HomeMy WebLinkAbout2024-2028 Capital Improvement PlanCAPITAL PROJECTS FUND
Fund Summary
Summary by Division
Summary by Funding Source
Annual Recurring Projects Project Summary by Name
Unfunded Projects
F
Y
2
0
2
5
CAPITAL PROJECTS FUND
The Capital Projects Fund accounts for the collection and disbursement of funds related
to capital improvements or significant capital equipment. The City annually updates and
issues a five-year capital improvement program (CIP). This program is the planning
guide for the City’s issuance of bonded debt and for the construction and replacement of
the City’s buildings and infrastructure. The first two years of the five-year capital
improvement program (CIP) are certified as part of the operating budget in the Capital
Projects Fund. The current five-year CIP is for years 2024-2028. Additional information
for the City’s five-year CIP program including maps and photos is available on the City’s
web page: https://www.icgov.org/budget under the Capital Improvement Program
heading.
Capital improvement projects involve the construction, purchase, or renovation of city
facilities or property. Most of the projects are specific, non-recurring major improvements
to the City's physical plant, are permanent in nature, and are greater than $25,000 and
have a useful life of three years or more. The City also budgets annually recurring
project funds for non-specified improvements of a specific nature; these funds are to be
spent on improvements that meet the same definition above. Funding sources for
capital improvement projects may be from operating funds, bond proceeds, grants,
donations, and a variety of other funding sources. The three largest sources of funds
are operating transfers in, bonded debt, and state and federal grants.
For the CIP for years 2024-2028, the total funding sources are $260,152,947, and the
total expenditures are $274,559,947. The difference between the total expenditures and
the total funding sources over the five-year period is a result of prior plan funding
sources that are being utilized to cover current plan expenditures such as engineering
and design.
The 2025 CIP expenditures of $76,043,300 will be certified as part of the fiscal year
2025 operating budget.
The 2025 CIP funding sources of $75,808,300 will also be certified as part of the fiscal
year 2025 operating budget. Budgeted fiscal year 2025 Capital Projects Fund revenues
and transfers in also include a transfer in from the TIF funds to reimburse for prior year
expenditures of $200, other local government funding of $85,200 to be used on a future
project and $75,000 of CDBG funds to be used on a project yet to be determined. Total
Capital Projects Fund fiscal year 2025 budgeted revenues and transfer in are
$75,968,700.
The changes to the 2024 CIP are amended into the fiscal year 2024 operating budget.
The fiscal year 2024 Capital Projects Fund expenditure budget also includes totals from
the carry forward of prior year projects that must be re-appropriated with the State. The
amounts being carried forward from prior years are not included in the five-year CIP
totals. The revised Capital Projects Fund expenditures for fiscal year 2024 are
$126,734,518; the revised budget includes the 2024 CIP expenditures of $68,634,952
and prior year project carry forwards of $58,099,566.
The revised fiscal year 2024 Capital Projects Fund revenues and transfers in budget
also includes totals from the carry forward of prior year projects. The amounts being
carried forward from prior years are not included in the five-year CIP totals. The revised
Capital Projects Fund revenues and transfers in for fiscal year 2024 are $83,437,663;
the revised budget includes the 2024 CIP funding sources of $73,929,952 and a transfer
in from the TIF funds to reimburse for prior year expenditures of $200, and prior year
project carry forwards of $9,507,511.
Fund balance in the Capital Projects Fund primarily represents unspent funding sources
from the current year and prior years. This balance fluctuates based on the timing of the
issuance of bonds and the timing of the project expenditures. The estimated ending
fund balance for fiscal year 2025 is $7,420,370.
2022 2023 2024 2024 2025 2026
Actual Actual Budget Revised Budget Projected
Fund Balance, July 1 42,097,840$ 46,227,340$ 235,025$ 50,866,819$ 7,569,964$ 7,420,370$
Revenues:
Use Of Money And Property
Interest Revenues 139,244$ 1,134,737$ -$ -$ -$ -$
Intergovernmental
Federal Intergovernmental Revenue 4,153,774 3,938,874 420,000 8,578,074 28,650,000 5,108,991
Disaster Assistance - - - - - -
Other State Grants 1,276,345 506,635 850,000 1,994,823 - 8,200,000
State 28E Agreements 95,035 92,907 525,000 850,000 185,200 150,000
Local 28E Agreements 25,000 30,000 30,000 30,000 - -
Miscellaneous
Contributions & Donations 52,367 219,826 - - - -
Printed Materials 570 - - - - -
Other Miscellaneous Revenue 634,881 879,316 - 1,800,000 - -
Other Financial Sources
Sale Of Assets - 1,409,975 - - - -
Debt Sales 10,790,326 10,541,862 42,535,000 42,980,000 16,350,000 14,013,000
Internal Service (Non-Budgetary):
ITS Fund - 705 - - - -
Sub-Total Revenues 17,167,542 18,754,837 44,360,000 56,232,897 45,185,200 27,471,991
Transfers In:Transfers-In from Governmental
Funds 4,756,585 4,976,342 6,214,516 7,179,516 14,288,000 5,887,800
Transfers-In from Enterprise Funds 8,468,773 13,895,163 13,038,750 19,731,250 8,920,500 6,334,554
Miscellaneous Transfers-In 1,081,114 84,795 75,000 75,000 75,000 -
Internal Service (Non-Budgetary):
Equipment Fund - 1,000,000 7,500,000 - 7,400,000 -
ITS Fund - 100,000 100,000 100,000 100,000 100,000
Sub-Total Transfers In 14,306,472 20,056,300 26,928,266 27,085,766 30,783,500 12,322,354
Total Revenues & Transfers In 31,474,014$ 38,811,137$ 71,288,266$ 83,318,663$ 75,968,700$ 39,794,345$
Expenditures:
Governmental:
General Government 231,848$ 264,101$ 415,000$ 1,294,077$ 50,000$ 50,000$
Culture & Recreation 2,643,138 3,747,365 2,520,000 13,440,054 12,075,000 7,700,000
Community and Economic Dvlpmnt 64,271 34,685 - 361,282 - -
Public Safety 636,140 684,999 - 3,604,036 625,000 2,050,000
Public Works 16,102,880 18,218,651 28,243,470 33,222,288 28,297,794 25,662,800
Enterprise:
Parking Operations 725,851 1,872,052 1,000,000 2,507,464 1,450,000 1,350,000
Public Transportation 148,467 1,895 325,000 8,544,031 20,705,500 25,000
Wastewater Treatment 2,980,470 3,299,955 25,755,000 43,186,268 560,000 926,000
Water Operations 1,240,873 702,043 3,144,000 3,858,320 970,000 3,100,000
Refuse Operations 544,461 - - - - -
Landfill 750,540 2,371,266 3,027,750 11,404,743 4,000,000 60,000
Storm Water 500,295 1,892,369 740,000 2,295,621 785,000 780,000
Airport 350,281 1,047,276 467,000 2,696,629 6,500,000 932,545
Internal Service (Non-Budgetary):
ITS Fund - - 100,000 200,705 100,000 100,000
Sub-Total Expenditures 26,919,514 34,136,657 65,737,220 126,615,518 76,118,294 42,736,345
Transfers Out:
Miscellaneous Transfers Out 425,000 - - - - -
Sub-Total Transfers Out 425,000 35,000 - - - -
Total Expenditures & Transfers Out 27,344,514$ 34,171,657$ 65,737,220$ 126,615,518$ 76,118,294$ 42,736,345$
Fund Balance, June 30 46,227,340$ 50,866,819$ 5,786,071$ 7,569,964$ 7,420,370$ 4,478,370$
Capital Projects Fund
Fund Summary
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa
CATEGORY SUMMARY
thru2024 2028
TotalCategory20242025202620272028
Airport 2,197,732 6,500,000 932,545 1,250,000 150,000 11,030,277
Equipment 12,000,000 12,000,000
Finance Administration 100,000 100,000 100,000 100,000 100,000 500,000
Fire 130,000 500,000 2,050,000 9,500,000 12,180,000
Government Buildings 1,000,000 250,000 450,000 250,000 50,000 2,000,000
Landfill 4,410,750 4,000,000 60,000 689,250 222,500 9,382,500
Library 55,000 775,000 830,000
Parking Operations 1,015,000 1,450,000 1,350,000 1,685,000 2,565,000 8,065,000
Parks Maintenance 2,675,000 1,450,000 4,200,000 1,720,000 1,540,000 11,585,000
Police 125,000 125,000
Public Works Administration 400,000 400,000
Recreation 550,000 10,350,000 500,000 50,000 50,000 11,500,000
Senior Center 1,825,000 1,825,000 3,650,000
Stormwater 935,000 785,000 1,090,000 240,000 240,000 3,290,000
Street Operations 12,728,470 15,897,800 25,662,800 24,382,800 28,762,800 107,434,670
Transit Operations 7,285,000 20,705,500 25,000 25,000 25,000 28,065,500
Wastewater Treatment 32,723,000 560,000 926,000 2,141,000 4,972,000 41,322,000
Water Operations 2,830,000 970,000 3,100,000 2,250,000 2,050,000 11,200,000
68,634,952 76,043,300 43,046,345 46,108,050 40,727,300 274,559,947TOTAL
Airport, $11,030,277
Equipment, $12,000,000
Government Buildings,
$2,000,000
Landfill, $9,382,500
Parking Operations,
$8,065,000 Parks Maintenance,
$11,585,000
Public Works
Administration,
$400,000
Street Operations,
$107,434,670
Recreation, $11,500,000
Stormwater, $3,290,000
Library, $830,000
Transit Operations,
$28,065,500
Fire, $12,180,000
Police, $125,000
Finance Administration,
$500,000
Wastewater Treatment,
$41,322,000
Senior Center,
$3,650,000
Water Operations,
$11,200,000
Capital Improvement
Program by Division
2024-2028
$274,559,947
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa
PROJECTS BY CATEGORY
2024 2028thru
Total20242025202620272028CategoryProject #Priority
Airport
A3465 150,000150,000Runway 7 Environmental Assessment 2
A3471 875,000875,000Runway 12/30 Threshold Displacement/Relocation 1
A3473 1,250,0001,250,000Airport Apron Expansion 2
A3474 300,000300,000Runway 7/25 Pavement Repairs 1
A3475 167,000167,000Runway 12/30 Pavement Repairs 1
A3478 7,000,000500,000 6,500,000Terminal Building Remodel/Reconstruction 1
A3480 200,000200,000Terminal Building Space Needs Study 1
A3481 1,088,277622,732 465,545Airport Solar 2
11,030,2772,197,732 6,500,000 932,545 1,250,000 150,000Airport Total
Equipment
P3953 12,000,00012,000,000Equipment Maintenance Facility replacement 2
12,000,00012,000,000Equipment Total
Finance Administration
I4721 500,000100,000 100,000 100,000 100,000 100,000Fiber Infill & Cameras 2
500,000100,000 100,000 100,000 100,000 100,000Finance Administration Total
Fire
Z4406 1,550,0001,550,000Fire Apparatus Replacement Program 1
Z4409 130,000130,000Fire Station #1 Apparatus Bay Slab Reconstruction 2
Z4411 10,000,000500,000 9,500,000Fire Station #5 Construction and #3 Replacement 2
Z4413 500,000500,000Rehab of Sleeping Areas & Alerting System Station1 2
12,180,000130,000 500,000 2,050,000 9,500,000Fire Total
Government Buildings
R4129 250,00050,000 50,000 50,000 50,000 50,000City Hall - Other Projects 1
R4194 250,000250,000Climate Action Facility Improvements 3
R4351 700,000700,000Recreation Center Improvements 2
R4381 200,000200,000Event Facility Improvements 2
R4388 600,000400,000 200,000ADA Elevator Improvements 1
2,000,0001,000,000 250,000 450,000 250,000 50,000Government Buildings Total
Landfill
L3328 4,250,0004,250,000Landfill Equipment Building Replacement 2
L3333 4,000,0004,000,000Compost Pad Improvements & Expansion 2
L3335 850,000160,750 689,250Landfill Dual Extraction System Expansion 3
L3348 207,50060,000 147,500Site Flow Improvements 3
L3349 75,00075,000Landfill Future Cell - Northeast Expansion 4
Total20242025202620272028CategoryProject #Priority
9,382,5004,410,750 4,000,000 60,000 689,250 222,500Landfill Total
Library
B4343 775,000775,000Carpet and Furnishings Replacement 2
B4347 55,00055,000ICPL Boardroom & Meeting Room E Renovation 2
830,00055,000 775,000Library Total
Parking Operations
T3004 6,025,000525,000 1,000,000 1,250,000 1,500,000 1,750,000Parking Facility Restoration Repair 2
T3021 150,000150,000Video Cameras for Parking Facilities 3
T3025 440,000240,000 200,000Replacement of LED fixtures in Parking Facilities 2
T3026 1,000,000185,000 815,000Tower Place Drainage Modifications 3
T3028 150,000150,000Tower Place Office Remodel 3
T3070 300,000100,000 100,000 100,000Replace Door-Door Closures in Parking Facilities 1
8,065,0001,015,000 1,450,000 1,350,000 1,685,000 2,565,000Parking Operations Total
Parks Maintenance
R4130 490,00090,000 100,000 100,000 100,000 100,000Parks Annual Improvements/Maintenance/ADA 1
R4132 150,000150,000Park Annual ADA Accessibility Improvements 2
R4206 750,000150,000 150,000 150,000 150,000 150,000Intra-city Bike Trails/Bridges 2
R4227 1,700,000200,000 1,500,000Hwy 6 Sidepath - Broadway to Fairmeadows 5
R4346 250,000250,000Palisades Park Development 2
R4358 750,000750,000Lower City Park Shelters & Restroom Replacement 2
R4362 450,000450,000Napoleon Park Softball Fields 5-8 Renovation 3
R4372 1,300,0001,300,000Terrell Mill Skate Park Redevelopment 5
R4380 275,00075,000 50,000 50,000 50,000 50,000Annual Contracted Tree Planting 4
R4384 200,000200,000Benton Hills Playground Replacement 2
R4385 400,000400,000College Green Park Playground 2
R4389 300,000300,000N. Market Square Playground Replacement 2
R4390 240,000240,000Reno Street Park Renovations 2
R4392 700,000700,000Westside Park Land Acquisition 2
R4397 260,000260,000Court Hill Trail Beech to Scott Replacement 2
R4398 300,000300,000Thornberry and Rita's Ranch Dog Park Improvements 2
R4400 150,000150,000Mercer Shelter Replacement 2
R4401 250,000250,000Parks Storage Building 2
R4403 1,700,000250,000 1,450,000Carson Lake Park 2
R4408 720,000720,000Columbarium Construction/Expansion 2
R4409 250,000250,000New Park Development - Location Unspecified 2
11,585,0002,675,000 1,450,000 4,200,000 1,720,000 1,540,000Parks Maintenance Total
Police
Y4446 125,000125,000Body Cameras & In Car Video Systems 3
125,000125,000Police Total
Public Works Administration
P3988 400,000400,000Entrance Way Improvements 4
400,000400,000Public Works Administration Total
Recreation
R4229 10,800,000500,000 10,300,000City Park Pool Replacement 3
R4330 250,00050,000 50,000 50,000 50,000 50,000Annual Recreation Center Improvements 2
R4406 250,000250,000RALRC Structural Cables 2
Total20242025202620272028CategoryProject #Priority
R4407 200,000200,000Mercer & RALRC HVAC Replacement 2
11,500,000550,000 10,350,000 500,000 50,000 50,000Recreation Total
Senior Center
K1003 3,650,0001,825,000 1,825,000Senior Center Interior Improvements Project 3
3,650,0001,825,000 1,825,000Senior Center Total
Stormwater
M3631 1,200,000240,000 240,000 240,000 240,000 240,000Annual Stormwater Improvements 2
M3634 500,00095,000 405,000Rundell Street Pump Station Vault Modifications 2
M3635 990,000140,000 850,000River Street Storm Sewer Improvements 2
M3637 500,000500,000Peterson Street Storm Sewer Improvments 1
M3638 100,000100,000Storm Sewer Asset Inventory 3
3,290,000935,000 785,000 1,090,000 240,000 240,000Stormwater Total
Street Operations
S3814 1,400,000200,000 300,000 300,000 300,000 300,000Annual Traffic Signal Projects 3
S3816 245,00045,000 50,000 50,000 50,000 50,000Traffic Calming 3
S3822 500,000100,000 100,000 100,000 100,000 100,000Curb Ramps-ADA 1
S3824 11,305,7882,125,388 2,145,100 2,345,100 2,345,100 2,345,100Annual Pavement Rehabilitation 1
S3826 1,058,882188,082 217,700 217,700 217,700 217,700Underground Electrical Facilities 2
S3827 200,00050,000 50,000 50,000 50,000Bicycle Master Plan Implementation 3
S3910 1,600,000400,000 300,000 300,000 300,000 300,000Annual Bridge Maintenance & Repair 1
S3939 3,730,0003,730,000Dubuque Street Reconstruction 1
S3946 10,050,000950,000 9,100,000Court Street Reconstruction 2
S3951 150,000150,000Hwy 1/Hwy 6 Intersection Improvements Study 2
S3952 19,800,000200,000 150,000 19,450,000Dodge Street Reconstruct - Governor to Burlington 2
S3953 5,000,000425,000 4,575,000Market St & Jefferson St Two-Way Conversion 2
S3955 2,550,000265,000 2,285,000N. Gilbert Street Reconstruction 2
S3956 1,375,0001,375,000Gilbert Street Bridge Replacement 1
S3959 12,200,00012,200,000Taft Avenue Reconstruct - Am Legion to Lwr West Br 2
S3960 100,000100,000Oakdale Blvd Extension - Alignment Study 2
S3963 30,125,000325,000 800,000 2,450,000 5,725,000 20,825,000Burlington Street Bridge Replacement 1
S3978 1,575,0001,575,000Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab 1
S3981 320,000320,000Camp Cardinal / Kennedy Parkway - Ped Accom 2
S3982 450,000450,000North Dodge St / ACT Circle - Signalization 2
S3983 2,650,000300,000 2,350,000Iowa Avenue Improvements 2
S3984 50,00050,000High Street & Southgate Ave Sidewalk Infill Proj 3
S3986 1,000,0001,000,000Camp Cardinal Road Extension Project 3
107,434,67012,728,470 15,897,800 25,662,800 24,382,800 28,762,800Street Operations Total
Transit Operations
T3055 27,465,5006,785,000 20,680,500Transit Maintenance Facility Relocation 2
T3059 125,00025,000 25,000 25,000 25,000 25,000Transit Interchange and Bus Stop Improvements 2
T3068 300,000300,000Transit Bus Video System 2
T3069 175,000175,000Bus Driver Protection Doors 2
28,065,5007,285,000 20,705,500 25,000 25,000 25,000Transit Operations Total
Wastewater Treatment
V3101 3,000,000500,000 500,000 500,000 750,000 750,000Annual Sewer Main Replacement 2
V3151 14,300,00014,300,000Digester Complex Rehabilitation 1
V3162 155,000155,000Benton Street Trunk Sewer Improvements 1
V3164 300,000300,000Return Activated Sludge Pump Replacement 2
Total20242025202620272028CategoryProject #Priority
V3165 300,000300,000Replacement of Influent Pump Station Pumps 2
V3169 2,825,000325,000 2,500,000Napoleon Lift Station Improvements 1
V3170 350,000350,000WWTP Roof Replacements 1
V3174 750,000300,000 350,000 100,000Aeration Equipment Improvements 3
V3175 285,000285,000Wastewater Treatment Facility Imp 2022 1
V3177 743,000683,000 60,000HVAC Replacement 2
V3178 705,000705,000Primary Clarifier Repairs 2
V3179 1,662,000195,000 1,467,000Rotating Drum Thickener Replacement 1 and 2 2
V3183 76,00076,000Effluent Water Pump Station Improvements 2
V3184 15,000,00015,000,000Wastewater Digester Gas Improvements 2
V3185 871,000871,000WW Treatment Plant Secondary Clarifier Repairs 2
41,322,00032,723,000 560,000 926,000 2,141,000 4,972,000Wastewater Treatment Total
Water Operations
W3300 800,00080,000 720,000Bradford Drive Water Main Replacement 2
W3314 1,375,0001,375,000High Service Pump VFD Replacement 2
W3320 1,000,0001,000,000Hwy 6 (Fairmeadows to Ind Park Rd) Water Main Repl 1
W3322 2,500,0002,500,000Collector Well #2 Cleaning and Upgrade 1
W3325 650,00050,000 600,000Roof Replacements 2
W3326 1,500,0001,500,000Treatment Process Update 2
W3327 600,000600,000Melrose Water Main Camp Cardinal to 218 2
W3328 375,000375,000Powerhouse Dam Rehabilitation 1
W3329 1,500,0001,500,000GSR Upgrade and Repairs 1
W3330 550,000550,000Water Plant Flowemeter Replacement 1
W3332 200,000200,000Peninsual Well Field Antenna 3
W3333 150,000150,000Relocate Bulk Water Station 3
11,200,0002,830,000 970,000 3,100,000 2,250,000 2,050,000Water Operations Total
GRAND TOTAL 274,559,94768,634,952 76,043,300 43,046,345 46,108,050 40,727,300
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa
FUNDING SOURCE SUMMARY
2024 thru 2028
TotalSource2024 2025 2026 2027 2028
AIRPORT FUND 691,054107,500 350,000 93,554 125,000 15,000
EMERGENCY LEVY 325,000325,000
EQUIPMENT FUND 7,400,0007,400,000
FACILITY REPLACEMENT RESERVE 22,450,000500,000 9,700,000 1,625,000 10,625,000
FEDERAL GRANTS 41,359,2232,840,232 28,650,000 5,108,991 4,625,000 135,000
GENERAL FUND 3,970,000895,000 1,025,000 800,000 850,000 400,000
GO BONDS-ESSENTIAL PURPOSE 61,573,0009,150,000 12,550,000 11,638,000 13,220,000 15,015,000
GO BONDS-GENERAL PURPOSE 7,955,000830,000 3,800,000 2,375,000 700,000 250,000
ITS FUND 500,000100,000 100,000 100,000 100,000 100,000
LANDFILL FUND 1,997,500660,750 500,000 689,250 147,500
LANDFILL REPLACEMENT RESERVE 4,325,0004,250,000 75,000
LANDFILL SURCHARGE FUND 60,00060,000
OTHER LOCAL GOVERNMENTS 160,000160,000
OTHER STATE GRANTS 9,050,000850,000 8,200,000
PARKING FUND 8,065,0001,015,000 1,450,000 1,350,000 1,685,000 2,565,000
REFUSE COLLECTION FUND 250,000250,000
REIMBURSEMENT OF EXPENSES 1,800,0001,800,000
REVENUE BONDS 33,000,00033,000,000
ROAD USE TAX FUND 15,605,0003,145,000 3,200,000 3,100,000 3,160,000 3,000,000
STORMWATER FUND 3,540,000935,000 1,035,000 1,090,000 240,000 240,000
TRANSIT FUND 8,815,5006,535,000 2,205,500 25,000 25,000 25,000
UNIVERSITY OF IOWA 675,000425,000 100,000 150,000
UTILITY FRANCHISE TAX 1,764,670313,470 362,800 362,800 362,800 362,800
WASTEWATER FUND 12,822,0003,423,000 1,360,000 926,000 2,141,000 4,972,000
WATER FUND 12,000,0002,830,000 1,770,000 3,100,000 2,250,000 2,050,000
73,929,952 75,808,300 40,104,345 40,958,050 29,352,300 260,152,947GRAND TOTAL
Airport Fund, $691,054
Equipment Fund,
$7,400,000
Landfill Replacement
Reserve, $4,325,000
Facility Replacement Reserve, $22,450,000
Stormwater Fund,
$3,540,000Transit Fund, $8,815,500
Emergency Levy,
$325,000
Other State Grants,
$9,050,000
Landfill Surcharge Fund,
$60,000
Federal Grants,
$41,359,223
Refuse Collection Fund,
$250,000General Fund, $3,970,000
Go Bonds-Essential
Purpose, $61,573,000
Reimbursement of
Expenses, $1,800,000
Go Bonds-General
Purpose, $7,955,000
University of
Iowa, $675,000
Landfill Fund,
$1,997,500
ITS Fund, $500,000
Revenue Bonds,
33,000,000
Other Local
Governments, $160,000
Parking Fund, $8,065,000
Road Use Tax Fund,
$15,605,000
Utility Franchise Tax,
$1,764,670
Wastewater Fund,
$12,822,000
Water Fund, $12,000,000
Capital Improvement
Program
by Funding Source
2024-2028
$260,152,947
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa
PROJECTS BY FUNDING SOURCE
2024 2028thru
TotalSourceProject # Priority 2024 2025 2026 2027 2028
AIRPORT FUND
A3465 15,00015,000Runway 7 Environmental Assessment 2
A3471 87,50087,500Runway 12/30 Threshold Displacement/Relocation 1
A3473 125,000125,000Airport Apron Expansion 2
A3474 30,00030,000Runway 7/25 Pavement Repairs 1
A3475 17,00017,000Runway 12/30 Pavement Repairs 1
A3478 350,000350,000Terminal Building Remodel/Reconstruction 1
A3480 20,00020,000Terminal Building Space Needs Study 1
A3481 46,554046,554Airport Solar 2
691,054107,500 350,000 93,554 125,000 15,000AIRPORT FUND Total
EMERGENCY LEVY
R4194 250,000250,000Climate Action Facility Improvements 3
R4380 75,00075,000Annual Contracted Tree Planting 4
325,000325,000EMERGENCY LEVY Total
EQUIPMENT FUND
P3953 7,400,0007,400,000Equipment Maintenance Facility replacement 2
7,400,0007,400,000EQUIPMENT FUND Total
FACILITY REPLACEMENT RESER
K1003 2,250,0001,125,000 1,125,000Senior Center Interior Improvements Project 3
P3953 700,000700,000Equipment Maintenance Facility replacement 2
R4229 9,500,000500,000 9,000,000City Park Pool Replacement 3
Z4411 10,000,000500,000 9,500,000Fire Station #5 Construction and #3 Replacement 2
22,450,000500,000 9,700,000 1,625,000 10,625,000FACILITY REPLACEMENT
RESERVE Total
FEDERAL GRANTS
A3465 135,000135,000Runway 7 Environmental Assessment 2
A3471 787,500787,500Runway 12/30 Threshold Displacement/Relocation 1
A3473 1,125,0001,125,000Airport Apron Expansion 2
A3474 270,000270,000Runway 7/25 Pavement Repairs 1
A3475 150,000150,000Runway 12/30 Pavement Repairs 1
A3478 6,650,000500,000 6,150,000Terminal Building Remodel/Reconstruction 1
A3480 180,000180,000Terminal Building Space Needs Study 1
A3481 1,041,723622,732 418,991Airport Solar 2
L3333 4,000,0004,000,000Compost Pad Improvements & Expansion 2
R4227 520,000520,000Hwy 6 Sidepath - Broadway to Fairmeadows 5
S3952 3,750,0003,750,000Dodge Street Reconstruct - Governor to Burlington 2
TotalSourceProject # Priority 2024 2025 2026 2027 2028
S3959 3,500,0003,500,000Taft Avenue Reconstruct - Am Legion to Lwr West Br 2
T3055 19,250,000750,000 18,500,000Transit Maintenance Facility Relocation 2
41,359,2232,840,232 28,650,000 5,108,991 4,625,000 135,000FEDERAL GRANTS Total
GENERAL FUND
B4347 55,00055,000ICPL Boardroom & Meeting Room E Renovation 2
P3988 300,000300,000Entrance Way Improvements 4
R4129 250,00050,000 50,000 50,000 50,000 50,000City Hall - Other Projects 1
R4130 490,00090,000 100,000 100,000 100,000 100,000Parks Annual Improvements/Maintenance/ADA 1
R4132 150,000150,000Park Annual ADA Accessibility Improvements 2
R4206 750,000150,000 150,000 150,000 150,000 150,000Intra-city Bike Trails/Bridges 2
R4330 250,00050,000 50,000 50,000 50,000 50,000Annual Recreation Center Improvements 2
R4346 250,000250,000Palisades Park Development 2
R4372 100,000100,000Terrell Mill Skate Park Redevelopment 5
R4380 200,00050,000 50,000 50,000 50,000Annual Contracted Tree Planting 4
R4381 200,000200,000Event Facility Improvements 2
R4388 600,000400,000 200,000ADA Elevator Improvements 1
R4409 250,000250,000New Park Development - Location Unspecified 2
Y4446 125,000125,000Body Cameras & In Car Video Systems 3
3,970,000895,000 1,025,000 800,000 850,000 400,000GENERAL FUND Total
GO BONDS-ESSENTIAL PURPOSE
R4227 1,180,0001,180,000Hwy 6 Sidepath - Broadway to Fairmeadows 5
R4358 750,000750,000Lower City Park Shelters & Restroom Replacement 2
R4384 200,000200,000Benton Hills Playground Replacement 2
R4385 400,000400,000College Green Park Playground 2
R4389 300,000300,000N. Market Square Playground Replacement 2
R4390 240,000240,000Reno Street Park Renovations 2
R4397 260,000260,000Court Hill Trail Beech to Scott Replacement 2
R4398 300,000300,000Thornberry and Rita's Ranch Dog Park Improvements 2
R4400 150,000150,000Mercer Shelter Replacement 2
R4403 1,900,0001,900,000Carson Lake Park 2
R4408 720,000720,000Columbarium Construction/Expansion 2
S3939 4,030,0004,030,000Dubuque Street Reconstruction 1
S3946 10,300,0001,500,000 8,800,000Court Street Reconstruction 2
S3952 8,258,0008,258,000Dodge Street Reconstruct - Governor to Burlington 2
S3953 5,000,0005,000,000Market St & Jefferson St Two-Way Conversion 2
S3955 2,750,000900,000 1,850,000N. Gilbert Street Reconstruction 2
S3956 1,375,0001,375,000Gilbert Street Bridge Replacement 1
S3959 9,700,0009,700,000Taft Avenue Reconstruct - Am Legion to Lwr West Br 2
S3963 9,025,0009,025,000Burlington Street Bridge Replacement 1
S3978 635,000635,000Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab 1
S3983 2,650,000300,000 2,350,000Iowa Avenue Improvements 2
S3984 50,00050,000High Street & Southgate Ave Sidewalk Infill Proj 3
Z4406 1,400,0001,400,000Fire Apparatus Replacement Program 1
61,573,0009,150,000 12,550,000 11,638,000 13,220,000 15,015,000GO BONDS-ESSENTIAL PURPOSE
Total
GO BONDS-GENERAL PURPOSE
B4343 775,000775,000Carpet and Furnishings Replacement 2
K1003 1,400,000700,000 700,000Senior Center Interior Improvements Project 3
TotalSourceProject # Priority 2024 2025 2026 2027 2028
P3953 1,300,0001,300,000Equipment Maintenance Facility replacement 2
R4229 1,300,0001,300,000City Park Pool Replacement 3
R4351 700,000700,000Recreation Center Improvements 2
R4362 450,000450,000Napoleon Park Softball Fields 5-8 Renovation 3
R4392 700,000700,000Westside Park Land Acquisition 2
R4401 250,000250,000Parks Storage Building 2
R4406 250,000250,000RALRC Structural Cables 2
R4407 200,000200,000Mercer & RALRC HVAC Replacement 2
Z4409 130,000130,000Fire Station #1 Apparatus Bay Slab Reconstruction 2
Z4413 500,000500,000Rehab of Sleeping Areas & Alerting System Station1 2
7,955,000830,000 3,800,000 2,375,000 700,000 250,000GO BONDS-GENERAL PURPOSE
Total
ITS FUND
I4721 500,000100,000 100,000 100,000 100,000 100,000Fiber Infill & Cameras 2
500,000100,000 100,000 100,000 100,000 100,000ITS FUND Total
LANDFILL FUND
L3328 500,000500,000Landfill Equipment Building Replacement 2
L3335 850,000160,750 689,250Landfill Dual Extraction System Expansion 3
L3348 147,500147,500Site Flow Improvements 3
P3953 500,000500,000Equipment Maintenance Facility replacement 2
1,997,500660,750 500,000 689,250 147,500LANDFILL FUND Total
LANDFILL REPLACEMENT RESE
L3328 4,250,0004,250,000Landfill Equipment Building Replacement 2
L3349 75,00075,000Landfill Future Cell - Northeast Expansion 4
4,325,0004,250,000 75,000LANDFILL REPLACEMENT
RESERVE Total
LANDFILL SURCHARGE FUND
L3348 60,00060,000Site Flow Improvements 3
60,00060,000LANDFILL SURCHARGE FUND Total
OTHER LOCAL GOVERNMENTS
S3981 160,000160,000Camp Cardinal / Kennedy Parkway - Ped Accom 2
160,000160,000OTHER LOCAL GOVERNMENTS
Total
OTHER STATE GRANTS
S3952 8,200,0008,200,000Dodge Street Reconstruct - Governor to Burlington 2
S3978 850,000850,000Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab 1
9,050,000850,000 8,200,000OTHER STATE GRANTS Total
PARKING FUND
T3004 6,025,000525,000 1,000,000 1,250,000 1,500,000 1,750,000Parking Facility Restoration Repair 2
