Loading...
HomeMy WebLinkAbout01-18-2018 Planning and Zoning CommissionIowa City Planning & Zoning Commission a. Formal Meeting Thursday, January 18, 2018 7:00 PM I• Emma Harvat Hall - City Hall - k x<<< . r ~ r IRI a QS �c •vs•n"J ,:tiara •:- jA Zo ."�'� R S 8 14 3 n Y R of ii ' l Department of Neighborhood and Development Services 11 CITY._ CITY OF IOWA CITY � UNESCO CITY OF LITERATURE PLANNING AND ZONING COMMISSION Thursday, January 18, 2018 - 7:00 PM Formal Meeting Emma Harvat Hall Iowa City City Hall 410 E. Washington Street AGENDA: A. Call to Order B. Roll Call C. Public Discussion of Any Item Not on the Agenda D. Rezoning Item Discussion of an application submitted by University Lake Partners 11, LLC, for a rezoning of approximately 53.29 acres from High Density Single Family Residential (RS-12) zone to Planned Development Overlay/High Density Single Family Residential (OPD/RS-12) for approximately 50.11 acres and Commercial Office (CO-1) zone for approximately 3.18 acres, located south of 1-80 west of Prairie Du Chien Road. (REV 7-00017) E. Consideration of Meeting Minutes: January 4, 2018 F. Planning & Zoning Information G. Adjournment If you will need disability -related accommodations in order to participate in this meeting, please contact Bob Milko, Urban Planning, at 319-356-5240 or at bob-miklo@iowa-city.org. Early requests are strongly encouraged to allow sufficient time to meet your access needs. Upcoming Planning & Zoning Commission Meetings Formal: February 1/ February 15 / March 1 Informal: Scheduled as needed. r CITY OF IOWA CITY ND Date: January 12, 2018 To: Planning and Zoning Commission From: Bob Miklo, Senior Planner Re: REZ17-00017 Foster Road The applicant has indicated that a revised Sensitive Areas Development Plan will be submitted. Staff will review the revised plan and provide comments at the January 18 Planning and Zoning Commission meeting. APPLICATION FOR REZONING FOSTER ROAD PLANNED DEVELOPMENT SENSITIVE AREAS DEVELOPMENT PLAN (REVISED 01.18.18) IN THE CITY OF IOWA CITY, JOHNSON COUNTY, IOWA APPLICANT INFORMATION SITE INFORMATION PROPERTY OWNER: WASHINGTON PARK PARTNERS PO BOX 2208 IOWA CITY, IA 52244-2208 319-351-6788 PROJECT APPLICANT: UNIVERSITY LAKE PARTNERS II, LLC 340 HERKY STREET NORTH LIBERTY, IA 52317 319-351-6788 LEGAL DESCRIPTION SUBMITTED SEPARATELY PROPERTY INFORMATION: PROPERTY AREA CURRENT ZONING PROPOSED ZONING REQUESTED VARIANCES: 53.29 ACRES RS-12 OPD-12 & CO-1 1. MINIMUM 40' FRONT SETBACK REQUIRED ALONG ANY LOT LINE ABUTTING AN ARTERIAL STREET. PROJECT PROPOSES VARIOUS FRONT SETBACKS DEPENDENT ON USE AND BUILDING HEIGHT 2. UNDERLYING ZONE IS RS-12; PROJECT PROPOSES MULTI -FAMILY USE. 3. MINIMUM 10' SEPARATION BETWEEN BUILDINGS AND PAVING; PROJECT PROPOSES 4' SEPARATION AT 4 LOCATIONS ON LOT 4 FROM BUILDING TO BACK OF SIDEWALK. BUILDING SETBACK INFORMATION: FRONT YARD 15 FEET SIDE YARD 10 FEET REAR YARD 20 FEET PARCEL #0734380001 10.79 ACRES **** EXISTING LOT LINES SHOWN HERE. PROPOSED LOT LINES SHOWN ON PLANS ARE CONCEPTUAL ONLY AND SUBJECT TO CHANGE. FINAL LOT LINES WILL BE PROVIDED WITH PLAT SUBMITTAL. PROJECT VICINITY MAP -r"W River 4LINDER PROJECT LOCATION ATKINSpR (IOWA CITY CORPORATE LIMITS) i z / NTURA VEAL � OR Vic^ o FUNTDR 1' z / 9G9 oGA � / a FUTURE FOSTER n y �Z 9Q G� rc �/ ROAD EXTENSION �m MIS DON FT yys �o ARCHROC SAMUEL r41 D FOSTER i J a OR AR NEAVE AROLINE CT z TAFT SPEEDWAY ,Po J y rn z is F CAROUNE o � WHITING AVE < DR Zomva River y W KIMBALL 5lk AVE pOpGF- m � N z sr y4P 9NV NOT TO SCALE IOWA CITY, JOHNSON COUNTY, IOWA PARCEL #0734454001 PARCEL #0734454002 5.14 ACRES 7.97 ACRES PARCEL #1003126003 21.65 ACRES PARCEL #1003126003 PARCEL #0734484001 1.95 ACRES PARCEL 41003126003 PARCEL #1003102006 1.91 ACRES PARCEL #0734484003 0.25 ACRES INDEX OF SHEETS SHEET TITLE C0.00 COVER SHEET CIVIL C1.00 EXISTING TOPOGRAPHIC PLAN C1.01 DENSITY EXHIBIT C1.02 EXISTING SENSITIVE AREAS C1.03 PROPOSED LOT LAYOUT/PLAT C2.00 SENSITIVE AREAS DEVELOPMENT PLAN C2.01 SITE PLAN - LOTS 1 & 2 C2.02 SITE PLAN - LOT 3 C2.03 SITE PLAN - LOT 4 C2.04 SITE PLAN - LOT 5 C3.00 RENDERING OVERVIEW C3.01 UNIT A RENDERINGS C3.02 UNIT B RENDERINGS C3.03 UNIT C RENDERINGS LANDSCAPE L1.01 LANDSCAPE PLAN - LOTS 1 & 2 BUILDING INFORMATION BUILDING INFORMATION: SENIOR HOUSING 99,906 SF SENIOR HOUSING W/GARAGE PARKING 133,715 SF TOWNHOMES 54,722 SF UNIT BREAKDOWN SENIOR HOUSING: 1-BEDROOM UNITS 3 2-BEDROOM UNITS 24 3-BEDROOM UNITS 26 MULTI -FAMILY RESIDENTIAL: W F PROJECT NUMBER: 17-0540 PROJECT NAME: FOSTER ROAD DEVELOPMENT ENGINEER: hbk ENGINEERING W W W.H B KENGIN E ERIN G.COM OWNER: WASHINGTON PARK PARTNERS PO BOX 2208 IOWA CITY, IA 52244-2208 319-351-6788 DEVELOPER: UNIVERSITY LAKE PARTNERS II, LLC 340 HERKY STREET NORTH LIBERTY, IA 52317 319-351-6788 DATE SUBMITTED: 3-BEDROOM UNITS 59 01 18 2018 H TOTAL UNITS 112 DRAWING LOG 1 REV I ISSUED FOR I DATE 1 PROJECT MANAGER: A.ASHBACKER DRAWN BY: CHECKED BY: SPR AA SHEET TITLE: COVER SHEET SHEET: C0.00 0 60 120 240 GRAPHIC SCALE /— — — — — — — — — — — — — - - - - - - - - - - - - - - - - - - - - - - - - - - _____ _-750-_-_---- _ /-_ / _--750- - _---/--_---- -\ i----- / _-- �__;-760-- / Jti-- �,l / �/ / / ` , % / �- - % /�/------_---------- ----'� \ �/ �, l I ( I l \ \\ _� \ \ / // / t 1 \\\\ \ // � I�%/i // \ --- / 6 / / / l / / \ \ I I / / / / _ I I / IIII\ \ I l I I —� 1 \ \ I( / 1//// 1 / o \ \ //111 /i/ i///i/^\ I I Il t`— /' / / / I/// --,// �/ / I/ j // I f— \ \ / / / / �////// / / / II \\ \ \ \\ /' / //JII I \\\�\ ) / // l \\I \\ \ —�� / /iI� \^��/� / �J �// // /�—I /� 760 /� , / / \III II(1 1 / / \)�\\\i II! !l I I ( I 1 \ l / f ` dlll /� f I J/ / / \ /I�// I!f \\ \ IIIIII / (' I ( '\ \ I/ I\\ J\) 1 / / 1 l 1 \ � � I I 1 / I / �� / (l \ / / l / 740 !