RESOLUTION NO. 07-265
RESOLUTION ACCEPTING THE WORK FOR THE
2007 DIRECTIONAL BORING PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2007 Directional Boring Project, as included in a contract between the City of Iowa City and
Gaylord Construction, Inc., of Fort Madison, IA, dated April 13, 2007, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond has been filed in the
City Clerk's office; and
WHEREAS, the final contract price is $73,428.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 4th day of September 2007
(;aL � tn2),A.
MAYOR
Approved by
ATTEST: 6lGLtiGid * .
CIT `CLERK City Attorney'sOffice gJ-A9/0-7
It was moved by Champion and seconded by Bailey the Resolution be
adopted, and upon roll call there were:
AYES:
x
x
x
x
x
x
x
Pweng/res/07direclborring-acpNrork.doc
8/07
NAYS: ABSENT:
Bailey
Champion
Correia
Elliott
O'Donnell
Vanderhoef
Wilburn
-ra.ay._
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240-1826
(319) 356-5000
(3I9) 356-5009 FAX
ENGINEER'S REPORT www.icgov.org
August 27, 2007
City Clerk
City of Iowa City, Iowa
Re: 2007 Directional Boring Project
Dear City Clerk:
I hereby certify that the construction of the 2007 Directional Boring Project has
been completed by Gaylord Construction, Inc. of Fort Madison, Iowa in
substantial accordance with the plans and specifications prepared by the City of
Iowa City Engineering Division.
The final contract price is $73,428.00.
I recommend that the above -referenced improvements be accepted by the City
of Iowa City.
Sincerely,
-
Ronald R. Knoche, P.E.
City Engineer
PERFORMANCE AND PAYMENT BOND
Gaylord Construction, Inc.
(insert the name and address or loyal title of the contractor)--, as
ontractor),as
Principal, hereinafter called the Contractor and American Contractors Indemnity
Company (insert the legal title of the Surety)
as Surety, hereinafter called
the Surely, are held and firmly bound unto the City of Iowa City, Iowa, as obligee, hereinafter
called the Owner, in the amount of Eighty one Thousand One Hundred Eighty and no/iNfars
($ 81 180.00 ,v, utu poy„iem of wnicn contractor and Surety
hereby bind themselves, their heirs; executors, administrators, successors and assigns, jointly and
severally.
WHEREAS, Contractor has, as of April 3, 2007 entered into a
T^
(date)
written Agreement with Owner for 2007 Directional Boring Project; and
WHEREAS, the Agreement requires execution of this Performance and Payment Bond, to
be completed by Contractor, in accordance with plans and specifications prepared by
the"Iowa City Engineering Division, which Agreement is by reference made a part hereof, and the
agreed upon work is hereafter referred to as the Project.
NOW, THEREFORE, THE CONDIFIONS OF THIS OBLIGATION are such that, if
Contractor shall promptly and faithfully perform said Agreement, then the obligation of this bond
shall be null and void; otherwise it shall remain in full force and effect until satisfactory completion
of the Project.
A. The Surety hereby waives notice of any alteration or extension of time made by the
Owner.
B. Whenever Contractor shall be, and is declared by Owner to be, in default under the
Agreement, the Owner having performed Owner's obligations thereunder, the Surety may
promptly remedy the default, or shall promptly:
1. Complete the Project in accordance with the terms and conditions of the
Agreement, or
2. Obtain a bid or bids for submission to Owner for completing the Project in
accordance with the terms and conditions of the Agreement; and upon determina-
tion by Owner and Surety of the lowest responsible bidder, arrange for a contract
between such bidder and Owner, and make available, as work progresses (even
though there may be a default or a succession of defaults under the Agreement or
subsequent contracts of completion arranged under this paragraph), sufficient
PB-1
funds to pay the cost of completion, less the balance of the Contract Price, but not
exceeding the amount set forth in the first paragraph hereof. The term "balance of
the Contract Price," as used in this paragraph, shall mean the total amount
payable by Owner to Contractor under the Agreement, together with any addenda
and/or amendments thereto, less the amount properly paid by Owner to
Contractor.
C. The Contractor and Contractor's Surety shall be obligated to keep the improvements
covered by this bond In good repair for a period of one (1) year from the date of formal
acceptance of the improvements by the Owner.
D. No right of action shall accrue to or for the use of any person, corporation or third party
other than the Owner named herein or the heirs, executors, administrators or successors
of Owner.
IT IS A FURTHER CONDITION OF THIS OBLIGATION that the Principal and Surely, in
accordance with provisions of Chapter 573, Code of Iowa, shall pay to all persons, firms or
corporations having contracts directly with the Principal, including any of Principal's subcontrac-
tors, all claims due them for labor performed or materials furnished in the performance of the
Agreement for whose benefit this bond is given. The provisions of Chapter 573, Code of Iowa, are
apart of this bond to the same extent as If it were expressly set out herein.
SIGNED AND SEALED THIS 10th DAY OF April
20 07 .
IN THE PRESENCE OF:
Witness
&4&j
Hess
Mary Janet Keaskowski
PB-2
Gaylord Construction, Inc.
(Principal)
(Title)
(Surety)
American Contractors Ind Wily Company
Ardeth M. Hillyer, Attorney- n-Fact
(title)
9841 Airport Blvd., 9th Floor
(Street)
Los Angeles, CA 90045
(City, State,
630-571-2804
(Phone)
State of ,Illinois
.......................
County of DuPage
10°i
On this ...............day of..?w91............ 2007, before me
Surety personally appeared ............. Ardeth•M..LIil1 e to be known
Company p Y hP .. y :....., ,
Acknowledgment-. whom being by me duly sworn, did depose and say: that he/she resides
at.. Wntilmh1i'..111imiS.......................................................
that he/she is the, A!MPEV Itl Fact o f American .Con..tractors...Indenm..ity
...........
compa,t}......................... , the corporation described in and which
executed the annexed instrument; that he/she knows the corporate seal of
said corporation that the seal affixed to said instrument is such corporate
seal; that it was so affixed by order of the Board of Directors of said
corporation; that he/she signed his/her name thereto by like order; and
that the liabilities of said corporation do not exceed its assets as
ascertained in the manner provided by law.
t ...........
.......:( .......o ... o ..................
Notary Public in and for the hove County and Stale.
5/14/2009
My commission expires .................................
"OFFICIAL SEAL"
PATRICIA KENIS
Notary Public, State of Illinois
My Commission Expires 5/14109
fir w =Zo'Y'
Prepared by: Denny Gannon, Asst. City Engineer, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5142
RESOLUTION NO. 08-156
RESOLUTION ACCEPTING THE WORK FOR THE RECONSTRUCTION OF
THE PAVEMENT AND ASSOCIATED STORM SEWER FOR THE ALLEY
LOCATED IN BLOCK 40 OF ORIGINAL TOWN.
WHEREAS, the Engineering Division has certified that the following improvements have been
completed in accordance with the plans and specifications of the City of Iowa City:
Reconstruction of the pavement and associated storm sewer for the alley located in Block
40 of Original Town as constructed by All American Concrete, Inc. of West Liberty, Iowa.
WHEREAS, the maintenance bond has been filed in the City Engineer's office; and
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 3rd day of
ATTEST: 2�1T P . ` a,4,t-
CITY CLERK
City Attorney's Office .c fir dS
It was moved by Champion and seconded by Wri ght the Resolution be
adopted, and upon roll call there were:
AYES:
P WE NG\R ES\SanSeweTBlock40.acptwk.doc
NAYS: ABSENT: ABSTAIN:
Bailey
Champion
Correia
Hayek x
O'Donnell
Wilburn
Wright
Prepared by: Brian Boelk, Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5437
RESOLUTION NO. 09-234
RESOLUTION ACCEPTING THE WORK FOR THE 2008 STORM SEWER
IMPROVEMENTS PROJECT.
WHEREAS, the Engineering Division has recommended that the work for construction of
the 2008 Storm Sewer Improvements Project, as included in a contract between the City
of Iowa City and Carter and Associates, Inc. of Coralville, Iowa, dated November 24th,
2008, be accepted; and
WHEREAS, the performance and payment bond has been filed in the City Clerk's office
WHEREAS, the final contract price is $52,078.09.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
IOWA CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa
City, Iowa.
Passed and approved this 6th
ATTEST: tit/
City Jerk
Approved by:
54
City Attorneys Office 4(oq
Resolution No. 09-234
Page 2
It was moved by Hayek and seconded by O'Donnell the Resolution be
adopted, and upon roll call there were:
AYES: NAYS: ABSENT:
x Bailey
x Champion
x Correia
x Hayek
x O'Donnell
x Wilburn
x Wright
wpdalalglossa ry-/resoi WoMcdoc
I r �
Qw;� 'l
A
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240-1826
(319) 356-5000
(319) 356.5009 FAX
ENGINEER'S REPORT wwwAgov.org
June 24, 2009
City Clerk
City of Iowa City, Iowa
Re: 2008 Storm Sewer Improvements Project
Dear City Clerk:
I hereby certify that the construction of the 2008 Storm Sewer Improvements
Project has been completed by Carter and Associates, Inc. of Coralville, Iowa in
substantial accordance with the plans and specifications prepared by City of
Iowa City Engineering Division.
The final contract price is $52,078.09.
I recommend that the above -referenced improvements be accepted by the City
of Iowa City.
Sincerely,
Ronald R. Knoche, P.E.
City Engineer
� 1 J
m-
2d(1)
Prepared by: Kim Sandberg, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
RESOLUTION NO. 09-233
RESOLUTION ACCEPTING THE WORK FOR THE 2008 SUMMER SIDEWALK
REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2008 Summer Sidewalk Repair Project, as included in a contract between the City of Iowa City
and Feldman Concrete of Dyersville, Iowa, dated July 23, 2008, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, the final contract price is $80,641.25.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 6th day of
ATTEST:
CITY -CLERK
CityAttorney's Office 1,13o'o`7
It was moved by Hayek and seconded by O'Donnell the Resolution be
adopted, and upon roll call there were:
AYES:
x
x
x
x
x
R
x
Pweng/res/acptwork-08sidews1krepalr.doc
NAYS: ABSENT:
Bailey
Champion
Correia
Hayek
O'Donnell
Wilburn
Wright
ENGINEER'S REPORT
June 25, 2009
City Clerk
City of Iowa City, Iowa
Re: 2008 Summer Sidewalk Repair Project
Dear City Clerk
I hereby certify that the construction of the 2008 Summer Sidewalk Repair
Project has been completed by Feldman Concrete of Dyersville, Iowa, in
substantial accordance with the plans and specifications prepared by the City of
Iowa City Engineering Division.
The final contract price is $80,641.25
1 recommend that the above -referenced improvements be accepted by the City
of Iowa City.
Sincerely,
Ron Knoche, P.E.
City Engineer
p.2
PERFORMANCE AND PAYMENT BOND
Feldman Concrete, 29888 Prier Rd., Dyersville, IA as
(insert the name and address or legal title of the Contractor)
Principal, hereinafter called the Contractor and Merchants Bonding Company
(insert the legal title of the Surety)
2100 Fleur Dr, Des Moines, IA 50321 , as Surety, hereinafter called
the Surety, are held and firmly bound unto the City of Iowa City, Iowa, as obligee, hereinafter
called the Owner, in the amount of Sixty-eight thousand, one -hundred and thirty Dollars
($68,130.00 ) for the payment for which Contractor and Surety
hereby bind themselves, their heirs, executors, administrators, successors and assigns, jointly
and severally.
WHEREAS, Contractor has, as of /� j 0� entered into a
(date)
written Agreement with Owner for 2008 Summer Sidewalk Repair Project; and
WHEREAS, the Agreement requires execution of this Performance and Payment Bond, to
be completed by Contractor, in accordance with plans and specifications prepared by
, which Agreement is by reference made a part hereof, and the agreed -upon work is hereafter
referred to as the Project.
NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION are such that, if
Contractor shall promptly and faithfully perform said Agreement, then the obligation of this bond
shall be null and void; otherwise it shall remain in full force and effect until satisfactory completion
of the Project.
A. The Surety hereby waives notice of any alteration or extension of time made by the
Owner.
B. Whenever Contractor shall be, and is declared by Owner to be, in default under the
Agreement, the Cwner having performed Owner's obligations thereunder, the Surety may
promptly remedy the default, or shall promptly:
1. Complete the Project in accordance with the terms and conditions of the
Agreement, or
2. Obtain a bid or -,bids for submission to Owner for completing the Project in
accordance with the terms and conditions of the Agreement; and upon determina-
tion by Owner and Surety of the lowest responsible bidder, arrange for a contract
between such bidder and Owner, and make available, as work progresses (even
though there may be a default or a succession of defaults under the Agreement or
subsequent contracts of completion arranged under this paragraph), sufficient
funds to pay the cost of completion, less the balance of the Contract Price, but not
PB-1
p.6
exceeding the amount set forth in the first paragraph hereof. The term "balance of
the Contract Price," as used in this paragraph, shall mean the total amount
payable by Owner to Contractor under the Agreement, together with any addenda
and/or amendments thereto, less the amount properly paid by Owner to
Contractor.
C. The Contractor and Contractors Surety shall be obligated to keep the improvements
covered by this bond in good repair for a period of ONE (1) year from the date of formal
acceptance of the improvements by the Owner.
D. No right of action :;hall accrue to or for the use of any person, corporation or third party
other than the Owner named herein or the heirs, executors, administrators or successors
of Owner.
IT IS A FURTHER CONDITION OF THIS OBLIGATION that the Principal and Surety, in
accordance with provisions of Chapter 573, Code of Iowa, shall pay to all persons, firms or
corporations having contracts directly with the Principal, including any of Principal's subcontrac-
tors, all claims due them for labor performed or materials furnished in the performance of the
Agreement for whose benefit this bond is given. The provisions of Chapter 573, Code of Iowa, are
a part of this bond to the same extent as if it were expressly set out herein.
SIGNED AND SEALED THIS ZZ!3d DAY OF
IN THE PRESENCE OF:
ilness
Witness
(Pri cipal)
1S4nme V _
(Title)
(Surety)
Attorney -in -Fact
(Title)
500 Iowa St
(Street)
Dubuque, IA 52001
(City, State, zip)
563-556-5441
(Phone)
MM
Merchants Bonding Company
(Mutual)
POWER OF ATTORNEY
Know All Persons By These Presents, that the MERCHANTS BONDING COMPANY (MUTUAL), a corporation duly organized under
the laws of the Slate of Iowa, and having its principal office in the City of Des Moines, County of Polk, State of Iowa, hath made,
constituted and appointed, and does by these presents make, constitute and appoint
David H. Fritz, Diana K. Hedrick, Keith M. Sindberg, Kevin L. Ehrlich, Charles Andracchio,
Kimberly A. Weiland, Olivia R. Schmitt
of Dubuque and State of Iowa its true and lawful Attorney -in -Fact, with full power
and authority hereby conferred in its name, place and stead, to sign, execute, acknowledge and deliver in its behalf as surety any
and all bonds, undertakings, recognlzances or other written obligations in the nature thereof, subject to the limitation that any such
instrument shall not exceed the amount of:
ONE MILLION ($1,000,000.00) DOLLARS
and to bind the MERCHANTS BONDING COMPANY (MUTUAL) thereby as fully and to the same extent as if such bond or
undertaking was signed by the duly authorized officers of the MERCHANTS BONDING COMPANY (MUTUAL), and all the acts of
said Attorney -in -Fact, pursuant to the authority herein given, are hereby ratified and confirmed.
This Power -of -Attorney is made and executed pursuant to and by authority of the following Amended Substituted and Restated By -
Laws adopted by the Board of Directors of the MERCHANTS BONDING COMPANY (MUTUAL) on November 16, 2002.
ARTICLE II, SECTION 8 - The Chairman of the Board or President or any Vice President or Secretary shall have power and
authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the
Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature
thereof.
ARTICLE II, SECTION 9 - The signature of any authorized officer and the Seal of the Company may be affixed by facsimile
to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking,
recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the
same force and effect as though manually fixed.
In Witness Whereof, MERCHANTS BONDING COMPANY (MUTUAL) has caused these presents to be signed by its President and
its corporate seal to be hereto affixed, this 16th day of January, 2006.
yl%G
m.• oP 9 •.
at
. yv.• 1933
STATE OF IOWA
COUNTY OF POLK as.
MERCHANTS BONDING COMPANY (MUTUAL)
By /'t'7 71
President
On this 16th day of January, 2006, before me appeared Larry Taylor, to me personally known, who being by me duty swam did say that
he is President of the MERCHANTS BONDING COMPANY (MUTUAL), the corporation described in the foregoing instrument, and that the
Seal affixed to the said instrument is the Corporate Seal of the said Corporation and that the said instrument was signed and sealed in behalf
of said Corporation by authority of its Board of Directors.
In Testimony Whereof, I have hereunto set my hand and affixed my Official Seal at the City of Des Moines, Iowa, the day and year first
above written.
r• CINDY SMYTH
Carim ssim Nnher173RY1
O.ANy
Carrm nm rissi
March 16, 2009 Notary Public, Polk County, Iowa
STATE OF IOWA
COUNTY OF POLK as.
I, William Warner, Jr., Secretary of the MERCHANTS BONDING COMPANY (MUTUAL), do hereby certify that the above and foregoing
is a true and correct copy of the POWER -OF -ATTORNEY executed by said MERCHANTS BONDING COMPANY (MUTUAL), which is
still in full force and effect and has not been amended or revoked. qq I ,rn�v-x�� �Q
In Witness Whereof, I have hereunto set my hand and affixed the seal of the Company on this 2Lylil ay of J '�i , n4
Secretary
POA 0001 (1/06)
NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT AND
ESTIMATED COST FOR IOWA CITY POLICE STORAGE PROJECT IN THE CITY OF IOWA
CITY, IOWA
TO ALL TAXPAYERS OF THE CITY OF IOWA CITY, IOWA, AND TO OTHER INTERESTED PERSONS:
Public notice is hereby given that the City Council of the City of Iowa City, Iowa, will conduct a public
hearing on plans, specifications, form of contract and estimated cost for the construction of the Iowa City
Police Storage Project in said City at 7:00 p.m. on the 28t' day of July, 2009, said meeting to be held in the
Emma J. Harvat Hall in City Hall in said City, or if said meeting is cancelled, at the next meeting of the City
Council thereafter as posted by the City Clerk.
Said plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk
in City Hall in Iowa City, Iowa, and may be inspected by any interested persons.
Any interested persons may appear at said meeting of the City Council for the purpose of making
objections to and comments concerning said plans, specifications, contract or the cost of making said
improvement.
This notice is given by order of the City Council of the City of Iowa City, Iowa and as provided by law.
MARIAN K. KARR, CITY CLERK
Pweng/nph/nph-pol icestorage09.doc
0 -28- 9
3f(5)
Prepared by: Kim Sandberg, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
RESOLUTION NO, 09-250
RESOLUTION ACCEPTING THE WORK FOR THE RIVERSIDE FESTIVAL
STAGE - ELECTRICAL FLOOD REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
Riverside Festival Stage - Electrical Flood Repair Project, as included in a contract between the
City of Iowa City and Gerard Electric, Inc. of Iowa City, Iowa, dated May 1, 2009, be accepted;
and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, the final contract price is $30,950.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this ?sth day of
ATTEST: 'f�l. n f
CIT?-CLERK
WI
City Attorney's Office
It was moved by Champion and seconded by Hayek the Resolution be
adopted, and upon roll call there were:
AYES: NAYS: ABSENT:
x Bailey
x Champion
x Correia
x Hayek
x O'Donnell
x Wilburn
x Wright
PRvenglres/acptwrk-6versidefestivalstage-electriea17-0g.do
rniSW iOE
a
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240-1826
(319) 356-5000
(319) 3565007 FAX
ENGINEER'S REPORT wwwAgov.org
July 15, 2009
City Clerk
City of Iowa City, Iowa
Re: Riverside Festival Stage Electrical Flood Repair Project 2009
Dear City Clerk:
I hereby certify that the construction of the Riverside Festival Stage Electrical
Flood Repair Project 2009 has been completed by Gerald Electric of Iowa City,
Iowa in substantial accordance with the plans and specifications prepared by the
City of Iowa City Staff
The final contract price is $30,950.
I recommend that the above -referenced improvements be accepted by the City
of Iowa City.
Sincerely,
Ronald R. Knoche, P.E.
City Engineer
Bond No. GRIA17036B
PERFORMANCE AND PAYMENT BOND
Neumiller Electric, Inc., 985 238th
(insert the name and address or le
Ste 5, North Liberty, IA 52317
title of the Contractor)
Principal, hereinafter called the Contractor and Granite Re, Inc.
(inset the legal little of the Surety)
as
as Surety, hereinafter called
the Surety, are held and firmly bound unto the City of Iowa City, Iowa, as obligee, hereinafter
called the Owner,_ in the amount of Fifty -Four Thousand and 00/100 Dollars
($ 54 000.00 ) for the payment for which Contractor and Surety
hereby bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally.
WHEREAS, Contractor has, as of Mpy 1L,2009 entered into a
(date)
written Agreement with Owner for the Lower City Park - Electrical Flood Repair Project; and
WHEREAS, the Agreement requires execution of this Performance and Payment Bond, to
be completed by Contractor, in accordance with plans and specifications prepared by
the Iowa City Engineering Division, which Agreement is by reference made a part hereof, and the
agreed -upon work is hereafter referred to as the Project.
NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION are such that, if
Contractor shall promptly and faithfully perform said Agreement, then the obligation of this bond
shall be null and void; otherwise it shall remain in full force and effect until satisfactory completion
of the Project.
A. The Surety hereby waives notice of any alteration or extension of time made by the
Owner.
B. Whenever Contractor shall be, and is declared by Owner to be, in default under the
Agreement, the Owner having performed Owner's obligations thereunder, the Surety may
promptly remedy the default, or shall promptly:
1. Complete the Project in accordance with the terms and conditions of the
Agreement, or
2. Obtain a bid or bids for submission to Owner for completing the Project in
accordance with the terms and conditions of the Agreement; and upon determina-
tion by Owner and Surety of the lowest responsible bidder, arrange for a contract
between such bidder and Owner, and make available, as work progresses (even
though there may be a default or a succession of defaults under the Agreement or
subsequent contracts of completion arranged under this paragraph), sufficient
funds to pay the cost of completion, less the balance of the Contract Price, but not
exceeding the amount set forth in the first paragraph hereof. The term "balance of
the Contract Price," as used in this paragraph, shall mean the total amount
payable by Owner to Contractor under the Agreement, together with any addenda
and/or amendments thereto, less the amount properly paid by Owner to
Contractor.
C. The Contractor and Contractor's Surety shall be obligated to keep the improvements
covered by this bond in good repair for a period of one U year from the date of formal
acceptance of the improvements by the Owner,
D. No right of action shall accrue to or for the use of any person, corporation or third party
other than the Owner named herein or the heirs, executors, administrators or successors
of Owner.
IT IS A FURTHER CONDITION OF THIS OBLIGATION that the Principal and Surety, in
accordance with provisions of Chapter 573, Code of Iowa, shall pay to all persons, firms or
corporations having contracts directly with the Principal, including any of Principal's subcontrac-
tors, all claims due them for labor performed or materials furnished in the performance of the
Agreement for whose benefit this bond is given. The provisions of Chapter 573, Code of Iowa, are
a part of this bond to the some extent as if it were expressly set out herein.
SIGNED AND SEALED THIS 5th
20 09 .
IN THE PRESENCE OF:
MIUMMAJi'll TIMMIN,
e° M
Liz Mosca, itness
DAY OF June
Neumiller Electric,.tk
(Prfncipal)
By:
-
Granite Re, Inc.
(Surety)
By:
Bryan Jay Huft, (title) Attorney -in -Fact
14001 Quailbrook Dr
(Street)
Oklahoma City, OK 73134
(City, State, Zip)
800-535-0006
(Phone)
F909
ACKNOWLEDGMENT OF PRINCIPAL (Individual)
State of
County of
On this
come($)
day of
, in the year 20 , before me personally
to me known and known to me to be the person(s) who (is) (are) described in and executed the foregoing instrument,
and acknowledge(s) to me that he
State of
County of
On this
come(s)
a member of the co -partnership of
executed the same.
Notary Public
ACKNOWLEDGMENT OF PRINCIPAL (Partnership)
day of , in the year 20 _ , before me personally
to me known and known to me to be the person who is described in and executed the foregoing instrument, and
acknowledges to me that he executed the same as for the act and deed of the said co -partnership.
Notary Public
ACKNOWLEDGMENT OF PRINCIPAL (Corporation)
Stale of w k/ ,_.
Countyof }
On this 9 day of JV411_ 6,�_ in the year 20 01 , before me personally
come(s) to me me known, who, being duly sworn, deposes and says that he resides in the City of Qr{ U kY), 10(AEa�
that he is the ffWVQ�y -______ ofthe NQ{{rh(_��Pi jZli IL�JVIL.__
the corporation described in and which executed the foregoing instrument,and that he signed his name thereto by like order.
NI N
-AN
o" ComrM1lsslonNumber7359A9 n
My Commission Exnn:s
P Au ust B, )C; --- - - -
Notary Publi
State of Wisconsin
County of St. Croix
On this 5th
come(s) Bryan Jay Huff
ACKNOWLEDGMENT OF SURETY
}
day of June in the year 2009 , before me personally
Attorney(s)-in-Fact of Granite Re, Inc. with whom I am personally acquainted, and who,
being by me duly sworn, says that he/she reside(s) in Hudson. WI that he/she is (are) the Altorney(s)-in-Fact of company
Granite Re. Inc. the company described in and which executed the within instrument;
that he know(s) the corporate seal of such Company; and that the seal affixed to the within instrument is such corporate seal and that it
was affixed by order of the Board of Directors of said Company, acid that, be signed said instrument as Attorneys) -in -Fact of the said
Company by like order. �� i! f `
' UIC>SCf'.
0 Y
Or W S Notary Publ c 18-Mar-12
GRANITE RE, INC.
GENERAL POWER OF ATTORNEY
Know all Men by these Presents:
That GRANITE RE, INC., a corporation organized and existing under the laws of the State of OKLAHOMA and having its principal office
at City of OKLAHOMA CITY in the State of OKLAHOMA does hereby constitute and appoint:
MICHAEL J. DOUGLAS; CHRIS STEINAGEL; BRYAN JAY HUFT; LIZ MOSCA its true and lawful Attorney-in-Fact(s) for the following purposes,
to wit:
To sign ,its name as surety to, and to execute, seal and acknowledge any and all bonds, and to respectively do and perform any and all
acts and things set forth in the resolution of the Board of Directors of the said GRANITE RE, INC. a certified copy of which is hereto annexed
and made a part of this Power of Attorney; and the said GRANITE RE, INC. through us, its Board of Directors, hereby ratifies and confirms all
and whatsoever the said:
MICHAEL J. DOUGLAS; CHRIS STEINAGEL; BRYAN JAY HUFT; LIZ MOSCA may lawfully do in the premises by virtue of these presents.
In Witness Whereof, the said GRANITE RE,INC. has caused this instrument to be sealed with its corporate seal, duly attested by the
signatures of its President and SecretarWreasurer„this 2nd day: of December, 2008,
EaE
Kenneth D. Whittin on, President
STATE OF OKLAHOMA ) a
) SS: O�
COUNTY OF OKLAHOMA) Rodman'A. Frates, Secretary/Treasurer
On this 2"d day of December, 2008, before me personally came Kenneth D. Whittington, President of the GRANITE RE, INC. Company
and Rodman A Frates, Secretary/Treasurer of said Company, with both of whom I am personally acquainted, who being by me severally duly
sworn, said; that they, the said Kenneth D. Whittington and Rodman A. Frates were respectively the President and the Secretary/Treasurer of
the GRANITE RE, INC., the corporation described in and which executed the foregoing Power of Attorney; that they each knew the seal of said
corporation; that the seal affixed to said Power of Attorney was such corporate seal, that it was so fixed by order of the Board of Directors of
said corporation, and that they signed their name thereto by like order as President and Secretary/Treasurer, respectively, of the Company.
DaMy Commission Expires;May9, 2012 Notary PubliCommission..#:00005708
GRANITE RE, INC,
Certificate
THE UNDERSIGNED, being the duly elected and acting Secretary/Treasurer of Granite Re, Inc., an Oklahoma Corporation,: HEREBY CERTIFIES
that the following resolution is a true and correct excerpt from the July 15, i1987, minutes of the meeting of the Board of Directors of Granite
Re, Inc. and that said Power of Attorney has not been revoked and is now in full force and effect.
"RESOLVED, that the President; any Vice President, the Secretary, and any Assistant Vice President shall each have authority to appoint
individuals as attorneys -in -fact or under other appropriate titles with authority to execute on behalf of the company fidelity and surety
bonds and other documents of similar character issued by the Company in the course of its business. On any instrument making or
evidencing such appointment, the signatures may be affixed by facsimile. On any instrument conferring such authority or on any bond
or undertaking of the Company, the seal, or a facsimile thereof, may be impressed or affixed or in any other manner reproduced;
provided, however, that the seal shall not be necessary to the validity of any such instrument or undertaking."
IN WITNESS WHEREOF, the undersigned has subscribed this Certificate and affixed the corporate seal of the Corporation this
501 day of Jun po9
odman A. Frates, Secretary/Treasurer
GR0800-1
3f(4)
Prepared by: Kim Sandberg, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
RESOLUTION NO. 09-249
RESOLUTION ACCEPTING THE WORK FOR THE LOWER CITY PARK -
ELECTRICAL FLOOD REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
Lower City Park - Electrical Flood Repair Project, as included in a contract between the City of
Iowa City and Neumiller Electric, Inc. of North Liberty, Iowa, dated May 15, 2009, be accepted;
and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, the final contract price is $54,000.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 28th day of
City Attorney's Office 7 yG�v
It was moved by Champion and seconded by Hayek the Resolution be
adopted, and upon roll call there were:
AYES:
NAYS: ABSENT:
Bailey
Champion
Correia
Hayek
O'Donnell
Wilburn
Wright
Pweng/reslacphvodk-Iw0tyPa rkElecldca17-09.doc
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240-1826
(319) 356-5000
(319) 356-5009 FAX
ENGINEER'S REPORT www.icgov.org
July 15, 2009
City Clerk
City of Iowa City, Iowa
Re: Baseball Fields Electrical Flood Repair Project 2009
Dear City Clerk:
I hereby certify that the construction of the Baseball Fields Electrical Flood
Repair Project 2009 has been completed by Neumiller Electric of North Liberty,
Iowa in substantial accordance with the plans and specifications prepared by the
City of Iowa City Staff
The final contract price is $54,000.
I recommend that the above -referenced improvements be accepted by the City
of Iowa City.
Sincerely,
�j
Ronald R. Knoche, P.E.
City Engineer
Bond Number 54-173232
Gerard Electric Inc. , as
(insert the name and address or legal title of the Contractor)
Principal, hereinafter called the Contractor and _ United Fire & Casualty Company
(insert the legal title of the Surety)
as Surety, hereinafter called
the Surety, are held and firmly bound unto the City of Iowa City, Iowa, as obligee, hereinafter
called the Owner, in the amount of Thirty Thousand Nine Hundred fifty & no/100ths----------Dollars
($ 30,950.00------------------------------- ------ --}-foe the payment for which Contractor and Surety
hereby bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally.
WHEREAS, Contractor has, as of MAY 1ST, 2009 entered Into a
(date)
written Agreement with Owner for the Riverside Festival Stage - Electrical Flood Repair Project;
and
WHEREAS, the Agreement requires execution of this Performance and Payment Bond, to
be completed by Contractor, in accordance " with plans and specifications prepared by
the Iowa City Engineering Division, which Agreement is by reference made a part hereof, and the
agreed -upon work is hereafter referred to as the Project,
NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION are such that, if
Contractor shall promptly and faithfully perform said Agreement, then the obligation of this bond
shall be null and void; otherwise It shall remain in full force and effect until satisfactory completion
of the Project.
A. The Surety hereby waives notice of any alteration or extension of time made by the
Owner.
B. Whenever Contractor shall be, and is declared by Owner to be, In default under the
Agreement, the Owner having performed Owner's obligations thereunder, the Surety may
promptly remedy the default, or shall promptly:
9. Complete the Project in accordance with the terms and conditions of the
Agreement, or
2. Obtain a bid or bids for submission to Owner for completing the Project In
accordance with the terms and conditions of the Agreement; and upon determine -
Von by Owner and Surety of the lowest responsible bidder, arrange for a contract
between such bidder and Owner, and make available, as work progresses (even
though there may be a default or a succession of defaults under the Agreement or
subsequent contracts of completion arranged under this paragraph), sufficient
funds to pay the cost of completion, less the balance of the Contract Price, but not
exceeding the amount set forth in the first paragraph hereof. The term "balance of
the Contract Price," as used in this paragraph, shall mean the total amount
payable by Owner to Contractor under the Agreement, together with any addenda
and/or amendments thereto, less the amount property paid by Owner to
Contractor.
C. The Contractor and Contractor's Surety shall be obligated to keep the improvements
covered by this bond in good repair for a period of one U year from the date of formal
acceptance of the improvements by the Owner.
D. No right of action shall accrue to or for the use of any person, corporation or third party
other than the Owner named herein or the heirs, executors, administrators or successors
of Owner.
IT IS A FURTHER CONDITION OF THIS OBLIGATION that the Principal and Surety, in
accordance with provisions of Chapter 573, Code of Iowa, shall pay to all persons, firms or
corporations having contracts directly with the Principal, including any of Principal's subcontrac-
tors, all claims due them for labor performed or materials fumished in the performance of the
Agreement for whose benefit this bond Is given. The provisions of Chapter 573, Code of Iowa, are
a part of this bond to the same extent as If it were expressly set out herein.
SIGNED AND SEALED THIS
20 09 .
IN THE PRESENCE OF:
�ll d�G� /1I�I � i0 h
4-
Witness
IST
DAY OF MAY
Gerard Electric, Inc.
(� (Principal)
(Title)
DAVID A. GERARD PRESIDENT
United Fire & Casualty Company
(Surety)
Nancy D. SchwaiVWmey-in-Fact
4200 University Avenue #200
(Street)
West Des Moines IA 50266
(City, State, Zip)
515-244-0166
P13-2
(Phone)
F.T.Wl
MMM
UNITED FIRE & CASUALTY COMPANY
HOME OFFICE - CEDAR RAPIDS, IOWA
CERTIFIED COPY OF POWER OF ATTORNEY
(Original on file at Home Office of Company - See Certification)
KNOW ALL MEN BY THESE PRESENTS, That the UNITED FIRE & CASUALTY COMPANY, a corporation duly organized and
existing under the laws of the State of Iowa, and having its principal office in Cedar Rapids <State of Iowa, does make, constitute and
appoint F. MELVYN HRUBETZ,::.OR GREG T. LA MAIR, OR JOYCE 0, HERBERT, OR.-NANCY D. :SCHWARZ. OR MARK E.
KEAIRNES,OR PATRICK K. DUFF, OR JEFFREY R. BAKER, OR JOSEPH I'SCHMIT, ALL INDIVIDUALLY of WEST DES '....
MOINES..IA
its true and lawful Attomey(s)-in-Fact with power and authority hereby conferred to sign, seal and execute in its behalf all lawful
bonds, undertakings and other obligatory instruments of similar nature as follows: Any and Al I Bonds:
and to bind UNITED FIRE & CASUALTY COMPANY thereby as fully and to the same extent as if such instruments were signed by
the duly authorized officers of UNITED FIRE & CASUALTY COMPANY and all the acts of said Attorney, pursuant to the authority
hereby given are hereby ratified and confirmed.
The Authority hereby granted is continuous and shall remain in full force and effect until <revoked ,by UNITED FIRE &
CASUALTY COMPANY.
This power of Attorney Is made and executed pursuant to and by authority of the following By -Law duly adopted by Board of
Directors of the Company on April 18, 1973.
"Article V - Surety Bonds and Undertakings"
Section 2, Appointment of Attorney -in -Fact. 'The President or any Vice President, or any other officer of the Company may,
from time to time, appoint by written certificates attorneys -in -fact to act in behalf of the Company in the execution of policies
of insurance,, bonds, undertakings and other obligatory instruments of like nature. The signature of any officer authorized
hereby,and the Corporate seal, may be affixed by facsimile to any power of attorney or special power of attorney or
certification of neither authorized hereby; such signature and seal, when so used, being adopted by the Company as the
original signature of such officer and the original seal of the Company, to be valid and binding upon the Company with the
same force and effect as though manually affixed. Such attorneys -in fact, subject to the; limitations set forth in their
respective certificates of authority shall have full power to bind the Company by their signature and execution of any such
instruments and to attach the seal of the Company thereto. The President or any Vice President, the Board of Directors or
any other officer of the Company may at any time revoke all power and authority previously given to any attorney -in -fact.
aomuuun
IN WITNESS WHEREOF, the UNITED FIRE & CASUALTY COMPANY has caused these presents to be signed by
its Vice president and its corporate seal to be hereto affixed this 2nd day of Apr i 1 , 2007
-`LSQ CORPORATE %S
-� �— ?z UNITED FIRE & CASUALTY COMPANY
SEAL p p
Y
State of Iowa, County of Linn ss ` Vice President
On 2nd day of April, 2007, 'before me personally came Dennis J. Richmann
to me known, who being by me duly sworn, did depose and say; that he resides in Cedar Rapids, State of Iowa; that he is'a Vice
President of the UNITED FIRE & CASUALTY COMPANY, the corporation described in and which executed the above instrument; that
he knows the seal of said corporation; that the seal affixed to the said instrument is such corporate seal; that it was so affixed
pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like
authority, and acknowledges same to be the act and deed of said corporation
t M 7, Jans¢n
mrd IN eat
Commissioneon
fl8D3
My Commugien Expires
tvzeno :Notary Public
I, the undersigned officer of the UNITED FIRE & CASUALTY COMPANY, do hereby certify that I have compared the foregoing copy
i
of the Power of Attorney and affidavit, and the copy of: the Section of the by-laws of said Company, as set forth in said Power of
Attorney, with the ORIGINALS ON FILE IN THE HOME OFFICE OF SAID COMPANY, ;and that the same are correct transcripts
thereof, and of the whole of the said originals, and that the said Power of Attorney has not been revoked and is now in full force and
effect.
11141'PPssA IGSLSriL rx� In testimony whereof I have hereunto subscribed my name and affixed the corporate seat of the said Company
c`4� `�- this day of 20 .
t CORPORATE
SEAL D /
�ryA C P
�rrRlllll\1%'0
Secretary
BPOA00190706
05-10-10
30 1
Prepared by: Kim Sandberg, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
RESOLUTION NO. i o-249
RESOLUTION ACCEPTING THE WORK FOR THE 2009 SUMMER SIDEWALK
REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2009 Summer Sidewalk Repair Project, as included in a contract between the City of Iowa City
and Feldman Concrete of Dyersville, Iowa, dated July 15, 2009, be accepted; and
WHEREAS, the performance and payment bond have been filed in the City Engineer's office; and
WHEREAS, the final contract price is $43,103.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this loth day of
ATTEST:?�a�L,/•
CITY ERK
2010
�.jlj
MAYOR
Approved by
City Attorney's Office I ( v
It was moved by Mims and seconded by Wright the Resolution be
adopted, and upon roll call there were:
AYES:
Bailey
Champion
Dickens
Hayek
Mims
Wilburn
Wright
Pweng/res109summersidewa Ik-acptwork.doc
4110
a6- -
2f 9 r
Prepared by: Brian Boelk, Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5437
RESOLUTION NO. 10-287
RESOLUTION ACCEPTING THE WORK FOR THE 2009 STORM SEWER
IMPROVEMENTS PROJECT.
WHEREAS, the Engineering Division has recommended that the work for construction of
the 2009 Storm Sewer Improvements Project, as included in a contract between the City
of Iowa City and Carter and Associates, Inc. of Coralville, Iowa, dated November 201h,
2009, be accepted; and
WHEREAS, the performance and payment bond has been filed in the City Engineer's
office.
WHEREAS, the final contract price is $46,086.50,
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
IOWA CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa
City, Iowa.
Passed and approved this 1st day of June , 2010.
Mayor
ATTEST: d zuJ
City Clerk
Approved by:
City Attorney's Office
SIa�IIv
Resolution No. 10-287
Page 2
It was moved by champion and seconded by Wright the Resolution be
adopted, and upon roll call there were:
AYES:
wpdata/glossa ry/resolution4c.doc
NAYS: ABSENT:
Bailey
Champion
Dickens
Hayek
Mims
Wilburn
Wright
Prepared by: Kim Sandberg, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
RESOLUTION NO. 1 o-313
RESOLUTION ACCEPTING THE WORK FOR THE 404 HAZARD MITIGATION
PROPERTY ACQUISITION DEMOLITIONS PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the 404
Hazard Mitigation Property Acquisition Demolitons, as included in a contract between the City of
Iowa City and D.W. Zinser Company of Walford, Iowa, dated September 4, 2009, be accepted;
and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, the final contract price is $120,646.93.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 12th day of
�i
TA 7100
20 10
Approved by
ATTEST:�hr�
CITY tERK City Attorney's Office
It was moved by Champion and seconded by Dickens the Resolution be
adopted, and upon roll call there were:
AYES:
Pweng/res/404hazmUde mo-acptwork.doc
7/10
NAYS: ABSENT:
Bailey
Champion
Dickens
Hayek
Mims
Wilburn
Wright
4 10
Prepared by: Kumi Morris, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
RESOLUTION NO. 10-334
RESOLUTION ACCEPTING THE WORK FOR THE SALT STORAGE FACILITY
OAKLAND CEMETERY PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the Salt
Storage Facility Oakland Cemetery, as included in a contract between the City of Iowa City and
Apex Construction Company of Iowa City, Iowa, dated November 2, 2009, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
Engineering Division office; and
WHEREAS, the final contract price is $79,953.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA CITY,
IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 12th day of July 2010
MAYOR
Approved by / r/ /'
ATTEST: / alul"d � 5
CITY CLERK City Attorney ss ce y j,
Pflu
It was moved by Champion and seconded by
adopted, and upon roll call there were:
AYES:
Pweng/res/ACPTWRK-sallslorageoakland doc
Dickens
NAYS: ABSENT:
Bailey
Champion
Dickens
Hayek
Mims
Wilburn
Wright
the Resolution be
I,' o s
4f(2)
Prepared by: Josh Slattery, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5149
RESOLUTION NO. 10-446
RESOLUTION ACCEPTING THE WORK FOR THE PEDESTRIAN MALL BRICK
REPAIR PROJECT.
WHEREAS, the Engineering Division has recommended that the work for construction of the
Pedestrian Mall Brick Repair Project, as included in a contract between the City of Iowa City and
Hardscape Solutions of Iowa of Marion, Iowa, dated July 21, 2010, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, the final contract price is $66,485.20.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 26th day of October , 20_i n
y-
MAYOR
Approved by
ATTEST: Aaae�,) ql- `k-aAA-) ((Jnn, qubm�
CIT LERK CtyAttorney'sOffice Iill1110
It was moved by Champion and seconded by Dickens the Resolution be
adopted, and upon roll call there were:
AYES:
NAYS:
ABSENT:
x Bailey
x Champion
x Dickens
x Hayek
x Mims
x Wilburn
x Wright
Pweng/res/ACPT W ORK-pedmallbrick.doc
10110
ENGINEER'S REPORT
October 18, 2010
City Clerk
City of Iowa City, Iowa
Re: Pedestrian Mall Brick Repair Project
Dear City Clerk:
Ir
3k rlll�� �
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240.1826
(319) 356-5000
(319) 356-5009 FAX
wwwJcgov.org
I hereby certify that the construction of the Pedestrian Mall Brick Repair Project
has been completed by Hardscape Solutions of Iowa of Marion, Iowa in
substantial accordance with the plans and specifications prepared by the City of
Iowa City Staff.
The final contract price is $66,485.20.
I recommend that the above -referenced improvements be accepted by the City
of Iowa City.
Sincerely,``
Ronald R. Knoche, P.E.
City Engineer
ro
0
S2
U
C7
C-)_
—I
Ca
CrJ
4f(1)
Prepared by: Kim Sandberg, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
RESOLUTION NO. 10-445
RESOLUTION ACCEPTING THE WORK FOR THE 2010 SUMMER SIDEWALK
REPAIR PROJECT.
WHEREAS, the Engineering Division has recommended that the work for construction of the
2010 Summer Sidewalk Repair Project, as included in a contract between the City of Iowa City
and Bud Maas Concrete, Inc. of Iowa City, Iowa, dated July 12, 2010, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, the final contract price is $49,954.26.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 26th day of October , 2010
MAYOR
�,d�s.,�
/J A Approved by
ATTEST: :22�7w
CITY bLERK City Attorney's Office la 1lq 10
It was moved by Champion and seconded by Dickens the Resolution be
adopted, and upon roll call there were:
AYES:
NAYS:
ABSENT:
x Bailey
x Champion
x Dickens
x Hayek
x Mims
x Wilburn
x Wright
Pweng/res/ACPTW OR K-2010summersldewalk.doc
10/10
ENGINEER'S REPORT
October 18, 2010
City Clerk
City of Iowa City, Iowa
Re: 2010 Summer Sidewalk Repair Project
Dear City Clerk:
I P 1
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240-1826
(319) 356-5000
(319) 356-5009 FAX
www.1cgov.org
I hereby certify that the 2010 Summer Sidewalk Repair Project has been
completed by Bud Maas Concrete, Inc. of Iowa City, IA, in substantial
accordance with the plans and specifications prepared by the City of Iowa City.
The final contract price is $49,954.26
recommend that the above -referenced improvements be accepted by the City
of Iowa City.
Sincerely,
l(J
Ronald Knoche, P.E.
City Engineer
r�
Q
n
C.)
