HomeMy WebLinkAboutPublic Notice Open House Letter_Fairchild_SKS Comments(110921) (002) (002) November 10, 2021 RE: Fairchild Street Reconstruction Project Dear Property Owner/Resident: Shive-Hattery has been hired by the City of Iowa City to perform preliminary and final design services for the Fairchild Reconstruction Project. The project generally includes the reconstruction of Fairchild Street from Clinton Street to Linn Street. As a property owner/resident located near the project, we would like to invite you to attend an informational meeting to discuss the proposed improvements to Fairchild Street. The meeting will feature exhibits that illustrate the planned improvements, including how the project will be built, traffic access during construction, and anticipated schedule. Residents are invited to learn more about the proposed improvements, provide feedback to the design team, and ask questions related to the project. The meeting will be held via Zoom on Thursday, November 18th, 2021 from 6:00 pm – 7:00 pm. Zoom Meeting Information Topic: Fairchild Street Reconstruction Public Meeting Time: Nov 18, 2021 06:00 PM Central Time (US and Canada) Join Zoom Meeting https://us06web.zoom.us/j/86263924935 Meeting ID: 862 6392 4935 Find your local number: https://us06web.zoom.us/u/kbDNzlI0US The meeting will include a formal presentation to start and the design consultant along with City staff will be available to answer any questions you may have regarding the project for the remainder of the meeting time. If you are unable to attend the meeting, please feel free to fill out the enclosed comment form and mail it back at your earliest convince or feel free to contact us at: Alin Dumachi, P.E., Civil Engineer Dave Panos, P.E., Project Manager City of Iowa City – Engineering Division Shive-Hattery Phone: (319) 356-5140 Phone: (319) 892-3660 Alin-dumachi@iowa-city.org dpanos@shive-hattery.com (see reverse for project information) PROJECT INFORMATION SUMMARY OF IMPROVEMENTS: This project will include replacement of Fairchild Street from Clinton Street to Linn Street. The work will include removal and salvage of the existing brick street. Rebuilding the street with a new concrete base and re-installation of the brick surface with new concrete curb and gutter. This work will result in a completed street similar to the current Davenport Street between Clinton Street and Linn Street. Sidewalk along each side of Fairchild will also be replaced and sidewalk at the intersections will be replaced to add ADA complaint sidewalk ramps. The work will also include the following: • New 8” Water Main • New drainage system including storm sewer piping and intakes PROJECT TIMELINE: The project is anticipated to start in Spring 2022, with completion by Fall 2022. HOW WILL IMPROVEMENTS BE PAID FOR? The project will be funded by City Road Use tax revenues and was budgeted under the City Capital Improvement Program. Costs for improvements will not be assessed to properties adjoining the project. WILL STREETS BE CLOSED DURING CONSTRUCTION? Construction on Fairchild Street will require closure of Fairchild Street. WILL I HAVE ACCESS TO MY PROPERTY? Work will require removal and replacement of driveways. Access will be limited to alleyway access for property with alley access. Property with only access from Fairchild will require staged driveway construction to maintain access. WILL SIDEWALKS BE REPLACED? Sidewalk will be replaced within the project limits. Sidewalk ramps will be installed or replaced to meet code and ADA requirements. WILL MY WATER/SANITARY SEWER SERVICE BE DISRUPTED? Minor interruptions to water or service of select properties will occur and will need to be coordinated to reduce impact. The City contractor will coordinate service interruptions directly with property owners to minimize inconvenience. Thank you for your collaboration as we work to improve our streets.