/� 1 /// I ��/ii j'//// / ( l l / l I / I I \ / I I I f / \ I /— / I I \ 1 I / I I J / / ( 1 J ( / / / / �--� ��_��/ /\—' / / ••_ / �// / I \ 0/ Lv— � . /.6°P I I / \\\ \ \_1-5p/� /Id <� o - \ // \ \� �� /° \ \ \ l I \ \ \ \ \ \ •-___\\�\\\\\\\\ \I \ � �� —'� /� \\\\\\1\\1 I\\ / I I I f / I I I I �70 ` i vv+hbak E PROJECT NUMBER: 17-0540 PROJECT NAME: FOSTER ROAD DEVELOPMENT ENGINEER: hbk ENGINEERING W W W.HBKENGINEERING.COM OWNER: WASHINGTON PARK PARTNERS PO BOX 2208 IOWA CITY, IA 52244-2208 319-351-6788 DEVELOPER: UNIVERSITY LAKE PARTNERS II, LLC 340 HERKY STREET NORTH LIBERTY, IA 52317 319-351-6788 DATE SUBMITTED: 01-18-2018 DRAWING LOG REV ISSUED FOR DATE PROJECT MANAGER: A.ASHBACKER DRAWN BY: CHECKED BY: SPR AA SHEET TITLE: TOPOGRAPHIC SU SHEET: C1.00 DENSITY SCHEMATIC DENSITY ANALYSIS PLANNED DEVELOPMENT OVERLAY ZONE UNDERLYING BASE ZONE: RS-12 MAXIMUM RESIDENTIAL DENSITY (14-3A-4.D.2): 13 DWELLING UNITS/ACRE MINIMUM LOT SIZE (DUPLEXES, TABLE 14-2A-2): 6,000 SF MINIMUM AREA/UNIT (DUPLEXES): 3,000 SF RS-12 DUPLEX LOT DIMESIONS: MINIMUM LOT WIDTH: 55 FEET FRONTAGE: 40 FEET FRONT SETBACK: 15 FEET SIDE SETBACK: 5 FEET+ 2 FEET PER STORY OVER 2 STORIES REAR SETBACK: 20 FEET ::7 TRADITIONAL LAYOUT GROSS SQUARE FOOTAGE: 2,321,377 SF = 53.29 AC RIGHT-OF-WAY (MIN 60' WIDTH): 822,315 SF NET DEVELOPABLE SQUARE FOOTAGE: 1,499,062 SF = 34.41 AC SCHEMATIC DENSITY SHOWN: 194 LOTS; 388 DUs ALLOWABLE DENSITY PER RS-12: 34.41 AC * 13DU/AC = 447 DUs PROPOSED DEVELOPMENT GROSS SQUARE FOOTAGE: 2,321,377 SF = 53.29 AC RIGHT OF WAY (60' WIDTH): 148,620 SF DEVELOPED AREA: 696,450 SF = 15.98 AC OPEN SPACE PRESERVED: 1,476,307 SF = 33.89 ACRES PROPOSED DENSITY: 112 DUs 0 75 150 300 GRAPHIC SCALE w+hbk E PROJECT NUMBER: 17-0540 PROJECT NAME: FOSTER ROAD DEVELOPMENT ENGINEER: hbk ENGINEERING W W W.HBKENGINEERING.COM OWNER: WASHINGTON PARK PARTNERS PO BOX 2208 IOWA CITY, IA 52244-2208 319-351-6788 DEVELOPER: UNIVERSITY LAKE PARTNERS II, LLC 340 HERKY STREET NORTH LIBERTY, IA 52317 319-351-6788 DATE SUBMITTED: 01-18-2018 DRAWING LOG 1 REV I ISSUED FOR I DATE 1 PROJECT MANAGER: A.ASHBACKER DRAWN BY: CHECKED BY: SPR AA SHEET TITLE: DENSITY EXHIBIT SHEET: C1.01 I 0 60 120 240 I GRAPHIC SCALE 1 1 I /---------- ----- ------------------- ------ _ - - - - - _ _ —�� / // / / ���// / / / / / r i \ / / // l \\ 1 ! // / / 1 I �\�/ / / /� i/ /�� / //// \ I I 1 /i�/// �� i // l �•r�' � / � I I � � i/ l 1\ \\\\ ( - / I ( Eel I r 1�'f / / / // / / 1 // � I I I I I I I \\ `• / r"/ / �i / � f � _ - -- L1i1'/ -_- 1\\\ LEGEND PROTECTED SLOPE (40 /o+) � N\1 0- V A \ 11 A A A`— %' ,ice' � �/ J 1—/ j // / / / / �--- // _ v� Av/' V I I A I 1 1 I /--� \/ 11 1 Il I PROTECTED SLOPE BUFFER STEEP SLOPE (18-25%) STREAM BUFFER CRITICAL SLOPE WETLANDS / 50'BUFFER WETLANDS 100' BUFFER WOODLANDS ), It WhbkE PROJECT NUMBER: 17-0540 PROJECT NAME: FOSTER ROAD DEVELOPMENT ENGINEER: ENGINEERING II I WWW.HBKENGINEERING.COM I' OWNER: WASHINGTON PARK PARTNERS PO BOX 2208 IOWA CITY, IA 52244-2208 319-351-6788 DEVELOPER: UNIVERSITY LAKE PARTNERS II, LLC 340 HERKY STREET NORTH LIBERTY, IA 52317 319-351-6788 DATE SUBMITTED: 01-18-2018 DRAWING LOG REV ISSUED FOR DATE PROJECT MANAGER: A.ASHBACKER DRAWN BY: CHECKED BY: SPR I AA SHEET TITLE: SENSITIVE AREAS SHEET: C1.02 131.30' 8- S3 I � S 84°49'36" W 78.49' S 83'23'15" W 21.14' N 87°51'10" E 508.72' S 84"5917" E 252.30' NS y3tiy ti� 66 R�11 NJ 20, ,A6 s �gQ Q1 '2 'o 4p S 86°29'30" W 148 51' w o OUTLOT "A" N 23.87 AC. z PRIVATE OPEN SPACE S 89'25'10" W 1570.94' POINT OF COMMENCEMENT w Al 247.97' S 89'56'10" E S 89°29'51" W 700.42' LOT 4 9.52 AC. S 88°00'13" W 442.75' IY�]I��t�3�:3XHI�I�II�[r 0 y2 O R0919 S 46°48'57" W 67.36' 1iF L=429.59' R=467.00' BRG=N 70°27'12" E CH=414.60' N 70°47'48" W N 89'54'16" W 275.90' L=69.30' R=533.00' BRG=N 86°55'25" W CH=69.25' 83°7ill 7' 83. 14' 8�14 S 83°11'17' 962.88' N 89'56'10" W FY:P3i�i0f[Ol�il S 58°13'50" W 11 S 89°41'34" W 14. S 02°30'21" E 101.16' S 02°30'21" E 1 N 89°29'51" E 706.96' LOT 3 6.00 AC. 3Aa 9p � RC' S p3 1p0 3 e GN- �A21 vp0 V' 3g3. 1616 R' g5 ya BRG, N,ApO G w N 90°00'00" E 252.00' LOT 2 0.79 AC. N 89°29'51" E 124.34' w N O N � N ° N 89°59'20" W 462.52' LOT 1 S 89°41'34" W 3.18 AC. N 01016'03" W 118.69'� S 24'28'16" E `N 88'47'17" E 15.52' % N 88'47'17" E p1 126.99' e= ay3 ti6 2 $o 1 8.31' 0 0� S 8 °29'51" W L=175.47' R=a BRG=S 77°10'48" 48" W W OUTLOT "B" CH=174.27' 0.26 AC. L=58.46' PRIVATE O N BRG S37°36'11"W S15°44'29P9CC85.12' CH=58.41' S 46°58'29" E 22.31 N 89°28'31" E 603.15' LOT 5 6.53 AC. Kt ti9 S 89°28'31" W 15. S 01 °39'24" E 141 89°15'39" W 161.98' 0 60 120 240 GRAPHIC SCALE FOSTER ROAD DEVELOPMENT PLAT FOR CONCEPTUAL USE ONLY WhbkE PROJECT NUMBER: 17-0540 PROJECT NAME: FOSTER ROAD DEVELOPMENT ENGINEER: hbk ENGINEERING IWWW.HBKENGINEERING.COM I OWNER: WASHINGTON PARK PARTNERS PO BOX 2208 IOWA CITY, IA 52244-2208 319-351-6788 DEVELOPER: UNIVERSITY LAKE PARTNERS II, LLC 340 HERKY STREET NORTH LIBERTY, IA 52317 319-351-6788 DATE SUBMITTED: 01-18-2018 DRAWING LOG REV ISSUED FOR DATE PROJECT MANAGER: A.ASHBACKER DRAWN BY: CHECKED BY: SPR AA SHEET TITLE: PLAT SHEET: C1.03 f\ 1 �1 i No (, �iiilll IIIIIIIIIII IIIIIIIIII '11 ♦♦ 11 VIA I Alp IF I "All ��y:��j� Ad �1��*���jt _ 1 \\\ ii OUTL W'hbkE PROJECT NUMBER: 17-0540 PROJECT NAME: FOSTER ROAD DEVELOPMENT ENGINEERING IWWW.HBKENGINEERIN G.COM I OWNER: WASHINGTON PARK PARTNERS PO BOX 2208 IOWA CITY, IA 52244-2208 319-351-6788 -lk , /,%i%1 LEGEND UNIVERSITY LAKE PARTNERS II, LLC PROTECTED SLOPE (40%+) 340 HERKY STREET NORTH LIBERTY, IA 52317 319-351-6788 PROTECTED SLOPE y BUFFER DATE SUBMITTED: j STEEP SLOPE (18-25%) 01 18-2018 DRAWING LOG STREAM BUFFER REV ISSUED FOR DATE ' \ CRITICAL SLOPE \ WETLANDS 50'BUFFER \\ PROJECT MANAGER: \ WETLANDS A. ASHBACKER 100' BUFFER FFFTWN BY: CHECKED BY: \ \I SPR AA WOODLANDS\\\\ PROPOSED WETLANDS o so so 120 BUFFER ADDITION GRAPHIC SCALE SHEET: CONSTRUCTION LIMITS C2.00 I: \Prole( 3d\Sheets\Rezoning\170540—REZONING 1-2-18.dwg D�vAg,VA I ■ \\\535CREETIING\ \ - \ t\11F 535CF\N� � \ CONS FUCilIN1U 5 O RES GENT PL 50UNOBGFTR O1� o am. a p �rr (s) (s) (s) � (s) (s) (s) 0 15 30 60 GRAPHIC SCALE LOT 1 IvI:Zi]liiymimtkiioiio[exam si LOT 2 7 3-BR DWELLING UNITS, 1950 SF FOOTPRINT EACH TOTAL PARKING REQUIRED: 2 STALLS/DU; 14 STALLS TOTAL PARKING PROVIDED: 14 STALLS (1 STALL GARAGE, 1 STALL DRIVEWAY EACH) LEGEND PROTECTED SLOPE (40%+) PROTECTED SLOPE BUFFER STEEP SLOPE (18-25%) STREAM BUFFER j CRITICAL SLOPE WETLANDS 50'BUFFER WETLANDS 100' BUFFER WOODLANDS \\\ PROPOSED WETLANDS BUFFER ADDITION CONSTRUCTION LIMITS W 'hbk E PROJECT NUMBER: 17-0540 PROJECT NAME: FOSTER ROAD