Loading...
HomeMy WebLinkAbout2020 American Legion Road Fact SheetPUBLIC INFORMATION MEETING AMERICAN LEGION ROAD IMPROVEMENTS SCOTT BOULEVARD TO TAFT AVENUE PROJECT OVERVIEW Iowa City is planning to reconstruct American Legion Road from Scott Boulevard to Taft Avenue. Planned improvements include: • New pavement with curb and gutter • Roundabout at Scott Boulevard • On-street bike lanes • Pedestrian facilities • Underground utilities The new roadway corridor will have one travel lane in each direction, on-street bikes lanes on both sides of the roadway, a shared-use path, sidewalks, and a pedestrian underpass near Hoover Elementary School. The project will also support the projected growth within the southeast quadrant of the City by upgrading the roadway infrastructure to current arterial design standards. PROJECT WEBSITE https://www.icgov.org/project/american-legion-road-improvements-project CONTACT INFORMATION For project questions, please contact the project team. Scott Sovers, P.E., Assistant City Engineer City of Iowa City – Engineering Division 319-356-5142 scott-sovers@iowa-city.org Aaron Moniza, P.E., Project Manager Foth Infrastructure and Environment, LLC 319-297-2073 aaron.moniza@foth.com PROJECT SCHEDULE The following is the anticipated schedule for the project FIELD SURVEYS Spring / Summer 2019 PRELIMINARY DESIGN January - June 2019 FINAL DESIGN June 2019 - February 2020 RIGHT-OF-WAY ACQUISTION Winter / Spring 2020 UTILITY RELOCATIONS Winter / Spring 2020 PROJECT LETTING May 19, 2020 PROJECT CONSTRUCTION Summer 2020 - 2021 PROJECT DETAILS Right-of-way will need to be acquired for project and Iowa City has started that process. Segments of American Legion Road will be closed during construction but access will be maintained. • 10’ Travel Lanes • 7’ Bike Lanes (includes buffer) • 10’ Shared Use Path • 5’ Sidewalk • Intersection Treatments • Pedestrian Underpass • Drainage Box Culvert • Storm Sewer • Sanitary Sewer • Water Main • Lighting (only at roundabout and intersections)