Loading...
HomeMy WebLinkAboutCoralville - Dubuque Street NE and Forevergreen Road RoundaboutCity of Coralville Engineering Department 1512 7th Street, Coralville, Iowa 52241 Phone: 319.248.1720 Page 1 of 2 F Date: February 24, 2025 Project: Dubuque Street NE & Forevergreen Road Roundabout ITEMIZED BREAKDOWN The following cost estimate breakdown was developed based on the cost of roundabouts recently constructed in the metro area with similar footprints to the proposed roundabout: - North Liberty Road & Forevergreen Road roundabout was constructed in 2022 with a total estimated cost of $2,654,000 - Saint Andrews Drive & South Alexander Way roundabout was constructed in 2021 with a total estimated cost of $2,564,000 Mobilization, Removals, and Earthwork $ 350,000 Paving (roadway, sidewalk, and temporary pavement) $ 1,100,000 Utilities $ 460,000 Traffic Control, Signange, and Pavement Markings $ 85,000 Electrical and Lighting $ 200,000 Erosion Control, and Landscaping $ 105,000 Design $ 184,000 Construction Admin $ 345,000 Project Total $ 2,829,000