Loading...
HomeMy WebLinkAbout01-15-2025 Board of AppealsT. -lw CITY OFIOWA CITY NOTICE OF PUBLIC MEETING The Iowa City Board of Appeals will convene at 3:30 p.m. on Wednesday January 15, 2025 in Emma J Harvat Hall, 410 Washington St., Iowa City, Iowa TENTATIVE AGENDA 1. Meeting to be called to order 2. Elect Officers for 2025 (Chair and Vice Chair) 3. Consider minutes from June 5, 2023 meeting. 4. Hear appeal of Building Officials issuance of a building permit. (319 N. Van Buren St.) 5. Adjournment If you will need disability related accommodations in order to participate in this meeting, please contact Tim Hennes, Building Inspection Services, at 319-356-5122 or at tim-hennes@ iowa-city.org. Early requests are strongly encouraged to allow sufficient time to meet your access needs. Final MINUTES IOWA CITY BOARD OF APPEALS June 5, 2023, 2023 — 4 PM WELLING CONFERENCE ROOM, CITYHALL 410 E. WASHINGTON STREET IOWA CITY, IA 52240 MEMBERSPRESENT: Andrea French, Andrew Martin, GT Karr MEMBERS ABSENT: Thomas McInerney, Jim Walker STAFF PRESENT: Tim Hennes (Sr. Building Inspector), Sarah Horning (Development Services Assistant), Liz Craig (Assistant City attorney) RECOMMENDATIONS TQ QQUN„Q1L: Approval of minutes from May 1, 2023 Board of Appeals meeting. CALL TO ORDER; Chair Andrew Martin called the meeting to order at 4 PM CONSIDERATION OF MINUTES: May 1, 2023 Board of Appeals minutes MOTION: French moved to approve the minutes from the May 1,2023 Board of Appeals meeting. Seconded by Karr. VOTE: Motion passed 3-0. ADJOURNMENT: MOTION: Karr moved to adjourn meeting, French seconded. VOTE: Motion passed 3-0. Meeting adjourned at 4:05 PM. Chairperson, Board of Appeals Date Ap,pellant ubmittals 2 Status: Submitted - Online Project Name: Applied Date: 12/20/2024 Issue Date: District: City of Iowa City Expire Date: Finalized Date: Description: My wife and I own the home at 425 East Davenport Street in Iowa City. For more than 100 years the sewer line for our property has exited the back of our lot, crossed directly under the vacant lot located at 319 North Van Buren Street, and emptied into the city sewer located in the alley which runs on the south side of the 319 Van Buren property. Because the existence of this line has never been challenged in this 100 year period we have an easement by prescription for our sewer line. The 319 Van Buren lot is currently vacant and has been since 2017. Prior to 2017 there was a very small cottage which was at that time voluntarily demolished by the then owner of the property. The vacant 319 Van Buren lot has now been sold and the city has issued a building permit for an approximate 2287 square foot single family residence and garage to be built on the lot. The lot at 319 North Van Buren is only 35 x 80 feet and the proposed structure has an approximate 25 x 45 foot footprint so it will interfere with my sewer line. believe the city should not have issued the building permit for the new residence because it violates Chapter 7 of the 2021 Uniform Plumbing Code (which has been adopted by Iowa City) by not complying with the required distance from sewer lines, by not requiring adequate underground materials and other adequate and necessary protection and other requirements for my sewer line. 3 From: Gregg Geerdes <geerdeslaw@peoplepc.com> Sent: Tuesday, December 31, 202412:16 PM To: Eric Goers <egoers@iowa-city.org> Subject: Re: Dave Moore appeal to Board of Appeals ** This email originated outside of the city of Iowa City email system. Tease take extra care opening any links or attachments. ** Mr Goers, here is the supplement you requested. Even though we are not required to provide this level of detail we are doing so as a courtesy. 1. Mr. Moore is the holder of a dominant sewer line easement by virtue of his and his predecessors, long use, and the long existence, of the sewer line that crosses the servient 319 North Van wren Street property. 