HomeMy WebLinkAboutStormwater Pollution Prevention Plan
Stormwater Pollution Prevention Plan (SWPPP) Information
Size of lot
Area of site to be disturbed
Local waterway potentially impacted by pollutants
Site drainage patterns, shown by arrows
Slope stabilization methods or limits of construction
Perimeter controls
Stormwater inlets
Stabilized exit (2” clean rock or existing pavement)
Stockpile location for reserved topsoil
Stockpile location for excavated subsoil
Concrete washout (note if on another lot)
Equipment & material storage (hazardous material kept under cover)
Construction waste disposal
Portable toilet
Location of SWPPP documents & inspection reports