Loading...
HomeMy WebLinkAbout11.Proposed Two Building Transit Facility Concept3 February 28th, 2023 Figure 2: Proposed Two-Building Transit Facility Concept Detailed Expense Breakdown Building 1 is designed to solely support Transit operations, therefore 100% of expenses related to this facility are federally eligible for grant funding. Building 1 is estimated to cost $17,000,000. The federally eligible Transit expenses for Building 2 were calculated by determining the square footage designated for exclusive use by the Transit or Equipment Divisions. The remaining square footage, common or shared spaces, was divided in half and assigned to each division (Table 1). Building 2 is expected to cost approximately $18,000,000 with federally eligible Transit expenses of $9,150,000. The Equipment Division will contribute the remaining $9,000,000 to complete Building 2. Building 1 – Transit Ops & Bus Storage and Charging Building 2 – Shared Transit & Equipment Maintenance