Loading...
HomeMy WebLinkAboutAppendix A - 2018 Iowa DOT - Iowa City Transit Facility Condition Assessment pg. 1 www.iowadot.gov/transit 800 Lincoln Way, Ames IA 50010 Transit Facility Condition Assessment App Full Report Iowa City Transit Region Iowa City Iowa City, IA Type of Facility: General Purpose Maintenance Facility/Depot Primary Mode of Facility: MB - Bus Facility Contact: Darian Nagle-Gamm Date of Assessment: Jul 10, 2018 Condition Assessment Overall Condition Rating: 2.86 Substructure Subtotal 1 Shell Subtotal 2.25 Interiors Subtotal 3 Conveyance Subtotal 0 Plumbing Subtotal 3.75 HVAC Subtotal 2.75 Fire Protection Subtotal 3 Electric Subtotal 4 Site Subtotal 3.16 Overall Conditional Rating 2.86 pg. 2 Purpose of Facility Assessment: The transportation reauthorization legislation Moving Ahead for Progress in the 21st Century (MAP-21) contains several provisions impacting 49 U.S.C. §5335. Section 20025 of MAP-21 required of grant recipients, and a requirement that Secretary of Transportation develop a FTA Facility Condition Assessment Guidebook the condition of capital assets of recipients, including equipment, rolling stock, Assessment Scale: The condition measure used in the National Transit Database (NTD) is the five-point scale used by FTA's Transit Economic Requirements Model (TERM). This scale has the following values: 5 Excellent, 4 Good, 3 Adequate, 2 Marginal, 1 Poor. An asset is deemed to be in good repair if it has a rating of 3, 4 or 5 on this scale. Likewise, a facility is deemed to be not in good repair if it has a rating of 1 or 2. Rating Condition Description 5 Excellent No visible defects, new or near new condition, may still be under warranty if applicable 4 Good Good condition, but no longer new, may have some slightly defective or deteriorated component(s), but is overall functional 3 Adequate Moderately deteriorated or defective components; but has not exceeded useful life 2 Marginal Defective or deteriorated component(s) in need of replacement; exceeded useful life 1 Poor Critically damaged component(s) or in need of immediate repair; well past useful life pg. 3 Facility Information Is this a section of a larger facility?No Is this facility federally funded?Yes What percentage of the facility is federally funded? Type of facility: General Purpose Maintenance Facility/Depot Primary Mode of Facility: MB - Bus Year Built or Reconstructed as new:1984 Size in Square Feet: Facility Contact: Darian Nagle-Gamm Date of Assessment: Jul 10, 2018 Condition Assessment Overall Condition Rating: 2.86 Substructure Subtotal 1 Shell Subtotal 2.25 Interiors Subtotal 3 Conveyance Subtotal 0 Plumbing Subtotal 3.75 HVAC Subtotal 2.75 Fire Protection Subtotal 3 Electric Subtotal 4 Site Subtotal 3.17 Overall Conditional Rating 2.86 pg. 4 A. Substructure Foundations Poor Basement Poor Substructure Subtotal 1 B. Shell Superstructure/ structural frame Marginal Roof Adequate Exterior Adequate Shell Appurtenances Poor Shell Subtotal 2.25 C. Interiors Partitions Adequate Stairs Not Applicable Finishes Adequate Interiors Subtotal 3 D. Conveyance Elevators Not Applicable Escalators Not Applicable Lifts Not Applicable Conveyance Subtotal 0 E. Plumbing Fixtures Good Water Distribution Adequate Sanitary Waste Good Rain Water Drainage Good Plumbing Subtotal 3.75 pg. 5 F. HVAC Heating Generation and Distribution Systems Adequate Cooling Generation and Distribution System Adequate Testing, Balancing, Controls and Instrumentation Adequate Chimneys and Vents Marginal HVAC Subtotal 2.75 G. Fire Protection Sprinklers Adequate Standpipes Marginal Hydrants and Other Fire Protection Specialties Good Fire Protection Subtotal 3 H. Electrical Electrical Service and Distribution Good Lighting and Branch Wiring Good Communications and Security Good Other Electrical Systems-Related Pieces Good Electrical Subtotal 4 I. Site Roadways / Driveways Adequate Parking Lots Adequate Pedestrian Areas Marginal Site Development Good Landscaping and Irrigation Adequate Site Utilities Good Site Subtotal 3.17 Overall Notes: 1983. Built over a landfill. Lots of structural issues. pg. 6 pg. 7 Photo Photo Photo Photo pg. 8 Photo Photo Photo Photo pg. 9 Photo Photo Photo Photo pg. 10 Photo Photo Photo Photo pg. 11 Photo Photo Photo Photo pg. 12 Photo Photo Photo Photo pg. 13 Photo Photo Photo Photo pg. 14 Photo Photo Photo Photo pg. 15 Photo Photo Photo Photo pg. 16 Photo Photo Photo Photo pg. 17 Photo Photo Photo Photo pg. 18 Photo Photo Photo Photo pg. 19