Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
4015171_Verification_Final_Report_20171027
Verification Report ICCSD Hoover East Elementary Iowa City, Iowa October 27, 2017 4015171 Prepared for by 877.939.1874 midamericanenergy.com 877.938.1588 theweidtgroup.com This page intentionally left blank. MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 1 Introduction This report documents the results of verification for several energy conservation strategies for the ICCSD Hoover East Elementary project, and shows the results of verification as compared to the baseline model. This report serves as a final document for verifying energy savings strategies implemented at this new building located in Iowa City, Iowa. MidAmerican Energy offers the Commercial New Construction program to assist owners and design teams in evaluating potential energy conservation strategies for new and renovated building projects during the design and construction processes. During the design phase, the building owner selected a number of energy conservation strategies. In response, MidAmerican Energy offered an incentive for the implementation of these strategies. For this project, the owner selected Bundle 2 for implementation. For more information about selected results, please see the Bundle Requirements Document (from November 01, 2016). Upon construction completion, The Weidt Group has verified the selected strategies via Construction Documents review, on site verification of the strategies selected (on August 25, 2017), and construction submittals. These measures provide projected energy cost savings of over $55,200 per year, in relation to the building baseline. The simple payback analysis shows that the MidAmerican Energy incentive has helped reduce the incremental costs associated with the energy conservation strategy investments in this building, resulting in a payback of 7.5 years. Energy Conservation Investments ‐ Simple Payback Analysis Project Incremental Construction Cost $521,229 Final MidAmerican Energy Incentive * $106,951 Project Adjusted Incremental Cost $414,278 Annual Energy Cost Savings $55,243 Payback, with incentive (in years) 7.5 * The MidAmerican Energy Commercial New Construction incentive cannot reduce the simple payback below one year, may not exceed 70% of the total bundled incremental strategy costs, and is capped at $1 million per building. For more information, please refer to the following report. MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 2 BUSINESSADVANTAGE BOTTOM LINE We are here when you need us. For busy business owners, BusinessAdvantage provides options to make working with us easier. You receive dedicated attention around the clock and convenient access to all your business’ most important energy-related information. Visit www.midamericanenergy.com and your My Account page to begin. Watch this video and see how easy it is. Watch Now> TO SET UP A NEW MY ACCOUNT You also may reach BusinessAdvantage Bottom Line by calling 800‐329‐6261, or emailing businessadvantage@midamerican.com – STEP 1 – Go to www.midamericanenergy.com – STEP 2 – Click on My Account and select Create New – STEP 3 – Enter a username, password, email address and your MidAmerican Energy account number Access account information 24/7/365 anywhere, anytime, with My Account. √ Customize outage and alert preferences √ Receive text and email notifications √ Report outages √ Pay/View current bill √ View previous bills √ View energy usage MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 3 Process The following list provides the process steps for this energy conservation program. Commercial New Construction program Establish goals and intentions Computer modeling of baseline, strategies, and bundles Bundle selection by the owner Bundle Requirements Document Summarizes key features/verification plan for all bundle strategies Construction Documents review Reviews drawings to locate the energy conservation measures and notify the design team of any changes from the selected bundle Verification study (following project completion and occupancy) Request construction documents Request submittals (e.g., glazing, insulation, cooling, heating plants) Locate the energy conservation measures on site