HomeMy WebLinkAbout4114046_Verification_Final_Report_20151204 Verification Report ICCSD New South Elementary School  Iowa City, Iowa  December 04, 2015   4114046 (7590.0248)  Prepared for  by 877.939.1874  midamericanenergy.com     877.938.1588 twgi.com  MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 1  Executive Summary  This report continues the Commercial New Construction program for the ICCSD New  South Elementary School.  MidAmerican Energy Company offers the Commercial New Construction program to  assist owners and design teams in evaluating potential energy conservation  strategies for new and renovated building projects during the design and  construction processes. During the design phase, the building Owner selected a  number of energy conservation strategies. In response, MidAmerican Energy offered  an incentive for the implementation of these strategies.  The new construction work has been completed and The Weidt Group has verified  that many of these conservation strategies have been installed. These measures  provide projected energy cost savings of over $71,000 per year, in relation to the  building baseline. Table A, below, provides further economic analysis of the energy  conservation investments.  Table A. Energy Conservation Investments ‐ Simple Payback Analysis  Project Incremental Construction Cost $416,984  Final MidAmerican Energy Incentive * $170,582  Project Adjusted Incremental Cost $246,402  Annual Energy Cost Savings $71,076   Payback, with incentive (in years) 3.5   * The MidAmerican Energy Commercial New Construction incentive cannot reduce  the simple payback below one year, may not exceed 70% of the total bundled  incremental strategy costs, and is capped at $1 million per building.  The simple payback analysis shows that the MidAmerican Energy incentive has  helped reduce the incremental costs associated with the energy conservation  strategy investments in this building, resulting in a payback of 3.5 years.   For more information, please refer to the following report.  MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 2  Table of Contents  Executive Summary .......................................................................................... 1  Introduction ...................................................................................................... 4  Process .............................................................................................................. 5  Strategy Summary List ...................................................................................... 6  Summary of Results ........................................................................................ 17  Building Summary ........................................................................................... 20  Category Summary ......................................................................................... 21    MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 3  Project Participants  Project Team  Owner ................................................................................................. Iowa City Schools   Duane Van Hemert  Architect ......................................................................................... OPN Architects, Inc.   Joe Tursi  Mechanical Engineer ........................................................................... Design Engineers   Jared Ramthun   Stephanie Riggan  Electrical Engineer ............................................................................... Design Engineers   Jonathan Gettler  Energy Design Assistance Team  Electric and Gas Utilities ................................................................ MidAmerican Energy   Marcus Galante   Claudia Hernandez   Amber Moser   Carly Smith  Energy Design Assistance Consultant .................................................. The Weidt Group   Jason Steinbock  Verification Consultant ........................................................................ The Weidt Group   John Sidey    MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 4  Introduction   This report documents the results of verification for several energy conservation  strategies for the ICCSD New South Elementary School project, and shows the results  of verification as compared to the baseline model.  The report follows the previous Commercial New Construction program report (from  May 16, 2014) for the project and serves as a final document for verifying energy  savings strategies implemented at this new building located in Iowa City, Iowa.  For this project, the Owner selected Bundle 2 for implementation. For more  information about selected bundle composition and strategy results, please see the  Bundle Requirements Document (from May 16, 2014). Upon selection, The Weidt  Group verifies the selected strategies via Construction Documents review, on site  verification of the strategies selected, and construction submittals.  