DEVELOPMENT ENGINEER: hbk ENGINEERING W W W.HBKENGINEERING.COM OWNER: WASHINGTON PARK PARTNERS PO BOX 2208 IOWA CITY, IA 52244-2208 319-351-6788 DEVELOPER: UNIVERSITY LAKE PARTNERS II, LLC 340 HERKY STREET NORTH LIBERTY, IA 52317 319-351-6788 DATE SUBMITTED: 01-18-2018 DRAWING LOG REV ISSUED FOR DATE PROJECT MANAGER: A.ASHBACKER DRAWN BY: CHECKED BY: SPR AA SHEET TITLE: SITE PLAN - LOTS 1 & 2 SHEET: C2.01 0 15 30 60 GRAPHIC SCALE )N LIMITS LOT 3 ELDER APARTMENTS: 99,906 SF TOTAL UNIT BREAKDOWN: 1 BEDROOM 3 2 BEDROOM 24 3 BEDROOM 26 TOTAL PARKING REQUIRED: 53 STALLS TOTAL PARKING PROVIDED: 97 STALLS (INCLUDING 67 INTERIOR/UNDERGROUND) *** PLEASE REFER TO SEPARATE SITE PLAN SUBMITTAL FOR PROPOSED GRADING AND DIMENSIONAL INFORMATION w+hbk E PROJECT NUMBER: 17-0540 PROJECT NAME: FOSTER ROAD DEVELOPMENT ENGINEER: hbk ENGINEERING I WWW.HBKENGINEERING.COM I OWNER: WASHINGTON PARK PARTNERS PO BOX 2208 IOWA CITY, IA 52244-2208 319-351-6788 LEGEND DEVELOPER: UNIVERSITY LAKE PROTECTED SLOPE (40%+) PARTNERS II, LLC 340 HERKY STREET PROTECTED SLOPE NORTH LIBERTY, IA 52317 BUFFER 319-351-6788 STEEP SLOPE (18-25%) %/ DATE SUBMITTED: 01-18-2018 DRAWING LOG STREAM BUFFER REV ISSUED FOR DATE CRITICAL SLOPE (25-40%) % ' : % WETLANDS 50'BUFFER WETLANDS 100' BUFFER WOODLANDS \\\ PROPOSED WETLANDS BUFFER ADDITION PROJECT MANAGER: A.ASHBACKER DRAWN BY: CHECKED BY: SPR AA SHEET TITLE: SITE PLAN - LOT 3 CONSTRUCTION LIMITS - J:Llpm SHEET: C2.02 �l I / FFE: 735.50 (F) 725.50 (REAR) UNIT B1 FFE : 733.50 (F) 723.50 (REAR) UNIT B2 FFE: 731.50 20 721) .50 (REAR) UNIT B3 \ FFE: 728.00 (F) 718.00 (REAR) UNIT B3 FFE: 726.00 (F) 716.00 (REAR) UNIT B2 40' FFE: 724.00 (F) 714.00 (REAR) UNIT B1 FFE : 722.00 (F) 712.00 (REAR) ■ UNIT B4 FFE: 720.50 (F) 710.50 (REAR) UNIT B2 FFE: 720.50 (F) 710.50 (REAR) UNIT B4 40' FFE: 718.50 (F) 708.50 (REAR) UNIT B1 FFE: 716.50 (F) 706.50 (REAR) UNIT B3 �V/S 1 V. -22'- 5' TYP FAF FFE: 733.00 (F; 723.00 (REAR) UNIT B1 40' FFE: 731.00 (F; 721.00 (REAR) UNIT B4 FFE: 729.00 (F 719.00 (REAR) UNIT B2 FFE: 727.50 (F) 717.50 (REAR) UNIT B2 40' FFE: 725.50 (F) 715.50 (REAR) UNIT B4 FFE: 723.50 (F) 713.50 (REAR) UNIT B3 - N "► 11 11 1 A\I 1 11 �� 11 r Pill 69 ,\\\k\ IF E : 702.0 (F) 7 .00 (RE R) UNIT C2 UNIT C3 L�NIT Cl \` r W E / LOT 4 PROJECT NUMBER: (4) 3-UNIT TOWNHOMES (3 BR EACH) 17-0540 BLDG FOOTPRINT = 2760 SF EACH / (4) 4-UNIT TOWNHOMES (3 BR EACH) BLDG FOOTPRINT = 3680 SF EACH PROJECTNAME: (1) 5-UNIT TOWNHOMES (3 BR EACH) FOSTER ROAD BLDG FOOTPRINT = 4600 SF EACH DEVELOPMENT TOTAL DWELLING UNITS: 33 3-BR UNITS TOTAL PARKING REQUIRED: 2(33) = 66 STALLS / TOTAL PARKING PROVIDED: 132 STALLS (2 GARAGE & 2 SURFACE PER UNIT) SS m 0 15 30 60 GRAPHIC SCALE 4' PCC SIDEWALK BUILDINGS FRONT PRIVATE STREET: BUILDING TYPE B BUILDINGS FRONTING FOSTER ROAD: BUILDING TYPE C -5' KT ORL 6' -� 11' 11' F� 1.5%9 PCC 4%y JOINT f_4% PAVEMENT f 2% 2 r r 6"SUBBASE COMPACTED SUBGRADE 26' B-B STORM SEWER OR 6" SUBDRAIN GLASGOW DRIVE SECTION (PRIVATE ROAD) NOT TO SCALE 4' PCC SIDEWALK 1 C2.03 LEGEND PROTECTED SLOPE (40%+) PROTECTED SLOPE BUFFER r STEEP SLOPE (18-25%) j STREAM BUFFER =I CRITICAL SLOPE WETLANDS 50'BUFFER WETLANDS 100' BUFFER WOODLANDS \\\ PROPOSED WETLANDS BUFFER ADDITION CONSTRUCTION LIMITS U LL z w J m ENGINEER: ENGINEERING W W W.HBKENGINEERIN G.COM OWNER: WASHINGTON PARK PARTNERS PO BOX 2208 IOWA CITY, IA 52244-2208 319-351-6788 DEVELOPER: UNIVERSITY LAKE PARTNERS II, LLC 340 HERKY STREET NORTH LIBERTY, IA 52317 319-351-6788 DATE SUBMITTED: 01-18-2018 DRAWING LOG REV ISSUED FOR DATE PROJECT MANAGER: A.ASHBACKER DRAWN BY: CHECKED BY: SPR I I AA SHEET TITLE: SITE PLAN - LOT 4 SHEET: C2.03 Jan 12, 2018 - 2:46pm I:\Proiect\170540\dwq\CAD\FosterRoad\Sheets\Rezoning\170540-REZONING 1-2-18.dwq LOT 5 (2) 2-UNIT TOWNHOMES (3 BR EACH) BLDG FOOTPRINT = 1720 SF EACH (1) 3-UNIT TOWNHOMES (3 BR EACH) BLDG FOOTPRINT = 2760 SF EACH (3) 4-UNIT TOWNHOMES (3 BR EACH) BLDG FOOTPRINT = 3680 SF EACH 11101tlF_10Diviv121on1►10101►11r0"mLokilAzZl1►110 TOTAL PARKING REQUIRED: 2(19) = 38 STALLS 0 15 30 60 GRAPHIC SCALE PROTECTED SLOPE (40%+) w+hbk E PROJECT NUMBER: 17-0540 PROJECT NAME: FOSTER ROAD DEVELOPMENT ENGINEER: hbk ENGINEERING I WWW.HBKENGINEERING.COM I OWNER: WASHINGTON PARK PARTNERS PO BOX 2208 IOWA CITY, IA 52244-2208 319-351-6788 DEVELOPER: UNIVERSITY LAKE PARTNERS II, LLC 340 HERKY STREET NORTH LIBERTY, IA 52317 PROTECTED SLOPE BUFFER 319-351-6788 STEEP SLOPE (18-250%) DATE SUBMITTED: 01-18-2018 DRAWING LOG STREAM BUFFER / REV ISSUED FOR DATE CRITICAL SLOPE WETLANDS 50'BUFFER WETLANDS 100' BUFFER TOTAL PARKING PROVIDED: 76 STALLS (2 \ \ GARAGE & 2 SURFACE PER UNIT) WOODLANDS \ \\\ PROPOSED WETLANDS BUFFER ADDITION PROJECT MANAGER: A.ASHBACKER DRAWN BY: CHECKED BY: SPR AA SHEET TITLE: SITE PLAN - LOT 5 CONSTRUCTION LIMITS SHEET: C2.04 - oil �i I III _ I1111 - !II ■ M �� ;io[ ■ y _ - 1 UNIT I A — REAR PERSPECTIVE — NTS PROJECT NUMBER: 17-0540 PROJ ECT NAME: FOSTER ROAD DEVELOPMENT UNIT A — FRONT PERSPECTIVE — NTS ENGINEER: hbk j I 1� Y ,-- - Aw mill, t f ■ � r /F �x ENGINEERING WWW.HBKENGINEERING.COM OWNER: WASHINGTON PARK PARTNERS PO BOX 2208 IOWA CITY IA 5224 2208 319-351-6788 DEVELOPER: UNIVERSITY LAKE PARTNERS II, LLC 340 HERKY STREET NORTH LIBERTY, IA52317 319-351-6788 UNIT B — FRONT PERSPECTIVE — NTS UNIT B — REAR PERSPECTIVE — NTS - .--_- - - -- mm y piping oil 11, . ..., _ -. UNIT C — FRONT PERSPECTIVE __ — NTS ��`- i - - - y-.� t .- - - - - - _ __ .. ............. - '.