11.16.10
4d 13
Prepared by: Kumi Morris, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
RESOLUTION NO. 10-483
RESOLUTION ACCEPTING THE WORK FOR THE CAPITOL STREET RAMP
DOOR AND WINDOW REPLACEMENT PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
Capitol Street Ramp Door and Window Replacement Project, as included in a contract between
the City of Iowa City and Apex Construction Company of Iowa City, Iowa, dated November 23,
2008, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, the final contract price is $86,000.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 16th day of November , 20 10
A`4'--4
MAYOR
Approved by
ATTEST:_��%Lc�,J
CIT ERK
It was moved by Champion and seconded by
adopted, and upon roll call there were:
AYES:
NAYS:
Wilburn
ABSENT:
Bailey
Champion
Dickens
Hayek
x Mims
Wilburn
Wright
the Resolution be
Pweng/res/ca pstrieplacement-acptwork.doe
11/10
12-01-10
Prepared by: Denny Gannon, Assistant City Engineer, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5142
RESOLUTION NO. 1 n-gog
RESOLUTION ACCEPTING THE WORK FOR THE WATER MAIN, STORM
INTAKES, AND PAVING PUBLIC IMPROVEMENTS FOR AUDITOR'S PARCEL
2004016 (WOOLF AVENUE EXTENSION), AND DECLARING PUBLIC
IMPROVEMENTS OPEN FOR PUBLIC ACCESS AND USE.
WHEREAS, the Engineering Division has certified that the following improvements have been
completed in accordance with the plans and specifications of the City of Iowa City:
Storm intakes and water main improvements for Auditor's Parcel 2004016 (Woolf Avenue
Extension), as constructed by Maxwell Construction, Inc. of Iowa City, Iowa.
Paving improvements for Auditor's Parcel 2004016 (Woolf Avenue Extension), as
constructed by Streb Construction Co., Inc, of Iowa City, Iowa.
WHEREAS, the maintenance bonds have been filed in the City Engineer's office; and
WHEREAS, the traffic control signs have been installed.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa and
that all dedications and public improvements are previously set aside as not being open for public
access are hereby formally accepted and declared open for public access and use.
Passed and approved this 7th day of becember 2010.
_M
1/' •'_
Approved by /
ATTEST: %( ate—�i �C�r� (-
wDa GEt r
CITY CLERK City Attorney's Office �'�z////o
It was moved by Champion and seconded by Wright the Resolution be
adopted, and upon roll call there were:
AYES: NAYS: ABSENT:
x Bailey
X Champion
X Dickens
x Hayek
x Mims
X Wilburn
X Wright
Pweny/resN=1faveex4ACPNJ0RK-10.dm
12/10
Prepared by: Dave Panos, Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
RESOLUTION NO. 11-9
RESOLUTION ACCEPTING THE WORK FOR THE IOWA RIVER BANK
REPAIR PROJECT.
WHEREAS, the Engineering Division has recommended that the work for construction of
the Iowa River Bank Repair Project, as included in a contract between the City of Iowa
City and Bockenstedt Excavating, Inc. of Iowa City, Iowa, dated February 13lh, 2009, be
accepted; and
WHEREAS, the performance and payment bond has been filed in the City Engineer's
office.
WHEREAS, the final contract price is $42,943.60.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
IOWA CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa
City, Iowa.
Passed and approved this 10th day of January , 2011.
5 �
Mayor
ATTEST: /(-, • �i d
City
Approved by:
City Attorney's Office 1,2- 1a
Resolution No. 1
Page 2
It was moved by Champion and seconded by _ Mims the Resolution be
adopted, and upon roll call there were:
AYES: NAYS: ABSENT:
x Bailey
—x— Champion
x Dickens
x Hayek
x Mims
x Wilburn
x Wright
wpdala/glossa ry/resolution-lo. doe
I r I
ENGINEER'S REPORT
May 3, 2011
City Clerk
City of Iowa City, Iowa
Re: Asbestos Abatement and Removal of Miscellaneous
at 645 McCollister Blvd. in Iowa City, Iowa
Dear City Clerk:
w sus®W�
STA
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240-1826
(319) 356-5000
(319) 356-5009 FAX
www.icgov.org
N
o'
�t
t7
r
m
Hazardous�*Iater&s
cb
I hereby certify that the Asbestos Abatement and Removal of Miscellaneous
Hazardous Materials at 645 McCollister Blvd. in Iowa City, Iowa has been
completed by Active Thermal Concepts of Hiawatha, Iowa in substantial
accordance with the plans and specifications prepared by Bracke-Hayes-Miller-
Mahon, Architects, LLP of Davenport, Iowa.
The final contract price is $5,200.00.
I recommend that the above -referenced improvements be accepted by the City
of Iowa City.
Sincerely,
Ronald R. Knoche, P.E.
City Engineer
ENGINEER'S REPORT
May 9, 2011
I t 1
®16a
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240-1826
(319) 356-5000
(319) 356-5009 FAX
www.icgov.org
N
_O
City Clerk
City of Iowa City, Iowa
��
_`
Re: Communication Duct Installation Combined Projects
:<tw„
b
v
Dear City Clerk:
Cn
I hereby certify that the Communication Duct Installation Combined Projects has
been completed by Advanced Electrical Services of Iowa City, IA, in substantial
accordance with the plans and specifications prepared by Communications
Infrastructure Services Group.
The final contract price is $79,137.00
I recommend that the above -referenced improvements be accepted by the City
of Iowa City.
Sincerely,
Ronald Knoche, P.E.
City Engineer
Prepared by: Gary Cohn, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5430
RESOLU T ION NO. 11-1 73
RESOLUTION ACCEPTING THE WORK FOR THE COMMUNICATION DUCT
INSTALLATION COMBINED PROJECTS
WHEREAS, the Engineering Division has recommended that the work for construction of the
Communication Duct Installation Combined Projects, as included in a contract between the City of
Iowa City and Advanced Electrical Services, of Iowa City, Iowa, dated July 6, 2010, be accepted;
and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the ITS Fiber Optic Utility account #8300; and
WHEREAS, the final contract price is $79,137.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 17th day of May 20 11 .
MAYOR
ATTEST: adz� -hl. t
CIT"'`CLERK
Approved by
City Attorneys Office
It was moved by Champion and seconded by Wright the Resolution be
adopted, and upon roll call there were:
AYES:
x
x
x
x
x
x
x
Pwenglreskom mdmt1nsta11-acptwork.doc
6111
NAYS: ABSENT:
Bailey
Champion
Dickens
Hayek
Mims
Wilburn
Wright
Pf-a)
3e 4
Prepared by: Josh Slattery, Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5149
RESOLUTION NO. 11 —1 74
RESOLUTION ACCEPTING THE WORK FOR THE ASBESTOS ABATEMENT
AND REMOVAL OF MISCELLANEOUS HAZARDOUS MATERIALS AT 645
MCCOLLISTER BLVD. IN IOWA CITY, IOWA PROJECT
WHEREAS, the Engineering Division has recommended that the work for the
Asbestos Abatement and Removal of Miscellaneous Hazardous Materials at 645 McCollister Blvd.
in Iowa City, Iowa Project, as included in a contract between the City of Iowa City and Active
Thermal Concepts of Hiawatha, Iowa, dated March 28, 2011, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the Terry Trueblood Recreation Area account
#4152; and
WHEREAS, the final contract price is $5,200.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 17th day of
ATTEST: 4Z . 7�
Crf"MLERK
20 11 .
MAYOR
Approved by
City Attorneys Offices (1
It was moved by Champion and seconded by Wright the Resolution be
adopted, and upon roll call there were:
AYES:
NAYS: ABSENT:
Bailey
Champion
Dickens
Hayek
Mims
Wilburn
Wright
Pwenglres/asbestosabate-acptwork.doc
5111
Prepared by: Kumi Morris, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
RESOLUTION NO. i 1-19a
RESOLUTION ACCEPTING THE WORK FOR THE PARKING RAMC' DOOR
REPLACEMENT CAPITOL STREET AND DUBUQUE STREET RAMPS
PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
Parking Ramp Door Replacement Capitol Street and Dubuque Street Ramps, as included in a
contract between the City of Iowa City and Selzer Werderitsch Associates of Iowa City, Iowa,
dated April 14, 2010, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the Capitol Street/Dubuque Street Ramps,
Doors and Windows Replacement account #3013-510800; and
WHEREAS, the final contract price is $61,029.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 7th day of June 20 11
4yqti -
MAYOR
Approved by
ATTEST: , � 1&, 6e w
CITY ttERK City Attorney's Office 3f I it
It was moved by champion and seconded by Dickens the Resolution be
adopted, and upon roll call there were:
AYES:
x
x
x
X
X
x
x
Pwe ng/res/acp(work-ParkingRampDoorReplace.do
5111
NAYS: ABSENT:
Bailey
Champion
Dickens
Hayek
Mims
Wilburn
Wright
ram; L73f 3 007
Prepared by: Brian Boelk, PW/Eng., 410 E. Washington St., Iowa City, IA 52240 (319) 356-5437
RESOLUTION NO. 1 1 -i en
RESOLUTION ACCEPTING THE WORK FOR THE 2010 STORM SEWER
IMPROVEMENTS PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2010 Storm Sewer Improvements Project, as included in a contract between the City of Iowa City
and Bockenstedt Excavating, Inc. of Iowa City, Iowa, dated December 14, 2010, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineering office; and
WHEREAS, funds for this project are available in the Stormwater Management account # 7700-
580100; and
WHEREAS, the final contract price is $43,965.75.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 7th day of June , 20 11
A
MAYOR
Approved by
ATTEST:�,U�
CITftC ERK
It was moved by Champion and seconded by
adopted, and upon roll call there were:
AYES:
i7
NAYS:
City Attorney's Office s'3 t I t i
Dickens the Resolution be
ABSENT:
Bailey
Champion
Dickens
Hayek
Mims
Wilburn
Wright
pweng/restacptwork2010stormwtrmgmt.doc
SW JECCCIVIt
®,�
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240-1826
(319) 356-5000
(319) 356-5009 FAX
ENGINEER'S REPORT www.icgov.org
May 25, 2011
City Clerk
City of Iowa City, Iowa
Re: 2010 Storm Sewer Improvements
Dear City Clerk:
I hereby certify that the construction of the 2010 Storm Sewer Improvements
Project has been completed by Bockenstedt Excavating, Inc. of Iowa City, Iowa
in substantial accordance with the plans and specifications prepared by the City
of Iowa City Engineering Division.
The final contract price is $43,965.75.
I recommend that the above -referenced improvements be accepted by the City
of Iowa City.
Sincerely,
Ronald R. Knoche, P.E.
City Engineer
p-6
Prepared by: Kumi Moms, Eng. Div., & Brenda Nations, 410 E. Washington St., Iowa City, IA 52240 (319)356-5044
RESOLUTION NO. i 1 —91 4
RESOLUTION AWARDING CONTRACT AND AUTHORIZING THE MAYOR TO
SIGN AND THE CITY CLERK TO ATTEST A CONTRACT FOR
CONSTRUCTION OF THE EECBG WATER PLANT IMPROVEMENT PROJECT
2011.
WHEREAS, Randall Electric, Inc. of Iowa City, Iowa has submitted the lowest responsible bid of
$143,350,00 for construction of the above -named project; and
WHEREAS, the original Consultant Engineer's estimate was $86,250.00; and
WHEREAS, through a competitive quotation process, three bids were received and although they
came in 60% higher than the Consultant's Estimate, the bids appear to be competitive based on
the close range in the bid amounts; and
WHEREAS, the increased costs are due to Davis Bacon Requirements, EECBG paperwork,
difficulty of installation work within process areas and increased material cost; and
WHEREAS, the amounts of the submitted bids were above the limit of competitive quotation, and
thus the contract award must be approved by the City Council; and
WHEREAS, funds for this project are available in the EECBG account # 2310-435100.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT:
The contract for the construction of the above -named project is hereby awarded to Randall
Electric, Inc., subject to the condition that awardee secure adequate performance and
payment bond, insurance certificates, and contract compliance program statements.
The Mayor is hereby authorized to sign and the City Clerk to attest the contract for
construction of the above -named project, subject to the condition that awardee secure
adequate performance and payment bond, insurance certificates, and contract compliance
program statements.
3. The Director of Public Works is authorized to execute change orders as they may become
necessary in the construction of the above -named project.
Passed and approved this 7th day of June 2011.
ATTEST: / J
CIT ERK
&44� bk",�
MAYOR
Approved by
City Attorney's Office III
pweng/res/awrdwn-randa]I EECeG.doc
Resolution No.
Page 2
It was moved by Wright and seconded by aims the Resolution be
adopted, and upon roll call there were:
AYES:
wpdata/glossa ry/resolution-ic.doc
NAYS: ABSENT:
Bailey
Champion
Dickens
Hayek
Mims
Wilburn
Wright
P,'jec 4
02� Cs)
Prepared by: Kum] Morris, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
RESOLUTION NO. _ 11-223
RESOLUTION ACCEPTING THE WORK FOR THE IOWA CITY PARKING
OFFICE REMODEL PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the Iowa
City Parking Office Remodel Project, as included in a contract between the City of Iowa City and
Calacci Construction Company, Inc. of Iowa City, Iowa, dated May 17, 2010, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are now available in the Parking Office Remodel account
#3016;and
WHEREAS, the final contract price is $47,539.78.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 21st day of
MAYOR
ATTEST: ��,,,
CITY CtERK
20 11 .
Approved by
City Attorney's Office.l I5
It was moved by Champion and seconded by trims the Resolution be
adopted, and upon roll call there were:
AYES: NAYS: ABSENT:
x Bailey
x Champion
x Dickens
x Hayek
x Mims
x Wilburn
x Wright
Pweng/res/parkingoKceremod-acphvork.doc
6111
3e(3)
Prepared by: Denny Gannon, Asst. City Engineer, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5142
RESOLUTION NO. t 1-244
RESOLUTION ACCEPTING THE WORK FOR THE SANITARY SEWER, STORM
SEWER, PAVING, CURB AND GUTTER, AND CERTAIN SIDEWALK PUBLIC
IMPROVEMENTS INSTALLED WITH THE JOHNSON COUN T Y HEALTH AND
HUMAN SERVICES BUILDING, AND DECLARING PUBLIC IMPROVEMENTS
OPEN FOR PUBLIC ACCESS AND USE.
WHEREAS, the Engineering Division has certified that the following improvements have been
completed with the Johnson County Health and Human Services Building in accordance with the
plans and specifications of the City of Iowa City:
• Sanitary sewer improvements as constructed by Rathje Construction Co., Inc. of Marion,
Iowa and Dave Schmitt Construction Company, Inc. of Cedar Rapids, Iowa.
• Storm sewer improvements as constructed by Rathje Construction Co., Inc. of Marion,
Iowa and Dave Schmitt Construction Company, Inc. of Cedar Rapids, Iowa.
• Paving improvements as constructed by Rathje Construction Co., Inc. of Marion, Iowa.
• Curb and gutter improvements as constructed by Tricon General Construction, Inc. of
Dubuque, Iowa.
• Certain sidewalk improvements as constructed by Tricon General Construction, Inc. of
Dubuque, Iowa.
WHEREAS, the maintenance bonds have been filed in the City Engineer's Office; and
WHEREAS, the City of Iowa City has notified those contractors listed previously of the date on
which it will consider acceptance of the aforementioned public improvements.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said storm sewer improvements are hereby accepted by the City of Iowa City,
Iowa.
Passed and approved this 2nd day of August 2011
10& ;
MAYOR
Approved by
ATTEST: Zwtz,J �
CITY'CLERK City Attorneys Office
Resolution No
Page 2
11-244
It was moved by Champion and seconded by Mims the Resolution be
adopted, and upon roll call there were:
AYES:
Pweng/res/pcohumanservbldg--acphvork.doc
7/11
NAYS:
ABSENT:
Bailey
Champion
Dickens
Hayek
Mims
Wilburn
Wright
Z3e
Prepared by: Jason Havel, Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5410
RESOLUTION NO. 11-282
RESOLUTION ACCEPTING THE WORK FOR THE 2011 WATER MAIN
DIRECTIONAL BORING PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2011 Water Main Directional Boring Project, as included in a contract between the City of Iowa
City and Advanced Electrical Services, Inc. of Iowa City, IA, dated April 27, 2011, be accepted;
and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the Annual Water Main Projects account #3204;
and
WHEREAS, the final contract price is $42,249.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 6th day of September 20 11
MAYOR
Approved by
ATTEST: l/7�Zi�zc� 9S J k
CITY'CLERK City Attorneys Office a`I II
It was moved by Rai la;z and seconded by Mims the Resolution be
adopted, and upon roll call there were:
AYES:
x
x
x
x
x
x
x
Pweng/res/2011 v&mai noon ng-acptwork.doc
8/11
NAYS: ABSENT:
Bailey
Champion
Dickens
Hayek
Mims
Wilburn
Wright
r
k :.v1 p'
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240-1826
(319) 356-5000
(319) 3S6-5009 FAX
ENGINEER'S REPORT wwwAgov.org
August 22, 2011
City Clerk
City of Iowa City, Iowa
Re: 2011 Water Main Directional Boring Project
Dear City Clerk:
I hereby certify that the 2011 Water Main Directional Boring Project has been
completed by Advanced Electrical Services, Inc. of Iowa City, Iowa, in substantial
accordance with the plans and specifications prepared by the City of Iowa City
staff.
The final contract price is $42,249.00
I recommend that the above -referenced improvements be accepted by the City
of Iowa City.
Sincerely,
Ronald R. Knoche, P.E.
City Engineer
l
i 0
01-2412 —
4d(6)
mo��
Prepared by: Jason Havel, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5410
RESOLUTION NO. 12-27
RESOLUTION ACCEPTING THE WORK FOR THE 2011 WATER MAIN
IMPROVEMENTS PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2011 Water Main Improvements Project, as included in a contract between the City of Iowa City
and Lynch's Excavating, Inc. of West Branch, Iowa, dated October 4, 2011, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the Annual Water Man Projects account #3204;
and
WHEREAS, the final contract price is $60,881.64.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 24th day of Tanuary 20 12
n +Q 4-q
MAYOR
Approved by
ATTEST: AV.4� e. K 4m-� dGlcfge,�
CIT RK City Attorneys Office 1/1i//2-
It was moved by Champion and seconded by Payne the Resolution be
adopted, and upon roll call there were:
AYES:
Pwenglres/2011 wlrmainimprov-acpbvork.doc
1/12
NAYS: ABSENT:
Champion
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
M-49
02-21.12
5d(2)
Prepared by: Dave Panos, Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
RESOLUTION NO. 12-50
RESOLUTION ACCEPTING THE FY2012 ASPHALT RESURFACING
PROJECT.
WHEREAS, the Engineering Division has recommended that the work for construction of
the FY2012 Asphalt Resurfacing Project, as included in a contract between the City of
Iowa City and L.L. Felling Company, Inc. of North Liberty, Iowa, dated July 5, 2011, be
accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been
filed in the City Clerk's office; and
WHEREAS, funds for this project are available in the Pavement Rehabilitation account
#3824; and
WHEREAS, the final contract price is $ 753,660.79.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
IOWA CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa
City, Iowa.
Passed and approved this 21st day of February 2012.
-A ^,
Mayor
ATTEST: ? - `� u/
City Jerk
Approved by:
��GtGC. ✓ o-,yl L��
City Attorney's Office a((o 1(7—
Resolution No.
Page 2
It was moved by Champion and seconded by ThroQmorton the
Resolution be adopted, and upon roll call there were:
AYES:
NAYS:
ABSENT:
Champion
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
rlll p'
®�rM
®i
CITY OF IOWA CITY
410 East Washington Sneet
Iowa City, Iowa 52240-1826
(319) 356-5000
(319) 356-5009 FAX
ENGINEER'S REPORT www.ICgo V.ol'g
February 10, 2012
City Clerk
City of Iowa City, Iowa
Re: FY2012 Asphalt Resurfacing Project
Dear City Clerk:
I hereby certify that the construction of the FY2012 Asphalt Resurfacing Project
has been completed by LL Pelling Company, Inc. of North Liberty, Iowa in
substantial accordance with the plans and specifications prepared by the City of
Iowa City.
The final contract price of the project is $753,660.79.
I recommend that the above -referenced improvements be accepted by the City
of Iowa City.
Sincerely,
Ronald R. Knoche, P.E.
City Engineer
MBC Bond No.: IAC 65238
IFIC Bond No.: CMIFSU 0560285
PERFORMANCE AND PAYMENT BOND
L.L. Pellinq Company, Inc. , as
(insert the name and address or legal title of the Contractor)
Principal, hereinafter called the Contractor and Merchants Bonding Company and
(insert the legal title of the Surety)
International Fidelity Insurance Company as Surety, hereinafter called
the Surety, are held and firmly bound unto the City of Iowa City, Iowa, as obligee, hereinafter
called the Owner, in the amount of Seven Hundred Seventeen Thousand, Seven Hundred Thirty Seven & 10/ Dollars
(g717,737.10-------------------------------- ) for the payment for which Contractor and Surety
hereby bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally.
WHEREAS, Contractor has, as of July 5, 2011 entered into a
(date)
written Agreement with Owner for the FY 2012 Asphalt Resurfacing Project; and
WHEREAS, the Agreement requires execution of this Performance and Payment Bond, to
be completed by Contractor, in accordance with plans and specifications prepared by
City of Iowa Citv, which Agreement is by reference made a part hereof, and the agreed -upon work
is hereafter referred to as the Project.
NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION are such that, if
Contractor shall promptly and faithfully perform said Agreement, then the obligation of this bond
shall be null and void; otherwise it shall remain in full force and effect until satisfactory completion
of the Project.
A. The Surety hereby waives notice of any alteration or extension of time made by the
Owner.
B. Whenever Contractor shall be, and is declared by Owner to be, in default under the
Agreement, the Owner having performed Owner's obligations thereunder, the Surety may
promptly remedy the default, or shall promptly:
1. Complete the Project in accordance with the terms and conditions of the
Agreement, or
2. Obtain a bid or bids for submission to Owner for completing the Project in
accordance with the terms and conditions of the Agreement; and upon determina-
tion by Owner and Surety of the lowest responsible bidder, arrange for a contract
between such bidder and Owner, and make available, as work progresses (even
though there may be a default or a succession of defaults under the Agreement or
subsequent contracts of completion arranged under this paragraph), sufficient
Iff
funds to pay the cost of completion, less the balance of the Contract Price, but not
exceeding the amount set forth in the first paragraph hereof. The term "balance of
the Contract Price," as used in this paragraph, shall mean the total amount
payable by Owner to Contractor under the Agreement, together with any addenda
and/or amendments thereto, less the amount properly paid by Owner to
Contractor.
C. The Contractor and Contractor's Surety shall be obligated to keep the improvements
covered by this bond in goad repair for a period of five (5) years from the date of formal
acceptance of the Improvements by the Owner.
D. No right of action shall accrue to or for the use of any person, corporation or third party
other than the Owner named herein or the heirs, executors, administrators or successors
of Owner.
IT IS A FURTHER CONDITION OF THIS OBLIGATION that the Principal and Surety, in
accordance with provisions of Chapter 573, Code of Iowa, shall pay to all persons, firms or
corporations having contracts directly with the Principal, including any of Principal's subcontrac-
tors, all claims due them for labor performed or materials furnished in the performance of the
Agreement for whose benefit this bond is given. The provisions of Chapter 573, Code of Iowa, are
a part of this bond to the same extent as if it were expressly set out herein.
2011
SIGNED AND SEALED THIS 5th
IN THE PRESENCE OF:
Witness
Witness Lisa Lawson
DAY OF July
(Principal) / 1
W I C e ��
(Title)
Merchants Bonding Company and
Intem onal Fidelity 1psurance Company
// (Surety)
Scott A. Bailey (Title) orney-ir-Fact
2100 Fleur Drive
(Street)
Des Moires, IA 50321
(City, State, Zip)
800-678-8171
(Phone)
1:7:39
MERCHANTS
BONDING COMPANY
POWER OF ATTORNEY Bond#: IAC65238
for Company Employees
Know All Persons By These Presents, that the MERCHANTS BONDING COMPANY (MUTUAL), a corporation duly organized under
the laws of the State of Iowa, and having its principal office in the City of Des Moines, County of Polk, State of Iowa, hath made,
constituted and appointed, and does by these presents make, constitute and appoint the following company employees
Scott A. Bailey
of Des Moines and State of Iowa its true and lawful Attorney -in -Fact, with full power
and authority hereby conferred in its name, place and stead, to sign, execute, acknowledge and deliver in its behalf as surely any
and all bonds, undertakings, recognizances or other virilten obligations in the nature thereof, subject to the limitation that any such
instrument shall not exceed the amount of:
Unlimited
and to bind the MERCHANTS BONDING COMPANY (MUTUAL) thereby as fully and to the same extent as if such bond or
undertaking was signed by the duly authorized officers of the MERCHANTS BONDING COMPANY (MUTUAL), and all the acts of
said Attomey-in-Fact, pursuant to the authority herein given, are hereby ratified and confirmed.
This Power -of -Attorney is made and executed pursuant to and by authority of the following Amended Substituted and Restated By -
Laws adopted by the Board of Directors of the MERCHANTS BONDING COMPANY (MUTUAL) on November 16, 2002.
ARTICLE II, SECTION 8 - The Chairman of the Board or President or any Vice President or Secretary shall have power and
authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the
Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature
thereof.
ARTICLE II, SECTION 9 - The signature of any authorized officer and the Seal of the Company may be affixed by facsimile
to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking,
recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the
same force and effect as though manually fixed.
In Wmess Whereof, MERCHANTS BONDING COMPANY (MUTUAL) has caused these presents to be signed by its President and
its corporate seal to be hereto affixed, this 30th day of March , 2010 .
STATE OF IOWA
COUNTY OF POLK ss.
• _LNG Cri
—;_ -o-
•z:
,
�:3.
y; 1933
; c;
MERCHANTS BONDING COMPANY (MUTUAL)
By /Oe-��7 /-74
President
On this 30th day of March , 2010 . before me appeared Larry Taylor, to
me personally known, who being by me duly sworn did say that he is President of the MERCHANTS BONDING COMPANY (MUTUAL),
the corporation described in the foregoing instrument, and that the Seal affixed to the said instrument is the Corporate Seal of the said
Corporation and that the said instrument was signed and sealed in behalf of said Corporation by authority of Its Board of Directors.
In Testimony Whereof, I have hereunto set my hand and affixed my Official Seal at the City of Des Moines, Iowa, the day and year first
above written.
r♦ CINDY SMYTH
r Commission Number 173504
fly Commission Expires
March 16, 2012 Notary Public, Polk County, Iowa
STATE OF IOWA
COUNTY OF POLK ss.
I, William Warner, Jr., Secretary of the MERCHANTS BONDING COMPANY (MUTUAL), do hereby certify that the above and foregoing
is a true and correct copy of the POWER -OF -ATTORNEY executed by said MERCHANTS BONDING COMPANY (MUTUAL), which is
still in full force and effect and has not been amended or revoked.
In Witness Whereof, I have hereunto set my hand and affixed the seal of the Company on this 5th day of July , 2011 ,. �/ , 1-1
Secretary
POA 0005 EMP (1/09)
ime
the exec[
CO\1PA;
principal.
This N
Directors
The Presl
(1) To
t to execute seal and deliver for: and on its
of
as fully and amply, to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at
e.
of Attorneyy is executed, and may be revoked, pursuant to and by authority of Article 3-Section 3, of die By Laws ado led by the Board of
VTERNAT.IONAL FIDELITY INSURANCE COMPANY at a meeting called and held on the 7th day of February, 1974 !
or any Vice President, Executive Vice President, Secretary or Assistant Secretary, shall have power and authority
lint Attorneys -in -fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the Company thereto; bonds and
kings, contracts of indemnity and other writings obligatory in the nature thereof and,
(2) To remove, at any time, any such attorney -in -fact and revoke the authority given.
Further, this Power of Attorney is signed and sealed by facsimile pursuant to resolution of the Board of Directors of said Company adopted at a meeting
duly called and held on the 29th day of April, 1982 of which the following is a true excerpt:
Now therefore die signatures of such officers and the seal of the Company may be affixed to any such power of attorney or any certificate relating thereto by
facsimile, and any such power of attorney or certificate bearing such facsimile signatures or facsimile seal shall be valid and bindingg upon die Company and any
such power so executed and certified by facsimile signatures and facsimile seal shall be valid and binding upon the Company in the future with respect to any
bond or undertaking to which it is attached.
swo
said
said
IN TEST
IN TESTIMONY WHEREOF, INTERNATIONAL FIDELITY INSURANCE COMPANY has caused this instrument to be
signed and its corporate seal to be affixed by its authorized officer, this T6dr day of October, A.D. 2007.
INTERNATIONAL FIDELITY INSURANCE COMPANY
STATE OF NEW JERSEY
County of Essex
Secretary
day of October 2007, before me came the individual who executed die receding instrument, to me personal)y known, and, being by tire duly
he is the therein described and authorized officer of the INTERNATIONAL fIDELIT] INSURANCE COMPANY; that the seal affixed to
is the Corporate Seat of said Company; that the said Corporate Seal and his signature were duly affixed by order of the Board of Directors ofIN .
at the City TESTIMONY hereunto s
of Newark, , New Jersey the day and year first above written.Of
Official Seal,
4gtIS
I have hereunto Set
that
Prepared by: Dave Panes, Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
RESOLUTION NO. 12-51
RESOLUTION ACCEPTING THE RIVERSIDE DRIVE FLOOD REPAIR
PROJECT.
WHEREAS, the Engineering Division has recommended that the work for construction of
the Riverside Drive Flood Repair Project, as included in a contract between the City of
Iowa City and L.L. Felling Company, Inc. of North Liberty, Iowa, dated July 281h, 2009, be
accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been
filed in the City Clerk's office; and
WHEREAS, funds for this project are available in the South Riverside Drive between
Riverside Drive / Hwy 6 and Park Road account # 3899; and
WHEREAS, the final contract price is $ 42,059.62
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
IOWA CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa
City, Iowa.
Passed and approved this 21st day of February 2012.
Mayor
ATTEST: i d
City Jerk
Approved by:
..AG k" mmn d 4.4-ot,,-, -
City Attorney's Office a(/olt2
Resolution No.
Page 2
It was moved by Champion and seconded by Throgmorton the
Resolution be adopted, and upon roll call there were:
AYES:
NAYS:
ABSENT:
Champion
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
III n" w h
®iqi
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240-1826
(319) 356-5000
(319) 356-5009 FAX
ENGINEER'S REPORT www.icgov.org
February 10, 2012
City Clerk
City of Iowa City, Iowa
Re: Riverside Drive Flood Repair Project
Dear City Clerk:
I hereby certify that the construction of the Riverside Drive Flood Repair Project
has been completed by LL Pelling Company, Inc. of North Liberty, Iowa in
substantial accordance with the plans and specifications prepared by the City of
Iowa City Staff.
The final contract price is $42,059.62.
I recommend that the above -referenced improvements be accepted by the City
of Iowa City.
Sincerely,
'Zrr a _1P'. 4�
Ronald R. Knoche, P.E.
City Engineer
A-..Ll�
THE AMERICAN INSTITUTE OF ARCHITECTS
IFIC Bond No. CMIFSU 0502531
il
1
Bond No. IAC 60954
AIA Document A312
"' ' 1 r • i #M
Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable,
CONTRACTOR (Name and Address);
SURETY (Name and Principal Place of Business):
Merchants Bonding Company (Mutual)
L.L. Polling Company Inc.
2100 Fleur Drive
1425 W. Perm Street, PO Box 230
Des Moines IA 50321-1158
North Liberty, IA 52317-0230
International Fidelity Insurance Company
OWNER (Name and Address):
One Newark Center, 20th Floor
City of Iowa City, Iowa
Newark, NJ 07102-5207
410 E. Washington Street
Iowa City, IA 52240
CONTSTRUCTION CONTRACT
Date:
Amount: $47 816.h
Description (lame and Location): perform Project
No.: ER-3715(638)--SR-52, Johnson County
BOND
Date (Not earlier than Construction Contract Date): August 11, 2009
Amount:. $47,816.30
Modifications to this Bond: ® None
CONTRACTOR AS PRINCIPAL
Company; (Corporate Seal)
L.L. Pelting Company Inc
Signature:
Name and Title: t ,z W V nn ar
Vi, ..e &-5oe"k-
(Any additional signatures appear on page 3)
UNTMEA
❑ See Page 3
Company: (Corporate SEA
Merchapls B ����1P Co any (Mutual) and
Internahona�Fiae�ty insurgstee CJ*pAny
Signature: d <--
Name and Title: Michael P. Foster
Attorney -In -Fact
(FOR INFORMATION ONLY— Name, Address and Telephone)
AGENT or BROKER: OWNER'S REPRESENTATIVE (Architect, Engineer or other
party):
MCKUSKER & ASSOCIATES
P O BOX 85
BROOKLYN, IA 52211
641-522-9206 -
AIA DOCUMENT A312 • PERFORMANCE BOND AND PAYMENT BOND - DECEMBER 1964 ED. • AIA
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 A312,1984 1
1 The Contractor and the Surety, jointly and severally, bind
themselves, their heirs, executors, administrators,
successors and assigns to the Owner for the performance
of the Construction Contract, which is incorporated herein
by reference.
2 If the Contractor performs the Construction Contract, the
Surety and the Contractor shall have no obligation under
this Bond, except to participate in conferences as provided
in Subparagraph 3.1.
3 If there is no Owner Default, the Suretys obligation
under this Bond shall arise after:
3.1 The Owner has notified the Contractor and the
Surety at its address described in Paragraph 10
below that the Owner is considering declaring a
Contractor Default and has requested and attempted
to arrange a conference with the Contractor and the
Surety to be held not later than fifteen days after
receipt of such notice to discuss methods of per-
forming the Construction Contract. If the Owner, the
Contractor and the Surety agree, the Contractor shall
be allowed a reasonable time to perform the
Construction Contract, but such an agreement shall
not waive the Owners right, if any, subsequently to
declare a Contractor Default; and
3.2 The Owner has declared a Contractor Default and
formally terminated the Contractor's right to complete
the contract. Such Contractor Default shall not be
declared earlier than twenty days after the Contractor
and the Surety have received notice as provided in
Subparagraph 3.1; and
3.3 The Owner has agreed to pay the Balance of the
Contract Price to the Surety in accordance with the
terms of the Construction Contract or to a contractor
selected to perform the Construction Contract in
accordance with the terms of the contract with the
Owner.
4 When the Owner has satisfied the conditions of
Paragraph 3, the Surety shall promptly and at the Surety's
expense take one of the following actions:
4.1 Arrange for the Contractor, with consent of the
Owner, to perform and complete the Construction
Contract; or
4.2 Undertake to perform and complete the Con-
struction Contract itself, through its agents or through
independent contractors; or
4.3 Obtain bids or negotiated proposals from qualified
contractors acceptable to the Owner for a contract for
performance and completion of the Construction
Contract, arrange for a contract to be prepared for
execution by the Owner and the contractor selected
with the Owner's concurrence, to be secured with
performance and payment bonds executed by a
qualified surety equivalent to the bonds issued on the
Construction Contract, and pay to the Owner the
amount of damages as described in Paragraph 6 in
excess of the Balance of the Contract Price incurred
by the Owner resulting from the Contractors default; or
4.4 Waive its right to perform and complete, arrange
for completion, or obtain a new contractor and with
reasonable promptness under the circumstances:
l After investigation, determine the amount for
which it may be liable to the Owner and, as soon
as practicable after the amount is determined,
tender payment therefore to the Owner; or
.2 Deny liability in whole or in part and notify the
Owner citing reasons therefore.
5 If the surety does not proceed as provided in Para- graph
4 with reasonable promptness, the Surety shall be deemed
to be in default on this Bond fifteen days after receipt of
an additional written notice from the Owner to the Surety
demanding that the Surety perform its obligations under this
Bond, and the Owner shall be entitled to enforce any
remedy available to the Owner. If the Surety proceeds as
provided in Subparagraph 4.4, and the Owner refuses the
payment tendered or the Surety had denied liability, in
whole or in part, without further notice the Owner shall be
entitled to enforce any remedy available to the Owner.
6 After the Owner has terminated the Contractor's right to
complete the Construction Contract, and if the Surety
elects to act under Subparagraph 4.1,4.2, or 4.3 above,
then the responsibilities of the Surety to the Owner shall
not be greater than those of the Contractor under the
Construction Contract, and the responsibilities of the
Owner to the Surety shall not be greater than those of the
Owner under the Construction Contract. To the limit of the
amount of this Bond, but subject to commitment by the
Owner of the Balance of the Contract Price to mitigation of
costs and damages on the Construction Contract, the
Surety is obligated without duplication for:
6.1 The responsibilities of the Contractor for cor-
rection of defective work and completion of the Con-
struction Contract;
6.2 Additional legal, design professional and delay
costs resulting from the Contractors Default, and
resulting from the actions or failure to act of the
Surety under Paragraph 4; and
6.3 Liquidated damages, or if no liquidated damages
are specified in the Construction Contract, actual
damages caused by delayed performance or non-
performance of the Contractor.
7 The Surety shall not be liable to the Owner or others for
obligations of the Contractor that are unrelated to the
Construction Contract, and the Balance of the Contract
Price shall not be reduced or set off on account of any
such unrelated obligations. No right of action shall accrue
on this Bond to any person or entity other than the Owner
or its heirs, executors, administrators or successors.
8 The Surety hereby waives notice of any change, inclu-
ding changes of time, to the Construction Contract or to
related subcontracts, purchase orders and other obli-
gations.
9 Any proceeding, legal or equitable, under this Bond may
be instituted in any court of competent jurisdiction in the
location in which the work or part of the work is located and
shall be instituted within two years after Contractor Default
or within two years after the Contractor ceased working
or within two years after the Surety refuses or fails to
perform its obligations under this Bond, whichever occurs
first. If the provisions of this Paragraph are void or
prohibited by law, the minimum period of limitation avail -
A IA DOCUMENYA312 a PERFORMANCE BOND AND PAYMENT BOND•DECEMBER1984 ED.* AIA® A312-1984 2
THEAMERICAN INSTITUTE OF ARCHnECHTS, 1735 NEW YORK AVE., N.W. WASHINGTON, O.C. 20006
able to sureties as a defense in the jurisdiction of the suit
shall be applicable.
10 Notice to the Surety, the Owner or the Contractor shall
be mailed or delivered to the address shown on the
signature page.
11 When this Bond has been furnished to comply with a
statutory or other legal requirement in the location where
the construction was to be performed, any provision in
this Bond conflicting with said statutory or legal
requirement shall be deemed deleted herefrom and
provisions conforming to such statutory or other legal
requirement shall be deemed incorporated herein. The
intent is that this Bond shall be construed as a statutory
bond and not as a common law bond.
12 DEFINITIONS
12.1 Balance of the Contract Price: The total amount
payable by the Owner to the Contractor under the
Construction Contract after all proper adjustments
M0DIFICA71ONS TO THIS BOND ARE AS FOLLOWS:
have been made including allowance to the
Contractor of any amounts received or to be
received by the Owner in settlement of insurance or
other claims for damages to which the Contractor is
entitled, reduced by all valid and proper payments
made to or on be- half of the Contractor under the
Construction Contract.
12.2 Construction Contract: The agreement between
the Owner and the Contractor identified on the sig-
nature page, including all Contract Documents and
changes thereto.
12.3 Contractor Default: Failure of the Contractor,
which has neither been remedied nor waived, to
perform or otherwise to comply with the terms of the
Construction Contract.
12.4 Owner Default: Failure of the Owner, which has
neither been remedied nor waived, to pay the Con-
tractor as required by the Construction Contract or to
perform and complete or comply with the other terms
thereof.
(Space Is provided below for additional signatures of added parties, other than those appearing on the cover page.)
CONTRACTOR AS PRINCIPAL
Company:
(Corporate Seal)
Signature:
Name and Title:
Address:
SURETY
Company:
Signature:
Name and Title:
Address:
(Corporate Seal)
A IA DOCUMENTA312 o PERFORM ANCE DON D AND PAYMENT BOND•DECEMBER 1994 ED,*AIA 0 A312-1984 3
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEWYORK AVE, N.W. WASHINOTON,D.C. 20006
THE AMERICAN INSTITUTE OF ARCHITECTS
toIFIC Bond No. CMIFSU 0502531
Bond No. IAC 60954
AIA Document A312
i 1 Y
Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable.
CONTRACTOR (Name and Address):
SURETY (Name and Principal Place of Business):
Merchants Bonding Company (Mutual)
L.L. Polling Company Inc,
8 P Y
2100 Fleur Drive
1425 W. Penn Street, PO Box 230
Des Moines IA 50321-I158
North Liberty, IA 52317.0230
OWNER(NameandAddress):
International Fidelity Insurance Company
One Newark Center, 20th. Floor
City of Iowa City, Iowa
Newark, NJ 07102-5207
410 E. Washington Street
Iowa City, IA 52240
CONTSTRUCfION CONTRACT
Date:
Amount: $47,816.30
Description (Name and Location): perform Project No.: ER-3715(638)--8R-52, Johnson County
BOND
Date (Not earlier than Construction Contract Date): August 11, 2009
Amount; '$47,816.30
Modifications to this Bond: ❑ None (M See Page 6
CONTRACTOR AS PRINCIPAL SURETY
Company. (Corporate Seal) Company: (Corporate Seal)
L.L, Petting Company Inc. Merchants Bonding Company (Mutual) and
International Fidelity uran Q C, npany
Signature Q4jSignature:
Name and Title: Kr) nQ p Name and tie: Michael P. Foster
_.. _l,. _.l Attomey-In-Fact
(Any additional
page 6)
(FOR INFORMATION ONLY— Name, Address and Telephone)
AGENT or BROKER:
MCKUSKER & ASSOCIATES
P O BOX 85
BROOKLYN, IA 52211
641.522.9206
OWNER'S REPRESENTATIVE (Architect, Engineer or other
part):
MA DOCUMENT A312 - PERTORMANCE BOND AND PAYMENT BOND - DECEMBER 1964 ED. • AU
THE AMERICAN INSTITUTE OF ARCHITECTS, I7}5 NEW YORK'AVE., N.W., WASHINGTON, D.C. 20006 A312-1984 4
1 The Contractor and the Surety, jointly and severally,
bind themselves, their heirs, executors, administrator,
successors and assigns to the Owner to pay for labor,
materials and equipment furnished for use in the
performance of the Construction Contract, which is
incorporated herein by reference.
2 Wth respect to the Owner, this obligation shall be null
and void if the Contractor:
2.1 Promptly makes payment, directly or indirectly,
for all sums due Claimants, and
2.2 Defends, indemnities, and holds harmless the
Owner from all claims, demands, liens or suits by any
person or entity who furnished labor, materials or
equipment for use in the performance of the
Construction Contract, provided the Owner has
promptly notified the Contractor and the Surety (at
the address described in Paragraph 12) of any
claims, demands, liens or suits and tendered defense
of such claims, demands, liens or suits to the
Contractor and the Surety, and provided there is no
Owner Default.
3 With respect to Claimants, this obligation shall be null
and void if the Contractor promptly makes payment,
directly or indirectly, for all sums due.
4 The Surety shall have no obligation to Claimants under
this Bond until:
4.1 Claimants who are employed by or have a direct
contract with the Contractor have given notice to the
Surety (at the address described in Paragraph 12)
and sent a copy, or notice thereof, to the Owner,
stating that a claim is being made under this Bond
and, with substantial accuracy, the amount of the
claim.
4.2 Claimants who do not have a direct contract with
the Contractor:
.1 Have furnished written notice to the Contractor
and sent a copy, or notice thereof, to the
Owner, within 90 days after having last per-
formed labor or last furnished materials or
equipment included in the claim stating, with
substantial accuracy, the amount of the claim
and the name of the party to whom the mater-
ials were furnished or supplied or for whom
the labor was done or performed; and
.2 Have either received a rejection in whole or in
part from the Contractor, or not received within
30 days of furnishing the above notice any
communication from the Contractor by which
the Contractor has indicated the claim will be
paid directly or indirectly; and
.3 Not having been paid within the above 30 days,
have sent a written notice to the Surety (at the
address described in Paragraph 12) and sent
a copy, or notice thereof, to the Owner, stating
that a claim is being made under this Bond and
enclosing a copy of the previous written notice
furnished to the Contractor.
5 If a notice required by Paragraph 4 is given by the
Owner to the Contractor or to the Surety, that is sufficient
compliance.
6 When the Claimant has satisfied the conditions of
Paragraph 4, the Surety shall promptly and at the Surety's
expense take the following actions:
6.1 Send an answer to the Claimant, with a copy to
the Owner, within 45 days after receipt of the claim,
stating the amounts that are undisputed and the
basis for challenging any amounts that are disputed.
6.2 Pay or arrange for payment of any undisputed
amounts.
7 The Suretys total obligation shall not exceed the
amount of this Bond, and the amount of this Bond shall be
credited for any payments made in good faith by the
Surety.
8 Amounts owed by the Owner to the Contractor under
the Construction Contract shall be used for the
performance of the Construction Contract and to satisfy
claims, if any, under any Construction Performance Bond.
By the Contractor furnishing and the Owner accepting this
Bond, they agree that all funds earned by the Contractor
in the performance of the Construction Contract are
dedicated to satisfy obligations of the Contractor and the
Surety under this Bond, subject to the Owners priority to
use the funds for the completion of the work.
9 The Surety shall not be liable to the Owner, Claimants
or others for obligations of the Contractor that are
unrelated to the Construction Contract. The Owner shall
not be liable for payment of any costs or expenses of any
Claimant under this Bond, and shall have under this Bond
no obligations to make payments to, give notices on
behalf of, or otherwise have obligations to Claimants
under this Bond.
10 The Surety hereby waives notice of any change,
including changes of time, to the Construction Contract or
to related subcontracts, purchase orders and other
obligations.
11 No suit or action shall be commenced by a Claimant
under this Bond other than in a court of competent juris-
diction in the location in which the work or part of the work
is located or after the expiration of one year from the date
(1) on which the Claimant gave the notice required by
Subparagraph 4.1 or Clause 4.2.3, or (2) on which the
last labor or service was performed by anyone or the last
materials or equipment were furnished by anyone under
the Construction Contract, whichever of (1) or (2) first
occurs. If the provisions of this Paragraph are Void or
prohibited by law, the minimum period of limitation
available to sureties as a defense in the jurisdiction of the
suit shall be applicable.
12 Notice to the Surety, the Owner or the Contractor shall
be mailed or delivered to the address shown on the
signature page. Actual receipt of notice by Surety, the
Owner or the Contractor, however accomplished, shall be
sufficient compliance as of the date received at the
address shown on the signature page.
