Roadway elevations
Flooding issues
Construction
Design considerations / footprint reduction
Is it correct that Dubuque Street has been closed 150 days in the
last 20 years due to flooding? Would Dubuque street have been
closed only 6 days if the road/bridge were at a 100 + 1 elevation?
•Both statements are correct
•Does not include closures from local heavy rains
Have you assessed any other intermediate flood levels?
•Looked at 200+1 elevation
•Approximately 3.4 feet higher than 100+1 elevation
•Updated comparisons for backwater, cost and cross sections in council
packet
Why is the use of Hesco barriers in combination with a
lower roadway elevation not a reasonable option?
Risk to keep Dubuque Street open with temporary measures
Impacts to traffic during deployment / removal
Pedestrian / bicycle traffic not possible
Estimated cost of approx. $690,000 to deploy per event
85% reimbursable for federally declared disaster deployment
How will water runoff from the east side of Dubuque
Street be handled?
Runoff conveyed from east to west to river
Will still use open ditches and cross-culverts
Project will reconstruct and upsize both for better conveyance
Will not be a certified levee when complete
Can more information be provided on future road closures by
various impact levels?
Can only look to past events
What is the economic impact when Dubuque Street closes?
Staff working with Economic Development Division, Summer of Arts and
the Chamber of Commerce to try to develop impact of 2008 and 2013
How will the project relate to the Corps operation plan for the
Coralville Reservoir?
Maximum release of 20,000 cfs could be achieved without impact to
elevated Dubuque Street
How would cost overruns during construction be paid for?
Current estimate includes 20% contingency
Cost overruns paid for by G.O. Bond proceeds
Wastewater project is over 70% complete with 1% change orders
Cost clarification between Gateway and No Build options?
Cost estimates presented for Gateway options were for construction only
and did not include Final Design, Construction Admin and Inspection Fees
Trunk sewer not included
No Build cost estimate did include the Final Design, Construction Admin
and Inspection Fees
Travel lanes in the Preferred Alternative are 12’ wide. Can
this width be reduced and if so, what will the affects be?
This is the standard for Iowa DOT Design Manual, Statewide
Urban Design and Specifications, and AASHTO Green Book
Accommodates all vehicles that currently use the corridor
Reducing lane width could lead to an increase in crashes
To increase safety on Dubuque St and Park Rd, would it be
better to reduce speed from 35 mph to 25 mph?
Would a reduction in lane width result in a reduction
in speed?
Currently an Arterial street at 35mph
Speed management will be studied during design
Lane width reduction could lead to reduced speed, but lane
width reduction could also lead to increase in crashes
I-80/Dubuque is now signal controlled as is Foster/Dubuque
Could a pedestrian-activated signal be installed
at Mayflower?
Will be considered during final design
Could have positive impact on ped safety and speed control
Other locations with pedestrians crossing in corridor
Would have a negative impact of traffic delay
The Preferred Alternative recommends wide sidewalks on both
sides of Dubuque Street. Can these widths be minimized or perhaps
eliminated on the east side?
Purpose and Need to maintain and enhance amenities
Brown to Foster walk was frequent request at public meetings
Reducing widths or eliminating east sidewalk counter to goals
Would reduce walkability of corridor
Iowa River Trail most heavily used in the metro area
North of Kimball, roadway shifted west to reduce impact
Can parkway widths be reduced?
Would create winter maintenance issues
Would reduce safety buffer
Can the median width be reduced from 0 – 25’ to 0 – 12’?
South of Kimball – No median proposed
Kimball to Ridge – alignment shifted west
Same as current medians to maintain character of corridor
Provides storage for Cambus and turning vehicles
It has been indicated that a right turn lane from
southbound Dubuque to westbound Park is warranted by
the MPOJC. Why is a new turn lane necessary?
Right turn lane warranted threshold is apx. 300 vehicles/hour
Current traffic is 715 SB right turns on to Park Rd in morning
Right turn lane will increase function and safety
Lane would not impact the wooded bluff
Are dual left turn lanes required on eastbound Park Road? Can we
have a shared right and left-turn lane to reduce the width of the
new bridge?
Dual left needed to obtain acceptable service levels
Will help anticipated growth in Hancher traffic turning NB
Will analyze more closely during final design
Is the 3rd lane on Park Road really needed?
