = 0 Building occupant requests = 0 In-house maintenance repairs = 0 Service calls to contractors = 0 5.4 Staffing Mercer is once again fully staffed as the MW on medical leave has returned. RALCRC has replaced 1 of 2 open positions. Steven Dohrer accepted the custodial position and started on September 25t". The open MWII position will be posted in October. 5.5 Miscellaneous Upon request of the fire department, we have taken the lead in monitoring and controlling fire stations HVAC equipment. 6. WATER TREATMENT LAB REPORTS Boiler and Chiller water chemical levels were reported normal at last sample submitted to Aqua Technologies Inc., (ATI). 7. MAJOR MAINTENANCE REPORTS: 7.1 The RALRC pool leak has been addressed. 7.2 RALCRC Gilbert St handicap ramp has incurred some damage from the winter. Engineering will review for modifications to ensure ADA compliance. An initial cost estimate to replace the ramp is $8500. Ron Knocke will review some other projects of this scope to determine if this proposal is in line. 8. FACILITIES INSPECTIONS: Emailed notification to all department and division heads that we will conduct annual facility inspections city wide and will need contact information by October 17, 2014. The inspections will begin at Mercer on October 10t'. City Hall will be conducted the following week with other Parks/Rec facilities to follow. October 2, 2014 Page 16 TTRA — Warranty has expired. A failed faucet in the ladies restroom remains to be repaired. Parts are on order. 10. LOST TIME ACCIDENTS, SAFETY PROBLEMS, OR MAZMAT INCIDENTS: No issues to report for September. 11. MAJOR EQUIPMENT OUT OF SERVICE: To: Mike Moran From: Russell Buffington Date: October Is', 2014 Re: Monthly Report for September 2014 and CeMetery n non -perpetual rare cemetery estoblished in1843 I. OPERATING AMOUNT A. Interments ( 6 ) 1. Cremation, Resident, Weekend w/ tent & chairs I @ $460.00 $460.00 2. Cremation, Non-resident 1 a $300,00 $300.00 3. Cremation, Non-resident, w/ tent & chairs 1 a $380.00 $380.00 4. Adult Full Burial, Resident 1 L $600.00 $600.00 5. Adult Full Burial, Non-resident I n $900.00 $900.00 6. Disinterment, Non-resident 1 ry$1,800.00 $1,800.00 INCOME FROM INTERMENTS $4,440.00 B. Lot Sales l . Resident, Adult Monument Space 6 (oi $700.00 $4,200.00 2. Resident, Flush Cremation Space 1 a $300.00 $300.00 3. Non -Resident, Columbarium Niche 1 a $1,050.00 $l Q50.00 INCOME FROM LOT SALES 55,550.00 TOTAL INCOME FROM INTERMENTS & LOT SALES $9,990.()0 Mailm, Addi ,,s: Pl�m!c i3 H, 356-510,, L(N,1000: 410 East 1-4rz5hirlghnt Street Fax (319) 341-1179 1000 El"wo `heel Iama Cihj, 1A 52_140-)826 Iowa C(hl, 1 i 52NO II. CEMETERY MAINTENANCE HOURS A. Funerals 42 B. Grounds Maintenance 70 C. Equipment Repair & Maintenance 49 D. Building Maintenance 11,5 E. Cemetery Plantings 15 F. Mow Cemetery 156 G. Trim Cemetery 80.5 TOTAL CEMETERY MAINTENANCE 424 HOURS II1. BUDGETED & SPECIAL PROJECTS HOURS A. Lot Locating 3 B. Lot Sales 8 C. Meetings 1.5 D. Genealogy Requests 3 E. Funeral O.T. 4 F. Grave Repair 3 TOTAL