A IA DOCUMENTA312*PER FORMA NCE BOND AND PAYMENT BOND, DECEMBER 1984 ED. eAIA 0 A312-1984 b
THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEWYORK AVE, N.W. WASHINGTON,D.C. 20006
13 When this Bond has been furnished to comply with a
statutory or other legal requirement in the location where
the construction was to be performed, any provision in
this Bond conflicting With said statutory or legal
requirement shall be deemed deleted herefrom and
provisions conforming to such statutory or other legal
requirement shall be deemed incorporated herein. The
intent is that this Bond shall be construed as a statutory
bond and not as a common law bond.
14 Upon request by any person or entity appearing to be
a potential beneficiary of this Bond, the Contractor shall
promptly furnish a copy of this Bond or shall permit a copy
to be made.
15 DEFINITIONS
15.1 Claimant: An individual or entity having a direct
contract Will the Contractor or with a subcontractor of
the Contractor to furnish labor, materials or
equipment for use in the performance of the Contract.
MODIFICATIONS TO THIS BOND AREAS FOLLOWS:
The intent of this Bond shall be to include without
limitation in the terms "labor, materials or equipment'
that part of water, gas, power, light, heat, oil,
gasoline, telephone service or rental equipment used
in the Construction Contract, architectural and
engineering services required for performance of the
work of the Contractor and the Contractor's
subcontractors, and all other items for which a
mechanic's lien may be asserted in the jurisdiction
where the labor, materials or equipment were
furnished.
15.2 Construction Contract: The agreement between
the Owner and the Contractor identified on the
signature page, including all Contract
Documents and changes thereto.
15.3 Owner Default: Failure of the Owner, which has
neither been remedied nor waived, to pay the
Contractor as required by the Construction Contract
or to perform and complete or comply with the other
terms thereof.
Section 6 is modified by adding section 6.3.
6.3 The Surety's failure to discharge its obligations under this Section 6 shall not be deemed to constitute a waiver of
defenses the Surety or Contractor may have or acquire as to a clams, However, if the Surety fails to discharge its
obligations under this Section 6, the Surety shall indemnify the Claimant for the reasonable attomey's fees the Clamiant
incurs to recover any sums found to be due and owing to the Claimant.
(Space is provided below for additional signatures of added parties, other than those appearing on the cover page.)
CONTRACTOR AS PRINCIPAL
Company:
(Corporate Seal)
Signature: _
Name and Title:
Address:
SURETY
Company:
Signature: _
Name and Title:
Address:
(Cwporate Seaq
AIA DOCUMENT A312 a PERFORMANCE BOND AND PAYM ENT BOND a DECEMBER 1984 ED. a AIA®
THEAMERICAN INSTITUTE OF ARCHITECTS, 1735 NEWYORK AVE., N.W. WASHINGTON,D.C. 20006 A312-19a4 6
MERCHANTS
BONDING COMPANY
POWER OF ATTORNEY Bond4: 1AC60954
for Company Employees
Know All Persons By These Presents, that the MERCHANTS BONDING COMPANY (MUTUAL), a corporation duly organized under
the laws of the State of Iowa, and having its principal office in the City of Des Moines, County of Polk, State of Iowa, hath made,
constituted and appointed, and does by these presents make, constitute and appoint the following company employees
Michael P. Foster
of Des Moines and State of Iowa its true and lawful Attorney -in -Fact, with full power
and authority hereby conferred in its name, place and stead, to sign, execute, acknowledge and deliver in its behalf as surety any
and all bonds, undertakings, recognizances or other written obligations in the nature thereof, subject to the limitation that any such
instrument shall not exceed the amount of:
Unlimited
and to bind the MERCHANTS BONDING COMPANY (MUTUAL) thereby as fully and to the same extent as if such bond or
undertaking was signed by the duly authorized officers of the MERCHANTS BONDING COMPANY (MUTUAL), and all the acts of
said Attorney -in -Fact, pursuant to the authority herein given, are hereby ratified and confirmed.
This Power -of -Attorney is made and executed pursuant to and by authority of the following Amended Substituted and Restated By -
Laws adopted by the Board of Directors of the MERCHANTS BONDING COMPANY (MUTUAL) on November 16, 2002.
ARTICLE II, SECTION 8 - The Chairman of the Board or President or any Vice President or Secretary shall have power and
authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the
Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature
thereof.
ARTICLE II, SECTION 9 - The signature of any authorized officer and the Seal of the Company may be affixed by facsimile
to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking,
recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the
same force and effect as though manually fixed.
In Witness Whereof, MERCHANTS BONDING COMPANY (MUTUAL) has caused these presents to be signed by its President and
its corporate seal to be hereto affixed, this I st day of January , 2009 .
STATE OF IOWA
COUNTY OF POLK ss.
MERCHANTS BONDING COMPANY (MUTUAL)
By /4-7-7
President
On this 1st day of January , 2009 before me appeared Larry Taylor, to
me personally known, who being by me duly sworn did say that he is President of the MERCHANTS BONDING COMPANY (MUTUAL),
the corporation described in the foregoing instrument, and that the Seal affixed to the said instrument Is the Corporate Seal of the said
Corporation and that the said instrument was signed and sealed in behalf of said Corporation by authority of its Board of Directors.
In Testimony Whereof, I have hereunto set my hand and affixed my Official Seal at the City of Des Moines, Iowa, the day and year first
above written.
4 CINDY SMYT
Commission Number 17350473504
uw. ' My Commission Expires
March 16, 2012 Notary Public, Polk County, Iowa
STATE OF IOWA
COUNTY OF POLK ss.
1, William Warner, Jr., Secretary of the MERCHANTS BONDING COMPANY (MUTUAL), do hereby certify that the above and foregoing
is a true and correct copy of the POWER -OF -ATTORNEY executed by said MERCHANTS BONDING COMPANY (MUTUAL), which is
still in full force and effect and has not been amended or revoked,
In Witness Whereof, I have hereunto set my hand and affixed the seal of the Company on
this I Ith day of August 2009 , I. • ...
y
RPo'q*- .°. Secretary
°j; _ -o-
• z:
s: 1933
POA 0005 EMP (1/09)
;LARRY TAYLOR, WILLIAM WARNER JR., MICHAEL P. FOSTER '
: s
g�
t Marengo, IA.
its true and lawful atone (s))-m-fact to execute, seal and deliver for and on its behalf as surety, an and all bonds and undertakings, contracts of indemnity and
other writings obligatory in tiie nature thereof, which. are or may be allowed, requiredor
ermined byy law, stature, rule regRuladon, contract or otherwise. and
the execution of -such mstrument(s) in pursuance of these presents, „shall be as binduag upon. We said INTERNATIONAL FIDELITY INSURANCE
COMPANY, as fully and amply, to all intents and purposes, as if the same had been duly executed and acknowledged by its. regularly elected officers at its
;principal office.
This Power of Attorn yyl�ls executed, and ma yy be revoked, pursuant to and by authority of Article 3-Section 3,' of the B Laws ad led by the Board of
Directors of INTERNA"1'iONAL FIDELITY INSURANCE COMPANY at a meeting called and held on the 7th day of Pebraary, 1974,
The President or any Vice President, Executive Vice President, Secretary or Assistant Secretary, shall have power mid authority
(1) To appoint Attorneys -in fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the Company thereto, bonds and
undertakings, contracts of indemnity and other writings obligatory in the nature thereof and,
(2) To remove, at any time, any such attorney -in -fact and revoke the authority given.
Further this Power of Attorneyy is signed, and sealed by facsimile pursuant to resolution of the Board of Directors of said Company adopted at a meeting
duly called and held on the 29th Alton
of April, 1982 of which the following is a true excerpt:
Now therefore the signatures of such officers and the seal of the Company, may be affixed to any, such Dover of attorney or. any certificate relating thereto by
facsimile, and any such power of attorney or certificate bearing such facsimile signatures or facsimile seal shall be valid and bmdmg upon the Company and any
such power so executed and certified by facsimile signatures and facsimile seat shall be valid and binding upon the Company in the future with respect to any
bond or undertaking to which it is attached.
W.
of
IN TESTIMONY WHEREOF, INTERNATIONAL FIDELITY INSURANCE COMPANY has caused this instrument to be
signed and its corporate seat to be affixed by its authorized officer, this I6th day of October, A.D. 2007.
INTERNATIONAL FIDELITY INSURANCE COMPANY
STATE OF NEW JERSEY
.County of Essex
IN TES
at the C
ad is
who exe
IN
Secretary
instrument, to me ppersonally known, and, being by me duly
'IDELITY IAIM1NCE COMPANY; that the seal affixed to
tture were duly. affixed by order of the Board of Directors of
.ed my Official Seal,
vritten.
'NOTARY PUBLIC OF NEW JERSEY
My Commission Expires Nov. 21, 2010
ereby certify that I have compared the foregoing copy of the
et forth in said power of Attorney, with the tORIGINALS -ON
and of the whole of the said originals, and that the said Power
4d(1)
Prepared by: Kumi Morris, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
RESOLUTION NO. 1 2-i n
RESOLUTION ACCEPTING THE WORK FOR THE EECBG WATER PLANT
IMPROVEMENT PROJECTS 2011
WHEREAS, the Engineering Division has recommended that the work for construction of the
EECBG Water Plant Improvement Projects 2011, as included in a contract between the City of
Iowa City and Randall Electric, Inc. of Iowa City, IA, dated July 7, 2011, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the Energy Efficiency and Conservation Block
Grant Program account # 2310; and
WHEREAS, the final contract price is $154,080.05.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 3rd day of
ATTEST: 4��. `��
CIT `CLERK
1 20 12 .
ry
MAYOR
Approved by
It was moved by nobyns and seconded by
adopted, and upon roll call there were:
AYES:
NAYS:
AAU,nvu� uw�
City Attorney's Office 3(i.Ie�tz
ABSENT:
the Resolution be
x Champion
x Dickens
x Dobyns
_x Hayek
x Mims
x Payne
x Throgmorton
Pweng/res/Mptwo*-eecbg wtrplimprov.doc
3/12
Prepared by: Dave Panos, Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319) 355-5145 4d(2)
RESOLUTION NO. 12-200
RESOLUTION ACCEPTING THE WASHINGTON STREET TWO-WAY
CONVERSION PROJECT.
WHEREAS, the Engineering Division has recommended that the work for construction of
the Washington Street Two -Way Conversion Project, as included in a contract between
the City of Iowa City and All American Concrete, Inc. of West Liberty, Iowa, dated March
8, 2012, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been
filed in the City Clerk's office; and
WHEREAS, funds for this project are available in the Central Business District
Maintenance account #3971; and
WHEREAS, the final contract price is $49,777.22
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
IOWA CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa
City, Iowa.
Passed and approved this 1st day of May , 2012.
A�
Mayor
ATTEST: 44,,
City clerk
Approved by:
mow, 4*hy1__
City Attorney's Office J/ 2,;, (/ Z,
Resolution No. 12-200
Page 2
It was moved by Champion and seconded by Dickens the
Resolution be adopted, and upon roll call there were:
AYES:
NAYS:
ABSENT:
Champion
Dickens
Dobyns
Hayek
Mims
Payne
Tluogmorton
Prepared by: Jason Havel, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5410
RESOLUTION NO. i 2-37s
RESOLUTION ACCEPTING THE WORK FOR THE 2012 WATER MAIN
DIRECTIONAL BORING PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2012 Water Main Directional Boring Project, as included in a contract between the City of Iowa
City and Volkens Excavating, Inc. of Dyersville, Iowa, dated April 16, 2012, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the Annual Water Main Projects account #3204;
and
WHEREAS, the final contract price is $56,400.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 21st day of august 20 12
�l-59 I n
qz
MAYOR
Approved by
ATTEST: 7/lCl fi ii �J �C 7UJ 11/ ✓dl e �2iG
CITY LERK City Attorney's Office g I/N 1z-
It was moved by Champion and seconded by Payne the Resolution be
adopted, and upon roll call there were:
AYES: NAYS: ABSENT:
x Champion
X Dickens
x Dobyns
x Hayek
x Mims
x Payne
Throgmorton
S.IENGIPM ResolutionsNroject ResolutionskA cept Projecl12012 Water Maln Boring12012 Boring -Accept Project.doc
8112
2d(5)
Prepared by: Kumi Morris, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
RESOLUTION NO. 12-406
RESOLUTION ACCEPTING THE WORK FOR THE COURT HILL PARK PUBLIC
RESTROOM BUILDING PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
Court Hill Park Public Restroom Building Project, as included in a contract between the City of
Iowa City and North Construction, LLC, of Muscatine, Iowa dated March 27, 2012, be accepted;
and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the Court Hill Park account, under account
number 4170.
WHEREAS, the final contract price is $56,908.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 4th day of September 20 12
MAYOR
YJ Approved by
ATTEST: �L Ce 4e�
CITY'CtERK City Attorney's Office g ?d / 2-
It was moved by champion and seconded by Throgmorton the Resolution be
adopted, and upon roll call there were:
AYES:
NAYS:
Pweng/masters/acptwork- FY2011 Elevator Modernization Project doe
8/12
I:I►IN
Champion
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
2d(7)
Prepared by: Kimberly Sandberg, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
RESOLUTION NO. 12-408
RESOLUTION ACCEPTING THE WORK FOR THE CDBG DEMOLITIONS
PROJECT-CONTRACT#6
WHEREAS, the Engineering Division has recommended that the work for construction of the
CDBG Demolitions Project - Contract #6, as included in a contract between the City of Iowa City
and Kelly Demolition LLC of Mount Vernon, Iowa, dated January 17, 2012, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the CDBG account # 813-2300; and
WHEREAS, the final contract price is $42,100.01,
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 4th day of September 120 12
ATTEST: 7C - 7Cez�
CITY ERK
�,�
MAYOR
Approved by
I �r�r l.�LeP.-hA �uvd A., 4 w
City Attorney's Office SWP <6-/ f 2-
It was moved by Champion and seconded by Throgmorton the Resolution be
adopted, and upon roll call there were:
AYES:
Pweng/maslerslacphvork.doc
8/12
NAYS: ABSENT:
Champion
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
MMMM-Trm
3d(5)
�o
Prepared by: Kumi Morris, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
RESOLUTION NO. 12-422
RESOLUTION ACCEPTING THF. WORK FOR THE EECBG MERCER LOBBY,
LOCKER ROOM & SCANLON GYM IMPROVEMENT PROJECTS 2011 [F/K/A
EECBG MERCER RECREATION CENTER IMPROVEMENTS]
WHEREAS, the Engineering Division has recommended that the work for construction of the
EECBG Mercer Lobby, Locker Room & Scanlon Gym Improvement Projects 2011, as included in
a contract between the City of Iowa City and Merit Electric, Ltd., of Iowa City, Iowa dated May 23,
2011, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the Energy Efficiency and Conservation Block
Grant Program account, under account number 2310.
WHEREAS, the final contract price is $76,928.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 18th day of
tember 2012
MAYOR
Approved by
It was moved by Champion and seconded by
adopted, and upon roll call there were:
AYES:
x
x
x
x
x
x
9n2
NAYS:
dew >
City Attorney's Office c// y4l z,
Dickens
ABSENT:
the Resolution be
Champion
Dickens
Dobyns
Hayek
Mims
x Payne
Throgmorton
4d
Prepared by: Dave Parma, Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
RESOLUTION NO. 12-474
RESOLUTION ACCEPTING THE. BURLINGTON STREET / U.S. HIGHWAY
6 FLOOD REPAIR PROJECT [ER-3715 (642)-8R-52, ER-3715(641)-8R-
521.
WHEREAS, the Engineering Division has recommended that the work for construction of
the Burlington Street / US Highway 6 Flood Repair Project, as included in a contract
between the City of Iowa City and Vieth Construction Corporation of Cedar Falls, Iowa,
dated August 18, 2009 be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been
filed in the City Clerk's office; and
WHEREAS, funds for this project are available in the Hwy 6 Bridge #3922, and Burlington
Street Bridge account #3923; and
WHEREAS, the final contract price is $49,981.91.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
IOWA CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa
City, Iowa.
Passed and approved this 13th day of November , 2012
Mayor
ATTEST: tJ
City Clerk
Approved by:
-
City Attorney's Offic-It
�� a �
Resolution No. 12-474
Page 2
It was moved by Champion and seconded by Dobyns the
Resolution be adopted, and upon roll call there were:
AYES:
NAYS:
ABSENT:
Champion
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
"m--
3d(3)
Prepared by: Dave Panos, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5415
RESOLUTION NO. 11-132
RESOLUTION ACCEPTING THE WORK FOR THE FY2013 CURB RAMP
IMPROVEMENT PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
FY2013 Curb Ramp Improvement Project, as included in a contract between the City of Iowa City
and Feldman Concrete of Dyersville, Iowa, dated June 6, 2012, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the Curb Ramp Construction - ADA account #
3822; and
WHEREAS, the final contract price is $81,273.89.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 3rd day of December , 20_ 3
/,V�
MAYOR
Approved by y�
ATTEST:
(/I.�A
.ym.
CITY"CLERK City Attorney's Office
It was moved by Mims and seconded by Payna the Resolution be
adopted, and upon roll call there were:
AYES:
iq
Peeng/masters/acptwork.doc
11/13
NAYS: ABSENT:
Champion
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
Prepared by: Kim Sandberg, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
RESOLUTION NO. 14-32
RESOLUTION ACCEPTING THE WORK FOR THE 2012 SUMMER SIDEWALK
REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2012 Summer Sidewalk Repair Project, as included in a contract between the City of Iowa City
and Feldman Concrete of Dyersville, Iowa, dated August 22, 2012, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the Sidewalk Inspection account # 22710220;
and
WHEREAS, the final contract price is $33,910.06.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 18th day of February 2014.
ATTEST: le �
CITY CLERK
MAYOR
Approved by
City Attorney's Office n%jy
It was moved by trims and seconded by Payne the Resolution be
adopted, and upon roll call there were:
AYES:
Pwenglm asters/aeptwork Am
2/14
NAYS: ABSENT:
Botchway
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
5d(4)
"3 -rra�
4d(3)
men�
Prepared by: Jason Reichart, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5416
RESOLUTION NO. 14-46
RESOLUTION ACCEPTING THE WORK FOR THE CDBG ASBESTOS
ABATEMENT CONTRACT #9 PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
CDBG Asbestos Abatement Contract #9 Project, as included in a contract between the City of
Iowa City and ECCO Midwest, Inc. of Inver Grove Heights, Minnesota, dated August 28, 2013 be
accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the CDBG account # D0813; and
WHEREAS, the final contract price is $10,000.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 4th day of March , 2014
n
MAYOR
Approved by
ATTEST: i A6, J&A�� 4—e._
CITY CLERK City Attorney's Office -4/ /y
It was moved by Dobyns and seconded by Payne the Resolution be
adopted, and upon roll call there were:
AYES:
Fi
Pweng/masters/acptwork.doc
2114
NAYS:
ABSENT:
Botchway
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
"nT- r-Tr-
4Ei �2MM
Prepared by: Daniel Scott, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5144
RESOLUTION NO. 14-45
RESOLUTION ACCEPTING THE WORK FOR THE 2012 IOWA RIVER POWER
DAM REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2012 Iowa River Power Dam Repair Project, as included in a contract between the City of Iowa
City and Lambourne Diving Service of Mechanicsville, Iowa, dated August 28, 2012, be accepted;
and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the Dam Repair account # 3278; and
WHEREAS, the final contract price is $51,774.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 4th day of
ATTEST: vC • `�
CITY CLERK
20 j_ —.
MAYOR
A;Jdl
Approved by
44la ','teniLLt/ GL�02y�
CttyAttorney'sOffice
It was moved by Dobyns and seconded by Payne the Resolution be
adopted, and upon roll call there were:
AYES:
Pweng/masterstacptwotk.doc
2/14
NAYS: ABSENT:
Botchway
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
Prepared by: Kim Sandberg, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
RESOLUTION NO. 14-146
RESOLUTION ACCEPTING THE WORK FOR THE 2013 SUMMER SIDEWALK
REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2013 Summer Sidewalk Repair Project, as included in a contract between the City of Iowa City
and JDM Concrete, LLC of Kalona, Iowa, dated August 2, 2013, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the Sidewalk Inspection account # 22710220;
and
WHEREAS, the final contract price is $30,254.81.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this loth day of May 12014,
ATTEST:
ITI'-aERK c v
MAYOR
Approved by
City Attorney's Office �v7J'
It was moved by Payne and seconded by Dickens the Resolution be
adopted, and upon roll call there were:
AYES:
014
Pweng/masters/acptwork.doc
5/14
NAYS: ABSENT:
Botchway
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
3d(12)
mommusom
Prepared by: Dave Panes, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5415
RESOLUTION NO. 14-145
RESOLUTION ACCEPTING THE WORK FOR THE IOWA RIVER BANK REPAIR
PROJECT 2014
WHEREAS, the Engineering Division has recommended that the work for construction of the
Iowa River Bank Repair Project 2014, as included in a contract between the City of Iowa City and
Neuzil and Sons, Inc., of Oxford, Iowa, dated March 12, 2014, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the Intra-City Bike Trails account #R4206; and
WHEREAS, the final contract price is $18,996.77.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 20th day of
ATTEST:
CITY
20 14
MAYOR
Approved by
City Attorney's Office
It was moved by Payne and seconded by Dickens the Resolution be
adopted, and upon roll call there were:
AYES:
Fa
Pweng/masters/acptwork.doc
5/14
NAYS: ABSENT:
Champion
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
Prepared by: Daniel Scott, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5144
RESOLUTION NO. 14-144
RESOLUTION ACCEPTING THE WORK FOR THE 2013 SEWER REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2013 Sewer Repair Project, as included in a contract between the City of Iowa City and Lynch's
Excavating, Inc. of West Branch, Iowa, dated July 15, 2013, be accepted; and
WHEREAS, seven additional sites were identified after the contract was signed; and
WHEREAS. Staff negotiated change orders to the original contract for the amount of $68,042.05;
and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the Annual Sewer Repair account # V3101; and
WHEREAS, the final contract price is $150,047.32.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT:
Said improvements are hereby accepted by the City of Iowa City, Iowa.
The final expenditure is approved.
Passed and approved this 20th day of May , 20_IL—.
MAYOR
ATTEST:��V D
-61TYdLERK
It was moved by Payne and seconded
adopted, and upon roll call there were
AYES:
1.1
X
X
x
X
x
X
NAYS:
A proved by ll//
6
City Attorney's Office
by Dickens the Resolution be
ABSENT:
Botchway
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
Prepared by: Jason Reichart, Special Projects Engineer, Public Works, 410 E. Washington St., Iowa City, IA 52240
(319)356-5416
RESOLUTION NO. 14-189
RESOLUTION ACCEPTING THE WORK FOR THE REMOVAL OF 2013
FLOOD -RELATED SAND AND DEBRIS FROM CITY PARK PROJECT
WHEREAS, the Engineering Division has recommended that the work for the Removal of 2013
Flood -Related Sand and Debris from City Park Project, as included in a contract between the City
of Iowa City and Peterson Contractors, Inc. of Reinbeck, Iowa, dated January 1, 2014, be
accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the RstLwrCity account # R4184; and
WHEREAS, the final contract price is $38,842.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 17th day of
ATTEST:
C,.J•�
20 14
/k
MAYOR
Approved by
City Attorney's Office
It was moved by sotchway and seconded by Mims the Resolution be
adopted, and upon roll call there were:
AYES: NAYS:
x
x
x
x
x
x
x
Pvreng/maste rslacphvork.doc
6114
ABSENT:
Botchway
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
Prepared by: Jason Reichart, Special Projects Engineer, Public Works, 410 E, Washington St., Iowa City, IA 52240
(319) 356-5416
RESOLUTION NO. 14-190
RESOLUTION ACCEPTING THE WORK FOR THE CDBG DEMOLITIONS
PROJECT - CONTRACT #9
WHEREAS, the Engineering Division has recommended that the work for construction of the
CDBG Demolitions Project - Contract #9, as included in a contract between the City of Iowa City
and CAJ Enterprises, Inc. of West Branch, Iowa, dated January 16, 2014, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the CDBG account # D0813; and
WHEREAS, the final contract price is $10,736,60.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 17th day of .Tune , 20 14
ATTEST: �/017,a, ) -/1 . A—,,.
CITY`CtERK
MAYOR`
Approved by
City Attorney's Office
It was moved by Botchway and seconded by trims the Resolution be
adopted, and upon roll call there were:
AYES:
Pweng/masters/acptwork.doc
5/14
NAYS:
ABSENT:
Botchway
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
Prepared by: Jason Havel, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5410
RESOLUTION NO. 14-214
RESOLUTION ACCEPTING THE WORK FOR THE EMERALD STREET
GROUND STORAGE RESERVOIR BOOSTER PUMP VFD REPLACEMENT
PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
Emerald Street Ground Storage Reservoir Booster Pump VFD Replacement Project, as included
in a contract between the City of Iowa City and Advanced Electrical Services, Inc. of Iowa City,
Iowa, dated October 16, 2013, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the Ground Storage Reservoir VFD
Replacement/Upgrade account #W3213; and
WHEREAS, the final contract price is $65,900,00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 15th day of July 120 14
MAYOR
Approved by
ATTEST: �i/�2»�s� Y� . Yt �ti✓ AXZ,4 1 w 1" ,�
CITY CLERK City Attorney's Office -i t-f /N
It was moved by Throgmorton and seconded by Dobyns the Resolution be
adopted, and upon roll call there were:
AYES:
*4
NAYS: ABSENT:
Botchway
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
Pweng/masters/acphvork.doc
7/14
08-19.14
3d(9)
nommmm
Prepared by: Josh Slattery, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5149
RESOLUTION NO. 14-236
RESOLUTION ACCEPTING THE WORK FOR THE SANITARY SEWER PUBLIC
IMPROVEMENTS FOR 475 — 509 S. DODGE STREET, AND DECLARING
PUBLIC IMPROVEMENTS OPEN FOR PUBLIC USE.
WHEREAS, the Engineering Division has certified that the following improvements have been
completed in accordance with the plans and specifications of the City of Iowa City:
Sanitary sewer improvements for 475 — 509 S. Dodge Street, as constructed by Maxwell
Construction, Inc. of Iowa City, Iowa.
WHEREAS, the maintenance bonds have been filed in the City Clerk's office; and
WHEREAS, the City of Iowa City has notified the contractor listed previously of the date on which
it will consider acceptance of the aforementioned public improvements; and
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa and
that all dedications and public improvements previously set aside as not being open for public
access are hereby formally accepted and declared open for public use.
Passed and approved this 19th day of August 2014
/-�ci A
MAYOR
Approved by
ATTEST: kik(A s IA&UDy, J1lk �
CITY OLERK 'NyAttorney's Office /)�
It was moved by trims and seconded by Payne the Resolution be
adopted, and upon roll call there were:
AYES:
X
x
x
x
X
X
pwengMastersl cpt-Improvements.tloc
NAYS: ABSENT:
X Botchway
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
Prepared by: Ben Clark, PE, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 366-5436
RESOLUTION NO. 14-297
RESOLUTION ACCEPTING THE WORK FOR THE WETLAND MITIGATION
FOR THE WASTEWATER TREATMENT FACILITIES CONSOLIDATION
PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
Wetland Mitigation for the Wastewater Treatment Facilities Conolidation Project, as included in a
contract between the City of Iowa City and Stek Earthmoving of New Sharon, Iowa, dated May
20'', 2014, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the South Wastewater Expansion Fund account
# V3135; and
WHEREAS, the final contract price is $49,548.10.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 21st day of October , 20 14
�3
Approved by
ATTEST:/4tld-r.-2 7r • .Iit� J�.c o<At�-v-w,i,;vc.
CITY C�LERK City Attorney's Office
It was moved by trims and seconded by Dickens the Resolution be
adopted, and upon roll call there were:
AYES
X
X
X
X
X
x
NAYS: ABSENT:
_ Botchway
_ Dickens
x Dobyns
Hayek
_ Mims
_ Payne
_ Throgmorton
4d(1)
Pweng/masterslacphvork.doe
10/14
Bond Number S428909
Slabach Construction Co Inc aS
(insert the name and address or legal title of the Contractor)
Principal, hereinafter Called the Contractor and _ Employers Mutual Casualty Company
(insert the legal title of the Surety)
PO Box 712 Des Moines IA 50306 as Surety, hereinafter called
the Surety, are held and firmly bound unto the City of Iowa City, Iowa, as obligee, hereinafter called
the Owner, in the amount of Forty-11VC Thousand Two Hundred Seventeen & no/100ths----- Dollars
($ 45,21zo0------------------------------------- ) for the payment for which Contractor and Surety
hereby bind themselves, their heirs, executors, administrators, successors and assigns, jointly; and
severally.
tdOU 13 2014
WHEREAS, Contractor has, as of 2 ZZ 5 , entered into a
(date) ('Ll f r
lovj"r.Iiy io/' l
written Agreement with Owner for Communications Infrastructure Improvement Project (combined
projects Part -A Preparatory Work (Project 2013-008A) & Part-B -- Optical Fiber Cable Installation
(Project 2013-008M and
WHEREAS, the Agreement requires execution of this Performance and Payment Bond, to
be completed by Contractor, in accordance with plans and specifications prepared by
the Iowa City Engineering Division, which Agreement is by reference made a part hereof, and the
agreed -upon work is hereafter referred to as the Project.
NOW, THEREFORE. THE CONDITIONS OF THIS OBLIGATION are such that, if
Contractor shall promptly and faithfully perform said Agreement, then the obligation of this bond
shall be null and void: otherwise it shall remain in full force and effect until satisfactory completion of
the Project.
A, The Surety hereby waives notice of any alteration or extension of time made by the Owner.
B. Whenever Contractor shall be, and is declared by Owner to be, in default under the
Agreement, the Owner having performed Owner's obligations thereunder, the Surety may
promptly remedy the defauft, or shall promptly:
1. Complete the Project in accordance with the terms and conditions of the Agreement,
or
2. Obtain a bid or bids for submission to Owner for completing the Project in
accordance with the terms and conditions of the Agreement; and upon determina-
tion by Owner and Surety of the lowest responsible bidder, arrange for a contract
between such bidder and Owner, and make available, as work progresses (even
though there may be a default or a succession of defaults under the Agreement or
2M
subsequent contracts of completion arranged under this paragraph), sufficient funds
to pay the cost of completion, less the balance of the Contract Price, but not
exceeding the amount set forth in the first paragraph hereof. The term "balance of
the Contract Price," as used in Oils paragraph, shell mean ft total amount payable
by Owner to Contractor under the Agreement, together with any addenda and/or
amendments thereto, kres the amount property paid by Owner to Contractor.
C. The Contractor and Contractor's Surely shall be obligated to keep the improvements
covered by this bond in good repair for a period of one (1) year from the data of formal
acceptance of the Improvements by the Owner.
D. No right of action shall accnts, to or for the use of any person, corporation or third party other
than the Owner named herein or the heirs, executors, administrators or successors of
Owner.
IT IS A FURTHER CONDITION OF THIS OBLIGATION that the Principal and Surety, in
accordance with provisions of Chapter 573, Code of Iowa, shall pay to all persons, firms or
corporations having contracts directly with the Principal, including any of principal's subcontractors,
all datms due them for labor performed or materials fumished in the perfomnance of the Agreement
for whose benefit this bond is given. The provisions of Chapter $73, Code of Iowa, are a part of this
bond to the same extent as if it were expressly set out herein.
SIGNED AND SEALED THIS
IN THE PRESENCE OF:
Iiness
DAY OF .20
Slabneh C011atrnc6011 Co Inc
(Principal)
Employers Mutual Casualty1Company
Nancy D' ffii tidal, Altorney-in-Fact
(Title)
4200 University Avenue #200
(Street)
West Des Moines IA 50266
ov 1.1 2014 (City, State, Zip)
515-244-0166
(Phone)
AVEMC
INSURANCE P.O. Box 712•Des Moines, lA50306-0712 No. A52630
CERTIFICATE OF AUTHORITY INDIVIDUAL ATTORNEY -IN -FACT
KNOW ALL MEN BY THESE PRESENTS, that:
1. Employers Mutual Casualty Company, an Iowa Corporation
2. EMCASCO Insurance Company, an Iowa Corporation
3. Union Insurance Company of Providence, an Iowa Corporation
4. Illinois EMCASCO Insurance Company, an Iowa Corporation
5, Dakota Fire Insurance Company, a North Dakota Corporation
6. EMC Property & Casualty Company, an Iowa Corporation
7. Hamilton Mutual Insurance Company, an Iowa Corporation
hereinafter referred to severally as "Company" and collectively as "Companies", each does, by these presents, make, constitute and appoint:
F. MELVYN HRUBETZ, PATRICK K. DUFF, GREG T. LAMAIR, MARK E. KEAIRNES, NANCY D. BALTUTAT, JEFFREY R. BAKER, JOSEPH I. SCHMIT,
JILL SHAFFER
its true and lawful attorney -in -fact, with full paver and authority conferred to sign, seal, and execute its lawful bonds, undertakings, and other obligatory instruments of a
similar nature as follows:
In an amount not exceeding Ten Million Dollars ......... ........... ................................................................................................................................. $10,000,000.00
and to bind each Company thereby as fully and to the same extent as if such instruments were signed by the duly authorized office"r`s of each such Company, and all of
the acts of said attorney pursuant to the authority hereby given are hereby ratified and confirmed.
The authority hereby granted shall expire APRIL 1, 2014 unless sooner revoked. NOV 1 s 7014
AUTHORITY FOR POWER OF ATTORNEY
This Power -of -Attorney is made and executed pursuant to and by the authority of the following resolution of the Boards of Direplgr,s_of{eapjb of,tba companies at a
regularly scheduled meeting of each company duly called and held in 1999:
RESOLVED: The President and Chief Executive Officer, any Vice President, the Treasurer and the Secretary of Employers Mutual Casually Company shall have power
and authonly to (1) appoint attorneys -in -fact and authorize them to execute on behalf of each Company and attach the seal of the Company thereto, bonds and
undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof; and (2) to remove any such attomey-in-tact at any time and revoke
the power and authority given to him or her. Attorneys -in -fact shall have power and authority, subject to the terms and limitations of the power -of -attorney issued to them,
to execute and deliver on behalf of the Company, and to attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and
other writings obligatory in the nature thereof, and any such instrument executed by any such attorney -in -fact shall be fully and in all respects binding upon the Company.
Certification as to the validity of any power -of -attorney authorized herein made by an officer of Employers Mutual Casualty Company shall be fully and in all respects
binding upon this Company. The facsimile or mechanically reproduced signature of such officer, whether made heretofore or hereafter, wherever appearing upon a
certified copy of any power -of -attorney of the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed.
IN WITNESS THEREOF, the Companies have caused these presents to be signed for each by their officers as shown, and the Corporate seals to be hereto affixed this
12th day of JUNE 2013
Sealsi�
`ps o'"SU" E °"^Pq"''• ; .......... Bruce G. Kelley, hairman Michael Freel
of Companies 2, 3, 4 5 & 6; President Assistant Vice President
0 3 of Company 1; Vice Chairman and
z SEAL,=g? ;�: 1863� o `- -1 CEO CEO of Company7
,.
r x
Nq •� •god: • a �`
mwA
b.:a .
J6\SURAryCF',
:•�\NSUMNC ,, C•FUUTUTAL Cq ,.
ty°:
:P o09: ;ye,.oevopq��,
oevoeq�,,oq;
`Pnvoxq��.,
`K-
-2. SEAL 'Y;
o SEAL 2�_ ? SEAL 'p_
;.
'� '� �•
DATI1 !'lDIM1ES.\� '
IOWA
DPY-U •�
pAUTUq[ /
tio�MUTUq� sG9
9
LAUREL A. BLOSS
�Ru,PIPo ¢ t Commission Number 183662
�N/NES, \off • • My Comm. Exp. Marl 3,201
On this 12th day of JUNE AD 2013 before me
Note y Public in and for the Stale of Iowa, personally appeared Bruce G. Kelley and Michael Freel,
who, being by me duly swom, did say that they are, and are known to me to be the Chairman,
President, Vice Chairman and CEO, and/or Assistant Vice Piesident/Assistant Secretary,
respectively, of each of The Companies above; that the seals affixed to this instrument are the
seals of said corporations; that said instrument was signed and sealed on behalf of each of the
Companies by authority of their respective Boards of Directors; and that the said Bruce G. Kelley
and Michael Freel, as such officers, acknowledged the execution of said instrument to be the
voluntary act and deed of each of the Companies.
My Commission Expires March 13, 2014.
Q bz_&A�
CERTIFICATE
Notary Public in and for the Stale of Iowa
I, James D. Clough, Vice President of the Companies, do hereby certify that the foregoing resolution of the Boards of Directors by each of the Companies,
and this Power of Attorney issued pursuant thereto on JUNE 12, 2013 on behalf of:
F. MELWN HRUBETZ, PATRICK K. DUFF, GREG T. LAMAIR, MARK E. KEAIRNES, NANCY D. BALTUTAT, JEFFREY R. BAKER, JOSEPH I. SCHMIT, JILL SHAFFER
are true and correct and are still in full force and effect.
In Testimony Whereof I have subscribed my name and affixed the facsimile seal of
each Company this day of
Vice President
Bond Number S435504
PERFORMANCE AND PAYMENT BOND
(insert the name and address or legal title of the Contractor)
Principal, hereinafter caHad the Contractor and Employers Mutual Casualty Company
(insert the legal We of the Surety)
P O Box 712, Des Moines IA 50306
as
as Surety, hereinafter called
the Surety, are held and firmly bound unto the City of Iowa City, Iowa, as obligee, hereinafter called
the Owner, in the amount of Thirty-eight Thousand Eight Hundred Fifty-eight & 50/100 Dollars
(g 38,858.50-------------------------------- ) for the payment for which Contractor and Surety
hereby bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally.`
NOV 13 2014
WHEREAS, Contractor has, as of-.. 9I Z/1 y entered into a
(date)
(l, l (,mv,1��,,,
written Agreement with Owner for Communications infrastructure Improvement Protect Flber'
Infrastructure Reroute To Vacate North Waste Water Treatment Plant (Project 2014-005 — Bob -
projects 2014-006A thru D), and
WHEREAS, the Agreement requires execution of this Performance and Payment Bond, to
be completed by Contractor, in accordance with plans and specifications prepared by
the Iowa City Engineering Division, which Agreement is by reference made a part hereof, and the
agreed -upon work is hereafter referred to as the Project.
NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION are such that, if
Contractor shall promptly and faithfully perform said Agreement, then the obligation of this bond
shall be null and void; otherwise it shall remain in full force and effect until astisfactory completion of
the Project.
A. The Surety hereby waives notice of any alteration or extension of time made by the Owner.
B. Whenever Contractor shall be, and is declared by Owner to be, in default under the
Agreement, the Owner having performed Owner's obligations thereunder, the Surety may
promptly remedy the default, or shall promptly:
1. Complete the Project in accordance with the terms and conditions of the Agreement,
or
2. Obtain a bid or bids for submission to Owner for completing the Project in
accordance with the terms and conditions of the Agreement; and upon determina-
tion by Owner and Surety of the lowest responsible bidder, arrange for a contract
between such bidder and Owner, and make available, as work progresses (even
am-
though there may be a default or a succession of defaults under the Agreement or
subsequent contracts of completion arranged under this paragraph), sufficient funds
to pay the cost of completion, less the balance of the Contract Price, but not
exceeding the amount set forth in the first paragraph hereof. The term "balance of
the Contract Price," as used in this paragraph, shall mean the total amount payable
by Owner to Contractor under the Agreement, together with any addenda and/or
amendments thereto, less the amount property paid by Owner to Contractor.
C. The Contractor and Contractor's Surety shall be obligated to keep the improvements
covered by this bond In good repair for a period of one (1) year from the date of formal
acceptance of the improvements by the Owner.
D. No right of action shall accrue to or for the use of any person, corporation or third party other
than the Owner named herein or the heirs, executors, administrators or successors of
Owner,
IT IS A FURTHER CONDITION OF THIS OBLIGATION that the Principal and Surety, in
accordance with provisions of Chapter 573, Code of Iowa, shall pay to all persons, firms or
corporations having contracts directly with the Principal, including any of Principal's subcontractors,
all claims due them for labor performed or materials furnished in the performance of the Agreement
for whose benefit this bond is given. The provisions of Chapter 573, Code of Iowa, are a part of this
bond to the same extent as If it were expressly set out herein.
SIGNED AND SEALED THIS /2 DAY OF
IN THE PRESENCE OF.
/ /
W Hess
Slabach Construction Co Inc
�(Principal)
Employers Mutual Casualty Company
(Surety)
Wrin (Title) Nancy D. Baltutat, Attorney -in -Fact
NOV 13 2014
4200 University Avenue #200
(Street)
West Des Moines IA 50266
(City, State, Zip)
515-244-0166
(Phone)
PB-2
AFEMCP INSURANCEP.O. Box 712•Des Moines, [A50306-0712 N0. A80496
CERTIFICATE OF AUTHORITY INDIVIDUAL ATTORNEY -IN -FACT
KNOW ALL MEN BY THESE PRESENTS, that:
1. Employers Mutual Casually Company, an Iowa Corporation
2. EMCASCO Insurance Company, an Iowa Corporation
3. Union Insurance Company of Providence, an Iowa Corporation
4. Illinois EMCASCO Insurance Company, an Iowa Corporation
5. Dakota Fire Insurance Company, a North Dakota Corporation
6. EMC Property & Casualty Company, an Iowa Corporation
7. Hamilton Mutual Insurance Company, an Iowa Corporation
hereinafter referred to severally as "Company" and collectively as "Companies", each does, by these presents, make, constitute and appoint:
F. MELWN HRUBETZ, PATRICK K. DUFF, GREG T, LAMAIR, MARK E. KEAIRNES, NANCY D. BALTUTAT, JEFFREY R. BAKER, JOSEPH I. SCHMIT, JILL
SHAFFER
its true and lawful attorney -in -fact, with full power and authodly conferred to sign, seal, and execute its lawful bonds, undertakings, and other obligatory instruments of a
similar nature as follows:
In an amount not exceeding Ten Million Dollars .......................... ............................................................ .......: .......:........510;000,000.00
and to bind each Company thereby as fully and to the same extent as if such instruments were signed by the duty authorized officers of each such Company, and all of
the acts of said attorney pursuant to the authority hereby given are hereby ratified and confirmed.
NOV 13 2014
The authority hereby granted shall expire APRIL 1 2017 unless sooner revoked.
AUTHORITY FOR POWER OF ATTORNEY AhwIlu�st
This Power -of -Attorney is made and executed pursuant to and by the authority of the following resolution of the Boards of Directors of each of the Companies at a
regularly scheduled meeting of each company duty called and held in 1999:
RESOLVED: The President and Chief Executive Officer, any Vice President, the Treasurer and the Secretary of Employers Mutual Casualty Company shall have power
and authority to (1) appoint attorneys -in -fact and authorize them to execute on behalf of each Company and attach the seal of the Company thereto, bonds and
undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof; and (2) to remove any such attorney -in -fact at any time and revoke
the power and authority given to him or her. Attorneys -in -fact shall have power and authority, subject to the terms and limitations of the power-of-attomey issued to them,
to execute and deliver on behalf of the Company, and to attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and
other writings obligatory in the nature thereof, and any such instrument executed by any such attomey-in-tact shall be fully and in all respects binding upon the Company.
Certification as to the validity of any power-of-attomey authorized herein made by an officer of Employers Mutual Casualty Company shall be fully and in all respects
binding upon this Company. The facsimile or mechanically reproduced signature of such officer, whether made heretofore or hereafter, wherever appearing upon a
certified copy of any power -of -attorney of the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed.
IN WITNESS THEREOF, the Companies have caused these presents to be signed for each by their officers as shown, and the Corporate seals to be hereto affixed this
12th day of JUNE 2013 /
Seals
p INSU �'•G01.1p•
000,
rr''
�Yr&
�$�5, AgM1,CL
ORgPi: .-
04F", yPF'
2 • ORgR!� O�i
QOP�• r�gS4
pPPORgP�:9 �.
.
� Q ��
25 SEAL =;`
1563�=a
?;: 1953�'IOVI
\,Su AN,, ,,NSUMp�•, ;J�V 1UA,'C'•
`4�. pGOR �'CO �: 4C.'PPORq eCQ: �«PS. pPPORa'SG:
SEAL SEAL w-SEALo
' IOWN O•ryONr" UAY.OgP•,- '•, `PM1fOINE5.�0` `
Mu1ua//
tio�MUTUq NSG
E z ,LYNNIAVERIDGE
y,`#, KATHY
i m : Commission Number 780769
My Commission Fires
October 10, 2016
�elNEs. toS�
Bruce G. Kelley, hairman
of Companies 2, 3, 4, 5 & 6; President
of Company 1; Mee Chairman and
CEO of Company 7
'/ '�
Michael Freel
Assistant Vice President
On this 12th day of JUNE AD 2013 before me
Notary Public in and for the Stale of Iowa, personally appeared Bruce G. Kelley and Michael Free],
who, being by me duly sworn, did say that they are, and are known to me to be the Chairman,
President, Vice Chairman and CEO, and/or Assistant Vice President/Assistant Secretary,
respectively of each of The Companies above; that the seals affixed to this instrument are the
seals of said corporations; that said Instrumentwas signed and sealed on behalf of each of the
Companies by authority of their respective Boards of Directors; and that the said Bruce G. Kelley
and Michael Freel, as such officers, acknowledged the execution of said instrument to be the
voluntary act and deed of each of the Companies.
My Commission Expires October 10, 2016.
) Notan/Public M and for the State of Iowa
CERTIFICATE
I, James D. Clough, Vice President of the Companies, do hereby certify that the foregoing resolution of the Boards of Directors by each of the Companies,
and this Power of Attorney issued pursuant thereto on JUNE 12 2013 on behalf of:
F. MELWN HRUBETZ, PATRICK K. OUFF, GREG T. LAMAIR, MARK E. KEAIRNES, NANCY D. BALTUTAT, JEFFREY R. BAKER, JOSEPH I. SCHMIT, JILL SHAFFER
are true and correct and are still in full force and effect.