TotalSourceProject # Priority 2024 2025 2026 2027 2028
T3021 150,000150,000Video Cameras for Parking Facilities 3
T3025 440,000240,000 200,000Replacement of LED fixtures in Parking Facilities 2
T3026 1,000,000185,000 815,000Tower Place Drainage Modifications 3
T3028 150,000150,000Tower Place Office Remodel 3
T3070 300,000100,000 100,000 100,000Replace Door-Door Closures in Parking Facilities 1
8,065,0001,015,000 1,450,000 1,350,000 1,685,000 2,565,000PARKING FUND Total
REFUSE COLLECTION FUND
P3953 250,000250,000Equipment Maintenance Facility replacement 2
250,000250,000REFUSE COLLECTION FUND Total
REIMBURSEMENT OF EXPENSES
S3946 1,000,0001,000,000Court Street Reconstruction 2
S3986 800,000800,000Camp Cardinal Road Extension Project 3
1,800,0001,800,000REIMBURSEMENT OF EXPENSES
Total
REVENUE BONDS
V3151 16,200,00016,200,000Digester Complex Rehabilitation 1
V3184 16,800,00016,800,000Wastewater Digester Gas Improvements 2
33,000,00033,000,000REVENUE BONDS Total
ROAD USE TAX FUND
S3814 1,400,000200,000 300,000 300,000 300,000 300,000Annual Traffic Signal Projects 3
S3816 245,00045,000 50,000 50,000 50,000 50,000Traffic Calming 3
S3822 500,000100,000 100,000 100,000 100,000 100,000Curb Ramps-ADA 1
S3824 10,600,0002,000,000 2,000,000 2,200,000 2,200,000 2,200,000Annual Pavement Rehabilitation 1
S3827 200,00050,000 50,000 50,000 50,000Bicycle Master Plan Implementation 3
S3910 1,600,000400,000 300,000 300,000 300,000 300,000Annual Bridge Maintenance & Repair 1
S3951 150,000150,000Hwy 1/Hwy 6 Intersection Improvements Study 2
S3960 100,000100,000Oakdale Blvd Extension - Alignment Study 2
S3981 160,000160,000Camp Cardinal / Kennedy Parkway - Ped Accom 2
S3982 450,000450,000North Dodge St / ACT Circle - Signalization 2
S3986 200,000200,000Camp Cardinal Road Extension Project 3
15,605,0003,145,000 3,200,000 3,100,000 3,160,000 3,000,000ROAD USE TAX FUND Total
STORMWATER FUND
M3631 1,200,000240,000 240,000 240,000 240,000 240,000Annual Stormwater Improvements 2
M3634 500,00095,000 405,000Rundell Street Pump Station Vault Modifications 2
M3635 990,000140,000 850,000River Street Storm Sewer Improvements 2
M3637 500,000500,000Peterson Street Storm Sewer Improvments 1
M3638 100,000100,000Storm Sewer Asset Inventory 3
P3953 250,000250,000Equipment Maintenance Facility replacement 2
3,540,000935,000 1,035,000 1,090,000 240,000 240,000STORMWATER FUND Total
TRANSIT FUND
T3055 8,215,5006,035,000 2,180,500Transit Maintenance Facility Relocation 2
TotalSourceProject # Priority 2024 2025 2026 2027 2028
T3059 125,00025,000 25,000 25,000 25,000 25,000Transit Interchange and Bus Stop Improvements 2
T3068 300,000300,000Transit Bus Video System 2
T3069 175,000175,000Bus Driver Protection Doors 2
8,815,5006,535,000 2,205,500 25,000 25,000 25,000TRANSIT FUND Total
UNIVERSITY OF IOWA
P3988 100,000100,000Entrance Way Improvements 4
S3978 425,000425,000Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab 1
Z4406 150,000150,000Fire Apparatus Replacement Program 1
675,000425,000 100,000 150,000UNIVERSITY OF IOWA Total
UTILITY FRANCHISE TAX
S3824 705,788125,388 145,100 145,100 145,100 145,100Annual Pavement Rehabilitation 1
S3826 1,058,882188,082 217,700 217,700 217,700 217,700Underground Electrical Facilities 2
1,764,670313,470 362,800 362,800 362,800 362,800UTILITY FRANCHISE TAX Total
WASTEWATER FUND
P3953 800,000800,000Equipment Maintenance Facility replacement 2
V3101 3,000,000500,000 500,000 500,000 750,000 750,000Annual Sewer Main Replacement 2
V3162 155,000155,000Benton Street Trunk Sewer Improvements 1
V3164 300,000300,000Return Activated Sludge Pump Replacement 2
V3165 300,000300,000Replacement of Influent Pump Station Pumps 2
V3169 2,825,000325,000 2,500,000Napoleon Lift Station Improvements 1
V3170 350,000350,000WWTP Roof Replacements 1
V3174 750,000300,000 350,000 100,000Aeration Equipment Improvements 3
V3175 285,000285,000Wastewater Treatment Facility Imp 2022 1
V3177 743,000683,000 60,000HVAC Replacement 2
V3178 705,000705,000Primary Clarifier Repairs 2
V3179 1,662,000195,000 1,467,000Rotating Drum Thickener Replacement 1 and 2 2
V3183 76,00076,000Effluent Water Pump Station Improvements 2
V3185 871,000871,000WW Treatment Plant Secondary Clarifier Repairs 2
12,822,0003,423,000 1,360,000 926,000 2,141,000 4,972,000WASTEWATER FUND Total
WATER FUND
P3953 800,000800,000Equipment Maintenance Facility replacement 2
W3300 800,00080,000 720,000Bradford Drive Water Main Replacement 2
W3314 1,375,0001,375,000High Service Pump VFD Replacement 2
W3320 1,000,0001,000,000Hwy 6 (Fairmeadows to Ind Park Rd) Water Main Repl 1
W3322 2,500,0002,500,000Collector Well #2 Cleaning and Upgrade 1
W3325 650,00050,000 600,000Roof Replacements 2
W3326 1,500,0001,500,000Treatment Process Update 2
W3327 600,000600,000Melrose Water Main Camp Cardinal to 218 2
W3328 375,000375,000Powerhouse Dam Rehabilitation 1
W3329 1,500,0001,500,000GSR Upgrade and Repairs 1
W3330 550,000550,000Water Plant Flowemeter Replacement 1
W3332 200,000200,000Peninsual Well Field Antenna 3
W3333 150,000150,000Relocate Bulk Water Station 3
12,000,0002,830,000 1,770,000 3,100,000 2,250,000 2,050,000WATER FUND Total
TotalSourceProject # Priority 2024 2025 2026 2027 2028
260,152,94773,929,952 75,808,300 40,104,345 40,958,050 29,352,300GRAND TOTAL
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa
PROJECTS BY DEPARTMENT WITH DESCRIPTIONS
2024 2028thru
FINANCE
Total2024 2025 2026 2027 2028DepartmentProject # Priority
I4721 500,000100,000 100,000 100,000 100,000 100,000Fiber Infill & Cameras 2
500,000100,000 100,000 100,000 100,000 100,000FINANCE Total
Expansion of the City's fiber optic network. Creation of redundant fiber optic rings, placement of cable underground when opportunities
arise, expansion to unserved facilites. ITS always includes our original partners (Johnson County, ICCSD, University of Iowa) when
planning expansion and redundant routes. Additional video cameras.
I4721
Fiber Infill & Cameras
PARKS & RECREATION
Total2024 2025 2026 2027 2028DepartmentProject # Priority
R4129 250,00050,000 50,000 50,000 50,000 50,000City Hall - Other Projects 2
R4130 490,00090,000 100,000 100,000 100,000 100,000Parks Annual Improvements/Maintenance/ADA 2
R4132 150,000150,000Park Annual ADA Accessibility Improvements 2
R4194 250,000250,000Climate Action Facility Improvements 2
R4206 750,000150,000 150,000 150,000 150,000 150,000Intra-city Bike Trails/Bridges 2
R4330 250,00050,000 50,000 50,000 50,000 50,000Annual Recreation Center Improvements 2
R4380 275,00075,000 50,000 50,000 50,000 50,000Annual Contracted Tree Planting 2
2,415,000815,000 400,000 400,000 400,000 400,000PARKS & RECREATION Total
FY25 HVAC System (AHU 2) in mechanical room 2nd floor north court; FY26 HVAC System (AHU-N) 3. FY27 Building System
Automation (BAS) UPGRADES for mezzzanine HVAC; FY28 Employee Fitness Room ADA Remodel
R4129
City Hall - Other Projects
Annual funding for small capital projects and improvements throughout park system. Priorities per the 2017 Park Master Plan are: Park
Signs, Site Furnishings, Shelter/Facility Maintenance, Court Maintenance, Partner Opportunities for Small Projects and Emerging
Opportunities and Needs.
R4130
Parks Annual Improvements/Maintenance/ADA
2024 ADA picnic table replacements, 2025 raised garden beds and accessible garden paths at Kiwanis Park, 2026 accessible fishing pier at
City Park, 2028 park bench accessiblity improvements.
R4132
Park Annual ADA Accessibility Improvements
An annual fund for sustainability projects to improve municipal building systems in regard to both energy savings and climate action
initiatives. Projects may include, but not be limited to, building insultation and envelopes, LED lighting upgrades, HVAC systems,
geothermal, solar panels and other infrastructure improvements that reduces the City's carbon footprint and greening of City structures.
UPDATE 08/28/23: 2024- Mercer Park Field Lights $260,000; 2025- Airport Solar Light (City contribution pending/project budget est.
$400,000) and Senior Center Interior Project LED lighting $100,000; 2027-Fire Stations LED lighing Replacement Project $250,000; 2028-
EV Fleet transition building improvements $250,000. [conferred Sarah Gardner/Climate Action & Outreach]
R4194
Climate Action Facility Improvements
Annual appropriation for the construction or repair of bike trails.
R4206
Intra-city Bike Trails/Bridges
FY23-24 RALRC Ceiling Tile & Grid Replacement; FY25 Mercer/Scanlon Lobby “Cosmetic” Improvements- $50,000; FY26 New Master
Keying System for all Recreation Facilities-$50,000; FY27RALRC – Window Blinds & Sound Attenuation in Social Hall and/or Meeting;
Room- $50,000; 4 FY28 Mercer/Scanlon Tile Flooring replacement $50,000
R4330
Annual Recreation Center Improvements
Annual contracted tree program for additions to street trees, neighborhood infill and park tree plantings. Areas of emphasis include low
income neighborhoods as well as neighborhoods that lost trees to the Emerald Ash Borer or the 2020 Derecho storm.
R4380
Annual Contracted Tree Planting
PUBLIC WORKS
Total2024 2025 2026 2027 2028DepartmentProject # Priority
M3631 1,200,000240,000 240,000 240,000 240,000 240,000Annual Stormwater Improvements 2
S3814 1,400,000200,000 300,000 300,000 300,000 300,000Annual Traffic Signal Projects 2
S3816 245,00045,000 50,000 50,000 50,000 50,000Traffic Calming 2
S3822 500,000100,000 100,000 100,000 100,000 100,000Curb Ramps-ADA 2
S3824 11,305,7882,125,388 2,145,100 2,345,100 2,345,100 2,345,100Annual Pavement Rehabilitation 2
S3826 1,058,882188,082 217,700 217,700 217,700 217,700Underground Electrical Facilities 2
S3827 200,00050,000 50,000 50,000 50,000Bicycle Master Plan Implementation 2
S3910 1,600,000400,000 300,000 300,000 300,000 300,000Annual Bridge Maintenance & Repair 2
V3101 3,000,000500,000 500,000 500,000 750,000 750,000Annual Sewer Main Replacement 2
20,509,6703,848,470 3,852,800 4,102,800 4,352,800 4,352,800PUBLIC WORKS Total
This is an annual project that will repair and/or improve storm water infrastructure throughout the City.
M3631
Annual Stormwater Improvements
This is an annual project to replace or add traffic signals at intersections with outdated traffic signal equipment or at dangerous and
uncontrolled intersections.
S3814
Annual Traffic Signal Projects
Annual appropriation for traffic calming projects
S3816
Traffic Calming
Annual appropriation for the construction of ADA accessible curb ramps.
S3822
Curb Ramps-ADA
Annual appropriation for resurfacing roadways and alleys including asphalt, concrete, and brick.
S3824
Annual Pavement Rehabilitation
This is an annual project to convert overhead electrical systems to underground.
Dubuque Street, Riverside Drive, and Gilbert Street are currently the priority corridors for undergrounding electrical facilities.
S3826
Underground Electrical Facilities
This is an annual project to implement the recommendations of the bicycle master plan. Improvement projects include construction of bike
lanes, bike boulevards, and other features that will improve streets to promote equal access and usability for all modes of transportation.
Projects also fund the conversion of 4-lane roads into 3-lane roads in certain areas that are highly used by all of the various modes of
transportation. Projects are scheduled as follows:
2023 - Sunset Bike Lanes (Benton to Highway 1); Oakcrest Bike Blvd; Emerald Bike Blvd; Arlington Bicycle Blvd; 2024 - Dover
/Westminster Bike Blvd; Highland Bicycle Blvd; 2025 - Church Street Bicycle Blvd; Broadway Bike Lanes (Sandusky to Highway 6);
Ridge/Broadway Bike Blvd; 2026 - Washington Street Bike Blvd (Scott Blvd to 1st Avenue); River Bike Blvd; Woolf Bike Blvd; Newton
Marked Route
S3827
Bicycle Master Plan Implementation
This provides for the biennial inspection and preservation of Iowa City's bridges including major repairs and restoration.
S3910
Annual Bridge Maintenance & Repair
This project consists of annual sanitary sewer repairs and preventive maintenance throughout the sewer system. Work include sewer lining,
spot repairs and manhole lining and replacement.
V3101
Annual Sewer Main Replacement
TRANSPORTATION SERVICES
Total2024 2025 2026 2027 2028DepartmentProject # Priority
T3004 6,025,000525,000 1,000,000 1,250,000 1,500,000 1,750,000Parking Facility Restoration Repair 2
T3059 125,00025,000 25,000 25,000 25,000 25,000Transit Interchange and Bus Stop Improvements 2
6,150,000550,000 1,025,000 1,275,000 1,525,000 1,775,000TRANSPORTATION SERVICES
Total
This annual project includes concrete restoration, application of concrete sealants, repair of control and expansion joints in addition to other
parking facility specific repairs.
T3004
Parking Facility Restoration Repair
To improve pedestrian safety and traffic flow at the downtown interchange and improve amenities at transit stops throughout the community
as recommended through the 2019-2020 Transit Study planning process. This project will include annual bus stop repairs and amenity
installations including concrete pads, benches, trash containers, lighting, information amenities, and bike racks.
T3059
Transit Interchange and Bus Stop Improvements
Project
Airport
A3465 Runway 7 Environmental Assessment…..............................................................................526
A3471 Runway 12/30 Threshold Displacement/Relocation…..............................................................................527
A3473 Airport Apron Expansion…..............................................................................528
A3474 Runway 7/25 Pavement Repairs…..............................................................................529
A3475 Runway 12/30 Pavement Repairs…..............................................................................530
A3478 Terminal Building Remodel/Reconstruction…..............................................................................531
A3480 Terminal Building Space Needs Study…..............................................................................532
A3481 Airport Solar…..............................................................................533
Finance
I4721 Fiber Infill & Cameras…..............................................................................534
Fire
Z4406 Fire Apparatus Replacement Program…..............................................................................535
Z4409 Fire Station #1 Apparatus Bay Slab Reconstruction…..............................................................................536
Z4411 Fire Station #5 Construction and #3 Replacement…..............................................................................537
Z4413 Rehab of Sleeping Areas & Alerting System Station1…..............................................................................538
Library
B4343 Carpet and Furnishings Replacement…..............................................................................539
B4347 ICPL Boardroom & Meeting Room E Renovation…..............................................................................540
Park & Recreation
R4129 City Hall - Other Projects…..............................................................................541
R4130 Parks Annual Improvements/Maintenance/ADA…..............................................................................542
R4132 Park Annual ADA Accessibility Improvements…..............................................................................543
R4194 Climate Action Facility Improvements…..............................................................................544
R4206 Intra-city Bike Trails/Bridges…..............................................................................545
R4227 Hwy 6 Sidepath - Broadway to Fairmeadows…..............................................................................546
R4229 City Park Pool Replacement…..............................................................................547
R4330 Annual Recreation Center Improvements…..............................................................................548
R4346 Palisades Park Development…..............................................................................549
R4351 Recreation Center Improvements…..............................................................................550
R4358 Lower City Park Shelters & Restroom Replacement…..............................................................................551
R4362 Napoleon Park Softball Fields 5-8 Renovation…..............................................................................552
Capital Project Funds
Project Listing
R4372 Terrell Mill Skate Park Redevelopment…..............................................................................553
R4380 Annual Contracted Tree Planting…..............................................................................554
R4381 Event Facility Improvements…..............................................................................555
R4384 Benton Hills Playground Replacement…..............................................................................556
R4385 College Green Park Playground…..............................................................................557
R4388 ADA Elevator Improvements…..............................................................................558
R4389 N. Market Square Playground Replacement…..............................................................................559
R4390 Reno Street Park Renovations…..............................................................................560
R4392 Westside Park Land Acquisition…..............................................................................561
R4397 Court Hill Trail Beech to Scott Replacement…..............................................................................562
R4398 Thornberry and Rita's Ranch Dog Park Improvements…..............................................................................563
R4400 Mercer Shelter Replacement…..............................................................................564
R4401 Parks Storage Building…..............................................................................565
R4403 Carson Lake Park…..............................................................................566
R4406 RALRC Structural Cables…..............................................................................567
R4407 Mercer & RALRC HVAC Replacement…..............................................................................568
R4408 Columbarium Construction/Expansion…..............................................................................569
R4409 New Park Development - Location Unspecified…..............................................................................570
Police
Y4446 Body Cameras & In Car Video Systems…..............................................................................571
Public Works
L3328 Landfill Equipment Building Replacement…..............................................................................572
L3333 Compost Pad Improvements & Expansion…..............................................................................573
L3335 Landfill Dual Extraction System Expansion…..............................................................................574
L3348 Site Flow Improvements…..............................................................................575
L3349 Landfill Future Cell - Northeast Expansion…..............................................................................576
M3631 Annual Stormwater Improvements…..............................................................................577
M3634 Rundell Street Pump Station Vault Modifications…..............................................................................578
M3635 River Street Storm Sewer Improvements…..............................................................................579
M3637 Peterson Street Storm Sewer Improvments…..............................................................................580
M3638 Storm Sewer Asset Inventory…..............................................................................581
P3953 Equipment Maintenance Facility replacement…..............................................................................582
P3988 Entrance Way Improvements…..............................................................................583
S3814 Annual Traffic Signal Projects…..............................................................................584
S3816 Traffic Calming…..............................................................................585
S3822 Curb Ramps-ADA…..............................................................................586
S3824 Annual Pavement Rehabilitation…..............................................................................587
S3826 Underground Electrical Facilities…..............................................................................588
S3827 Bicycle Master Plan Implementation…..............................................................................589
S3910 Annual Bridge Maintenance & Repair…..............................................................................590
S3939 Dubuque Street Reconstruction…..............................................................................591
S3946 Court Street Reconstruction…..............................................................................592
S3951 Hwy 1/Hwy 6 Intersection Improvements Study…..............................................................................593
S3952 Dodge Street Reconstruct - Governor to Burlington…..............................................................................594
S3953 Market St & Jefferson St Two-Way Conversion…..............................................................................595
S3955 N. Gilbert Street Reconstruction…..............................................................................596
S3956 Gilbert Street Bridge Replacement…..............................................................................597
S3959 Taft Avenue Reconstruct - Am Legion to Lwr West Br…..............................................................................598
S3960 Oakdale Blvd Extension - Alignment Study…..............................................................................599
S3963 Burlington Street Bridge Replacement…..............................................................................600
S3978 Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab…..............................................................................601
S3981 Camp Cardinal / Kennedy Parkway - Ped Accom…..............................................................................602
S3982 North Dodge St / ACT Circle - Signalization…..............................................................................603
S3983 Iowa Avenue Improvements…..............................................................................604
S3984 High Street & Southgate Ave Sidewalk Infill Proj…..............................................................................605
S3986 Camp Cardinal Road Extension Project…..............................................................................606
V3101 Annual Sewer Main Replacement…..............................................................................607
V3151 Digester Complex Rehabilitation…..............................................................................608
V3162 Benton Street Trunk Sewer Improvements…..............................................................................609
V3164 Return Activated Sludge Pump Replacement…..............................................................................610
V3165 Replacement of Influent Pump Station Pumps…..............................................................................611
V3169 Napoleon Lift Station Improvements…..............................................................................612
V3170 WWTP Roof Replacements…..............................................................................613
V3174 Aeration Equipment Improvements…..............................................................................614
V3175 Wastewater Treatment Facility Imp 2022…..............................................................................615
V3177 HVAC Replacement…..............................................................................616
V3178 Primary Clarifier Repairs…..............................................................................617
V3179 Rotating Drum Thickener Replacement 1 and 2…..............................................................................618
V3183 Effluent Water Pump Station Improvements…..............................................................................619
V3184 Wastewater Digester Gas Improvements…..............................................................................620
V3185 WW Treatment Plant Secondary Clarifier Repairs…..............................................................................621
W3300 Bradford Drive Water Main Replacement…..............................................................................622
W3314 High Service Pump VFD Replacement…..............................................................................623
W3320 Hwy 6 (Fairmeadows to Ind Park Rd) Water Main Repl…..............................................................................624
W3322 Collector Well #2 Cleaning and Upgrade…..............................................................................625
W3325 Roof Replacements…..............................................................................626
W3326 Treatment Process Update…..............................................................................627
W3327 Melrose Water Main Camp Cardinal to 218…..............................................................................628
W3328 Powerhouse Dam Rehabilitation…..............................................................................629
W3329 GSR Upgrade and Repairs…..............................................................................630
W3330 Water Plant Flowemeter Replacement…..............................................................................631
W3332 Peninsual Well Field Antenna…..............................................................................632
W3333 Relocate Bulk Water Station…..............................................................................633
Senior Center
K1003 Senior Center Interior Improvements Project…..............................................................................634
Transportation Services
T3004 Parking Facility Restoration Repair…..............................................................................635
T3021 Video Cameras for Parking Facilities…..............................................................................636
T3025 Replacement of LED fixtures in Parking Facilities…..............................................................................637
T3026 Tower Place Drainage Modifications…..............................................................................638
T3028 Tower Place Office Remodel…..............................................................................639
T3055 Transit Maintenance Facility Relocation…..............................................................................640
T3059 Transit Interchange and Bus Stop Improvements…..............................................................................641
T3068 Transit Bus Video System…..............................................................................642
T3069 Bus Driver Protection Doors…..............................................................................643
T3070 Replace Door-Door Closures in Parking Facilities…..............................................................................644
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Michael Tharp
2024 2028thru Department AIRPORT
Description
Runway 7 Extension (213') Environmental Assessment.