BUDGETED & SPECIAL PROJECTS 22.5 HOURS IV. ADMINISTRATION & OFFICE DUTIES 129.5 HOURS V. OUTSIDE MAINTENANCE HOURS A. Mow outside cemetery 2 B. Trim outside cemetery 1 TOTAL OUTSIDE MAINTENANCE 3 HOURS TOTAL CEMETERY HOURS *total hours include the,following 1. Leaves with pay 2. Rest Periods 3. Supervisor x 1 4. PF"I' x 2 5, Seasonal Full Time x 1 681 HOURS Wailing Ad7re>s: Yhow (319) 356-5105 Laahon: 410 East I Vashingion Shed Fax 619) 341-4179 1000 Brotur� Shret Iowa 61y IA 52240-1826 Iowa Ohl, iA 5224'0 DEOARTMFNT Of PARKS & RECREATION DIVISION Of PARKS, FORESTRY, ANd CBD Date; October 2, 2014 To: Michael Moran, Director Feonr; Zac Hall, Superintendent Re; Parks Monthly Report —September 2014 I, GrENERAL OPERATIONS A. Mowing B. Parks Security C .Cleaning Shelters & Park Areas D. Construction Tennis building in City Park, Pheasant Hill Shelter Ned Ashton House Railing and Misc. prof Bets E.,Dog Parks 1. Install Benches &'Trash Receptacles 148 . 2. Fill Water lank 11 3, Stir & Pump Manure Tanks 10 4. Collection of Money 9 5. Fix Gate & Tree Fencing 6 6. Sweep Grass off Trails 3 F. Equipment Maintenance & Repairs G. Ground Repairs 11. Facility Repairs Includes 13 hours for Vandalism Repairs I. Signs Bike Trail signs & Adopt a Park sign J. Garbage Pick Up K. Plumbing & Electrical Repairs L. Carnival Rides Includes lime to remove for winter storage M. Drop off & Pick Up Materials N. Playground Repairs Hours 852 353 341 316 187 128 121 103 82 72 64 58 42 39 a Tree Pruning & Removals P. Spraying for Weeds Q. Cleaning Shops R. Meetings S, Move Herky S(atues T. Removal of a Homeless Camp U. Doclor Appoinhnen(s V. Flooding Repairs W. Miscellaneous Tasks 36 33 27 18 13 8 8 8 6 DEPARTMENT 01 PARKS & RFCRFATION DIVISION Of PARkS, FORESTRY, ANd CBD Date : October 2, 2014 To : Michael Moran, Director Prom: Zac Hall, Superintendent RE : Forestry Nlmrthly Rcpm•t— September 2014 I Fll,LD OI'El2XI'ION l SERVICE RIQUESTS HOURS A. SERVICE REQUESTS: 35 Trees Pruned.= 40 Trees Removed = 20 258 4.5 hours for posting "No Parking "signs' 22hours for EAB Prep included -2711 Removals B. PARKS & SPECIAL REQUESTS:10 Trees Pruned = 11 Removed= 4 29 II FIELD OPERATIONS/ GENERAL A. ROUTINE STREE'I' MAINT: Trees Pruned = 197 "frees Removed = 3 245 Watering Street Trees = 53 hours EAB rep: 16 hours removal 1/III included B. ROUTINE PARK MAINT: Trees Pruned = 81'rees Removed = 2 63 See Attached for Details Watering Park Trees 5 hours EAB Prep = 8.5 hours 2 /I1 removal included C. TRAIL, MAINTENANCE: 5 Included on Detail D. TRANSPLANTING / HAND PLANTING 83 Streets 64 hours Within Parks 19 hours E. NURSERY 31 Watering & Pruning F. TREES REMOVF,D Size Distribution CLASS 1 = 6 CLASS 11 = 21 CLASS 111 = 2 111, MAINTENANCE OPERATIONS A, CHAIN SAW/ IIAND TOOL MA1NT Saws & chains 9 firs Hand fools 18 firs ►all B. EQUIPMENT TRANSFER/ EQUIP MNNT. 30 Transfers I firs Maintenance 19 Ills C. SHOP TIME 4 Cleaning 4 hrs D. DUMP CIfIPS/ FUELTRUCKS 2 IV. ADMINSTRATION A. New Service Requests 58 E, Privafe'llim Notices 11 C. Planting Prep 