Loading...
HomeMy WebLinkAboutStormwater Pollution Prevention Plan Stormwater Pollution Prevention Plan (SWPPP) Information Size of lot Area of site to be disturbed Local waterway potentially impacted by pollutants Site drainage patterns, shown by arrows Slope stabilization methods or limits of construction Perimeter controls Stormwater inlets Stabilized exit (2” clean rock or existing pavement) Stockpile location for reserved topsoil Stockpile location for excavated subsoil Concrete washout (note if on another lot) Equipment & material storage (hazardous material kept under cover) Construction waste disposal Portable toilet Location of SWPPP documents & inspection reports