Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Sewer Rehab Door Hanger Info
. \\'\\ your Wat. ,, e,. 'lt"'e -oe\ow for <1. <,'5' � i> $l �Q.,-SI �� (I) .....-"' . ---------- Your Sewer Access Will Temporarily Be Shut Off! r� AEGION. � lnsituform· Stronger. Safer. Infrastructure." In the next few days, we will be in the neighborhood reconstructing certain sewer pipes in need of repair. lnsituform is under contract by your local government. The lnsituform® process repairs pipes without digging up your neighborhood. This helps to preserve your property and minimize any inconveniences. Please bear with us as we repair your sewer system. We apolog ize for any equipment noise which may be created . While the work is being performed, your sewer service connection will be temporarily sealed off (see Figure 3). We need your cooperation to avoid backup of sewer water into your residence or business by preventing water from escaping through any drain during the specified time period. 0 Do not wash clothes or dishes. f)Do not take showers or baths. @) Do not flush toilets. 0 Turn off sump pumps which are connected to the sewer service. If any problem occurs with your sewer service during this rehabilitation process, please visit one of our on-site representatives. If you have any questions after completion of the project, please call the local representative listed below, not a plumber. lnsituform is sending this handout to provide advance notice before beginning actual work. Please do not use water during the hours of: ____ to ____ on __________ _ Day and Date Local Representative Phone No. For additional questions regarding our process, please visit www.insituform.com or call our headquarters at 636.530.8000. Thank you for your cooperation. We have enjoyed being your neighbor-if only for a day. AB12B1 DOC ID: COR/FRM-OPR-10 EFF. DATE: 03/01/01 APPROVAL: CO. MGMT. REP: ON FILE Revised 09/16 © 201 6 Aegion Corporation