HomeMy WebLinkAboutAmerican Legion Road Fact Sheet 2019Public Information Meeting American Legion Road Improvements Scott Boulevard to Taft Avenue January 10, 2019 Project Overview Iowa City is planning to reconstruct American Legion Road from Scott Boulevard to Taft Avenue. Planned improvements include: •New pavement with curb and gutter •Roundabout at Scott Boulevard •On-street bike lanes •Pedestrian facilities •Underground utilities The new roadway corridor will have one travel lane in each direction, on-street bikes lanes on both sides of the roadway, a shared-use path, sidewalks, and a pedestrian underpass near Hoover Elementary School. The project will improve safety, reduce traffic congestion, and create vehicular and pedestrian linkages. Project Website https://www.icgov.org /project/american-legion-road- improvements-project Project Schedule The following is the anticipated schedule for the project Field Surveys July –August 2018 Preliminary Design November –January 2019 Final Design February –November 2019 Right-of-Way Acquisition Spring/Summer 2019 Utility Relocations Summer/Fall 2019 Project Construction April 2020 -2021 Contact: For project questions, please contact the project team. Scott Sovers, P.E., Senior Civil Engineer City of Iowa City –Engineering Division 319-356-5142 scott-sovers@iowa-city.org Aaron Moniza, P.E., Project Manager Foth Infrastructure and Environment, LLC 319-297-2073 aaron.moniza@foth.com Project Details Right-of-way will need to be acquired for project and Iowa City will be starting that process in early 2019. Segments of American Legion Road may be closed during construction but access will be maintained. 10’ Travel Lanes 7’ Bike Lanes 8’ Shared Use Path 5” Sidewalk Intersection Treatments Pedestrian Underpass Drainage Box Culvert Storm Sewer Sanitary Sewer Water Main Lighting