The Weidt Group visited the ICCSD New South Elementary School on October 30,  2015. During this visit we verified the energy conservation strategies that had been  chosen for implementation.  MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 5  Process   The following list provides the process steps for this energy conservation program.   Commercial New Construction program  Establish goals and intentions  Computer modeling of baseline, strategies, and bundles   Bundle Selection by the Owner   Bundle Requirements Document  Summarizes key features/verification plan for all bundle strategies   Construction Documents Review  Reviews drawings to locate the energy conservation measures and notify the  Design Team of any changes from the selected bundle   Verification Study (following project completion and occupancy)  Request construction documents  Request submittals (e.g., glazing, insulation, cooling, heating plants)  Locate the energy conservation measures on site   Final Verification Report  Detail the findings of the verification process   Estimate of final energy savings for the building  Document final incentive    MidAmerican Energy Incentive Payment  MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 6  Strategy Summary List  The following table provides a complete list of the modeled energy conservation  strategies that were selected by the Design Team for installation.  Table 1. Bundled Strategies and Verification Results  ID Strategy Description Portion of Total kWh Savings Modeled Verified as Modeled? Portion of Total kWh Savings Verified Architectural EWC02 R-20 wall assembly 4% Yes 4% ERC02 R-25 roof assembly 2% Yes 2% WGB01 Curtainwall glazing - design team provided 4% Yes 5% WGC01 Solera glazing 4% Partial 3% Electrical DGA02 Dimming Daylighting - Art / Music Classrooms <1% Partial <1% DGA03 Dimming Daylighting - Gym <1% Yes <1% DGA04 Dimming Daylighting - Media Center <1% Yes <1% DGA05 Dimming Daylighting - Lobby, Vestibules, Stairs <1% Yes <1% DGA06 Dimming Daylighting - Commons <1% Yes <1% DGA07 Dimming Daylighting - Multi-Purpose <1% Yes <1% LCCL1 Classroom occupancy sensor control 1% Yes 1% LCCL4 Classroom banked switching <1% Yes <1% LCAM1 Art/Music Classroom occupancy sensor control <1% Yes <1% LCCC1 Computer Classroom occupancy sensor control <1% Yes <1% LCCC4 Computer Classroom banked switching <1% Yes <1% LCCI1 Corridor occupancy sensor control <1% Yes <1% LCRR1 Restroom occupancy sensor control <1% Yes <1% LCLO1 Lobby occupancy sensor control <1% Yes <1% LCPO1 Private office occupancy sensor control <1% Yes <1% LCCN1 Conference occupancy sensor control <1% Yes <1% LCGY1 Gym occupancy sensor control <1% Yes <1% LCGY5 Gym manual dimming <1% Yes <1% LCMC1 Library occupancy sensor control <1% Yes <1% LCDN1 Multi Purpose occupancy sensor control <1% Yes <1% LCCM1 Commons occupancy sensor control <1% Partial <1% LCKT1 Serving Kitchen occupancy sensor control <1% Yes <1% LCST1 Storage occupancy sensor control <1% Yes <1% LCWK1 Workroom occupancy sensor control <1% Yes <1% L02BW Building wide 30% lower than 90.1-2007 4% Yes 7% MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 7  ID Strategy Description Portion of Total kWh Savings Modeled Verified as Modeled? Portion of Total kWh Savings Verified Mechanical MGH03 2-stage ground heat pumps - Alternate 2 w/VFD 56% Yes 57% MOA02 CO2 control of OA - media center, gym, multi-purpose 2% Yes 2% MOA03 Transfer air: multi-purpose to kitchen <1% Yes <1% MOA04 Transfer air: classrooms to restrooms <1% Yes <1% MOA05 Transfer air: offices to restrooms <1% Yes <1% MOA09 Low wall classroom return 2% Yes 2% MHRT1 Total heat recovery - Alt 1 18% Partial 17% Total Savings 100% 104%    MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 8  Summary  Based on the Verification site visit and submittals received, the building is currently  saving 61% compared to the Baseline. As shown in Table 1, we have been able to  locate 104% of the documented, Bundle 2 savings. The list below details items that  are different from the Selected Bundle.  Wall Assembly   The verified wall assembly R‐value is higher than expected, resulting in more  savings.  Roof Assembly   The verified roof assembly R‐value is higher than expected, resulting in more  savings.  Glazing   The verified curtainwall glazing U‐factor and solar heat gain coefficient are lower  than expected, resulting in more savings.   The verified Solera glazing U‐factor and solar heat gain coefficient are higher than  expected, resulting in less savings  Daylighting   The verified daylighting control area is lower than expected in the Art / Music  classrooms resulting in less savings.   