2. The 2017 voluntary demolition of the former residence at 319 North Van wren resulted in the loss of any "grandfather" rights that the Van wren Street property may otherwise have had. 3. Iowa City has adopted the State of Iowa Plumbing Code, which is the 2021 Uniform Plumbing Code. Under the table in Section 721.1 of the 2021 Uniform Plumbing Code two feet must be maintained between a building and another building's sewer line. 4. The project at 319 North Van Buren is to be built directly on top of Mr Moore's sewer, meaning that this two foot distance requirement has not been met. 5. Under Section 718.3 of the Uniform Plumbing Code any plumbing materials used under a building must be approved for under -building use. 6. Mr Moore's sewer line is believed to be over 100 years old and is made of materials which have not been approved for under -building use. 7. When Mr Moore attempted to discuss the location of his sewer line and possible alternatives with the contractor he was threatened with trespass and the police were called on him. Gregg This message is intended only for the use of the person to whom It Is addressed and may contain information that is confidential and privileged. $ yvv received this message and are not the intended reciplent, pleasenotify the sender and destroy your copy and attachments. Messages sent over the Internet are not secure, please notify us If you prefer not to use emall to communicate with this office. Gregg Geerdes, Attorney at Low, 1051owa Avenue, Suite 234, Iowa City, Iowa 52240, Telephone (319)341-3304 -----Original Message ----- From: Eric Goers<egoers iowa-city.org> Sent: Dec 27, 2024 4:42 PM To: geerdeslaw@pooplepc.com < eerdeslaw eo Ie c.com> Cc: glientzPnorthlibertylowa.org <Rhentz@northIJbertylowa.org>, Matthew Adam <madam spmblaw.com>, Tim Hennes <thennes Iowa-citv.org>, Danielle Sitzman <dsitzman@iowa-city.org>, Eric Bigley <EBi ley@iowa-ci,/.org> Subject: Dave Moore appeal to Board of Appeals Mr. Geerdes, The City is in receipt of your appeal to the Board of Appeals dated December 20th. In it, your client stated that the building permit should not have been issued "because it violates Chapter 7 of the 2021 Uniform Plumbing Code (which has been adopted by Iowa City) by not complying with the required distance from sewer lines, by not requiring adequate underground materials and other adequate and necessary protection and other requirements from my sewer line." The City needs to know the precise nature of your client's appeal in order to be able to address it at the hearing. Given that your client asserts the basis for his appeal is found in alleged violations of the Uniform Plumbing Code, the City will need to know what specific provisions of the Uniform Plumbing Code your client believes have been violated. Until your client's appeal is supplemented with the specifics, the City considers the appeal filing incomplete. Any allegation of a Uniform Plumbing Code violation lacking a citation to the specific Uniform Plumbing Code provision your client believes has been violated will be considered incomplete and not addressed in the 5 appeal. Failure to cite any specific Uniform Plumbing Code provisions will result in no hearing being held. As you know, the appeal period expired 30 days after the November 22Id issuance of the building permit, and the appeal remains incomplete, but the City will allow your client to file a supplement if it is received by the City no later than 4:30 p.m. on January 311, 2025. The supplement may be sent via email to Mr. Hennes or myself if that is most convenient to you. Eric R. Goers (he/him/his)* City Attorney 410 East Washington Street Iowa City, IA 52240 319-356-5030 egoe rs @ i owa-city. o rg *1 include my pronouns in my email signature so people know how they should refer to me and so those who receive my email know I am interested in how I should refer to them. ftlFAREREE iOWA CITV Notice: Iowa City Transit is now FARE FRET? Learn more at 1CGOV.ORG/FAREFREE Since e-mail messages sent between you and the City Attorney's Office and its employees are transmitted over the internet, the City Attorney's Office cannot assure that such messages are secure. You should be careful in transmitting information to the City Attorney's Office that you consider confidential. If you are uncomfortable with such risks, you may decide not to use e-mail to communicate with the City Attorney's Office, Without written notification that you do not wish to communicate with the City Attorney's Office via e-mail communication, the City Attorney's Office will assume you assent to such communication. This message Is covered by the Electronic Communication Privacy Act, 18 U.S.C. Sections 2510 2515, is intended only for the use of the person to whom it