49 D.Other - 39 Office Work - 5 firs, Logs- 14 firs Oce Health 10,1irs. EAB Prep 10 firs Work completed at Various Parks, Green Spaces Right of Ways and 'Trails Month September 2014 Location Trim Removal Class Worl< Hours Olher jAy Park 7 6 Mercer Park 4 Slwnps Hickory Hill Park 1 19 18.5 1.5 — Ve Mfafion Removal Vegetation Removal Planting Pre Willow Creek Park Rita's Ranch Dog Park TOTALS - - '1'IiAIL NIA1N'ItiNANCE Creekside Trail 7 -- - 49 - - - 2 1 Vegetation Removal Ve =elalion Rcnumal LindemannTrail Cumberland Tr ail 2 VegGation Removal TOTALS 5 Month Sept. 2014 Planting Forestry mew only, all hand plaits 425 South Lucas St. Red Jewel Crab Apple 430 South Lucas St. Ivory Silk Lilac 505 South Lucas St. Redbud 511 South Lucas St, Red Jewel Crab Apple 517 South Lucas St. Spring Flurry Serviceberry 628 South Lucas St, Ironwood 634 South Lucas St. Redbud 903 South Lucas St. (Walnut St. side) Ruby Slippers Amur Maple 726 Walnut St. Ivory Silk Lilac 1302 Ginter Ave. Sugar Tyme Crab Apple 752 Dearborn St. (Sheridan Ave side) Ivory Silk Lilac 846 Rundell St, Redbud 1854 Friendship St. 2 While Oaks 1905 Keokuk St. (Hollywood side) 2 Sugar,ryme Crab Apples 425 Thornbury Ave Redbud 4002 Rohret Rd. Cleveland Select Pear Upper City Park : White Oak (memorial) Cleveland Select Pear (memorial) Showtime Crab Apple (memorial) South Hickory Hill Park : Northern Pin Oak (memorial) September Week 1 Week 2 Week 3 Week 4 Week 5 Total Ground Litter CBD plaza 41 44.5 34 39.5 7.5 166.5 CBD StScp 40.5 73.5 72 73.5 11.5 271 Parks 0 Hazardous Clean Up CBD 1 5.5 1 0.5 8 Parks 0 Designed Flower Bed Maintenance CBD 1 3 7.5 11.5 Parks 9 9 Planting CBD 2 22 24 Parks 0 Watering CBD 1.75 2 5 30.5 39.25 Parks 22 9 7.5 38.5 Fertilizing CBD 1 11 2 Parks 0 Mulching CBD 2 5 7 Parks 0 Pruning CBD 3 11 22 32.5 68.5 Parks 0 Weeding CBD 48 44.5 53.5 18.5 164.5 Parks 3 5 8 Mow/Cord Trim CBD 23.5 25 22 14 84.5 Parks 0 Equip Repair & Maintenance CBD 6.5 20 13.5 11 1 52 Parks 0 Event Prep/Cleanup CBD 1 1 12.5 7.5 22 Parks 0 Graffiti Removal CBD 6.75 8 15.5 10 40.25 Parks 0 Vandalism Repair CBD 1 1 Parks 0 Play Equipment/Surface Maintenance CBD 0 Parks 0 Plaza Fountain Maintenance CBD 0 Parks 0 Construction CBD 15 2 17 Parks 0 Art Sculptures/Literary Plaques CBD 2 7 9 Parks 0 Ash Urns CBD 2 1 3 Parks 0 Benches CBD 0.5 0.5 Parks 0 Bike Racks/Bikes CBD 1.5 5 6.5 Parks 0 Drinking Fountains CBD 0.25 0.25 Parks 0 Light Poles/Outlets CBD 9 9 Parks 0 Posting Pillars/Kiosks CBD 1 8 7 16 Parks 0 Recycle Units CBD 1 2 3 Parks 0 Trash Receptacles CBD 4.25 6 10.25 Parks 0 Tree Grates CBD 6 0.5 11 17.5 Parks 0 Water Hydrants/Hose Bibs CBD 0 Parks 0 Landfill CBD 3 8 4 5 20 Parks 0 Cleaning/Organizing CBD 5 16 21 Parks 0 Snow Removal CBD 0 Parks 0 Holiday Decor CBD 0 Parks 0 Administrative CBD 25 16 8.5 29.5 16 95 Parks 0 Mist: CBD CBD 4.25 23.25 12.5 17.5 57.5 I 1 0 Monthly Total CBD 1 220.51 332.51 298.51 338 58 1247.5 Parks 1 221 121 51 16.5 0 55.5 Grand Total Monthly Total Parks 4% ■ Grand Total CBD ■ Grand Total Parks I Grand Total CBD 96%