The verified daylighting control area is higher than expected in the gym, media  center, lobby, vestibule, stairs, and commons areas, resulting in more savings.  Lighting Control   The commons occupancy sensor control area is lower than expected, resulting in  less savings. Occupancy sensors were not found in commons area 112.    MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 9    Lighting Design   The verified lighting power density (Watt/sf) is higher than expected in the  corridor, private office, multi purpose, and serving / kitchen areas and lower than  expected in the classroom, art / music, computer classroom, restroom, lobby,  conference, gym, library, commons, storage, mechanical/electrical, workroom,  vestibule, stairs and team room areas, resulting in variations in savings. Overall  this strategy results in more savings. Please see the electrical portion of the report  for additional details.  Ground Heat Pump   The verified ARI ton‐weighted average EER and COP are higher than expected,  resulting in more savings. VFD control of the ground loop pumps has been verified  as expected.    Total Heat Recovery   The verified sensible heat recovery efficiency is higher than expected. The verified  latent heat recovery efficiency is lower than expected. Overall, the verified heat  recovery efficiencies are achieving less savings.  Further detail about these strategies may be found in the “Individual Strategy  Verification Results” section of this Report.   MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 10  Individual Strategy Verification Results  The following table(s) provides the field verification detailed findings for the  applicable strategies. In addition, the Appendices have further information and  calculations.  MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 11  Architectural Strategy Verification Results  ID Strategy Description Key Design  Parameter  Verification  Review Verification Findings  EWC02 R‐20 wall assembly R‐20 R‐23 The verified wall insulation is higher than expected, resulting  in more savings.  ERC02 R‐25 roof assembly R‐25 R‐27 The verified roof insulation is higher than expected, resulting  in more savings.  WGB01 Curtainwall glazing ‐ design  team provided  0.30 U‐factor  COG 0.24  The verified U‐Factor is lower than expected, resulting in  more savings.    The verified SHGC is lower than expected, resulting in more  savings.  0.43 U‐factor  Unit 0.37  0.38 SHGC 0.30  0.51 Vis Trans 0.49  WGC01 Solera glazing  0.20 U‐factor  COG 0.47  The verified U‐Factor is higher than expected, resulting in less  savings.    The verified SHGC is higher than expected, resulting in less  savings.  0.33 U‐factor  Unit 0.61  0.22 SHGC 0.31  0.37 Vis Trans 0.33    MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 12  Electrical Strategy Verification Results  ID Strategy Description Key Design  Parameter  Verification  Review Verification Findings  DGA02 Dimming Daylighting ‐ Art /  Music Classrooms 1,000 Control  Area sf 860 The verified control area is lower than expected, resulting in  less savings.  DGA03 Dimming Daylighting ‐ Gym 1,800 Control  Area sf 2,000  The verified control area is higher than expected, resulting in  more savings.  DGA04 Dimming Daylighting ‐ Media  Center 1,800 Control  Area sf 2,350  DGA05 Dimming Daylighting ‐ Lobby,  Vestibules, Stairs 2,600 Control  Area sf 2,900  DGA06 Dimming Daylighting ‐  Commons 200 Control  Area sf 300  DGA07 Dimming Daylighting ‐ Multi‐ Purpose 700 Control  Area sf 700  The verified control area meets the strategy requirements.  LCCL1 Classroom occupancy sensor  control 23,500 Control  Area sf 23,500  LCAM1 Art/Music Classroom occupancy  sensor control 2,300 Control  Area sf 2,300  LCCC1 Computer Classroom occupancy  sensor control 700 Control  Area sf 700  LCCI1 Corridor occupancy sensor  control 6,900 Control  Area sf 6,900  LCRR1 Restroom occupancy sensor  control 2,900 Control  Area sf 2,900  LCLO1 Lobby occupancy sensor control 2,500 Control  Area sf 2,500  LCPO1 Private office occupancy sensor  control 1,300 Control  Area sf 1,300  LCCN1 Conference occupancy sensor  control 700 Control  Area sf 700  LCGY1 Gym occupancy sensor control 7,100 Control  Area sf 7,100  LCMC1 Library occupancy sensor  control 2,800 Control  Area sf 2,800  LCDN1 Multi Purpose occupancy  sensor control 2,000 Control  Area sf 2,000  LCCM1 Commons occupancy sensor  control 2,800 Control  Area sf 2,500  The verified control area is lower than expected, resulting in  less savings. Occupancy sensors were not found in commons  area 112.  LCKT1 Serving Kitchen occupancy  sensor control 800 Control  Area sf 800  The verified control area meets the strategy requirements.  