SUMMARY OF DESIGN
DESIGN SUMMARY
•UTILITY UPGRADES
•NEW WATER MAIN
•TELECOM
•ENHANCED STORM SEWER SYSTEM
•NEW ELECTRICAL
•MULTI -LAYERED LIGHTING FRAMEWORK
•NEW PEDESTRIAN POLE LIGHTS
•ACCENT LIGHTING AT TREES, ART, STORY WALLS
•CANOPY AND STRUCTURE LIGHTING
•CREATE SECONDARY DESTINATIONS
•PERMANENT STAGE CANOPY AT FOUNTAIN
•SHADE STRUCTURE AT BLACK HAWK MINI PARK
[ FUTURE CONSTRUCTION ]
•STORY WALLS •REPAIR OF LIMESTONE PLANTER WALLS
•ENHANCED PLANTING AREAS
•8,905 SF EXISTING PERVIOUS AREA (8%)
•14,228 SF PROPOSED PERVIOUS AREA (13%)
DESIGN SUMMARY
PEDESTRIAN MALL IMPROVEMENTS
•FULL PAVING REPLACEMENT
•NEW SITE FURNISHINGS
•MOVABLE TABLES AND CHAIRS
•BIG BELLY STATIONS
•TRASH RECEPTACLES
•FIXED TABLE AND CHAIRS
•DRINKING FOUNTAIN
•BIKE RACKS
•BENCHES
RANGE OF SEATING TYPES PROPOSED
INCLUDING BENCHES, SEAT WALLS,
TABLES AND CHAIRS
BEGA 84 120 POWER PEDESTALS IN PLANTING AREAS
LAYERS OF LIGHTING
PEDESTRIAN MALL IMPROVEMENTS
SITE FURNISHINGS
PEDESTRIAN MALL IMPROVEMENTS
PLAINWELL BENCHNEOLIVIANO BENCH BENCHMARK BENCH
FERMOB MOVABLE TABLE + CHAIRS
EXISTING VS. PROPOSED COUNTS
85 EXISTING BENCHES -74 PROPOSED BENCHES (24 EXTENDED LENGTH)
DESIGN PROPOSES A RANGE OF SEATING TYPES INCLUDING SEAT WALLS,
AND TABLES AND CHAIRS (1 FIXED AND 6 MOVABLE TABLES AND CHAIRS)
DUMOR TABLE 78
SITE FURNISHINGS
PEDESTRIAN MALL IMPROVEMENTS
TRASH RECEPTACLE
SCARBOROUGH, LANDSCAPE FORMS
[ 55 EXISTING -15 PROPOSED ]
RECYCLING SYSTEM
BIGBELLY & SMARTBELLY DOUBLE
STATION [ 4 PROPOSED ]
BIKE RACKS
U Bike Rack by Madrax
[ 6 RACKS EXISTING / 35 BICYCLES ]
[ 24 PROPOSED / 48 BICYCLES ]
WAYFINDING KIOSK
[ 2 PROPOSED ]
MOST DEPENDABLE FOUNTAIN
[ 1 EXISTING -1 PROPOSED ]
PEDESTRIAN MALL IMPROVEMENTS
PERMANENT STAGE CANOPY AT WDF
BLACK HAWK MINI PARK
PEDESTRIAN MALL IMPROVEMENTS
2200 SF
FLEXIBLE SPACE
SHADE STRUCTURE
FUTURE CONSTRUCTION
DESIGN GOALS
Create an open and flexible design to support
a varied and diverse program [ 2200 SF, 55’ x 40’ ]
Create a welcoming and comfortable space
Provide shaded seating areas to enhance
usability of the space
Capture and communicate the
history of Black Hawk Mini Park
Create a timeless design that projects a
progressive and/or forward-thinking
image for Iowa City
Screen Transformer
BLACK HAWK MINI PARK
PEDESTRIAN MALL IMPROVEMENTS
PROCESS: Online Survey
Group of Local Experts
COMMUNITY
1920s Howard Moffit
1940s Dottie Ray
1960s Minnette Doderer
1960s Nancy Seiberling
1970s Bill Sackter
1990s Karen Kubby
DISCOVERY
1830s Cyrus Sanders
1950s James Van Allen
1990s Connie Mutel
COMMERCE
1850 E.D. Rate & Family
1860 John Hands
1870s Emil Boerner & Family
1940s John Alberhasky
EDUCATION
1850s Martha Reno
1920s George Gallup
CULTURE
1910s Dora Chapmen & Etta Englert
1970s Dave Morice
CELEBRATE RESIDENTS WHO HAVE SHAPED AND INFLUENCED IOWA CITY
CLINTON STREET ENTRY
PEDESTRIAN MALL IMPROVEMENTS
CONSTRUCTION PHASING
CONSTRUCTION PHASING
PEDESTRIAN MALL IMPROVEMENTS
Access to businesses and residences
shall be maintained at all times.
Provide minimum 8-foot wide
pedestrian walkway up against the
buildings along College Street and
along the west side of Dubuque Street.
The pedestrian walkway increases to
eleven (11) feet in width along the east
side of Dubuque to afford fire truck
access during construction.
Business and building owners shall be
provided notice 1 week prior to
construction activities that will limit
ingress or egress, or disrupt utility
service.
Notice shall again be provided 48
hours prior to construction activities
that will limit ingress or egress, or
disrupt utility service.
Phase 1A:
Late Start Date: April 30, 2018
Substantial Completion: Date: July 31, 2018
Incentive / Disincentive: $1000/Day
Maximum Incentive: $10,000
Phase 1 Alley Critical Closure:
14 Allowable Closure Days
Incentive / Disincentive: $1000/Day
Maximum Incentive: $5000
Note: Once alley is closed, it is to remain closed
until completion of all work.
Phase 1B:
Late Start Date: April 30, 2018
Substantial Completion: Date: October 31, 2018
Incentive / Disincentive: $1000/Day
Maximum Incentive: $10,000
No work shall be done
during the following events:
Downtown Block Party June 23, 2018
Sidewalk Sales July 20 –21, 2018
Ragbrai July 27, 2018
Taste of Iowa City August 22, 2018
CONSTRUCTION PHASING
PEDESTRIAN MALL IMPROVEMENTS
No work shall be done
during the following events:
Downtown Block Party June 22 or
29, 2019
Sidewalk Sales July 19-20, 2019
Taste of Iowa City August 21, 2019
Phase 2:
Early Start Date: May 13, 2019
Substantial Completion: Date: October 31, 2019
Incentive / Disincentive: $1000
CONSTRUCTION PHASING
PEDESTRIAN MALL IMPROVEMENTS
COMMUNICATION PLAN
COMMUNICATION PLAN
PEDESTRIAN MALL IMPROVEMENTS
To learn more about the project and see a current rendering, visit
the project web page at icgov.org/downtownstreetscape
Sign up to receive project updates by email: Select “Ped Mall
Improvements Project” at icgov.org/e-subscriptions
Follow the City of Iowa City on Facebook and Twitter using
#PedProject
Weekly Construction Update Meetings
For more information, contact Scott Sovers at 319-356-5142 or
Scott-Sovers@iowa-city.org
Q & A