Project #A3465
Priority Essential (2)
Justification
Runway extension to push the Runway 25 landing distance available to above 5000' a key metric for charter operators using the airport.
Budget Impact/Other
The operating impact is negligible.
Useful Life 20 yearsProject Name Runway 7 Environmental Assessment Category Airport
Type One Phase
MATCH %10%
GRANTEE FAA
Total Project Cost:$150,000
TIF DISTRICT None
PLAN Airport Master Plan
Status Active
Total20242025202620272028Expenditures
150,000150,000PLANNING/DESIGN
150,000 150,000Total
Total20242025202620272028Funding Sources
15,00015,000AIRPORT FUND
135,000135,000FEDERAL GRANTS
150,000 150,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Michael Tharp
2024 2028thru Department AIRPORT
Description
This project creates a 500' displaced threshold on the Runway 12 end and adds approxiamately 300' of additional pavement to the Runway 30 end.
Construction in Spring/Summer 2025.
Project #A3471
Priority Critical (1)
Justification
Runway 12 displaced threshold removes a number of trees from the NW neighborhood from of the airport's obstruction/hazard database without
having to physically remove them. The additional pavement to the Runway 30 end maintains current runway functionality for airport traffic.
Budget Impact/Other
Minor increase due to additional lighting fixtures and pavement on ground, offset by conversion of existing lighting infrastructure from
incandescent to LED.
Useful Life 20 yearsProject Name Runway 12/30 Threshold Displacement/Relocation Category Airport
Type One Phase
MATCH %10%
GRANTEE FAA
Total Project Cost:$875,000
TIF DISTRICT None
PLAN Airport Master Plan
Status Active
Total20242025202620272028Expenditures
875,000875,000CONSTRUCTION
875,000 875,000Total
Total20242025202620272028Funding Sources
87,50087,500AIRPORT FUND
787,500787,500FEDERAL GRANTS
875,000 875,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Michael Tharp
2024 2028thru Department AIRPORT
Description
This project adds additonal apron space for aircraft parking.
Project #A3473
Priority Essential (2)
Justification
High traffic events and large jets require parking aircraft on closed runway or other areas of the airport. This will expand the parking apron near
the terminal to accommodate traffic.
Budget Impact/Other
Minor increase for snow removal and pavement maintenance.
Useful Life 20 yearsProject Name Airport Apron Expansion Category Airport
Type One Phase
MATCH %10%
GRANTEE FAA
Total Project Cost:$1,250,000
TIF DISTRICT None
PLAN Airport Master Plan
Status Active
Total20242025202620272028Expenditures
150,000150,000PLANNING/DESIGN
1,100,0001,100,000CONSTRUCTION
1,250,000 1,250,000Total
Total20242025202620272028Funding Sources
125,000125,000AIRPORT FUND
1,125,0001,125,000FEDERAL GRANTS
1,250,000 1,250,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Michael Tharp
2024 2028thru Department AIRPORT
Description
Runway joint and crack sealing and pavement repairs to the west half of runway 7/25.
Project #A3474
Priority Critical (1)
Justification
Project would route and seal joints as well as perform any panel repairs as needed to maintain the runway.
Budget Impact/Other
Extends the life of the runway and reduces annual budget needs for short term maintenance.
Useful Life 20 yearsProject Name Runway 7/25 Pavement Repairs Category Airport
Type One Phase
MATCH %10%
GRANTEE FAA
Total Project Cost:$300,000
TIF DISTRICT None
PLAN Airport Master Plan
Status Active
Total20242025202620272028Expenditures
30,00030,000PLANNING/DESIGN
270,000270,000CONSTRUCTION
300,000 300,000Total
Total20242025202620272028Funding Sources
30,00030,000AIRPORT FUND
270,000270,000FEDERAL GRANTS
300,000 300,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Michael Tharp
2024 2028thru Department AIRPORT
Description
Runway joint and crack sealing and pavement repairs to the west half of runway 12/30.
Project #A3475
Priority Critical (1)
Justification
Project would route and seal joints as well as perform any panel repairs as needed to maintain the runway.
Budget Impact/Other
Extends the life of the runway and reduces annual budget needs for short term maintenance.
Useful Life 20 yearsProject Name Runway 12/30 Pavement Repairs Category Airport
Type One Phase
MATCH %10%
GRANTEE FAA
Total Project Cost:$167,000
TIF DISTRICT None
PLAN Airport Master Plan
Status Active
Total20242025202620272028Expenditures
20,00020,000PLANNING/DESIGN
147,000147,000CONSTRUCTION
167,000 167,000Total
Total20242025202620272028Funding Sources
17,00017,000AIRPORT FUND
150,000150,000FEDERAL GRANTS
167,000 167,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Michael Tharp
2024 2028thru Department AIRPORT
Description
Phase 1 - Environmental and Historical Reviews, Design and Bid for October 2024 Grant Application Phase 2: Removal of existing building and
construction of new terminal/entrance gateway.
Project #A3478
Priority Critical (1)
Justification
The current terminal building was built in 1951 and is unable to accomodate current operations or future growth. The Airport Commission
completed a space needs study, which included a user survey and open house in 2023 and chose to develop a new terminal building as it's preferred
method to achieve the needed operational space. Phase 1 will take the preferred concept and develop a design, take the design through
environmental and historical reviews, and bid the design with the goal of applying for additional FAA funding in October 2024. FAA funding is
competitively available in federal years 2022-2026 as part of the Bipartisan Infrastructure Law. Project will also including landscaping and work
along the entrance drive. FAA Share is 95%
Budget Impact/Other
New building should lower ongoing maintnenace costs of supporting existing building. Enhanced environmental controls to better manage
conditions in building.
Useful Life 50 yearsProject Name Terminal Building Remodel/Reconstruction Category Airport
Type Multi-Phase
MATCH %5%
GRANTEE FAA
Total Project Cost:$7,000,000
TIF DISTRICT
PLAN
Status Active
Total2024 2025 2026 2027 2028Expenditures
500,000500,000PLANNING/DESIGN
5,000,0005,000,000CONSTRUCTION
500,000500,000INSPECTION
275,000275,000ADMINISTRATION
725,000725,000CONTINGENCY
500,000 6,500,000 7,000,000Total
Total2024 2025 2026 2027 2028Funding Sources
350,000350,000AIRPORT FUND
6,650,000500,000 6,150,000FEDERAL GRANTS
500,000 6,500,000 7,000,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Michael Tharp
2024 2028thru Department AIRPORT
Description
This is to study the terminal building area for future space needs.
Project #A3480
Priority Critical (1)
Justification
The current terminal building was built in 1951 and is unable to accomadate growth of current businesses at the airport, or accomdate any new
uses. The study will look at the building, airport entrance, and adjacent parking to plan for future growth and use. A future project targeting
Bipartisan Infrastructure Law dollars dedicated to airport terminal building projects would help fund construction (if awarded).
Budget Impact/Other
The impact on the operating budget is negligible.
Useful LifeProject Name Terminal Building Space Needs Study Category Airport
Type One Phase
MATCH %
GRANTEE FAA
Total Project Cost:$200,000
TIF DISTRICT
PLAN
Status Active
Total2024 2025 2026 2027 2028Expenditures
200,000200,000PLANNING/DESIGN
200,000 200,000Total
Total2024 2025 2026 2027 2028Funding Sources
20,00020,000AIRPORT FUND
180,000180,000FEDERAL GRANTS
200,000 200,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Michael Tharp
2024 2028thru Department AIRPORT
Description
Installation of 2 solar arrays to provide renewable energy source of power for the airfield lighting and generally, daily occupied and active
buildings. Project split to accommodate BIL funding use requirements.
Project #A3481
Priority Essential (2)
Justification
This project will construct an estimated 200,000 kWh array on the north side of the airport to support operations of the airfield lighting and
terminal building. A second approximatley 170,000 kWh array near the entry drive circle to support the operations of the University of Iowa
Operator Performance Lab and Jet Air Maintenance hangar. Funding is a 90% FAA share grant from BIL funds
Budget Impact/Other
Will save approximately $12,000/year in direct utility costs to the airport, and provide another $10,000/year of income through charges to other
entities for use of power.
Useful Life 20 yearsProject Name Airport Solar Category Airport
Type Unassigned
MATCH %10%
GRANTEE FAA
Total Project Cost:$1,088,277
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
200,000200,000PLANNING/DESIGN
888,277422,732 465,545CONSTRUCTION
622,732 465,545 1,088,277Total
Total20242025202620272028Funding Sources
46,554046,554AIRPORT FUND
1,041,723622,732 418,991FEDERAL GRANTS
622,732 465,545 1,088,277Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Michael Harapat
2024 2028thru Department FINANCE
Description
Expansion of the City's fiber optic network. Creation of redundant fiber optic rings, placement of cable underground when opportunities arise,
expansion to unserved facilites. ITS always includes our original partners (Johnson County, ICCSD, University of Iowa) when planning expansion
and redundant routes. Additional video cameras.
Project #I4721
Priority Essential (2)
Justification
The City relies heavily on high-speed data communications to facilities. Further investment in the system is required to ensure that this service is
not interrupted.
Budget Impact/Other
The project will increase operating costs due to the additional equipment to maintain. The estimated increase in operating costs is less than $10,000
per year.
Useful Life 30 YearsProject Name Fiber Infill & Cameras Category Finance Administration
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$1,100,000
TIF DISTRICT None
PLAN
Status Active
Total20242025202620272028Expenditures
500,000100,000 100,000 100,000 100,000 100,000CONSTRUCTION
100,000 100,000 100,000 100,000 100,000 500,000Total
Prior
600,000
Total
Total20242025202620272028Funding Sources
500,000100,000 100,000 100,000 100,000 100,000ITS FUND
100,000 100,000 100,000 100,000 100,000 500,000Total
Prior
600,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Scott Lyon
2024 2028thru Department FIRE
Description
To ensure an operational fleet of frontline and reserve fire response vehicles.
Project #Z4406
Priority Critical (1)
Justification
This revision realigns the CIP with the ICFD's replacement program. The replacement program uses a wear-based scoring algorythm, and by
department policy assumes a life of fifteen years for heavy apparatus. Fire engines serve in frontline capacity for 9 years, and reserve staus for 7
years. The aerial ladder apparatus which is currently scheduled for replacement in FY24 remains in good condition and can be delayed until FY26;
the Fleet Manager and ICFD request the replacement of 3 fire engines in FY24. It should be noted that apparatus manufacturing timelines have
recently been extended to two years from time of specification. Fire engines ordered in FY24 likely will not be received until FY25. While new
market parameters for apparatus purchase are uncertain, the City should prepare for conveying payments across two fiscal years - likely when the
chassis is paid for, and finally when the apparatus is received.
Budget Impact/Other
The operating expenses for the City should decrease due to the replacement of older equipment with newer equipment. The estimated decrease in
operating expenses is less than $10,000.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 16 yearsProject Name Fire Apparatus Replacement Program Category Fire
Type Multi-Phase
MATCH %VARIES
GRANTEE U OF I
Total Project Cost:$7,171,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
1,550,0001,550,000EQUIPMENT
1,550,000 1,550,000Total
Prior
5,621,000
Total
Total20242025202620272028Funding Sources
1,400,0001,400,000GO BONDS-ESSENTIAL
PURPOSE
150,000150,000UNIVERSITY OF IOWA
1,550,000 1,550,000Total
Prior
5,621,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Scott Lyon
2024 2028thru Department FIRE
Description
This project will reconstruct the floor slab in the apparatus bay of Fire Station 1.
Project #Z4409
Priority Essential (2)
Justification
The slab is nearing the end of its useful life and is developing large cracks.
Budget Impact/Other
The impact on the operating budget is negligible.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name Fire Station #1 Apparatus Bay Slab Reconstruction Category Fire
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$225,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
40,00040,000PLANNING/DESIGN
90,00090,000CONSTRUCTION
130,000 130,000Total
Prior
95,000
Total
Total20242025202620272028Funding Sources
130,000130,000GO BONDS-GENERAL
PURPOSE
130,000 130,000Total
Prior
95,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Scott Lyon
2024 2028thru Department FIRE
Description
The project is to construct a new Fire Station #5 and construct a new replacement Fire Station #3.
Project #Z4411
Priority Essential (2)
Justification
The City is continuing to grow and expand which increases to need to add fire stations and reposition them for the changes in the City coverage
areas in order to meet demand and maintain appropriate response times.
Budget Impact/Other
Fire Station #5 will require new staffing, equipment, and facilities which will require considerable additional annual expenditures. The
replacement of Fire Station #3 will most likely also increase annual operating expenditures even though it may be more efficient, it will require
more costly insurance coverage and operating costs. The estimated increase in annual operating expenditures is $600,000 per year.
Useful Life 40 YearsProject Name Fire Station #5 Construction and #3 Replacement Category Fire
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$10,000,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
500,000500,000PLANNING/DESIGN
9,500,0009,500,000CONSTRUCTION
500,000 9,500,000 10,000,000Total
Total20242025202620272028Funding Sources
10,000,000500,000 9,500,000FACILITY REPLACEMENT
RESERVE
500,000 9,500,000 10,000,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Scott Lyon
2024 2028thru Department FIRE
Description
This project is designed to meet the needs of our current employees at Fire Station 1 to provide a private sleeping space and to construct non-
gender specific shower/restrooms. Ten sleeping rooms to be constructed of materials that can be repurposed or resold when the final facilities plan
is implemented. Project includes the following elements- demolition of existing non-private sleeping areas, demolition of current gender specific
restroom/shower areas, construction of non-gender specific shower/restroom facilities, installation of ten prefabricated sleeping rooms with doors.
Project #Z4413
Priority Essential (2)
Justification
Over the past number of years the sleeping areas and restroom facilities at Station 1 have become inadequate by not allowing expected privacy of
all members. All other fire stations have private, secure sleeping areas for members. As the Fire Department continues to evolve in diversity it is
imperative that the safety and well-being of all staff is promoted. Ensuring that all Fire Stations promote internal equity and inclusive environment
is supported as part of the current City of Iowa City's Strategic Plan.
Budget Impact/Other
No impact is noted for the operational budget.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Rehab of Sleeping Areas & Alerting System Station1 Category Fire
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$500,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
475,000475,000CONSTRUCTION
25,00025,000OTHER
500,000 500,000Total
Total20242025202620272028Funding Sources
500,000500,000GO BONDS-GENERAL
PURPOSE
500,000 500,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Elsworth Carman
2024 2028thru Department LIBRARY
Description
A multi-year project to replace carpeting and some furnishings in large areas of the Library. First floor has 31,000 square feet of carpet and second
floor has 39,000. Project includes updates for carpet, demo and floor prep, moving, GC, insurance, fees, bonds, and contingency. In addition,
some of the original furnishings, including casual seating and gallery furnishings will be replaced. An emphasis on sustainable, durable materials
and flexible space-making will steer this project.
Project #B4343
Priority Essential (2)
Justification
Since the building opened in 2004, more than 9,500,000 people have come through the doors. The Library is a heavily visited public space in the
heart of downtown; ongoing investment in the building is necessary to ensure a safe and attractive space is maintained. While this project falls
under the "Aesthetic Improvement" priority right now, failure to complete this work in a timely manner will result in safety and efficiency issues in
the future, which could lead to more costly unplanned repairs.
Budget Impact/Other
Neutral impact on staffing and maintenance expected. No additional revenue generated.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 15 yearsProject Name Carpet and Furnishings Replacement Category Library
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$775,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
775,000775,000CONSTRUCTION
775,000 775,000Total
Total20242025202620272028Funding Sources
775,000775,000GO BONDS-GENERAL
PURPOSE
775,000 775,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Elsworth Carman
2024 2028thru Department LIBRARY
Description
Necessary improvements are required in the Boardroom and Meeting Room E at the Iowa City Public Library. Renovations we wish to complete
include installing a hearing augmentation system, replacing 49 chairs, replacing 2 flat screen monitors, resurfacing the Boardroom table, painting
both rooms, resurfacing cabinets in the Boardroom, and implementing a web conferencing hub in Meeting Room E.
Project #B4347
Priority Essential (2)
Justification
Meeting Room E and the Boardroom are very popular meeting spaces that see regular use. Upgrades mentioned in the project description are
necessary to maintain quality services to our patrons. A hearing augmentation system and technology upgrades would enable us to more equitably
serve our patrons. After nearly 20 years of use, furniture upgrades are required to maintain a clean and safe environment for patrons.
Budget Impact/Other
The impact on the operating budget is negligible.
Useful Life 20 yearsProject Name ICPL Boardroom & Meeting Room E Renovation Category Library
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$55,000
TIF DISTRICT
PLAN
Status Active
Total2024 2025 2026 2027 2028Expenditures
15,00015,000CONSTRUCTION
40,00040,000OTHER
55,000 55,000Total
Total2024 2025 2026 2027 2028Funding Sources
55,00055,000GENERAL FUND
55,000 55,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
FY25 HVAC System (AHU 2) in mechanical room 2nd floor north court; FY26 HVAC System (AHU-N) 3. FY27 Building System Automation
(BAS) UPGRADES for mezzzanine HVAC; FY28 Employee Fitness Room ADA Remodel
Project #R4129
Priority Critical (1)
Justification
2024-ADA east entry exterior stair and ramp; FY25 and FY26 HVAC upgrade in mechanical room 2nd floor north court replace 1980s equipment
with higher SEER and efficient systems; FY27 Employee Fitness room bathroom remodel to become ADA compliant and addition of toilet and
sink. Update finishes and lighting in space.
Budget Impact/Other
These updates replace aging structures. No change is anticipated in revenue, staffing or maintenance costs.
Useful Life 20 yearsProject Name City Hall - Other Projects Category Government Buildings
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$1,100,000
TIF DISTRICT None
PLAN Facilities Master Plan
Status Active
Total20242025202620272028Expenditures
250,00050,000 50,000 50,000 50,000 50,000CONSTRUCTION
50,000 50,000 50,000 50,000 50,000 250,000Total
Prior
850,000
Total
Total20242025202620272028Funding Sources
250,00050,000 50,000 50,000 50,000 50,000GENERAL FUND
50,000 50,000 50,000 50,000 50,000 250,000Total
Prior
850,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
Annual funding for small capital projects and improvements throughout park system. Priorities per the 2017 Park Master Plan are: Park Signs, Site
Furnishings, Shelter/Facility Maintenance, Court Maintenance, Partner Opportunities for Small Projects and Emerging Opportunities and Needs.
Project #R4130
Priority Critical (1)
Justification
This funding keeps park facilities safe and in good repair between full park renovations. It also allows for funding of small projects as new needs
or neighborhood preferences arise that are not currently available in a park. The 2017 Park Master Plan priorities use of this funds for: Park Signs,
Site Furnishings, Shelter/Facility Maintenance, Court Maintenance, Partner Opportunities for Small Projects, Funding for Emerging recreaiton
trends or neighborhood needs.
Budget Impact/Other
Neutral Impact - repair and replacement through the smaller projects funded in this project will allow for efficient maintenance.
Useful Life 20 yearsProject Name Parks Annual Improvements/Maintenance/ADA Category Parks Maintenance
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$1,307,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
490,00090,000 100,000 100,000 100,000 100,000CONSTRUCTION
90,000 100,000 100,000 100,000 100,000 490,000Total
Prior
817,000
Total
Total20242025202620272028Funding Sources
490,00090,000 100,000 100,000 100,000 100,000GENERAL FUND
90,000 100,000 100,000 100,000 100,000 490,000Total
Prior
817,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
2024 ADA picnic table replacements, 2025 raised garden beds and accessible garden paths at Kiwanis Park, 2026 accessible fishing pier at City
Park, 2028 park bench accessiblity improvements.
Project #R4132
Priority Essential (2)
Justification
Revised based on additional inspections of parks. Requests for community garden and fishing accessiblity improvements are common. ADA site
amenities are also needed to improve equity of park features.
Budget Impact/Other
Limited annual operating costs are expected and the garden paths will increase effeciency of plot layout each spring.
Useful Life 20 yearsProject Name Park Annual ADA Accessibility Improvements Category Parks Maintenance
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$380,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total20242025202620272028Expenditures
150,000150,000CONSTRUCTION
150,000 150,000Total
Prior
230,000
Total
Total20242025202620272028Funding Sources
150,000150,000GENERAL FUND
150,000 150,000Total
Prior
230,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Kumi Morris
2024 2028thru Department PARKS & RECREATION
Description
An annual fund for sustainability projects to improve municipal building systems in regard to both energy savings and climate action initiatives.
Projects may include, but not be limited to, building insultation and envelopes, LED lighting upgrades, HVAC systems, geothermal, solar panels
and other infrastructure improvements that reduces the City's carbon footprint and greening of City structures.
UPDATE 08/28/23: 2024- Mercer Park Field Lights $260,000; 2025- Airport Solar Light (City contribution pending/project budget est. $400,000)
and Senior Center Interior Project LED lighting $100,000; 2027-Fire Stations LED lighing Replacement Project $250,000; 2028-EV Fleet
transition building improvements $250,000. [conferred Sarah Gardner/Climate Action & Outreach]
Project #R4194
Priority Efficiency Improvement (3)
Justification
Council strategic goals
Budget Impact/Other
No impact on operating budget as these are replacements for current facilities.
Useful Life 20 yearsProject Name Climate Action Facility Improvements Category Government Buildings
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$750,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
250,000250,000CONSTRUCTION
250,000 250,000Total
Prior
500,000
Total
Total20242025202620272028Funding Sources
250,000250,000EMERGENCY LEVY
250,000 250,000Total
Prior
500,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jason Havel
2024 2028thru Department PARKS & RECREATION
Description
Annual appropriation for the construction or repair of bike trails.
Project #R4206
Priority Essential (2)
Justification
This project maintains the city's trail system and adds segments that are spelled out in the city's trail system master plan.
Budget Impact/Other
This project will increase operating expenses due to the additional maintenance required for the new trail and amenities. Estimated additional
operating costs are less than $10,000 per year.
Useful Life 40 YearsProject Name Intra-city Bike Trails/Bridges Category Parks Maintenance
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$1,040,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
750,000150,000 150,000 150,000 150,000 150,000CONSTRUCTION
150,000 150,000 150,000 150,000 150,000 750,000Total
Prior
290,000
Total
Total20242025202620272028Funding Sources
750,000150,000 150,000 150,000 150,000 150,000GENERAL FUND
150,000 150,000 150,000 150,000 150,000 750,000Total
Prior
290,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Kent Ralston
2024 2028thru Department PARKS & RECREATION
Description
Construction of sidepath extension along Hwy 6 between Broadway Street and Fairmeadows Blvd and along First Avenue from the south side of
Hwy 6 to Lower Muscatine Road.
Project #R4227
Priority Non-essential (5)
Justification
This project is an extension of the Hwy 6 sidepath and is an integral piece of the planned trail network. The project appears in MPOJC documents
as a 'future' sidewalk and also appears in the adopted 2017 Iowa City Bicycle Master Plan. This project also meets the Council's Strategic Plan
goal of 'Enhancing Community Mobility' by substantially improving the sidewalk network. This is the last major segment of missing Hwy 6 trail
and connects to the 2021 CIP funded segment between Heinz and Fairmeadows.
Budget Impact/Other
This project will add 4,800 feet of sidepath to the Parks & Recreation Department snow plowing, mowing, and general maintenance expenses.
Additional operating expenditures are estimated to be approximately than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 40 YearsProject Name Hwy 6 Sidepath - Broadway to Fairmeadows Category Parks Maintenance
Type One Phase
MATCH %VARIES
GRANTEE TRAILS GRANT
Total Project Cost:$1,700,000
TIF DISTRICT None
PLAN Bike Master Plan
Status Active
Total20242025202620272028Expenditures
200,000200,000PLANNING/DESIGN
1,500,0001,500,000CONSTRUCTION
200,000 1,500,000 1,700,000Total
Total20242025202620272028Funding Sources
520,000520,000FEDERAL GRANTS
1,180,0001,180,000GO BONDS-ESSENTIAL
PURPOSE
1,700,000 1,700,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
Replace City Park Pool with new outdoor swimming pool and bathhouse.
Project #R4229
Priority Efficiency Improvement (3)
Justification
City Park Pool is an Iowa City landmark and tradition. However, due to its advancing age it will need to be replaced with a more modern facility.
Budget Impact/Other
This project will increase annual operating expenditures for insurance and utilities, but will also require lower maintenance and upkeep. The net
increase in operating expenditures is estimated between $15,000 and $25,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 40 YearsProject Name City Park Pool Replacement Category Recreation
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$10,800,000
TIF DISTRICT None
PLAN Recreation Master Plan
Status Active
Total20242025202620272028Expenditures
500,000500,000PLANNING/DESIGN
9,800,0009,800,000CONSTRUCTION
500,000500,000CONTINGENCY
500,000 10,300,000 10,800,000Total
Total20242025202620272028Funding Sources
9,500,000500,000 9,000,000FACILITY REPLACEMENT
RESERVE
1,300,0001,300,000GO BONDS-GENERAL
PURPOSE
500,000 10,300,000 10,800,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
FY23-24 RALRC Ceiling Tile & Grid Replacement; FY25 Mercer/Scanlon Lobby “Cosmetic” Improvements- $50,000; FY26 New Master
Keying System for all Recreation Facilities-$50,000; FY27RALRC – Window Blinds & Sound Attenuation in Social Hall and/or Meeting; Room-
$50,000; 4 FY28 Mercer/Scanlon Tile Flooring replacement $50,000
Project #R4330
Priority Essential (2)
Justification
These renovations and updates address necessary structural, aesthetic and operational concerns from facilities studies and long known ADA access
issues and improve use of the community recreation centers for the public.
Budget Impact/Other
No impact on operating budget as these are replacements for current facilities.
Useful Life 20 yearsProject Name Annual Recreation Center Improvements Category Recreation
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$745,000
TIF DISTRICT None
PLAN Facilities Master Plan
Status Active
Total20242025202620272028Expenditures
250,00050,000 50,000 50,000 50,000 50,000CONSTRUCTION
50,000 50,000 50,000 50,000 50,000 250,000Total
Prior
495,000
Total
Total20242025202620272028Funding Sources
250,00050,000 50,000 50,000 50,000 50,000GENERAL FUND
50,000 50,000 50,000 50,000 50,000 250,000Total
Prior
495,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
Funding to develop new neighborhood parks in emerging or underserved locations. Improvements in soon to be acquired location in the Palisades
Subdivisions to include playground, shelter, or other park features.
Project #R4346
Priority Essential (2)
Justification
The 2017 Park Master plan points to a district with deficiencies in park land. This project will be designed to develop a new neighborhood park in
a growing or underserved neighborhood as the opportunity becomes available.
Budget Impact/Other
Modest operating budget impacts are expected but not significantly higher than current mowing maintenance needs as the parcels transfer to City
ownership.
Useful Life 20 yearsProject Name Palisades Park Development Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$250,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total20242025202620272028Expenditures
30,00030,000PLANNING/DESIGN
180,000180,000CONSTRUCTION
5,0005,000INSPECTION
5,0005,000ADMINISTRATION
30,00030,000CONTINGENCY
250,000 250,000Total
Total20242025202620272028Funding Sources
250,000250,000GENERAL FUND
250,000 250,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
FY25 - RALRC Structural Cables $250,000, Mercer Pool UV Disinfection System $75,000, Mercer HVAC Chiller Replacement $100,000; FY26
Remodel of RALRC former racquetball courts/game room including Gym HVAC Unit $275,000; FY27 RALRC Upstairs ADA Remodel –
Restrooms, Kitchen & staff offices $700,000; FY28 Mercer/Scanlon Parking Lot Storm/flooding issue $930,000 ($700,000 in FY28)
Project #R4351
Priority Essential (2)
Justification
These renovations address necessary structural, HVAC, pool system, parking flooding and operational concerns from facilities studies and long
known ADA access issues and improve use of the community recreation centers for the public.