In Testimony Whereof I have subscribed my name and affixed the facsimile seal of
each Company this day of
Vice President
Prepared by: Jason Reichart, Public Works / Engineering, 410 E. Washington St., Iowa City, IA 52240, (319)356-5416
RESOLUTION NO. 14-316
RESOLUTION ACCEPTING THE WORK FOR THE HESCO BARRIER REMOVAL 2014
PROJECT
WHEREAS, the Engineering Division has recommended that the work for the Hesco Barrier
Removal 2014 Project, as included in a contract between the City of Iowa City and Iowa Bridge &
Culvert, LC of Washington, Iowa, dated July 21, 2014, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the Storm Water Management account #
77770110-905;and
WHEREAS, the final contract price is $51,686.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 18th day of November 120 14
ATTEST:
CITY CLERK
n
MAYOR
Approved by
City Attorneys Office !� 7 /ef
It was moved by Throgmorton and seconded by Mims the Resolution be
adopted, and upon roll call there were:
AYES:
Pweng/maste rs/acptwork.doc
11/14
NAYS: ABSENT:
Botchway
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
Prepared by: Josh Slattery, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5149
RESOLUTION NO. 14-442
RESOLUTION ACCEPTING THE WORK FOR THE PEDESTRIAN MALL PLAY
AREA SURFACING IMPROVEMENTS PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
Pedestrian Mall Play Area Surfacing Improvements Project, as included in a contract between the
City of Iowa City and Bruce & Sarah Feldman d/b/a Feldman Concrete of Dyersville, Iowa, dated
July 30, 2014, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the Central Business District Streetscape
account # P3971: and
WHEREAS, the final contract price is $89,174.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 16th day of December , 20 14
MAYOR���
Approved by
ATTEST: • mat% atq rd�art�v7�cp
CITY 'LERK City Attorney'sOffice /4y/Iy
It was moved by Payne and seconded by Botchway the Resolution be
adopted, and upon roll call there were:
AYES:
i�
Pweng/masters/acptworkAm
12/14
NAYS: ABSENT:
Botchway
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
12-16-14
4d(3)
hk ,.N .,,
Prepared by: Daniel Scott, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5144
RESOLUTION NO. 15-63
RESOLUTION ACCEPTING THE WORK FOR THE 2014 SEWER REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the 2014 Sewer
Repair Project, as included in a contract between the City of Iowa City and Lynch's Excavating, Inc. of West
Branch, Iowa, dated June 12, 2014, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the City
Engineer's office; and
WHEREAS, funds for this project are available in the Annual Sewer Repair account # V3101; and
WHEREAS, the final contract price is $1W377.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA CITY, IOWA,
THAT:
Passed and approved this 9th day of March , 20 15
P
MAYOR
Approved by
ATTEST:J�c�-«1 �fzGL� �Mic,��
CITY CL'RK City Attor
It was moved by Throgmorton
and upon roll call there were:
AYES:
iA
X
X
X
X
X
X
Pweng/masters/acptwork. doc
2/15
and seconded by Botchway the Resolution•be adopted,
NAYS: ABSENT:
Botchway
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
-7r�
4d(5)
Prepared by: Daniel Scott, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5144
RESOLUTION NO. 15-93
RESOLUTION APPROVING THE FINAL CONTRACT PRICE FOR THE 2014 SEWER
REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2014 Sewer Repair Project, as included in a contract between the City of Iowa City and Lynch's
Excavating, Inc. of West Branch, Iowa, dated June 12, 2014, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the Annual Sewer Repair account # V3101, and
WHEREAS, this work was accepted by this Resolution No. 15-63 but the final contract price was
inaccurately stated therein; and
WHEREAS, the final contract price is $108,592.00, and
WHEREAS, this resolution is to correct the final contract amount.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, Ti
1. The final contract price of $108,592.00 is approved.
2. The retainage held per Iowa Code Chapter 573 shall be released 30 (thirty) days after the
original acceptance date of March 9, 2015.
Passed and approved this 7th day of
MAYOR
ATTEST: r &� X. of
CITY'CLERK
20 15
Approved by
Gl
City Attorney's Office
It was moved by Payne and seconded by trims the Resolution be
adopted, and upon roll call there were:
AYES: NAYS: ABSENT:
Botchway
Dickens
x Dobyns
Hayek
Mims
Payne
Th rogm o rton
Pwe n g lma sterslacphvork. doc
4115
Prepared by: Ben Clark, PE, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
RESOLUTION NO. 15-41
61 1 1 • ra -�� ♦ • ♦-
WHEREAS, the Engineering Division has recommended that the work for the Asbestos
Abatement, Removal of Misc. Hazardous Materials and Removal of Household Hazardous
Waste at the City of Iowa City North Wastewater Treatment Plant project, as included in a
contract between the City of Iowa City and New Horizons Enterprises, Inc. of Lincoln, Nebraska,
dated December 24, 2014, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the North Wastewater Plan Demolition Fund
account # V3142; and
WHEREAS, the final contract price is $25,019.00
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 23rd day of February 20 15
MAYOR
Approved by
ATTEST: LZ.p 7. wnW)cz/P��l� ua�
CITY CLERK City Attorney's Office
It was moved by trims and seconded by Dickens the Resolution be
adopted, and upon roll call there were:
AYES: NAYS: ABSENT:
x Botchway
x Dickens
x Dobyns
x Hayek
x Mims
x Payne
x Throgmorton
4d(6)
Prepared by: Kim Sandberg, Public Works, 416 E Washington St., Iowa City, IA 52240 (319) 356-5139
RESOLUTION NO. 15-112
RESOLUTION ACCEPTING THE WORK FOR THE 2014 SUMMER SIDEWALK
REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2014 Summer Sidewalk Repair Project, as included in a contract between the City of Iowa City
and Schafbuch Concrete & Foundations Inc. of Iowa City, Iowa, dated August 4, 2014, be
accepted, and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office, and
WHEREAS, funds for this project are available in the Sidewalk Inspection account # 22710220,
and
WHEREAS, the final contract price is $64,298.75.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 21st day of April 2015,
ATTEST:_ /Jig t J
CITY CLERK
It was moved by Mims
adopted, and upon roll call there were:
AYES:
ip
MAYOR
Approved by
�14a Aw,a,—
City Attorney's Office t,I( p-Jf J-
and seconded by Payne the Resolution be
NAYS:
ABSENT:
x
Botchway
x Dickens
x
Dobyns
x
Hayek
x
Mims
x
Payne
x
Throgmorton
Pwenglmastersfacptwo rk. doc
4/15
Prepared by Jason Reichart, Special Projects Engineer, Public Works, 410 E. Washington St., Iowa City, IA 52240
(319) 356-5416
RESOLUTION NO. 15-2
RESOLUTION ACCEPTING THE WORK FOR THE REMOVAL OF 2014
FLOOD -RELATED SAND AND DEBRIS FROM CITY PARK PROJECT
WHEREAS, the Engineering Division has recommended that the work for the Removal of 2014
Flood -Related Sand and Debris from City Park Project, as included in a contract between the City
of Iowa City and Delong Construction, Inc. of Washington, Iowa, dated December 9, 2014, be
accepted, and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the 6.14 Flood Parks Category G account #
R4173, and
WHEREAS, the final contract price is $33,219,90.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 15th day of September 20 15
MAYOR
Approved by
ATTEST:
CITY CLERK City Attorney's Office
It was moved by trims
adopted, and upon roll call there were:
AYES:
Pweng/masterslacpMork. doc
9115
and seconded by Dickens the Resolution be
NAYS:
ABSENT:
Botchway
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
Prepared by: Dave Panes, Public Works, 410 E Washington St., Iowa City, IA 52240 (319) 356-5415
RESOLUTION NO. 15-278
RESOLUTION ACCEPTING THE WORK FOR THE NORMANDY DRIVE
RESTORATION PROJECT, PHASE IIIA
WHEREAS, the Engineering Division has recommended that the work for construction of the
Normandy Drive Restoration Project, Phase IIIA as included in a contract between the City of
Iowa City and Advanced Electrical Services, Inc. of Iowa City, Iowa, dated November 7, 2014, be
accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the Normandy Drive Restoration account #
R417:and
WHEREAS, the final contract price is $ 29,303.90.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 15th day of September , 20 15
�� "" Approved by
ATTEST: 7?'a
CITY`CLERK'City Attorney's Office
It was moved by Mims and seconded by
adopted, and upon roll call there were:
AYES:
`wen g/masters/acptwork, doc
9115
NAYS:
Dickens
ABSENT.
the Resolution be
Botchway
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
MTT-rT-
2c(2)
Prepared by: Geoff Fruin, Assistant City Manager, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5010
RESOLUTION NO. 15-366
RESOLUTION ACCEPTING THE WORK FOR THE ASHTON HOUSE RAMP
AND SIDEWALK PROJECT
WHEREAS, the Parks & Recreation Acting Director and the consultant, Abundant Playscapes,
Inc., have recommended that the work for construction of the Ashton House Ramp and Sidewalk
Project, as included in a contract between the City of Iowa City and Iowa State Contractors of
Ottumwa, Iowa, dated December 3, 2013, be accepted; and
WHEREAS, the performance and payment bond have been filed in the City Clerk's office; and
WHEREAS, this project is budgeted in CIP project#4178; and
WHEREAS, the final contract price is $147,621.97.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 30th day of
ATTEST :??C� k
CITY -CLERK
Cl
November ,20 15
(.a�/0.
MAYOR
Approved by
City Attorney's Office
It was moved by sotchway and seconded by trims the Resolution be
adopted, and upon roll call there were:
AYES:
NAYS: ABSENT:
x
Botchway
x
Dickens
x
Dobyns
x
Hayek
x
Mims
x Payne
x
Throgmorton
� d(14)
a awnwim
Prepared by: Dave Panos, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5415
RESOLUTION NO. 15-380
RESOLUTION ACCEPTING THE WORK FOR THE 2014 CURB RAMP
IMPROVEMENT PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2014 Curb Ramp Improvement Project, as included in a contract between the City of Iowa City
and Feldman Concrete of Dyersville, Iowa, dated October 23, 2014, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the Curb Ramp Construction - ADA account #
S3822: and
WHEREAS, the final contract price is $91,035.20.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 15th day of
ATTEST: �%<Zy«�% k _ kay L/
CITY LERK
It was moved by trims
adopted, and upon roll call there were:
AYES:
Pwe n g/ma ste rs.!acpMork. d oc
12/15
cember ,20 15
MAYOR�
Approved by
y�
City Attorney's Office
and seconded by Dobyns the Resolution be
NAYS:
ABSENT:
Botchway
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
4d(15)
■�
Prepared by: Jason Havel, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5410
RESOLUTION NO. 15-381
RESOLUTION ACCEPTING THE WORK FOR THE SYCAMORE STREET GSR
BOOSTER PUMP VFD REPLACEMENT PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
Sycamore Street GSR Booster Pump VFD Replacement Project, as included in a contract
between the City of Iowa City and Neumiller Electric, Inc. of Iowa City, Iowa, dated March 13,
2015, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the Ground Storage Reservoir VFD Upgrades
account # W3213; and
WHEREAS, the final contract price is $76,330.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 15th day of December 20 15
ATTEST: fS .
CITY'CLERK
t.
MAYOR
Approved by
CityAttorney's Office, fl�ys
It was moved by Mims and seconded by Dobyns the Resolution be
adopted, and upon roll call there were:
AYES:
i5
NAYS:
ABSENT:
Botchway
Dickens
Dobyns
Hayek
Mims
Payne
Throgmorton
Prepared by: Ben Clark, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
RESOLUTION NO. 16-6
RESOLUTION ACCEPTING THE WORK FOR THE 2015 CAPITOL STREET
STORM SEWER REPLACEMENT PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2015 Capitol Street Storm Sewer Replacement Project, as included in a contract between the City
of Iowa City and Yordi Excavating of Cedar Rapids, IA, dated October 22,2015, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineering office; and
WHEREAS, funds for this project are available in the Stormwater account # 77770110; and
WHEREAS, the final contract price is $30,551.10
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 5th day of January 20 16
M OR
Approved by
ATTEST:?Gr,-v % X 7�ti'u �AZ�rv�/�n>al
C T RK CityAttorney's Office
It was moved by Dickens and seconded by sotchway the Resolution be
adopted, and upon roll call there were:
AYES:
r0.
X
X
X
X
X
X
Pw2n91M 2ste rs/acptwork. doc
12M 6
NAYS:
ABSENT:
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
Prepared by: Daniel Scott, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5144
RESOLUTION NO, 16-120
RESOLUTION ACCEPTING THE WORK FOR THE 2015 SEWER REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the 2015 Sewer
Repair Project, as included in a contract between the City of Iowa City and Calacci Construction of Iowa City,
Iowa, dated May 20, 2015, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the City
Engineer's office, and
WHEREAS, funds for this project are available in the Annual Sewer Repair account # V3101, and
WHEREAS, the final contract price is $147,42722.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA CITY, IOWA,
THAT:
Passed and approved this 3rd day of May , 20 16
MAYAR \+
Approved by � 44 LL--�
ATTEST: 2 5 Qtz/Gn(A �H�O' 1w-
CITY ERK LvAttorneys Office ,A/�I,�
It was moved by Botchway and seconded by Dickens the Resolution be adopted,
and upon roll call there were:
AYES: NAYS: ABSENT:
% Botchway
% Dickens
X Dobyns
X Hayek
_x Mims
Payne
Throgmorton
Pweng/masters/ac ptwork. doc
4/16
mm"TrT
1m
4d(9)
Prepared by: Ben Clark, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
RESOLUTION NO. 16-
RESOLUTION ACCEPTING THE WORK FOR THE 2015 NED ASHTON PARK
STORM SEWER REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2015 Ned Ashton Park Storm Sewer Repair Project, as included in a contract between the City of
Iowa City and Lynch's Excavating of West Branch, Iowa, dated September 16"', 2015, be
accepted, and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineering office, and
WHEREAS, funds for this project are available in the Stormwater account # 777701101 and
WHEREAS, the final contract price is $24,065.00
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 3rd day of May 20 16 .
MAybR
Approved by
ATTEST: �t�r�✓ 7f_�u✓
CITY � LERK
It was moved by Botchway and seconded by
adopted, and upon roll call there were:
AYES:
X
X
X
X
X
X
X
Pweng/m asters/a cplwo rk. doc
4.!16
NAYS:
l A nrord it
City Attorney's Office q h-11IL,
Dickens the Resolution be
ABSENT:
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
Prepared by. Ben Clark, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
RESOLUTION NO. 16-122
RESOLUTION ACCEPTING THE WORK FOR THE NATURAL GAS MAIN
REPLACEMENT, SOUTH WASTEWATER TREATMOENT PLANT
WHEREAS, the Engineering Division has recommended that the work for the Natural Gas Main
Replacement, South Wastewater Treatment Plant project, as included in a contract between the
City of Iowa City and Profile Contracting LLC of Bettendorf, Iowa dated November 10'°, 2015 be
accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineering office; and
WHEREAS, funds for this project are available in the Wastewater account # 72720122; and
WHEREAS, the final contract price is $89,812.76
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 3rd day of May , 20 16
MA R
Approved by
ATTEST:
CITY fRK
It was moved by Botchway and seconded by
adopted, and upon roll call there were:
AYES:
PwenglmasterslacIrtwork-doc
4116
NAYS:
4AIC4 4-
City Attorney's Office y 7,7 1ILo
Dickens
ABSENT:
the Resolution be
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
4d(10)
Prepared by: Daniel Scott, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5144
RESOLUTION NO, 16-120
RESOLUTION ACCEPTING THE WORK FOR THE 2015 SEWER REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the 2015 Sewer
Repair Project, as included in a contract between the City of Iowa City and Calacci Construction of Iowa City,
Iowa, dated May 20, 2015, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the City
Engineer's office, and
WHEREAS, funds for this project are available in the Annual Sewer Repair account # V3101, and
WHEREAS, the final contract price is $147,42722.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA CITY, IOWA,
THAT:
Passed and approved this 3rd day of May , 20 16
MAYAR \+
Approved by � 44 LL--�
ATTEST: 2 5 Qtz/Gn(A �H�O' 1w-
CITY ERK LvAttorneys Office ,A/�I,�
It was moved by Botchway and seconded by Dickens the Resolution be adopted,
and upon roll call there were:
AYES: NAYS: ABSENT:
% Botchway
% Dickens
X Dobyns
X Hayek
_x Mims
Payne
Throgmorton
Pweng/masters/ac ptwork. doc
4/16
mm"TrT
1m
4d(9)
Prepared by: Ben Clark, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
RESOLUTION NO. 16-
RESOLUTION ACCEPTING THE WORK FOR THE 2015 NED ASHTON PARK
STORM SEWER REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2015 Ned Ashton Park Storm Sewer Repair Project, as included in a contract between the City of
Iowa City and Lynch's Excavating of West Branch, Iowa, dated September 16"', 2015, be
accepted, and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineering office, and
WHEREAS, funds for this project are available in the Stormwater account # 777701101 and
WHEREAS, the final contract price is $24,065.00
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 3rd day of May 20 16 .
MAybR
Approved by
ATTEST: �t�r�✓ 7f_�u✓
CITY � LERK
It was moved by Botchway and seconded by
adopted, and upon roll call there were:
AYES:
X
X
X
X
X
X
X
Pweng/m asters/a cplwo rk. doc
4.!16
NAYS:
l A nrord it
City Attorney's Office q h-11IL,
Dickens the Resolution be
ABSENT:
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
Prepared by. Ben Clark, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
RESOLUTION NO. 16-122
RESOLUTION ACCEPTING THE WORK FOR THE NATURAL GAS MAIN
REPLACEMENT, SOUTH WASTEWATER TREATMOENT PLANT
WHEREAS, the Engineering Division has recommended that the work for the Natural Gas Main
Replacement, South Wastewater Treatment Plant project, as included in a contract between the
City of Iowa City and Profile Contracting LLC of Bettendorf, Iowa dated November 10'°, 2015 be
accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineering office; and
WHEREAS, funds for this project are available in the Wastewater account # 72720122; and
WHEREAS, the final contract price is $89,812.76
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 3rd day of May , 20 16
MA R
Approved by
ATTEST:
CITY fRK
It was moved by Botchway and seconded by
adopted, and upon roll call there were:
AYES:
PwenglmasterslacIrtwork-doc
4116
NAYS:
4AIC4 4-
City Attorney's Office y 7,7 1ILo
Dickens
ABSENT:
the Resolution be
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
4d(10)
Prepared by Melissa Clow, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5413
RESOLUTION NO. 16-141
RESOLUTION ACCEPTING THE WORK FOR THE IOWA CITY GATEWAY
TREE CLEARING PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
Iowa City Gateway Tree Clearing Project, as included in a contract between the City of Iowa City
and CAJ Enterprises, Inc. of West Branch, IA, dated March 4, 2016, be accepted, and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the Iowa City Gateway Project account # S3809;
and
WHEREAS, the final contract price is $131,642.44.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 17th day of May , 20 16
MAYOR /
ATTEST:�ICLer.+x,c/
CITY tUERK
It was moved by sotchway and seconded by
adopted, and upon roll call there were:
AYES:
x
x
Pwenglmasters/acplwork. doc
5M 6
Approved by
;� ! oItIc
City Attorney's Office
Mims
the Resolution be
NAYS: ABSENT:
Botchway
Cole
x Dickens
Mims
Taylor
Thomas
Throgmorton
4d(4)
3■�d(8
Prepared by: Daniel Scott, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5144
RESOLUTION NO. 16-181
RESOLUTION APPROVING THE FINAL CONTRACT PRICE FOR THE 2015 SEWER
REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2015 Sewer Repair Project, as included in a contract between the City of Iowa City and Calacci
Construction of Iowa City, Iowa, dated May 20, 2015, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the Annual Sewer Repair account # V3101, and
WHEREAS, this work was accepted by this Resolution No. 16-120 but the final contract price was
inaccurately stated therein; and
WHEREAS, the final contract price is $142,427,22; and
WHEREAS, this resolution is to correct the final contract amount.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT:
1. The final contract price of $142,427.22 is approved.
2. The retainage held per Iowa Code Chapter 573 shall be released 30 (thirty) days after the
original acceptance date of May 3, 2016.
Passed and approved this 6th day of .rune 20 16
MAYOR
Approved by
ATTEST: �lXuic-' u
CITY Z1ERK City Attorney's Office Z/yam
Resolution No. 16-181
Page 2
It was moved by Botchway and seconded by
Resolution be adopted, and upon roll call there were:
AYES:
NAYS: ABSENT: ABSTAIN:
Dickens
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
the
m7rn"Tr'
2d(2)
Prepared by: Ben Clark, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
RESOLUTION NO. 16-209
RESOLUTION ACCEPTING THE WORK FOR THE 2016 FOREST GLEN
STORM SEWER REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2016 Forest Glen Storm Sewer Repair Project, as included in a contract between the City of Iowa
City and Bockenstedt Excavating of Iowa City, Iowa, dated April 21 st, 2016, be accepted, and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineering office; and
WHEREAS, funds for this project are available in the Stormwater account # 77770110; and
WHEREAS, the final contract price is $45,481.70
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 5th day of July , 20 16
M OR
Approved by
ATTEST: %/_ J 7i - -eatd
CIT LERK City Attorney's Office�,/;-,/y,
It was moved by Dickens
adopted, and upon roll call there were:
AYES:
X
X
X
X
X
X
Pweng/masters/acphvork. doc
6116
and seconded by
NAYS
Cole
ABSENT:
the Resolution be
X Botchway
_ Cole
_ Dickens
_ Mims
_ Taylor
_ Thomas
Throgmorton
08-16-16
2d(4)
Prepared by. Kim Sandberg, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
RESOLUTION NO. 16-243
RESOLUTION ACCEPTING THE WORK FOR THE 2015 SUMMER SIDEWALK
REPAIR PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2015 Summer Sidewalk Repair Project, as included in a contract between the City of Iowa City
and JDM Concrete of Kalona, Iowa, dated July 22, 2015, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the Sidewalk Inspection account # 22710220,
and
WHEREAS, the final contract price is $63,801.28.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 16th day of August 2016.
M OR
Approved' by
ATTEST: 1�ill tcf►.°J 7Ccl. c �%�� /�Zi° ��s�t�� 9i/L L}�e
CITY -CLERK City Attorney's Office
It was moved by sotchway and seconded by
adopted, and upon roll call there were:
AYES:
x
x
Pwenglmasterslacptwork. doc
8/15
Thomas
the Resolution be
NAYS' ABSENT;
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
Prepared by: Jason Havel, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5140
RESOLUTION NO. 1 6-244
RESOLUTION ACCEPTING THE WORK FOR THE FIBER INFRASTRUCTURE -
IOWA CITY SOUTH PART 1 - DUCT INSTALLATION PROJECT.
WHEREAS, the Engineering Division has recommended that the work for construction of the
Fiber Infrastructure - Iowa City South Part 1 - Duct Installation Project, as included in a contract
between the City of Iowa City and Slabach Construction Company, Inc. of Kalona, Iowa, dated
June 23, 2015, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the S. Wastewater Fiber Repair/Redundant
Path account # 14722; and
WHEREAS, the final contract price is $91,128.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 16th day of August , 2016.
MOOR
Approved by
ATTEST:
CITY ERK City Attorney's Office �/ J
It was moved by sotchway and seconded by 'Thomas the Resolution be
adopted, and upon roll call there were:
AYES:
NAYS: ABSENT:
x
Botchway
x
Cole
x
Dickens
x
Mims
x
Taylor
x
Thomas
x
Throgmorton
Pweng/m asto rslac pMo rk.doc
W15
_ nml"
3d(5)
sma�
Prepared by: Josh Slattery, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5149
RESOLUTION NO. 16-276
RESOLUTION ACCEPTING THE WORK FOR THE COURT HILL PARK
SIDEWALK INFILL PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
Court Hill Park Sidewalk Infill Project, as included in a contract between the City of Iowa City and
Calacci Construction Co., Inc. of Iowa City, Iowa, dated September 3, 2014, be accepted, and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the 2014 Intra-City Bike Trails account # R4206
and the Sidewalk Infill Program account # S3828, and
WHEREAS, the final contract price is $153,898.24.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 20th day of September .20 16
M OR
Approved by
i
ATTEST. %tares �/r Ui% �1 .ri�� '�G7pi
CITY CLERK City Attorney's Office '�112 11Lr
It was moved by Mims and seconded by Dickens the Resolution be
adopted, and upon roll call there were:
AYES
x
Pwen g/ma ster/acptwork. doc
9/r 6
NAYS: ABSENT:
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
Prepared by: Ben Clark, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
RESOLUTION NO. 16-286
RESOLUTION ACCEPTING THE WORK FOR THE 2016 Drain Tile Project
WHEREAS, the Engineering Division has recommended that the work for construction of the
2016 Drain Tile Project, as included in a contract between the City of Iowa City and Petra
Excavating Inc. Wayland, Iowa, dated October 6, 2016, be accepted, and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineering office; and
WHEREAS, funds for this project are available in the Stormwater account # 77770110; and
WHEREAS, the final contract price is $72,175.81
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 18th day of
MOOR
ATTEST: e,
CITY CLERK
October ,20 16
Approved by
�rCityAttorney's Office
It was moved by Botchway and seconded by Mims the Resolution be
adopted, and upon roll call there were.
AYES:
X
X
X
x
X
x
X
Pweng/masterslacptwork. doc
10116
ABSENT:
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
4d(2)
4d(3)
�e
Prepared by; Jason Havel, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5140
RESOLUTION NO. 16-287
RESOLUTION ACCEPTING THE WORK FOR THE IOWA CITY FIBER
INFRASTRUCTURE SOUTH PART 2 FIBER CABLE INSTALLATION PROJECT.
WHEREAS, the Engineering Division has recommended that the work for construction of the Iowa
City Fiber Infrastructure South Part 2 Fiber Cable Installation Project, as included in a contract
between the City of Iowa City and Advanced Electric, Inc. of Iowa City, Iowa, dated September 24,
2015, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
WHEREAS, funds for this project are available in the S Wastewater Fiber Repair/Redundant
Path account # 14722 and
WHEREAS, the final contract price is $38,750.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 18th day of Oct
ATTEST: u J x - e,4_ i/
CITY CLERK
MA R IV
Approved by
2016.
A6 /dim Yd�.�L zEn
City Attorney's Office Y�13'Ily
It was moved by Eotchway and seconded by Mims the Resolution be
adopted, and upon roll call there were:
AYES
x
Pwe n g/masters/acptwork. doc
10M 6
NAYS: ABSENT:
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
mTrTrfrw
4d(4)
Prepared by: Kumi Morris, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5082
RESOLUTION NO. 16-288
RESOLUTION ACCEPTING THE WORK FOR THE ROBERT A LEE
RECREATION CENTER BOILER REPLACEMENT PROJECT 2015
WHEREAS, the Engineering Division has recommended that the work for construction of the
Robert A Lee Recreation Center Boiler Replacement Project 2015, as included in a contract
between the City of Iowa City and Pipe Pro Inc„ of Cedar Rapids, Iowa, dated December 15,
2015, be accepted, and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the Rec Center Annual Improvements account #
R4330; and
WHEREAS, the final contract price is $220,300.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 18" day of October 2016.
MAKOR �—
Approved by
ATTEST. Y V(au�
CITY CLERK
It was moved by Botchway and seconded by
adopted, and upon roll call there were:
Pwen g/rrasters/acptwo rk. do c
10/16
City Attorney's Office
Mims
the Resolution be
NAYS: ABSENT:
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
Prepared by: Ben Clark, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
RESOLUTION NO. 16-335
RESOLUTION ACCEPTING THE WORK FOR THE 2016 RALSTON CREEK
IMPROVEMENTS PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
2016 Ralston Creek Improvements Project, as included in a contract between the City of Iowa City
and CAJ Enterprises Inc. (d/b/a/ Chris Jones Trucking) of West Branch, Iowa, dated August 30th
2016, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the Annual Storm Water Improvements account
# M3631:and
WHEREAS, the final contract price is $112,044.47.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 6th day of December , 20 16
M OR
Approved by
ATTEST: �1< ��tCftw%�ue� rQtG/1�7y?e, i
CITY gERK City Attorney's Office If/21�fv
It was moved by Botchway and seconded by Dickens the Resolution be
adopted, and upon roll call there were:
hM
Pweng/m asterslacptvo rk. doc
11/16
NAYS: ABSENT:
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
Prepared by: Scott Sovers, Sr. Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319)356-5142
RESOLUTION NO. 17-48
RESOLUTION ACCEPTING THE WORK FOR THE REPLACEMENT OF
VARIABLE FREQUENCY DRIVES — ROCHESTER GSR PUMP STATION
PROJECT
WHEREAS, the Engineering Division has recommended that the work for construction of the
Replacement of Variable Frequency Drives — Rochester GSR Pump Station Project, as included
in a contract between the City of Iowa City and Esco Electric Company, Inc. of Cedar Rapids, IA,
dated July 22nd 2016, be accepted; and
WHEREAS, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
WHEREAS, funds for this project are available in the Ground Storage Reservoir account
#W3213; and
WHEREAS, the final contract price is $79,360.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF IOWA
CITY, IOWA, THAT said improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 21st day of_ February 20 17
ATTEST:
DEPUTY CIV CLERK
It was moved by Mims
adopted, and upon roll call there were:
AYES
x
Pweng/mastemlacptwork.doc
2/17
� �.�Z�
M4YOR l/
Approved by
�CityAttorney'sOffice 7
/ �9//
and seconded by Botchwa the Resolution be
NAYS: ABSENT:
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
Prepared by: Scott Sovers, Sr. Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319)356-5142
Resolution No. 17-190
Resolution accepting the work for the Sycamore Street
Pavement Marking Project — City Limits to U.S. Highway 6
Whereas, the Engineering Division has recommended that the work for construction of the
Sycamore Street Pavement Marking Project (City Limits to U.S. Highway 6), as included in a
contract between the City of Iowa City and Advanced Traffic Control Inc. of Cedar Rapids, Iowa,
dated October 12, 2016, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the Annual Complete Street Improvements
account #S3827; and
Whereas, the final contract price is $40,170,00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 6th day of June 2017.
M or
Approved by
l
ATTE = zL Qr�{caQ nn J�2n✓i "
eputy City Cler ) City Attorney's Office %3d / i
It was moved by Botchway and seconded by
adopted, and upon roll call there were:
Ayes: Nays:
x
x
x
x
x
x
Pwenglmasterslacpmork doc
5l17
Dickens the Resolution be
Absent:
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
Prepared by: Josh Slattery, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5149
Resolution No. 17-207
Resolution accepting the work for the 2016 Sidewalk Infill Project
Project
Whereas, the Engineering Division has recommended that the work for construction of the 2016
Sidewalk Infill Project, as included in a contract between the City of Iowa City and Bushman
Excavating, Inc. of Fairfax, Iowa, dated August 31, 2016, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the Sidewalk Infill Program account # S3828; and
Whereas, the final contract price is $83,299.19.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 20th day of June 2017
May r
Attes
City Clerk/ /
Approved by
City Attorney's Office
It was moved by Mims and seconded by Dickens the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays: Absent:
X Botchway
X
Cole
X
Dickens
X
Mims
X
Taylor
x
Thomas
X
Throgmorton
Prepared by, Brett Zimmerman, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
Resolution No. 17-232
Resolution accepting the work for the 2017 Clearing and
Grubbing Project
WHEREAS, the Engineering Division has recommended that the work for construction of the
2017 Clearing and Grubbing Project, as included in a contract between the City of Iowa City and
Delong Construction, Inc. of Washington, IA, dated March 16, 2017, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineers office; and
Whereas, funds for this project are available in account #'s M3631 Annual Stormwater
Improvements, 10530200 Park Maintenance Operations, L3322 Hi Road Improvements, and
S3809 Iowa City Gateway Project (Dubuque Street); and
Whereas, the final contract price is $47,399.30.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 18th day of July 2017
Ma or
Approved by
Attest: oy,r� A�e a
Ci rk ICityAttorney'sOffice 119117
It was moved by Botchway and seconded by Dickens the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays: Absent:
x
Botchway
x
Cole
x
Dickens
x
Mims
x
Taylor
x
Thomas
x Throgmorton
Prepared by: Dave Panos, Sr. Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
Resolution No. 17-251
Resolution accepting the work for the Iowa Highway 1 / US
Highway 218 Traffic Signal Pole Replacement Project.
Whereas, the Engineering Division has recommended that the work for construction of the Iowa
Highway 1 / US Highway 218 traffic Signal Pole Replacement Project as included in a contract
between the City of Iowa City and Advanced Electrical Services, Inc. of Iowa City, Iowa dated
September 8, 2017, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office, and
Whereas, funds for this project are available in the Loss Reserve fund account # 82310613; and
Whereas, the final contract price is $26,700.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 1st day of August �2017.�
MA�or /
Approved by
Atte xy L
City Clerk City Attorney's Office -7!
It was moved by Taylor and seconded by sotchway the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays: Absent:
x
Botchway
X
Cole
x
Dickens
x
Mims
x
Taylor
X
Thomas
%
Throgmorton
Pwe ng/masters/a c Ptwc rk. doc
7/17
Prepared by: Brett Zimmerman, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
Resolution No. 17-267
Resolution accepting the work for the City Hall Landscaping
Project
WHEREAS, the Engineering Division has recommended that the work for construction of the City
Hall Landscaping Project, as included in a contract between the City of Iowa City and Feldman
Concrete of Dyersville, IA, dated June 15, 2017, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the City Hall General Projects account # G4704;
and
Whereas, the final contract price is $31,579.47.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 15th day of August 2017
May r
Approved by
City C� City Att�OMS75-
�7
It was moved by Botchway and seconded by Thomas the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays: Absent:
x
Botchway
X
Cole
x Dickens
X
Mims
X
Taylor
X
Thomas
X
Throgmorton
'2,,-t F s�
Prepared by: Dave Panes, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
Resolution No. 17-282
Resolution accepting the work for the Mercer Park
Tennis/Pickleball Court Improvements Project
WHEREAS, the Engineering Division has recommended that the work for construction of the
Mercer Park Tennis/Pickleball Court Improvements Project, as included in a contract between the
City of Iowa City and Tricon General Construction of Cedar Rapids, Iowa, dated March 15, 2017,
be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
Whereas, funds for this project are available in the Tennis Ct/Pickle Ball Ct Resurface account #
R4337 and Park Annual Improvement #R4130; and
Whereas, the final contract price is $135,278.52.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 5th day of September % 2017
Ma r
Approved by
Attes �Glilrli v
4i8erk City Attorney's Office ?1291 7
It was moved by Mims and seconded by 'Taylor the Resolution be
adopted, and upon roll call there were:
Ayes:
x
x
x
Nays:
Absent:
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
Prepared by: Jason Reichart, Public Works, 410 E Washington St., Iowa City, IA 52240, (319)356.5416
Resolution No. 17-283
Resolution accepting the work for the Scott Park Gabion Basket
Repair Project.
Whereas, the Engineering Division has recommended that the work for construction of the Scott
Park Gabion Basket Repair Project, as included in a contract between the City of Iowa City and
CAJ Enterprises, of West Branch, Iowa, dated April 26, 2017, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the Stormwater — 2014 Flood account #M3628;
and
Whereas, the final contract price is $22,931.37.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 5th day of Septembers , 2017.
v ��
Moor Ir
Approved by
Atte t: c-c-G i f Lm
City C rk Ctty Attorney's Office
It was moved by Mims and seconded by Taylor the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays: Absent:
x
Botchway
x
Cole
x
Dickens
x
Mims
x
Taylor
x
Thomas
x
Throgmorton
Pweng/masters/acptwork.doc
8/17
Prepared by: Jason Reicharl, Public Works, 410 E. Washington St., Iowa City, IA 52240, (319)356-5416
Resolution No. 17-284
Resolution accepting the work for the Iowa River Trail Handrail
Repair Project.
Whereas, the Engineering Division has recommended that the work for construction of the Iowa
River Trail Handrail Repair Project, as included in a contract between the City of Iowa City and
CAJ Enterprises, of West Branch, Iowa, dated May 25, 2017, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the Parks — 2014 Flood account #R4173; and
Whereas, the final contract price is $17,630.74.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 5th day of September / , 2017.
Mayor
Approved by
Atte t �,6 i-c Ay,Ih
City G rk City Attorney's Office z g Jj 7
It was moved by Mims and seconded by Taylor the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays: Absent:
x
Botchway
x
Cole
x
Dickens
x
Mims
x
Taylor
X
Thomas
x
Throgmorton
Pwenglmasterslacptwork.doc
ar17
?:'- i Ur)
Prepared by: Scott Sovers, Sr. Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319)356-5142
Resolution No. 17-298
Resolution accepting the work for the Kiwanis Park Storm Sewer
Improvements Project
Whereas, the Engineering Division has recommended that the work for construction of the
Kiwanis Park Storm Sewer Improvements Project, as included in a contract between the City of
Iowa City and Lynch Excavating Inc. of West Branch, IA, dated March 13, 2017, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the Annual Storm Water Improvements account
#M3631; and
Whereas, the final contract price is $20,848.50.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 19th day of September , 2017
""� z1--�
Ma or
Approved by
ATTEST ' cx
amity Clerk
It was moved by Botchway and seconded by
adopted, and upon roll call there were:
Ayes: Nays:
X
X
X
X
X
X
X
Pwe n g/m asters/acptwork.doc
9117
ja,t, 4c-�fpa-,
City Attorney's Office
Dickens
Absent:
the Resolution be
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
Prepared by: Kim Sandberg, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
Resolution No. 17-299
Resolution accepting the work for the 2016 Summer Sidewalk
Repair Project
WHEREAS, the Engineering Division has recommended that the work for construction of the
2016 Summer Sidewalk Repair Project, as included in a contract between the City of Iowa City
and Feldman Concrete of Dyersville, Iowa, dated July 8, 2016, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the Sidewalk Inspection account # 22710220; and
Whereas, the final contract price is $64,800.14.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 19th day of September 2017
Yor '
Approved by
Attes
4CiCIeZrk CityAttorney's Office 9 /12,h7
It was moved by Botchway and seconded by Dickens
adopted, and upon roll call there were:
Ayes: Nays:
x
x
Absent:
the Resolution be
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
f
Prepared by: Scott Sovers, Public Works, 410 E_ Washington St., Iowa City, IA 52240 (319)356-5142
Resolution No. 17-300
Resolution authorizing the extension of the contract for the
annual Pavement Repair Project
Whereas, a request for unit prices related to annual pavement repairs (November 1, 2016 -
October 31, 2017) associated with water main breaks was bid as an informal project in October
2016; and
Whereas, two bids were received for the project; and
Whereas, All American Concrete, Inc. of West Liberty, Iowa submitted the lowest responsible bid
for construction of the above named project; and
Whereas, in the previous three years, the cost of pavement repairs for water main breaks has
averaged $102,000 per year; and
Whereas, due to an increased number and size of repairs, the contract amount is anticipated to
exceed $150,000; and
Whereas, the current purchasing policy requires expenditures exceeding $150,000 to be
authorized by the City Council; and
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that:
1. The City Manager hereby has authority to enter into a contract for the 2016-2017
Pavement Repair Project with All American Concrete in an amount in excess of $150,000
but less than $225,000.
Passed and approved this 19th day of September 2017
M yor
Approved by
Attest'
Ci Clerk City Attorney's Office .7 ff 2- 7
It was moved by Botchway and seconded by Dickens the Resolution be
adopted, and upon roll call there were
Ayes:
X
X
X
X
X
X
X
Nays:
Absent:
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
Prepared by: Scott Sovers, Sr. Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319)356-5142
Resolution No. 17-312
Resolution accepting the work for the First Ave (US Highway 6 to
Mall Drive) Four Lane to Three Lane Conversion Project
Whereas, the Engineering Division has recommended that the work for construction of the Firsl
Ave (US Highway 6 to Mall Drive) Four Lane to Three Lane Conversion Project, as included in a
contract between the City of Iowa City and Quality Striping Inc. of Des Moines, IA, dated April 27,
2017, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the First Avenue Three Lane Conversion account
#S3937; and
Whereas, the final contract price is $21,916.04.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, That said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 3rd day of October
2017.
Mayor
ATTE ee e E e�
City Clerk
Approved by
%, ., .y—s�pyClc"
CrtyAttorneysOffice
It was moved by sotchway and seconded by Thomas
adopted, and upon roll call there were: the Resolution be
Ayes: Nays
x
x
x
x
x —
x
x
Pwe n 9/ma ste rsla cptwo rk. d oc
9117
Absent:
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
Prepared by: Dave Panes, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
Resolution No. 17-313
Resolution accepting the work for the HMA Crack Sealing
Project 2017
WHEREAS, the Engineering Division has recommended that the work for construction of the
HMA Crack Sealing Project 2017, as included in a contract between the City of Iowa City and
Illowa Investment Inc. of Blue Grass, Iowa, dated July 28, 2017, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
Whereas, funds for this project are available in the Pavement Rehabilitation Fund account #
S3824; and
Whereas, the final contract price is $58,077.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 3rd day of October
2017
Ma or
Approved by
Att st'
City Clerk City Attorney's Office9��,
It was moved by Botchway and seconded by
adopted, and upon roll call there were:
Ayes: Nays:
x
x
x
x
x
x
x
Thomas the Resolution be
Absent:
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
Prepared by: Dave Panos, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-6145
Resolution No. 17-326
Resolution accepting the work for the Ashton House Site
Improvements REAP Grant 2016 Project
Whereas, the Engineering Division has recommended that the work for construction of the
Ashton House Site Improvements REAP Grant 2016 Project, as included in a contract between
the City of Iowa City and Carew Landscaping, of Iowa City, Iowa, dated April 4, 2017, be
accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the Ashton House Patio Improvements account #
R4193; and
Whereas, the final contract price is $136,097.25.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 17th day of October / 2017
MayOr
% J Approved by
Attu rT 0
Ci Clerk U City Attorneys Office
It was moved by Botchway and seconded by Thomas the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays: Absent:
x
Botchway
x
Cole
x
Dickens
x
Mims
x
Taylor
x
Thomas
x
Throgmorton
'AC-i (_t-r)
Prepared by: Dave Panos, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
Resolution No. 17-337
Resolution accepting the work for the CDBG Curb Ramp Project
2016
Whereas, the Engineering Division has recommended that the work for construction of the CDBG
Curb Ramp Project 2016, as included in a contract between the City of Iowa City and Calacci
Construction Company, Inc. of Iowa City, Iowa, dated June 15, 2016, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the Curb Ramps-ADA account # S3822; and
Whereas, the final contract price is $94,154.20.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 6th day of November 2017
Ma r
Attes
Cify Clerk
Approved by
�� o� E6L,e,.-
fCity Attorneys Office 1,f-3r't7
It was moved by Botchwav and seconded by Thomas the Resolution be
adopted, and upon roll call there were:
Ayes:
x
x
x
Nays:
Absent:
Botchway
Cole
x Dickens
_ Mims
Taylor
Thomas
Throgmorton
v ^'
Prepared by: Brett Zimmerman, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
Resolution No. 18-5
Resolution accepting the work for the Fire Station #3 Kitchen
Remodel Project
Whereas, the Engineering Division has recommended that the work for construction of the Fire
Station #3 Kitchen Remodel Project, as included in a contract between the City of Iowa City and
TD Builders, LLC. of Swisher, IA, dated November 9, 2017, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in account # Y4432; and
Whereas, the final contract price is $38,281.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 2nd day of January 2018
"-", Z�
Ma r
Approved �by
Cify Clerk / 'City Attorney's Office 17./a;07
It was moved by sotchway and seconded by 'Taylor the Resolution be
adopted, and upon roll call there were:
Ayes
x
Nays:
Absent:
Botchway
Cole
Mims
Salih
Taylor
Thomas
Throgmorton
Prepared by: Brett Zimmerman, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
Resolution No. 18-6
Resolution accepting the work for the South Gilbert Street Trail
Connection
WHEREAS, the Engineering Division has recommended that the work for construction of the
South Gilbert Street Trail Connection, as included in a contract between the City of Iowa City and
CAJ Enterprises of West Branch, IA, dated July 25, 2017, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the Intra-City Bike Trails account # R4206; and
Whereas, the final contract price is $93,267.59.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 2nd day of January 2018
M or
1 Approved by/
Attest:���P �Jcc �Yu,tot�rlf�y¢.
City Clerk City Attorney's Office
It was moved by sotchway and seconded by Taylor the Resolution be
adopted, and upon roll call there were:
Ayes
x
x
Nays:
Absent:
Botchway
Cole
Mims
Salih
Taylor
Thomas
Throgmorton
J
Prepared by: Scott Sovers, Sr. Civil Engineer, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5142
Resolution No. 18-44
Resolution accepting the work for the Bloomington GSR Booster
Pump VFD Replacement Project
Whereas, the Engineering Division has recommended that the work for construction of the
Bloomington GSR Booster Pump VFD Replacement Project, as included in a contract between
the City of Iowa City and ESCO Electric of Marion, IA, dated June 6`h, 2017, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
Whereas, funds for this project are available in the Ground Storage Reservoir VFD Upgrades
account #W3213; and
Whereas, the final contract price is $119,450.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 20th day of February 2018
L,
Ma r
Approved by
Attest• ec P� e 13 —1
City Clerk City Attorney's Office
It was moved by Botchway and seconded by Salih the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays:
Absent:
Botchway
Cole
Mims
Salih
Taylor
Thomas
Throgmorton
Prepared by: Trent Hansen, Information Technology Services, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5433
Resolution No. 18-82
Resolution accepting the work for the Fiber Infrastructure at the
Iowa City Landfill and Recycling Center Project
Whereas, the Engineering Division has recommended that the work for construction of the Fiber
Infrastructure at the Iowa City Landfill and Recycling Center Project, as included in a contract
between the City of Iowa City and Advanced Electrical Services, Inc. of Iowa City, Iowa, dated May
16, 2016, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the City
Engineer's office; and
Whereas, funds for this project are available in the Landfill Surveillance Cameras account #L3326;
and
Whereas, the final contract price is $56,000.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this end day of April 2018
Attest et_ "wC/.