Final Verification Report Detail the findings of the verification process Estimate of final energy savings for the building Document final incentive MidAmerican Energy incentive payment MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 4 List of Verified Strategies The following table provides a complete list of the modeled energy conservation strategies that were selected by the project team for installation. All savings percentages in the table below are relative to the selected bundle savings. ID Strategy Description Portion of Total $ Savings Modeled Verified as Modeled? Portion of Total $ Savings Verified Architectural EWC02 R-16 wall assembly 1% Yes 1% ERC02 R-30 roof assembly 1% Yes 1% WGB01 PPG Solarban x50 Punched Opening 1% Partial 1% WGD01 Curtain wall assembly Alt. 2 1% Partial <1% WGE01 Kalwall for Gym <1% Partial <1% Electrical DGA02 Dimming daylighting for Media Center <1% Yes <1% DGA03 Dimming daylighting for Center Common Area <1% Yes <1% DGA04 Dimming daylighting for Common Area <1% Yes <1% DGA05 Dimming daylighting for West Stairs <1% Yes <1% DGA06 Dimming daylighting for Classrooms 2% Not found 0% DGA07 Dimming daylighting for Art & Music Suite <1% Yes <1% LCCL8 Classroom vacancy sensor control 1% Yes 1% LCCI8 Corridor vacancy sensor control 1% Yes 1% LCCC8 Computer Classroom vacancy sensor control <1% Yes <1% LCGY8 Gym vacancy sensor control <1% Yes <1% LCMC8 Library/ media center vacancy sensor control <1% Yes <1% LCKT8 Kitchen vacancy sensor control <1% Yes <1% LCST8 Storage vacancy sensor control <1% Yes <1% LCRR8 Restroom vacancy sensor control <1% Yes <1% LCDN8 Multipurpose vacancy sensor control <1% Not found 0% LCCN8 Conference vacancy sensor control <1% Yes <1% LCSG8 Small Group vacancy sensor control <1% Yes <1% LCCM8 Common Area vacancy sensor control <1% Yes <1% L03BW Building wide 30% lower than 90.1-2010 6% Yes 13% L10XX Exterior lighting proposed design 1% Yes 1% MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 5 Mechanical MGH01 Ground heat pump, Design 67% Partial 63% MGH04 VFD on ground loop 4% Yes 4% MFD01 Fan system power 10% reduction; DOAS 1% Yes 1% MOA02 CO2 control of outside air 2% Yes 2% MOA04 Transfer air: multi-purpose to kitchen 1% Yes 1% MOA05 Transfer air: office/classroom to restrooms 2% Yes 2% MOA09 Displacement Ventilation for Classrooms 3% Yes 3% MHRT1 Total heat recovery 6% Yes 6% MHW12 WaterSense lavatories <1% Yes 1% Total Savings 100% 102% MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 6 Summary The list below details items that are different from the selected bundle. Wall Assembly The verified wall assembly R‐value is higher than expected, resulting in more savings. Roof Assembly The verified roof assembly R‐value is higher than expected, resulting in more savings. Glazing The verified punched opening windows glazing solar heat gain coefficient is higher than expected, resulting in less savings. The verified curtain wall windows glazing U‐factor is higher than expected, resulting in less savings. The verified gym glazing U‐factor and solar heat gain coefficient are higher than expected, resulting in less savings. Daylighting The classrooms dimming daylighting control was not implemented, resulting in no savings. Lighting Control The multipurpose vacancy sensor control area was not found, resulting in no savings. Lighting Design The building wide lighting power density is lower than expected, resulting in more savings. Please see the electrical portion of the report for additional details. The exterior lighting power is lower than expected, resulting in more savings. Ground Heat Pump The verified ARI ton‐weighted average EER is lower than expected, resulting in less savings. The verified ARI ton‐weighted average COP is lower than expected, resulting in less savings. Fan System Power The verified fan power is lower than expected, resulting in more savings. Water Flow Rate The verified lavatory flow rate is lower than expected, resulting in more savings. Further detail about these strategies may be found in the “Individual Strategy Verification Results” section of this report. MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 7 Individual Strategy Verification Results The following table(s) provides the