Budget Impact/Other
These updates replace aging structures and will allow for more effective uses of the space. No change is anticipated in revenue, staffing or
maintenance costs.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 30 YearsProject Name Recreation Center Improvements Category Government Buildings
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$700,000
TIF DISTRICT None
PLAN Facilities Master Plan
Status Active
Total20242025202620272028Expenditures
65,00065,000PLANNING/DESIGN
570,000570,000CONSTRUCTION
65,00065,000CONTINGENCY
700,000 700,000Total
Total20242025202620272028Funding Sources
700,000700,000GO BONDS-GENERAL
PURPOSE
700,000 700,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
This project will demolish 7 picnic shelters and 1 restroom in Lower City Park and replace these with 1 large and 4 small shelters and renovate an
existing restroom facility. The remaining facilities will be in locations further from the river as outlined in Lower City Park Master Plan.
Project #R4358
Priority Essential (2)
Justification
The shelters and restrooms in Lower City Park are quickly reaching the end of their serviceable life. Some are in areas that are prone to regular
flooding. This project follows recommendations of the 2016 Lower City Park Master Plan and 2017 Park Master Plan while repositioning and
resizing the shelters to meet current and future use patterns.
Budget Impact/Other
No impact on operating budget as these are replacements for current facilities.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Lower City Park Shelters & Restroom Replacement Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$750,000
TIF DISTRICT None
PLAN Lower City Park Master Plan
Status Active
Total20242025202620272028Expenditures
50,00050,000PLANNING/DESIGN
640,000640,000CONSTRUCTION
10,00010,000INSPECTION
50,00050,000CONTINGENCY
750,000 750,000Total
Total20242025202620272028Funding Sources
750,000750,000GO BONDS-ESSENTIAL
PURPOSE
750,000 750,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
This project will renovate and enhance fields 5-8 at the Napoleon Park Softball Complex. The project will include the laser grading infields, the
addition of drainage tile, and new outfield turf.
Project #R4362
Priority Efficiency Improvement (3)
Justification
In 2013 we completed this process on fields 1-4 at Napoleon. Fields 5-8 currently have water retention and playability issues that present
maintenance and play challenges thus limiting their use.
Budget Impact/Other
The operating budget for this facility will remain the same.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 10 yearsProject Name Napoleon Park Softball Fields 5-8 Renovation Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$450,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
50,00050,000PLANNING/DESIGN
380,000380,000CONSTRUCTION
5,0005,000INSPECTION
15,00015,000CONTINGENCY
450,000 450,000Total
Total20242025202620272028Funding Sources
450,000450,000GO BONDS-GENERAL
PURPOSE
450,000 450,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
Revised - move to 2024. Renovation of skatepark and access paths. Addition of bicycle pump track.
Project #R4372
Priority Non-essential (5)
Justification
The skatepark is nearing an age where replacement is necessary for it to continue to draw skaters as well as for improved maintenance and safety.
The addition of the pump track will bring even more users to the facility.
Budget Impact/Other
Small impact on maintenance, once completed, but will not increase staff.
Useful Life 20 yearsProject Name Terrell Mill Skate Park Redevelopment Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$1,300,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total20242025202620272028Expenditures
100,000100,000PLANNING/DESIGN
1,000,0001,000,000CONSTRUCTION
100,000100,000ADMINISTRATION
100,000100,000CONTINGENCY
1,300,000 1,300,000Total
Total20242025202620272028Funding Sources
100,000100,000GENERAL FUND
100,000 100,000Total
Prior
1,200,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
Annual contracted tree program for additions to street trees, neighborhood infill and park tree plantings. Areas of emphasis include low income
neighborhoods as well as neighborhoods that lost trees to the Emerald Ash Borer or the 2020 Derecho storm.
Project #R4380
Priority Aesthetic Improvement (4)
Justification
This supports the City's Climate Action Plan goals and increases the health of the overall urban tree canopy.
Budget Impact/Other
This will require additional maintenance staff, contracted services, and operating supplies to properly maintain and support establishment of new
trees. The estimated additional annual cost is $10,000 to $25,000 per year
Useful Life 75 yearsProject Name Annual Contracted Tree Planting Category Parks Maintenance
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$675,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
25,0005,000 5,000 5,000 5,000 5,000PLANNING/DESIGN
250,00070,000 45,000 45,000 45,000 45,000CONSTRUCTION
75,000 50,000 50,000 50,000 50,000 275,000Total
Prior
400,000
Total
Total20242025202620272028Funding Sources
75,00075,000EMERGENCY LEVY
200,00050,000 50,000 50,000 50,000GENERAL FUND
75,000 50,000 50,000 50,000 50,000 275,000Total
Prior
400,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
FY26 TTRA Lodge staining $180,000; FY28 Ashton House Driveway - Parking Lot Improvements due to deterioration and need for better
accessibility by vans and small busses $325,000.
Project #R4381
Priority Essential (2)
Justification
These renovations are needed as the buildings and systems age, includes ADA updates to meet current standards for accessibility.
Budget Impact/Other
All of these improvements will enhance the usability of these facilities for rentals, programs and public events.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Event Facility Improvements Category Government Buildings
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$1,050,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
15,00015,000PLANNING/DESIGN
170,000170,000CONSTRUCTION
15,00015,000CONTINGENCY
200,000 200,000Total
Prior
850,000
Total
Total20242025202620272028Funding Sources
200,000200,000GENERAL FUND
200,000 200,000Total
Prior
850,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
This project replaces the playground at Benton HIll Park. Site constraints keep this as a smaller piece of equipment.
Project #R4384
Priority Essential (2)
Justification
Playground replacement following Park Master Plan. Playground reaching end of servicable life.
Budget Impact/Other
No impact on operating budget as this replaces current infrastructure.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Benton Hills Playground Replacement Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$200,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total20242025202620272028Expenditures
5,0005,000PLANNING/DESIGN
190,000190,000CONSTRUCTION
5,0005,000CONTINGENCY
200,000 200,000Total
Total20242025202620272028Funding Sources
200,000200,000GO BONDS-ESSENTIAL
PURPOSE
200,000 200,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
This project replaces the playground at College Green Park.
Project #R4385
Priority Essential (2)
Justification
Playground replacement following Park Master Plan. Playground reaching end of servicable life.
Budget Impact/Other
No impact on operating budget as this replaces current infrastructure.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name College Green Park Playground Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$400,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total20242025202620272028Expenditures
25,00025,000PLANNING/DESIGN
335,000335,000CONSTRUCTION
15,00015,000INSPECTION
25,00025,000CONTINGENCY
400,000 400,000Total
Total20242025202620272028Funding Sources
400,000400,000GO BONDS-ESSENTIAL
PURPOSE
400,000 400,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
Elevators in City Hall, Senior Center, Robert A. Lee Recreation Center need ADA operating system updates including braille, visible and verbal
signals to indicate which elevator car is available, its direction, and when it has reached a designated floor. UPDATED 08 28 23: 2024- Consultant
Condition survey report and ADA assessment/Bid Documents- 2025- City Hall Elevator Upgrades 5 flrs/hydraulic $325,000; 2026- Senior Center
Elevator upgrades (Interior Remodel Project) 4 flrs/hydraulic; $250,000; Robert A. Lee Recreation Center 2 flrs/hydraulic $200,000
Project #R4388
Priority Critical (1)
Justification
Presently these elevators do not meet the current ADA standards. These recommendations were cited in the 2012 Space Needs Study and Master
Plan and the Facility ADA study.
Budget Impact/Other
No impact on operating budget as this replaces current infrastructure.
Useful Life 10 yearsProject Name ADA Elevator Improvements Category Government Buildings
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$600,000
TIF DISTRICT None
PLAN Facilities Master Plan
Status Active
Total2024 2025 2026 2027 2028Expenditures
600,000400,000 200,000CONSTRUCTION
400,000 200,000 600,000Total
Total2024 2025 2026 2027 2028Funding Sources
600,000400,000 200,000GENERAL FUND
400,000 200,000 600,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
Replace playground at North Market Square Park. This includes replacing rubber mat surface with engineered wood fiber. Adjacent elementary
school playground has poured in place surfacing.
Project #R4389
Priority Essential (2)
Justification
This replacement follows recommendatation of 2017 Park Master Plan. Playground components are aging and becoming difficult to repair and
replace.
Budget Impact/Other
This replaces existing equipment. No increased expenditures.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name N. Market Square Playground Replacement Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$300,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total20242025202620272028Expenditures
20,00020,000PLANNING/DESIGN
250,000250,000CONSTRUCTION
10,00010,000INSPECTION
20,00020,000CONTINGENCY
300,000 300,000Total
Total20242025202620272028Funding Sources
300,000300,000GO BONDS-ESSENTIAL
PURPOSE
300,000 300,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
Replace playground at Reno Street Park. Add ADA compliant paths, park furnishings and fence to community garden.
Project #R4390
Priority Essential (2)
Justification
This replacement follows recommendatation of 2017 Park Master Plan. Playground components are aging and becoming difficult to repair and
replace. This park lacks ADA compiant paths.
Budget Impact/Other
There will be slightly less maintenance costs due to the replacement of older equipment. The expected annual savings is less than $5,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Reno Street Park Renovations Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$240,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total20242025202620272028Expenditures
20,00020,000PLANNING/DESIGN
200,000200,000CONSTRUCTION
5,0005,000INSPECTION
15,00015,000CONTINGENCY
240,000 240,000Total
Total20242025202620272028Funding Sources
240,000240,000GO BONDS-ESSENTIAL
PURPOSE
240,000 240,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Geoff Fruin
2024 2028thru Department PARKS & RECREATION
Description
This project is to acquire property in the future growth and annexation areas west of Highway 218 between Rohret Road and Highway 1.
Project #R4392
Priority Essential (2)
Justification
The future growth area west of Highway 218 includes a 196-acre potential annexation which will require ameneties for parks and recreation to
serve the anticipated population growth.
Budget Impact/Other
The future west park would require additional maintenance such as mowing and natural areas management. It also has the potential to include
other amenities in the future such as park shelters, trails, restroom facilities, pavilions, playgrounds, sport fields, etc. The estimated increase in
annual operating expenditures due to the land acquisition not including future amenities is $50,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 75 yearsProject Name Westside Park Land Acquisition Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$700,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total20242025202620272028Expenditures
700,000700,000LAND/ROW ACQUISITION
700,000 700,000Total
Total20242025202620272028Funding Sources
700,000700,000GO BONDS-GENERAL
PURPOSE
700,000 700,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
Replacement of the 1/4 mile segment of Court Hill Trail from Beech St to Scott Blvd. Current 10 ft wide asphalt trail to be replace with 10 ft wide
concrete trail.
Project #R4397
Priority Essential (2)
Justification
This segment of trail is in poor condition and quickly approaching a state where it will become hazardous due to cracking and uneven surfacing.
Budget Impact/Other
Replacement of the asphalt trail with a concrete surface will reduce the amount of ongoing maintenance.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Court Hill Trail Beech to Scott Replacement Category Parks Maintenance
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$260,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
30,00030,000PLANNING/DESIGN
160,000160,000CONSTRUCTION
15,00015,000INSPECTION
15,00015,000ADMINISTRATION
40,00040,000CONTINGENCY
260,000 260,000Total
Total20242025202620272028Funding Sources
260,000260,000GO BONDS-ESSENTIAL
PURPOSE
260,000 260,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
This project will replace and or improve trails, fencing and other amenities at Thornberry and Rita's Ranch Dog Parks. Thornberry will include trail
resurfacing and fencing repairs. Rita's Ranch will include a new loop trail and fencing repairs. Both parks may include other site amenity updates.
Project #R4398
Priority Essential (2)
Justification
The trail surface at Thornberry is reaching the end of it's life and fencing repairs would make gates and existing fences safer and more user
friendly. Rita's Ranch does not currently have interior paths or routes to the shelters. Addition of paths would make the location more accessible
and fencing repairs would improve gate access points. Both locations would also benefit from updates to aging site amenities.
Budget Impact/Other
Updates to proposed elements would reduce repair costs currently needed on a regular basis as features deteriorate.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Thornberry and Rita's Ranch Dog Park Improvements Category Parks Maintenance
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$300,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
10,00010,000PLANNING/DESIGN
280,000280,000CONSTRUCTION
10,00010,000CONTINGENCY
300,000 300,000Total
Total20242025202620272028Funding Sources
300,000300,000GO BONDS-ESSENTIAL
PURPOSE
300,000 300,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
Replacement of Shelter #2 at Mercer Park.
Project #R4400
Priority Essential (2)
Justification
This shelter is deteriorating and reaching end of life. Replacement with a shelter of similar size will maintain service levels at this popluar shelter
rental location.
Budget Impact/Other
This is a replacement and little budget impact is expected.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Mercer Shelter Replacement Category Parks Maintenance
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$150,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
5,0005,000PLANNING/DESIGN
135,000135,000CONSTRUCTION
10,00010,000CONTINGENCY
150,000 150,000Total
Total20242025202620272028Funding Sources
150,000150,000GO BONDS-ESSENTIAL
PURPOSE
150,000 150,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
Construction of 50'x60' pole building with concrete floor for Parks equipment storage. Location is planned for south end of the soccer park.
Project #R4401
Priority Essential (2)
Justification
Equipment storage, especially in winter, is maxed out at current facilities and our fleet is expanding as our acreage of parks increases. This storage
facility would consolidate storage and increse efficiency of operations. Current storage at the old Mercer Park pool building that has limited
functionality could be eliminated with addition of this new facility. Our historic use of winter storage at the County Fairgrounds has been
eliminated by the fair board operations further constraining storage during critical months when equipment needs protection.
Budget Impact/Other
While the buliding will require upkeep and maintenance the cost are expected to be offset by increases in efficiency and longevity of equipment
stored out of the elements.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name Parks Storage Building Category Parks Maintenance
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$250,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
10,00010,000PLANNING/DESIGN
225,000225,000CONSTRUCTION
15,00015,000CONTINGENCY
250,000 250,000Total
Total20242025202620272028Funding Sources
250,000250,000GO BONDS-GENERAL
PURPOSE
250,000 250,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Joe Welter
2024 2028thru Department PARKS & RECREATION
Description
This project will construction a new lake west of Highway 218, south of Rohret Road.
Project #R4403
Priority Essential (2)
Justification
This park is part of the Southwest District Development Plan.
Budget Impact/Other
There will be regular maintenance of the lake, landscaping, shelter, and sidewalks/trails. The estimated increase in annual operating expenditures
is less than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful LifeProject Name Carson Lake Park Category Parks Maintenance
Type Unassigned
MATCH %
GRANTEE
Total Project Cost:$1,900,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
200,000200,000PLANNING/DESIGN
1,000,0001,000,000CONSTRUCTION
100,000100,000INSPECTION
100,00050,000 50,000ADMINISTRATION
300,000300,000CONTINGENCY
250,000 1,450,000 1,700,000Total
Prior
200,000
Total
Total20242025202620272028Funding Sources
1,900,0001,900,000GO BONDS-ESSENTIAL
PURPOSE
1,900,000 1,900,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
Replace aging post construction structural cables on RALRC.
Project #R4406
Priority Essential (2)
Justification
Theses cables were installed shortly after construction of the building. They were needed to stablize the building structure. The cables are
deteriorating and need to be replaced to maintain the structural integrity of the building
Budget Impact/Other
No change to operating budget.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name RALRC Structural Cables Category Recreation
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$250,000
TIF DISTRICT
PLAN
Status Active
Total2024 2025 2026 2027 2028Expenditures
250,000250,000CONSTRUCTION
250,000 250,000Total
Total2024 2025 2026 2027 2028Funding Sources
250,000250,000GO BONDS-GENERAL
PURPOSE
250,000 250,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
Replacement of Mercer/Scanlon Gym/Entry HVAC Chiller replacement $100,000 and RALRC Gym HVAC Unit replacement or repairs.
Project #R4407
Priority Essential (2)
Justification
These units are critcal to public use of the recreation center gyms.
Budget Impact/Other
These updates replace aging equipment which will allow for more efficient and consistent temperates in the gyms.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Mercer & RALRC HVAC Replacement Category Recreation
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$200,000
TIF DISTRICT
PLAN
Status Active
Total2024 2025 2026 2027 2028Expenditures
200,000200,000CONSTRUCTION
200,000 200,000Total
Total2024 2025 2026 2027 2028Funding Sources
200,000200,000GO BONDS-GENERAL
PURPOSE
200,000 200,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2024 2028thru Department PARKS & RECREATION
Description
Design and construction of a new Columbarium structure for single and double cremation niches. The scope of this project may or may not include
the expansion of the current Forestview Columbarium.
Project #R4408
Priority Essential (2)
Justification
Current columbarium space is 74% sold. With average yearly rate of sale, 6.5 years of life expectancy on current columbarium.
Budget Impact/Other
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Columbarium Construction/Expansion Category Parks Maintenance
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$720,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
60,00060,000PLANNING/DESIGN
600,000600,000CONSTRUCTION
60,00060,000CONTINGENCY
720,000 720,000Total
Total20242025202620272028Funding Sources
720,000720,000GO BONDS-ESSENTIAL
PURPOSE
720,000 720,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact
2024 2028thru Department PARKS & RECREATION
Description
Funding to develop new neighborhood parks in emerging or underserved locations. 2024 location at newly acquired parcel along Shannon Dr. to
include a park shelter and playground.
Project #R4409
Priority Essential (2)
Justification
The 2017 Park Master plan points to a districts with deficiencies in park land. This project will be designed to develop new neighborhood parks in
a growing or underserved neighborhoods as the opportunity becomes available.
Budget Impact/Other
Modest operating budget impacts are expected but not significantly higher than current mowing maintenance needs as the parcels transfer to City
ownership.
Useful Life 20 yearsProject Name New Park Development - Location Unspecified Category Parks Maintenance
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$250,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
30,00030,000PLANNING/DESIGN
180,000180,000CONSTRUCTION
5,0005,000INSPECTION
5,0005,000ADMINISTRATION
30,00030,000CONTINGENCY
250,000 250,000Total
Total20242025202620272028Funding Sources
250,000250,000GENERAL FUND
250,000 250,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jody Matherly
2024 2028thru Department POLICE
Description
RFP for acquisition and purchase of new body-worn and in-car camera hardware and software to replace the current system that is at end-of-life.
A new cloud-based system would also provide digital evidence management that was the basis of the original Y4446 project.
Project #Y4446
Priority Efficiency Improvement (3)
Justification
The current body-worn camera and in-car camera hardware originally purchased in 2019 from WatchGuard is at end-of-life in part due to
Motorola’s acquisition of WatchGuard in 2022. Motorola announced that they were ending support/service of the current product at the end of
CY2024. In order to maintain transparency, follow best practices, and protect community members and officers, it imperative that the camera
systems are replaced. The cloud-based system will continue to allow staff to create links to video for the county attorney and the discovery
process. This system will also allow uploading of photographs and evidence from businesses, etc., creating a log and filing items under the proper
incident number making the entire process more efficient.
Budget Impact/Other
Y4446 currently has $125,000 in funding. New cameras, charging banks, spare batteries, upload stations, uniform accessories, mounting
hardware, video storage, Command Central Evidence, and 5.5 TB of storage will have a Year 1 cost of $251,575. Year 2-5 will have an annual
subscription fee for cameras and software of $144,140/year. Uploading of interview room video to the cloud is $4475/year; total annual cost for
Year 2-5 is $148,615.
Useful Life 10 yearsProject Name Body Cameras & In Car Video Systems Category Police
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$250,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
125,000125,000EQUIPMENT
125,000 125,000Total
Prior
125,000
Total
Total20242025202620272028Funding Sources
125,000125,000GENERAL FUND
125,000 125,000Total
Prior
125,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jen Jordan
2024 2028thru Department PUBLIC WORKS
Description
The project consists of creating a Landfill Master Plan in 2021 and 2022, and the design and replacement of the landfill equipment storage
buildings, currently known as buildings A and B, in 2022 and 2023. The Master Plan component will determine where on the site the new building
will be constructed in addition to assessing overall traffic flow, potential compost facility changes and potential future methane use infrastructure
locations.
Project #L3328
Priority Essential (2)
Justification
Based on progress in the master plan process in 2022 and signifcant cost increases in materials, the consultant is recommending an increase to the
budget.
Budget Impact/Other
The new building will be more energy efficient, allow for better equipment maintenance and accommodate storing landfill equipment indoors.
Potential grant funding.
Useful Life 30 YearsProject Name Landfill Equipment Building Replacement Category Landfill
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$5,000,000
TIF DISTRICT None
PLAN Facilities Master Plan
Status Active
Total20242025202620272028Expenditures
100,000100,000PLANNING/DESIGN
3,500,0003,500,000CONSTRUCTION
350,000350,000INSPECTION
150,000150,000ADMINISTRATION
150,000150,000CONTINGENCY
4,250,000 4,250,000Total
Prior
750,000
Total
Total20242025202620272028Funding Sources
500,000500,000LANDFILL FUND
4,250,0004,250,000LANDFILL REPLACEMENT
RESERVE
4,750,000 4,750,000Total
Prior
250,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jen Jordan
2024 2028thru Department PUBLIC WORKS
Description
The landfill six-acre compost pad will be backfilled in multiple areas to fill large pits. An asphalt layer will be added to cover the rock and a seal
coat will be applied to prevent liquids from seeping. A seal coat will be added to cover the raw millings on the eastern half of the pad that has not
been sealed in the past.
Project #L3333
Priority Essential (2)
Justification
The landfill six-acre compost pad and wood processing pad is in need of significant repair. Deferred maintenance over many years has resulted in
the need for repair to ensure customer safety and regulatory compliance. The pad must meet the Iowa Department of Natural Resources'
requirements for impermeability and for stormwater control.
Budget Impact/Other
An improved surface will reduce equipment repair costs and reduce customer safety issues/potential liability claims. The estimated annual savings
is less than $10,000 per year.
Useful Life 20 yearsProject Name Compost Pad Improvements & Expansion Category Landfill
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$4,350,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
55,00055,000PLANNING/DESIGN
3,500,0003,500,000CONSTRUCTION
55,00055,000INSPECTION
40,00040,000ADMINISTRATION
350,000350,000CONTINGENCY
4,000,000 4,000,000Total
Prior
350,000
Total
Total20242025202620272028Funding Sources
4,000,0004,000,000FEDERAL GRANTS
4,000,000 4,000,000Total
Prior
350,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jen Jordan
2024 2028thru Department PUBLIC WORKS
Description
This project includes the design and installation of an expansion of the Landfill Dual Extraction System, which was originally constructed in 2018.
This project will expand the current system (13 pnuematic pumps and 4 solar pumps) to include pumps in 8-9 additional wells and add SCADA
monitoring to the proposed new and existing pumps. This revision pushes the project two years into the future.
Project #L3335
Priority Efficiency Improvement (3)
Justification
The expansion will continue to improve landfill gas extraction as well as limit potential efffects of landfill gas, leachate migration, and odor, and
positively impact groundwater. Adding SCADA greatly improves monitoring capabilities and efficiencies for landfill staff.
Budget Impact/Other
Adding SCADA monitoring to the new and existing pumps will increase staff efficiency by allowing central monitoring.
Useful Life 30 YearsProject Name Landfill Dual Extraction System Expansion Category Landfill
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$850,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
100,000100,000PLANNING/DESIGN
625,00050,000 575,000CONSTRUCTION
32,75032,750INSPECTION
30,75010,750 20,000ADMINISTRATION
61,50061,500CONTINGENCY
160,750 689,250 850,000Total
Total20242025202620272028Funding Sources
850,000160,750 689,250LANDFILL FUND
160,750 689,250 850,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jen Jordan
2024 2028thru Department PUBLIC WORKS
Description
Site traffic flow improvements include a second scale, electrical connectivity to the scale, additional software, improved wayfinding signage,
improvements to concrete near the scale, and the relocation of the oil shed for increased efficiency in traffic flow.
Project #L3348
Priority Efficiency Improvement (3)
Justification
The current site configuration was designed and constructed in the early 2000's; traffic flow across the scale has increased by 52% in that time.
Customers often have to wait for service, and occasionally have signficant delays. A second scale would handle commercial customers separately
and reduce idling times for all customers, which could result in reduced greenhouse gas emissions.
Budget Impact/Other
Grant assistance is likely for this purchase based on greenhouse gas reductions from reduced idling.
Useful Life 25 yearsProject Name Site Flow Improvements Category Landfill
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$207,500
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
15,0005,000 10,000PLANNING/DESIGN
177,50047,500 130,000CONSTRUCTION
15,0007,500 7,500INSPECTION
60,000 147,500 207,500Total
Total20242025202620272028Funding Sources
147,500147,500LANDFILL FUND
60,00060,000LANDFILL SURCHARGE
FUND
60,000 147,500 207,500Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Joe Welter
2024 2028thru Department PUBLIC WORKS
Description
The project consists of designing and building the next landfill cell in the Northeast Expansion Area of the site. A preliminary project will be
needed in advance of the cell construction to move haul roads, groundwater wells, and other site features.
Project #L3349
Priority Aesthetic Improvement (4)
Justification
FY23 Cell is estimated to have capacity for nine to eleven years. This would put the cell usage from 2024-2032 or 2024-2034. Based on the nine
year usage of FY23 Cell, the next cell will need to have construction completed in Calendar Year 2031. That would put design in Calendar Years
2029-2030. If FY23 Cell fills up quicker than anticipated, it will be beneficial to begin design and construction of the preliminary site feature
movement project well in advance of needing the cell.
Budget Impact/Other
Useful Life 10 yearsProject Name Landfill Future Cell - Northeast Expansion Category Landfill
Type Multi-Phase
MATCH %
GRANTEE
Total Project Cost:$7,200,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
50,00050,000PLANNING/DESIGN
25,00025,000ADMINISTRATION
75,000 75,000Total
Future
7,125,000
Total
Total20242025202620272028Funding Sources
75,00075,000LANDFILL REPLACEMENT
RESERVE
75,000 75,000Total
Future
7,125,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Ben Clark
2024 2028thru Department PUBLIC WORKS
Description
This is an annual project that will repair and/or improve storm water infrastructure throughout the City.
Project #M3631
Priority Essential (2)
Justification
This project is required to maintain the existing storm water system and to make improvements where necessary.
Budget Impact/Other
The impact of this project on the operating budget is negligible.
Useful Life 50 yearsProject Name Annual Stormwater Improvements Category Stormwater
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$2,880,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
1,200,000240,000 240,000 240,000 240,000 240,000CONSTRUCTION
240,000 240,000 240,000 240,000 240,000 1,200,000Total
Prior
1,680,000
Total
Total20242025202620272028Funding Sources
1,200,000240,000 240,000 240,000 240,000 240,000STORMWATER FUND
240,000 240,000 240,000 240,000 240,000 1,200,000Total
Prior
1,680,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Ben Clark
2024 2028thru Department PUBLIC WORKS
Description
The project will reconstruct the top of the vault and modify the hatches in order to accomodate ADA compliant sidewalks. It will also include
replacment of the trash rack screen, control panel and modifications to the generator electrical connection.
Project #M3634
Priority Essential (2)
Justification
The location of the vault and hatches creates a maintenance issue and prohibits the installation of ADA compliant sidewalks. This pump station
was installed 37 years ago and some of the components are in need of replacement.
Budget Impact/Other
There is no anticipated impact to the operating budget.
Useful Life 50 yearsProject Name Rundell Street Pump Station Vault Modifications Category Stormwater
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$500,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
90,00090,000PLANNING/DESIGN
350,000350,000CONSTRUCTION
25,00025,000INSPECTION
10,0005,000 5,000ADMINISTRATION
25,00025,000CONTINGENCY
95,000 405,000 500,000Total
Total20242025202620272028Funding Sources
500,00095,000 405,000STORMWATER FUND
95,000 405,000 500,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Ben Clark
2024 2028thru Department PUBLIC WORKS
Description
This project will install storm sewer pipe in an open ditch along the west side of River Street, north of the lower Lincoln School parking lot. A
five-foot-wide compliant sidewalk will replace the existing walk.