Ci Clerk
It was moved by _
adopted, and upon
Salih
roll call there were:
Ayes:
Ma r
A proved by
City Attorney's Office
and seconded by Thomas
Nays:
Absent:
x Botchway
the Resolution be
Cole
Mims
Salih
Taylor
Thomas
Throgmorton
Prepared by: Josh Slattery, Public Works, 410 E. Washington St., Iowa City, IA 62240 (319) 356-5149
Resolution No. 18-191
Resolution accepting the work for the 2017 Oakcrest Street
Sidewalk Infill Project
Whereas, the Engineering Division has recommended that the work for construction of the 2017
Oakcrest Street Sidewalk Infill Project, as included in a contract between the City of Iowa City and
Sulzco, LLC of Muscatine, Iowa dated June 30, 2017, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the Sidewalk Infill Program account # S3828; and
Whereas, the final contract price is $36,915.20.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 3rd day of July 2018
Ma or
Approved by
Attest / e
(.<<; I /fit
City Clerk City Attorney's Office
It was moved by Mims and seconded by Thomas the Resolution be
adopted, and upon roll call there were:
Ayes
x
Nays:
Absent:
Botchway
Cole
Mims
x Salih
Taylor
Thomas
Throgmorton
Prepared by: Dave Panos, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
Resolution No. 17-313
Resolution accepting the work for the HMA Crack Sealing
Project 2017
WHEREAS, the Engineering Division has recommended that the work for construction of the
HMA Crack Sealing Project 2017, as included in a contract between the City of Iowa City and
Illowa Investment Inc. of Blue Grass, Iowa, dated July 28, 2017, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
Whereas, funds for this project are available in the Pavement Rehabilitation Fund account #
S3824; and
Whereas, the final contract price is $58,077.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 3rd day of October
2017
Ma or
Approved by
Att sY
dy Clerk City Attorneys Office
g7Z-5117
It was moved by sotchway and seconded by
adopted, and upon roll call there were:
Nays:
Thomas the Resolution be
Absent:
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
�1 f
Prepared by: Dave Panos, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
Resolution No. 17-326
Resolution accepting the work for the Ashton House Site
Improvements REAP Grant 2016 Project
Whereas, the Engineering Division has recommended that the work for construction of the
Ashton House Site Improvements REAP Grant 2016 Project, as included in a contract between
the City of Iowa City and Carew Landscaping, of Iowa City, Iowa, dated April 4, 2017, be
accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the Ashton House Patio Improvements account #
R4193; and
Whereas, the final contract price is $136,097.25.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 17 th day of October 2017
MaY6r
Attu c G c L e
CAy Clerk
Approved by
City Attorney's Office
It was moved by Botchway and seconded by Thomas
adopted, and upon roll call there were:
Ayes: Nays:
x
x
x
x
x
x
x
Absent:
the Resolution be
Botchway
Cole
Dickens
Mims
Taylor
Thomas
Throgmorton
Prepared by: Scott Sovers, Sr. Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319)356-5142
Resolution No. 17-312
Resolution accepting the work for the First Ave (US Highway 6 to
Mall Drive) Four Lane to Three Lane Conversion Project
Whereas, the Engineering Division has recommended that the work for construction of the First
Ave (US Highway 6 to Mall Drive) Four Lane to Three Lane Conversion Project, as included in a
contract between the City of Iowa City and Quality Striping Inc. of Des Moines, IA, dated April 27,
2017, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the First Avenue Three Lane Conversion account
#S3937: and
Whereas, the final contract price is $21,916.04.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, That said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 3rd day of October 2017.
Ma or
Approved by
ATTE PAC-f eJi_u %��h n v�'/pL�lc
City Clerk City Attorneys OfficeIi7
It was moved by Botchway and seconded by Thomas the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays: Absent:
x
Botchway
X
Cole
X
x
Dickens
x
Mims
x
Taylor
X
Thomas
Throgmorton
Pweng/masters/acptwo rk.d oc
9/17
6.�
Prepared by: Brett Zimmerman, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
Resolution No. 18-299
Resolution accepting the work for the Water Park Trail
Connection Project.
Whereas, the Engineering Division has recommended that the work for construction of the Water
Park Trail Connection, as included in a contract between the City of Iowa City and Feldman
Concrete of Dyersville, IA, dated May 14, 2018, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the Water Division's Operations budget, account #
73730120;and
Whereas, the final contract price is $59,018.63.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 6th day of Novembers , 2018.
M or
Attest: cli
Ci Clerk
A roved by /) J
�0
City Attorney's Office
It was moved by saiih and seconded by Taylor the Resolution be
adopted, and upon roll call there were:
Ayes:
�7
Nays:
Absent:
Cole
Dickens
Mims
Taylor
Teague
Thomas
Throgmorton
Prepared by: Dave Panos, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
Resolution No. 18-330
Resolution accepting the work for the Camp Cardinal Boulevard
and Lower West Branch Road Landscape Improvements Project
Whereas, the Engineering Division has recommended that the work for construction of the Camp
Cardinal Boulevard and Lower West Branch Road Landscape Improvements Project as included
in a contract between the City of Iowa City and Suburban Landscape, LLC of North Liberty, Iowa,
dated May 24, 2018, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the Carbon Emissions Reduction Project account
# E4520; and
Whereas, the final contract price is $ 56,985.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this _ nth day of becember , 2018
Z4�
Ma r If
Attest:
City Clerk
It was moved by Salih and seconded by
adopted, and upon roll call there were:
Ayes:
Nays:
Approved by
City Attorney's Office
Teague
Absent:
the Resolution be
Cole
Mims
Salih
Taylor
Teague
Thomas
Throgmorton
5,b
Prepared by: Brett Zimmerman, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
Resolution No. 18-329
Resolution accepting the work for the 2017 Dover Street
Drainage Channel Restoration Project
Whereas, the Engineering Division has recommended that the work for construction of the 2017
Dover Street Drainage Channel Restoration Project, as included in a contract between the City of
Iowa City and All American Concrete Inc. of West Liberty, IA, dated May 1, 2017, be accepted;
and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the Annual Storm Water Improvements fund,
account # M3631; and
Whereas, the final contract price is $57,148.80.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 4th day of December
4=
Mayor
Attest:
Cit Clerk
2018
roved by
City Attorney's Office
It was moved by Saiih and seconded by Teague the Resolution be
adopted, and upon roll call there were:
Nays:
Absent:
Cole
Dickens
Mims
Taylor
Teague
Thomas
Throgmorton
Prepared by: Brett Zimmerman, Public Works, 410 E. Washington St„ Iowa City, IA 52240 (319) 356-5044
Resolution No. 19-3
Resolution accepting the work for the Market Street and Union
Place Curb Ramp and Storm Sewer Improvements.
Whereas, the Engineering Division has recommended that the work for construction of the Market
Street and Union Place Curb Ramp and Storm Sewer Improvements, as included in a contract
between the City of Iowa City and Bockenstedt Excavating of Iowa City, Iowa, dated July 2, 2018,
be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in account #s M3631 and S3822; and
Whereas, the final contract price is $43,239.70.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 8th day of January
M or
Attest: L-
City Clerk
2019
Approved by
2 i671
City Attorney's Office
It was moved by Salih and seconded by Mims the Resolution be
adopted, and upon roll call there were:
Ayes:
X
X
X
Nays:
Absent:
Cole
Mims
Salih
Teague
Taylor
Thomas
Throgmorton
6,'`
Prepared by Josh Slattery, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5149
Resolution No. 19-1.2
Resolution accepting the work for the Prairie du Chien Check
Valve Vault Project
Whereas, the Engineering Division has recommended that the work for construction of the Prairie
du Chien Check Valve Vault Project, as included in a contract between the City of Iowa City and
Carter and Associates, Inc. of Coralville, Iowa, dated February 15, 2019, be accepted, and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the Water Distribution Pressure Zone
Improvements account # W3301; and
Whereas, the final contract price is $54,633.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 21st day of_ May , 2019
M or
Approved by
City Attorney's Office S (Ito I t
It was moved by Cole and seconded by Thomas the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays:
Absent:
Cole
Mims
Salih
Taylor
Teague
Thomas
Throgmorton
Prepared by: Brett Zimmerman, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
Resolution No. 19-154
Resolution accepting the work for the Villa Park and Highland
Park CDBG Improvements Project.
Whereas, the Engineering Division has recommended that the work for construction of the Villa
Park and Highland Park CDBG Improvements Project, as included in a contract between the City
of Iowa City and Carter and Associates, Inc. of Coralville, Iowa, dated August 28, 2018, be
accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in account # R4361; and
Whereas, the final contract price is $66,707.42.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 18th day of June / , 2019
Ma or
Attest:
City Jerk '
Approved by
City Attorney's Office
It was moved by Cole and seconded by Teague the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays:
Absent:
x
Cole
x
Mims
x Salih
x
Taylor
x
Teague
x
Thomas
x
Throgmorton
Prepared by David Powers, Neighborhood & Development Services, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5233
Resolution No. 19-178
Resolution accepting the work for the Flood Plain Demolition
Project
Whereas, the Engineering Division has recommended that the work for construction of the Flood
Plain Demolition Project, as included in a contract between the City of Iowa City and CAJ
Enterprises of West Branch, Iowa, dated January 30, 2019, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
Whereas, funds for this project are available in the emergency fund account # 10310712; and
Whereas, the final contract price is $33,060.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 16th day of _ July , 2019
Attest:.
City Clerk
Z� -
M*or
p�rov
City Attorney's Office
It was moved by Mims and seconded by Teague the Resolution be
adopted, and upon roll call there were:
Ayes:
x
x
Nays:
Absent:
Cole
Mims
Salih
Taylor
Teague
Thomas
Throgmorton
�f f
Prepared by: Joe Welter, Public Works, 410 East Washington Street, Iowa City, Iowa 52240 (319) 356-5144
Resolution No. 19-183
Resolution accepting the work for the street, storm sewer, and
water main public improvements for Breckenridge Apartments,
707 S Dubuque Street, Riverfront Crossings Development located
on Lots 1 and 2, Block 17, County Seat Addition, and declaring
public improvements open for public access and use.
Whereas, the Engineering Division has certified that the following improvements have been
completed in accordance with the plans and specifications of the City of Iowa City: street, storm
sewer, and water main improvements for the Breckenridge Apartments, 707 South Dubuque Street,
as constructed by Dave Schmitt Construction Company, Inc. of Cedar Rapids, Iowa.; and
Whereas, the maintenance bonds have been filed in the City Clerk's office; and
Whereas, the City of Iowa City has notified the contractor listed previously of the date on which it
will consider acceptance of the aforementioned public improvements.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that:
Said improvements are hereby accepted by the City of Iowa City, Iowa and that all
dedications and public improvements previously set aside as not being open for public
access are hereby formally accepted and declared open for public use.
Passed and approved this 16th day of July P019
4�
Mdyor
Approved b,r�
Attest: �' � � Y� ),, t lr
City Attorney's Office
It was moved by trims and seconded by Teague the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays:
Absent:
x
Cole
x
Mims
x Salih
x
Taylor
x
Teague
x
Thomas
x
Throgmorton
Prepared by: Josh Slattery, Senior Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5149
Resolution No. 19-200
Resolution accepting the work for the sanitary sewer, water
main, improvements for 101 Lusk Avenue, and declarina public
improvements open for public access and use
Whereas, the Engineering Division has certified that the following improvements have been
completed in accordance with the plans and specifications approved by the Engineering Division.
Sanitary sewer and water main improvements for 101 Lusk Avenue Sanitary, as
constructed by Maxwell Construction, Inc. of Iowa City, Iowa.
Whereas, the maintenance bonds have been filed in the City Clerk's office; and
Whereas, the City of Iowa City has notified those contractors listed previously of the date on which
it will consider acceptance of the aforementioned public improvements; and
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa and that all dedications and
public improvements previously set aside as not being open for public access are hereby formally
accepted and declared open for public access and use.
Passed and approved this 6th day of August , 2019
Ma or
Attest:
City Clerk
roved by
'7-2�i-1�
City Attorneys Office
It was moved by Cole and seconded by Teague the Resolution be
adopted, and upon roll call there were:
Ayes:
M
Nays:
Absent:
Cole
Mims
Salih
Taylor
Teague
Thomas
Throgmorton
&�,C
Prepared by: Brett Zimmerman, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
Resolution No. 19-206
Resolution accepting the work for the Park Accessibility
Improvements Project 2018.
Whereas, the Engineering Division has recommended that the work for construction of the Park
Accessibility Improvements Project 2018, as included in a contract between the City of Iowa City
and All American Concrete, Inc. of West Liberty, Iowa, dated August 29, 2018, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in account # R4132; and
Whereas, the final contract price is $70,888.07.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 6th day of August2019
`
�-
M yor
J A roved
Attest: 41��,17 � 2� ,
City Clerk City Attorney's Office
It was moved by Cole and seconded by Teague the Resolution be
adopted, and upon roll call there were:
Ayes:
h
x
Nays:
Absent:
Cole
Mims
Salih
Taylor
Teague
Thomas
Throgmorton
(,,5
Prepared by: Joe Welter, Public Works, 410 East Washington Street, Iowa City, Iowa 52240 (319) 356-5144
Resolution No. 19-207
Resolution accepting the work for the Landfill Cell FY18 — 2019
Repairs Project.
Whereas, the Engineering Division has recommended that the work for the Landfill Cell FY18 —
2019 Repairs Project., as included in a contract between the City of Iowa City and Connolly
Construction, Inc. of Peosta, Iowa, dated May 15, 2019, be accepted; and
Whereas, the maintenance bond has been filed; and
Whereas, the Engineer's Report has been filed in the City Engineer's Office; and
Whereas, the City of Iowa City has notified the contractor listed previously of the date on which it
will consider acceptance of the aforementioned public improvements; and
Whereas, funds for this project are available in Landfill Operations, 75750121; and
Whereas, the final contract price is $65,486.02.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 6th day of August 2019
M or
p r?ved b
Attest : J 7-2 q_ J j
City Jerk City Attorney's Office
It was moved by core and se nded by Teague the Resolution be
adopted, and upon roll call there were:
Ayes:
ti
Nays:
Absent:
Cole
Mims
Salih
Taylor
Teague
Thomas
Throgmorton
Prepared by: Jason Reichart, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5416
Resolution No. 19-208
Resolution accepting the work for the Curb Ramp 2018 Project
Whereas, the Engineering Division has recommended that the work for construction of the Curb
Ramp 2018 Project, as included in a contract between the City of Iowa City and Feldman
Concrete of Dyersville, Iowa dated January 9, 2019 be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in the Curb Ramps - ADA account # S3822; and
Whereas, the final contract price is $100,017.24.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 6th day of August , 2019
Mi6or
Approved by
iP
Attest:
City Clerk City Attorney's Office
It was moved by Cole and seconded by Teague the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays:
Absent:
Cole
Mims
Salih
Taylor
Teague
Thomas
Throgmorton
Prepared by: Kim Sandberg, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
Resolution No. 19-221
Resolution accepting the work for the 2018 Summer Sidewalk
Repair Project
Whereas, the Engineering Division has recommended that the work for construction of the 2018
Summer Sidewalk Repair Project, as included in a contract between the City of Iowa City and
Ziegenhorn Construction of Muscatine, Iowa, dated July 17, 2018, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in account # 22710220; and
Whereas, the final contract price is $69,377.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 20th day of August/ , 2019
4
Moor
Attest:
City Jerk
It was moved by Cole and seconded by
adopted, and upon roll call there were:
Ayes:
Nays:
�A'prov�ed b.
City Attorney's Office /
Salih
Absent:
the Resolution be
Cole
Mims
Salih
Taylor
Teague
Thomas
Throgmorton
6,J-
Prepared by: Ben Clark, Senior Civil Engineer, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
Resolution No. 19-228
Resolution accepting the work for the Peterson Street Stormwater
Pipe Repair Project
Whereas, the Engineering Division has recommended that the work for construction of the Peterson
Street Stormwater Pipe Repair Project, as included in a contract between the City of Iowa City and
CAJ Enterprises, Inc. of West Branch, Iowa, dated June 17, 2019, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have been
filed in the City Engineer's office; and
Whereas, funds for this project are available in the Annual Storm Water Improvements account #
M3631; and
Whereas, the final contract price is $42,793.13
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 3ra day of September 2019
Maor
Approved by
Attest:
City Clerk City Attorney's Office
It was moved by Salih and seconded by trims
adopted, and upon roll call there were:
Ayes.
Nays:
Absent:
the Resolution be
x Cole
Mims
Salih
Taylor
Teague
Thomas
Throgmorton
�,j
Prepared by; Ben Clark, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5140
Resolution No. 19-256
Resolution accepting the work for the Robert A Lee Recreation
Center BAS Project 2018.
WHEREAS, the Engineering Division has recommended that the work for construction of the
Robert A. Lee Recreation Center BAS Project 2018 as included in a contract between the City of
Iowa City and Baker Mechanical Inc. of Ankeny, Iowa, dated March 20, 2018, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in account # R4332; and
Whereas, the final contract price is $91,330.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 15 th day of
Attest:
City Jerk
October
Ma or
It was moved by Salih and seconded by
adopted, and upon roll call there were:
Ayes:
Nays:
2019
Approved b
�L)
City Attorney's Office
Cole
Absent:
the Resolution be
Cole
Mims
Salih
Taylor
Teague
Thomas
Throgmorton
1 ,�
Prepared by: Ben Clark, Senior Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319) 356.5436
Resolution No. 19-264
Resolution accepting the Work for the Iowa City Equipment Shop
2019 Roof Improvements Project
Whereas, the Engineering Division has recommended that the work for construction of the Iowa
City Equipment Shop 2019 Roof Improvements Project, as included in a contract between the City
of Iowa City and Stanley Roofing LLC of Vinton, Iowa, dated June 25, 2019, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the City
Clerk's office; and
Whereas, funds for this project are available in the Equipment Shop Roof Replacement account
#P3984; and
Whereas, the final contract price is $48,875.00
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 4th day of November 2019
Maybr
Attest:
City Jerk
It was moved by Salih and seconded by
adopted, and upon roll call there were:
Ayes:
Nays:
Approved by
City Attorneys Office
Cole
Absent:
the Resolution be
Cole
Mims
Salih
Taylor
Teague
Thomas
Throgmorton
-a 0
Prepared by: Ben Clark, Senior Civil Engineer, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
Resolution No. 19-265
Resolution accepting the work for the Hickory Hill Park Forest
Management Project
Whereas, the Engineering Division has recommended that the work for construction of the Hickory
Hill Park Forest Management Project, as included in a contract between the City of Iowa City and
Sustainable Landscape Solutions of Riverside, Iowa, dated November 8, 2018, be accepted; and
Whereas, the Engineer's Report has been filed in the City Clerk's office; and
Whereas, funds for this project are available in the Hickory Hill Trail Redesign and Development
account #R4224; and
Whereas, the final contract price is $50,012.40.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 4th day of November , 2019
Ma or
}
Attest:
Cit Clerk
Approved by
O,e�20�--• -2,S 4
City Attorney's Office
It was moved by salih and seconded by Cole the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays:
Absent:
Cole
Mims
Salih
Taylor
Teague
Thomas
Throgmorton
718
Prepared by: Joe Wetter, Public Works, 410 East Washington Street, Iowa City, IA 52240 (319) 3565144
Resolution No. 19-271
Resolution accepting the work for the 2018 Sanitary Sewer
Rehabilitation Construction Project
Whereas, the Engineering Division has recommended that the work for construction of the 2018
Annual Sanitary Sewer Rehabilitation (Repair) Construction Project, as included in a contract
between the City of Iowa City and Lynch's Excavating, Inc. of West Branch, Iowa, dated November
2, 2018, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the City
Engineer's office; and
Whereas, funds for this project are available in the Annual Sewer Main Replacement, Account
Number, V3101; and
Whereas, the final contract price is $264,271.70.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 19 th day of November , 2019
M dyor
Attest:
City Clerk
AAproved
City Attorneys Office
It was moved by trims and seconded by
adopted, and upon roll call there were:
Ayes:
Nays:
Salih
Absent:
the Resolution be
Cole
Mims
Salih
Taylor
Teague
Thomas
Throgmorton
� ,,J
Prepared by: Ben Clark, Senior Civil Engineer, 410 E. Washington St., Iowa City, A 52240 (319) 356-5436
Resolution No. 20-4
Resolution accepting the work for the Miller Avenue Sidewalk and
Retaining Wall Project
Whereas, the Engineering Division has recommended that the work for construction of the Miller
Avenue Sidewalk and Retaining Wall Project, as included in a contract between the City of Iowa
City and Triple B Construction Corp of Wilton, Iowa, dated March 12, 2019, be accepted; and
Whereas, the Engineer's Report has been filed in the City Clerk's office; and
Whereas, funds for this project are available in the Sidewalk Infill account #S3828; and
Whereas, the final contract price is $104,881.08
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 7th day of .Tan„nry 2020.
Attest:
It was moved by Mims
adopted, and upon roll call there were:
Ayes:
May �
and seconded by
Nays:
Approved by
a4-e-)G- r ;1 -3 0 -1 g
City Attorney's Office
Salih
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
the Resolution be
Prepared by: Ben Clark, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
Resolution No. 20-5
Resolution accepting the work for the 2019 Drain Tile Project
Whereas, the Engineering Division has recommended that the work for construction of the 2019
Drain Tile Project, as included in a contract between the City of Iowa City and Calacci
Construction Company, Inc, of Iowa City, Iowa, dated August 16, 2019, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Annual Storm Water Improvements account #
M3631; and
Whereas, the final contract price is $104,832.06.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 7th day of January 2020
'T�� /
M r
Approved by
Attest:
City Jerk City Attorney's Office
It was moved by Mims and seconded by
adopted, and upon roll call there were:
Ayes:
Nays:
Salih
Absent:
x
Bergus
x
Mims
x
Salih
x
Taylor
x
Teague
x
Thomas
x
Weiner
the Resolution be
M1
Prepared by. Scott Sovers, Asst. City Engineer, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319)356fi142
Resolution No. 20-3
Resolution approving a contract for the Annual Pavement
Repairs 2019 Project
Whereas, a request for unit prices related to annual pavement repairs (November 1, 2018 -
October 31, 2019) associated with water main breaks was bid as an informal project (by
competitive quotation) in October 2018; and
Whereas, two bids were received for the project; and
Whereas, All American Concrete, Inc. of West Liberty, Iowa submitted the lowest responsible bid
and entered into a contract with the City for the Pavement Repair Project November 1, 2018 -
October 31, 2019 on October 26, 2018; and
Whereas, due to an increased number and size of repairs, the contract amount will exceed
$150,000; and
Whereas, the purchasing manual requires that if the cost of a contract entered into by competitive
quotation exceeds $150,000 the contract must be approved by the City Council.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that:
1. Said contract for annual pavement repair is hereby approved by the City Council and may
exceed $150,000 as determined necessary by the City Manager.
Passed and approved this 7th day of January 2020
Attest :� S.6 k-o o - I ^ 30 - / 9
City Clark City Attorneys Office
It was moved by trims and se ded by Salih the Resolution be
adopted, and upon roll call there were:
Ayes:
0
Nays:
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
Jr,t
Prepared by: Joe Welter, Public Works, 410 East Washington Street, Iowa City, IA 52240 (319) 3665144
Resolution No. 20-72
Resolution accepting the work for the Highway 1 and Sunset
Street Traffic Signal Improvement Construction Project
Whereas, the Engineering Division has recommended that the work for construction of the Highway
1 and Sunset Street Traffic Signal Improvement Construction Project, as included in a contract
between the City of Iowa City and Advanced Electrical Services, Inc. of Iowa City, Iowa, dated
January 9, 2020, be accepted; and
Whereas, the Engineer's Report and the performance, payment, and maintenance bond have been
filed in the City Clerk's office; and
Whereas, funds for this project are available in Annual Traffic Signal Projects, Account Number
S3814:and
Whereas, the final contract price is $38,500.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 24th day of March 2020
kyo
Approved by
Attest:
City
City Attorney's Office
It was moved by Taylor and seconded by Mims the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays: Absent:
x
Bergus
x
Mims
x
x
Salih
x
Taylor
x
Teague
Thomas
x
Weiner
06110 54-226938
PERFORMANCE pAYM
ENT, AND MAINTENANCE BOND
HIGHWAY 1 - SUNSET STREET TRAFFIC SIGNAL IMPROVEMENTS
PROJECT
dllrV OF IOWA-CITY
KNOW ALLBY THESE PRESENTS:
That we. Advanced F-fettriCal I S I eNlo"_ Inc IOWO City, Iowa, at. Rrinefool (henitnaftat the
'Cohtraotoru or "Principal") and Advan6ed. bectrical Services,- Inc. as Surety are
held and firmjy bound unto city —
Of Iowa UnY, referred to as "the
and to all persons who may be frifured by any breach of any of the conditions of this
Bond in the penal sum of thirty-ftht.thousand, tine hundred dollars ($36,600), lawful money of
the United States, for the payment of which sum, "If and truly to be Made, we bind vureelves,
Our heirs, legal representatives and 49819118,JOWly or'sev&Aly�,.firrinlyby these presents.
The conditions of the Wmv6 Obliggitiong are such that �eWs into
coritra t with 4� 2ZJ In 0 A
g wi theJiurisdiction, bearing day -of !A*lf
(hereinafter the 'Contract") wherein said Contractor undertakes ,nda agrees
,to
construct the following described improvements:
!Ast.WI video *60110n'cametas, PTZcarnera,:and wiring at the Sunset Street and Highway I
.
1rdersectionjo.provide a.complete ard.*f6rotional video detection systemlorthe signal.
To faithfully perfortrin all the terrils And reqdIteinerh of "said "Contract within in
i the tirnd'jh&d�
specified, in a good and workmanlike:manner, and in accordance With the Contract DOdurnItrits;
It it ekptdsily understood and brgMbd by the Oorrtftd6rand
Surety in tills'bond that the folldMng
provisions are-9,part of this Bond and," binding -.Upon said Contractor and Surety, to4o�
1, PE11PORIVIAN015: The Contractor shall well and faithfully bbgaN6, do I pe rm, fulfill, and
-abide by each and every covenant; condition, and paffof said Contract; by reference made
A part bereof, for the above referenced improvements, and shad
ants indemnify arfd save
harmless the Jurisdiction from all Outlay and akpanto incurred by the
Jurisdiction by
reason Of the Contractor's default Of failure to perform as required. The Contractor shall
also be responsiblefor the default or failure to perform as requirad under the Contract and
Contracr Documents by all Itssubountractom, suppliers"agents, or employees furnishingmaterials or providing labor hthe performance of the Contract.
2. )5AYMl5NT: The 106ritr6dioi and the Surety cri'llhiis Bond hereby agireed to pay all just
claims submitted by persons firms, subctirvtrector%and corporatlorisfurhishing materials
for or performing labor in the performance of the Contract on account.0 which this
is olveri, including but not 11 Bond
limited 10"clalms for all amounts for labor, materials,
lubricants oil, gasoline, repairs on machinefy,equipment; and toolc consumed or Used
by the Contractor or any subcontractor, wherein -the tAM0,0re hotsatis fled. out of the
portion of the contract. price the Jurisdiction it required to retain Until completion -of the
Improv 'ernsrit, but the Contractor and Su rely shall not be liable to said persons, firms, or
Highway I Sunset Street Traffic Signal Improvements Project 0616- Page I Of 4
corporations unless the claims of said claimants against said portion of the contract price
shall have been established as provided by law. The Contractor and Surety hereby bind
themselves to the obligations and conditions set forth in Chapter 573 of the Iowa Code,
which by this reference is made a part hereof as though fully set out herein.
3. MAINTENANCE: The Contractor and the Surety on this Bond hereby agree, at their own
expense:
A. To remedy any and all defects that may develop in or result from work to be
performed under the Contract within the period of two years (2) from the date of
acceptance of the work under the Contract, by reason of defects in workmanship
or materials used in construction of said work;
B. To keep all work in continuous good repair; and
C. To pay the Jurisdiction's reasonable costs of monitoring and inspection to assure
that any defects are remedied, and to repay the Jurisdiction all outlay and expense
incurred as a result of Contractor's and Surety's failure to remedy any defect as
required by this section.
4. GENERAL: Every Surety on this Bond shall be deemed and held bound, any contract to
the contrary notwithstanding, to the following provisions:
A. To consent without notice to any extension of time to the Contractor in which to
perform the Contract;
B. To consent without notice to any change in the Contract or Contract Documents,
which thereby increases the total contract price and the penal sum of this bond,
provided that all such changes do not, in the aggregate, involve an increase of
more than 20% of the total contract price, and that this bond shall then be released
as to such excess increase; and
C. To consent without notice that this Bond shall remain in full force and effect until
the Contract is completed, whether completed within the specified contract period,
within an extension thereof, or within a period of time after the contract period has
elapsed and the liquidated damage penalty is being charged against the
Contractor.
D. That no provision of this Bond or of any other contract shall be valid that limits to
less that five years after the acceptance of the work under the Contract the right to
sue on this Bond.
E. That as used herein, the phrase "all outlay and expense" is not to be limited in any
way, but shall include the actual and reasonable costs and expenses incurred by
the Jurisdiction including interest, benefits, and overhead where applicable.
Accordingly, "all outlay and expense" would include but not be limited to all contract
or employee expense, all equipment usage or rental, materials, testing, outside
experts, attorneys fees (including overhead expenses of the Jurisdiction's staff
attorneys), and all costs and expenses of litigation as they are incurred by the
Jurisdiction. It is intended the Contractor and Surety will defend and indemnify the
Jurisdiction on all claims made against the Jurisdiction on account of Contractor's
failure to perform as required in the Contract and Contract Documents, that all
agreements and promises set forth in the Contract and Contract Documents, In
approved change orders, and in this Bond will be fulfilled, and that the Jurisdiction
will be fully indemnified so that it will be put into the position it would have been in
had the Contract been performed in the first instance as required.
Highway 1 - Sunset Street Traffic Signal Improvements Project 0510 — Page 2 of 4
In the event the Jurisdiction incurs any "outlay and expense" in defending itself against
any claim as to which the Contractor or Surety should have provided the defense, or in the
enforcement of the promises given by the Contractor in the Contract, Contract Documents,
or approved change orders, or in the enforcement of the promises given by the Contractor
and Surety in this Bond, the Contractor and Surety agree that they will make the
Jurisdiction whole for all such outlay and expense, provided that the Surety's obligation
under this bond shall not exceed 125% of the penal sum of this bond.
In the event that any actions or proceedings are initiated regarding this Bond, the parties
agree that the venue thereof shall be Johnson County, State of Iowa. If legal action is
required by the Jurisdiction to enforce the provisions of this Bond or to collect the monetary
obligation incurring to the benefit of the Jurisdiction, the Contractor and the Surety agree,
jointly, and severally, to pay the Jurisdiction all outlay and expense incurred therefor by
the Jurisdiction. All rights, powers, and remedies of the Jurisdiction hereunder shall be
cumulative and not alternative and shall be in addition to all rights, powers, and remedies
given to the Jurisdiction, by law. The Jurisdiction may proceed against surety for any
amount guaranteed hereunder whether action is brought against the Contractor or whether
Contractor is joined in any such action(s) or not.
NOW THEREFORE, the condition of this obligation is such that if said Principal shall
faithfully perform all the promises of the Principal, as set forth and provided in the Contract
and in this Bond, then this obligation shall be null and void, otherwise it shall remain in full
force and effect.
When a work, term, or phrase is used in this Bond, it shall be interpreted or construed first
as defined in this Bond and the Contract; second, if not defined in the Bond or Contract, it
shall be interpreted or construed as defined in applicable provisions of the Iowa Code;
third, if not defined in the Iowa Code, it shall be interpreted or construed according to its
generally accepted meaning in the construction industry; and fourth, if it has no generally
accepted meaning in the construction industry, it shall be interpreted or construed
according to its common or customary usage.
Failure to specify or particularize shall not exclude terms or provisions not mentioned and
shall not limit liability hereunder. The Contract is hereby made a part of this Bond.
Highway 1 - Sunset Street Traffic Signal Improvements project 0510 — page 3 of 4
MUNCIPAt!
By
,Jason Moore, President
ffile of Contractor Officer
SURETY.
United Fire. & Casualty Group
Surely Company Nance
gy\, D t
Signature.of Attorney-irr-Fact Office
Beth Ambrisco, An Iowa Resident Agent
Printed Name of Attomey5lri act Officer
AW Welt Ambrisco Insurance, Inc.
Company Name of Attorney -In -Fact
24 Westside Drive
Company Address of Attorney -in -Fact
Iowa City,. Iowa 52246
City, State, Zip Code of A#%mey-in-Fact
(319) 087-3700
Telephone Number of Attorney -in -Fact
I
Highway 1 - Sunset Street Traffic Signal Improvements Project 0510 - Page 4 of 4
UNITED FIRE & CASUALTY COMPANY, CMZ AR RAPIDS TA fuNuir es: Surety Depxrfinent
i `NFfED rIRL" & INDf MNrl'Y COMPANY = WF,Bf -RITX
.i`NANCIAL PACIFIC INSURANCE CpMPANy FF� IN
..CA 118 Second Ave SF.
Itv6Ul'tA.t+iCC CERTIFIED COPY OI'P0)XrtROFATTORNEY CedarRitplds,IA 52,40
o
(original on file at Home Office of Company - See Cewt icatum)
KNOW ALI, PERSONS, BY THESE PRESENTS; That Haired Fne A Casualty Company, a corporation duly organized and existing under the laws
of the State of Iowa, United Fire & Indemnty, COMpany, a corporatian duly orgmized,ard existing under Akre_ laws of %lie State of texas; and
the
an mpail et), insure re Company: a corporation duly organized and existing under, the laws of the State of California {herein collectively called
the Companies}, and having they corporate headquarters in CedarRapids, State of Iowa, does make, constitute and appoint
TERdtY L.... MCDONALD, JEAN A. WILSON, ., JOE WEGMAN, BET,HAMBRISCO,. KRIS-SI. NI@LSON., DIANE SANDERS, ,S.C'OTT
ENYART, CRAIG SCHROEDER, .JOY PERKINS, BRAD HODAPP, ASHLEY LEE, EACH INDIVIobALLY
their true and lawful Attonwy(s),m=Fact wrdr power and autiigrity hereby, coiden d to,:sign, seal and execute in ita behalf all la€vfvl bonds,
undertakings and other obligatory anstrumelti of similar nature provided that no single Obligation shall exceed $35, 000, COO.00
and to bind the Companies thereby as`fuTiv mid to the same extent as if such arstmalents were signed by the duly, suthocr<ed officers of dretCompanies
and all of the acts of said Attorney, pursuant to the authority hereby given and hereby ravfsd and confi vied.
The Authority hereby granted $hall expire die 1st day ofOctober, 2021 unless sooner revoked
Company, United Foe & Indemnity Company, and Financial Pacific Insurance Company. lay ITrutit Five & Casualty -
This Power of Attorney is made and executed pursuant to and by authority of the following bylaw duly adopted on May 15, 2013, by the Boards of
Directors of United Fite & Casualty Company, United Fire & Indemnity Company, and Financial Pacific Insurance Company. '
"Article dI — Surety Bonds and Undertakings"
,Section 2, Appaintmpnt if Attorney -in -Fact. "The President or any vice President, or any other officer of the Companies may, iron time to mile, appoint b} evtaite
caHlfieates attonleys.in-fact to act in behal£tiFtho Companies in the execution ofpaneies of insurance, bonds, undenakdngs and other obligatory instrle, appoint
inice
The signature ed hereby,,
authorized hereby, and the Corporate seal, may be affixed by facsimile to any Power of attorney Or spacial power of attorney ni ceIIiSFatrob of
either authorized hereby; such signature aid seal, when sa used, being adopted by the Companies as the original signature of such officer and the angina( seal of the
Companies, to be valid and binding upon the Companies with the same force and effect as though manually affixed Such anomeys-m-fact, subject to the limitations set of
hirab m their respoctive certificates of authority shall have full power to bind the Companies by their signature and execution of airy such instruments end to attach the -seal
Ike Companies thereto. The President or any Vice President, the Board of Direetnrs or any other officer of the Companies may at any time revoke all Power and autlio1'i1;y
yrestaus{y gWca tp xny anomay-m-Yact
IN WITNESS WHEREOF, the COMPANIES have each caused these presents to jiesiened by its:..
4°`tx vice president and its corporate seal to be hereto affixed this 1st day of
'� coxeou4rc coxroaan r _a° room -October, 2019
UNITED FIRE& CASUALTY COMPANY
'+ SrA1 5EAL Ina
0},irannm�`` °9<'oa+fv f= UNITED FIRE& INDEMNITY COMPANY
a{i""`g8+ FINAN,}CIIIAAAL-PACIFIC INSURANCL- COMPANY
State'of Iowa,,County of Linn, ss: „' „`. By_
Orr 1st day of Octotfer, 2019,,-before me V'icePresident
personally came Dennis J. Richtnariri
to me known, who being by me duly swam, did depose and say; that ire resides in Cedar Rapids, State of Iowa; that he is a Vice President Of Unted Fire
& Casualty Company, a-Yrce President of United Fire & Indemnity Company, and a Vice President of Financial, Pacific loan, cc Coin,, ly the
corporations described' in and which executed the above instrument; that he knouts the sexy of said. corporations that the seal'afiaxcd to the said
instrument thereto
o ours ant to, li corporate that it was sa off¢l pursuant to althout$ given by the Board of Direcetoxs of umisssaid ,othat the, seal affixed
signed his
eagle thereto`puisuant to lrke�uthotity, and arlm�wletjges same to be theact-aud deed of said hotpot atiott.+i-
.3h Judith A.Jonos
m loxNobe
Commission number
numberr173041
MY commission Expires 4/2342021 Notary Public
My commission expires,; 4/23/2021
I Mary A, BetG§c33, Ass stint S`eure art afUn toil Fire &Casualty Campuly and Assistant Secretary ofUnited nited Fire & Ipdemnity Cogipany, and Assistant
Secretary of Financial Pacific busurance Company, do hereby certify That I have compared the foregoing, copy of the Power of Attanldy and affidavit,' and.
'the COPY OfThe Section of the bylaws and resolitrions of sand Corporations as set forth in..said:Powerof Aporhey, wull"Ibe ORIGIItALS ON FILE IN THE':.
HllIY3E OFFICE OF SATII C0RPC}RA'1'fE?N 3, and that the same rare correct transcripts thereof, and of'tile whole of'die said origmals, and that the said
Power of Attorney has not been revoked and, is now in full force and effect.
In testimony whereof I have hereunto subscribed my name and affixed the corporate seal of the said Corporations
this ,-3;-at—day of DeZMIDer 20 19
ow
V siten "� g � t Fr.xARKArz'1ersss �s By'tag
4/4��'�ninnnii,.•` °• �� f#SSls[anti£eretaiy,
u"'",, "�'°•L1F&C & OF&I & FPIC
BPOA0045 122617 This paper has a colored background and void pantograph.
ENGINEER'S REPORT
March 10, 2020
City Clerk
Iowa City, Iowa
!) r 1
On, �
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240 - 1826
(319) 356 - 5000
(319) 356 - 5009 FAX
www.icgov.org
Re: Highway 1 and Sunset Street Traffic Signal Improvements Construction Project
Dear City Clerk:
I hereby certify that the Highway 1 and Sunset Street Traffic Signal Improvements Construction
Project has been completed by Advanced Electrical Services, Inc. of Iowa City, Iowa, in
substantial accordance with the Project Manual developed by Shive-Hattery, Inc, of Cedar
Rapids, Iowa.
The project was bid as a unit price contract and the final contract price is $38,500.00.
There was one change order on this project for adjustment of the camera pole height and the
completion dates. The Contract Amount was not revised by the change order.
I recommend that the above -referenced improvements be accepted by the City of Iowa City.
(Sincerely,
Jason Havel
City Engineer
C ro
Prepared by: Joe Wetter, Public Works, 410 East Washington Street, Iowa City, IA 52240 (319) 356-5144
Resolution No. 20-73
Resolution accepting the work for the 2019 Landfill Gate
Replacement Construction Project
Whereas, the Engineering Division has recommended that the work for construction of the 2019
Landfill Gate Replacement Construction Project, as included in a contract between the City of Iowa
City and Apex Construction Company, Inc. of Iowa City, Iowa, dated July 18, 2019, be accepted;
and
Whereas, the Engineer's Report and the performance, payment, and maintenance bond have been
filed in the City Clerk's office; and
Whereas, funds for this project are available in Loss Reserve, Account # 82310625 and Landfill
Operations, Account # 75750121; and
Whereas, the final contract price is $100,440.64.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 24th day of March 2020
Mb,ybr 7�
Apived by
Attest:
City Jerk City Attomey's Office
It was moved by Taylor and seconded by
adopted, and upon roll call there were:
Mims
Ayes:
Nays: Absent:
x
Bergus
x
x
Mims
3alih
x
Taylor
x
Teague
x
Thomas
x
Weiner
the Resolution be
Bond Number IAC589510
0510
PERFORMANCE, PAYMENT, AND MAINTENANCE BOND
2019 LANDFILL GATE REPLACEMENT PROJECT
CITY OF IOWA CITY
KNOW ALL BY THESE PRESENTS:
That we, Apex Construction Company Inc as Principal
(hereinafter the Contractor or Principal) and MPrrhant Banding omoany (Mutual) ,
as Surety are held and firmly bound unto City of Iowa City, Iowa, as Obligee (hereinafter referred
to as "the Jurisdiction"), and to all persons who may be injured by any breach of any of the
conditions of this Bond in the penal sum of ninety-four thousand, eight hundred and sixteen dollars
($94,818.00), lawful money of the United States, for the payment of which sum, well and truly to
be made, we bind ourselves, our heirs, legal representatives and assigns, jointly or severally,
firmly by these presents.
The conditions of the above obligations are such that whereas said Contractor entered into a
contract with the Jurisdiction, bearing date the 8th day of _ate Tki
2019 . (hereinafter the "Contract") wherein said Contractor undertakes and agrees to
construct the following described improvements:
The replacement of the Iowa City Landfill and Recycling Center entrance, gate, and wall and to
faithfully perform all the terms and requirements of said Contract within the time therein specified,
in a good and workmanlike manner, and in accordance with the Contract Documents.
It is expressly understood and agreed by the Contractor and Surety in this bond that the following
provisions are a part of this Bond and are binding upon said Contractor and Surety, to -wit:
1. PERFORMANCE: The Contractor shall well and faithfully observe, perform, fulfil, land
abide by each and every covenant, condition, and part of said Contract, by reference made
a part hereof, for the above referenced improvements, and shall indemnify and save
harmless the Jurisdiction from all outlay and expense incurred by the Jurisdiction by
reason of the Contractor's default of failure to perform as required. The Contractor shall
also be responsible for the default or failure to perform as required under the Contract and
Contract Documents by all its subcontractors, suppliers, agents, or employees furnishing
materials or providing labor in the performance of the Contract.
2, PAYMENT: The Contractor and the Surety on this Bond hereby agreed to pay all just
claims submitted by persons, firms, subcontractors, and corporations furnishing materials
for or performing labor in the performance of the Contract on account of which this Bond
is given, including but not limited to claims for all amounts due for labor, materials,
lubricants, oil, gasoline, repairs on machinery, equipment, and tools, consumed or used
by the Contractor or any subcontractor, wherein the same are not satisfied out of the
portion of the contract price the Jurisdiction is required to retain until completion of the
improvement, but the Contractor and Surety shall not be liable to said persons, firms, or
corporations unless the claims of said claimants against said portion of the contract price
shall have been established as provided by law. The Contractor and Surety hereby bind
themselves to the obligations and conditions set forth in Chapter 573 of the Iowa Code,
2019 Landfitl Gate Replacement Project 0510 — Page 1 of 4
which by this reference is made a part hereof as though fully set out herein.
3. MAINTENANCE: The Contractor and the Surety on this Bond hereby agree, at their own
expense:
A. To remedy any and all defects that may develop in or result from work to be
performed under the Contract within the period of two year(s) (2) from the date of
acceptance of the work under the Contract, by reason of defects in workmanship
or materials used in construction of said work;
B. To keep all work in continuous good repair; and
C. To pay the Jurisdiction's reasonable costs of monitoring and inspection to assure
that any defects are remedied, and to repay the Jurisdiction all outlay and expense
incurred as a result of Contractor's and Surety's failure to remedy any defect as
required by this section.
4. GENERAL: Every Surety on this Bond shall be deemed and held bound, any contract to
the contrary notwithstanding, to the following provisions:
A. To consent without notice to any extension of time to the Contractor in which to
perform the Contract;
B. To consent without notice to any change in the Contract or Contract Documents,
which thereby increases the total contract price and the penal sum of this bond,
provided that all such changes do not,'in the aggregate, involve' an increase of
more than 20% of the total contract price, and that this bond shall then be released
as to such excess increase; and
C. To consent without notice that this Bond shall remain in full force and effect until
the Contract is completed, whether completed within the specked contract period,
within an extension thereof, or within a period of time after the contract period has
elapsed and the liquidated damage penalty is being charged against the
Contractor.
D. That no provision of this Bond or of any other contract shall be valid that limits to
less that five years after the acceptance of the work under the Contract the right to
sue on this Bond.
E. That as used herein, the phrase "all outlay and expense" is not to be limited in any
way, but shall include the actual and reasonable costs and expenses incurred by
the Jurisdiction including interest, benefits, and overhead where applicable.
Accordingly, "all outlay and expense" would include but not be limited to all contract
or employee expense, all equipment usage or rental, materials, testing, outside
experts, attorneys' fees (including overhead expenses of the Jurisdiction's staff
attorneys), and all costs and expenses of litigation as they are incurred by the
Jurisdiction. It is intended the Contractor and Surety will defend and indemnify the
Jurisdiction on all claims made against the Jurisdiction on account of Contractor's
failure to perform as required in the Contract and Contract Documents, that all
agreements and promises set forth in the Contract and Contract Documents, in
approved change orders, and in this Bond will be fulfilled, and that the Jurisdiction
will be fully indemnified so that it will be put into the position it would have been in
had the Contract been performed in the first instance as required.
In the event the Jurisdiction incurs any "outlay and expense" in defending itself against
any claim as to which the Contractor or Surety should have provided the defense, or in the
enforcement of the promises given by the Contractor in the Contract, Contract Documents,
or approved change orders, or in the enforcement of the promises given by the Contractor
and Surety in this Bond, the Contractor and Surety agree that they will make the
wiu Lanarm care Kepiacement Project 0510 - Page 2 of 4
Jurisdiction whole for all such outlay and expense, provided that the Surety's obligation
under this bond shall not exceed 125% of the penal sum of this bond.
In the event that any actions or proceedings are initiated regarding this Bond, the parties
agree that the venue thereof shall be Johnson County, State of Iowa. If legal action is
required by the Jurisdiction to enforce the provisions of this Bond or to collect the monetary
obligation incurring to the benefit of the Jurisdiction, the Contractor and the Surety agree,
jointly, and severally, to pay the Jurisdiction all outlay and expense incurred therefor by
the Jurisdiction. All rights, powers, and remedies of the Jurisdiction hereunder shall be
cumulative and not alternative and shall be in addition to all rights, powers, and remedies
given to the Jurisdiction, by law. The Jurisdiction may proceed against surety for any
amount guaranteed hereunder whether action is brought against the Contractoror whether
Contractor is joined in any such action(s) or not.