field verification detailed findings for the applicable strategies. In addition, the appendices have further information and calculations. MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 8 Architectural Strategy Verification Results ID Strategy Description Key design parameter Verification Review Verification Findings EWC02 R‐16 wall assembly R‐16 R‐22 The verified wall insulation is higher than expected, resulting in more savings. ERC02 R‐30 roof assembly R‐30 R‐33.6 The verified roof insulation is higher than expected, resulting in more savings. WGB01 PPG Solarban x50 Punched Opening 0.24 U‐factor COG 0.24 The verified U‐Factor meets the strategy requirements. The verified SHGC is higher than expected, resulting in less savings. 0.37 U‐factor Unit 0.37 0.31 SHGC 0.32 0.51 Vis Trans 0.51 WGD01 Curtain wall assembly Alt. 2 N/A U‐factor COG N/A The verified U‐Factor is higher than expected, resulting in less savings. The verified SHGC meets the strategy requirements. 0.38 U‐factor Unit 0.47 0.31 SHGC 0.31 0.51 Vis Trans 0.33 WGE01 Kalwall for Gym 0.18 U‐factor COG 0.47 The verified U‐Factor is higher than expected, resulting in less savings. The verified SHGC is higher than expected, resulting in less savings. 0.23 U‐factor Unit 0.52 0.23 SHGC 0.31 0.20 Vis Trans 0.33 MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 9 Electrical Strategy Verification Results ID Strategy Description Key design parameter Verification Review Verification Findings DGA02 Dimming daylighting for Media Center 1,600 Control Area sf 1,600 The verified control area meets the strategy requirements. DGA03 Dimming daylighting for Center Common Area 2,300 Control Area sf 2,300 DGA04 Dimming daylighting for Common Area 1,200 Control Area sf 1,200 DGA05 Dimming daylighting for West Stairs 1,100 Control Area sf 1,100 DGA06 Dimming daylighting for Classrooms 11,600 Control Area sf Not found Not implemented. DGA07 Dimming daylighting for Art & Music Suite 1,100 Control Area sf 1,100 The verified control area meets the strategy requirements. LCCL8 Classroom vacancy sensor control 27,000 Control Area sf 27,000 LCCI8 Corridor vacancy sensor control 12,200 Control Area sf 12,200 LCCC8 Computer Classroom vacancy sensor control 1,000 Control Area sf 1,000 LCGY8 Gym vacancy sensor control 5,500 Control Area sf 5,500 LCMC8 Library/ media center vacancy sensor control 3,500 Control Area sf 3,500 LCKT8 Kitchen vacancy sensor control 900 Control Area sf 900 LCST8 Storage vacancy sensor control 2,900 Control Area sf 2,900 LCRR8 Restroom vacancy sensor control 2,600 Control Area sf 2,600 LCDN8 Multipurpose vacancy sensor control 3,000 Control Area sf Not found Not found. LCCN8 Conference vacancy sensor control 200 Control Area sf 200 The verified control area meets the strategy requirements. LCSG8 Small Group vacancy sensor control 2,200 Control Area sf 2,200 LCCM8 Common Area vacancy sensor control 2,500 Control Area sf 2,500 L03BW Building wide 30% lower than 90.1‐2010 0.71 W/sf 0.40 The verified Watts/square foot is lower than expected, resulting in more savings. L10XX Exterior lighting proposed design 4.95 kW 1.70 The verified kW is lower than expected, resulting in more savings. The baseline exterior lighting power allowance has been updated to reflect as found conditions to 9.802 kW. MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 10 Space Type Lighting Power Density Space Type Baseline Lighting Power (W/sf) Target Lighting Power (W/sf) Takeoff Lighting Power (W/sf) Classroom 1.24 0.87 0.42 Corridor 0.66 0.46 0.27 Office/Admin 1.11 0.78 0.62 Computer Classroom 1.24 0.87 0.40 Gym 0.72 0.50 0.59 Library/ media center 1.12 0.78 0.23 Kitchen 0.99 0.69 0.51 Storage 0.63 0.44 0.36 Mech/elec 0.95 0.67 0.18 Restroom 0.98 0.69 0.58 Multipurpose 0.65 0.46 0.38 Conference 1.23 0.86 0.73 Small Group 1.24 0.87 0.54 Common Area 1.24 0.87 0.42 Building Average 1.01 0.71 0.40 MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 11 Site Photos Image of media center lighting MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 12 Mechanical Strategy Verification Results ID Strategy Description Key design parameter Verification Review Verification Findings MGH01 Ground heat pump, Design 22.45/4.13 EER / COP 19.33/3.65 The