Project #M3635
Priority Essential (2)
Justification
The existing open channel storm water drainage ditch is deteriorating and is susceptible to blockage from debris. Utility services have been
exposed to the surface due to erosion along the bottom of the ditch. Further erosion will potentially impact the sidewalk and street. A compliant
sidewalk will facilitate pedestrian traffic to the school.
Budget Impact/Other
There is no anticipated impact to operating budget.
Useful Life 50 yearsProject Name River Street Storm Sewer Improvements Category Stormwater
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$990,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
90,00090,000PLANNING/DESIGN
50,00050,000LAND/ROW ACQUISITION
700,000700,000CONSTRUCTION
60,00060,000INSPECTION
30,00030,000ADMINISTRATION
60,00060,000CONTINGENCY
140,000 850,000 990,000Total
Total20242025202620272028Funding Sources
990,000140,000 850,000STORMWATER FUND
140,000 850,000 990,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Ben Clark
2024 2028thru Department PUBLIC WORKS
Description
This project will replace approximately 430 linear feet of corrugated metal pipe with reinforced concrete pipe.
Project #M3637
Priority Critical (1)
Justification
The existing storm sewer was constructed approximately 40 years ago using corrugated metal pipe that is now severely corroded and past the end
of its useful life.
Budget Impact/Other
Impact to operating budget is expected to be less than $10,000 annually.
Useful Life 50 yearsProject Name Peterson Street Storm Sewer Improvments Category Stormwater
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$500,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
50,00050,000PLANNING/DESIGN
400,000400,000CONSTRUCTION
10,00010,000INSPECTION
5,0005,000ADMINISTRATION
35,00035,000CONTINGENCY
500,000 500,000Total
Total20242025202620272028Funding Sources
500,000500,000STORMWATER FUND
500,000 500,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Ben Clark
2024 2028thru Department PUBLIC WORKS
Description
Locate with survey grade accuracy all storm sewers, manholes and intakes and deliver in a geographic information system geographic network with
associated metadata for asset management functions.
Project #M3638
Priority Efficiency Improvement (3)
Justification
Asset management requires an accurate asset inventory to reliably know the number, location and information regarding assets. Updated and
accurate mapping is also a requirement of the City's National Pollution Discharge Elimination System (NPDES) Permit .
Budget Impact/Other
This project will have a negligible impact on the operating budget.
Useful Life 10 yearsProject Name Storm Sewer Asset Inventory Category Stormwater
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$500,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
100,000100,000OTHER
100,000 100,000Total
Prior
400,000
Total
Total20242025202620272028Funding Sources
100,000100,000STORMWATER FUND
100,000 100,000Total
Prior
400,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Ron Knoche
2024 2028thru Department PUBLIC WORKS
Description
Construct a new Equipment Maintenance Facility on the public works campus to replace the old and dated facility at the corner of Highways 1 & 6.
Project #P3953
Priority Essential (2)
Justification
The current Equipment Maintenance Facility is outdated, inefficient, and a poor working environment for the employees.
Budget Impact/Other
A new facility will be more energy efficient which will save costs on utilities; however, a newer facility will add square footage and increase
insurance, cleaning, and similar expenses. The estimated annual increase in operating expenditures is $50,000 to $100,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 40 YearsProject Name Equipment Maintenance Facility replacement Category Equipment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$13,000,000
TIF DISTRICT None
PLAN Facilities Master Plan
Status Active
Total20242025202620272028Expenditures
12,000,00012,000,000CONSTRUCTION
12,000,000 12,000,000Total
Prior
1,000,000
Total
Total20242025202620272028Funding Sources
7,400,0007,400,000EQUIPMENT FUND
700,000700,000FACILITY REPLACEMENT
RESERVE
1,300,0001,300,000GO BONDS-GENERAL
PURPOSE
500,000500,000LANDFILL FUND
250,000250,000REFUSE COLLECTION FUND
250,000250,000STORMWATER FUND
800,000800,000WASTEWATER FUND
800,000800,000WATER FUND
12,000,000 12,000,000Total
Prior
1,000,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Ron Knoche
2024 2028thru Department PUBLIC WORKS
Description
This project improves the landscaping at the City entrance ways on North Dubuque Street and North Dodge Street including entrance signage on
North Dubuque.
Project #P3988
Priority Aesthetic Improvement (4)
Justification
The entrance ways to the city provide an important impression of the community to visitors. North Dubuque Street and North Dodge Street are
primary entrances to the City off Highway 80 and serve as the front doors to the city.
Budget Impact/Other
This project will slightly increase the annual operating expenditures due to the additional maintenance required on the landscaping and signage.
The estimated increase in operating expenditures is less than $10,000 per year.
Useful Life 20 yearsProject Name Entrance Way Improvements Category Public Works Administration
Type One Phase
MATCH %VARIES
GRANTEE U OF I
Total Project Cost:$400,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
400,000400,000CONSTRUCTION
400,000 400,000Total
Total20242025202620272028Funding Sources
300,000300,000GENERAL FUND
100,000100,000UNIVERSITY OF IOWA
400,000 400,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Ron Knoche
2024 2028thru Department PUBLIC WORKS
Description
This is an annual project to replace or add traffic signals at intersections with outdated traffic signal equipment or at dangerous and uncontrolled
intersections.
Project #S3814
Priority Efficiency Improvement (3)
Justification
The addition and replacement of traffic signal equipment ensures the safe flow of traffic, maintains equipment with updated technology, provides
for better fuel mileage consumption for motorists, and reduces traffic accidents due to unimproved intersections.
Budget Impact/Other
Useful Life 20 yearsProject Name Annual Traffic Signal Projects Category Street Operations
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$3,020,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
1,400,000200,000 300,000 300,000 300,000 300,000EQUIPMENT
200,000 300,000 300,000 300,000 300,000 1,400,000Total
Prior
1,620,000
Total
Total20242025202620272028Funding Sources
1,400,000200,000 300,000 300,000 300,000 300,000ROAD USE TAX FUND
200,000 300,000 300,000 300,000 300,000 1,400,000Total
Prior
1,620,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Ron Knoche
2024 2028thru Department PUBLIC WORKS
Description
Annual appropriation for traffic calming projects
Project #S3816
Priority Efficiency Improvement (3)
Justification
These projects create safer and quieter neighborhoods from vehicle traffic.
Budget Impact/Other
The addition of infrastructure of this nature adds maintenance expense to the City's operating budget. The estimated increase in operating expenses
is less than $10,000 per year.
Useful Life 40 YearsProject Name Traffic Calming Category Street Operations
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$445,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
245,00045,000 50,000 50,000 50,000 50,000CONSTRUCTION
45,000 50,000 50,000 50,000 50,000 245,000Total
Prior
200,000
Total
Total20242025202620272028Funding Sources
245,00045,000 50,000 50,000 50,000 50,000ROAD USE TAX FUND
45,000 50,000 50,000 50,000 50,000 245,000Total
Prior
200,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jason Havel
2024 2028thru Department PUBLIC WORKS
Description
Annual appropriation for the construction of ADA accessible curb ramps.
Project #S3822
Priority Critical (1)
Justification
This program is to bring the City curb ramps in compliance with the Federal ADA standards.
Budget Impact/Other
This project creates additional infrastructure to maintain. The estimated increase in operating costs is negligible.
Useful Life 40 YearsProject Name Curb Ramps-ADA Category Street Operations
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$1,400,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
450,00090,000 90,000 90,000 90,000 90,000CONSTRUCTION
50,00010,000 10,000 10,000 10,000 10,000ADMINISTRATION
100,000 100,000 100,000 100,000 100,000 500,000Total
Prior
900,000
Total
Total20242025202620272028Funding Sources
500,000100,000 100,000 100,000 100,000 100,000ROAD USE TAX FUND
100,000 100,000 100,000 100,000 100,000 500,000Total
Prior
900,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jason Havel
2024 2028thru Department PUBLIC WORKS
Description
Annual appropriation for resurfacing roadways and alleys including asphalt, concrete, and brick.
Project #S3824
Priority Critical (1)
Justification
This is project is necessary to maintain the city's street infrastructure at an acceptable level.
Budget Impact/Other
Replacing aged infrastructure will lower the City's operating expenditures through decreased maintenance costs. The estimated decrease in
operating expenses is less than $10,000 per year.
Useful Life 20 yearsProject Name Annual Pavement Rehabilitation Category Street Operations
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$29,012,622
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
500,000100,000 100,000 100,000 100,000 100,000PLANNING/DESIGN
10,305,7881,925,388 1,945,100 2,145,100 2,145,100 2,145,100CONSTRUCTION
250,00050,000 50,000 50,000 50,000 50,000INSPECTION
250,00050,000 50,000 50,000 50,000 50,000ADMINISTRATION
2,125,388 2,145,100 2,345,100 2,345,100 2,345,100 11,305,788Total
Prior
17,706,834
Total
Total20242025202620272028Funding Sources
10,600,0002,000,000 2,000,000 2,200,000 2,200,000 2,200,000ROAD USE TAX FUND
705,788125,388 145,100 145,100 145,100 145,100UTILITY FRANCHISE TAX
2,125,388 2,145,100 2,345,100 2,345,100 2,345,100 11,305,788Total
Prior
17,706,834
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Ron Knoche
2024 2028thru Department PUBLIC WORKS
Description
This is an annual project to convert overhead electrical systems to underground.
Dubuque Street, Riverside Drive, and Gilbert Street are currently the priority corridors for undergrounding electrical facilities.
Project #S3826
Priority Essential (2)
Justification
The City receives franchise fees from utility services. A portion of these fees is assigned to underground electrical issues and for moving electrical
lines underground. This creates fewer electrical issues due to weather and a cleaner appearance from fewer above ground lines.
Budget Impact/Other
Maintenance of the electrical lines is the responsibility of the utility companies. This project has a negligible impact on the City's operating budget.
Useful Life 20 yearsProject Name Underground Electrical Facilities Category Street Operations
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$2,736,523
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
1,058,882188,082 217,700 217,700 217,700 217,700CONSTRUCTION
188,082 217,700 217,700 217,700 217,700 1,058,882Total
Prior
1,677,641
Total
Total20242025202620272028Funding Sources
1,058,882188,082 217,700 217,700 217,700 217,700UTILITY FRANCHISE TAX
188,082 217,700 217,700 217,700 217,700 1,058,882Total
Prior
1,677,641
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Ron Knoche
2024 2028thru Department PUBLIC WORKS
Description
This is an annual project to implement the recommendations of the bicycle master plan. Improvement projects include construction of bike lanes,
bike boulevards, and other features that will improve streets to promote equal access and usability for all modes of transportation. Projects also
fund the conversion of 4-lane roads into 3-lane roads in certain areas that are highly used by all of the various modes of transportation. Projects
are scheduled as follows:
2023 - Sunset Bike Lanes (Benton to Highway 1); Oakcrest Bike Blvd; Emerald Bike Blvd; Arlington Bicycle Blvd; 2024 - Dover /Westminster
Bike Blvd; Highland Bicycle Blvd; 2025 - Church Street Bicycle Blvd; Broadway Bike Lanes (Sandusky to Highway 6); Ridge/Broadway Bike
Blvd; 2026 - Washington Street Bike Blvd (Scott Blvd to 1st Avenue); River Bike Blvd; Woolf Bike Blvd; Newton Marked Route
Project #S3827
Priority Efficiency Improvement (3)
Justification
This project implements the bicycle master plan that meets the City's goals for a greener, more walkable community that is pedestrian and bicycle
friendly and helps build a more sustainable environment.
Budget Impact/Other
The impact of the operating budget is negligible.
Useful Life 20 yearsProject Name Bicycle Master Plan Implementation Category Street Operations
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$1,450,000
TIF DISTRICT None
PLAN Bike Master Plan
Status Active
Total20242025202620272028Expenditures
200,00050,000 50,000 50,000 50,000CONSTRUCTION
50,000 50,000 50,000 50,000 200,000Total
Prior
1,250,000
Total
Total20242025202620272028Funding Sources
200,00050,000 50,000 50,000 50,000ROAD USE TAX FUND
50,000 50,000 50,000 50,000 200,000Total
Prior
1,250,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jason Havel
2024 2028thru Department PUBLIC WORKS
Description
This provides for the biennial inspection and preservation of Iowa City's bridges including major repairs and restoration.
Project #S3910
Priority Critical (1)
Justification
Repairs to bridge components that have deteriorated because of age or have been damaged from vehicular collisions or other factors, are necessary
to provide safe structures for motorists and pedestrians. The budget amount is higher than past years, as necessary repairs have exceeded available
funding. Currently, there is a backlog of repairs that need to be completed.
Budget Impact/Other
This is a maintenance project, and repairs will require continued regular maintenance. However, completing maintenance on a regular basis should
reduce maintenance costs over the life of the bridges.
Useful Life 50 yearsProject Name Annual Bridge Maintenance & Repair Category Street Operations
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$3,150,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
160,00050,000 25,000 25,000 25,000 35,000PLANNING/DESIGN
1,200,000300,000 225,000 225,000 225,000 225,000CONSTRUCTION
75,00015,000 15,000 15,000 15,000 15,000INSPECTION
165,00035,000 35,000 35,000 35,000 25,000ADMINISTRATION
400,000 300,000 300,000 300,000 300,000 1,600,000Total
Prior
1,550,000
Total
Total20242025202620272028Funding Sources
1,600,000400,000 300,000 300,000 300,000 300,000ROAD USE TAX FUND
400,000 300,000 300,000 300,000 300,000 1,600,000Total
Prior
1,550,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Geoff Fruin
2024 2028thru Department PUBLIC WORKS
Description
This project is part of the downtown streetscape master plan. This project reconstructs Dubuque Street from Washington to Iowa Avenue. The
project also improves sidewalk pavement, addresses critical utility updates, and enhances the retail environment with streetscape components.
Project also includes alley improvements, lighting, and wayfinding.
Project #S3939
Priority Critical (1)
Justification
Dubuque Street is an important link in Downtown as is often the entry way for visitors into the area. The project will narrow the road creating a
more pedestrian friendly environment and allowing for enhanced retail areas.
Budget Impact/Other
This project will slightly increase the annual operating expenditures due to the additional maintenance required on the landscaping and signage.
The estimated increase in operating expenditures is less than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name Dubuque Street Reconstruction Category Street Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$4,030,000
TIF DISTRICT City-University
PLAN Downtown Streetscape Plan
Status Active
Total20242025202620272028Expenditures
30,00030,000PLANNING/DESIGN
3,100,0003,100,000CONSTRUCTION
150,000150,000INSPECTION
50,00050,000ADMINISTRATION
400,000400,000CONTINGENCY
3,730,000 3,730,000Total
Prior
300,000
Total
Total20242025202620272028Funding Sources
4,030,0004,030,000GO BONDS-ESSENTIAL
PURPOSE
4,030,000 4,030,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Scott Sovers
2024 2028thru Department PUBLIC WORKS
Description
This project will reconstruct Court Street from Muscatine Avenue to 1st Avenue.
Project #S3946
Priority Essential (2)
Justification
Court Street is an important collector street that connects the east side of Iowa City to the Downtown area. The project will replace aging street
and sidewalk pavement that is in poor condition and upgrade public utilities as needed.
Budget Impact/Other
Replacing aged infrastructure will lower the City's operating expenditures through decreased maintenance costs. The estimated decrease in
operating expenses is less than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name Court Street Reconstruction Category Street Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$12,200,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
300,000300,000LAND/ROW ACQUISITION
8,300,0008,300,000CONSTRUCTION
200,000200,000INSPECTION
150,00050,000 100,000ADMINISTRATION
500,000500,000CONTINGENCY
600,000600,000OTHER
950,000 9,100,000 10,050,000Total
Prior
2,150,000
Total
Total20242025202620272028Funding Sources
10,300,0001,500,000 8,800,000GO BONDS-ESSENTIAL
PURPOSE
1,000,0001,000,000REIMBURSEMENT OF
EXPENSES
2,500,000 8,800,000 11,300,000Total
Prior
900,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jason Havel
2024 2028thru Department PUBLIC WORKS
Description
This project will study the south Hwy 1/Hwy 6 intersection and adjacent City owned properties and provide a functional design for the preferred
future improvements.
Project #S3951
Priority Essential (2)
Justification
This area is likely to redevelop in the future, and it is important to have an understanding of the anticipated roadway improvments/needs when
considering possible changes to the surrounding area. This project will also provide a plan for future trail connections and other associated
improvements.
Budget Impact/Other
The proposed study and functional design is not expected to have any operating budget impacts.
Useful Life 50 yearsProject Name Hwy 1/Hwy 6 Intersection Improvements Study Category Street Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$150,000
TIF DISTRICT Riverside Drive
PLAN None
Status Active
Total20242025202620272028Expenditures
150,000150,000PLANNING/DESIGN
150,000 150,000Total
Total20242025202620272028Funding Sources
150,000150,000ROAD USE TAX FUND
150,000 150,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jason Havel
2024 2028thru Department PUBLIC WORKS
Description
Reconstruction of Dodge Street from Governor Street to Burlington Street. This will be a joint project with the DOT, and will include new street
pavement, sidewalk, utility improvements and other associated work.
Project #S3952
Priority Essential (2)
Justification
This section of Dodge Street is in poor condition and requires significant ongoing maintenance.
Budget Impact/Other
Replacing aged infrastructure will lower the City's operating expenditures through decreased maintenance costs. The estimated decrease in
operating expenses is less than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name Dodge Street Reconstruct - Governor to Burlington Category Street Operations
Type One Phase
MATCH %35%
GRANTEE IDOT
Total Project Cost:$21,325,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
200,000200,000PLANNING/DESIGN
300,000150,000 150,000LAND/ROW ACQUISITION
15,000,00015,000,000CONSTRUCTION
400,000400,000INSPECTION
400,000400,000ADMINISTRATION
3,500,0003,500,000CONTINGENCY
200,000 150,000 19,450,000 19,800,000Total
Prior
1,525,000
Total
Total20242025202620272028Funding Sources
3,750,0003,750,000FEDERAL GRANTS
8,258,0008,258,000GO BONDS-ESSENTIAL
PURPOSE
8,200,0008,200,000OTHER STATE GRANTS
20,208,000 20,208,000Total
Prior
1,117,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jason Havel
2024 2028thru Department PUBLIC WORKS
Description
Conversion of Market Street and Jefferson Street from one-way to two-way corridors. The project cost includes new traffic signals, pavement
markings and signage necessary to implement the conversion. The conversion is intended to generally take place betweenn Madison Street and the
eastern termini of the one-way streets - exact limits subject to further evaluation.This project will also add electrical outlets to each of the
pedestrian level light poles on Linn Street from Jefferson Street to Bloomington Street.
Project #S3953
Priority Essential (2)
Justification
The feasibility of the project was initially evaluated as a part of the Downtown Iowa City Traffic Modeling Study completed in 2015.
Budget Impact/Other
Operating budget impacts are assumed to be negliable as the corridors already exist and require rountine maintneance activities. The conversion
will only change how the facilities are used by the traveling public.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 30 YearsProject Name Market St & Jefferson St Two-Way Conversion Category Street Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$5,000,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
400,000400,000PLANNING/DESIGN
25,00025,000LAND/ROW ACQUISITION
3,825,0003,825,000CONSTRUCTION
100,000100,000INSPECTION
100,000100,000ADMINISTRATION
550,000550,000CONTINGENCY
425,000 4,575,000 5,000,000Total
Total20242025202620272028Funding Sources
5,000,0005,000,000GO BONDS-ESSENTIAL
PURPOSE
5,000,000 5,000,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Melissa Clow
2024 2028thru Department PUBLIC WORKS
Description
Reconstruction of N. Gilbert Street from the construction limits of the Gateway project just south of Kimball Road to and including the intersection
with Brown Street. Improvements to inlcude new sanitary sewer, adjustment and replacement of minor sections of water main and fire hydrants,
new stormsewer extensions, PCC roadway paving on the main corridor of N Gilbert Street, reconstruction of the brick Brown Street and N Gilbert
Street intersection, sidewalks on both sides of the street, retaining wall reconstruction and repairs, and private utility undergrounding. The
reconstruction of the sidewalk crosswalk at the intersection with Kimball Road is also included.
Project #S3955
Priority Essential (2)
Justification
Gilbert Street requires full reconstruction at this time. There are no storm sewers between Brown Street and the new intakes installed with the
Gateway project. Sidewalks are located only at the top of the hill, near Brown Street and residents have requested that pedestrian connectivity be
provided to them with the roadway improvements.
Budget Impact/Other
Replacing aged infrastructure will lower the City's operating expenditures through decreased maintenance costs. The estimated decrease in
operating expenses is less than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name N. Gilbert Street Reconstruction Category Street Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$2,750,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
65,00065,000PLANNING/DESIGN
2,135,000200,000 1,935,000CONSTRUCTION
100,000100,000INSPECTION
100,000100,000ADMINISTRATION
150,000150,000CONTINGENCY
265,000 2,285,000 2,550,000Total
Prior
200,000
Total
Total20242025202620272028Funding Sources
2,750,000900,000 1,850,000GO BONDS-ESSENTIAL
PURPOSE
900,000 1,850,000 2,750,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Melissa Clow
2024 2028thru Department PUBLIC WORKS
Description
This project will replace the existing Gilbert Street Bridge over Ralston Creek. In addition, the project will include removal and replacement of
slope protection, sidewalk, storm sewer, water main, roadway paving and other related work.
Project #S3956
Priority Critical (1)
Justification
The Biennial Bridge Inspection Program identified advanced deterioration of the bridge deck and superstructure on the existing Gilbert Street
Bridge. The Program recommended that the bridge be scheduled for significant repair or replacement.
Budget Impact/Other
Replacing aged infrastructure will lower the City's ongoing expenditures through decreased maintenance costs. The estimated decrease in
operating expenses is less than $10,000 / year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name Gilbert Street Bridge Replacement Category Street Operations
Type One Phase
MATCH %60%
GRANTEE IDOT
Total Project Cost:$5,750,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
850,000850,000CONSTRUCTION
150,000150,000INSPECTION
375,000375,000CONTINGENCY
1,375,000 1,375,000Total
Prior
4,375,000
Total
Total20242025202620272028Funding Sources
1,375,0001,375,000GO BONDS-ESSENTIAL
PURPOSE
1,375,000 1,375,000Total
Prior
4,375,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jason Havel
2024 2028thru Department PUBLIC WORKS
Description
Reconstruction of Taft Avenue from American Legion Road to Lower West Branch. Design of this project would begin in 2022 with construction
to begin in 2025.
Project #S3959
Priority Essential (2)
Justification
The properties west of Taft Avenue between Lower West Branch Road and American Legion Road are now fully developed. With the construction
of the new Hoover School and the upcoming American Legion Road and Scott Boulevard trunk sewer extension projects, the area will likely
experience growth in the next five to ten years necessitating improvements to Taft Avenue.
Budget Impact/Other
This project will add infrastructure into the City which will incrementally increase the City's operating costs. The estimated increase in operating
expenditures is less than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name Taft Avenue Reconstruct - Am Legion to Lwr West Br Category Street Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$13,200,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
350,000350,000LAND/ROW ACQUISITION
9,750,0009,750,000CONSTRUCTION
300,000300,000INSPECTION
300,000300,000ADMINISTRATION
1,500,0001,500,000CONTINGENCY
12,200,000 12,200,000Total
Prior
1,000,000
Total
Total20242025202620272028Funding Sources
3,500,0003,500,000FEDERAL GRANTS
9,700,0009,700,000GO BONDS-ESSENTIAL
PURPOSE
13,200,000 13,200,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Kent Ralston
2024 2028thru Department PUBLIC WORKS
Description
Obtain consultant services to perform an alignment study for the Oakdale Boulevard extension east of Highway 1.
Project #S3960
Priority Essential (2)
Justification
This project will conduct an aligment study for the Oakdale Boulevard extension east of Highway 1. The existing alignment study was completed
in 2003 and changes in land use, ownership and travel patterns nessesitate revisting the appropriate alignment for the road extension. This project
also meets the Council's Strategic Plan goal of 'Investing in Public Infrastructure' by initiating a planning effort to prepare for future expansion of a
critical public facility.
Budget Impact/Other
This project will not have an impact on the operating budget.
Useful Life 10 yearsProject Name Oakdale Blvd Extension - Alignment Study Category Street Operations
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$100,000
TIF DISTRICT Northgate Corporate Park
PLAN Transportation Plan
Status Active
Total20242025202620272028Expenditures
100,000100,000PLANNING/DESIGN
100,000 100,000Total
Total20242025202620272028Funding Sources
100,000100,000ROAD USE TAX FUND
100,000 100,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jason Havel
2024 2028thru Department PUBLIC WORKS
Description
This project will replace both the eastbound and westbound Burlington Street bridges with one new bridge over the Iowa River. In addition, the
project will include repair or replacement of the existing pedestrian overpass at Riverside Drive, realignment of Grand Avenue west of Riverside
Drive, reconstruction of portions of Grand Avenue, Byington Road and Melrose Avenue, and investigation of the feasibililty of eliminating the
existing dam. This project will be a joint project with the DOT.
Project #S3963
Priority Critical (1)
Justification
The 2019 and 2021 biennial bridge inspection programs identified advanced detorioration of the sub and super structures on the Burlington Street
Bridges. The programs recommended the bridge to be scheduled for replacement.
Budget Impact/Other
Operating expenses are expected to decrease, as this will be replacing aged infrastructure that has reached the end of its useful life. It is also
anticipated the DOT will take over ownership and maintenance of the new bridge.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name Burlington Street Bridge Replacement Category Street Operations
Type One Phase
MATCH %VARIES
GRANTEE STP
Total Project Cost:$30,150,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
3,200,000300,000 750,000 2,150,000PLANNING/DESIGN
26,350,0005,625,000 20,725,000CONSTRUCTION
325,00025,000 50,000 50,000 100,000 100,000ADMINISTRATION
250,000250,000CONTINGENCY
325,000 800,000 2,450,000 5,725,000 20,825,000 30,125,000Total
Prior
25,000
Total
Total20242025202620272028Funding Sources
9,025,0009,025,000GO BONDS-ESSENTIAL
PURPOSE
9,025,000 9,025,000Total
Prior
300,000
Total
Future
20,825,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Melissa Clow
2024 2028thru Department PUBLIC WORKS
Description
This project will provide repairs to the existing pedestrain overpass, including removal of loose and delaminated material and the application of a
corrosive inhibiting coating to protect the exposed areas and match the appearance of the surrounding concrete. New light fixtures, expansion
jointing, walkway surfacing and handrails will be provided. The walkway to the Iowa Avenue Pedestrian underpass will be reconstructed to meet
current ADA requirements.
Project #S3978
Priority Critical (1)
Justification
A condition assessment of the Pedestrian Bridge was completed in the Spring of 2021 and a rehabilitation project was recommended. Widespread
areas of deterioration exist along the outside edges of the carousel deck and bridge deck. Expansion joints are not functioning well, there are
exposed electric wires at the light pole blisters, and areas of the railing are damaged. Loose material causing immediate concern was removed in
cooperation with the Iowa DOT.
Budget Impact/Other
This project will reduce the maintenance costs through the rehabilitation of an older structure. This project is expected to extend the life of the
pedestrian bridge from 10 to 30 years. The annual savings is less than $10,000 / year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 10 yearsProject Name Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab Category Street Operations
Type One Phase
MATCH %25%
GRANTEE IDOT
Total Project Cost:$1,910,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
1,440,0001,440,000CONSTRUCTION
30,00030,000INSPECTION
55,00055,000ADMINISTRATION
50,00050,000CONTINGENCY
1,575,000 1,575,000Total
Prior
335,000
Total
Total20242025202620272028Funding Sources
635,000635,000GO BONDS-ESSENTIAL
PURPOSE
850,000850,000OTHER STATE GRANTS
425,000425,000UNIVERSITY OF IOWA
1,910,000 1,910,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Kent Ralston
2024 2028thru Department PUBLIC WORKS
Description
This project will remove existing right turn bays and install pedestrian refuge islands on Camp Cardinal Boulevard at Kennedy Parkway.