� , ATE SUBM D ITTED' -- 2018 DRAWING LOG REV ISSUED FOR DATE ECT MANAGER: A. ASHBACKER DRAWN BY: R CHECKED BY: SHEET TITLE: RENDERING OVERVIE UNIT C — REAR PERSPECTIVE — NTS SHEET: C3.00 Jan 12, 2018 — 2:53pm I:\Project\170540\dwg\CAD\FosterRoad\Sheets\Rezoning\170540 — Renderings.dwg _.. �,, �;. �:.,c x �, UNIT B1 UNIT B2 UNIT B3 UNIT B4 T UNIT B - FRONT ELEVATION - NTS UNIT B - LEFT ELEVATION - NTS FINISHES: MASONRY FACADE FIBERBOARD HORIZ. SIDING FIBERBOARD VERT. SIDING ASPHALT SHINGLES UNIT B - REAR ELEVATION - NTS UNIT B - RIGHT ELEVATION - NTS T -09 _ dd a PROJECT NUMBER: 17-0540 PROJECT NAME: FOSTER ROAD DEVELOPMENT ENGINEER: hbk ENGINEERING W W W.HBKENGINEERING.COM OWNER: WASHINGTON PARK PARTNERS PO BOX 2208 IOWA CITY, IA 52244-2208 319-351-6788 DEVELOPER: UNIVERSITY LAKE PARTNERS II, LLC 340 HERKY STREET NORTH LIBERTY, IA 52317 319-351-6788 DATE SUBMITTED: 01-18-2018 DRAWING LOG REV I ISSUED FOR I DATE PROJECT MANAGER: A.ASHBACKER DRAWN BY: CHECKED BY: SPR AA SHEET TITLE: UNIT B RENDERINGS SHEET: C3.02 FINISHES: MASONRY FACADE FIBERBOARD HORIZ. SIDING FIBERBOARD VERT. SIDING ASPHALT SHINGLES I UNIT C - FRONT ELEVATION - NTS UNIT C - LEFT ELEVATION - NTS ,8. PROJECT NUMBER: 17-0540 PROJECT NAME: FOSTER ROAD DEVELOPMENT ENGINEER: hbk ENGINEERING W W W.HBKENGINEERING.COM OWNER: r ■ WASHINGTON PARK PARTNERS _= PO BOX 2208 IOWA CITY, IA 52244-2208 -- - -- - - 319-351-6788 UNIT C - RIGHT ELEVATION - NTS DEVELOPER: UNIVERSITY LAKE PARTNERS II, LLC 340 HERKY STREET NORTH LIBERTY, IA 52317 319-351-6788 DATE SUBMITTED: 01-18-2018 DRAWING LOG REV ISSUED FOR DATE PROJECT MANAGER: A.ASHBACKER DRAWN BY: CHECKED BY: SPR AA SHEET TITLE: UNIT C RENDERINGS i e SHEET: C3.03 0 40 80 160 GRAPHIC SCALE IOWA CITY CODE OF ORDINANCES 14-5F-6 - SCREENING STANDARDS I HIGH SCREEN, S3: PROJECT NUMBER: 17-0540 �\ 1. INTENT: THE S3 STANDARD IS A BUFFERING TREATMENT THAT USES DENSE LANDSCAPE SCREENING TO PROVIDE A VISUAL AND PHYSICAL 000�`� I \i SEPARATION BETWEEN USES AND ZONES. IT IS COMMONLY APPLIED PROJECT NAME: BETWEEN RESIDENTIAL USES AND COMMERCIAL AND INDUSTRIAL USES FOSTER ROAD I AND TO SCREEN OUTDOOR WORK OR STORAGE AREAS. DEVELOPMENT 2. REQUIRED MATERIALS: ENOUGH SHRUBS AND SMALL EVERGREENS \\ II TO FORM A CONTINUOUS SCREEN OR HEDGE AT LEAST FIVE FEET (51) TO �� II SIX FEET (61) IN HEIGHT AND MORE THAN FIFTY PERCENT (50%) SOLID YEAR ROUND. SCREENING MATERIALS MUST BE AT LEAST THREE FEET (31) HIGH WHEN PLANTED. AT LEAST ONE-HALF (1/2) THE SHRUBS MUST BE \J I I EVERGREEN VARIETIES. I a. ALTERNATIVE MATERIALS (OPTION A): A BERM MAY BE USED IN ENGINEER: CONJUNCTION WITH A HEDGE TO ACHIEVE AN OVERALL HEIGHT OF SIX FEET (61). b. ALTERNATIVE MATERIALS (OPTION B): A CONTINUOUS OR hbk v vv / 111 I II I I II III BEEHIV INTAKE \ \ \ 'Y SEMICONTINUOUS FIVE (5) TO SIX FOOT (6') HIGH MASONRY WALL OR SOLID FENCE. BREAKS IN THE WALL OR FENCE ARE PERMITTED FOR ENGINEERING RIM 6.63 \ III I i \\\ ACCESS AND TO ACCOMMODATE REQUIRED STREET TREES. ONE SHRUB NV 12• R P E 75 28 \\\\\ s I\ \I\I111 PER TEN (10) LINEAR FEET OF WALL, ON AVERAGE, IS REQUIRED. SHRUBS / / I MAY BE GROUPED, BUT LONG STRETCHES WITHOUT ANY SHRUBS SHOULD \)S� G> II T- 61.226 vvv BE AVOIDED. AT LEAST ONE-THIRD (1/3) OF THE SHRUBS MUST GROW TO NO LESS THAN FIVE FEET (5') IN HEIGHT. IT B X • PLAN SHOWS VEGETATED S3 SCREENING. • FINAL SCREENING DESIGN TO BE DETERMINED AT TIME OF SITE DEVELOPEMENT. _ • FINAL DESIGN TO BE IN ACCORDANCE WITH THE ABOVE '1P, SCREENING REQUIREMENTS IN THE IOWA CITY CODE OF WWW.HBKENGINEERING.COM ORDINANCES. OWNER: \\ TYPICAL SCREENING PLANTINGS WASHINGTON PARK PARTNERS PO BOX 2208 IOWA CITY, IA52244-2208 TREES BOTANICAL NAME / COMMON NAME QTY BEEHIVE INTAKE \ 319-351-6788 / RIM 755.68 INV 12" RCP E 754.43 \ Overstory deciduous tree 4 • I 11 \ — �— �- — — — — DEVELOPER: — UNIVERSITY LAKE _ �\ 00' TI UFE€f� / _ �\ `\ I `— Small evergreen tree/Large evergreen shrub 8 PARTNERS II, LLC FOI \ Medium evergreen Tree/Large evergreen shrub 21 Q) 340 HERKY STREET NORTH LIBERTY, IA 52317 (W)A Medium evergreen shrub 19 319-351-6788 Small/Medium evergreen shrub 13 `✓ `v 7- IT RES EN L ' " s> (s> s>/ s> (s> (s>v \ �� - - 7.3 ss ss ss s �s ss ss ss� DATE SUBMITTED: 01-18-2018 ;, ass B 31.0 LOG LIDSDRAWING i _� -- -- — — i — — — — — — — — — x� �r ---- REV ISSUED FOR DATE — — —� ---- —1 — _ = g5`47751 LI ---- I ( STOq If 4 s� —__ -- �I 7 off, C (/� o_ ' -' _—I I N 12 RC 75 15 m � ��� ;—�_,-- ,— —_ — 11 66� 11111v I I 2�i��i>®�� sHP _ 15 0o R / �_ S 6 , 7 6 k6n / / 5(G) (G) (G) « _ e)1 42 _�6_ _ 094 _ G / — 1 / —_—— — _ f y t/� — — 155 / J/ / / / // ' ' _,--� 752T / C M M P C 0 \ SEN N _ / /� FESHRUBt1NrCLS — — 7 ( (OH) (('6H) (0 ) H.} — -('0 — H .6 / / / — I )I I�� (/0 / /—�--� (OH) (OH) (OH) (OH) (OH) (OH) OH) �I I I ECT MANAGER: 687 _ — i / I I I I I A.ASHBACKER -- 5 53 48 t DRAWN BY: CHECKED BY: _ �� / / I I I I I I SPR AA SHEET TITLE: LANDSCAPE PLAN - LOT 1&2 SHEET: L1.01 Jan 12, 2018 — 2:55pm I: \Project\170540\dwg\CAD\FosterRoad\Sheets\Rezoning\170540 — L Sheets rev 01.08.18.dwg MINUTES PRELIMINARY PLANNING AND ZONING COMMISSION JANUARY 4, 2018 — 7:00 PM — FORMAL MEETING EM MA J. HARVAT HALL, CITY HALL MEMBERS PRESENT: Carolyn Dyer, Ann Freerks, Mike Hensch, Max Parsons, Mark Signs MEMBERS ABSENT: Phoebe Martin, Jodie Theobald STAFF PRESENT: Sylvia Bochner, Sara Hektoen, Bob Miklo, OTHERS PRESENT: Curt Moore, Mike Welch, Siobhan Harman, Megan Carr RECOMMENDATIONS TO CITY COUNCIL: By a vote of 5-0 the Commission recommends approval of the rezoning of 1010 1 st Avenue from Low Density Single Family Residential (RS-5) to Community Commercial (CC-2), and 1022 1 st Avenue from (RS-5) to Commercial Office (CO-1) and a portion of 1025 Wade Street from (CO-1) to (CC-2). By a vote of 5-0 the Commission recommends approval of ANN17-00001 and REZ17-00020, annexation of approximately 7.90 acres and a rezoning from County Commercial (C) and County Multifamily Residential (RMF) to Interim Development Multifamily (ID-RM) for approximately 5.27 acres and Interim Development Single Family (ID-RS) for approximately 2.76 acres located at 4643 Herbert Hoover Highway SE. CALL TO ORDER: Freerks called the meeting to order at 7:00 PM. PUBLIC DISCUSSION OF ANY ITEM NOT ON THE AGENDA: None. REZONING ITEM (REZ17-00017): Discussion of an application submitted by University Lake Partners 11, LLC, for a rezoning of approximately 53.29 acres from High Density Single Family Residential (RS-12) zone to Planned Development Overlay/High Density Single Family Residential (OPD/RS-12) for approximately 50.11 acres and Commercial Office (CO-1) zone for approximately 3.18 acres, located south of 1-80 west of Prairie Du Chien Road. Miklo noted this item was deferred at the last meeting due to a number of deficiencies in the in application, new material was received today and Miklo shared that with the Commission. One was a revised plan that now shows the townhouse