verified cooling efficiency is lower than expected, resulting in less cooling energy savings. The verified heating efficiency is lower than expected, resulting in less heating energy savings. MGH04 VFD on ground loop VFD Yes The verified VFD on the ground loop meets the strategy requirements. MFD01 Fan system power 10% reduction; DOAS 10% reduction 1.02 bhp/1000 cfm The verified fan system power is lower than expected, resulting in more savings. MOA05 Transfer air: office/classroom to restrooms Transfer air Yes The verified transfer of classroom and office air to restrooms meets the strategy requirements. MOA09 Displacement Ventilation for Classrooms displacement Yes The verified classroom displacement ventilation meets the strategy requirements. MOA02 CO2 control of outside air Reset OA Control Type Yes CO2 control of outside air has been installed as expected. Sequence of operation found. MOA04 Transfer air: multi‐purpose to kitchen Transfer air Yes The kitchen transfer air from multipurpose has been installed as expected. MHRT1 Total heat recovery 76% sensible 70% latent Efficiency ratio 79% sensible 70% latent The heat recovery systems have been installed as expected. MHW12 WaterSense lavatories 1.50 GPM 1.35 The verified flow rate is lower than expected, resulting in more savings. MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 13 Site Photos Image of typical energy recovery unit Image of typical heat pump unit MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 14 Verified Bundle Results and Incentive The tables on the next pages show the calculated energy cost savings for these energy investments with the included MidAmerican Energy Company incentive. The simple payback analysis shows that the MidAmerican Energy Company incentive has helped reduce the incremental costs associated with the energy conservation strategy investments in this building, resulting in a payback of 7.5 years. Energy Parameter Baseline*Bundle 2, As Modeled* Bundle 2, As Verified Energy Cost $92,459 $38,046 $37,216 Energy Cost Savings $54,413 $55,243 Percent Energy Cost Savings 59%60% Electricity Demand 348 kW 189 kW 193 kW Electricity Demand Savings 159 kW 155 kW Percent Electricity Demand Savings 46%45% Electricity Consumption 1,018,919 kWh 469,125 kWh 443,916 kWh Electricity Consumption Savings 549,794 kWh 575,003 kWh Percent Electricity Consumption Savings 54%56% Natural Gas Demand 5 therms/day 5 therms/day 5 therms/day Natural Gas Demand Savings 0 therms/day 0 therms/day Percent Natural Gas Demand Savings 0%0% Natural Gas Consumption 410 therms 410 therms 410 therms Natural Gas Consumption Savings 0 therms 0 therms Percent Natural Gas Consumption Savings 0%0% Incremental First Cost $521,976 $521,229 MidAmerican Energy Company Electric Incentive $101,162 $106,951 MidAmerican Energy Company Gas Incentive $0 $0 MidAmerican Energy Company Incentive** $101,162 $106,951 Simple Payback with Incentive (in years) 7.7 7.5 * The figures in the 'Baseline' and 'Bundle 2, As Modeled' are reprinted from the March 21, 2016, Design Assistance Results Report for this project, which were the basis for the original energy savings projections. ** MidAmerican Energy’s Commercial New Construction incentives cannot reduce the simple payback below one year, may not exceed 70% of the total bundled incremental strategy costs, and are capped at $1 million per building. If the incentive threshold of 15% for electric and/or natural gas savings of the selected bundle is not met, Commercial New Construction may offer a reduced incentive pending completion of the verification process. MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 15 Energy Parameter Baseline*Bundle 2, As Modeled* Bundle 2, As Verified Building Results Energy Use Intensity (EUI) 50.4 kBtu/sf 23.5 kBtu/sf 22.3 kBtu/sf EUI Savings 26.9 kBtu/sf 28.1 kBtu/sf Percent EUI Savings 53%56% Note: Subject to the following qualifications, the computer model offers sophisticated predictions of energy savings with estimations as good as any other means available for a building that has not been built. The strategy and bundle results compare relative differences in net energy use for design alternatives. The results are not appropriate for system design and/or