NOW THEREFORE, the condition of this obligation is such that if said Principal shall
faithfully perform all the promises of the Principal, as set forth and provided in the Contract
and in this Bond, then this obligation shall be null and void, otherwise it shall remain in full
force and effect.
When a work, term, or phrase is used in this Bond, it shall be interpreted or construed first
as defined in this Bond and the Contract; second, if not defined in the Bond or Contract, it
shall be interpreted or construed as defined in applicable provisions of the Iowa Code;
third, if not defined in the Iowa Code, it shall be interpreted or construed according to its
generally accepted meaning in the construction industry; and fourth, if it has no generally
accepted meaning in the construction industry, it shall be interpreted or construed
according to its common or customary usage.
Failure to specify or particularize shall not exclude terms or provisions not mentioned and
shall not limit liability hereunder. The Contract is hereby made a part of this Bond.
cv I U Ldl wun sidle mepiacement rrolect 0510 -Page 3 of 4
PR.......... .
M
ti
d JP K�
Title of Contractor Officer
0
Company Name of Attomey-in-Fact
Company Address of Attomey-in-Fact
City, State, Zip Code of Attomey-in-Fact
Telephone Number of Attomey-in-Fact
2019 Landfill Gate Replacement Project 0510 — Page 4 of 4
k
Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.,
both being corporations of the State of Iowa (herein collectively called the "Companies") do hereby make, constitute and appoint, individually,
Nora Fetter
their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings,
contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity
of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any
actions or proceedings allowed by law.
This Powerof-At erney is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board
of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Directors
of Merchants National Bonding, Inc., on October 16, 2015.
"The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority
to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and
undertakings, recognizances, contracts of indemnity and other wri ings obligatory in the nature thereof."
'The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney
or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the
Company, and such signature and seal when so used shall have the same force and effect as though manually fixed:'
In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut horny hereby given to the
Attomey-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction
contracts required by the Slate of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department
of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of
its obligations under its bond.
In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given
to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner -
Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation.
In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 3rd day of July . 2019
yQiPOg1 MERCHANTS BONDING COMPANY (MUTUAL)
9 .S • MERCHANT NATIONAL BONDING, INC.
1933 a'c' By
{r'':� •' ��.•� President
STATE OF IOWA ...................•
COUNTY OF DALLAS as.
On this this 3rd day of July 2019 , before me appeared Larry Taylor, to me personally known, who being by me duly sworn
did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the
seals affixed to the foregoing instmment are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf
of the Companies by authority of their respective Boards of Directors.
AUCIA K. GRAM
Z � ComrrilssionNumber 767430
My Ccxrtm lion res (^
� April 1, 2020 �)`i►�•-.--
Notary Public
(Expiration of notary's commission
does not invalidate this instrument)
1, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby
certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full
force and effect and has not been amended or revoked.
In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 3rd day of July 2019
jL/�j
-o-►�!/y/
2003 1933 : Secretary
•' .......... ••r••••
POA 0018 (3(17)
It r I
Ong
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240 - 1826
(319) 356 - 5000
(319) 356 - 5009 FAX
ENGINEER'S REPORT www.icgov.org
March 3, 2020
City Clerk
Iowa City, Iowa
Re: 2019 Landfill Gate Replacement Construction Project
Dear City Clerk:
I hereby certify that the 2019 Landfill Gate Replacement Construction Project has been completed
by Apex Construction Company, Inc. of Iowa City, Iowa, in substantial accordance with the Project
Manual developed by Shoemaker-Haaland Professional Engineers of Coralville, Iowa in
conjunction with the City of Iowa City Engineering Division.
The project was bid as a unit price contract and the final contract price is $100,440.64.
There were a total of four change orders for the project as follows:
1. Concrete Wall Foundation Execution (added $2,780.00)
2. Additional Electrical Circuit (added $1,050.64)
3. Extension of Completion Dates (no cost)
4. Gate stability posts and extra white fencing (added $1,794,00)
Total Amount for Change Orders = $5,624.64
I recommend that the above -referenced improvements be accepted by the City of Iowa City.
Siince�rely,
f I'L(�
Jason Havel
City Engineer
Prepared by: Kim Sandberg, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 3565139
Resolution No. 20-111
Resolution accepting the work for the 2019 Summer Sidewalk
Repair Project
Whereas, the Engineering Division has recommended that the work for construction of the 2019
Summer Sidewalk Repair Project, as included in a contract between the City of Iowa City and
Quality Construction Services of Eldridge, Iowa, dated July 1, 2019, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the City
Engineer's office; and
Whereas, funds for this project are available in account # 22710220; and
Whereas, the final contract price is $73,266.84.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 5th day of May 2020
Mayor
Attest:
46iliedrk�,
It was moved by Taylor and seconded by
adopted, and upon roll call there were:
Ayes:
k7
Nays:
salih the Resolution be
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
Prepared by: David Powers, Neighborhood & Development Services, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5233
Resolution No. 19-178
Resolution accepting the work for the Flood Plain Demolition
Project
Whereas, the Engineering Division has recommended that the work for construction of the Flood
Plain Demolition Project, as included in a contract between the City of Iowa City and CAJ
Enterprises of West Branch, Iowa, dated January 30, 2019, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
Whereas, funds for this project are available in the emergency fund account # 10310712; and
Whereas, the final contract price is $33,060.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 16th day of July , 2019
M or
Attest: r
City Clerk
rov
City Attorney's Office
It was moved by trims and seconded by Teague the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays:
Absent:
x
Cole
x
Mims
x Salih
X
Taylor
x
Teague
x
Thomas
x
Throgmorton
Y 1'I�,L
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240 - 1826
(319) 356 - 5000
(319) 356 - 5009 FAX
ENGINEER'S REPORT www.icgov.org
July 8, 2019
City Council
Iowa City, Iowa
Re: Flood Plain Demolition Project
Dear City Council:
I hereby certify that the construction of the Flood Plain Demolition Project has been completed
by CAJ Enterprises, Inc. of West Branch, Iowa in substantial accordance with the plans and
specifications prepared by the City of Iowa City.
The project was bid as a lump sum contract and was awarded for $33,060.00. The final
contract price is $33,060,00.
There were no change orders.
I recommend that the above -referenced improvements be accepted by the City of Iowa City,
Sincerely,
Jason Havel, P.E.
City Engineer
pwenglmaaleretengrpLda
WEST BEND
A MUTUAL INSURANCE COMPANY"
Bond Number 2404875
Performance Bond
KNOW ALL MEN BY THESE PRESENTS:
That CAJ Enterprises, Inc dba Chris Jones Trucking of 263 260th St, West Branch, IA 52358-8546
(Name and address of the Contractor)
as Principal, hereinafter called Principal, and WEST BEND MUTUAL INSURANCE COMPANY as Surety, hereinafter
called Surety, are held and firmly bound unto city of Iowa city of
410 E Washington St, Iowa City IA 52240-1825
(Name and address of the Owner)
as Obligee, hereinafter called Owner, in the amount of
Thirty Three Thousand Sixty Dollars
_ Dollars ($ 33,060.00
for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors and
assigns, jointly and severally, firmly by these presents.
WHEREAS, Contractor has by written agreement dated 03/01/2019 entered into a contract with Owner
for Demolition of two houses
in accordance with drawings and specifications prepared by
(Name of Architect or Engineer)
which contract is by reference made a part hereof, and is hereinafter referred to as the Contract.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that, if Contractor shall promptly and faithfully
perform said contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect.
The Surety hereby waives notice of any alteration or extension of time made by the Owner.
Whenever Contractor shall be, and declared by Owner to be in default under the Contract, the Owner having performed
Owners Obligations thereunder, the Surety may promptly remedy the default, or shall promptly
1. Complete the Contract in accordance with its terms and conditions, or
2. Obtain a bid or bids for completing the Contract in accordance with its terms and conditions, and upon determination by
Surety of the lowest responsible bidder, or, if the Owner elects, upon determination by the Owner and the Surety jointly
of the lowest responsible bidder, arrange for a contract between such bidder and Owner, and make available as Work
progresses (even though there should be a default or a succession of defaults under the contract or contract of com-
pletion arranged under this paragraph) sufficient funds to pay the cost of completion less the balance of the contract
price; but not exceeding, including other costs and damages for which the surety may be liable hereunder, the amount
set forth in the first paragraph hereof. The term "balance of the contract price", as used in this paragraph, shall mean
the total amount payable by Owner to Contractor under the Contract and any amendments thereto, less the amount
properly paid by Owner to Contractor.
PROVIDED, FURTHER, that it is expressly agreed that the BOND shall be increased automatically and immediately, with-
out the need for separate amendments hereto, upon amendment to the Contract that does not increase the contract price
more than ten (10) percent, so as to bind the PRINCIPAL and the SURETY to the full and faithful performance of the CON-
TRACT as so amended. The term "Amendment', wherever used in this BOND, and whether referring to this BOND, the
Contract or the Loan Documents shall include any alteration, addition, extension, or modification of any character whatso-
ever.
NB 001211 17 Page 1 of 2
PO Box 620976 1 Middleton, WI 53562 1 Phone: (608) 410-3410 1 Fax: (877) 674-2663 1 www.thesilverlining.com
Any suit under this bond must be instituted before the expiration of one (1) year from the date on which final payment
under the contract falls due.
No right of action shall accrue on this bond to or for the use of any person or corporation other than the Owner named
herein of the heirs, executors, administrators or successors of the Owner.
Signed and Sealed this 16
Witness:
Witness:w
day of March
KOW
Principal:
CAJ En"r riseonc dba C)Qis Jones Trucking
By:( // ^t' i yr Cf (SEAL)
__Name Typed: Chr' Jones President
Title
Surety:
West Bend Mutual Ins ura ce Company
By ft l h .) (SEAL)
Name yped: KRISTIN TOLLE Attomey-In-Fact
Title
MICHIGAN ONLY: This policy is exempt from the filing requirements of Section 2236 of the Insurance Code of 1956,
1956 PA 218 and MCL 500.2236.
Page 2 of 2 NB 0012 1117
PO Box 620976 1 Middleton, WI 53562 1 Phone: (608) 410-3410 1 Fax: (877) 674-2663 1 www.thesilverlining.com
Prepared by: Joe Welter, Public Works, 410 East Washington Street, Iowa City, Iowa 52240 (319) 356-5144
Resolution No, 20-1
Resolution accepting the Work for the 2019 Iowa City Kickers
Soccer Park Field Addition Project
Whereas, the Engineering Division has recommended that the work for construction of the 2019
Iowa City Kickers Soccer Park Field Addition Project, as included in a contract between the City of
Iowa City and MBA Incorporated of North Liberty, Iowa, dated February 5, 2020, be accepted; and
Whereas, the Engineer's Report and the performance, payment, and maintenance bond have been
filed in the City Clerk's office; and
Whereas, funds for this project are available in IC Kickers Park Soccer Field Addition, Account
Number R4355; and
Whereas, the final contract price is $83,757.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 4th day of August 2020
Ma
Attest: e 0 L90
City' Clerk
Approved 1
IL
City Attorney's Office
(Sara Greenwood Hektoen — 07/28/2020)
It was moved by salih and seconded by
adopted, and upon roll call there were:
Ayes:
Nays:
Weiner the Resolution be
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
� r I
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240 - 1826
(319) 356 - 5000
(319) 356 - 5009 FAX
www.icgov.org
July 24, 2020
City Clerk
Iowa City, Iowa
Re: 2019 Iowa City Kickers Soccer Park Field Addition Project
Dear City Clerk:
I hereby certify that the 2019 Iowa City Kickers Soccer Park Field Addition Project has been
completed by MBA Incorporated of North Liberty, Iowa, in substantial accordance with the Project
Manual developed by the Engineering Division of the City of Iowa City.
The project was bid as a unit price contract and the final contract price is $83,757.00.
There were two (2) change orders on this project:
1. Revisions to the completion dates due to wet conditions $0.00
2. Revised tile line layout and site grading. $2,883.00
Total $2,883.00
I recommend that the above -referenced improvements be accepted by the City of Iowa City.
Sincerely,
Jason Havel
City Engineer
0510
PERFORMANCE, PAYMENT, AND MAINTENANCE BOND
2019 IOWA CITY KICKERS SOCCER PARK FIELD ADDITION PROJECT
CITY OF IOWA CITY
KNOW ALL BY THESE PRESENTS:
Bond Number IAC589647
That we, MBA Incorporated, as Principal (hereinafter the "Contractor" or "Principal") and
Merchants Bonding Company (Mutual) as Surety are held and firmly bound unto City of
Iowa City, Iowa, as Obligee (hereinafter referred to as "the Jurisdiction"), and to all persons who
may be Injured by any breach of any of the conditions of this Bond in the penal sum of eighty
thousand eight hundred and seventy-four dollars ($80,874), lawful money of the United States,
for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, legal
representatives and assigns, jointly or severally, firmly by these presents.
The conditions of the above obligations are such that whereps said Contractor entered into a
contract with the Jurisdiction, bearing date the 2artt-34' day of Sep swileer FLExR
204Zr+, (hereinafter the "Contract") wherein said Contractor undertakes and agrees to
construct the following described improvements:
The project includes installation of a drainage network consisting of 2-inch subdrains, 6-inch drain
collectors, 12-inch storm sewer service, five drain cleanouts, a drain outlet to the ditch, various
drain connections, and grading of the field. The project covers an area of roughly five acres with
approximately two acres of grading.
To faithfully perform all the terms and requirements of said Contract within the time therein
specified, In a good and workmanlike manner, and in accordance with the Contract Documents.
tll
It is expressly understood and agreed by the Contractor and Surety in this bond that the fallowing
provisions are a part of this Bond and are binding upon said Contractor and Surety, to -wit;
1. PERFORMANCE: The Contractor shall well and faithfully observe, perform, fulfill, and
abide by each and every covenant, condition, and part of said Contract, byreference made
a part hereof, for the above referenced improvements, and shall indemnify and save
harmless the Jurisdiction from all outlay and expense incurred by the Jurisdlouon by
reason of the Contractor's default of failure to perform as required. The Contrad& shall
also be responsible for the default or failure to perform as required under the Contract and
Contract Documents by all its subcontractors, suppliers, agents, or employees furnishing
materials or providing labor in the performance of the Contract.
2. PAYMENT: The Contractor and the Surety on this Bond hereby agreed to pay all just
claims submitted by persons, firms, subcontractors, and corporations furnishing materials
for or performing labor in the performance of the Contract on account of which this Bond
is given, including but not limited to claims for all amounts due for labor, materials,
lubricants, oil, gasoline, repairs on machinery, equipment, and tools, consumed or used
2019 Iowa City Kickers Soccer Park Field Addition Project 0510 —Page 1 of 4
by the Contractor or any subcontractor, wherein the same are not satisfied out of the
portion of the contract price the Jurisdiction Is required to retain until completion of the
improvement, but the Contractor and Surety shall not be liable to said persons, firms, or
corporations unless the claims of said claimants against said portion of the contract price
shall have been established as provided by law. The Contractor and Surety hereby bind
themselves to the obligations and conditions set forth In Chapter 573 of the Iowa Code,
which by this reference Is made a part hereof as though fully set out herein.
3. MAINTENANCE: The Contractor and the Surety on this Bond hereby agree, at their own
expense:
A. To remedy any and all defects that may develop in or result from work to be
performed under the Contract within the period of two year(s) (2) from the date of
acceptance of the work under the Contract, by reason of defects in workmanship
or materials used in construction of said work;
B. To keep all work in continuous good repair; and
C. To pay the Jurisdiction's reasonable costs of monitoring and inspection to assure
that any defects are remedied, and to repay the Jurisdiction all outlay and expense
incurred as a result of Contractor's and Surety's failure to remedy any defect as
required by this section.
4. GENERAL: Every Surety on this Bond shall be deemed and held bound, any contract to
the contrary notwithstanding, to the following provisions:
A. To consent without notice to any extension of time to the Contractor in which to
perform the Contract;
B. To consent without notice to any change in the Contract or Contract Documents,
which thereby increases the total contract price and the penal sum of this bond,
provided that all such changes do not, in the aggregate, involve an increase of
more than 20% of the total contract price, and that this bond shall then be released
as to such excess increase; and
C. To consent without notice that this Bond shall remain in full force and effect until
the Contract is completed, whether completed within the specified contract period,
within an extension thereof, or within a period of time after the contract period has
elapsed and the liquidated damage penalty is being charged against the
Contractor.
D. That no provision of this Bond or of any other contract shall be valid that limits to
less that five years after the acceptance of the work under the Contract the right to
sue on this Bond.
E. That as used herein, the phrase "all outlay and expense" is not to be limited In any
way, but shall Include the actual and reasonable costs and expenses Incurred by
the Jurisdiction Including interest, benefits, and overhead where applicable.
Accordingly, "all outlay and expense" would include but not be Ilmitedto all contract
or employee expense, all equipment usage or rental, materials, testing;' outside
experts, attorneys fees (including overhead expenses of the Jurisdiction's staff
attorneys), and all costs and expenses of litigation as they are incurred by the
Jurisdiction. It is intended the Contractor and Surety will defend and indemnify the
Jurisdiction on all claims made against the Jurisdiction on account of Contractor's
failure to perform as required in the Contract and Contract Documents, that all
agreements and promises set forth in the Contract and Contract Documents, in
approved change orders, and In this Bond will be fulfilled, and that the Jurisdiction
will be fully indemnified so that it will be put into the position it would have been in
had the Contract been performed in the first instance as required.
2019 Iowa City Kickers Soccer Park Field Addition Project 0510 — Page 2 of 4
In the event the Jurisdiction incurs any "outlay and expense" in defending itself against
any claim as to which the Contractor or Surety should have provided the defense, or in the
enforcement of the promises given by the Contractor in the Contract, Contract Documents,
or approved change orders, or in the enforcement of the promises given by the Contractor
and Surety in this Bond, the Contractor and Surety agree that they will make the
Jurisdiction whole for all such outlay and expense, provided that the Surety's obligation
under this bond shall not exceed 125% of the penal sum of this bond.
In the event that any actions or proceedings are initiated regarding this Bond, the parties
agree that the venue thereof shall be Johnson County, State of Iowa. If legal action is
required by the Jurisdiction to enforce the provisions of this Bond or to collect the monetary
obligation incurring to the benefit of the Jurisdiction, the Contractor and the Surety agree,
jointly, and severally, to pay the Jurisdiction all outlay and expense incurred therefor by
the Jurisdiction. All rights, powers, and remedies of the Jurisdiction hereunder shall be
cumulative and not alternative and shall be in addition to all rights, powers, and remedies
given to the Jurisdiction, by law. The Jurisdiction may proceed against surety for any
amount guaranteed hereunder whether action is brought against the Contractor or whether
Contractor is joined in any such action(s) or not.
NOW THEREFORE, the condition of this obligation is such that if said Principal shall
faithfully perform all the promises of the Principal, as set forth and provided in the Contract
and in this Bond, then this obligation shall be null and void, otherwise It shall remain in full
force and effect.
When a work, term, or phrase is used in this Bond, it shall be interpreted or construed first
as defined in this Bond and the Contract; second, if not defined in the Bond or Contract, it
shall be Interpreted or construed as defined in applicable provisions of the Iowa Code;
third, if not defined in the Iowa Code, it shall be interpreted or construed according to its
generally accepted meaning in the construction industry; and fourth, if it has no generally
accepted meaning in the construction industry, it shall be interpreted or construed
according to its common or customary usage.
Failure to specify or particularize shall not exclude terms or provisions not mentioned and
shall not limit liability hereunder. The Contract is hereby made a part of this Bond.
2019 Iowa City Kickers Soccer Park Field Addition Project 0510 — Page 3 of 4
PRINCIPAL:
Beverly Seelman
Printed Name of Contractor Officer
By
Sign re of Contractor Officer
President/Co-Owner
Title of Contractor Officer
E�
Merchants Bonding Company (Mutual)
Surety Company Name
By
�nature of Attorn r i -Fact Officer
1
Jill Shaffer
Printed Name of Attomey-in-Fact Officer
LMC Insurance & Risk Management
Company Name of Attomey-in-Fact
4200 University Avenue #200
Company Address of Attomey-in-Fact
West Des Moines, IA 50266
City, State, Zip Code of Attomey-in-Fact
515-244-0166
Telephone Number of Attorney -in -Fact
2019 Iowa City Kickers Soccer Park Field Addition Project 0510 — Page 4 of 4
.MERCHANTS
BONDING COMPANY.
POWER OF ATTORNEY
Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.,
both being corporations of the State of Iowa (herein collectively called the "Companies') do hereby make, constitute and appoint, Individually,
Christopher R Selbeding; Greg T LaMair, Jeffrey R Baker; Jill Shaffer; Joseph I SchmlC Nancy D Baltutat; Patrick K Duff
their true and lawful Attorney(s)dn-Fact, to sign Its name as surety(les) and to execute, seal and acknowledge any and all bonds, undertakings,
contracts and other written Instruments In the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity
of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any
actions or proceedings showed by low.
This Power -of -Attorney Is granted and Is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board
of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2016 and adopted by the Board of Directors
of MerchantsNatlonal Bonding, Inc., on October 16, 2015.
'The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority
to appoint Attorneys -In -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and
undertakings, recognizanees, contracts of Indemnity and other writings obligatory In the nature thereof.'
"The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney
or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obllgaficna of the
Company, and such signature and seal when so used shall have the same force and effect as though manually foxed."
In connection with obligations In favor of the Florida Department of Transportation only, It Is agreed that the power and out horky hereby given to the
Attorney -In -Fact Includes any and all consents for the release of retained percentages and/or final estimates on engineering and contraction
contracts required by the State of Florida Department of Transportation. It Is fully understood that consenting to the State of Florida Department
of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of
Its obligations under its bond.
In connection with obligations In favor of the Kentucky Department of Highways only, it Is agreed that the power and authority hereby given
to the Aftmey-In-Fact cannot be modified or revoked unless prior written personal notice of such Intent has been given to the Commissioner -
Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation.
In Witness Whereof, the Companies have caused this Instrument to be signed and sealed this 17th day of April 12019
*�' dP40R"'•�o%
`�6J:•GO ��•%Z'
gA�
MERCHANTS BONDING COMPANY (MUTUAL)
"y� ��.
MERCHANT NATIONAL BONDING, INC.
:�yy1 2003 ;;o:
�y 1993 c;
By t/
..� '�..
. b�;
STATE OF IGWA t..." "'••.•'-
COUNTY OF DALLAS as.
On this this 17th day of April 2019 , before me appeared Larry Taylor, to me personally known, who being by me duly sworn
did say that he Is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the
seals affixed to the foregoing Instrument are the Corporate Seals of the Companies; and that the said Instrument was signed and sealed In behalf
of the Companies by authority of their respective Boards of Directors.
t-at � AL,IGIA; K. ORANI
o Cammis6lorrNurt7Yber70743D
a My CommissionEkpires
:o ah " APNI 1,202C
Notary Publk
(Expiration of notary's commlesion
roes not Invalidate this Instrument)
1, William Warner, Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby
certify that the above and foregoing Is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which Is still In full
force and effect and has not been amended or revoked.
In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 7th day of November 2019
1POgq'r o'
:'A4rO�Y0"�•V:9•y• %_',,•
2003 "Jo
yt. 1933 :•' secretary,
POA 0018 (3117)
Prepared by: Josh Slattery, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
Resolution No. 20-223
Resolution accepting the work for the Underground Duct and
Fiber Installation to JECC Communications Facility on Compass
Drive Project.
WHEREAS, the Engineering Division has recommended that the work for construction of the
Underground Duct and Fiber Installation to JECC Communications Facility on Compass Drive
Project, as included in a contract between the City of Iowa City and Utility Service Contractors of
Hiawatha, Iowa, dated April 15, 2019, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer; and
Whereas, funds for this project are available in account # P3982; and
Whereas, the final contract price is $56,962.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 15th day of September , 2020
Mayor—��
Attest:
4CityClerk
It was moved by Thomas
adopted, and upon roll call there were:
Ayes:
roved by
.
City Attorney's Office
(Sue Dulek - 09/10/2020)
and seconded by Taylor the Resolution be
Nays:
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
110
Prepared by: Maui VanDyke, Civil Engineer, Public Works, 410 E. Washington St, Iowa City. IA 52240 (319) 356-5044
Resolution No, 20-242
Resolution accepting the work for the Windsor Ridge Drainage
Improvement Project
Whereas, the Engineering Division has recommended that the work for construction of the Windsor
Ridge Drainage Improvement Project as included in a contract between the City of Iowa City and
Carter and Associates, Inc., of Coralville, Iowa, dated June 301, 2020, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have been
filed in the City Engineer's office; and
Whereas, funds for this project are available in the Annual Storm Water Improvements account
#M3631; and
Whereas, the final contract price is $40,617.50.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 20th day of October 20 zo
Mayor
Attest:
ed by
City erk Attom
aovCity
ey's Office—10/15/2020
It was moved by Weiner and seconded by
adopted, and upon roll call there were:
Ayes
x
Nays:
Salih
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
the Resolution be
Prepared by: Ben Clark, Senior Engineer, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
Resolution No. 20-264
Resolution accepting the work for the Police Front Offices
Remodel Project
Whereas, the Engineering Division has recommended that the work for construction of the Police
Front Offices Remodel Project as included in a contract between the City of Iowa City and RoCon
Construction, LLC, of Iowa City, Iowa, dated May 281, 2020, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have been
filed in the City Engineer's office; and
Whereas, funds for this project are available in the Police Front Offices Remodel account #Y4443;
and
Whereas, the final contract price is $51,704.91.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 1st day of December 2020
Mqia
App ed by %
Attest: /
City Clerk City Attorneys Office—11t2412020
It was moved by sergus and seconded by Weiner the Resolution be
adopted, and upon roll call there were:
Ayes:
IN
Nays:
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
b,J
Prepared by: Jason Reichert. Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 62240 (319) 356-5416
Resolution No. 20-266
Resolution accepting the work for the Traffic Calming 2020 Project
Whereas, the Engineering Division has recommended that the work for construction of the Traffic
Calming 2020 Project, as included in a contract between the City of Iowa City and LL Pelling
Company, Inc. of North Liberty, Iowa dated August 20, 2020 be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have been
filed in the City Engineer's office; and
Whereas, funds for this project are available in the Traffic Calming account # 53816; and
Whereas, the final contract price is $74,577.55.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 1st day of December , 2020
Ma
Attest:
City lerk
It was moved by Bergus and seconded by
adopted, and upon roll call there were:
Ayes:
Nays:
Ap ved by %
City Attorney's Office—11124/2020
Weiner
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
the Resolution be
Prepared by: Kim Sandberg, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
Resolution No. 20-265
Resolution accepting the work for the 2020 Summer Sidewalk
Repair Project
Whereas, the Engineering Division has recommended that the work for construction of the 2020
Summer Sidewalk Repair Project, as included in a contract between the City of Iowa City and
Ziegenhom Construction LLC of Muscatine, Iowa, dated July 21, 2020, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the City
Engineer's office; and
Whereas, funds for this project are available in account # 22710220; and
Whereas, the final contract price is $92,625.71.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this lse day of December 12020
M r
Ap ed by
Attest: 7.
City'Clerk City Attorney's Office—11/24/2020
It was moved by Bergus
adopted, and upon roll call there were:
Ayes:
and seconded by
Nays:
Weiner
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
the Resolution be
("f
Prepared by: Ben Clark, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
Resolution No. 21-21
Resolution accepting the work for the Augusta Place Bird
Proofing Project
Whereas, the Engineering Division has recommended that the work for construction of the
Augusta Place Bird Proofing Project, as included in a contract between the City of Iowa City and
Minturn, Inc. of Brooklyn, Iowa, dated October 15, 2019, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Augusta Place account # 71810146; and
Whereas, the final contract price is $84,159.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 2nd day of February 2021
Mayor
Approved by
Attest:
City Clerk Ci ttorney's Office — 01/28/2021
It was moved by Mims
adopted, and upon roll call there were:
Ayes:
kq
and seconded by sergus the Resolution be
Nays:
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
Prepared by: Ben Clark, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
Resolution No. 21-227
Resolution accepting the work for the Robert A. Lee Recreation
Center Phase 2 Improvements - On -Deck Shower Restroom
Project.
Whereas, the Engineering Division has recommended that the work for construction of Robert A.
Lee Recreation Center Phase 2 Improvements - On -Deck Shower Restroom Project, as included
in a contract between the City of Iowa City and Macomas-Lacina Construction, LC, of Iowa City,
Iowa, dated November 19, 2020, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Recreation Center ADA Improvements account
# R4351; and
Whereas, the final contract price is $96,151.05.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 17th day of August 2021
M r
Attest:
Cit Clerk
Approved by
G
z,==� -
City At rney's Office
(Sue Dulek - 08110/2021)
It was moved by salih and seconded by Taylor the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays:
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
5, &
Prepared by: Ben Clark, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
Resolution No. 21-226
Resolution accepting the work for the Robert A. Lee Recreation
Center Phase 2 Improvements - Fire Alarm Project.
Whereas, the Engineering Division has recommended that the work for construction of Robert A.
Lee Recreation Center Phase 2 Improvements - Fire Alarm Project, as included in a contract
between the City of Iowa City and Gerard Electric, Inc., Iowa City, Iowa, dated November 231d,
2020, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Recreation Center ADA Improvements account
# R4351;and
Whereas, the final contract price is $43,635.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 17th day of August 12021
May
Approved by
Attest: )�
City Jerk City Attoneys Office
(Sue Dulek - 08/10/2021)
It was moved by
Salih
adopted, and upon roll call there were:
Ayes
x
and seconded by Taylor the Resolution be
Nays:
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
Prepared by: Joe Welter, Engineering Division, Public Works, 410 East Washington Street, Iowa City, Iowa 52240 (319) 356-5144
Resolution No. 21-225
Resolution accepting the work for the 2018-2020 Annual Sanitary
Manhole Rehabilitation Construction Project
Whereas, the Engineering Division has recommended that the work for construction of the 2018-
2020 Annual Manhole Rehabilitation Construction Project, as included in a contract between the
City of Iowa City and Redina Construction Company of Glen Ellyn, Illinois, dated October 13, 2020,
be accepted; and
Whereas, the Engineer's Report and the performance, payment, and maintenance bond have been
filed in the City Engineer's office; and
Whereas, funds for this project are available in Annual Sewer Main Replacement, Account # V3101;
and
Whereas, the final contract price is $83,394.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 17th day of
1
Attest: V V
City Clerk
august ,2021
M r
Approved by
zl==---o
City A ney's Office
(Sue Dulek - 08/10/2021)
It was moved by salih and seconded by Taylor the Resolution be
adopted, and upon roll call there were:
Ayes:
F.5
Nays:
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
Prepared by: Melissa Clow, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5413
Resolution No. 21-245
Resolution accepting the work for the Park Road Thru Arch
Bridge — Pedestrian Deterrent Project
Whereas, the Engineering Division has recommended that the work for construction of the Park
Road Thru Arch Bridge — Pedestrian Deterrent Project, as included in a contract between the City
of Iowa City and All American Concrete, Inc. of West Liberty, IA, dated March 16, 2021, be
accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Iowa City Gateway Project account # 53809;
and
Whereas, the final contract price is $103,979.80.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 7th day of September , 2021
r
M or
Attest: )-j, 1 JJ7 (�C� p
Ci Clerk
It was moved by 4a1;h and seconded by
adopted, and upon roll call there were:
Ayes:
x
Approved by
z�
City A rney's Office — 8/30/2021
Sergus the Resolution be
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
Prepared by: Scott Severs, Asst. City Engineer, Engineering Division, 410 E. Washington St., Iowa City, IA 52240, (319)356-5142
Resolution No. 21-246
Resolution accepting the work for the Villa Park Shelter Project
Whereas, the Engineering Division has recommended that the work for construction of the Villa
Park Shelter Project, as included in a contract between the City of Iowa City and McComas-
Lacina Construction LC of Iowa City, Iowa, dated July 8, 2020, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Villa Park Redevelopment account # R4361;
and
Whereas, the final contract price is $66,532.15.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 7th day of September 2021
1-
M
Attest: L�u Le 1 ',
City Clerk
It was moved by Salih
adopted, and upon roll call there were:
Ayes:
Approved by
City ttomey`s Office
(Sue Dulek - 8/26/2021)
and seconded by Bergus the Resolution be
Nays
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
Prepared by: Josh Slattery, Engineering Division, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5149
Resolution No. 21-255
Resolution accepting the work for, sanitary sewer, water main,
and certain sidewalk public improvements for Capital
Subdivision, and declaring public improvements open for public
access and use.
Whereas, the Engineering Division has certified that the following improvements have been
completed in accordance with the plans and specifications approved by the Engineering Division.
Sanitary sewer and water main improvements for Capital Subdivision, as constructed by
Maxwell Construction, Inc. of Iowa City, Iowa.
Whereas, the maintenance bonds have been filed in the City Clerk's office; and
Whereas, the City of Iowa City has notified those contractors listed previously of the date on which
it will consider acceptance of the aforementioned public improvements; and
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa and that all dedications and
public improvements previously set aside as not being open for public access are hereby formally
accepted and declared open for public access and use.
Passed and approved this 21st day of
Attest:
4tylerk
-IJ (Sara Greenwood Hektoen - 09/14/2021)
It was moved by Salih and seconded by
adopted, and upon roll call there were:
Ayes:
X
X
X
X
X
X
X
Nays:
Thomas the Resolution be
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
�. 6
Prepared by: Ben Clark, Engineering Division, Public Works, 410 E. Washington St.. Iowa City, IA 52240 (319) 356-5436
Resolution No. 21-261
Resolution accepting the work for the Digester Seals Project.
Whereas, the Engineering Division has recommended that the work for construction of the
Digester Seals Project, as included in a contract between the City of Iowa City and Woodruff
Construction LLC, of Tiffin, Iowa, dated October 14, 2019, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Clerk's office; and
Whereas, funds for this project are available in the Wastewater Digester Seals account # V3150;
and
Whereas, the final contract price is $82,700.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 5th day of October
M
on
6ity
Approved by
Attest: Clerk City o y s Ice
(Sara Gr6enwood Hektoen - 09/29/2021)
It was moved by salih and seconded by Weiner the Resolution be
adopted, and upon roll call there were:
Ayes:
x
Nays:
Absent:
Bergus
Mims
Salih
Taylor
Teague
Thomas
Weiner
ENGINEER'S REPORT
September 28, 2021
City Council
Iowa City, Iowa
RE: Digester Seals Project
Dear City Council:
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240 - 1826
(319) 356 - 5000
(319) 356 - 5009 FAX
www,icgov.org
I hereby certify that the construction of the Digester Seals Project has been completed by
Woodruff Construction LLC, of Tiffin, Iowa in substantial accordance with the plans and
specifications prepared by Stanley Consultants, Inc., of Muscatine, Iowa.
The project was bid as a lump sum contract and the final contract price is $82,700.00. There
were no change or extra work orders on the project.
I recommend that the above -referenced improvements be accepted by the City of Iowa City.
Sincerely,
Jason Havel, P.E.
City Engineer
0510
PERFORMANCE, PAYMENT, AND MAINTENANCE BOND
DIGESTER SEALS PROJECT
CITY OF IOWA CITY
KNOW ALL BY THESE PRESENTS:
That we, Woodruff Construction, LLC, as Principal (hereinafter the "Contractor" or "Principal")
and United Fire & Casualty Company, as Surety are held and firmly bound unto City of Iowa
City, Iowa, as Obligee (hereinafter referred to as "the Jurisdiction"), and to all persons who may
be injured by any breach of any of the conditions of this Bond in the penal sum of Eighty Two
Thousand Seven Hundred dollars ($82,700), lawful money of the United States, for the
payment of which sum, well and truly to be made, we bind ourselves, our heirs, legal
representatives and assigns, jointly or severally, firmly by these presents.
The conditions of the above obligations are such that whereas said Contractor entered into a
contract with the Jurisdiction, bearing date the 14'h day of October, 2019, (hereinafter the
"Contract") wherein said Contractor undertakes and agrees to construct the following described
improvements:
Install annular seal between stainless -steel cover and concrete wall on Wastewater Digester Tank
8101A.
To faithfully perform all the terms and requirements of said Contract within the time therein
specified, in a good and workmanlike manner, and in accordance with the Contract Documents.
It is expressly understood and agreed by the Contractor and Surety in this bond that the following
provisions are a part of this Bond and are binding upon said Contractor and Surety, to -wit:
1. PERFORMANCE: The Contractor shall well and faithfully observe, perform, fulfill, and
abide by each and every covenant, condition, and part of said Contract, by reference made
a part hereof, for the above referenced improvements, and shall indemnify;apd save
harmless the Jurisdiction from all outlay and expense incurred by the. Jurisdiction by
reason of the Contractor's default of failure to perform as required. The Contrat4or shall
also be responsible for the default or failure to perform as required under.theCowact and
Contract Documents by all its subcontractors, suppliers, agents, or emp!Ryees fp3 nishing`
materials or providing labor in the performance of the Contract. < _
2. PAYMENT: The Contractor and the Surety on this Bond hereby agreed, to pay all just
claims submitted by persons, firms, subcontractors, and corporations furrii9fing Medals
for or performing labor in the performance of the Contract on account of which ttzrs Bond
is given, including but not limited to claims for all amounts due for labor, materials,
lubricants, oil, gasoline, repairs on machinery, equipment, and tools, consumed or used
by the Contractor or any subcontractor, wherein the same are not satisfied out of the
portion of the contract price the Jurisdiction is required to retain until completion of the
improvement, but the Contractor and Surety shall not be liable to said persons, firms, or
corporations unless the claims of said claimants against said portion of the contract price
shall have been established as provided by law. The Contractor and Surety hereby bind
themselves to the obligations and conditions set forth in Chapter 573 of the Iowa Code,
which by this reference is made a part hereof as though fully set out herein.
3. MAINTENANCE: The Contractor and the Surety on this Bond hereby agree, at their own
expense:
A. To remedy any and all defects that may develop in or result from work to be
performed under the Contract within the period of two year(s) (2) from the date of
acceptance of the work under the Contract, by reason of defects in workmanship
or materials used in construction of said work;
B. To keep all work in continuous good repair; and
C. To pay the Jurisdiction's reasonable costs of monitoring and inspection to assure
that any defects are remedied, and to repay the Jurisdiction all outlay and expense
incurred as a result of Contractor's and Surety's failure to remedy any defect as
required by this section.
4, GENERAL: Every Surety on this Bond shall be deemed and held bound, any contract to
the contrary notwithstanding, to the following provisions:
A. To consent without notice to any extension of time to the Contractor in which to
perform the Contract;
B. To consent without notice to any change in the Contract or Contract Documents,
which thereby increases the total contract price and the penal sum of this bond,
provided that all such changes do not, in the aggregate, involve an increase of
more than 20% of the total contract price, and that this bond shall then be released
as to such excess increase; and
C. To consent without notice that this Bond shall remain in full force and effect until
the Contract is completed, whether completed within the specified contract period,
within an extension thereof, or within a period of time after the contract period has
elapsed and the liquidated damage penalty is being charged against the
Contractor.
D. That no provision of this Bond or of any other contract shall be valid that limits to
less than two year(s) (2) after the acceptance of the work under the Contract the
right to sue on this Bond,
E. That as used herein, the phrase "all outlay and expense" is not to be limited in any
way, but shall include the actual and reasonable costs and expenses incurred by
the Jurisdiction including interest, benefits, and overhead where applicable.
Accordingly, "all outlay and expense" would include but not be limited to all contract
or employee expense, all equipment usage or rental, materials, testing, outside
experts, attorneys fees (including overhead expenses of the Jurisdiction's staff
attorneys), and all costs and expenses of litigation as they are incurred by the
Jurisdiction. It is intended the Contractor and Surety will defend and indemnify the
Jurisdiction on all claims made against the Jurisdiction on account of Contractor's
failure to perform as required in the Contract and Contract Documents"that al'
agreements and promises set forth in the Contract and Contract Documents, it
approved change orders, and in this Bond will be fulfilled, and that the Jurtsdictior
will be fully indemnified so that it will be put into the position it would have'lbeen it
had the Contract been performed in the first instance as required:
ut
In the event the Jurisdiction incurs any "outlay and expense" in defending itself against
any claim as to which the Contractor or Surety should have provided the defense, or in
the enforcement of the promises given by the Contractor in the Contract, Contract
Documents, or approved change orders, or in the enforcement of the promises given by
the Contractor and Surety in this Bond, the Contractor and Surety agree that they will
make the Jurisdiction whole for all such outlay and expense, provided that the Surety's
obligation under this bond shall not exceed 125% of the penal sum of this bond.
In the event that any actions or proceedings are initiated regarding this Bond, the parties
agree that the venue thereof shall be Johnson County, State of Iowa. If legal action is
required by the Jurisdiction to enforce the provisions of this Bond or to collect the monetary
obligation incurring to the benefit of the Jurisdiction, the Contractor and the Surety agree,
jointly, and severally, to pay the Jurisdiction all outlay and expense incurred therefor by
the Jurisdiction. All rights, powers, and remedies of the Jurisdiction hereunder shall be
cumulative and not alternative and shall be in addition to all rights, powers, and remedies
given to the Jurisdiction, by law. The Jurisdiction may proceed against surety for any
amount guaranteed hereunder whether action is brought against the Contractor or
whether Contractor is joined in any such action(s) or not.
NOW THEREFORE, the condition of this obligation is such that if said Principal shall
faithfully perform all the promises of the Principal, as set forth and provided in the Contract
and in this Bond, then this obligation shall be null and void, otherwise it shall remain in full
force and effect.
When a work, term, or phrase is used in this Bond, it shall be interpreted or construed first
as defined in this Bond and the Contract; second, if not defined in the Bond or Contract, it
shall be interpreted or construed as defined in applicable provisions of the Iowa Code;
third, if not defined in the Iowa Code, it shall be interpreted or construed according to its
generally accepted meaning in the construction industry; and fourth, if it has no generally
accepted meaning in the construction industry, it shall be interpreted or construed
according to its common or customary usage.
Failure to specify or particularize shall not exclude terms or provisions not mentioned and
shall not limit liability hereunder. The Contract is hereby made a part of this Bond.
a}
- : T417M
Woodruff Construction, LLC
Contractor
By
Signatur
Printed Name
ast&ali n g-° idyzt
Title
SURETY:
Anne crowner, Attorney-m-ract
Printed Name of Attorney -in -Fact
Officer
Holmes, Murphy and Associates, LLC
Company Name
P.O. Box 9207
Company Address
Des Moines, ]A 50305-9207
City, State, Zip Code
(5151223.6800 _
Company Telephone Number
1. All signatures on this performance, payment, and maintenance bond must be
original signatures in ink; copies, facsimile, or electronic signatures will not be
accepted.
2. This bond must be sealed with the Surety's raised, embossing seal.
3. The Certificate or Power of Attorney accompanying this bond must be valid on its
face and sealed with the Surety's raised, embossing seal.
4. The name and signature of the Surety's Attorney-in-Fact/Officer entered on this
bond must be exactly as listed on the Certificate or Power of Attorney
accompanying this bond.
:111
UNITED FIRE & CASUALTY COMPANY, CEDAR RAPIDS, IA Inquiries: Surety Department
UNITED FIRE & INDEMNITY COMPANY, WEBSTER, TX 118 Second Ave SE
AFINANCIAL PACIFIC INSURANCE COMPANY, ROCKLIN, CA Cellar Rapids, IA 52401
IN6uRANCE CERTIFIED COPY OF POWER OF ATTORNEY
(origination file at Home Office of Company -See Certification)
KNOW ALL PERSONS BY THESE PRESENTS, That United Fine & Casualty Company, a corporation duly organized and existing under the laws
of the State of Iowa; United Fire & Indemnity Company, it cooperation duly organized and existing under the laws of the State of Texas; and
Financial Pacific Insurance Company, a corporation duly organized and existing under die laws of the State of California (herein collectively called
the Companies), and having their corporate headquarters hi Cedar Rapids, State of Iowa, does make, constitute and appoint
CRAIG E. HANSEN, JAY D. FREIERMUTH, BRIAN M. DEIMERLY, CINDY BENNETT, ANNE CROWNER, TIM MCCULLOH,
STACY VENN, SHIRLEY BARTENHAGEN, DIONE R. YOUNG, KEVIN J. KNUTSON, MICHELLE GRUIS, KATHLEEN BREWER,
SETH D. ROOKER, SYDNEY BURNETT, EACH INDIVIDUALLY
their the and lawful Attorneys) -in -Fact with power and authority hereby conferred to sign, seal and execute in its behalf all lawfuul bonds,
undertakings and other obligatory instruments of similar nature provided that no single obligation shall exceed $100, 000, 000.00
and to bind the Companies thereby as fully and to the same extent as if such instruments were signed by the duly authorized officers of tie Companies
and all of the acts of said Attorney, pursuant to the authority hereby given and hereby ratified and confirmed.
The Authority hereby granted is continuous and shall remain in full force and effect until revoked by United Fie & Casualty Company, United Fire &
Indemnity Company, and Financial Pacific Insurance Company.
This Power of Attorney is made and executed pursuant to and by authority of the following bylaw duly adopted on May 15, 2013, by the Boards of
Directors of United Fire & Casualty Company, United Fire & Indemnity Company, and Financial Pacific Insurance Company.
"Article VI — Surety Bonds and [Jnderta [dikes"
Section 2, Appointment of Attomey-in-Fact. The President or any Vice President, or tiny other offscor of the Companies may, from time to time, appoint by written
certificates attorneys-in-fnct to act in behatf of the Companies in the execution ofpolicies of instmosm, bonds, undertakings and other obligatory instruments sinks nature.
'Ito signature of any officer authorized hereby, and the Corporate sea], may be axed by £aedmile to any power of attomay or special power of attorney or certification of
either authorized hereby; such signature and seal, when so used, being adopted by the Companies as the original signature of such officer and the original seal ofthe
Companies, to be valid and binding upon the Companies with the same fares and effect as though manually affixed. Such attorneys -in -fact, subject to the limitations saint
forth in than respective certificates of authority shall have ftdi power to bird the Companies by their signature and execution of any such instruments and to attach the seal
the Companies thereto. The President or any Vice President, the Board of Dhomorxs or any other officer of the Companies may at any time revoke all power mid authority
previously given to any attomoyin-fact.