Project #S3981
Priority Essential (2)
Justification
This project is necessary to improve the safey and comfort of bikes and pedestrians crossing Camp Cardinal Boulevard. With Borlaug Elementary
School to the east of the corridor and numerous recent developments to the west, the current configuration is not adequate. This project is intended
to be a mid-term (10-20 year) improvment until which time construction of a full roundabout may be warranted. This project will need to be
coordianted with the City of Coralville as half of the intersection is in their municpal boundary.
Budget Impact/Other
This project will have no impact on operating budgets.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 40 YearsProject Name Camp Cardinal / Kennedy Parkway - Ped Accom Category Street Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$320,000
TIF DISTRICT
PLAN Transportation Plan
Status Active
Total20242025202620272028Expenditures
30,87030,870PLANNING/DESIGN
5,0005,000LAND/ROW ACQUISITION
212,100212,100CONSTRUCTION
20,58020,580INSPECTION
20,58020,580ADMINISTRATION
30,87030,870CONTINGENCY
320,000 320,000Total
Total20242025202620272028Funding Sources
160,000160,000OTHER LOCAL
GOVERNMENTS
160,000160,000ROAD USE TAX FUND
320,000 320,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Kent Ralston
2024 2028thru Department PUBLIC WORKS
Description
This project will install traffic signals for motorists/pedestrians at the North Dodge Street / ACT Circle intersection.
Project #S3982
Priority Essential (2)
Justification
The intersection is currently only stop controlled for ACT Circle and has limited sight distance due to the vertical curvature of Dodge Street. The
intersection currently meets applicable traffic signal warrants. Project approval will need to be obtained from the Iowa DOT.
Budget Impact/Other
This project will add costs to the Streets Department operating budget for general maintenance of signal equipment.
Useful Life 30 YearsProject Name North Dodge St / ACT Circle - Signalization Category Street Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$450,000
TIF DISTRICT
PLAN Transportation Plan
Status Active
Total20242025202620272028Expenditures
43,71843,718PLANNING/DESIGN
5,0005,000LAND/ROW ACQUISITION
270,129270,129CONSTRUCTION
29,14529,145INSPECTION
29,14529,145ADMINISTRATION
72,86372,863CONTINGENCY
450,000 450,000Total
Total20242025202620272028Funding Sources
450,000450,000ROAD USE TAX FUND
450,000 450,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Scott Sovers
2024 2028thru Department PUBLIC WORKS
Description
This corridor is a part of the downtwon streetscape master plan. The scope of thie project is the reconstruction of Iowa Avenue from Clinton Street
to Gilbert Street. The project also includes replacement of sidewalks and curb ramps, utility upgrades and streetscape amenities.
Project #S3983
Priority Essential (2)
Justification
Iowa Avenue is an important corridor within the downtown area that is lined with the retail on the south side and the University of Iowa Campus
on the north. The public infrastructure and streestcape amenities are starting to show signs of detoration and are in need replacement. Addtionally,
the electrical system is in need of upgrading to provide adequate power during festivals and events.
Budget Impact/Other
This project is replacing existing infrastructure and should reduce future street maintenance costs. The anticipated annual savings is less than
$10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50Project Name Iowa Avenue Improvements Category Street Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$2,650,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
250,000250,000PLANNING/DESIGN
2,000,0002,000,000CONSTRUCTION
150,000150,000INSPECTION
50,00050,000ADMINISTRATION
200,000200,000CONTINGENCY
300,000 2,350,000 2,650,000Total
Total20242025202620272028Funding Sources
2,650,000300,000 2,350,000GO BONDS-ESSENTIAL
PURPOSE
300,000 2,350,000 2,650,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Scott Sovers
2024 2028thru Department PUBLIC WORKS
Description
The project will involve the construction of sidewalk along High Street between 1801 High Street and Morningside Drive as well as along
Southgate Avenue between 303 and 367 Southgate Avenue.
Project #S3984
Priority Efficiency Improvement (3)
Justification
This project improves the City's multimodal transportation system for pedestrians and bicycles by filling in portions of the sidewalk network that
have missing segments.
Budget Impact/Other
Sidewalks are maintained by the adjoining property owners and will not increase the City's operating expenses.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 30 YearsProject Name High Street & Southgate Ave Sidewalk Infill Proj Category Street Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$160,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
10,00010,000CONSTRUCTION
10,00010,000CONTINGENCY
30,00030,000OTHER
50,000 50,000Total
Prior
110,000
Total
Total20242025202620272028Funding Sources
50,00050,000GO BONDS-ESSENTIAL
PURPOSE
50,000 50,000Total
Prior
110,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Scott Sovers
2024 2028thru Department PUBLIC WORKS
Description
The project will involve the extension of Camp Cardinal Road from Gathering Place Lane to the north end of the Right of Way at 608 Camp
Cardinal Road. The project will include storm sewer, a traffic circle, and other related work.
Project #S3986
Priority Efficiency Improvement (3)
Justification
Camp Cardinal Road from Gathering Place Lane to the north end of the Right of Way at 608 Camp Cardinal Road is currently a roughly 24' wide
gravel road that does not meet City standards. It is anticipated that the properties on both sides may be developed in the next few years.
Budget Impact/Other
Operating expenses are expected to decrease as this project will replace gravel surfaced roadway with a new paved urban street with sidewalks.
Useful Life 50 yearsProject Name Camp Cardinal Road Extension Project Category Street Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$1,000,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
15,00015,000PLANNING/DESIGN
5,0005,000LAND/ROW ACQUISITION
700,000700,000CONSTRUCTION
80,00080,000INSPECTION
80,00080,000ADMINISTRATION
120,000120,000CONTINGENCY
1,000,000 1,000,000Total
Total20242025202620272028Funding Sources
800,000800,000REIMBURSEMENT OF
EXPENSES
200,000200,000ROAD USE TAX FUND
1,000,000 1,000,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Joe Welter
2024 2028thru Department PUBLIC WORKS
Description
This project consists of annual sanitary sewer repairs and preventive maintenance throughout the sewer system. Work include sewer lining, spot
repairs and manhole lining and replacement.
Project #V3101
Priority Essential (2)
Justification
This work is necessary to prevent sewer cave-ins and blockages that can cause sanitary sewer overflows and basement flooding and reduces
infiltration and inflow to the sanitary sewer system.
Budget Impact/Other
This project reduces expenditures through the replacement of aged infrastructure with new infrastructure. The anticipated savings are less than
$10,000 per year.
Useful Life 60 yearsProject Name Annual Sewer Main Replacement Category Wastewater Treatment
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$8,750,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
3,000,000500,000 500,000 500,000 750,000 750,000CONSTRUCTION
500,000 500,000 500,000 750,000 750,000 3,000,000Total
Prior
5,750,000
Total
Total20242025202620272028Funding Sources
3,000,000500,000 500,000 500,000 750,000 750,000WASTEWATER FUND
500,000 500,000 500,000 750,000 750,000 3,000,000Total
Prior
5,750,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Tim Wilkey
2024 2028thru Department PUBLIC WORKS
Description
This project will have multiple phases to rehabilitate and improve the digester complex. The phases will include new process related structures and
equipment to mitigate struvite formation and improve sludge quality. General building and equipment improvements include heat exchanger
replacements, digester cover repairs and/or replacement, sludge recirculation pumps and piping, electrical, instrumentation and controls upgrades.
Project #V3151
Priority Critical (1)
Justification
Biological nutrient removal as part of the 2014 project captures phosphorous (P) and creates struvite in the digesters. It collects on piping,
equipment and in structures. Current struvite management uses extensive maintenance resources. Additionally, the digester complex was
constructed in 1989/2002 and the facility and equipment are at various stages of wear, nearing the end of their useful life.
Budget Impact/Other
This project will reduce operating and maintenance cost through the rehabilitation of older equipment and adding new equipment. The annual
savings is less than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Wastewater fund, and the City reasonably expects to
reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Digester Complex Rehabilitation Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$16,200,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
12,500,00012,500,000CONSTRUCTION
200,000200,000INSPECTION
100,000100,000ADMINISTRATION
1,500,0001,500,000CONTINGENCY
14,300,000 14,300,000Total
Prior
1,900,000
Total
Total20242025202620272028Funding Sources
16,200,00016,200,000REVENUE BONDS
16,200,000 16,200,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Tim Wilkey
2024 2028thru Department PUBLIC WORKS
Description
Reroute the Benton Trunk sewer from Emerald Street to Westgate Street through green space and a parking lot. This will allow access for future
maintenance and removes the sewer from under and close proximity to an apartment complex. The project will increase the sewer capacity at
Emerald Street and remove a capacity restriction (pipe diameter) at Emerald Street.
Project #V3162
Priority Critical (1)
Justification
Previous rerouting of the trunk and upstream sanitary sewer left undersized piping creating a bottle neck and limited maintenance access to the
sanitary sewer on private property. The bottle neck has caused potential project to be routed to the west or not pursued. Making improvements will
allow better access and not be a bottleneck, which limits future growth north of Melrose Avenue.
Budget Impact/Other
This project will have a minimal impact on the operating budget.
Useful Life 75 yearsProject Name Benton Street Trunk Sewer Improvements Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$910,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
15,00015,000PLANNING/DESIGN
40,00040,000INSPECTION
15,00015,000ADMINISTRATION
85,00085,000CONTINGENCY
155,000 155,000Total
Prior
155,000
Total
Future
600,000
Total
Total20242025202620272028Funding Sources
155,000155,000WASTEWATER FUND
155,000 155,000Total
Prior
155,000
Total
Future
600,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Tim Wilkey
2024 2028thru Department PUBLIC WORKS
Description
The project would include the replacement of return activaterd sludge pumps (RAS) 7121A, 7122A, 7123A, 5301A and 5401A along with
associated equipment. This includes all pumps, valves, sludge and any piping/structural modifications required to fit the pumps.
Project #V3164
Priority Essential (2)
Justification
These pumps and valves have been in service since 2002 and are nearing the end of their useful working life. The maintenance repair frequency for
these pumps has been increasing in the past year. Failure to replace these pumps in a timely manner could cause diminished operation and
treatment of the wastewater resulting in violations of our NPDES discharge permit.
Budget Impact/Other
New pumps and associated equipment would increase pump efficiency, and lower energy consumption and maintenance costs. The estimated
reduction in operating expenditures is less than $10,000 per year.
Useful Life 20 yearsProject Name Return Activated Sludge Pump Replacement Category Wastewater Treatment
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$300,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
300,000300,000CONSTRUCTION
300,000 300,000Total
Total20242025202620272028Funding Sources
300,000300,000WASTEWATER FUND
300,000 300,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Tim Wilkey
2024 2028thru Department PUBLIC WORKS
Description
Replacement of the influent pump station pumps 1301A, 1302A, and 1303A, Variable Frequency Drive's (VFD's) for these pumps, and the VFD's
for pumps 1304A, 1305A, and 1306A. This is inclusive of any piping/electrical modifications that will be required.
Project #V3165
Priority Essential (2)
Justification
There are 6 influent pumps and drives currently installed. The 3 pumps listed were installed in 2002 and are at the end of their design life. The
pumps have had significant repairs over the past 5-years but they have not extended their design life. They are close coupled centrifugal pumps and
be replaced by dry pit submersible pumps that match existing style of the remaining pumps. All drives were part of the original 2002 install and
will be replaced with the project. Other work includes piping mods, controls, installation, and SCADA integration.
Budget Impact/Other
The existing pumps have increasing maintenance cost and operation costs when they are OOS. New pumps and drives will improve pump
efficiency of all pumps, lower power cost and reduced maintenance cost. The current pumps are rated at 10 milllion gallons per day, the newer
pumps will be 12 MGD.
Useful Life 25 yearsProject Name Replacement of Influent Pump Station Pumps Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$300,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
300,000300,000CONSTRUCTION
300,000 300,000Total
Total20242025202620272028Funding Sources
300,000300,000WASTEWATER FUND
300,000 300,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Tim Wilkey
2024 2028thru Department PUBLIC WORKS
Description
Rehabilitate selected equipment at the Napoleon Lift Station including the bar screen crawler assemblies with electric drive units, provide
screening washer compactors, role off, air handling system and rebuilding of the NPPS Pumps #1 and #6 pumping assembly’s and replacing
associated electrical or mechanical appurtenances as necessary.
Project #V3169
Priority Critical (1)
Justification
Napoleon lift station was constructed in 2000 and is the primary lift station for approximately 2/3 of the wastewater flow to the WWTP. The Bar
screen crawler, pumps #1 and #6 and air handling system have operated consistently since its coming into operations and show wear and tear
consistent with 20 years of operations and are nearing the end of their useful design life. Improvements in crawler, adding a washer/compactor with
roll off, and pump design will offer operation and efficiency improvements.
Budget Impact/Other
Napoleon Lift Station is the City's primary lift station conveying 2/3 of the daily total flow to the WWTP. If any of this equipment were to fail it
would limit the operation of the lift station until repairs could be made.
Useful Life 20 yearsProject Name Napoleon Lift Station Improvements Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$2,825,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
325,000325,000PLANNING/DESIGN
2,237,0002,237,000CONSTRUCTION
33,00033,000INSPECTION
14,00014,000ADMINISTRATION
216,000216,000CONTINGENCY
325,000 2,500,000 2,825,000Total
Total20242025202620272028Funding Sources
2,825,000325,000 2,500,000WASTEWATER FUND
325,000 2,500,000 2,825,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Tim Wilkey
2024 2028thru Department PUBLIC WORKS
Description
Replace roofs on the following buildings: IPS, SABS, SSPUS, SSPRS, SDSB, SSDA1, SSDS2 and the gas house. This project was originally to
start in 2022 but delays in the building roof evaluations, we proposed to move this to start in 2023.
Project #V3170
Priority Critical (1)
Justification
These roofs were identified by City staff as being deficient. The bulk of these buildings are part of the original WWTP project from 1988 with the
others from the 2000 project. They have outlived any warranty’s given at the time of construction and are in need of replacement.
Budget Impact/Other
These roof's cover multiple buildings with critical infrastructure in them. Should any building suffer water damage that impedes the division staff
from performing their job function or causes equipment failure, that could cause the WWTP to not meet its NPDES permit required discharge
limits and put the City in environmental liability.
Useful Life 40 YearsProject Name WWTP Roof Replacements Category Wastewater Treatment
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$747,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
20,00020,000PLANNING/DESIGN
278,000278,000CONSTRUCTION
10,00010,000INSPECTION
10,00010,000ADMINISTRATION
32,00032,000CONTINGENCY
350,000 350,000Total
Prior
397,000
Total
Total20242025202620272028Funding Sources
350,000350,000WASTEWATER FUND
350,000 350,000Total
Prior
397,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Tim Wilkey
2024 2028thru Department PUBLIC WORKS
Description
Replace the remaining mixers in the aeration trains 1 - 4 with high efficiency mixers matching those placed in Cell 9 of trains 1-4 and replace
mixers in the high strength tank. This would be total of 30 mixers.
Project #V3174
Priority Efficiency Improvement (3)
Justification
Most of these mixers are original to the 2002/2014 construction and have been rebuilt at least once at a cost of $7,000 to almost $10,000 a piece.
They typically operate 24hs/7 days a week when the trains are in service. Replacement with the higher efficiency mixer with lower horsepower will
decrease energy usage and continue to reduce our carbon footprint. Estimated cost savings over a 20-year period were estimated to be in excess of
$600,000 when all 30 mixers in operation.
Budget Impact/Other
We anticipate an energy consumption reduction of 15% and will reduce our electrical usage/cost and continue to reduce our carbon footprint.
Useful Life 25 yearsProject Name Aeration Equipment Improvements Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$3,628,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
750,000300,000 350,000 100,000CONSTRUCTION
300,000 350,000 100,000 750,000Total
Future
2,878,000
Total
Total20242025202620272028Funding Sources
750,000300,000 350,000 100,000WASTEWATER FUND
300,000 350,000 100,000 750,000Total
Future
2,878,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Tim Wilkey
2024 2028thru Department PUBLIC WORKS
Description
Place Parshall flume(s) directly downstream of the grit tank channel isolation valves including ultrasonic measuring. This will require channel
modifications, flume and sensor installation and programming into the headworks PLC.
Project #V3175
Priority Critical (1)
Justification
Flow measuring was changed from a Parshall flume to an in-channel area velocity sensor/meter in the last plant upgrade. That sensor/meter failed
and subsequent efforts at flow measurement lack staff confidence in being greater than 80% accurate. Parshall flumes have been used in the
wastewater industry for decades with 99+% accuracy and confidence.
Budget Impact/Other
This project will reduce operating and maintenance cost through the rehabilitation of older equipment. The annual savings is less than $10,000 per
year.
Useful Life 20 yearsProject Name Wastewater Treatment Facility Imp 2022 Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$536,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
285,000285,000CONSTRUCTION
285,000 285,000Total
Prior
251,000
Total
Total20242025202620272028Funding Sources
285,000285,000WASTEWATER FUND
285,000 285,000Total
Prior
251,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Tim Wilkey
2024 2028thru Department PUBLIC WORKS
Description
Replace the heating/ventilation/air conditioning (HVAC) for the Influent Pump Station (IPS), Sludge Processing Building (SSPRS), Motor
Vehicle Storage Building (MVSB), Administration Building (ADMIN), and Grit Building (GRIT)
Project #V3177
Priority Essential (2)
Justification
The HVAC systems for the buildings listed above are all original to them. They age from 20 to 35 years old and have had significant repair work in
the past 5 years but that has not extended the useful life of these systems. Due to the nature of the facility, building ventilation is critical to the
work that is being performed and provides a safe work environment for the employees.
Budget Impact/Other
The estimated impact on the operating budget is less than $10,000.
Useful Life 25 yearsProject Name HVAC Replacement Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$743,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
743,000683,000 60,000CONSTRUCTION
683,000 60,000 743,000Total
Total20242025202620272028Funding Sources
743,000683,000 60,000WASTEWATER FUND
683,000 60,000 743,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Tim Wilkey
2024 2028thru Department PUBLIC WORKS
Description
This project will replace the rake mechanisms for Calrifiers C3300 and 3400 that were new in 2002 and part of WWTP upgrades.
Project #V3178
Priority Essential (2)
Justification
They both have the original zinc plated carbon steel mechanisms that are severly corroded and are in need of replacement and/or repair. These
repairs were identified during recent inspections of the clarifiers. These repairs are necessary to avoid untimely equipment failure..
Budget Impact/Other
This project repairs existing equipment which should reduce maintenance and repairs costs. The estimated impact on the operating budget is less
than $10,000.
Useful Life 25 yearsProject Name Primary Clarifier Repairs Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$705,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
34,00034,000PLANNING/DESIGN
600,000600,000CONSTRUCTION
7,0007,000INSPECTION
4,0004,000ADMINISTRATION
60,00060,000CONTINGENCY
705,000 705,000Total
Total20242025202620272028Funding Sources
705,000705,000WASTEWATER FUND
705,000 705,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Tim Wilkey
2024 2028thru Department PUBLIC WORKS
Description
Replace RDT 1 and 2 with in-kind process equipment or a more efficient process equipment. This will include all ancillary equipment required to
make this an operational and a direct replacement for the existing RDTs 1 and 2 and all of their ancillary equipment.
Project #V3179
Priority Essential (2)
Justification
Replace RDT 1 and 2 with in-kind process equipment or a more efficient process equipment. This will include all ancillary equipment required to
make this an operational and a direct replacement for the existing RDTs 1 and 2 and all of their ancillary equipment.
Budget Impact/Other
The estimated impact on the operating budget is less than $10,000.
Useful Life 20 yearsProject Name Rotating Drum Thickener Replacement 1 and 2 Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$1,662,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
195,000195,000PLANNING/DESIGN
1,300,0001,300,000CONSTRUCTION
25,00025,000INSPECTION
12,00012,000ADMINISTRATION
130,000130,000CONTINGENCY
195,000 1,467,000 1,662,000Total
Total20242025202620272028Funding Sources
1,662,000195,000 1,467,000WASTEWATER FUND
195,000 1,467,000 1,662,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Tim Wilkey
2024 2028thru Department PUBLIC WORKS
Description
Install a fourth Effluent Water Pump to serve the in plant distribution system and soccer park irrigation system. Work includes rebuilding of the
Amiad filtration system.
Project #V3183
Priority Essential (2)
Justification
There are 5 pumps installed at the effluent water pump station. Three are rated at 900-GPM and two are rated at 500-GPM. We are seeing the three
900-GPM pumps running at capacity and need an additionla pump as a standy pump.
Budget Impact/Other
The estimated impact on the operating budget is less than $10,000
Useful Life 30 YearsProject Name Effluent Water Pump Station Improvements Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$76,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
60,00060,000CONSTRUCTION
5,0005,000INSPECTION
5,0005,000ADMINISTRATION
6,0006,000CONTINGENCY
76,000 76,000Total
Total20242025202620272028Funding Sources
76,00076,000WASTEWATER FUND
76,000 76,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Tim Wilkey
2024 2028thru Department PUBLIC WORKS
Description
This project includes a new process to treat the digester gas to pipeline quality and infrastructure necessary to transport conditioned gas to the
pipeline network. Additionally, a High Strength Receiving Station will be installed for additional biogas feedstock.
Project #V3184
Priority Essential (2)
Justification
The 2022 Digester Complex Facilities Plan identified pipeline injection as a potential revenue generating alternative for biogas reuse. Funding
may be available through the Infrastructure and Jobs Investment Act.
Budget Impact/Other
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Wastewater Digester Gas Improvements Category Wastewater Treatment
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$16,800,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
13,650,00013,650,000CONSTRUCTION
100,000100,000INSPECTION
50,00050,000ADMINISTRATION
1,200,0001,200,000CONTINGENCY
15,000,000 15,000,000Total
Prior
1,800,000
Total
Total20242025202620272028Funding Sources
16,800,00016,800,000REVENUE BONDS
16,800,000 16,800,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Tim Wilkey
2024 2028thru Department PUBLIC WORKS
Description
This project will replace the rake mechanisms and drives for Clarifiers C5300 and 5400 that were new in 2002 and part of WWTP upgrades.
Project #V3185
Priority Essential (2)
Justification
They both have the original zinc plated carbon steel mechanisms that are severely corroded and are in need of replacement and/or repair. These
repairs were identified during recent inspections of the clarifiers. These repairs are necessary to avoid untimely equipment failure.
Budget Impact/Other
The estimated impact on the operating budget is less than $10,000
Useful Life 20 yearsProject Name WW Treatment Plant Secondary Clarifier Repairs Category Wastewater Treatment
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$871,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
30,00030,000PLANNING/DESIGN
750,000750,000CONSTRUCTION
7,0007,000INSPECTION
4,0004,000ADMINISTRATION
80,00080,000CONTINGENCY
871,000 871,000Total
Total20242025202620272028Funding Sources
871,000871,000WASTEWATER FUND
871,000 871,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jonathan Durst
2024 2028thru Department PUBLIC WORKS
Description
**Revised to increase the budget from $650,000 to $800,000 due to inflation** This is a water main replacement project on Bradford Dr, Louise
St, and Wayne Ave. Approximately 1950 feet of 6-inch cast-iron pipe (vintage 1956) will be replaced with 2,500 feet of 8-inch PVC. The scope
of the project will replace or install water main on Bradford Dr from Arthur St to 1st Ave, on Louise St from Bradford Dr to Wayne Ave, and on
Wayne Ave from Wade St to Arthur St.
Project #W3300
Priority Essential (2)
Justification
The existing water main has been subject to (18) water main breaks. This project would also make the distribution system more robust by adding
an additional looped feed to the system. This water main feeds Southeast Junior High School and Mercer Park. The water main in this area is not
under road pavement. There will be approximately (30) services lines, (20) valves, (6) fire hydrants, (21) driveway approaches, and (9)
intersections impacted or installed by the project.
Budget Impact/Other
Reduced expenditures for the repair of main breaks and associated pavement.
Useful Life 100Project Name Bradford Drive Water Main Replacement Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$800,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
80,00080,000PLANNING/DESIGN
720,000720,000CONSTRUCTION
80,000 720,000 800,000Total
Total20242025202620272028Funding Sources
800,00080,000 720,000WATER FUND
80,000 720,000 800,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jonathan Durst
2024 2028thru Department PUBLIC WORKS
Description
Revised cost estimate based on actual consultant agreement and preliminary OPCC of design. Currently funded at $661,500 ($67.5K in 2023 and
$594K in 2024), need to increase to $1,000,000 in 2024** Replace approximately 2,000 feet of 1964 16-inch ductile iron water main along the
north side of Highway 6 from Fairmeadows Blvd. to Industrial Park Rd. with 16-inch PVC water main.
Project #W3314
Priority Essential (2)
Justification
This water main has had five (5) water main breaks since the year 2000, four (4) of which have happened in 2018/2019. The type of break have
been majority corrosion related and it is expected to continue to have main breaks on this main until it is replaced due to corrosive soils. Due to
the size and relative location of the water main in the distribution system the breaks on this line are very disruptive - large pressure swings that
cause other water quality and integrity issues as well as loss of service to critical customers.
Budget Impact/Other
Main breaks on average cost approximately $10,000 each to repair. The main breaks on this stretch of Hwy 6 are significant enough to cause
cascading effects such as more main breaks or the need to flush the distribution system which increases costs. Therefore the replacement of this
main will have a direct impact on the operational budget lessening main break repairs and indirectly by increasing system integrity overall.
Useful Life 75 yearsProject Name High Service Pump VFD Replacement Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$1,375,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
125,000125,000PLANNING/DESIGN
1,250,0001,250,000CONSTRUCTION
1,375,000 1,375,000Total
Total20242025202620272028Funding Sources
1,375,0001,375,000WATER FUND
1,375,000 1,375,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jonathan Durst
2024 2028thru Department PUBLIC WORKS
Description
Replace approximately 2,000 feet of 1964 16-inch ductile iron water main along the north side of Highway 6 from Fairmeadows Blvd. to Industrial
Park Rd. with 16-inch PVC water main.
Project #W3320
Priority Critical (1)
Justification
This water main has had five (5) water main breaks since the year 2000, four (4) of which have happened in 2018/2019. The type of break have
been majority corrosion related and it is expected to continue to have main breaks on this main until it is replaced due to corrosive soils. Due to
the size and relative location of the water main in the distribution system the breaks on this line are very disruptive - large pressure swings that
cause other water quality and integrity issues as well as loss of service to critical customers.
Budget Impact/Other
Main breaks on average cost approximately $10,000 each to repair. The main breaks on this stretch of Hwy 6 are significant enough to cause
cascading effects such as more main breaks or the need to flush the distribution system which increases costs. Therefore the replacement of this
main will have a direct impact on the operational budget lessening main break repairs and indirectly by increasing system integrity overall.
Savings is anticipated to average $10,000 to $20,000 per year.
Useful Life 70 yearsProject Name Hwy 6 (Fairmeadows to Ind Park Rd) Water Main Repl Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$1,067,500
TIF DISTRICT Lower Muscatine/Ind Park Rd
PLAN None
Status Active
Total20242025202620272028Expenditures
100,000100,000PLANNING/DESIGN
900,000900,000CONSTRUCTION
1,000,000 1,000,000Total
Prior
67,500
Total
Total20242025202620272028Funding Sources
1,000,0001,000,000WATER FUND
1,000,000 1,000,000Total
Prior
67,500
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jonathan Durst
2024 2028thru Department PUBLIC WORKS
Description
Clean and cap portions on the existing laterals of Collector Well #2 and install new 12-inch laterals to increase the production capacity of this raw
water well.
Project #W3322
Priority Critical (1)
Justification
Collector Well #2 has degraded specific capacity (amount of water yield per foot of well height) and will continue to decline as the pore spaces in
the surrounding geologic formations plug with fines. Therefore to maintain the usefulness of this high quality water source and to increase its yield
capacity lateral cleaning and lateral installation are necessary.
Budget Impact/Other
The impact to the operating budget is negligible.
Useful Life 70 yearsProject Name Collector Well #2 Cleaning and Upgrade Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$2,600,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
2,500,0002,500,000CONSTRUCTION
2,500,000 2,500,000Total
Prior
100,000
Total
Total20242025202620272028Funding Sources
2,500,0002,500,000WATER FUND
2,500,000 2,500,000Total
Prior
100,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jonathan Durst
2024 2028thru Department PUBLIC WORKS
Description
Increase budget based on inflation and previous bid prices. Unfunded projects #62 & 76. Replace the roof membranes on the Water Plant garage,
shop, and chemical storage rooms, generator building, well houses, and ground storage reservoir pump houses.
