HomeMy WebLinkAboutPDM-PresentationPre Design Meeting February 25, 2014 Address following issues: Historic floods Seasonal flooding Infrastructure replacement Federal Approval (NEPA) City Council Design Parameters Design Construction 12-18 months +/- 2 Years •Received finding of Conditional No Effect, summer 2012 •Affirmed by independent evaluation, summer 2013 •Iowa City Historic Preservation Commission confirmed support, fall 2013 •Received FHWA Finding of No Significant Impact, December 2013 •September 17, 2013 – Work Session •October 1, 2013 – Work Session and Formal Meeting •January 21, 2014 – Work Session and Formal Meeting Design Parameters set: •Level of protection for Dubuque Street – 100’+1’ •Backwater reduction goal (Elevation of Park Road Bridge) - Low Steel at 200 year event +1’ •Bridge Type - Through Arch Bridge Conceptual Design Elements shown on roll plots •Dubuque Street – 100-year flood + 1 foot elevation •Park Road Bridge – 200-year flood + 1 foot elevation (lowest point on the bridge) •Smaller project footprint •Same roadway cross-section and design elements Design Schedule •Conceptual design •Community and City Council design input •Preliminary design •Easement and property acquisition •Final design •Public hearing and City Council approval of final plans and specifications •Iowa DOT letting process You might see: •Surveyors •Field work •Utility flags Your input will be: (1) Shared with the City Council (2) Used as more specific design elements are developed •What are your priorities for the corridor? •How/why do you currently use the corridor? •What do you see as its strengths and weaknesses? •How do you envision future improvements? •Traffic Operations •Roadway Alignment and Medians •Roadway Design Speed •Vehicular Travel Lane Width •Sidewalk / Trail Locations and Width •Turning Lanes on Dubuque Street, Park Road and Park Road Bridge •Pedestrian Activated Cross-Walk Signal at Mayflower •Landscaping / Aesthetics •Special Needs or Concerns during Construction Comment forms are available here, or on-line at www.iowacitygateway.org Began in April 2010 Two public meetings: 250+ attendees Drop-in center + online public meetings Public hearing/drop-in center Multiple paid ads Local media press releases Multiple media stories City and project specific Web site* Mailing list of nearly 2,000* Neighborhood and civic group meetings* Multiple one-on-one meetings and calls* Additional public meetings* *Will continue in the design process March 25 – Roadway Design Elements Discussion May – Landscaping and Aesthetic Discussion (Exact date to be determined)