Loading...
HomeMy WebLinkAboutCSR subs schedBuilding Division, 410 E. Washington St. Iowa City, IA 52240 319/356-5120 www.icgov.org Construction Site Runoff Permit (CSR) Required Information Project Address or Lot and Subdivision Subcontractors Company Name Contact Name and Telephone Excavation Geothermal Foundation Flatwork Framing Plumbing Electric Mechanical Siding Painting Landscaping Drywall Mason Pollution Prevention Miscellaneous Construction Schedule Dates (estimated) Pollution Prevention Schedule Dates (estimated) Excavation Perimeter Controls Geothermal Silt fence Rolled Other Foundation Topsoil Stockpiled Groundwork Site Entry & Exit (2” clean rock) Backfilling Inlet Protection Flatwork Concrete Wash-Out Framing Pit Above-ground enclosure Plumbing Solid Waste Removal Electrical Portable Toilet Mechanical Temporary Stabilization Insulation & Sheetrock After 14 days of inactivity on the site Roofing Other Siding & Masonry Other Drives & Walks Ongoing Maintenance Paint & Interior Finish Topsoil Distributed Landscaping Stabilization of all Disturbed Areas The CSR permit will not be issued until an initial inspection of the site is conducted & required controls are properly installed. I certify, under penalty of law, that I will satisfy the requirements of NPDES General Permit #2 to minimize compaction and preserve pre-development topsoil on the lot(s) listed above. I understand that the City of Iowa City, Iowa Department of Natural Resources or the Environmental Protection Agency may do additional verification of compliance with General Permit #2 on the lot(s) listed above. Any violation of the General Permit #2 requirements may result in fines or penalties as allowed by law. ______________________________________ Owner’s Signature ______________________________________ Owner’s Name (printed) ______________________________________ Title ______________________________________ Date