units as three bedrooms rather than one and two bedroom units, there has also been a slight reconfiguration of some of the townhouses. Additionally a new townhouse building design was submitted, but Miklo is unclear if that is an alternative or if it is in addition to the other elevations already submitted. He said that with other Planning and Zoning Commission January 4, 2018 — Formal Meeting Page 2 of 10 recent projects there has been a concern about the same townhouse being repeated on every lot, resulting in a monotonous design. Miklo noted that there are still a few items that have not been clarified completely on the revised plan, the construction limit lines do appear on some of the lots but not all of them and that is necessary to establish where the grading will end to make sure the steep slopes and wetlands are not encroached upon. Miklo stated they did receive a cross-section for the private street but engineering and fire department staff have not had time to review that. He said the City had not yet received acceptance of the wetlands delineation from the Army Corp of Engineers. Therefore if the Commission does decide to recommend this item to Council it could be subject to the Corp signoff before the Council reviews the plan. The issue being if the Corp does not agree with this delineation there may be some changes to the overall plan and it would have to come back to Planning & Zoning. Miklo stated that due to some of these items not being resolved Staff is recommending deferral until the January 18 meeting. Hensch asked if the issue of varying facades on the townhouses could also be an issue asked to be resolved before approval. Freerks agreed that plus many other items need to be resolved and agrees with a deferral. Freerks noted that the original townhouse design was much better than the new proposal and asked that the applicant reconsider that design. Freerks opened the public hearing. Curt Moore (3169 Dubuque Street) asked that the City move forward with this application as fast as possible as the street is needed. Mike Welch (HBK Engineering) spoke on behalf of the applicant. He stated that the wetland delineation was conducted by Earthview Environmental on site and they are waiting on the Corp concurrence. They are confident with the delineation that Earthview did, past experiences show the Corp concurs with Earthview's delineations. With regards to the building elevations and facades it is the applicants intentions to have a varying unit type throughout and not have them all look the same. Welch stated the construction limit lines are on all the drawings, they are just hard to see so their staff is working to update the drawings so that can be seen easier. Hensch asked about the S3 screening notated on Lot 1, but a landscaping plan is not included. Welch stated that if the Commission would like to see a detailed landscaping plan they will provide one. Freerks closed the public hearing. Hensch moved to defer REZ17-00017 until the January 18, 2018 meeting to clarify the issues raised in the staff report as well as a landscaping plan and illustrations of varying facades on the townhomes. Parsons seconded the motion. A vote was taken and the motion carried 5-0. Planning and Zoning Commission January 4, 2018 — Formal Meeting Page 3 of 10 :7�4•7,I1,[Hr0=1ky,r1: *A lVE1111111 V Discussion of an application submitted by Kum & Go, LC, for a rezoning of 1010 1 st Avenue from Low Density Single Family Residential (RS-5) to Community Commercial (CC-2), and1022 1 st Avenue from (RS-5) to Commercial Office (CO-1) and a portion of 1025 Wade Street from (CO-1) to (CC-2). Bochner began the staff report by showing the location of the property and noted that staff received updated plans after the packet went out to the Commission so there are some changes and an updated site plan and landscaping plan have been given to the Commission. Additionally there was a Good Neighbor meeting held on January 3 and a summary of that meeting was distributed to the Commission. The application is to rezone these properties as part of a larger redevelopment of the site. Currently at 2303 Muscatine Avenue there is a Kum & Go and right next to it at 2315 Muscatine Avenue there is another gas station. Kum & Go is in the process of purchasing that gas station and would like to consolidate the sites and redevelop a new Kum & Go Market. To accomplish this they would use the area at 1010 1 st Avenue for parking as well as the 1025 Wade Street area. That area is currently the parking for Iowa City Hospice and to obtain 1025 Wade Street for parking for Kum & Go they will be trading it for the area at 1022 1"Avenue. This area is located in the Towncrest Commercial Area which is part of an Urban Renewal Area and a Design Review District. Because this area is in a Design Review overlay zone the standards for redevelopment are different than they would typically be in a Community Commercial (CC-2) zone, most importantly it means the quick vehicle servicing use requires a special exemption from the Board of Adjustment so the applicant will have to go through that process if this rezoning is granted in order to redevelop the site. When quick vehicle services uses are permitted in this design review zone they must be developed according to the site development standards of the Central Business Support Zone (CB-5) which means different standards to account for walkability and better design. One of the notable differences is that the facades have to be at least 50% glass. Bochner noted that the site plans and renderings currently available don't meet all of the standards for this district but the design review process and special exception process will make sure all those standards are met before redevelopment. Bochner showed the renderings of the redevelopment that have been submitted and how the building, gas pumps and parking would be laid out. She added that this redevelopment will contribute to several goals from the Comprehensive Plan. The Southeast District Plan sees this area as becoming a more walkable, mixed -use center. This development contributes to that goal by adding