HomeMy WebLinkAboutChecklist of Required Items To Be Submitted for a CSR Permit
Building Division, 410 E. Washington St. Iowa City, Iowa 52240 319/356-5120 www.icgov.org
Construction Site Runoff Permit Review Checklist
Address Reviewed by Date
Received Comments Action Required Application Information
Name & contact information (24-hour contact)
Signed certification
IDNR NPDES permit, proof of publication, & Notice Of Intent
Sub-contractors & contact information
Estimated sequence of construction activity
Estimated sequence of pollution prevention measures
Form for weekly inspections
Stormwater Pollution Prevention Plan (SWPPP) Information
Size of lot
Area of site to be disturbed
Local waterway potentially impacted by pollutants
Site drainage patterns, shown by arrows
Slope stabilization methods or limits of construction
Perimeter controls
Stormwater inlets
Stabilized exit (2” clean rock or existing pavement)
Soil stockpile(s) with perimeter controls or temporary stabilization
Concrete washout (note if on another lot)
Equipment & material storage (hazardous material kept under cover)
Construction waste disposal
Portable toilet
Location of SWPPP documents & inspection reports
The CSR permit will not be issued until an initial inspection of the site is conducted & required controls are properly installed.