Loading...
HomeMy WebLinkAbouthickory hillPROJECT MAP ACCESS & STAGING C0.00 ACCESS: COORDINATE WITH OWNER TO WHICH CONSTRUCTION ACCESS LOCATION TO USE. FIRST AVE CONSTRUCTION ENTRANCE. CONTRACTOR TO UTILIZE FOR AREAS CONTAINED WITHIN SHEETS C2.00 FIRST AVENUE TRAIL SHEETS C2.00-C2.12 ACCESS: CONTRACTOR TO ACCESS VIA HICKORY HEIGHTS LANE EASEMENT (SEE C0.02 FOR EASEMENT MAP) ISSUED FOR DRAWING LOG DATE CB OWNER: CONTRACTOR: WWW.HBKENGINEERING.COM HBK ENGINEERING, LLC 509 S. GILBERT ST. IOWA CITY, IA 52240 PHONE: (319) 338-7557 FAX: (319) 358-2937 IOWA DEPARTMENT OF LABOR REGISTRATION NO. 00527328 PROJECT NUMBER: ORIGINAL SCOPE DB PROJECT NAME: ENGINEER: SHEET TITLE: Oct 31, 2018 - 2:17pm I:\Project\170042\dwg (all drawing files)\CAD\170042 - Re Bid Phase 1\170042 - DESIGN PHASE 1.dwg PROJECT MANAGER: SHEET: DATE CREATED: DEVELOPER: 17-0042 HICKORY HILL PARK IMPROVEMENTS PROJECT - PHASE 1 TO BE DETERMINED MARCH 15, 2018 A. ASHBACKER 03-21-17 DESIGN TJK RAD 03-31-17 60% REVIEW TJK RAD 06-15-17 95% REVIEW TJK RAD 10-17-17 MODIFIED SCOPE 12-01-17 DESIGN DOCS TJK RAD 10-26-18 FINAL PLANS KMW ALA ACCESS MAP TO HICKORY HEIGHTS LANE EASEMENT NEW BRIDGE 3 (STEEL)AND REVETMENT SHEETS S3.00-S3.03 OLD BRIDGE (REMOVAL) 20' CITY EASEMENT LEGEND STAGING ACCESS BRIDGE 3 (STEEL) & REVETMENT SHEETS S3.00-S3.03 & C4.01-C4.02 BRIDGE 2 (REVETMENT) SHEETS C2.11 AND C4.01-C4.02 ACCESS: 7TH AVE ENTRANCE. CONTRACTOR TO UTILIZE FOR AREAS CONTAINED WITHIN SHEETS C2.00. 1234CABD1234CABDKEY PLAN©PROJECT. THEY ARE NOT SUITABLE FOR USEON OTHER PROJECTS OR IN OTHERLOCATIONS WITHOUT THE EXPRESS WRITTENAPPROVAL AND PARTICIPATION OF RDGPlanning & Design. REPRODUCTION ISPROHIBITED.THESE DOCUMENTS HAVE BEEN PREPARED BYRDG IA Inc. SPECIFICALLY FOR THERDG Planning & DesignPROJECT NO:ISSUED:3001.774.00DESCRIPTIONREV DATEHICKORY HILL PARK03/15/20182018THIS DRAWING MAY NOT REPRESENT ALLCHANGES THAT HAVE OCCURRED DURING BIDOR CONSTRUCTION PHASES. CONSTRUCTIONDOCUMENTS, ADDENDA AND CHANGEDOCUMENTS REMAIN THE OFFICIALCONSTRUCTION DOCUMENTS.L5.03SIGNLAYOUT