walkability, they added a landscape buffer between 1It Avenue and the sidewalk (currently the sidewalk adjacent to the street). This redevelopment will also reduce the number of curb cuts, there are currently two curb cuts on Muscatine Avenue for the gas stations and that would be reduced to one, it also reduces curb cuts along 1It Avenue. In terms of compatibility with the neighborhood, the type of uses are not changing here, currently there are two gas stations which will be consolidated into one and the use for the Iowa City Hospice will remain the same. In terms of compatibility with residential areas of the neighborhood the applicant has shown in their landscaping plan they will put a S3 buffer between the residential property to the south and also along the west side because there is residential properties across the street, S2 buffers will be everywhere else on the site. Planning and Zoning Commission January 4, 2018 — Formal Meeting Page 4 of 10 Bochner noted that staff received updates to the address all the deficiencies that were discussed in the staff report, therefore staff is recommending approval of REZ17-00019 subject to general conformance to the site plan. Hensch asked to be shown on the map exactly where the curb cuts will be on Muscatine Avenue and 1"Avenue. Freerks asked if the access point to the Kum & Go lines up to alley or driveway of the houses. Miklo replied that it is the alley and the property will be screened with landscaping from the houses. Freerks noted her concern of headlights leading into house windows. Hensch asked about the lightening for the entrance and parking areas. Miklo stated that downcast lighting is required city-wide. Where a commercial development is within so many feet of a residential area there is also a limit of the height of the light poles, 25 feet, and there are standards where light cannot trespass across the property line. This development will have to comply with those requirements at the time of site plan approval. Miklo noted that one of the complaints they often hear with gas stations is the canopy lighting, one benefit of this design is the canopy will be as far from the residential as possible and will be oriented more toward the commercial part of Towncrest. Freerks asked about the parking for Hospice, the current parking has better access to the front door whereas the new parking will be behind the building, is there back door access into the Hospice building. Miklo and Bochner both stated they are not familiar with the Hospice building. Signs asked what the plant materials are for what appears to be a retaining wall along the southern border of the Kum & Go property. Bochner said this is noted on the landscaping plan, typically a five-foot landscaping buffer is required between different parking areas. Freerks asked about the curb cut width. Miklo noted this development will require some variation form the City Standards and will need to be approved by the City Engineer and will be done during the special exception process. The standard is on an arterial street intersection the curb cut has to be at least 150 feet from that intersection and has to also be 50 feet from another street and in this area cannot meet both those requirements. In this situation the new curb cut will still be more preferable than the current two curb cuts. Freerks noted that in the revitalization plan for this area it discusses the area being pedestrian friendly the Kum & Go design is to have a whole wall of glass that has no entrance for pedestrians (as seen at the Benton Street Kum & Go) and perhaps there could be an entrance on that wall. Miklo noted that the design plan has not yet been reviewed against the Towncrest Design Review Standards so there may be design changes once that is completed. Freerks opened the public hearing Siobhan Harman (Kum & Go) noted that with regards to the buffer between the residential and the parking lot for Hospice, it will be an eight foot fence with landscaping. The parking will face south but the buffer will keep lights away from the houses. With the area between Kum & Go and Hospice there is a significant grade change and there will be landscaping and she shared an elevation drawing with the Commission. Harman also stated they will lower the canopy Planning and Zoning Commission January 4, 2018 — Formal Meeting Page 5 of 10 height and are looking at other areas in town where HyVee and Casey's have done so successfully and will match those heights. It appears it will be about two feet lower than their standard canopy. Hensch asked if the objective is to have the canopy the same height as the building structure so there isn't light going over the building into the residential area. Harman said it may not be the same height as the store, but it will be lowered a bit so there won't be light spillage. The good thing about this plan is the back of the building faces the residential and the auto usage areas face into the commercial area. Harman also noted they use LED lighting both in the store and outside the store for energy efficiency, and the foot candles are down to zero at the lot line. Parsons asked if it is assumed the overall lighting will be less with this new development than what the two gas stations are emitting right now. Harman cannot comment on that, but noted they did take the square footage of all the buildings that are out there and currently between the BP and Kum & Go there are 5830 square feet and the new Kum & Go building will be just under 5900 so it is a minimal change there. Harman added they will be adding additional green space with the removal of the two houses. Hensch stated that with regards to greenspace there has been some issues in the past with developments following up on landscaping and stated that his hope is this development will not follow suit. The Kum & Go on Benton Street looked as if the landscaping was struggling for a while but seemed to improve towards the end of summer and fall. Dyer added that the landscaping at the Benton Street location is very minimal. Harman noted that with the exterior of their building they understand if it doesn't look good