Recommended by MPOJC in 2008
Part of approved CIP
Helps Park Road and Hancher traffic operate at acceptable service levels
Are there additional options available for shrinking the
horizontal footprint and minimizing impact along the Bella
Vista hillside at Dubuque and Park Road?
Retaining walls along east side of sidewalk
Steeper slopes
Tree wells for protecting mature trees
Tree replacement
Native plantings along affected hillside and slope
What are the design criteria affecting clear zone and the
use of barriers?
Look to Iowa DOT Design Standards for clear zone and barrier
requirements
Setback of retaining wall in the Preferred Alternative greater
than required clear zone
The top of wall does not require a crash worthy barrier if it is
outside the required clear zone
Clear zone will be verified and analyzed in more detail during
design
•Level of Protection for Dubuque Street
•Backwater Reduction Goals
•Structural Type of the Bridge
Recommended minimum level of protection for Dubuque
Street: One foot above the 2008 flood.
* Including one day for cleaning, inspection and repair
Protection Option # of Days Closed from
Past Flood Events
Inches Above/Below the
2008+1’ Protection Level
Existing 150 NA
100 year +1’ 7* - 39”
200 year +1’ 5* - 11”
2008 flood +1’ (Recommended) 0 0”
500 year +1’ (EA Preferred) 0 + 19”
•Rocky Shore Drive / Highway 6 Flood Gate
•Riverside Drive Lift Station
•South Gilbert / Stevens Drive Flood Gate
•Floodplain Map Update
2008
2013
After 2008 we are now
implementing a $6.6M
upgrade that is part of a 5
project $26.9M collaborative
regional effort to protect this
area.
2008
After 2008 the University
installed a temporary flood
wall to protect the Art
Building. Also, a $1M joint
project to upgrade to the
lift station is planned.
2008
After 2008 upgrades to the
existing level of protection
were investigated, but the
estimated cost exceeded
funding that was available.
After 2008 the Floodplain
Management Ordinance was
amended to require
protection to 1’ above the
500 year event.
2008
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Bridge Type Low Steel
Elevation
Backwater
Reduction
at Idyllwild
Incremental
Improvement
in Backwater
Reduction
Deck
Elevation
Incremental
Height of
Bridge Deck
Constructi
on Cost
Estimate
with
Dubuque
at
100yr + 1’
Constructi
on Cost
Estimate
with
Dubuque
at
200yr + 1’
Construction
Cost
Estimate
with
Dubuque at
2008 + 1’
Construction
Cost
Estimate
with
Dubuque at
500yr + 1’
Deck Girder 100yr + 1’ 3.4” 660.20 $32.67 M $34.26 M
Deck Girder 200yr + 1’ 6.1” 2.7” 662.52 27.8” $34.63 M $35.01 M
Deck Girder 2008 + 1’ 6.6” 0.5” 663.45 11.2” $33.41 $35.17 M
Deck Girder 500yr + 1’ 7.0” 0.4” 665.03 19.0” $34.20 M $35.01 M $35.34 M $36.65 M
EA Preferred
Alternative
Deck Arch 100yr + 1’ 3.6” 659.20 $36.01 M $37.59 M
Deck Arch 200yr + 1’ 4.7” 1.1” 661.52 27.8” $37.96 M $38.34 M
Deck Arch 2008 + 1’ 5.2” 0.5” 662.45 11.1” $36.71 M $38.48 M
Deck Arch 500yr + 1’ 5.6” 0.4” 664.03 19.0” $36.94 M $38.33 M $38.66 M $39.98 M
Through
Arch
100yr + 1’ 3.4” 656.87 $35.99 M $37.58 M
Through
Arch
200yr + 1’ 4.9” 1.5” 659.02 25.8” $37.93 M $38.31 M
Through
Arch
2008 + 1’ 5.2” 0.3” 659.95 11.1” $36.70 M $38.47 M
Through
Arch
500yr + 1’ 5.8” 0.6” 661.53 19.0” $36.90 M $38.30 M $38.63 M $39.60 M
Receive FHWA approval / Finding of No Significant Impact
Decide on the design parameters:
•Dubuque Street Elevation
•Backwater reduction goal
•Bridge Type
Begin Final Design