Project #W3325
Priority Essential (2)
Justification
Roof membranes deteriorate over time due to exposure to the elements and inclement weather events. The membranes not replaced in the 2018
project are in need of comprehensive replacement to keep the equipment housed within and out of the elements.
Budget Impact/Other
Reduction of about $5,000 to $10,000 annually in roof repairs and water mitigation efforts
Useful Life 20 yearsProject Name Roof Replacements Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$650,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
100,000100,000PLANNING/DESIGN
550,00050,000 500,000CONSTRUCTION
50,000 600,000 650,000Total
Total20242025202620272028Funding Sources
650,00050,000 600,000WATER FUND
50,000 600,000 650,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jonathan Durst
2024 2028thru Department PUBLIC WORKS
Description
Update treatment processes to better conform with pending regulation. The scope of this project will be informed by the Treatment Study (CIP
W3321)
Project #W3326
Priority Essential (2)
Justification
Forecasted regulations include PFAS, Magenese, stricter lead and copper rules, continued intrusion of nutrient runoff, and heavy metal reductions.
Climate change will also continue to cause carbon producing processes to increase operating costs. Due to these factors a treatment study will be
commissioned in 2024 to evaluate the existing unit processes employed by the treatment plant and make recommendations for changes to better
conform with climate change and new regulation. Our expectation is to move away from lime softening and employ membrane filtration.
Budget Impact/Other
The impact to the operating budget may increase or decrease depending on the results of the Treatment Study.
Useful Life 20 yearsProject Name Treatment Process Update Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$1,500,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
1,500,0001,500,000CONSTRUCTION
1,500,000 1,500,000Total
Total20242025202620272028Funding Sources
1,500,0001,500,000WATER FUND
1,500,000 1,500,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jonathan Durst
2024 2028thru Department PUBLIC WORKS
Description
Replace approximately 1,900 feet of 12-inch, 1984 ductile iron water main with 16-inch PVC water main.
Project #W3327
Priority Essential (2)
Justification
The existing water main has four corrosion-related water main breaks and signs of continued corrosion within the surrounding wet soils.
Replacing the existing with 16-inch PVC will remove the corrosion hazard and mitigate velocity headloss identified during the 2018 water
distribution system future growth study.
Budget Impact/Other
This project has minimal impact on the operating budget.
Useful Life 70 yearsProject Name Melrose Water Main Camp Cardinal to 218 Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$600,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
600,000600,000CONSTRUCTION
600,000 600,000Total
Total20242025202620272028Funding Sources
600,000600,000WATER FUND
600,000 600,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jonathan Durst
2024 2028thru Department PUBLIC WORKS
Description
Repair defects found during an underwater inspection of the Iowa River powerhouse dam located below the pedestrian bridge connecting the Iowa
River Power Restaurant to the Peninsula Well Field area.
Project #W3328
Priority Critical (1)
Justification
The powerhouse dam maintains the Iowa River elevation in the tract extending from the Coralville Dam to the powerhouse dam. This pool
elevation directly impacts the production of the water treatment facility collector wells #1 and #2 by providing hydrostatic pressure above the well
laterals. The dam's failure would also negatively impact the pedestrian bridge and other surrounding infrastructure. The inspection work has been
completed. The repair design and construction remain.
Budget Impact/Other
This project will have a neutral impact on the operating budget as it is the replacement of existing infrastructure.
Useful Life 70 yearsProject Name Powerhouse Dam Rehabilitation Category Water Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$600,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
107,050107,050PLANNING/DESIGN
165,000165,000CONSTRUCTION
50,00050,000ADMINISTRATION
52,95052,950CONTINGENCY
375,000 375,000Total
Prior
225,000
Total
Total20242025202620272028Funding Sources
375,000375,000WATER FUND
375,000 375,000Total
Prior
225,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jonathan Durst
2024 2028thru Department PUBLIC WORKS
Description
Increased budget based on estimates from electrical engineers. Replace and elevate rotting electrical panels in the Rochester (ROC), Emerald
(EME), and Sycamore (SYC) ground storage reservoirs (GSR). Make repairs to the pump house structures, roofs, and replace doors. Evaluate the
addition of a third pump to ROC or EME. Add a third pump to application GSR.
Project #W3329
Priority Critical (1)
Justification
The City's drinking water system is controlled by the operation of pumps at the treatment facility and GSRs. These GSRs have been in operation
since the 1970's operating 24 hours-a-day. With the creation of the east pressure zone and the continued development to the west it is imperative
to keep the ROC and EME GSR's capable of being water pressure generators by improving their pumpage and electrical systems. The SYC GSR is
in need of electrical and building repairs.
Budget Impact/Other
Useful Life 20 yearsProject Name GSR Upgrade and Repairs Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$1,500,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
150,000150,000PLANNING/DESIGN
1,350,0001,350,000CONSTRUCTION
1,500,000 1,500,000Total
Total20242025202620272028Funding Sources
1,500,0001,500,000WATER FUND
1,500,000 1,500,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jonathan Durst
2024 2028thru Department PUBLIC WORKS
Description
Part of Unfunded Project #84. Replacement of (1) 12-inch, (2) 20-inch, (3) 30-inch, and (2) 36-inch magnetic flow meters at the Water Treatment
Plant.
Project #W3330
Priority Critical (1)
Justification
Flow meters are used to control unit operations of the water treatment system. Magnetic flowmeters are currently installed to control the softeners,
chlorine contact tanks, and high service pumps to the Emerald, Rochester, and Plant Service Water transmission lines. The existing magnetic
flowmeters are at end-of-life and are malfunctioning. Operations and maintenance teams have developed work around to avoid the costly
replacements. These work arounds are beginning to fail as well. Therefore replacement is necessary with new equipment more applicable to the
application.
Budget Impact/Other
This project will have a neutral impact on the operating budget as it is the replacement of existing infrastructure.
Useful Life 30 YearsProject Name Water Plant Flowemeter Replacement Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$550,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
50,00050,000PLANNING/DESIGN
500,000500,000CONSTRUCTION
550,000 550,000Total
Total20242025202620272028Funding Sources
550,000550,000WATER FUND
550,000 550,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jonathan Durst
2024 2028thru Department PUBLIC WORKS
Description
Install a new antenna at the Rocky Shore Dr. lift station by Crandic Park and decommission the antenna at the N. Dodge St. HyVee.
Project #W3332
Priority Efficiency Improvement (3)
Justification
The Peninsula Well Field is integrated with the Water Treatment Plant SCADA system. The well field communication is via radio to the HyVee
antenna and then fiber from the antenna to the Water Plant. Resilient and timely communication with the Peninsula Well Field is necessary to
effectively monitor raw water production during all weather events. Both the existing and proposed sites have backup power generation. The
installation of reliable fiber to the Rocky Shore Dr. lift station is anticipated to occur with S3958 - Park Rd Reconstruction in 2025.
Budget Impact/Other
This project will have a neutral impact on the operating budget as it is the replacement of existing infrastructure.
Useful Life 40 YearsProject Name Peninsual Well Field Antenna Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$200,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
40,00040,000PLANNING/DESIGN
160,000160,000CONSTRUCTION
200,000 200,000Total
Total20242025202620272028Funding Sources
200,000200,000WATER FUND
200,000 200,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Jonathan Durst
2024 2028thru Department PUBLIC WORKS
Description
The relocation of the bulk water fill station from the Equipment & Transit Division site to the Public Works campus coincident with the build out
of the Equipment & Transit Division expansion to the Public Works campus. The new bulk water fill station is intended to be designed with better
access for large vehicles and with more climate control to allow the use of the station into the colder months. Unfunded project #72
Project #W3333
Priority Efficiency Improvement (3)
Justification
Bulk water fill stations are used by contractors and Johnson County residents for large quanitity water purchases. In order for the City to
effectively abandon the existing Equipment & Transit division site, the bulk water fill station will need to be removed and relocated.
Budget Impact/Other
This project will have a neutral impact on the operating budget as it is the replacement of existing infrastructure.
Useful Life 30 YearsProject Name Relocate Bulk Water Station Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$150,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
20,00020,000PLANNING/DESIGN
130,000130,000CONSTRUCTION
150,000 150,000Total
Total20242025202620272028Funding Sources
150,000150,000WATER FUND
150,000 150,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact LaTasha DeLoach
2024 2028thru Department SENIOR CENTER
Description
This project will include American Disabilities Act (ADA), code, architectural, mechanical, electrical, cosmetic, wayfinding and signage
improvements to all floors of The Center, including a new (ADA) accessible vestibule on East Washington Street. The interior building
improvement projects will focus on sustainable and life cycle cost improvements, with a goal to reduce The Center's carbon foot print. The
improvements are based on recommendations from the 2020 Accessibility Study and the 2021 Master Plan. Lower level fitness rooms will be
realigned to better accommodate equipment and to provide adequate space for classes. The first floor will be converted to a social floor that can be
used for public events. Offices will be centrally relocated on the second floor for better collaboration. The third floor includes a reception area for
patrons that park in the ramp and includes realigning classrooms to better accommodate lifelong learning activities. Energy efficiency
improvements and building code upgrades be incorporated into the project.
Project #K1003
Priority Efficiency Improvement (3)
Justification
This project will allow for program and event needs to continue mission work of lifelong learning, connection and community engagement of
residents 50 plus. This will provide adequate office space and classrooms, increase customer service capacity, improve wayfinding, provide
improved lighting and design for older adults, aging eyes and decreased capacity which occurs when serving older adults. This project will address
sustainability needs, and provide more access to community members for rental space. It will also address aging infrastructure, sustainability
needs, and provide more access to community members for rental space.
Budget Impact/Other
Renovating the Senior Center will increase revenue by creating a space where more community members will have events for weddings, small
conferences, retirement events, etc. Improved wayfinding and tailored design for older adults will allow for longevity of The Center for older adults
for generations to come. There will be a need for a new staff to assist with additional programs needed.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name Senior Center Interior Improvements Project Category Senior Center
Type Unassigned
MATCH %
GRANTEE
Total Project Cost:$3,650,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
345,000245,000 100,000PLANNING/DESIGN
2,135,000865,000 1,270,000CONSTRUCTION
90,00040,000 50,000ADMINISTRATION
200,000100,000 100,000CONTINGENCY
880,000575,000 305,000OTHER
1,825,000 1,825,000 3,650,000Total
Total20242025202620272028Funding Sources
2,250,0001,125,000 1,125,000FACILITY REPLACEMENT
RESERVE
1,400,000700,000 700,000GO BONDS-GENERAL
PURPOSE
1,825,000 1,825,000 3,650,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Darian Nagle-Gamm
2024 2028thru Department TRANSPORTATION SERVI
Description
This annual project includes concrete restoration, application of concrete sealants, repair of control and expansion joints in addition to other
parking facility specific repairs.
Project #T3004
Priority Essential (2)
Justification
A thorough facility condition evaluation will be conducted on all of our existing facilities in 2023. This will include a maintenance plan for
scheduling the repairs that will be facilitated in the following five years. Most of the work is to remove and restore concrete and structural steel in
the deck flooring.
Budget Impact/Other
There should be a reduction in operating expenditures through the replacement of older infrastructure. The estimated decrease in operating
expenditures is less than $10,000 per year.
Useful Life 20 yearsProject Name Parking Facility Restoration Repair Category Parking Operations
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$10,228,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
700,000150,000 200,000 250,000 100,000PLANNING/DESIGN
5,065,000515,000 850,000 1,000,000 1,200,000 1,500,000CONSTRUCTION
100,000100,000INSPECTION
160,00010,000 50,000 50,000 50,000ADMINISTRATION
525,000 1,000,000 1,250,000 1,500,000 1,750,000 6,025,000Total
Prior
4,203,000
Total
Total20242025202620272028Funding Sources
6,025,000525,000 1,000,000 1,250,000 1,500,000 1,750,000PARKING FUND
525,000 1,000,000 1,250,000 1,500,000 1,750,000 6,025,000Total
Prior
4,203,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Darian Nagle-Gamm
2024 2028thru Department TRANSPORTATION SERVI
Description
This project involves the installation of additional high-definition cameras in parking facilities.
Project #T3021
Priority Efficiency Improvement (3)
Justification
The cameras will aid in securing facilities, following up on incidents, and evaluating parking demand. Additional cameras were installed on the
rooftop of the Capitol Street Parking ramp in 2021. These have been extremely useful tools to investigate issues and monitoring vehicle
occupancies. The additional funding request will allow for similar installation in the remaining facilities.
Budget Impact/Other
This project will increase the operating expenditures due to the maintenance of the new equipment. The estimated impact on the operating budget
is less than $10,000 per year.
Useful Life 10 yearsProject Name Video Cameras for Parking Facilities Category Parking Operations
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$400,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
150,000150,000CONSTRUCTION
150,000 150,000Total
Prior
250,000
Total
Total20242025202620272028Funding Sources
150,000150,000PARKING FUND
150,000 150,000Total
Prior
250,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Darian Nagle-Gamm
2024 2028thru Department TRANSPORTATION SERVI
Description
Project to replace all LED fixtures in the Court Street Transportation Center, Capitol Street ramp, Dubuque Street ramp, Tower Place ramp,
Chauncey Swan Ramp, and fixtures in other facilities as they age out of production.
Project #T3025
Priority Essential (2)
Justification
LED technologies have evolved since our early adoption in our parking facilities nearly a decade ago. Many of the early-style fixtures need to be
replaced. During 2021-2022 the fixtures in the Court Street Transportation Center were replaced. During 2023 the fixtures in the Capitol Street
and Dubuque Street facilities were replaced. This project will allow the replacements of the Tower Place and Chauncey Swan facilities in 2024-
2025.
Budget Impact/Other
It will cost approximately $10,000 in staff time to replace all fixtures in the Capitol Street facility. The impact on the operating budget is negligible.
Useful Life 10 yearsProject Name Replacement of LED fixtures in Parking Facilities Category Parking Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$880,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
440,000240,000 200,000CONSTRUCTION
240,000 200,000 440,000Total
Prior
440,000
Total
Total20242025202620272028Funding Sources
440,000240,000 200,000PARKING FUND
240,000 200,000 440,000Total
Prior
440,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Darian Nagle-Gamm
2024 2028thru Department TRANSPORTATION SERVI
Description
This project will modify the existing drainage pipe network and divert storm water from the upper decks to the exterior of the structure rather than
routing it through the lower level.
Project #T3026
Priority Efficiency Improvement (3)
Justification
The lower level of Tower Place Parking Ramp repeatedly floods during high intensity rain events causing significant property damage. Several
spaces in the lower level are closed to prevent future property damage until this project is completed. These vehicles are utilizing visitor parking
spaces in the upper levels of the ramp resulting in loss revenue.
Budget Impact/Other
Twelve revenue generating spaces in the upper levels of the Tower Place Parking Ramp are currently being used for this relocation. The revenue
impact is $12,000 annually in addition to less available parking to accommodate visitor parking.
Useful Life 20 yearsProject Name Tower Place Drainage Modifications Category Parking Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$1,050,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
160,000160,000PLANNING/DESIGN
640,000640,000CONSTRUCTION
50,00050,000INSPECTION
50,00025,000 25,000ADMINISTRATION
100,000100,000CONTINGENCY
185,000 815,000 1,000,000Total
Prior
50,000
Total
Total20242025202620272028Funding Sources
1,000,000185,000 815,000PARKING FUND
185,000 815,000 1,000,000Total
Prior
50,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Darian Nagle-Gamm
2024 2028thru Department TRANSPORTATION SERVI
Description
Design and remodel of Customer Service and Administrative Support office areas of the Tower Place parking ramp.
Project #T3028
Priority Efficiency Improvement (3)
Justification
Administrative office space demand has greatly changed at our Tower Place location. This remodel will provide dedicated workspaces for three
Customer Services Representatives who currently share two work stations in an open office space. The remodel will also provide dedicated office
space for Supervisory staff including Operations Supervisors, Director, Associate Director, and a Data Analyst. Currently the Supervisory staff
operate in an open workspace room with very limited privacy. Upgraded funiture will also be part of this project.
Budget Impact/Other
There is no anticipated impact to the operating budget.
Useful Life 20 yearsProject Name Tower Place Office Remodel Category Parking Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$150,000
TIF DISTRICT None
PLAN None
Status Active
Total20242025202620272028Expenditures
12,00012,000PLANNING/DESIGN
138,000138,000CONSTRUCTION
150,000 150,000Total
Total20242025202620272028Funding Sources
150,000150,000PARKING FUND
150,000 150,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Darian Nagle-Gamm
2024 2028thru Department TRANSPORTATION SERVI
Description
This project involves the construction of a new transit facility for maintenance operations and storage. As part of this project, the storage area will
be expanded allowing for an increase in fleet size and the maintenance facility will be upgraded. The relocation will address the environmental
issues that exist at the current facility and allow for the redevelopment of a major commercial site at the corner of Highway 6 and Riverside Drive.
Project #T3055
Priority Essential (2)
Justification
The current tranist maintenance facility has outlived its useful life and is in need of replacement. The facility has structural issues from the
surrounding area, and a new facility will improve the delivery of service. The new facility would be eventually be consolidated with Equipment
Services into one facility to better utilize space and be more cost effective. Grants are being sought to assist in the construction.
Budget Impact/Other
The replacement of transit maintenance facility should be to a newer and more energy efficient facility, however, the new facility will be larger and
contain more operational functionality. The additional size and capability of the facility will most likely offset the potential savings from a newer
and more efficient facility. Additional savings/cost from this facility has not been determined.
Useful Life 40 YearsProject Name Transit Maintenance Facility Relocation Category Transit Operations
Type One Phase
MATCH %20%
GRANTEE FTA
Total Project Cost:$27,815,500
TIF DISTRICT None
PLAN Transportation Plan
Status Active
Total20242025202620272028Expenditures
2,775,0002,775,000PLANNING/DESIGN
20,680,50020,680,500CONSTRUCTION
4,010,0004,010,000OTHER
6,785,000 20,680,500 27,465,500Total
Prior
350,000
Total
Total20242025202620272028Funding Sources
19,250,000750,000 18,500,000FEDERAL GRANTS
8,215,5006,035,000 2,180,500TRANSIT FUND
6,785,000 20,680,500 27,465,500Total
Prior
350,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Dan Striegel
2024 2028thru Department TRANSPORTATION SERVI
Description
To improve pedestrian safety and traffic flow at the downtown interchange and improve amenities at transit stops throughout the community as
recommended through the 2019-2020 Transit Study planning process. This project will include annual bus stop repairs and amenity installations
including concrete pads, benches, trash containers, lighting, information amenities, and bike racks.
Project #T3059
Priority Essential (2)
Justification
Both the Climate Action Plan and the Strategic Plan calls for an evaluation of the transit system to improve the transit system to meet a greater
number of resident's needs, increase transit ridership, and improve amenities.
Budget Impact/Other
Additional amenities will require additional annual staff time for refuse pickup, cleaning shelters, repairing shelters, and snow removal. The
estimated annual increase in operating expenditures is $10,000 to $15,000 per year.
Useful Life 25 yearsProject Name Transit Interchange and Bus Stop Improvements Category Transit Operations
Type Annual
MATCH %NONE
GRANTEE NONE
Total Project Cost:$520,000
TIF DISTRICT None
PLAN Iowa City Area Transit Study
Status Active
Total20242025202620272028Expenditures
125,00025,000 25,000 25,000 25,000 25,000CONSTRUCTION
25,000 25,000 25,000 25,000 25,000 125,000Total
Prior
395,000
Total
Total20242025202620272028Funding Sources
125,00025,000 25,000 25,000 25,000 25,000TRANSIT FUND
25,000 25,000 25,000 25,000 25,000 125,000Total
Prior
395,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Darian Nagle-Gamm
2024 2028thru Department TRANSPORTATION SERVI
Description
This project will replace the video recording system in the 27 fixed route transit buses. The camera system is used for security monitoring as well
as investigating incidents on and off the buses and is very useful during employee on-going training.
Project #T3068
Priority Essential (2)
Justification
The current system is at the end of it's useful life and is not reliable. Having clear and available recordings is necessary for a safe and secure transit
system.
Budget Impact/Other
This project will not increase operating expenditures.
Useful Life 10 yearsProject Name Transit Bus Video System Category Transit Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$450,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
300,000300,000EQUIPMENT
300,000 300,000Total
Prior
150,000
Total
Total20242025202620272028Funding Sources
300,000300,000TRANSIT FUND
300,000 300,000Total
Prior
150,000
Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Darian Nagle-Gamm
2024 2028thru Department TRANSPORTATION SERVI
Description
The doors feature a large safety glass and heavy-duty lower door to provide barrier against passengers, projectiles and thrown fluids.
Project #T3069
Priority Essential (2)
Justification
The doors provide safety and security for transit drivers by securing the driver cab area.
Budget Impact/Other
Useful Life 10 yearsProject Name Bus Driver Protection Doors Category Transit Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$175,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
175,000175,000CONSTRUCTION
175,000 175,000Total
Total20242025202620272028Funding Sources
175,000175,000TRANSIT FUND
175,000 175,000Total
Capital Improvement Plan 2024-2028
City of Iowa City, Iowa Contact Mark Rummel
2024 2028thru Department TRANSPORTATION SERVI
Description
Project to replace several damaged doors and door closures in the Capitol Street ramp, Dubuque Street ramp, Tower Place ramp, Chauncey Swan
ramp, and doors in other facilities as they fail.
Project #T3070
Priority Critical (1)
Justification
Most of the current doors and door closers are original to each facility and have began to fail. These failures include doors that will not close
allowing wind, water, and snow to enter the stairwells causing damage. Additional failures are causing the doors to slam closed too quickly and
could cause injuries to the customers of the facility. Many of the early-style doors need to be replaced. This project will allow the replacements of
the Capitol Street, Dubuque Street, Tower Place, and Chauncey Swan facilities.
Budget Impact/Other
Useful Life 20 yearsProject Name Replace Door-Door Closures in Parking Facilities Category Parking Operations
Type Multi-Phase
MATCH %
GRANTEE
Total Project Cost:$300,000
TIF DISTRICT
PLAN
Status Active
Total20242025202620272028Expenditures
300,000100,000 100,000 100,000CONSTRUCTION
100,000 100,000 100,000 300,000Total
Total20242025202620272028Funding Sources
300,000100,000 100,000 100,000PARKING FUND
100,000 100,000 100,000 300,000Total
Project Name Description Unfunded Amt
1 - Bridges
1 Iowa Avenue Culvert This project will include the removal and replacement of the
existing reinforced concrete box culvert with a new three-
sided arch culvert. The project will also include removal and
replacement of slope protection adjacent to the bridge on
Ralston Creek, removal and replacement of street pavement
and sidewalk, and site restoration.
$3,500,000
2 F Street Bridge This project involves the removal and replacement of the
existing corrugated metal arch bridge with a larger bridge.
$773,000
3 Fourth Avenue Bridge This project will replace the bridge over the South Branch of
Ralston Creek at Fourth Avenue and will include sidewalks.
Possibility of approximately $75,000 state funding.
$773,000
4 Sixth Avenue Bridge This project involves the removal and replacement of the
existing twin box culvert with a larger bridge.
$773,000
5 Third Avenue Bridge This project will include the removal and replacement of the
existing concrete bridge with a new single-span reinforced
concrete box culvert. The project will also include removal
and replacement of slope protection adjacent to the bridge on
Ralston Creek South Branch, removal and replacement of
street pavement, and storm sewer improvements.
$650,000
6 First Avenue Bridge This project will be a comprehensive concrete rehabilitation of
the Iowa Ave Bridge over the Iowa River. Additional repair
items will include sidewalks, approach pavement, expansion
joints, pedestrian handrails and painting.
$2,250,000
2 - Streets
7 Benton Street - Orchard To Oaknoll This is a capacity related improvement identified by the
Arterial Street Plan.
$5,150,000
8 Brookland Park Drive Rehabilitation This project will include reconstruction of Brookland Park
Drive and updates to utilities.
$1,450,000
9 Dodge St - Burlington To Bowery Street reconstruction and storm sewer improvements. This is
a joint project with the IDOT.
$13,250,000
10 Dubuque Rd Paving - Bristol To
Dodge
Reconstruct and upgrade to urban cross sections.$1,339,000
11 Dubuque Street Access Road And
Traffic Signal
This project will construct an access drive from the north end
of Laura Dr to Dubuque Street, south of the Interstate 80 /
Dubuque St interchange. May also facilitate a second means
of access from the Peninsula area to Dubuque St.
$2,000,000
12 Emerald Street Diamond Grinding This project will diamond grind all of Emerald Street to
remove the slab warping that interferes with the use of this
street by fire trucks.
$212,000
13 Gilbert / Us 6 Intersection Left Turn
Lanes
Reconstruct the intersection of Gilbert & US 6 to include dual
left turn lanes on Gilbert St.
$4,840,000
14 Gilbert St Iais Underpass This project relocates the sidewalks of the Gilbert St.
underpass at the IAIS Railroad. The sidewalks are moved
further from the street and existing erosion problems are
addressed.
$327,000
15 Old Hwy 218 Streetscape Streetscape improvements on Old Hwy 218 entrance -
Sturgis Ferry Park to US Hwy 6. This project includes
landscaping, lighting and sidewalk improvements. The
project should be coordinated with Sturgis Ferry Park
upgrade and /or Riverside Drive Redevelopment project.
$812,000
City of Iowa City
Capital Improvement Program
Unfunded Projects
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
16 Highway 965 Extension This project will be initial phase of constructing Hwy 965
extended from the south side of Hwy 218 to Melrose Avenue
to arterial standards.
$9,167,000
17 Mccollister - Sycamore St To Scott
Blvd
Extend proposed McCollister Boulevard from Sycamore
Street to Scott Boulevard.
$9,088,000
18 Muscatine Avenue Reconstruction,
Iowa To First Ave
This project will reconstruct Muscatine Avenue from Iowa
Avenue to 1st Avenue.
$10,510,000
19 Oakdale Blvd This project would construct an extension north across I-80 to
a new intersection with Iowa Hwy 1.
$15,000,000
20 Oakdale Blvd-Hwy 1 To Prairie Du
Chien Rd
This project would construct Oakdale Blvd from Hwy 1, west
to Prairie Du Chien Road.
$8,240,000
21 Peninsula Secondary Access Road This project will establish a more reliable access to the
Peninsula neighborhood by either elevating Foster Rd from
Laura Dr to No Name road by creating a secondary access to
the area. This project will not be necessary if the Taft
Speedway Levee Project is constructed.
$2,883,000
22 Riverside Drive Streetscape Phases II to V of the South Riverside Drive Streetscape
Master Plan, which includes improvements to the west side of
Riverside Drive from Benton to Hwy 6 and the east side of
Riverside from Myrtle to Hwy 6. Project includes
consolidation of driveways, undergrounding of utilities, and
installation of sidewalks and landscaping.
$2,650,000
23 Rohret Rd Improvements-
Lakeshore To Limits
Project will reconstruct Rohret Rd to urban standards.$1,813,000
24 South Gilbert Street Improvements Reconstruction from Benton Street to Stevens Drive. This
project does not include improvements to the Gilbert St. /
Highway 6 intersection.
$4,326,000
25 South Arterial And Bridge, Us218
To Gilbert Street
Construction of a south arterial street and bridge over the
Iowa River, connecting from Old Hwy 218/US 218
interchange on the west side of the Iowa River to Gilbert
Street/Sycamore 'L' intersection .
$15,987,000
26 Sycamore-Hwy 6 To Highland This project involves additional lanes to improve capacity and
storm sewer improvements.
$750,000
27 Sycamore Street - East-West Leg
From "L" To South Gilbert
This project will reconstruct Sycamore Street to arterial
standards using the Complete Streets Policy. This phase will
be the east-west leg of Sycamore Street.
$3,040,000
28 Taft Avenue – Herbert Hoover Hwy
To Lower West Branch
Reconstruct Taft Avenue from Herbert Hoover Hwy to Court
Street.