on the outside what will make someone want to come inside, so they take pride in the exterior of their properties. They build all their stores to LEED specifications and one of the specifications is to use native plantings which they do at all their locations. The one place they break the LEED standard is where they install irrigation because it is very difficult in Iowa to get grass and landscaping materials to grow without the water. They will replace any dead items or grass as needed as well. Hensch noted this development is an improvement over what is currently at the location but just wanted to reinforce the desire to see the correct landscaping. Freerks asked Harman to talk a bit about the building, noting it has to meet the standards which are a little higher in this area, and if there is any opportunity to bring people in off 1It Avenue. Harman noted it is very difficult because that one wall is completely "back of house" which is restrooms and kitchen area and those have to be enclosed and not seen by the public. There will be a side door on the Muscatine Avenue side. They do have to be careful regarding entrances however due to theft and that is why they only do two entrances on a building. Dyer asked if the 11' Avenue side of the building would be similar to Benton Street where there is a wall of glass that shows a hallway and a mural. Harman confirmed that was correct, and noted that area is not meant for storage. Signs noted that is what has happened at the Benton Street location, that hallway is full of storage items, including what appears to be CO2 tanks. He added that he knows the design standards require glass but perhaps the mural could be on the glass and cover up that back space. Freerks stated that would be against the sign standards. Miklo suggested another solution of using frosted glass towards the bottom which would hide storage. Harman noted she would address the storage issues at the Benton Street location with that store manager. Planning and Zoning Commission January 4, 2018 — Formal Meeting Page 6 of 10 Signs noted his concern with the southern border of the Kum & Go parking lot with the extensive retaining wall and feels it may be an ominous wall. Harman said the wall will be gradual so it will not look like a large wall from all angles and there will be plantings and landscaping on it as well. Freerks asked if Harman knew if there was a Hospice door to the west and Harman acknowledged there was and Hospice has stated their needs are met. Miklo suggested adding some trees to help shield the canopy glow from the houses to the south. Harman said that should be discussed with Hospice because when they have used over story trees over parking there are complaints from customers that those trees can weep down onto the cars. She feels there can be some solutions. Miklo agreed but noted it would depend on the species of tree, and if the trees are on the driveway side it shouldn't affect the parking. Freerks agreed the addition of trees should be stressed. Harman addressed this area being pedestrian friendly and as part of their LEED criteria they are required to install a bike rack. Typically they install one bike rack, the City has asked them to install a second bike rack which they have agreed to do. They will also have plaques around the building and on the canopy explaining what the LEED requirements are and how Kum & Go met them. Curt Moore (3169 Dubuque Street) noted that he feels this will be a definite improvement to Iowa City and that area. He agrees with looking for options on the glass wall that will face 1It Avenue as he drives by Benton Street all the time and sees the storage. Mike Welch (HBK Engineering) remarked about the curb cuts and locations and noted that Kum & Go puts a wider radius on their curb cuts because of the fuel trucks. Freerks closed the public hearing. Signs moved to approve the rezoning of 1010 1st Avenue from Low Density Single Family Residential (RS-5) to Community Commercial (CC-2), and 1022 1st Avenue from (RS-5) to Commercial Office (CO-1) and a portion of 1025 Wade Street from (CO-1) to (CC- 2). Parsons seconded the motion. Hensch asked about the list of discrepancies listed in the staff report. Miklo said those have all been resolved or will be with the special exception. Hensch asked if they need to add an amendment to the motion regarding the addition of trees and shrubbery along the south border Miklo said it can be added as a conditional zoning agreement. Hensch moved to amend the motion to include the requirement of additional trees and shrubbery along the southern border particularly along the area where the Hospice parking lot will be. Dyer seconded the amendment. Signs noted that this development is a significant improvement in the space, but wanted to reemphasize the need for landscaping needs to be completed as to the intention of the proposal. Planning and Zoning Commission January 4, 2018 — Formal Meeting Page 7 of 10 Hensch stated his appreciation with Kum & Go working with Hospice and that this design actually improves the parking situation for Hospice. Freerks agreed noting the details that have gone into this proposal are thoughtful. Signs stated he was concerned at first about the parking lot for Hospice jetting over to the residential part of 111 Avenue but feels the applicant did a nice job trying to screen that as nice as they can. Dyer added that most of the parking in that area will happen during the day so headlights shouldn't be an issue. Parsons stated he likes the layout and thinks it will be an efficient use of space, much better than what is there now. A vote was taken and the motion with amendment carried 5-0. ANNEXATION & REZONING ITEM (ANN17-00001/REZ17-00020 Discussion of an application submitted by IC Housing Group, LLC, for annexation and a rezoning of approximately 7.9 acres from County Commercial (C) and County Multifamily Residential (RMF) to Interim Development Multifamily (ID-RM) for approximately 5.27 acres and Interim Development Single Family for approximately 2.76 acres located at 4643 Herbert Hoover Highway SE. Miklo noted that the property is on the south