IN WITNESS WHEREOF, the COMPANIES have each caused these presents to be signed by its
01. a `e6jlrt - \`Paroil'k, so. vice vice resident and its corporate seal to be hereto affixed this
zoos,* `""ts.";y sm?;a°` "3' , ° � p P 15th day of January, 2014
eunrow.re _ ES eoxwanrz / 'owrr�e _ UNITED FIRE & CASUALTY COMPANY
s sank .p y; �"" cart cy gy+�; peal f UNITED FIRE & INDEMNITY COMPANY
2?'zexera r=_ �s ^trfc,@)R" FINANCIAL PACIFIC INSURAN.CK COMPANY
I mRn+4� 4ngoqum nrannm,l^ V �/A+/� -A
State of Iowa, County of Linn, ss: Vice Presitt
olit
On 15th dayy of January, 2014, before me personally came Dennis J. Richmann —t
tome known, whu being by me duly sworn, did depose and say; tbat I e resides in Cedar Rapids, State of Iowa; that he is u Vice Pre,�'dem of United Fire
& Casualty Company, a Vice President of United Fire & indemnity Company, art( a Vice President of Financial Pol6ifiv:Insit'I = Company the
corporations described in and which executed the above inatrnme[14 Ihut he lmows Ilse seal of said corporations; that -the seal -affixed to,th'e said
insuument is such corporate seal; tat it was so affixed pursuant to authority given by the Board of Directors of said corliarahmis afcl'tiat Ue signed his
name dimz:m ptnstmatto like authority, and acknowledges same to be lbe act and deed of said Corporations77
.
s a Patti Weddell
a Iowa Notarial Seal
✓" N
Commission number
713274
2
My commisslan Expires ia1281212a19 otary Public
My commission expires: 1012672019
1, Mary A. Bertsch, Assistant Secretary of United Fite & Casualty Company mid Assistant Secretary of United Fire & Indemnity Company, and Assistant
Secretary of Financial Pacific Insurance Company, do hereby certify that I have compared die foregoing copy of tie Power of Atmrrney and affidavit, and
the copy of the Section of the bylaws and resolutions of said Corporations as set faith in said Power of Attorney, with the ORIGINA LS ON FILE IN THE
HOME OFFICE OF SAID CORPORATIONS, and that the same are correct transcripts thereof, and of the whole of the said originals, and that the said
Power of Attorney has not been revoked and is now in full force acid effect.
In testimony whereof I have herewito Subscribed my surme and affixed the corporate seal of the said Corporations
this day of , 2019 ,
nutrot
al\i�vumnw,A
yan�Otaryy'� olu'i"nq weIG Ix$ "m
fes
poaxonam <onrorarz g . 0.9
i '•-® a.::;.
tlaee4 By: `�Ni�TG"'"—_.
snnc c y rut y;n� ype. t4'',g
sma e,� trcax:3' Assistant Secretary,
pai'�e'le r414,12 ' rem OF&C & OF&I & FPIC
11111\1 "IlAnlllllle "bllllAlll111\e
BPOAD049 1217
Ict
Prepared by: Scott Sovers, Asst. City Engineer, Engineering Division, 410 E. Washington St., Iowa City, IA 52240, (319)356-5142
Resolution No. 21-278
Resolution accepting the work for the Madison Street Jordan
Well Plugging Project
Whereas, the Engineering Division has recommended that the work for construction of the
Madison Street Jordan Well Plugging Project, as included in a contract between the City of Iowa
City and Lynch's Excavating, Inc. of West Branch, Iowa, dated June 15, 2021, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Water Fund account # 73730120; and
Whereas, the final contract price is $83,058.54.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 16th day of Nove er 2021
Mayor P o Tem
r Approved by
Attest: l
Atyerk City Attey's Office
(Sara Greenwood Hektoen—11/09/21)
It was moved by Weiner and seconded by Taylor the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays: Absent:
R
Bergus
X Mims
x
Salih
X_
Taylor
X Teague
g
Thomas
g
Weiner
Prepared by: Ben Clark, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
Resolution No. 22-7
Resolution accepting the work for the Iowa River Trail Culvert
Repair Project
Whereas, the Engineering Division has recommended that the work for construction of the Iowa
River Trail Culvert Repair Project, as included in a contract between the City of Iowa City and
Peterson Contractors, Inc. of Reinbeck, Iowa, dated August 19, 2021, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Intra-City Bike Trails account #R4206; and
Whereas, the final contract price is $144,432.80
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this _4th day of
January 12022
Mayor
Approved by
r
1]L Z�
Attest: �f - -
City Clerk City Atto ey's Office
(Sara Greenwood-Hektoen - 12/28/2021)
It was moved by Weiner and seconded by Thomas the Resolution be
adopted, and upon roll call there were:
Ayes
Nays: Absent:
Alter
X
X
Bergus
x
_ Harmsen
x
Taylor
x
_
Teague
x
Thomas
x
Weiner
Prepared by: Scott Savers, Asst. City Engineer, Engineering Division, 410 E. Washington St., Iowa City, IA 52240, (319) 356-5142
Resolution No. 22-42
Resolution accepting the work for the Salt Building Demolition
Project
Whereas, the Engineering Division has recommended that the work for construction of the Salt
Building Demolition Project, as included in a contract between the City of Iowa City and ECCO
Midwest, Inc. of Cedar Rapids, Iowa, dated November 30, 2021, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Snow and Ice Control Fund, account
#22710335; and
Whereas, the final contract price is $ 74,444.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 1st day of, march
Mayor
Attest:
City Clerk City Attor y's Office
(Liz Craig - 02/24/22)
It was moved by Taylor and seconded by Weiner the Resolution be
adopted, and upon roll call there were:
Ayes:
x
_-
Alter
Bergus
Harmsen
Taylor
Teague
Thomas
Weiner
Prepared by: Melissa Clow, Engineering Division, Public Works, ^1oEWashington m.Iowa City, ms2z4o(310)356-5413
Resolution No. 99-64
Roco|UMOO 8CCep6nO the work for the Fuel Facility DEF System
Project
Whereas, the Engineering Division has recommended that the work for construction ufthe Fuel
Facility DEF System Project, as included in a contract between the City of Iowa City and All
American Concrete, Inc. ofWest Liberty, Iowa, dated October 13'2821'hoaccepted; and
Whereas, the Engineer's Report and the D8rfunnmnoa' p8yn}80t and maintenance bond have
been filed in the City Engineers office; and
Whereas, funds for this project 8r8avai|abl8inUheFquipmontConto/cted|n1pK8/enlentu8Ccount
#81710510:ond
Whereas, the final contract price is$71.q00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 21od day of March 2022
Mayoo
Approved by
Attest:
City Clerk City Attorl Office
�~ (Liz Craig -0]/11/22)
|twas moved byWeiner and seconded by Taylor the Resolution be
adopted, and upon roll call there were:
/\voy:
Nays:
Absent:
Alter
u°rgus
HannSen
Taylor
Teague
Thomas
Weiner
0510
PERFORMANCE, PAYMENT, AND MAINTENANCE BOND
FUEL FACILITY DEF SYSTEM PROJECT
CITY OF IOWA CITY
Bond Number SY99767
KNOW ALL BY THESE PRESENTS:
That we, All American Conmete. Inc , as Principal
(hereinafter the "Contractor" or "Principal") and IMT Insurance Company
as Surety are held and firmly bound unto City of Iowa City, Iowa, as Obligee (hereinafter referred
to as "the Jurisdiction"), and to all persons who may be injured by any breach of any of the
conditions of this Bond in the penal sum of
Seventy One Thousand Nine Hundhed Dollars & 00/100 dollars
($ 71,900.09 ), lawful money of the United States, for the payment of which sum,
well and truly to be made, we bind ourselves, our heirs, legal representatives and assigns, jointly
or severally, firmly by these presents.
The conditions of the above obligations are such that whereas said Contractor entered into a
contract with the Jurisdiction, bearing date the 27th day of August
2o21 . (hereinafter the "Contract") wherein said Contractor undertakes and agrees to
construct the following described improvements:
Diesel Exhaust Fluid (DEF) dispenser, FuelMaster pedestal and related appurtenances at the City
of Iowa City Fuel Facility located at 520 McCollister Blvd, at the south end of the Public Work
Facility.
To faithfully perform all the terms and requirements of said Contract within the time therein
specified, in a good and workmanlike manner, and in accordance with the Contract Documents.
It is expressly understood and agreed by the Contractor and Surety in this bond that the following
provisions are a part of this Bond and are binding upon said Contractor and Surety, to -wit:
PERFORMANCE: The Contractor shall well and faithfully observe, perform, fulfill, and
abide by each and every covenant, condition, and part of said Contract, by reference made
a part hereof, for the above referenced improvements, and shall indemnify and save
harmless the Jurisdiction from all outlay and expense incurred by the Jurisdiction by
reason of the Contractor's default of failure to perform as required. The Contractor shall
also be responsible for the default or failure to perform as required under the Contract and
Contract Documents by all its subcontractors, suppliers, agents, or employees furnishing
materials or providing labor in the performance of the Contract.
2. PAYMENT: The Contractor and the Surety on this Bond hereby agreed to pay all just
claims submitted by persons, firms, subcontractors, and corporations furnishing materials
for or performing labor in the performance of the Contract on account of which this Bond
is given, including but not limited to claims for all amounts due for labor, materials,
lubricants, oil, gasoline, repairs on machinery, equipment, and tools, consumed or used
by the Contractor or any subcontractor, wherein the same are not satisfied out of the
portion of the contract price the Jurisdiction is required to retain until completion of the
Fuel Facility DEF System Project 0510 — Page 1 of 4
improvement, but the Contractor and Surety shall not be liable to said persons, firms, or
corporations unless the claims of said claimants against said portion of the contract price
shall have been established as provided by law. The Contractor and Surety hereby bind
themselves to the obligations and conditions set forth in Chapter 573 of the Iowa Code,
which by this reference is made a part hereof as though fully set out herein.
3. MAINTENANCE: The Contractor and the Surety on this Bond hereby agree, at their own
expense:
A. To remedy any and all defects that may develop in or result from work to be
performed under the Contract within the period of two year(s) (2) from the date of
acceptance of the work under the Contract, by reason of defects in workmanship
or materials used in construction of said work;
B. To keep all work in continuous good repair; and
C. To pay the Jurisdiction's reasonable costs of monitoring and inspection to assure
that any defects are remedied, and to repay the Jurisdiction all outlay and expense
incurred as a result of Contractor's and Surety's failure to remedy any defect as
required by this section.
4. GENERAL: Every Surety on this Bond shall be deemed and held bound, any contract to
the contrary notwithstanding, to the following provisions:
A. To consent without notice to any extension of time to the Contractor in which to
perform the Contract;
B. To consent without notice to any change in the Contract or Contract Documents,
which thereby increases the total contract price and the penal sum of this bond,
provided that all such changes do not, in the aggregate, involve an increase of
more than 20% of the total contract price, and that this bond shall then be released
as to such excess increase; and
C. To consent without notice that this Bond shall remain in full force and effect until
the Contract is completed, whether completed within the specified contract period,
within an extension thereof, or within a period of time after the contract period has
elapsed and the liquidated damage penalty is being charged against the
Contractor.
D. That no provision of this Bond or of any other contract shall be valid that limits to
less than two year(s) (2) after the acceptance of the work under the Contract the
right to sue on this Bond.
E. That as used herein, the phrase "all outlay and expense" is not to be limited in any
way, but shall include the actual and reasonable costs and expenses incurred by
the Jurisdiction including interest, benefits, and overhead where applicable.
Accordingly, "all outlay and expense" would include but not be limited to all contract
or employee expense, all equipment usage or rental, materials, testing, outside
experts, attorneys fees (including overhead expenses of the Jurisdiction's staff
attorneys), and all costs and expenses of litigation as they are incurred by the
Jurisdiction. It is intended the Contractor and Surety will defend and indemnify the
Jurisdiction on all claims made against the Jurisdiction on account of Contractor's
failure to perform as required in the Contract and Contract Documents, that all
agreements and promises set forth in the Contract and Contract Documents, in
approved change orders, and in this Bond will be fulfilled, and that the Jurisdiction
will be fully indemnified so that it will be put into the position it would have been in
had the Contract been performed in the first instance as required.
Fuel Facility DEF System Project
0510 — Page 2 of 4
In the event the Jurisdiction incurs any "outlay and expense" in defending itself against
any claim as to which the Contractor or Surety should have provided the defense, or in the
enforcement of the promises given by the Contractor in the Contract, Contract Documents,
or approved change orders, or in the enforcement of the promises given by the Contractor
and Surety in this Bond, the Contractor and Surety agree that they will make the
Jurisdiction whole for all such outlay and expense, provided that the Surety's obligation
under this bond shall not exceed 125% of the penal sum of this bond.
In the event that any actions or proceedings are initiated regarding this Bond, the parties
agree that the venue thereof shall be Johnson County, State of Iowa. If legal action is
required by the Jurisdiction to enforce the provisions of this Bond or to collect the monetary
obligation incurring to the benefit of the Jurisdiction, the Contractor and the Surety agree,
jointly, and severally, to pay the Jurisdiction all outlay and expense incurred therefor by
the Jurisdiction. All rights, powers, and remedies of the Jurisdiction hereunder shall be
cumulative and not alternative and shall be in addition to all rights, powers, and remedies
given to the Jurisdiction, by law. The Jurisdiction may proceed against surety for any
amount guaranteed hereunder whether action is brought against the Contractor or whether
Contractor is joined in any such action(s) or not.
NOW THEREFORE, the condition of this obligation is such that if said Principal shall
faithfully perform all the promises of the Principal, as set forth and provided in the Contract
and in this Bond, then this obligation shall be null and void, otherwise it shall remain in full
force and effect.
When a work, term, or phrase is used in this Bond, it shall be interpreted or construed first
as defined in this Bond and the Contract; second, if not defined in the Bond or Contract, it
shall be interpreted or construed as defined in applicable provisions of the Iowa Code;
third, if not defined in the Iowa Code, it shall be interpreted or construed according to its
generally accepted meaning in the construction industry; and fourth, if it has no generally
accepted meaning in the construction industry, it shall be interpreted or construed
according to its common or customary usage.
Failure to specify or particularize shall not exclude terms or provisions not mentioned and
shall not limit liability hereunder. The Contract is hereby made a part of this Bond.
Fuel Facility DEF System Project
0510 — Page 3 of 4
PRINCIPAL: All American Concrete Inc
cod; Sirnon
Printed meName of �C�onttracMtor Officer
By 00 Olt. 1CJ�^'+ ' '� ' '
Signature of Contractor Officer
V; Gil! eres id
Title of Contractor Officer
NOTE:
SURETY:
IMT Insurance Company
Surety Company Name
Bytcbt✓l�l�/ -
ignature of A ey-in- act Officer
Printed Name of Attorney -in -Fact Officer
LMC Insurance & Risk Management
Company Name of Attorney -in -Fact
4200 University Avenue iQQ0
Company Address of Attorney -in -Fact
West Des Manes, IA 5 M(3
City, State, Zip Code of Attorney -in -Fact
515-2440186
Telephone Number of Attorney -in -Fact
1. These notes will be deleted for the executed copy of the contract documents.
2. All signatures on this performance, payment, and maintenance bond must be
original signatures in ink; copies, facsimile, or electronic signatures will not be
accepted.
3. This bond must be sealed with the Surety's raised, embossing seal.
4. The Certificate or Power of Attorney accompanying this bond must be valid on its
face and sealed with the Surety's raised, embossing seal.
5. The name and signature of the Surety's Attorney-in-Fact/Officer entered on this
bond must be exactly as listed on the Certificate or Power of Attorney
accompanying this bond.
Fuel Facility DEF System Project 0510 - Page 4 of 4
IMT INSURANCE
POWER OF ATTORNEY
Know All Persons By These Presents, that IMT Insurance Company a corporation duly organized under the laws of the State of Iowa,
and having its principal office in the City of West Des Moines, County of Polk, State of Iowa, bath made, constituted and appointed, and does by
these presents make, constitute and appoint
Jeffrey R. Baker, Nancy D. Baltutat, Patrick K. Duff, Mark E. Keairnes,
Greg T. LaMair, Joseph L Schmit, Christopher R. Seiberling, and Jill Shaffer
of West Des Moines and State of Iowa its true and lawful Attorney -in -Fact, with full power and
authority hereby conferred in its name, place and stead, to sign, execute, acknowledge and deliver in its behalf as surety any and all bonds, under-
takings, recognizances or other written obligations in the nature thereof, subject to the limitation that any such instrument shall not exceed the
amount of:
*****Unlimited Amounts*****
and to bind IMT Insurance Company thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized
officers of IMT Insurance Company, and all such acts of said Attomey-in-Fact, pursuant to the authority herein given, are hereby ratified and
confirmed.
This Power -of -Attorney is made and executed pursuant to and by authority of the following By -Laws adopted by the Board of
Directors of IMT Insurance Company on December 18, 1998.
ARTICLE VIII, SECTION 4. - The President or any Vice President or Secretary shall have the authority to appoint Attorneys In Fact and
to authorize them to execute on behalf of the Company, and attach thereto the Corporate Seal, bonds, undertakings, recognizances, con-
tracts of indemnity or other obligatory writings, excluding insurance policies and endorsements.
ARTICLE VIII, SECTION 5. - The signature of any authorized officer and the Corporate Seal may be affixed by facsimile to any Power
of Attorney authorizing the execution and delivery of any of the instruments described in Article VIII, Section 4 of the By -Laws. Such
facsimile signature and seal shall have the same force and effect as though manually affixed.
In Witness Whereof, IMT Insurance Company has caused these presents to be signed by its President and its corporate seal to
be hereto affixed, this 1st day of October 2021
IMT Insurraanncce Company
Sean Kennedy, President 'r 2•
STATE OF IOWA as: rvTr-N
COUNTY OF Dallas } -
On this 1st day of October , 2021 , before me appeared Scan Kennedy, to me personally known,
who being by me duly sworn did say that he is President of the IMT Insurance Company, the corporation described in the foregoing
instrument, and that the Seal affixed to the said instrument is the Corporate Seal of the said Corporation and that the said instrument was signed
and sealed in behalf of said Corporation by authority of its Board of Directors.
In Testimony Whereof, I have hereunto set my hand and affixed my Official Seal at the City of West Des Moines, Iowa, the day and year
fast above written. 4�i is TAMI M SOOA•GOOD
z Commission Number816G49
My C miss Expires
• ,�„ cL 3 Notary Public, Dallas County, Iowa
CERTIFICATE
I, Dalene Holland, Secretary ofthe IMT Insurance Company do hereby certify that the above and foregoing is a true and correct copy
of the POWER -OF -ATTORNEY, executed by said the IMT Insurance Company, which is still in force and effect.
In Witness Whereof, I have hereunto set my hand and affixed the Seal of the Company on 1st day of
October 2021
l�W�il-I�-c.-lam+`-^�`+'Y �' _�`��`'�,•�aT :T'�f i'�c
Dinette Holland, Secretary A_
SY 06 06 (01/19) ' -N� f-. Tr
i r 1
x
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240 - 1826
(319) 356 - 5000
(319) 356 - 5009 FAX
www.icgov.org
ENGINEER'S REPORT
February 14, 2022
City Council
Iowa City, Iowa
Re: Fuel Facility DEF System Project
Dear City Council:
I hereby certify that the Fuel Facility DEF System Project has been completed by All American
Concrete, Inc. of West Liberty, Iowa in substantial accordance with the plans and specifications
prepared by Shive-Hattery, Inc. of Iowa City, Iowa.
The project was bid as a lump sum contract and the final contract price is $71,900.
There were no change or extra work orders for the project.
I recommend that the above -referenced improvements be accepted by the City of Iowa City.
Sincerely, l
Jason Havel, PE
City Engineer
Prepared by: Joe Welter, Engineering Division, Public Works, 410 East Washington Street, Iowa City, Iowa 52240 (319) 356-5144
Resolution No. 22-62
Resolution accepting the work for the 2019-2020 Sanitary Sewer
Repairs Project
Whereas, the Engineering Division has recommended that the work for construction of the 2019-
2020 Sanitary Sewer Repairs Construction Project, as included in a contract between the City of
Iowa City and Lynch's Excavating, Inc. of West Branch, Iowa, dated November 4, 2020, be
accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have been
filed in the City Engineer's Office; and
Whereas, funds for this project are available in Annual Sewer Main Replacement, Account Number
V3101; and
Whereas, the final contract price is $160,680.53; and
Whereas, by accepting the work, the City does not waive its other rights under the contract,
including the City's right to demand a defense and indemnification by Lynch Excavating, Inc. as
provided under the contract.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 22nd day of March
Attest: 7
City Clerk
2022
L��Ua__
�
r
Approved by
4Z=� —
City Attor y's Office
(Liz Craig - 03/15/22)
It was moved by Weiner and seconded by Taytnr the Resolution be
adopted, and upon roll call there were:
Ayes:
X
X
X
X
X
X
X
Nays:
Absent:
Alter
Bergus
Harmsen
Taylor
Teague
Thomas
Weiner
Prepared by: Kim Sandberg, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
Resolution No 22-95
Resolution accepting the work for the 2021 Summer Sidewalk
Repair Project
Whereas, the Engineering Division has recommended that the work for construction of the 2021
Summer Sidewalk Repair Project, as included in a contract between the City of Iowa City and
Feldman Concrete of Dyersville, Iowa, dated August 13, 2021, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Clerk's office; and
Whereas, funds for this project are available in account # 22710220; and
Whereas, the final contract price is $78,776.15.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 19th day of April . 2022
Attest: V i
City Jerk
It was moved by Weiner
adopted, and upon roll call there were:
Ayes:
Approved by
City Attome s Office
(Liz Craig - 04/12/2022)
and seconded by Taylor the Resolution be
Nays:
Absent:
Alter
Bergus
Harmsen
Taylor
Teague
Thomas
Weiner
� r
CITY OF IOWA CITY
410 East Washington Street
Iowa City, Iowa 52240 - 1826
(319) 356 - 5000
(319) 356 - 5009 FAX
www.icgov.org
ENGINEER'S REPORT
April 5, 2022
City Council
Iowa City, Iowa
Re: 2021 Summer Sidewalk Repair Project
Dear City Council:
I hereby certify that the 2021 Summer Sidewalk Repair Project has been completed by Feldman
Concrete of Dyersville, Iowa in substantial accordance with the plans and specifications
completed by the City of Iowa City.
The project was bid as a unit price contract and the final contract price is $77,926,15,
There was a total of two (2) change or extra work orders for the project:
1. Liquidated Damages
2, Regrade Parkway
Total
($ 1,100.00)
$ 250.00
I recommend that the above -referenced improvements be accepted by the City of Iowa City.
Sincerely, `l
xt'
Jason Havel, PE
City Engineer
0510
PERFORMANCE, PAYMENT, AND MAINTENANCE BOND
2021 SUMMER SIDEWALKS REPAIR PROJECT
CITY OF IOWA CITY
KNOW ALL BY THESE PRESENTS:
That we, reioman concrete
(hereinafter the "Contractor or "Principer) and bderchants e
as Surety are held and firmly bound unto City of Iowa City,
to as "the Jurisdiction"), and to all persons who may be
Cendltlen3 of Eighty-eight thousand nine hundred s xy Bond in
-five
Bond NO. IAC592201
as Principal
owa, as Voligee tPtumulan— ----
injured by any breach of any of the
the penal sum of
dollars
($ as ss5 1> lawful money of the United States, for the payment of which sum,
well and truly to be me a, we bind ourselves, our hairs, legal representatives and assigns, jointly
or severally, firmly by these presents.
The conditions of the above obligations are such that wt reas said Co tractor entered into a
contr ct Wth the Jurisdiction, bearing date the Al day of r O ;'
:10, , {hereinafter the "Contract") wherein said Contractor undertake and agrees to
construct the following described improvements:
Removal and replacement of the existing sidewalk marked for repair as parrot the City's Sidewalk
Inspection Repair Program,
To faithfullerform all the temns and specified, in a good and workmanlike requirements ani ke ma ner, and naccordance with the Contract Documents.
It is expressly understood and agreed by the Contractor and Surety In this bond that the following
provisions are a part of this Bond and are binding upon said Contractor and Surety, to -wit:
PERFORMANCE:
l, and
and every covenant, condition, and part off said Contract, by referenceobserve, perform, made
abide bymade
a part hereof, for the above referenced improvements, and shall indemnify and save
harmless the Jurisdiction from all outlay and expense incurred by the Jurisdiction by
reason of the Contractor's default of failure to perform as required. The Contractor shall
also be responsible far the default or failure to perform as required under the Contract and
Contract documents by all its subcontractors, suppliers, agents, or employees fumishing
materials or providing labor in the performance of the ContrecL
2, PAYMENT: The Contractor and the Surety on this Bond hereby agreed to pay all just
claims submitted by persons, firms, subcontractors, and corporations furnishing materials
for or performing labor in the performance of the Contract on account of which this Bond
is given, Including but not limited to claims for all amounts due for labor, materials,
lubricants, oil, gasoline, repairs on machinery, equipment, and tools, consumed or used
by the Contractor or any subcontractor, wherein the same are not satisfied out of the
portion of the contract price the Jurisdiction is required to retain until completion of the
improvement but the Contractor and Surety shall not be liable to said persons, firms, or
2021 Summer Sidewalks Repair Project Addendum No, 1 Page 1 of 4
corporations unless the claims of said claimants against said portion of the contract price
shall have been established as provided by law. The Contractor and Surety hereby bind
themselves to the obligations and conditions set forth in Chapter 573 of the Iowa Code,
which by this reference is made a part hereof as though fully set out herein.
3. MAINTENANCE: The Contractor and the Surety on this Bond hereby agree, at their own
expense:
A. To remedy any and all defects that may develop in or result from work to be
performed under the Contract within the period of one year (1) from the date of
acceptance of the work under the Contract, by reason of defects in workmanship
or materials used in construction of said work;
B. To keep all work in continuous good repair; and
C. To pay the Jurisdiction's reasonable costs of monitoring and inspection to assure
that any defects are remedied, and to repay the Jurisdiction all outlay and expense
incurred as a result of Contractor's and Surety's failure to remedy any defect as
required by this section.
4. GENERAL: Every Surety on this Bond shall be deemed and held bound, any contract to
the contrary notwithstanding, to the following provisions:
A. To consent without notice to any extension of time to the Contractor in which to
perform the Contract;
B. To consent without notice to any change in the Contract or Contract Documents,
which thereby increases the total contract price and the penal sum of this bond,
provided that all such changes do not, in the aggregate, involve an increase of
more than 20% of the total contract price, and that this bond shall then be released
as to such excess increase; and
C. To consent without notice that this Bond shall remain in full force and effect until
the Contract is completed, whether completed within the specified contract period,
within an extension thereof, or within a period of time after the contract period has
elapsed and the liquidated damage penalty is being charged against the
Contractor.
D. That no provision of this Bond or of any other contract shall be valid that limits to
less than one year (1) after the acceptance of the work under the Contract the right
to sue on this Bond.
E. That as used herein, the phrase "all outlay and expense" is not to be limited in any
way, but shall include the actual and reasonable costs and expenses incurred by
the Jurisdiction including interest, benefits, and overhead where applicable.
Accordingly, "all outlay and expense' would include but not be limited to all contract
or employee expense, all equipment usage or rental, materials, testing, outside
experts, attorneys fees (including overhead expenses of the Jurisdiction's staff
attorneys), and all costs and expenses of litigation as they are incurred by the
Jurisdiction. It is intended the Contractor and Surety will defend and indemnify the
Jurisdiction on all claims made against the Jurisdiction on account of Contractor's
failure to perform as required in the Contract and Contract Documents, that all
agreements and promises set forth in the Contract and Contract Documents, in
approved change orders, and in this Bond will be fulfilled, and that the Jurisdiction
will be fully indemnified so that it will be put into the position it would have been in
had the Contract been performed in the first instance as required.
2021 Summer Sidewalks Repair Project Addendum No. 1 Page 2 of 4
In the event the Jurisdiction incurs any "Outlay and expense" in defending itself against
any claim as to which the Contractor or Surety should have provided the defense, or in the
enforcement of the promises given by the contractor in the Contract, Contract Documents,
or approved change orders, or in the enforcement of the promises given by the Contractor
and Surety in this Bond, the Contractor and Surety agree that they will make the
Jurisdiction whole for all such outlay and expense, provided that the Surety's obligation
under this bond shall not exceed 125% of the penal sum of this bond.
In the event that any actions or proceedings are initiated regarding this Bond, the parties
agree that the venue thereof shall be Johnson County, State of Iowa. If legal action is
required by the Jurisdiction to enforce the provisions of this Bond orto collectthe monetary
obligation incurring to the benefit of the Jurisdiction, the Contractor and the Surety agree,
Jointly, and severally, to pay the JurisdicUon all outlay and expense incurred therefor by
the Jurisdiction. All rights, powers, and remedies of the Jurisdiction hereunder shall be
cumulative and not alternative and shall be in addition to all rights, powers, and remedies
given to the Jurisdiction, by law. The Jurisdiction may proceed against surety for any
amount guaranteed hereunder whether action is brought against the Contractor or whether
Contractor is joined in any such action(s) or not.
NOW THEREFORE, the condition of this obligation is such that if said Principal shall
faithfully perform all the promises of the Principal, as set forth and provided in the Contract
and in this Bond, then this obligation shall be null and void, otherwise it shall remain in full
force and effect.
When a work, term, or phrase is used in this Bond, it shall be interpreted or construed first
as defined in this Bond and the Contract; second, if not defined in the Bond or Contract, it
shall be interpreted or construed as defined in applicable provisions of the Iowa Code;
third, if not defined in the Iowa Code, it shall be interpreted or construed according to its
generally accepted meaning in the construction industry; and fourth, if it has no generally
accepted meaning in the construction industry, it shall be interpreted or construed
according to its common or customary usage.
Failure to specify or shall not exclude
rms or
rovisions not
shall not limit liability pherrr.hereunder. The Contract is hereby by made a part of this Bond. mentioned and
2t}21 Summer Sidewalks Repair Project Addendum No. t Page 3 of 4
PRINCIPAL:
Feldman Concrete
Printed Name of Contractor Officer
By p�y4o By
Signature of ontraCtOr Officer
Owner
Title of Contractor Officer
suRETY:
Merchants Bonding Company (Mutual)
Surety Company Name
Signature Cof Attorney -in -Fact Officer
Kim Hess
Printed Name of Attomey-in-Fact Officer
Tdcor
Company Name of Attomey-in-Fact
600 Star Brewery Dr Ste 110
Company Address of Attorney -in -Fact
Dubuque, IA 52001
CEty, State, Zip Code of Attorney -in -Fact
563-556-5441
Telephone Number of Attomey-in-Fact
NOTE:
1. All signatures on this performance, payment, and maintenance bond must be
original signatures In ink; copies, facsimile, or electronic signatures will not be
accepted.
2. This bond must be sealed with the Surety's raised, embossing seal.
3. The Certificate or Power of Attorney accompanying this bond must be valid on its
face and sealed with the Surety's raised, embossing seal. Officer entered on this
4. The name and signature of the Surety's Attorney -
bond must be exactly as listed on the Certificate or Power of Attorney
accompanying this bond.
2021 Summer Sidewalks Repair Project
Addendum No. 1 Page 4 of 4
MERCHANTS
BONDING COMPANY -
POWER OF ATTORNEY
Knew All Persons By Those Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.,
both twng corporations of the Stale of Iowa chereln collectively called the'Companles•) do hereby make, constitute and appoint, individually,
Kim Hess
their We and lawful Ahomey(s)-in•Facb to sign Its name as sumb(les) and to execute, seal and acknowledge any and all bonds, undertakings,
ocrimscls and other wrihen tnstrumems In the nature thereof, on behalf or the Companies In their buslnesa of guaranteeing the Ill
ofpelsons, guaranteeing the pedoonance of contracts and executing or guaranteetng bonds and undertakings required or permitted In any
actions or proceedings allowed by few.
This Power-of•Atlomey Is granted and is signed and sealed by facsimile under and by authority of the following By -Laws adopted by the Board
of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and adopted by the Board of Dimcters
of MerchantsNatlonal Bonding, Inc., on October 16. 2015.
'The President, Secretary. Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power andauthOrity,
to appoint Attorrreys.ln-Fad, and to authorize them to execule on behalf of the Company, and attach the seal of the Company thereto, bonds and
undertakings, recognizances, contracts of Indemnity and otherwril obligatory In the nature thereof.'
`fhe signature of any authorized Officer and the seal of the Company may be affxed by facsimile or electronic transmission to any Power of Attorney
or Certification thereof aulhorizing the axeation and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the
Company, and such signature and seai when so used shall have the some force and effect as though manually fixed."
In wrinection with obligallons In favor of the Florida Department of Transporlalon only, it is agreed that the power and out hodty, hereby given to the
Asomay-In-Fact Includes any and all consents for the release of retained percentages andior final estimates on engineering and construction
contracts required by the State of Florida Department of Transportation. II Is fully understood that consenting to the Slate of Florida Department
of Transportation making payment of the final estimate to the Contractor endlor Its assignee, shall not relieve this surety company of any of
Its obligations under Its bond.
In connactlonwiih ohllgasons In favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given
to the Atiomeydll-Fact cannot be will or revoked unless prior written personal notiw of such Intent has been given to the Commissioner-
Oeparrmentof Nlghways of the Commonwealth of Kentucky at least thirty (10) days prior to the modification or revocation.
In Witness Whereof, the Companies have caused this instrument to be signed and seated this 51h day of August 2021
•... .......
•S101gq� • .�Q�N�.MERCHANTS BONDING COMPANY (MUTUAL)
:�cO�e0�pOR4 e0Z; Iy���4PUgA19y,�: MERCHANT NATIONAL BONDING, INC.
;xdr _d_ 0;04:r—:z -e- to
csq 2003 ezi : y,• 1933 c: By
�'dodk•.. ..•;t�`F •;da'K,..*..•��'�: President
STATE OF IOWA
COUNTY OF DALLAS ss.
on Ibis 51h day of August 2021 before me appeared Larry Taylor, to me personalty known, who being by me duty mom
did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the
seats affixed to the foregoing Instrument are the Corporate Seats of the Companies; and that the said Instrument was signed and sealed in behalf
of the Companies by authority of their respective Boards Of DlredOre.
all
POLLY MASONCommission Number 750576 y11 A&My CommissionFpirasrp jEnuary07, 2023
Notary Public
(Expiration of notary's commission
does not invalidate this instrument)
I, William Warner. Jr., Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby
certify that the above and foregoing Is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full
force and effect and has not been amended or revoked.
In Witness Whereof, I have hereunto set
hand and affixed the seal of the Companies on this
day of
e-
1933 ; Cr.Secretary
POA 0018 (1120) For bond verification contact vedWmerchantsbonding.com
of
Prepared by: Josh Slattery, Engineering Division, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5149
Resolution No. zz-] 1
Resolution accepting the work for the sanitary sewer relocation
at 1907 Keokuk Street, and declaring public improvements open
for public access and use.
Whereas, the Engineering Division has certified that the following improvements have been
completed in accordance with the plans and specifications approved by the Engineering Division.
Sanitary sewer relocation at 1907 Keokuk Street as co
structed by Baker Enterprises, Inc.
of Waverly, Iowa.
Whereas, the maintenance bonds have been filed in the City Clerk's office; and
Whereas, the City of Iowa City has notified those contractors listed previously of the date on which
it will consider acceptance of the aforementioned public improvements; and
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa and that all dedications and
public improvements previously set aside as not being open for public access are hereby formally
accepted and declared open for public access and use.
Passed and approved this 3rd day of
Mai r
Approve y
Attest: i`
City Clerk
r
City Attorney' Office
(Liz Craig - 04/26/22)
It was moved by Wainer and seconded by Tay] or the Resolution e
adopted, and upon roll call there were:
Ayes: Nays: Absent:
x Alter
Bergus
—� Harmsen
x Taylor
x Teague
x Thomas
x Weiner
Prepared by: Joe Welter, Engineering Division, Public Works, 410 East Washington Street, Iowa City, Iowa 52240 (319) 356-5144
Resolution No. 22-149
Resolution accepting the work for the 2022 Sanitary Sewer
Abandonment Project
Whereas, the Engineering Division has recommended that the work for construction of the 2022
Sanitary Sewer Abandonment Project, as included in a contract between the City of Iowa City and
Lynch's Excavating, Inc. of West Branch, Iowa, dated March .3, 2022, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have been
filed in the City Engineer's office; and
Whereas, funds for this project are available in Annual Sewer Main Replacement, Account Number
V3101;and
Whereas, the final contract price is $99,865.90.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 6th day of June 2022
Mayor C�
Approved by
Attest:
Aityle'rk City Attorney' Office
(Sara Greenwood Hektoen - 06/0112022)
It was moved by Bergus
adopted, and upon roll call there were:
Ayes:
and seconded by
Taylor the Resolution be
Absent:
Alter
Bergus
Harmsen
Taylor
Teague
Thomas
Weiner
Prepared by: Joe Welter, Engineering Division, Public Works, 410 East Washington Street, Iowa City, Iowa 52240 (319) 356-5144
Resolution No. 22-17
Resolution accepting the work for the Church - Center Streets
Sanitary Sewer Improvements Project
Whereas, the Engineering Division has recommended that the work for construction of the Center -
Church Streets Sanitary Sewer Improvements Project, as included in a contract between the City
of Iowa City and Midwest Concrete, Inc. of Peosta, Iowa, dated November 10, 2021, be accepted;
and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have been
filed in the City Engineer's Office; and
Whereas, funds for this project are available in Annual Sewer Main Replacement, Account Number
V3101;and
Whereas, the final contract price is $62,403.17.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 12th day of July
r
Attest:
City Jerk �: J
E
2022
Approved by
Z�
City Attorney; Office
(Liz Craig — 07/01/2022)
It was moved by Harmsen and seconded by Taylor the Resolution be
adopted, and upon roll call there were:
Ayes:
am
Absent:
Alter
Bergus
Harmsen
Taylor
Teague
Thomas
Weiner
Prepared by: Ethan Yoder, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
Resolution No. 22-176
Resolution accepting the work for the College Green, Court Hill,
and Happy Hollow Parks Improvements Project
Whereas, the Engineering Division has recommended that the work for construction of the
College Green, Court Hill, and Happy Hollow Parks Improvements Project, as included in a
contract between the City of Iowa City and All -American Concrete Inc of West Liberty, IA, dated
August 20, 2020 be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Parks Annual Improvements/Maintenance
account #R4130; and
Whereas, the final contract price is $82,742.95.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 12 th day of July , 2022
r
M
Attest: i f
it lark
Approved by /
G .
City Attome 's Office
(Liz Craig — 07/01/2022)
It was moved by Harms en and seconded by Taylor the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays:
Absent:
Alter
Bergus
Harmsen
Taylor
Teague
Thomas
Weiner
Prepared by: Scott Severs, Assistant city Engineer, Public Works, 410 E. Washington St., Iowa City, IA 52240 319-356-5142
Resolution No. 22-190
Resolution accepting the work for the Peninsula Well Field
Power Redundancy Project
Whereas, the Engineering Division has recommended that the work for construction of the
Peninsula Well Field Power Redundancy Project, as included in a contract between the City of
Iowa City and Price Industrial Electric Inc of Robins, Iowa, dated November 16, 2021, be
accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Peninsula Well Field Power Redundancy
account# W3315; and
Whereas, the final contract price is $47,000.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 2na day of " 2022
M or r' 1
Approved by
Attest:
ACityark
It was moved by . Weiner and seconded by
adopted, and upon roll call there were:
Ayes:
Nays:
City Attor y's Office
(Liz Craig — 07/27/2022)
Taylor the Resolution be
Absent:
Alter
Bergus
Harmsen
Taylor
Teague
Thomas
Weiner
, , e'
Prepared by: Melissa Clow, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5413
Resolution No. 22-259
Resolution accepting the work for the PCC Stair Reconstruction
and Handrail — 729 and 816 N Dubuque Street Project.
Whereas, the Engineering Division has recommended that the work for construction of the PCC
Stair Reconstruction and Handrail - 729 and 816 N Dubuque Street Project, as included in a
contract between the City of Iowa City and Woodruff Construction of Tiffin, Iowa, dated October
12, 2021, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Iowa City Gateway account # S3809; and
Whereas, the final contract price is $39,566.17.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 1 sth day of ortn} r 2022
Attest:
City Clerk
a#M�
City Attom 's ffice
(Sara Greenwood Hektoen-10/13/2022)
It was moved by Weiner and seconded by Taylor the Resolution be
adopted, and upon roll call there were:
Ayes:
M
x
Alter
x
Bergus
x
Harmsen
x
Taylor
x Teague
Thomas
�—
Weiner
0510
PERFORMANCE, PAYMENT, AND MAINTENANCE BOND
PCC STAIR RECONSTRUCTION & HANDRAIL PROJECT
CITY OF IOWA CITY
KNOW ALL BY THESE PRESENTS:
That we Woodruff Construction, Inc., as Principal (hereinafter the "Contractor" or "Principal") and
Liberty Mutual Insurance Company , as Surety are held and firmly bound unto City of
Iowa City, Iowa, as Obligee (hereinafter referred to as "the Jurisdiction"), and to all persons who
may be injured by any breach of any of the conditions of this Bond in the penal sum of Thirty Five
Thousand, One Hundred and Twenty -Five dollars and Zero cents ($35,125.00), lawful money of
the United States, for the payment of which sum, well and truly to be made, we bind ourselves,
our heirs, legal representatives and assigns, jointly or severally, firmly by these presents.
The conditions of the above obligations are such that whereas said Contractor entered into a
contract with the Jurisdiction, bearing date the IZVO day of DGToBErz
2021 , (hereinafter the "Contract') wherein said Contractor undertakes and agrees to
construct the following described improvements:
At 729 N. Dubuque Street, remove and dispose of the existing handrail and PCC stairs and
foundation. Reconstruct new PCC steps including steel handrail, reinforcement, subdrain tile and
associated backfill material, fabric and rodent guard, expansion joint material and preparation of
subgrade. Site stabilization and sodding to be performed. At 816 N. Dubuque Street, instgll steel
handrail at existing steps adjacent to the sidewalk.
:r
To faithfully perform all the terms and requirements of said Contract within the timetherein
specified, in a good and workmanlike manner, and in accordance with the Contract bocWreents.
It is expressly understood and agreed by the Contractor and Surety in this bond that the following
provisions are a part of this Bond and are binding upon said Contractor and Surety, t641i1
,l
1. PERFORMANCE: The Contractor shall well and faithfully observe, perform, fuff Il, and
abide by each and every covenant, condition, and part of said Contract, by reference made
a part hereof, for the above referenced improvements, and shall indemnify and save
harmless the Jurisdiction from all outlay and expense incurred by the Jurisdiction by
reason of the Contractors default of failure to perform as required. The Contractor shall
also be responsible for the default or failure to perform as required under the Contract and
Contract Documents by all its subcontractors, suppliers, agents, or employees furnishing
materials or providing labor in the performance of the Contract.
2. PAYMENT: The Contractor and the Surety on this Bond hereby agreed to pay all just
claims submitted by persons, firms, subcontractors, and corporations furnishing materials
for or performing labor in the performance of the Contract on account of which this Bond
is given, including but not limited to claims for all amounts due for labor, materials,
lubricants, oil, gasoline, repairs on machinery, equipment, and tools, consumed or used
by the Contractor or any subcontractor, wherein the same are not satisfied out of the
portion of the contract price the Jurisdiction is required to retain until completion of the
improvement, but the Contractor and Surety shall not be liable to said persons, firms, or
corporations unless the claims of said claimants against said portion of the contract price
shall have been established as provided by law. The Contractor and Surety hereby bind
themselves to the obligations and conditions set forth in Chapter 573 of the Iowa Code,
which by this reference is made a part hereof as though fully set out herein.
PCC Stair Reconstruction & Handrail Project 0510 - Page 1 of 3
3. MAINTENANCE: The Contractor and the Surety on this Bond hereby agree, at their own
expense:
A. To remedy any and all defects that may develop in or result from work to be
performed under the Contract within the period of five year(s) (5) from the date of
acceptance of the work under the Contract, by reason of defects in workmanship
or materials used in construction of said work;
B. To keep all work in continuous good repair; and
C. To pay the Jurisdiction's reasonable costs of monitoring and inspection to assure
that any defects are remedied, and to repay the Jurisdiction all outlay and expense
incurred as a result of Contractor's and Surety's failure to remedy any defect as
required by this section.
4. GENERAL: Every Surety on this Bond shall be deemed and held bound, any contract to
the contrary notwithstanding, to the following provisions:
A. To consent without notice to any extension of time to the Contractor in which to
perform the Contract;
B. To consent without notice to any change in the Contract or Contract Documents,
which thereby increases the total contract price and the penal sum of this bond,
provided that all such changes do not, in the aggregate, involve an increase of
more than 20% of the total contract price, and that this bond shall then be released
as to such excess increase; and
C. To consent without notice that this Bond shall remain in full force and effect until
the Contract is completed, whether completed within the specified contract period,
within an extension thereof, or within a period of time after the contract period has
elapsed and the liquidated damage penalty is being charged against the
Contractor.
D. That no provision of this Bond or of any other contract shall be valid that limits to
less than five year(s) (5) after the acceptance of the work under the Contract the
right to sue on this Bond.
E. That as used herein, the phrase "all outlay and expense" is not to be limited in any
way, but shall include the actual and reasonable costs and expenses incurred by
the Jurisdiction including interest, benefits, and overhead where applicable.
Accordingly, "all outlay and expense" would include but not be limited to all contract
or employee expense, all equipment usage or rental, materials, testing, outside
experts, attorneys fees (including overhead expenses of the Jurisdiction's staff
attorneys), and all costs and expenses of litigation as they are incurred by the
Jurisdiction. It is intended the Contractor and Surety will defend and indemnify the
Jurisdiction on all claims made against the Jurisdiction on account of Contractor's
failure to perform as required in the Contract and Contract Documents, ghat all
agreements and promises set forth in the Contract and Contract Documents, in
approved change orders, and in this Bond will be fulfilled, and that the Jurisdiction
will be fully indemnified so that it will be put into the position it wou_1d have been in
had the Contract been performed in the first instance as required, .