$3,300,000
29 Taft Avenue – American Legion
Road To 420th Street
Reconstruct Taft Avenue from American Legion Road to
Herbert Hoover Hwy.
$8,200,000
30 Laura Drive Reconstruction Reconstruction of entire length of Laura Drive to standard two
lane width with curb, storm sewer and sidewalk.
$2,000,000
31 Linn Street Reconstruction,
Burlington To Iowa
This project is part of the downtown streetscape master plan.
This project reconstructs Linn Street from Burlington Street to
Iowa Avenue. Project also improves sidewalk pavement,
addresses critical update to water main, replaces and
relocates storm sewer between Washington & Iowa.
$1,935,000
32 Clinton Street Streetscape Improve Clinton Street Streetscape south of Burlington Street
consistent with the Riverfront Crossings Plan. Minor
pavement improvements and lane striping a part of project.
$1,500,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
33 Kimball Road Reconstruction Reconstruct Kimball road from N. Gilbert Street to N.
Governor Street. Project includes 22 foot wide PCC street
and a 5 foot wide sidewalk on one side of the street, new 8"
DIP water main, new storm sewer, and sanitary service
improvements.
$3,480,000
34 Interstate 80 Aesthetic
Improvements
Landscaping and aesthetic treatments in the Interstate 80
corridor. The objective of this project is to mitigate the visual
impact of the addition of a third lane to I-80 and to provide
cohesive and pleasing feel to the Iowa City corridor.
$300,000
35 Towncrest Drive Reconstruction A private street that the property owners would dedicate the
right of way to the City, and the City will reconstruct. Parking
along and adjacent to the right of way will be reconfigured to
better facilitate vehicle movement and pedestrian safety.
$600,000
36 Gilbert Street Functional Design -
Hwy 6 To Kirkwood
Obtain consulting services to provide a functional design of
Gilbert Street between Hwy 6 & Kirkwood Avenue. The
functional design should take into account all previous design
work completed for the corridor.
$60,000
37 Foster Road Elevation This project will reconstruct and elevate Foster Road from No
Name Street to Dubuque Road.
$7,800,000
38 Camp Cardinal Blvd / Kennedy
Parkway - Roundabout
This project will construct a roundabout at Camp Cardinal
Boulevard / Kennedy Parkway. This project is intended for the
unfunded list of projects.
$2,058,839
39 Kirkwood Ave to Capitol Street
Connection
The extensions of these streets plays an important part in the
overall development of the Riverfront Crossings area. It will
also imporve access and the traffic cirulation in this area.
This project does not include any costs necessary for the
property acquisitions.
$3,100,000
40 Gilbert Street Lighting &
Landscaping Improvments
This project will provide landscaping and street/pedestrian
lighting on Gilbert Street from College Street to the Gilbert
Street Bridge over Ralston Creek
$975,000
41 Washington Stree Recon - Madison
to Clinton
This project will reconstruct Washington Street from Madison
Street to Clinton Street and will include new street pavement,
sidewalk, curb ramps, utility repairs/improvements and other
associated work.
$2,700,000
42 Friendship Sidewlk Infill - 5th Ave to
7th Ave
This project will construct a 5' wide ADA sidewalk on
Friendship Street between 5th Ave and 7th Ave
$210,000
43 Herbert Hoover Highway - Turn
Lanes
This project will construct dedicated left-turn lanes (or a
center left-turn lane) on Herbert Hoover Highway at American
Pharoah Drive, Hanks Drive and Thunder Gulch Road. This
project is intended to be placed on the unfunded list of
projects until the pending traffic study is complete.
$6,400,000
44 Lakeside Drive Crosswalk
Improvements
This project generally includes the construction of a raised
midblock crosswalk on Lakeside Drive between Aniston
Street and Amber Lane at the Sycamore Greenway Trail
$240,000
45 Linn Street Reconstruction This project includes the reconstruction of three blocks of
brick street along Linn Street from Bloomington Street to
Church Street
$3,650,000
46 Park Road Reconstruction - Rocky
Shore to Riverside
Reconstruction of Park Road from Rocky Shore Drive to the
west project limits of the Gateway Project, approximately
Riverside Drive. This project will include new street
pavement, sidewalk, utility improvements and other
associated work.
$7,500,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
47 Kitty Lee Road SW Improvements This project is necessary to provide an adequate secondary
access for the future Carson Farms and other developments
in the area.
$7,700,000
48 Ridgewood Lane Reconstruction This project includes complete reconstruction of Ridgewood
Lane and a portion of Virginia Drive, as well as water main
and storm sewer replacement.
$700,000
3 - Transportation Services
49 Rock Island Railroad Depot
Restoration
Preparation of Old Rock Island Railroad Depot for Amtrak
service, including platform construction, lighting, utilities,
passenger information display, ticketing kiosks, canopy,
warming shelter, signage, parking, and accessibility
improvements.
$5,381,000
50 Capitol & Dubuque Street Parking
Ramp Façade Improvements
To construct façade improvements on the Capitol Street and
Dubuque Street parking ramps to improve their aesthetic
appearance in these high profile, high traffic areas.
$1,000,000
4 - Ped & Bike Trails
51 Iowa River Trail, Highway 6 To
Sturgis Ferry Park
This project will extend the Iowa River Trail from just north of
Highway 6 to Sturgis Ferry Park on the west side of the Iowa
River.
$1,180,000
52 Iowa River Trail, Gateway Segment Construction of a trail extension adjacent to (east) of the Iowa
River between Park Road and the University of Iowa
pedestrian bridge.
$500,000
53 Windsor Ridge Trail Extension The project includes the extension of a 10' wide trail along
north Branch of Snyder Creek from Scott Boulevard to
American Legion Road.
$1,200,000
54 Old Highway 218 Trail/Wide
Sidewalk
This project will construct an 8' wide sidewalk adjacent to Old
Highway 218 between Sturgis Ferry Park and McCollister
Boulevard.
$550,000
55 Crandic Railroad Rails-To-Trails
Project
The project removes the existing Crandic tracks and
repurposes the existing corridor for a 10' multi-use trail
approximately between Oakdale Boulevard in Coralville to
Gilbert Street in Iowa City (approximately 6.1 miles). Iowa
City's portion of the project is approximately 1.75 miles.
$1,575,000
56 Myrtle Ave Sidewalk Infill The project will construct sidewalk along the north side of
Myrtle Avenue between Greenwood Drive and Olive in order
to fill in a gap in the City’s sidewalk network.
$155,000
57 Southgate Ave Iowa River Trail
Connector
This project will construct a trail connection along Southgate
Avenue from Gilbert Street to the Iowa River Trail.
$250,000
58 Willow Creek Trail - Phase Iii Construct a trail from Willow Creek Drive, under Highway
One, around perimeter of airport, to connect with Iowa River
Corridor (IRC) Trail.
$870,000
59 Willow Creek Trail-West Connect Willow Creek Trail from its current west terminus via
a tunnel under Highway 218, to connect with the trail in
Hunters Run Park and further west.
$2,814,000
60 Fairmeadows Trail Addition of a loop trail and connections to the bikeways in the
surrounding neighborhood.
$125,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
61 Southgate Ave - Iowa River Trail
Connector
This project will construct a cul-de-sac a the west terminus of
Southgate Ave as well as 8' wide trail connection from
Soutgate Ave to the Iowa River Trail.
$400,000
62 Napoleon-Riverfront Crossings Trail
Segment Repl
Replacement of the asphalt trail from Napoleon Park to
Riverfront Crossings Park with a 10' wide concrete trail (1.25
miles). This will include a new spur connecting the trail to
Southgate Ave
$720,000
63 Whispering Meadows Trail
Improvements
Current trail infrastructure is reaching end of life and needs
replaced in order to continue to serve park users.
$250,000
63 Stone Bridge Park Development Funding to develop new neighborhood parks in emerging or
underserved locations. 2026 improvements in soon to be
acquired location in the Stone Bridge Subdivisions to include
playground, shelter, or other park features.
$275,000
5 - Wastewater
64 North Branch Dam Trunk Sewer This project extends easterly along Ralston Creek from the
North Branch Dam to Scott Boulevard.
$3,860,000
65 Northeast Trunk Sewer Reconstruction of an under-sized sewer through the northeast
neighborhoods.
$5,221,000
66 Sanitary Sewer Extension - Scott To
Hickory Trail
This project includes the design and construction of a sanitary
sewer trunk extension between Scott Boulevard and Hickory
Trail.
$790,000
67 New Cold Storage Building Construct 90' by 40' covered roof area with open side similar
to the Sludge Storage area. Building to be the same
dimension of the existing cold storage building.
$360,000
68 Geo-Thermal Hvac Conversion Project would include the conversion of the HVAC system to
Geo-Thermal. Installation of Geo-thermal loops, new pump
systems, new chiller, and improved controllers required to
operate the system.
$300,000
69 Secondary Calrifier 5300-5400
Repairs
This project will replace the rake mechanisms and drives for
Calrifiers C5300 and 5400 that were new in 2002 and part of
WWTP upgrades.
$864,000
70 Heat for Cold Storage Building Project would require the addition of natural gas fired area
heaters. Initially the heat load would be enough to keep the
building above freezing. When the digester rehabilitation
project proceeds, glycol heating from the digester boilers
would be included that project. Glycol piping would be routed
under the parking lot and drive to the building to new heating
units.
$123,000
71 Aeration Eqiuipment Improvements
Phase 1
Replace the remaining mixers in the aeration trains 1 - 4 with
high efficiency mixers matching those placed in Cell 9 of
trains 1-4 and replace mixers in the high strength tank. This
would be total of 30 mixers.
$2,978,000
72 Aeration Eqiuipment Improvements
Phase 2 (Lamson)
Replace Lamson 300 HP Centrifugal Blower with a High-
Speed Turbo Blower including any ancillary equipment, pipe
modifications and PLC programing. We currently utilize
service contract for yearly maintenance for two existing high-
speed blowers installed. We would want to require service
contract for hte new high speed blowers once the warrenty
period had expired.
$1,911,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
73 Hawkeye Lift Station Rehabilitation includes demolishing the existing building,
converting the station to a wet-well valve vault with surface
hatches for pump access, basket screening, new standby
generator, replace 20 year old pump, new controls, valve
vault with bypass capacity, new security fence, landscaping
and access road improvements. The station would be
plumbed for future expansion, but would not include additional
$1,645,000
74 Rotating Drum Thickener
Replacement 1 & 2
Replace RDT 1 and 2 with in-kind process equipment or a
more efficient process equipment. This will include all
ancillary equipment required to make this an operational and
a direct replacement for the existing RDTs 1 and 2 and all of
their ancillary equipment.
$1,662,000
75 Peninsula Control Panel and Pump
Improvement
The project includes the replacement of the control panel and
aquisistion of a redundent pump.
$130,000
76 UV Building and Storage Build a 40' x 60' structure over Ultra Violet disifection
structure for protection and for storage of the UV bank
modules during the off season. Project will include buildng
heat and electical supply.
$1,000,000
77 Effluent Water Pump Station
Improvements
Install a fourth Effluent Water Pump to serve the in plant
distribution system and soccer park irrigation system. Work
includes rebuilding of the Amiad filtration system.
$76,000
77 UV Building and Storage Build a 40' x 60' structure over Ultra Violet disifection
structure for protection and for storage of the UV bank
modules during the off season. Project will include buildng
heat and electical supply. Funds requested below are for
design with construction to follow in 2029.
$100,000
78 Wastewater Division Master Plan Perform a master plan for the Wastewater Division looking
forward for the next 20 years. The study will include the
wastewater treatment plant, all sanitary lift stations, and the
sanitary sewer collection system.
$299,000
6 - Water
79 West Side Ground Storage
Reservoir
Construction of a two million gallon ground or elevated
storage reservoir with associated pumping station and
generator west of US-218. Current land acquired for this
reservoir is southeast of the Slothower Rd at Hebl Ave
$15,000,000
80 Nutrient Removal Project This project will be for the reduction of dissolved nutrients (i.e.
nitrates) in the source water. The project is preceded by a
study. The study will review treatment technology options
(i.e. reverse osmosis, biological treatment) and the long-term
viability of continued lime softening.
$4,000,000
81 Collector Well #1 Rehabilitation Clean two of the existing laterals and cap one existing lateral
of Collector Well #1. Install two new 12-inch laterals to
increase the production capacity of this raw water well.
$3,000,000
82 Water Treatment Plant Filter #6
Buildout
Add underdrains, granular media, controls, and
instrumentation to filter bay #6. This bay was left unfinished
to allow for future expanded production. The project will also
repair or replace a number of filter control valves. The project
will be informed by the Treatment Study.
$1,500,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
83 Well Field Electrical Cable
Replacement
Replace aging medium voltage (13,200V) cabling and install
communication fiber to wells at the Water Plant and
Peninsula sites.
$1,000,000
84 Lee/Highwood Street Water Main
Replacement
This is a water main replacement project with respective
street and sidewalk replacement at Lee Street and Highwood
Street. Approximately 550 feet of 6" cast-iron pipe (vintage
1951) will be replaced with 6" PVC pipe. Approximately 300
feet of PVC will be installed where no pipe has existed
previously.
$1,000,000
85 Deforest Ave Water Main
Replacement
Approximately 500 feet of 6-inch cast-iron pipe (vintage 1958)
will be replaced with 500 feet of 8-inch PVC on the 900 block
of Deforest Avenue.
$700,000
86 Giblin Drive Water Main
Replacement
This is a water main replacement project with respective
street and sidewalk replacement. Approximately 620 feet of 6-
inch cast-iron pipe (vintage 1953) will be replaced with 8"
PVC.
$600,000
87 Sixth Avenue Water Main
Replacement
This is a water main replacement project with respective
street and sidewalk replacement. Approximately 650 feet of 6-
inch cast-iron pipe (vintage 1974) will be replaced with 8"
PVC.
$600,000
88 Lime Lagoon Outlet Structure
Modifications
Modify the lagoon outlet structure to an open channel design.
This project will be informed by the Treatment Study.
$500,000
89 Market Street Water Main - Madison
To Clinton
Extend 20-inch water main from Madison to Clinton on Market
St. Tie in 12-inch on Clinton St. to 16-inch at Bloomington St.
This project will be preceded by the abandonment of the 20-
inch main along the old Davenport St right-of-way between
dormitories.
$3,000,000
90 Bloomington Gsr Decommissioning Decommission the Bloomington ground storage reservoir
within the University of Iowa Campus Parking Ramp and
return the space to the University of Iowa per the associated
28E agreement. The 28E agreement expires on December
31, 2038. (Resolution No. 88-176)
500,000$
91 Soda Ash Replacement Remove the existing soda ash and ammonia chemical feed
systems. Replace the existing powdered soda ash feed
system with a liquid soda ash feed. The use of soda ash is
to increase alkalinity of the source water for lime softening
purposes. This is necessary if drawing from the river. This
project will be informed by the Nutrient Study.
1,000,000$
92 Sand Pit Pumping Station
Rehabilitation
Clean and inspect the laterals of the Sand Pit Pumping
Station. Replace and repair the lateral isolation valves and
operators.
1,000,000$
93 East Side Water Tower Construct a two million gallon ground or elevated storage
reservoir within the East Pressure Zone.
15,000,000$
94 Sycamore Gsr Replacement Replace the two million gallon ground storage reservoir
located on Sycamore Street with a ground or elevated two
million gallon storage tank along McCollister Blvd.
15,000,000$
95 Melrose & Westgate 16-Inch Water
Main
Install 16-inch water main parallel to the existing water main
on Melrose Ave from Dublin Rd to Westgate St and on
Westgate St from Melrose Ave to Benton St. This project
would reduce velocity headloss from the Emerald ground
storage reservoir to customers west of US-218, increasing
service pressure. This project will be evaluated by hydraulic
modeling after the West Side GSR project is completed.
6,000,000$
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
96 Construct New Collector Well #3 Add an additional radial collector well for high quality source
water production. The project will need to be a hydrogeologic
study and cost/benefit analysis between adding collector
laterals to existing collector wells or constructing a new
collector well.
10,000,000$
97 Hvac System Replacement &
Remove Process Area Heaters
Replace and upgrade aging HVAC equipment and controls at
the water treatment facility. Remove gas overhead heaters
and associated gas lines, electrical, and exhaust piping. The
heaters are not used and in time pose a safety hazard.
2,500,000$
98 Teeters Ct Water Main
Replacement
Replace approximately 410 linear feet of 6-inch 1950 cast iron
water main on Teeters Ct. The water main has experienced
three main breaks and services Lincoln Elementary.
500,000$
99 Hwy 6 (Industrial Park Rd To
Riveria)
Replace approximately 1,400 linear feet of 12-inch 1971
ductile iron water main on Highway 6. The water main has
experienced two water main breaks. Due to the size of the
water main, it's proximity to the Sycamore reservoir, and 16-
inch water main on the north side of Highway 6, breaks tend
to cause large system disruptions.
1,000,000$
100 Southlawn Dr Water Main
Replacement
Replace approximately 1,100 linear feet of 6-inch 1962 cast
iron water main on Southlawn Dr (800-900 blk). The water
main has experienced 10 main breaks and services Lucas
Elementary.
700,000$
101 Melrose Water Main Camp Cardinal
To Us-218
Replace approximately 1,900 feet of 12-inch, 1984 ductile iron
water main with 16-inch PVC water main.
900,000$
102 Pwf Water Material Outdoor
Covered Storage
Installation of paving and covered outdoor material storage
structures to protect water distribution materials from the
elements.
100,000$
103 Water Plant And Gsr Gate
Replacement
Replace the (3) water plant site gates and the (3) GSR gates
(Rochester, Emerald, and Sycamore).
100,000$
104 Process Flow Meter And Valve
Replacements
Replace (14) flow meters within the treatment plant and wells.
Replace process valves coincident to the flow meters and
filters.
1,200,000$
105 Water Plant And Peninsula Well
Field Fiber Optic Cable
Install fiber optic communication cable to all wells and remove
existing radio telemetry.
1,000,000$
106 Highway 1 from Miller Ave to
Hudson Ave Water Main
Replacement
Replace approximately 400 feet of 1984 12-inch water main
on Highway 1 between Miller Ave and Hudson Ave. The work
would also simplify the utility network in the area.
700,000$
107 Hwy 6 from Rocky Shore Dr to
Newton Rd & Rocky Shore Dr from
Hwy 6 to Dill St Water Main
Replacement
Replace approximately 800 feet of 1994 16-inch water main
on Hwy 6 between Rocky Shore Dr and Newton Rd & replace
400 feet of 1967 12-inch on Rocky Shore Dr from Hwy 6 to
Dill St.
1,000,000$
108 Pleasant St from Cedar St to
Davenport St Water Main
Replacement
Replace approximately 350 feet of 1948 2-inch water main on
Pleasant St from Cedar St to Davenport St
400,000$
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
7 - Stormwater
109 Carson Lake Regional Storm Water Construction of a regional storm water management facility
on the middle branch of Willow Creek immediately west of
Highway 218. This facility will serve development west of
Highway 218 and south of Rohret Road.
$1,160,000
110 Riverfront Crossings Storm Sewer Storm sewer improvements in the Central Crossings Sub-
District.
$1,375,000
111 Iowa Avenue Culvert Repairs This project will repair a box culvert that carries Ralston
Creek under Iowa Avenue.
$348,000
112 N. Branch Basin Excavation Aerial mapping done for the update to the flood plain maps
revealed that sedimentation has consumed a portion of the
capacity of the facility. This basin is located in Hickory Hill
Park.
$135,000
113 Olympic Court Storm Water Storm sewer retrofit to relieve localized flooding from storm
water runoff.
$464,000
114 Sunset Street Storm Sewer The area just north and south of Kineton Green, east of
Sunset, has experienced back yard flooding and drainage
problems.
$440,000
115 Riverside Drive & Arts Campus
Storm Sewer
This will be a joint project with the University of Iowa to
upgrade the Riverside Drive / Arts Campus storm sewer and
lift station to perform better during future floods.
$1,000,000
8 - Parks & Recreation
116 Recreation / Aquatic Center As recommended in the Parks and Recreation Master Plan,
construct a major new Recreation & Aquatic Center, probably
in the western part of Iowa City.
$16,000,000
117 Mercer Park Pool Improvements This project would include the replacement of the two pool
bulkheads, deck tile, dive stands, and the renovation of the
women's locker room from a shared shower space to two
separate shower spaces.
$500,000
118 Waterworks Park Boat Ramp This project is to add a boat ramp to access the Iowa River in
the northeast corner of Waterworks Park. Improvements
include a boat ramp, boat trailer parking, a boat dock, and an
access road.
$250,000
119 Riverfront Crossings Park - Phase 4 Phase 4 of the Riverfront Crossings Park master plan adds a
new river access, an amphitheater, a kayak launch, and new
river trails.
$1,353,000
120 Riverfront Crossings Park Restroom
& Bridge
Construction of second restroom/shelter by Nature Play and
second bridge to 2nd Street; also includes removing an
abandoned trunk sewer line.
$910,000
121 Gilbert Street/Park Maint Shop Boat
Ramp
Addition of an accessible boat access to the Iowa River from
the parking lot at the Park Maintenance Shop.
$245,000
122 Iowa River Trail, Benton To
Highway 6
This project will extend the Iowa River Trail from Benton St to
Highway 6, on the west side of the Iowa River. Future
phases of the trail could extend to Sturgis Ferry Park and on
top of the west side levee to McCollister Blvd.
$1,700,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
123 Ralston Creek Trail Under Iowa
Interstate Railroad
The project would involve constructing a trail connection
under the Iowa Interstate Railroad that connects the existing
trail along the west side of Ralston Creek, north of the Iowa
Interstate Railroad, to the proposed trail that will be
constructed along the west side of Ralston Creek as part of a
development located south of the Iowa Interstate Railroad.
$1,700,000
124 Sand Prairie Enhancement Take steps to clear, re-seed and perform low impact
development on the 38 acre sand prairie and adjacent
McCollister property acquired in 2004/05.
$273,000
125 Mercer Park Ball Diamond #4
Renovation
This project would reconfigure ball diamond #4 at Mercer
Park to realign the field to a NW orientation. This would
include the removal of the existing field, fencing, and
$374,000
126 Kicker's Park Playground
Replacement
Replace playground #1 at Kickers Athletic Complex as it is
reaching the end of projected serviceable life. Project also
adds ADA compliant paths.
$185,000
127 Calder Park Playground
Replacement
Replace the playground at Calder Park. Site constraints keep
this as a smaller piece of equipment.
$135,000
128 Second Parking Lot At Ashton
House
Provides for additional parking on the north side of the Ashton
House to support larger events at the facility.
$300,000
129 Lower City Park Master Plan
Improvements
Implement changes to make the park more resilient to
flooding. Follows from the 2015 master plan.
$23,268,522
130 East Side Sports Complex
Improvements
Build out of a new 73 acre park on the City’s east side. The
park includes expansion of various field sports as well as
serves as a neighborhood amenity. Follows from the 2015
master plan.
$14,034,794
131 Terry Trueblood Recreation Area
Parking Expansion
Expansion of the parking areas with addition of 100 parking
spaces at the Terry Trueblood Recreation Area lodge and
lake.
$225,000
132 Wetherby Park Entrance And
Parking Lot Improvements
Connect Broadway sidewalks to the trail system in Wetherby
Park. Resurface the parking lot and basketball court adjacent
to parking lot. A trail extension will also be made to the
Community Garden area in order to provide ADA access.
$100,000
133 Scott Park Driveway and Parking Replace the chipseal driveway and parking area at Scott Park
with a concrete surface and reconfigure the lot to more
effeciently serve additional parking
$275,000
134 Benton Hill Park Sidewalk Addition of sidewalk along the Benton St right-of-way of
Benton Hill Park along with necessary retaining wall
elements.
$175,000
135 Brookland Park Playground Replace the aging playground at Brookland Park with a
similar small size playground and swings. Update other site
amenities as needed.
$200,000
136 Robert A. Lee Recreation Center
Pool Filter & HVAC
Post 2021 Recreation Master Plan- moved RALRC pool and
HVAC project to FY27, updated costs to replace RALRC
existing pool filtration system, add a UV disinfectant system,
upgrade deteriorated iron piping under deck, surge tank
replacment and add dehumidication HVAC system to bring
facility to current building code compliancy for air quality.
$4,060,000
137 Oak Grove Park Improvements Replacement of the playground, basketball court surfacing,
shelter, and site amenities.
$300,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
9 - Other Projects
138 Burlington Street Median Construct the Burlington Street median from Gilbert Street to
Madison Street. Project includes relocation of water and
sewer utilities. This project will require a traffic signal
preemption system. (Part of the Riverfront Crossings
amendment to City-University URA).
$1,973,000
139 Cemetery Columbarium Construction of a columbarium.$405,000
140 City Hall Relocation Relocate and expand / modernize City Hall and City Council
Chambers.
$12,000,000
141 Police Evidence Storage Facility Construction of a permanent evidence storage facility.$929,000
142 Central Police Station Relocation Relocate and expand / modernize Central Police Station. $19,000,000
143 Fire Station #1 Relocation Relocate and expand / modernize Central Fire Station #1. $11,593,000
144 Fire Station #5 Construction of Fire Station #5 in the South Planning District. $2,898,000
145 Fire Station #6 Construction of Fire Station #6 in the Southwest Planning
District.
$2,898,000
146 Flood Buyouts This project will provide funds for the purchase of houses in
designated flood hazard buyout areas after FEMA and CDBG
buyout programs have ended.
$530,000
147 Riverside Drive Redevelopment This project includes methane abatement, excavation, and fill
at the 7 acre site owned by the City at Riverside Dr. and Hwy
6. This site preparation would allow for marketing of this
property for commercial development.
$2,527,000
148 Airport Equipment Shelter Snow removal equipment was previously stored in United
Hangar. Equipment Shelter would provide enclosed storage
for equipment.
$337,500
149 Airport Perimeter Road Construction perimeter road for maintenance and fueling
vehicles to travel to south development area.
$267,700
150 South Airport Site Development South General Aviation area site development with access
roadway and utilities.
$2,125,100
151 Hangar A Door Replacement Hangar A door replacement; hangar A has 10 doors to be
replaced.
$200,000
152 Summit Street Historic Plan Streetscape and intersection elements through Summit Street
Historic District.
$302,000
153 Traffic Signal Pre-Emption System This project will install a city-wide Geographic Information
System based traffic signal pre-emption system for
emergency vehicles. This system is necessary if the
Burlington St Median Project is constructed between Madison
St and Gilbert St.
$1,221,000
154 Iowa Interstate Railroad Quiet
Zones
The Quiet Zones project would be for design and
implementation of required upgraded warning devices and
physical infrastructure (medians and gates) for four at-grade
street crossings. The upgrades would improve safety at each
crossing and reduce the need for trains to sound their horns.
$1,000,000
155 Burlington Street Dam Modification of the Burlington Street Dam to address public
safety concerns, improve riverbank stability, improve fish
habitat, and create recreational opportunities.
$6,435,000
156 Excavator for compost operations This machine would be used primarily in the compost and
wood chip facility at the landfill to assist in safely grinding
incoming materials.
$280,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
157 Fire Training Center Improvements Over the past number of years the sleeping areas and
restroom facilities at Station 1 have become inadequate by
not allowing expected privacy of all members. All other fire
stations have private, secure sleeping areas for members.
As the Fire Department continues to evolve in diversity it is
imperative that the safety and well
$200,000
158 Material Vending Machine-Remote
Book Returns
Purchase and installation of two library material vending
machines and two new remote book returns to be located at
$300,000
159 ICPL Children's Room Shelving Remove original (built-in) media shelving along the interior
east wall of the Children's Room and replace with shelving
that can accommodate current formats and reflects modern
materials usage. New shelving will be modular and flexible to
allow for reuse in a larger, future renovation of the Children's
Room. Existing shelving was designed to hold CDs, which
were a significant part of the Children's circulating collection
for several years. The shelves have been modified multiple
times in an attempt to maximize their useful life.
$71,500
Total - Unfunded Projects