equipment selection; these are responsibilities of the registered design professionals of record. The actual energy use of this building will be different from simulated results. Building systems and other operating parameters provided by the design team and modeled by The Weidt Group approximate actual conditions, but differences in weather, operating parameters, occupancy level, and changes that occur through the bidding and construction process will result in annual energy costs that will be different from what is predicted here. However, when a bundle of strategies is selected relative to other alternatives, its energy (and dollar) conserving value can be expected to remain constant relative to the other alternatives, and the magnitude of the cost should be approximately as predicted. Thus, implementation of a bundle of strategies offers the opportunity for energy savings, but the realization of those savings is the responsibility of the owner/operator of the building – not MidAmerican Energy Company or The Weidt Group. Savings are not guaranteed. MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 16 Appendix A. Project Information Location Iowa City, IA Building Organization Building Summary Building Area 69,700 Systems Summary Envelope Masonry walls and low slope roof with insulation above the deck Glazing Mixture of aluminum framed curtain wall and punched openings Lighting LED lighting Plug Loads Typical plugs, control where required Service Water Heating Electric Hours of Operation Typical school hours with minimal summer use Mechanical Ground source heat pumps with ventilation air delivered by a dedicated outdoor air system. CO2 control for large volume spaces. Utilities Electric Utility MidAmerican Energy Gas Utility MidAmerican Energy Schedule Construction Documents Complete January 2016 Construction Start October 2015 Occupancy August 2017 Other Notes MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 17 Appendix B. Category Summary Category Description Strategies Annual Energy Cost Savings ($) Annual Total Electric Consumption Savings (kWh) Electric Demand Savings (kW) Annual Natural Gas Consumption Savings (Therms) Electric Incremental Cost ($) Natural Gas Incremental Cost ($) Envelope Insulation Strategies EWC02, ERC02 $1,374 24,492 2 0 $70,248 $0 Window Glazing Strategies WGB01, WGD01, WGE01 $438 6,551 1 0 $316,342 $0 Daylighting Control Strategies DGA02, DGA03, DGA04, DGA05, DGA07 $187 2,003 1 0 $0 $0 Lighting Control Strategies LCCL8, LCCI8, LCCC8, LCGY8, LCMC8, LCKT8, LCST8, LCRR8, LCCN8, LCSG8, LCCM8 $1,020 12,279 4 0 $15,144 $0 Lighting Design Strategies L03BW, L10XX $7,540 95,595 31 0 $28,707 $0 Heat Pump Efficiency Strategies MGH01, MGH01, MGH04 $36,245 332,058 63 0 $0 $0 Alternative HVAC System Strategies MOA05, MOA09 $3,171 41,786 15 0 $3,790 $0 Conditioning of Outside Air Strategies MOA02, MOA04, MHRT1 $4,922 54,026 37 0 $86,998 $0 Service Hot Water Strategies MHW12 $346 6,214 0 0 $0 $0 Total As Verified Bundle Savings $55,243 575,003 155 0 $521,229 $0 MidAmerican Energy ICCSD Hoover East Elementary, Iowa City, Iowa Commercial New Construction program © THE WEIDT GROUP Verification Report October 27, 2017 Privileged and Confidential 18 Appendix C. Project Participants Name Company Email Phone Jonathan Gettler Design Engineers P.C. Jonathan.Gettler@designengineers.com 319-841-1944 Andrew Jorjorian Design Engineers P.C. Andrew.Jorjorian@designengineers.com 319-841-1944 Jared Ramthun Design Engineers P.C. Jared.Ramthun@designengineers.com 319-841-1944 Jon Schrobilgen Design Engineers P.C. JonS@designengineers.com 319-841-1944 Duane Van Hemert Iowa City Schools VanHemert.Duane@iowacityschools.org 319-688-1020 Michelle Webster Iowa City Schools Webster.Michelle@iowacityschools.org 319-688-1000 Brian Gibbs MidAmerican Energy Company BSGibbs@midamerican.com 319-341-4439 Amber Moser MidAmerican Energy Company ALMoser@midamerican.com 563-333-8049 Carly Smith MidAmerican Energy Company cssmith@midamerican.com 563-333-8206 Monica Davis OPN Architects, Inc. mdavis@opnarchitects.com 319.363.6018 Jeanne Huntsman The Weidt Group jeanneh@twgi.com 815-520-4550 Greg Kooker The Weidt Group gregk@twgi.com 515-271-9919 Matt Swenka The Weidt Group matts@twgi.com 515-271-9911