LCST1 Storage occupancy sensor  control 2,000 Control  Area sf 2,000  LCWK1 Workroom occupancy sensor  control 800 Control  Area sf 800  LCCL4 Classroom banked switching 23,500 Control  Area sf 23,500  LCCC4 Computer Classroom banked  switching 700 Control  Area sf 700  LCGY5 Gym manual dimming 7,100 Control  Area sf 7,100  L02BW Building wide 30% lower than  90.1‐2007 0.80 W/sf 0.49 The verified Watts/sq ft is lower than expected, resulting in  more savings.    MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 13  Space Type Lighting Power Density  Space Type Baseline lighting  power (W/sf)  Target lighting  power (W/sf)  Takeoff Lighting  power (W/sf)  Classroom 1.40 0.98 0.41  Art/Music Classroom 1.40 0.98 0.74  Computer Classroom 1.40 0.98 0.57  Corridor 0.50 0.35 0.42  Restroom 0.90 0.63 0.62  Lobby 1.30 0.91 0.37  Private office 1.10 0.77 0.79  Conference 1.30 0.91 0.49  Gym 0.90 0.63 0.55  Library 1.33 0.93 0.74  Multi Purpose 0.90 0.63 0.72  Commons 0.90 0.63 0.41  Serving Kitchen 1.20 0.84 1.14  Storage 0.80 0.56 0.52  Mechanical/electrical 1.50 1.05 0.38  Workroom 1.10 0.77 0.76  Vestibule 0.50 0.35 0.29  Stairs 0.50 0.35 0.27  Team Room 1.30 0.91 0.79  Building Average 1.14 0.80 0.49    MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 14  Site Photos  Image of gym area lighting    Image of typical classroom area lighting    MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 15  Mechanical Strategy Verification Results  ID Strategy Description Key Design  Parameter  Verification  Review Verification Findings  MGH03 2‐stage ground heat pumps ‐  Alternate 2 w/VFD  21.0 EER  4.00 COP  VFD Controlled Ground  Loop Pumps  23.2 EER  4.04 COP   VFD Controlled  Ground Loop  Pumps    The verified heating and cooling efficiencies are higher than  expected, resulting in more savings. VFD control of the  ground loop pumps has been verified as expected.  MOA04 Transfer air: classrooms to  restrooms Transfer make up air Yes Transfer air has been verified as expected.  MOA05 Transfer air: offices to  restrooms Transfer make up air Yes Transfer air has been verified as expected.  MOA09 Low wall classroom return VE 1.0 Yes Low wall return air grills have been verified as expected.  MOA02 CO2 control of OA ‐ media  center, gym, multi‐purpose  Reset OA  Control Type Yes CO2 control of outside air has been verified as expected.  MOA03 Transfer air: multi‐purpose to  kitchen Transfer make up air Yes Transfer air has been verified as expected.  MHRT1 Total heat recovery ‐ Alt 1  65% Sensible    65% latent  Efficiency ratio  74% Sensible  59% Latent  The verified sensible heat recovery efficiency is higher than  expected. The verified latent efficiency is lower than  expected. Overall, the verified heat recovery is achieving less  savings.    MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 16  Site Photos  Image of typical energy recovery unit   Image of water to water heat pumps  MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 17  Summary of Results  Tables 2 and 3 provide summarized and updated field‐verified energy savings  projections for this new building.   Table 2. “As Verified” energy savings and energy cost savings  Energy Parameter Baseline*Bundle 2, As  Modeled*  Bundle 2, As  Verified  Energy Cost $118,774 $50,827 $47,698  Energy Cost Savings $67,947 $71,076  Percent Energy Cost Savings 57%60%  Electricity Demand 435 kW 224 kW 222 kW Electricity Demand Savings 211 kW 213 kW Percent Electricity Demand Savings 49%49%  Electricity Consumption 1,469,798 kWh 605,599 kWh 572,000 kWh Electricity Consumption Savings 864,199 kWh 897,798 kWh Percent Electricity Consumption Savings 59%61%  Natural Gas Demand 00 therms/day 00 therms/day 00 therms/day Natural Gas Demand Savings 00 therms/day 00 therms/day Percent Natural Gas Demand Savings 0%0%  Natural Gas Consumption 0 therms 0 therms 0 therms Natural Gas Consumption Savings 0 therms 0 therms Percent Natural Gas Consumption Savings 0%0%  Incremental First Cost $416,984 $416,984  MidAmerican Energy Company Electric Incentive $163,334 $170,582  MidAmerican Energy Company Gas Incentive $0 $0   Final MidAmerican Energy Company Incentive**$163,334 $170,582  * The figures in the 'Baseline' and 'Bundle 2, As Modeled' are reprinted from the April 10, 2014 Design Assistance Bundle Report for this project,  which were the basis for the original energy savings projections.  ** Commercial New Construction cannot reduce the simple payback below one year; MidAmerican Energy's Commercial New Construction  incentive may not exceed 70% of the total bundled incremental strategy costs, and are capped at $1 million per building.  MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 18  Table 3. “As Verified” energy use intensity savings  Energy Parameter Baseline*Bundle 2, As  Modeled*  Bundle 2, As  Verified  Building Results   Energy Use Intensity (EUI) 76.3 kBtu/sqft 31.4 kBtu/sqft 29.7 kBtu/sqft EUI Savings 44.9 kBtu/sqft 46.6 kBtu/sqft Percent EUI Savings 59%61%    MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 19  Simple Payback Analysis  Table 4 shows the calculated simple payback for these energy investments with the  included MidAmerican Energy Company incentive. The table also provides payback  analysis of the As‐Verified Bundle 2.  Table 4. Bundle Simple Payback Analysis   Incremental  Construction  Cost  Final Total  Incentive  Adjusted  Incremental  Cost  Energy Savings  vs. Baseline  Payback w/  Incentive  Bundle 2 $416,984 $170,582 $246,402 $71,076 3.5  The simple payback analysis shows that the MidAmerican Energy Company incentive  has helped reduce the incremental costs associated with the energy conservation  strategy investments in this building, resulting in a payback of 3.5 years.   Note: Subject to the following qualifications, the computer model offers  sophisticated predictions of energy savings with estimations as good as any other  means available for a building that has not been built.   The baseline and as‐verified results compare relative differences in net energy use for  design alternatives. The actual energy use of this building will be different from  simulated results. Building systems and other operating parameters provided by the  Design Team and modeled through this program approximate actual conditions, but  differences in weather, operating parameters, occupancy level, and changes that  occur through the bidding and construction process will result in annual energy costs  that will be different from what is predicted here.   Thus, implementation of a bundle of strategies offers the opportunity for energy  savings, but the realization of those savings is the responsibility of the  owner/operator of the building‐ not The Weidt Group or MidAmerican Energy  Company. Savings are not guaranteed.  MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 20  Building Summary  Building Summary  Building type Elementary School  Location Corner of Sycamore Street and Daniel Place, Iowa City, Iowa  Building area 65,757 sq ft  Number of stories Grades 1‐6 will be a 2‐story wing.  Other areas are 1‐story.  Building structure Concrete block, roof is steel deck with insulation above.  Building organization South wing is education with grades pre‐k to 6th.  North wing contains library,  gym, art, music and multi‐purpose space.  Building operation hours Weekdays:  7:30 am to 5:00 pm for classroom areas, gym until 10 pm  Weekends:  Classroom areas are unoccupied, gym used heavily  Summer:  Classroom areas unoccupied, gym and admin used heavily  Summer is from June 1 to August 1.  Glazing systems Considering either 6" curtainwall or possibly store front glazing in the punched  openings as an alternate.  Lighting system(s) Mix of fluorescent and LED lighting.  Occupancy sensors used throughout.  Daylighting controls are being considered for multi‐purpose, media center,  commons and main lobby.  HVAC system(s) Horizontal well field coupled to water to air heat pumps, 1 per thermal zone.  Dedicated outside air units serving the building with total energy recovery  and water to water heat pumps.  Considering radiant floor heat in some areas.  Service hot water system is electric tank style water heaters.  Areas heated All  Areas cooled All  Electric utility MidAmerican Energy  Gas utility MidAmerican Energy  Approx. construction document  completion date  April 2014  Approx. construction start May 2014  Approx. occupancy date  June 2014     MidAmerican Energy ICCSD New South Elementary School, Iowa City, Iowa  Commercial New Construction program © THE WEIDT GROUP Verification Report  December 04, 2015 Privileged and Confidential 21  Category Summary  Category Description Strategies Annual  Energy  Cost  Savings  ($)  Annual Total  Electric  Consumption  Savings  (kWh)  Electric  Demand  Savings  (kW)  Annual  Natural Gas  Consumption  Savings  (Therms)  Electric  Incremental  Cost  ($)  Natural Gas  Incremental  Cost  ($)  Envelope Insulation  Strategies  EWC02, ERC02 $4,318 57,213 0 0 $77,720 $0 Window Glazing Strategies WGB01, WGC01 $5,452 66,793 49 0 $6,865 $0 Daylighting Control  Strategies  DGA02, DGA03,  DGA04, DGA05,  DGA06, DGA07  $1,294 13,672 0 0 $9,930 $0 Lighting Control Strategies LCCL1, LCAM1, LCCC1,  LCCI1, LCRR1, LCLO1,  LCPO1, LCCN1, LCGY1,  LCMC1, LCDN1, LCCM1,  LCKT1, LCST1, LCWK1,  LCCL4, LCCC4, LCGY5  $2,695 28,278 3 0 $18,969 $0 Lighting Design Strategies L02BW $5,357 58,697 6 0 $0 $0 Heat Pump Efficiency  Strategies  MGH03 $37,930 489,452 168 0 $312,500 $0 Alternative HVAC System  Strategies  MFD00, MOA04,  MOA05, MOA09  $1,266 15,884 1 0 ‐$32,000 $0 Conditioning of Outside Air  Strategies  MOA02, MOA03,  MHRT1  $12,764 167,809 ‐14 0 $23,000 $0 Total As Verified Bundle Savings $71,076 897,798 213 0 $416,984 $0