In the event the Jurisdiction incurs any "outlay and expense" in defending itseff against
any claim as to which the Contractor or Surety should have provided the defense, or in
the enforcement of the promises given by the Contractor in the Contract, Contract
Documents, or approved change orders, or in the enforcement of the promises given by
the Contractor and Surety in this Bond, the Contractor and Surety agree that they will
make the Jurisdiction whole for all such outlay and expense, provided that the Surety's
obligation under this bond shall not exceed 125% of the penal sum of this bond.
PCC Stair Reconstruction & Handrail Project 0510 - Page 2 of 3
In the event that any actions or proceedings are initiated regarding this Bond, the parties
agree that the venue thereof shall be Johnson County, State of Iowa. If legal action is
required by the Jurisdiction to enforce the provisions of this Bond orto collect the monetary
obligation incurring to the benefit of the Jurisdiction, the Contractor and the Surety agree,
jointly, and severally, to pay the Jurisdiction all outlay and expense incurred therefor by
the Jurisdiction. All rights, powers, and remedies of the Jurisdiction hereunder shall be
cumulative and not alternative and shall be in addition to all rights, powers, and remedies
given to the Jurisdiction, by law. The Jurisdiction may proceed against surety for any
amount guaranteed hereunder whether action is brought against the Contractor or
whether Contractor is joined in any such action(s) or not.
NOW THEREFORE, the condition of this obligation is such that if said Principal shall
faithfully perform all the promises of the Principal, as set forth and provided in the Contract
and in this Bond, then this obligation shall be null and void, otherwise it shall remain in full
force and effect.
When a work, term, or phrase is used in this Bond, it shall be interpreted or construed first
as defined in this Bond and the Contract; second, if not defined in the Bond or Contract, it
shall be interpreted or construed as defined in applicable provisions of the Iowa Code;
third, if not defined in the Iowa Code, it shall be interpreted or construed according to its
generally accepted meaning in the construction industry; and fourth, if it has no generally
accepted meaning in the construction industry, it shall be interpreted or construed
according to its common or customary usage.
Failure to specify or particularize shall not exclude terms or provisions not mentioned and
shall not limit liability hereunder. The Contract is hereby made a part of this Bond.
PRINCIPAL:
SURETY:
Woodruff Construction, Inc. Liberty Mutual Insurance Company
Printed e of r Officer Surety Company Name
gy j ��—
Signature of ontractor Officer Signature of tt. ey-in-Fact Officer
,�e D
Title of Contractor Officer
Stacy Venn Attorney -in -Fact
Printed Name of Attorney -in -Fact Officer
Holmes, Murphy and Associates, �C
Company Name of Attomey-in-Fact
2727 Grand Prairie Parkway ,
Company Address of'Attorney-in-Fact
Waukee, IA 50263
City, State, Zip Code of Attorney -in -Fact
(515)223-6800
Telephone Number of Attorney -in -Fact
PCC Stair Reconstruction & Handrail Project 0510 - Page 3 of 3
NOTE:
1. All signatures on this performance, payment, and maintenance bond must be
original signatures in ink; copies, facsimile, or electronic signatures will not be
accepted.
2. This bond must be sealed with the Surety's raised, embossing seal.
3. The Certificate or Power of Attorney accompanying this bond must be valid on its
face and sealed with the Surety's raised, embossing seal.
4. The name and signature of the Surety's Attorney-in-Fact/Officer entered on this
bond must be exactly as listed on the Certificate or Power of Attorney
accompanying this bond.
oLiberty
Mutual.
SURETY
This Power of Attorney limits the acts of those named herein, and they have no authority to
bind the Conpany except in the manner and to the extent herein stated.
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
WestAmerican Insurance Company
POWER OF ATTORNEY
Certificate No: 8205943-190056
KNOWN ALL PERSONS BY THESE PRESENTS: That The Oho Casualty Insurance Carrion is a corporation diy agarized under the laws of the Stare of New Flarrpship, tat
Liberty M111al Insurance Corrpary is a corporationdrAj orgarized trdarthe lain of the Stan_ oFMassachnsev6, and Weg American Insurance Corrpary Is a corp;lrafim dry organized
ucerthelannsofthe Stage oflnciam(herein cdledvelycalled die texrlowies),prsrart03ardtyau}gdryFerinsetfbrih does herelajnaneconsfimand appoirt Anne
CrDwneG Brian M. Deimerl , Cindy Bennett, C4g E. Hansen, Dione R. Y ouMjay D. Freienmut t Seth D. Rooker, Stacie Chrislereen, Stacy Vent' Tim McCulloh
alfoltheciryd Waukee state of L4 each ilwtiulalyitireta Ge mote nn ore roman is iue am iavru aware)4nriamneKe,
execute, seal, acl°ladedge and dew. forand on its betalfas suety and as its adarcl deed any and all undertakings, bards, recogrizances and otersureryohigaticrs, In pustaree
of these presents and shall be as birdrg upon the Companies as if obey have been duly signed by the presider t and attested by 11e secretary of the Corrparies In their own proper
persons.
IN WITNESS WHEREOF, this Parer of Attorney has been suscdbed ty an audorized officer or official of the Carpanies and the corporate seals of the Carp3des have been affixed
theretotis 13th dayof July , 2021 .
Liberty Mltal Laurance Conpany
Mau 1Y rasp a
The Ohio Casualty InsuranceCarpary
�� "P°",�ko 6 °"40^t„ WestAnrericanInsLrance Corrpary
a3 "omc$ "a n1912 r+_ 1919 ns� mO �D �iOr�aB,CN°°aas�HAYP4� D rar7 * ha�yl r h�BY
nav'vIM rams °ccidarf Sarrabry
StatedPENNSYLVAMA ss
Co nlydMONTGONERY
W Onthis 13th dayof 2021 before ne personally appeared David M Carey, +v&adxnoviledged hinseffto betheAssb'tartSecretig dLrbeny MAW Insurance
8.2 Carparry, The olio Casua Carpary, ai—Iix WestAnmcan zrurarce Cmpary, and dat ho, as such belg audntized so to do, exen�ihe icregdrg rFswrert far the purposes
tluvein contained bysigrrrg on behaffoftte corpo atio ns tri hirseff as a duly at.dnaized officer.
IN WITNESS WHEREOF, I have hereuntestbscribed try nacre and affixed try notarial seal at King ofPnssr%Perirsylvania, on the clay and yearfirstabvode vmdlten
O i wyAo%W STfd aommonwealiB of PennsyNama-NofaySwid
F1ye4°d� �di s TeresantgomeryNoAmyCoup Public
Montgomery County �,(Ql6�t�G— /Ll/42 OaB OF My ommmiesw eqd� March 28,2020 By: -JT
CoinNssion number 11280ib Term Pastiella, Ncta PuiIIC
O e VP � Member,Penion— iamoer 11m Wnohihs ry
1Dy 4RVP
°tp,N This Power of Atlamey is made and exeaffid pfstartt to and by authority of the fdiw,ing By -lava and Adha¢aliors of The Oho Casualty Insurance Comoary, Liberty Moral'
c IrswanceCwWry, and WestArtenian rnsnrarce Conlaryvhch resdidom are nenrin furl face and effect reatirg as fellows:
E& ARTICLE by" OFFICERS: Section 12 PalerciAmerney.
E° Ary officer or otter official of the Corpaafio n authorized far that plipdse in vnitng by the Chairman or the President and subject to such linihation as the Chairman or the
President may prescribe, stall appoint such attorneys -intact as may be necessary to act in behalf of the Corporation to make, execute, seat acknonledge and deliver as su"
ro arty and all udertaldrgs, bads, leccgruances and other surety obligation. Such athxneys-irrfact subject to the lirdiations set forth in their respective prime; of attorney, shall
c have full paver to hind the Corporation by their signature and execution of any such innvurre is aril to attach thereto the seal of the Corpiration. WYen so executed such
Z u instruments shall be as binding as if signed by the President and attested to byr the Secretary. Any pxnner or authority granted to ary representative or awnWin-fact under the
pwsiors dths art may be revoked ataryfirre by the Board the Chairmen the President or by the officer or officers granting such pzAerorautouy.
ARTICLE XIg' Execution of Contracts; Section 5. Surely Bords and Urd erraldrgs.
Ary officer of the Conlary auft&ed for tat purpose invaitirg by the chaimen or the press and su6jectto such limitations as the chaiman or the president may prescribe,
shall appoint such attoneys-infact as may be necessary to act in behalf of the Campar y+to make, executo, seal admorllete and deliver as suety arty and all udertdkirgs,
bonds, recogrizarres and other surely obligations. Such attorneys-ir4actsuti ce the firritatims setfixih in their respective pavers of attorney, shall have fill pointer to bind the
Coerpary by their signature and execution dart' such instruments; and to attach thereto the seal of the Compary. Wien so executed such instruments stall be as binding as ff
signed bythe president and attested by the secretary.
Certificate of Designadw - The President of the Carpary, acting pasuarttothe Bylaw dthe ton any, aWha¢es David M Carey; Assistant5ectelaryto appoint such attoreys4n-
fad as may be necessary to act on behalfd the Company to crake, execute, seat aclvovledge and deliver as suety any and all u dareldrgs, bards, reccgrizances and other surety
obligations.
Authorization' By unanirro s consent ofte Carpary's Board of Directors, the Corrparyconsents tatfacsirile or mechanically reproduced signature of any assistant secretary of the
Conpary, Wherever appearing upon a certified copy Barry pnnerofavarhey issued by the Calpary in connection Wttsurety bonds, shall be valid and brding upon the Company Win
the same face and effect as though manually affied
L Renee C. Llewellyn the undersigned Assistant Secretary, The Oho Casualty Insurance Corpary, Liberty Mlhal Irsuance Conrpary, and West A erican Insurance Conpany tb
hereby certify tat the original ponerofattorney of Mc hthefencimg is a hilt vie and correct copy of the Power dAtiro ey executed by said Carparies, is infull face and effect and
has net been revoked
IN TESTIMDW WHERE OF, I have hereuin set my tard and affixed the seals ofsaid Conparies this d@yd PP021
CD(80
tNapa. 1991 oery, �A`°rANA ��yReneeC. Llewelvyn Assisart5ecretary Bit • ►N
LMS-12873 LMIC OCIC WAIC Multi Co 02121
t
p
Prepared by: Mari VanDyke, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
Resolution No. 22-274
Resolution accepting the work for the Animal Care and Adoption
Center Catio Project
Whereas, the Engineering Division has recommended that the work for construction of the Animal
Care and Adoption Center Catio Project, as included in a contract between the City of Iowa City
and The Henley Group, LLC of Muscatine, Iowa, dated April 26, 2022, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Animal Shelter Catio account # Y4448; and
Whereas, the final contract price is $70,372.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 1st
Attest:
City lerk
day of November
2022
Approved by
City Attorn 's Office
(Liz Craig - 10/27/2022)
It was moved by weiiaa and seconded by Bprg„s the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays:
Absent:
Alter
Bergus
Harmsen
Taylor
Teague
Thomas
Weiner
Prepared by: Joe Welter, Engineering Division, Public Works, 410 East Washington Street, Iowa City, Iowa 52240 (319) 356-5144
Resolution No. 99-285
Resolution accepting the work for the Pepperwood Plaza Sanitary
Sewer Replacement Project.
Whereas, the Engineering Division has recommended that the work for construction of the 2022
Pepperwood Plaza Sanitary Sewer Replacement Project, as included in a contract between the City
of Iowa City and B.G. Brecke, Inc. of Cedar Rapids, Iowa, dated September 6, 2022, be accepted;
and
Whereas, the Engineers Report and the performance, payment and maintenance bond have been
filed in the City Engineer's office; and
Whereas, funds for this project are available in the Annual Sewer Main Replacement, Account
#V3101; and
Whereas, the final contract price is $88,722.50.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 15 th day of Noveuber ,2022
Mqy�pi
Attest: VCity ( J
—4-LClerk
Approved by
City Attorney` Office
(Liz Craig — 11/09/2022)
It was moved by Weiner — and seconded by Taylor the Resolution be
adopted, and upon roll call there were:
Ayes: Nays: Absent:
x Alter
x Beraus
--T-- Harmsen
Taylor
Teague
x Thomas
x Weiner
Prepared by: Josh Slattery, Engineering Division, Public Works, 410 E. Washington St„ Iowa City, IA 52240 (319) 356-5149
Resolution No. 22-298
Resolution accepting the work for the Highland Court Sidewalk
Infill Project
Whereas, the Engineering Division has recommended that the work for construction of the
Highland Court Sidewalk Infill Project, as included in a contract between the City of Iowa City and
Midwest Concrete Inc. of Peosta, Iowa, dated September 2nd, 2022, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Highland Court Sidewalk Infill Project account
# S3962; and
Whereas, the final contract price is $52,056.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 6th day of December , 2022
Approved by
Attest: �l
City Clerk City Attorneys s Office
(Sue Dulek -11 /29/2022)
It was moved by w ;nPr and seconded by . Ai t-pr the Resolution be
adopted, and upon roll call there were:
Ayes'
Nays:
Absent:
Alter
Bergus
Harmsen
Taylor
Teague
Thomas
Weiner
..,1A&-
CITY OF Iowa CITY
410 East Washington Street
Iowa City, Iowa 52240 - 1826
(319) 356 - 5000
(319) 356 - 5009 FAX
wvvw,iegov.org
ENGINEER'S REPORT
November 21, 2022
City Clerk
Iowa City, Iowa
Re: Highland Court Sidewalk Infill Project
Dear City Clerk:
I hereby certify that the construction of the Highland Court Sidewalk Infill Project has been
completed by Midwest Concrete Inc. of Peosta, Iowa in substantial accordance with the plans
and specifications prepared by the Engineering Division of the City of Iowa City.
The project was bid as a unit price contract and the final contract price is $52,056.00.
There were no change or extra work orders for the project.
I recommend that the above -referenced improvements be accepted by the City of Iowa City.
Sincerer
J_ ason Havel, P.E.
City Engineer
Bond No. 2526805
0510
PERFORMANCE, PAYMENT, AND MAINTENANCE BOND
HIGHLAND COURT SIDEWALK INFILL PROJECT PROJECT
CITY OF IOWA CITY
KNOW ALL BY THESE PRESENTS:
That we, Midwest Concrete, Inc., as Principal (hereinafter the "Contractor" or "Principal") and
West Bend Mutual Insurance Company , as Surety are held and firmly bound unto City of
Iowa City, Iowa, as Obligee (hereinafter referred to as "the Jurisdiction"), and to all persons who
may be injured by any breach of any of the conditions of this Bond in the penal sum of
Fifty Thousand Eight Hundred Eighty -Four dollars ($ 50,804 ),
lawful money of the United States, for the payment of which sum, well and truly to be made, we
bind ourselves, our heirs, legal representatives and assigns, jointly or severally, firmly by these
presents.
The conditions of the above obligations are such that whereas said Contractor entered into a
contract with the Jurisdiction, bearing date the 15th day of lulu
2022 , (hereinafter the "Contract") wherein said Contractor undertakes and agrees to
construct the following described improvements:
Construction of 4-foot wide sidewalk along Highland Court adjacent to 424 and 1202 Highland
Court. The project will include the removal and replacement of roughly 20-feet of sidewalk
adjacent to 1210 Highland Court. This project will also include driveway removal and replacement,
installation of two trees, adjustment of a manhole, site restoration and other related work.
To faithfully perform all the terms and requirements of said Contract within the time therein
specified, in a good and workmanlike manner, and in accordance with the Contract Documents.
It is expressly understood and agreed by the Contractor and Surety in this bond that the following
provisions are a part of this Bond and are binding upon said Contractor and Surety, to -wit:
PERFORMANCE: The Contractor shall well and faithfully observe, perform, fulfill, and
abide by each and every covenant, condition, and part of said Contract, by reference made
a part hereof, for the above referenced improvements, and shall indemnify and save
harmless the Jurisdiction from all outlay and expense incurred by the Jurisdiction by
reason of the Contractor's default of failure to perform as required. The Contractor shall
also be responsible for the default or failure to perform as required under the Contract and
Contract Documents by all its subcontractors, suppliers, agents, or employees furnishing
materials or providing labor in the performance of the Contract.
2. PAYMENT: The Contractor and the Surety on this Bond hereby agreed to pay all just
claims submitted by persons, firms, subcontractors, and corporations furnishing materials
for or performing labor in the performance of the Contract on account of which this Bond
is given, including but not limited to claims for all amounts due for labor, materials,
lubricants, oil, gasoline, repairs on machinery, equipment, and tools, consumed or used
by the Contractor or any subcontractor, wherein the same are not satisfied out of the
portion of the contract price the Jurisdiction is required to retain until completion of the
Highland Court Sidewalk Infill Project 0510 — Page 1 of 4
improvement, but the Contractor and Surety shall not be liable to said persons, firms, or
corporations unless the claims of said claimants against said portion of the contract price
shall have been established as provided by law. The Contractor and Surety hereby bind
themselves to the obligations and conditions set forth in Chapter 573 of the Iowa Code,
which by this reference is made a part hereof as though fully set out herein.
MAINTENANCE: The Contractor and the Surety on this Bond hereby agree, at their own
expense:
A. To remedy any and all defects that may develop in or result from work to be
performed under the Contract within the period of five year(s) (5) from the date of
acceptance of the work under the Contract, by reason of defects in workmanship
or materials used in construction of said work;
B. To keep all work in continuous good repair; and
C. To pay the Jurisdiction's reasonable costs of monitoring and inspection to assure
that any defects are remedied, and to repay the Jurisdiction all outlay and expense
incurred as a result of Contractor's and Surety's failure to remedy any defect as
required by this section.
4. GENERAL: Every Surety on this Bond shall be deemed and held bound, any contract to
the contrary notwithstanding, to the following provisions:
A. To consent without notice to any extension of time to the Contractor in which to
perform the Contract;
B. To consent without notice to any change in the Contract or Contract Documents,
which thereby increases the total contract price and the penal sum of this bond,
provided that all such changes do not, in the aggregate, involve an increase of
more than 20% of the total contract price, and that this bond shall then be released
as to such excess increase; and
C. To consent without notice that this Bond shall remain in full force and effect until
the Contract is completed, whether completed within the specified contract period,
within an extension thereof, or within a period of time after the contract period has
elapsed and the liquidated damage penalty is being charged against the
Contractor.
D. That no provision of this Bond or of any other contract shall be valid that limits to
less than five year(s) (5) after the acceptance of the work under the Contract the
right to sue on this Bond.
E. That as used herein, the phrase "all outlay and expense" is not to be limited in any
way, but shall include the actual and reasonable costs and expenses incurred by
the Jurisdiction including interest, benefits, and overhead where applicable.
Accordingly, "all outlay and expense" would include but not be limited to all contract
or employee expense, all equipment usage or rental, materials, testing, outside
experts, attorneys fees (including overhead expenses of the Jurisdiction's staff
attorneys), and all costs and expenses of litigation as they are incurred by the
Jurisdiction. It is intended the Contractor and Surety will defend and indemnify the
Jurisdiction on all claims made against the Jurisdiction on account of Contractor's
failure to perform as required in the Contract and Contract Documents, that all
agreements and promises set forth in the Contract and Contract Documents, in
approved change orders, and in this Bond will be fulfilled, and that the Jurisdiction
will be fully indemnified so that it will be put into the position it would have been in
had the Contract been performed in the first instance as required.
Highland Court Sidewalk Infill Project 0510 — Page 2 of 4
In the event the Jurisdiction incurs any "outlay and expense" in defending itself against
any claim as to which the Contractor or Surety should have provided the defense, or in the
enforcement of the promises given by the Contractor in the Contract, Contract Documents,
or approved change orders, or in the enforcement of the promises given by the Contractor
and Surety in this Bond, the Contractor and Surety agree that they will make the
Jurisdiction whole for all such outlay and expense, provided that the Surety's obligation
under this bond shall not exceed 125% of the penal sum of this bond.
In the event that any actions or proceedings are initiated regarding this Bond, the parties
agree that the venue thereof shall be Johnson County State of Iowa. If legal action is
required by the Jurisdiction to enforce the provisions of this Bond orto collect the monetary
obligation incurring to the benefit of the Jurisdiction, the Contractor and the Surety agree,
jointly, and severally, to pay the Jurisdiction all outlay and expense incurred therefor by
the Jurisdiction. All rights, powers, and remedies of the Jurisdiction hereunder shall be
cumulative and not alternative and shall be in addition to all rights, powers, and remedies
given to the Jurisdiction, by law. The Jurisdiction may proceed against surety for any
amount guaranteed hereunder whether action is brought against the Contractor or whether
Contractor is joined in any such action(s) or not.
NOW THEREFORE, the condition of this obligation is such that if said Principal shall
faithfully perform all the promises of the Principal, as set forth and provided in the Contract
and in this Bond, then this obligation shall be null and void, otherwise it shall remain in full
force and effect.
When a work, term, or phrase is used in this Bond, it shall be interpreted or construed first
as defined in this Bond and the Contract; second, if not defined in the Bond or Contract, it
shall be interpreted or construed as defined in applicable provisions of the Iowa Code;
third, if not defined in the Iowa Code, it shall be interpreted or construed according to its
generally accepted meaning in the construction industry; and fourth, if it has no generally
accepted meaning in the construction industry, it shall be interpreted or construed
according to its common or customary usage.
Failure to specify or particularize shall not exclude terms or provisions not mentioned and
shall not limit liability hereunder. The Contract is hereby made a part of this Bond.
Highland Court Sidewalk Infill Project 0510 — Page 3 of 4
PRINCIPAL: Midwest Concrete, Inc.
Ryan Coates
Printed Name of Contractor Officer
By
5 nature of Contractor Officer
Owner
Title of Contractor Officer
SURETY:
West Bend Mutual Insurance Company
Surety Company Name
By M'tTt'757
Signature of Attorney -in -Fact Officer
Kim Hess
Printed Name of Attorney -in -Fact Officer
Tricor
Company Name of Attorney -in -Fact
600 Star Brewgry Dr Ste 110
Company Address of Attorney -in -Fact
Dubuque, IA 52001
City, State, Zip Code of Attorney -in -Fact
563-556-5441
Telephone Number of Attorney -in -Fact
Highland Court Sidewalk Infill Project 0510 — Page 4 of 4
WEST BEND
A MUTUAL INSURANCE COMPANY'
POWER OF ATTORNEY
THE SILVER LININGO
2526805
Know all men by these Presents, That West Bend Mutual Insurance Company, a corporation having its principal office in the City of West Bend,
Wisconsin does make, constitute and appoint:
17Pu11111deF Fy
lawful Altomey(s)-in-fact, to make, execute, seal and deliver for and on its behalf as surety and as its act and deed any and all bonds, undertakings
and contracts of suretyship, provided that no bond or undertaking or contract of suretyship executed under this authority shall exceed in amount the
sum of: Ten Million Dollars ($10,000,000)
This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board
of Directors of West Bend Mutual Insurance Company at a meeting duly called and held on the 21.1 day of December, 1999.
Appointment ofAttorney-In-Fact. The president or any vice president or any other officer of West Bend Mutual Insurance Company may appoint
by written certificate Attorneys -in -Fact to act on behalf of the company In the execution of and attesting of bands and undertakings and other
written obligatory instruments of like nature. The signature of any officer authorized hereby and the corporate seal maybe affixed byfacsimile
to any such power of attorney or to any certificate relating therefore and any such power of attorney or certificate bearing such facsimile
signatures orfacsimile seal shall be valid and binding upon the company, and any such power so executed and certified byfacsimile signatures
andfacsimile seal shall be valid and binding upon the company in the future with respect to any bond or undertaking or other writing obligatory
in nature to which it is attached. Any such appointment maybe revoked for cause, or without cause, by any said officer at anytime.
In witness whereof, the West Bend Mutual Insurance Company has caused these presents to be signed by its president undersigned and its
corporate seal to be hereto duly attested by its secretary this 17th day of August, 2021.
Attest
Christopher C. Z dart
Secretary
State of Wisconsin
County of Washington
ppR°oTe- g, Kevin A. Steiner
`. ft�SE�• Chief Executive Officer/President
' o+CP' tg:
y
On the 17th day of August, 2021, before me personally came Kevin A. Steiner, to me known being by duly swom, did depose and say that he resides
in the County of Washington, State of Wisconsin; that he is the President of West Bend Mutual Insurance Company, the corporation described in and
which executed the above instrument; that he knows the seal of the said corporation; that the seal affixed to said instrument is such corporate seal;
that is was so affixed by order of the board of directors of said corporation and that he signed his name thereto by like order.
Matthew E. Carlton
Senior Corporate Attorney
Notary Public, Washington Co., WI
My Commission is Permanent
The undersigned, duly elected to the office stated below, now the incumbent in West Bend Mutual Insurance Company, a Wisconsin corporation
authorized to make this certificate, Do Hereby Certify that the foregoing attached Power of Attorney remains in full force effect and has not been
revoked and that the Resolution of the Beard of Directors, set forth in the Power of Attorney is now in force.
Signed and sealed at West Bend, Wisconsin this 12th day of September
2022
SJ4yy IK9(r
ti SEAI.94
Heather Dunn
'"'P�
Vice President — Chief Financial Officer
Noll Any questions concerning this Power of Attorney may be directed to the Bond Manager at West Bend Mutual Insurance Company,
1900 South 18th Avenue I West Bend, WI 53095 ; Phone: (608) 410-3410 1 Fax: (877) 674-2663 1 w Ahesilverlinhg.com
Prepared by: Ethan Yoder, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
Resolution No. 23-31
Resolution accepting the work for the Access Control Upgrade
Project
Whereas, the Engineering Division has recommended that the work for construction of the Access
Control Upgrade Project, as included in a contract between the City of Iowa City and Tri-City
Electric Co. of Davenport, Iowa, dated February 3, 2022, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Clerk's office; and
Whereas, funds for this project are available in the Access Control Upgrade account #G4725; and
Whereas, the final contract price is $133,608.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 7th day of FPr unr) 2023
M o
' r _
Attest: LL.
City lerk / I
Approved by
City Atto ey s office
(Liz Craig - 01/31/2023)
It was moved by Taylor and seconded by Bergus the Resolution be
adopted, and upon roll call there were:
Ayes
x
Nays:
Absent:
Alter
Bergus
Dunn
Harmsen
Taylor
Teague
Thomas
",
Prepared by: Ethan Yoder, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
Resolution No. 23-30
Resolution accepting the work for the 2022 Traffic Calming
Project
Whereas, the Engineering Division has recommended that the work for construction of the 2022
Traffic Calming Project, as included in a contract between the City of Iowa City and Hansen
Asphalt, Inc. of Iowa City, Iowa, dated October 18, 2022, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Traffic Calming account #S3816; and
Whereas, the final contract price is $65,060.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 7th day of Februar}r 2023
Ma o
Attest: V lU Y i -
City Clerk
Approved by
Z/�
City Attom 's Office
(Liz Craig — 01/31/2023)
It was moved by Taylor and seconded by Bergus the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays;
Absent:
Alter
Bergus
Dunn
Harmsen
Taylor
Teague
Thomas
,,
6
Prepared by: Justin Harland, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5149
Resolution No. 23-56
Resolution accepting the work for the Rochester Avenue
Electrical Conversion Project
Whereas, the Engineering Division has recommended that the work for construction of the
Rochester Avenue Electrical Conversion Project, as included in a contract between the City of
Iowa City and Price Electric, LLC. of Robins, Iowa, dated April 271h, 2022, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Rochester Avenue Reconstruction from
Ralston Creek to N First Avenue Project account # S3950; and
Whereas, the final contract price is $73,400.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 7th day of March
� 2A-
or
2023
J Approved by
Attest: Iz , ` Ln
•,
City Clerk City Attor ey s Office
(Liz Craig — 02/27/2023)
It was moved by Dunn and seconded by Taylor the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays:
Absent:
x Alter
x Bergus
x Dunn
x Harmsen
Y Taylor
x Teague
x Thomas
Prepared by: Scott Severs, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5142
Resolution No. 23-101
Resolution accepting the work for the Pedestrian Mall
Handrailing Project
Whereas, the Engineering Division has recommended that the work for construction of the
Pedestrian Mall Handrailing Project, as included in a contract between the City of Iowa City and
The Henley Group, LLC of Muscatine, Iowa, dated June 24, 2022, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Pedestrian Mall Reconstruction account #
R4340; and
Whereas, the final contract price is $ 12,400.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 4th day of April 2023
May -J
Approved by
Attest: E
City Clerk City Attorn 's ffice
v (Liz Craig — 03/29/2023)
It was moved by Alter and seconded by Dunn the Resolution be
adopted, and upon roll call there were:
Ayes:
M
Absent:
Alter
Bergus
Dunn
Harmsen
Taylor
Teague
Thomas
Prepared by: Kim Sandberg, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
Resolution No. 23-159
Resolution accepting the Work for the 2022 Summer Sidewalk
Repair Project
Whereas, the Engineering Division has recommended that the work for construction of the 2022
Summer Sidewalk Repair Project, as included in a contract between the City of Iowa City and
Feldman Concrete of Dyersville, Iowa, dated August 25, 2022, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in account # 22710220; and
Whereas, the final contract price is $82,017.73.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 6th day of June 2023
I 1r
I
hli2�CJI'
R
Attest:
City Clerk
It was moved by Taylor and seconded by
adopted, and upon roll call there were:
Ayes:
x
x
M
Approved by
/,�40E-
City Attorney' Office
(Liz Craig — 06/01 /2023)
Alter the Resolution be
Absent:
Alter
Bergus
Dunn
Harmsen
Taylor
Teague
Thomas
(� Prepared by: Justin Harland, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5154
✓X
Resolution No. 23-194
Resolution accepting the work for the Mormon Trek Boulevard
Guardrail Replacement Project
Whereas, the Engineering Division has recommended that the work for construction of the
Mormon Trek Boulevard Guardrail Replacement Project, as included in a contract between the
City of Iowa City and Hawkeye Weld & Repair, Inc. of Iowa City, IA, dated March 17, 2023, be
accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in Engineering account # 10710200; and
Whereas, the final contract price is $60,.827.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this llth day of July
2023
Qo
Ma
i
Attest:
City blerk
It was moved by Dunn and seconded by
adopted, and upon roll call there were:
Ayes:
x
Nays:
Approved by
Z/�,�-
City Attorn 's Office — 07/06/23
Thomas
Absent:
x Alter
Bergus
Dunn
Harmsen
Taylor
Teague
Thomas
the Resolution be
LcX_
Prepared by: Ethan Yoder, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
Resolution No. 23-198
Resolution accepting the work for the Parks ADA Access Project
Whereas, the Engineering Division has recommended that the work for construction of the Parks
ADA Access Project, as included in a contract between the City of Iowa City and All -American
Concrete, Inc. of West Liberty, Iowa, dated November 23, 2022, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Park Annual ADA Accessibility Improvements
account #R4132; and
Whereas, the final contract price is $43,715.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 11 th day of July , 2023
Mayw
Attest: It J 0"41 lc�lyc, 41�
City blerk
It was moved by Dunn and seconded by
adopted, and upon roll call there were:
Ayes:
x
Nays:
Approved by
City Afforne4ls Office
(Sue Dulek - 07/03/23)
Thomas
Absent:
x Alter
Bergus
Dunn
Harmsen
Taylor
Teague
Thomas
the Resolution be
Prepared by: Ben Clark, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5436
Resolution No. 23-261
Resolution accepting the work for the Water Treatment Plant
Front Meeting Room AN Upgrades Project
Whereas, the Engineering Division has recommended that the work for construction of the Water
Treatment Plant Front Meeting Room AN Upgrades Project, as included in a contract between
the City of Iowa City and Selzer Werdentsch Associates of Iowa City, Iowa, dated November 3,
2022, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Water Front Meeting Room A/V Upgrades
account #W3317; and
Whereas, the final contract price is $112,773.83.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 19th day of September 2023
Ma�o�
Attest: LLI LO
City Clerk
It was moved by Taylor and seconded by
adopted, and upon roll call there were:
Ayes:
--5F—
Nays:
Approved by
City Attorno's -Office
(Liz Craig - 09/14/2023)
Thomas
Absent:
x Alter
— Bergus
Dunn
Harmsen
— Taylor
—Teague
Thomas
the Resolution be
—•r
Prepared by: Shaun Bradbury, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5140
Resolution No. 23-297
Resolution accepting the work for the PV Solar Array — Iowa City
Public Works Facility Project
Whereas, the Engineering Division has recommended that the work for construction of the PV
Solar Array - Iowa City Public Works Facility Project as included in a contract between the City
of Iowa City and Acme Electric Company, of Cedar Rapids, Iowa, dated the 28th day of September
2022, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in Account #R4194 - Climate Action Facility
Improvement; and
Whereas, the final contract price is $127,492.00
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 21st day of November 2023
/l_q_
M6t6r
t
Attest:
City Clerk
Approved by
Z/�,�
City Attorra y's Office
(Liz Craig-11/16/2023)
It was moved by Alter and seconded by Taylor
adopted, and upon roll call there were:
Ayes:
Nays:
Absent:
Alter
Bergus
Harmsen
Salih
Taylor
Teague
Thomas
the Resolution be
Prepared by: Joe Welter, Engineering Division, Public Works, 410 East Washington Street, Iowa City, Iowa 52240 (319) 356-5144
Resolution No. 24-26
Resolution accepting the Work for the 2023 Dual Extraction
System Expansion Project.
Whereas, the Engineering Division has recommended that the work for construction of the 2023
Dual Extraction System Expansion Project, as included in a contract between the City of Iowa City
and Connolly Construction, Inc. of Peosta, Iowa, dated October 20, 2023, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have been
filed in the City Engineer's office; and
Whereas, funds for this project are available in the RCM Landfill Gas Infrastructure Expansion
Project, Account Number L3344; and
Whereas, the final contract price is $87,485.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 6th day of February 2024
A
Attest: i' e-
City Clerk
It was moved by n,,,,r, and seconded by
adopted, and upon roll call there were:
Ayes:
Nays:
Approved by
City Atto ey's Office
(Liz Craig - 02/01/2024)
Absent:
X Alter
X Bergus
X Dunn
x Harmsen
x Moe
x Salih
x Teague
the Resolution be
r L
ENGINEER'S REPORT CITY OF IOWA CITY
June 12, 2024
City Clerk
Iowa City, Iowa
RE: City Hall Housing Authority Front Area Remodel Project
Dear City Clerk:
UNESCOUNESCO CITY OF LITERATURE
410 East Washington Street
Iowa City. Iowa 52240-1826
319-356-5000
www.icgov.org
I hereby certify that the City Hall Housing Authority Front Area Remodel Project has been
completed by Reed Construction LLC of Bettendorf, Iowa, in substantial accordance with the
plans and specifications prepared by Shive-Hattery Inc., of Iowa City, Iowa.
The project was bid as a lump sum contract and the final contract price is $36.221.67.
There was a total of one (1) change order for the project as described below:
01 Maintenance bond, continuous window header, and $2,221.67
fiberglass panel painting
I recommend that the above -referenced improvements be accepted by the City of Iowa City.
Sincerely,
Jason Lel, P.E.
City Engineer
FILED
1UN 12 Z024
City Clerk
Iowa City, Iowa
Prepared by: Marri VanDyke, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5044
Resolution No. 24-169
Resolution accepting the work for the City Hall Housing Authority
Front Area Remodel Project
Whereas, the Engineering Division has recommended that the work for construction of the City
Hall Housing Authority Front Area Remodel Project, as included in a contract between the City of
Iowa City and Reed Construction LLC of Bettendorf, Iowa, dated March 27, 2024, be accepted;
and
Whereas, the Engineer's Report has been filed in the City Clerk's office; and
Whereas, funds for this project are available in the Housing Authority Admin Account, account
#79490110;and
Whereas, the final contract price is $36,221.67
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this lsth day of June 2024
Ma
Attest:
City Jerk
City Attorneys Office — 06/13/2024
It was moved by xarmsen and seconded by Moe the Resolution be
adopted, and upon roll call there were:
Ayes:
Nays:
Absent:
Alter
Bergus
Dunn
Harmsen
Moe
Salih
Teague
Prepared by: Ethan Yoder, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
Resolution No. 24-152
Resolution accepting the work for the ADA Curb Ramps 2023
Project.
Whereas, the Engineering Division has recommended that the work for construction of the ADA
Curb Ramp 2023 Project, as included in a contract between the City of Iowa City and Feldman
Concrete of Dyersville, Iowa, dated August 23, 2023, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Curb Ramps — ADA account #53822; and
Whereas, the final contract price is $87,423.96.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 4th day of June , 2024
t!:g
Mayor
Approved by
Attest:
City Clerk City Attor ey's Office
(Sara Hektoen — 05/30/2024)
It was moved by Dunn and seconded by Bergus
adopted, and upon roll call there were:
Ayes:
x
Em
Absent:
Alter
Bergus
Dunn
Harmsen
x Moe
Salih
Teague
the Resolution be
Prepared by: Ethan Yoder, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5145
Resolution No. 24-184
Resolution accepting the work for the 2023 Traffic Calming
Project
Whereas, the Engineering Division has recommended that the work for construction of the 2023
Traffic Calming Project, as included in a contract between the City of Iowa City and LL Pelling
Company, Inc. of North Liberty, Iowa, dated April 14, 2023, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Traffic Calming account #S3816; and
Whereas, the final contract price is $47,764.11.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 16th day of July , 20 24
M
Attest: _p 1-) ccic'
City derk
It was moved by Dunn and seconded by
adopted, and upon roll call there were:
Ayes:
Nays:
Approved by
G '
City Attorney' Office — 07/11/2024
Moe the Resolution be
Absent:
x Alter
x Bergus
x Dunn
X Harmsen
x Moe
x Salih
x Teague
Prepared by: Justin Harland, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5140
Resolution No. 24-204
Resolution accepting the work for the Willow Creek Trail Bridge
Replacement Project
Whereas, the Engineering Division has recommended that the work for construction of the Willow
Creek Trail Bridge Replacement Project, as included in a contract between the City of Iowa City
and Boomerang Corp. of Anamosa, Iowa, dated July 13, 2023, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Intra-City Bike Trails Project account # R4206;
and
Whereas, the final contract price is $76,691.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 6th day of August
M
Attest: Lc./:.p 1'�\� OnaLC&I,
City Clerk
It was moved by Dunn and seconded by
adopted, and upon roll call there were:
Ayes:
Nays:
2024
Approved by
City Attor y's Office
(Jennifer Schwickerath - 08/0172024)
Moe the Resolution be
Absent:
Alter
Bergus
Dunn
Harmsen
Moe
Teague
Salih
5' a"
Prepared by: Toni Davis, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5139
Resolution No. 24-214
Resolution accepting the work for the 2023 Summer Sidewalk
Repair Project
Whereas, the Engineering Division has recommended that the work for construction of the 2023
Summer Sidewalk Repair Project, as included in a contract between the City of Iowa City and
Venture Concrete of Cedar Rapids, Iowa, dated July 28, 2023, be accepted; and
Whereas, the Engineer's Report and the performance and payment bond have been filed in the
City Engineer's office; and
Whereas, funds for this project are available in account # 22710220; and
Whereas, the final contract price is $84,314.89
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 20th day of August , 2024
Mayor ro Tem
I �.
Attest:
City berk
It was moved by Alter and seconded by
adopted, and upon roll call there were:
Ayes:
Nays:
Approved by
G '
City Aftorneylfs Office
(Liz Craig - 08/15/2024)
Moe the Resolution be
Absent:
Alter
Bergus
Dunn
Harmsen
Moe
Salih
Teague
Prepared by: Scott Sovers, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5142
Resolution No. 24-243
Resolution accepting the work for the Pedestrian Mall Camera
Project
Whereas, the Engineering Division has recommended that the work for construction of the
Pedestrian Mall Camera Project, as included in a contract between the City of Iowa City and Tri-
City Electric Company of Davenport, Iowa, dated May 19, 2023, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Police Department's operating budget account
# 10410310-474420; and
Whereas, the final contract price is $110,858.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 1st day of ctobex: 2024
ar �
Approved by
Attest: 0 tf
City Clerk City Attois Office
(Sue Dulek - 09/25/2024)
It was moved by Moe
adopted, and upon roll call there were:
Ayes:
X
and seconded by
Nays:.
Salih
Absent:
x
x
Alter
Bergus
Dunn
Harmsen
Moe
Salih
Teague
the Resolution be
M
Prepared by: Bryan Dannen, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5413
Resolution No. 24-281
Resolution accepting the work for the Benton Street Bridge
Guardrail Replacement Project
Whereas, the Engineering Division has recommended that the work for construction of the Benton
Street Bridge Guardrail Replacement Project, as included in a contract between the City of Iowa
City and Minturn, Inc. of Brooklyn, Iowa, dated July 29, 2024, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Annual Bridge Maintenance & Repair Account
#S3910; and
Whereas, the final contract price is $29,400.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 19th day of November , 2024
M
Attest: 40-C.�
City blerk
It was moved by MOe and seconded by
adopted, and upon roll call there were:
Ayes:
x
x
Nays:
Approved by
G
City Attorn 's Office
(Liz Craig - 11 /13/2024)
Harmsen the Resolution be
Absent:
Alter
Bergus
x Dunn
Harmsen
Moe
Salih
Teague
Prepared by: Josh Slattery, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5149
Resolution No. 25-08
Resolution accepting the work for the High Street and Southgate
Avenue Sidewalk Infill Project
Whereas, the Engineering Division has recommended that the work for construction of the High
Street and Southgate Avenue Sidewalk Infill Project, as included in a contract between the City of
Iowa City and Feldman Concrete of Dyersville, Iowa, dated August 26, 2024, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the High Street & Southgate Ave Sidewalk Infill
Project account # S3984; and
Whereas, the final contract price is $87,322.50.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 7th day of Jg1iLiary 2025
Mayor pro Pem
Attest:.
City Clerk
It was moved by Moe and seconded by
adopted, and upon roll call there were:
Ayes:
x_
x
Nays:
Approved by
City Attorn"i`s Office -
(Eric Bigley — 12/31 /2024)
Alter the Resolution be
Absent:
Alter
Bergus
Vacant
Harmsen
Moe
Salih
x Teague
Prepared by: Joe Welter, Engineering Division, Public Works, 410 East Washington Street, Iowa City, Iowa 52240 (319) 356-5144
Resolution No. 25-09
Resolution accepting the work for the 2024 Ridge Road Sanitary
Sewer Repair Project
Whereas, the Engineering Division has recommended that the work for construction of the 2024
Ridge Road Sanitary Sewer Repair Project, as included in a contract between the City of Iowa City
and Lynch's Excavating, Inc. of West Branch, Iowa, dated September 18, 2024, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have been
filed in the City Engineer's office; and
Whereas, funds for this project are available in the Annual Sewer Main Replacement Account
Number V3101; and
Whereas, the final contract price is $78,568.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this ___ILh_ day of
Mayor Pro
Attest:,
City Clerk
It was moved by Moe and seconded by
adopted, and upon roll call there were:
Ayes:
X
X
Nays:
2025
Approved by
City Attorn 's Office
(Eric Bigley— 12/31/2024)
Alter
Absent:
Alter
Bergus
Vacant
Harmsen
Moe
Salih
X Teague
the Resolution be
Prepared by: Justin Harland, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5154
Resolution No. 25-21
Resolution accepting the work for the Optical Fiber Cable
Installation Along Foster Road & Peninsula Area Project
Whereas, the Engineering Division has recommended that the work for construction of the Optical
Fiber Cable Installation Along Foster Road & Peninsula Area Project, as included in a contract
between the City of Iowa City and MP Nexlevel, LLC of Maple Lake, MN, dated September 24,
2024, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Peninsula Well Field Antenna account #
W3332; and
Whereas, the final contract price is $29,146.32.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 21st day of January 2025
... „
May r
Attest: _C�c.,
City derk
It was moved by Moe and seconded by
adopted, and upon roll call there were:
Ayes:
x.
x
Nays:
Approved by
City Atto /ey's Office
(Liz Craig — 01/15/2025)
salih the Resolution be
Absent:
Alter
Bergus
Vacant
Harmsen
Moe
Salih
Teague
pb
Prepared by: Joe Welter, Engineering Division, Public Works, 410 East Washington Street, Iowa City, Iowa 52240 (319) 356-5144
Resolution No.
25 ' 161
Resolution accepting the work for the 2024 Landfill Camera
Movement Project
Whereas, the Engineering Division has recommended that the work for construction of the 2024
Landfill Camera Movement Project, as included in a contract between the City of Iowa City and
Advanced Electrical Services, Inc. of Iowa City, Iowa, dated November 12, 2024, be accepted; and
Whereas, the Engineer's Report and the performance, payment and maintenance bond have been
filed in the City Engineer's office; and
Whereas, funds for this project are available in the account # 75750121; and
Whereas, the final contract price is $34,600.00.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 8th day of Jul
Mayor
Attest: a-- Cc r j cx c-e—
City Clerk
It was moved by Moe
adopted, and upon roll call there were:
Ayes:
and seconded by
Nays:
2025
Approved by
9�.
City Attor y's Office
(Liz Craig — 07/02/2025)
salih the Resolution be
Absent:
x Alter
x Bergus
x Harmsen
x Moe
X Salih
x Teague
x Weilein
Prepared by: Michelle Riedinger, Engineering Division, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5188
Resolution No. 25-259
Resolution accepting the work for the Animal Shelter Standby
Generator Project
Whereas, the Engineering Division has recommended that the work for construction of the Animal
Shelter Standby Generator Project, as included in a contract between the City of Iowa City and
Advanced Electrical Services, Inc. of Iowa City, Iowa, dated June 25th, 2024, be accepted; and
Whereas, the Engineer's Report and the Performance, Payment and Maintenance Bond have
been filed in the City Engineer's office; and
Whereas, funds for this project are available in the Animal Shelter Standby Generator account
#Y4447; and
Whereas, the final contract price is $174,000.
Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said
improvements are hereby accepted by the City of Iowa City, Iowa.
Passed and approved this 3rd day of
Attest:
City Jerk
It was moved by salih
adopted, and upon roll call there were:
Ayes:
November
202 5-
_ [ a
Mayor
and seconded by _
Nays.
Approved by
City Attor y's Office
(Alexandra Bright — 10/30/2025)
Moe the Resolution be
Absent:
Alter
Bergus
Harmsen
Moe
Salih
Teague
Weilein