side of Herbert Hoover Highway, just east of the Iowa City Care Center and Old Towne commercial area, and west of the latest addition of Churchill Meadows. Miklo showed aerials of the current zoning and the proposed zoning. The Comprehensive Plan for the area is the Northeast District Plan, the Plan shows the Care Center and shows this area as green space around the Care Center, but that is not going to happen. The Plan does show single family as it moves to the east. The staff report shares the details about the annexation policy, this application meets the policy as it is clearly in the Iowa City growth area, it is an area they would rather see develop in the City and not the County. Miklo noted there are some infrastructure needs that haven't been resolved such as how sewer and water will be provided but the interim zoning address that until those issues are resolved. Staff recommends approval of ANN17-00001 and REZ17-00020, annexation of approximately 7.90 acres and a rezoning from County Commercial (C) and County Multifamily Residential (RMF) to Interim Development Multifamily (ID-RM) for approximately 5.27 acres and Interim Development Single Family (ID-RS) for approximately 2.76 acres located at 4643 Herbert Hoover Highway SE. Freerks asked if in the ID-RS area how many houses could go in an area like that. Miklo replied that in the RS-5 zone they typically see about three units per acre, if it is a planned development it might be up to five houses per acre, so there could be a total of five to ten houses here. Parsons asked about utilities and the sidewalk along Herbert Hoover Highway extending down to Churchill Estates. Miklo said that sidewalk is now in place. Planning and Zoning Commission January 4, 2018 — Formal Meeting Page 8 of 10 Signs asked if the Commission had seen the adjacent property to the east in an application recently. Miklo said with that location the Commission saw the application because it was a County subdivision and the City allowed it to be split into one additional lot and an outlot and any development other than that would require annexation. Miklo pointed out two other properties in the area that are still County properties. Parsons asked about the green space to the south and if it would remain green space. Miklo said while the current owner has the property it will be green space but any future owner could develop that space. Freerks opened the public hearing. Megan Carr (Sand Companies/IC Housing Group) said they do have under contract the 5.72 acres and would like to apply for annexation and then eventual rezoning to develop two multi- family developments at that location. Each building would be about 30-40 units. Hensch asked what the timeline for that project. Carr replied start of construction would be in 9- 10 months noting they recognize there are water, sewer and traffic items they need to address which they are not prepared to proceed with at this time, and that is why they are applying for interim development at this time. Freerks commented that 30-40 units per building seems quite large. Miklo noted the City has approved some 36 unit buildings recently. Carr noted they are currently developing a building in Coralville that is 56 units where the old Lantern Park Nursing Home was. Carr added the building would be no taller than three stories. Freerks closed the public hearing. Hensch moved to recommend approval ofANN17-00001 and REZ17-00020, annexation of approximately 7.90 acres and a rezoning from County Commercial (C) and County Multifamily Residential (RMF) to Interim Development Multifamily (ID-RM) for approximately 5.27 acres and Interim Development Single Family (ID-RS) for approximately 2.76 acres located at 4643 Herbert Hoover Highway SE. Parsons seconded the motion. Freerks noted it meets all criteria of annexation and development. Parsons asked if there has been any interest in developing the northern side of Herbert Hoover Highway. Miklo replied there has not. Parsons noted seeing this portion of the Highway becoming very busy in the future. Signs noted the north side is owned by one individual. A vote was taken and the motion carried 5-0. CONSIDERATION OF MEETING MINUTES: DECEMBER 21, 2017 Parsons moved to approve the meeting minutes of December 21, 2017. Hensch seconded the motion. A vote was taken and the motion passed 5-0. Planning and Zoning Commission January 4, 2018 — Formal Meeting Page 9 of 10 i1kIlkIIIkI"Al kIII]PF IIIkI"IkI170]:1JYJFA�I[]�F Freerks noted that she was at the new UIHC clinic on North Dodge Street recently and it made her think that when that project was approved it seemed the visual they saw for landscaping was different than what is now there. Miklo said staff is researching those files and will bring them to the Commission at a future meeting. Signs added that almost all of the projects they see the landscaping is always so minimal to begin with, and then when plantings die they are not replaced. Miklo noted it is required that plantings be replaced, however it is a matter of inspection and the City does not have the staff to go out and inspect areas. They only way staff becomes aware of issues is when someone complains, and then there will be enforcement. Signs asked that for trees and vegetation for landscaping, does the City have a list of ones for developers to select from. Miklo said there is a list in the Zoning Code, but that is over 10 years old now and may be something that will need reviewed when there is time. ADJOURNMENT: Parsons moved to adjourn. Signs seconded. A vote was taken and motion carried 5-0. PLANNING & ZONING COMMISSION ATTENDANCE RECORD 2017 - 2018 5/4 5/18 6/1 (W.S) 6/7 6/15 7/6 7/20 8/3 8117 9/7 9/21 10/5 10/19 11/2 12/7 12/21 1/4 DYER, CAROLYN X O/E X X X X X X X X X X X O/E X X X FREERKS, ANN X X X X X X X X O/E X X X X X O/E X X HENSCH, MIKE X X X O/E X X X X X X X X X X X X X MARTIN, PHOEBE X X X X O/E X X X X X X X X X X O/E O/E PARSONS, MAX X X X X X X X X X O/E X X X X X X X SIGNS, MARK X X X X X X X X X X X X X X X X X THEOBALD, JODIE X X X X X X X O/E X X X X X X X X O/E KEY: X = Present O = Absent O/E = Absent/Excused --- = Not a Member