is addressed and may contain information that is confidential and subject to the attorney -client privilege. It should not be forwarded to anyone else without consultation with the originating attorney. IF you received this message and are not the addressee, you have received this message in error. Please notify the person sending the message and destroy your copy. Thank you. R+ Disclaimer The information contained in this communication from the sender is confidential. it is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful. City's Reply nlp� CITY OF 101`JA CITY 8 � MEMORANDUM Date: January 10, 2025 To: Board of Appeals From: Tim Hennes, Sr. Building lnspe�to Susan Dulek, Ass't. City Attorne Re: 319 N. Van Buren Street/appeal of building permit INTRODUCTION The owner of 425 E Davenport Street (Dave Moore) appealed the issuance of a building permit for a new single-family home on 319 N Van Buren Street, Mr. Moore alleges the City violated Chapter 7 of the Plumbing Code in issuing the building permit. (pages 2-4) [- Davenport St KA The private sewer for 425 E Davenport Street crosses over both 323 N Van Buren Street and 319 N Van Buren Street before entering the City's sewer main that runs along the alley south of 319 N Van Buren. The exact location of the private sewer is not known to City staff. City staff only knows where the private sewer enters the City's sewer main on the alley south of 319 N Van Buren Street. (pages 25-28) January 10, 2025 Page 2 WO This is a civil matter between the owners of the two properties. The new construction at 319 N Van Buren Street needs to be resolved between the property owners. The City notified all parties the presence of the private sewer for 425 E Davenport Street crossing 319 N Van Buren Street would not prevent a building permit for 319 N Van Buren Street from being issued. Although Attachment 1 (pages 14-15) shows the sewer going directly from 425 E Davenport Street to Van Buren Street passing through both 323 N Van Buren Street and 319 North Van Buren Street, the exact location of the sewer is not known to City staff. Mr. Moore claims the corner of the garage is located over the sewer line, but the exact location of the sewer line is unknown. Additionally, Mr. Moore does not have an easement for the use of 319 N Van Buren for his private sewer. ATTACHMENTS Attachment 1--Letter from Tim Hennes notifying owners of the existence of the sewer (pages 14-15) Attachment 2--Building Permit and Plans (pages 17-23) Attachment 3--Emails from J.J. Wombacher, City Waste Water Division (pages 25-28) Attachment 4--Chapter 7 of the 2021 Uniform Plumbing Code (pages 30-42) Attachment 5—Power Point (page 44) APPEAL AND CITY'S RESPONSE TO THE APPEAL Mr. Moore's attorney sent the City Attorney an email alleging the City made 7 errors in issuing the building permit. (pages 2-6) Each alleged error is set forth below followed by the City's response. 1. Alleged Error. Mr. Moore is the holder of a dominant sewer line easement by virtue of his and his predecessors' long use, and the long existence, of the sewer line that crosses the servient 319 North Van Buren Street property. City response. The City is not aware of a recorded sewer easement, and at the Board of Adjustment meeting on January 8, Mr. Moore did not state he had a recorded easement. The City is also not aware of a Judge finding that a prescriptive easement exists, and at the January 8 Board of Adjustment meeting, Mr. Moore did not state he had a Court order finding a prescriptive easement. A prescriptive easement does not exist simply because a person insists one exists. A prescriptive easement is an unwritten easement that must be proven in Court. Only a Judge can determine if an easement exists when one is not recorded. Last, this does not allege a violation of a provision in Chapter 7 of the Plumbing Code. 2. Alleged Error. The 2017 voluntary demolition of the former residence at 319 North Van Buren resulted in the loss of any "grandfather" rights that the Van Buren Street property may otherwise have had. City response. The City is not claiming any legacy (i.e., "grandfather") rights in the Plumbing Code are applicable to this appeal. 3. Alleged Error. Iowa City has adopted the State of Iowa Plumbing Code, which is the 2021 Uniform Plumbing Code. Under the table in Section 721.1 of the 2021 Uniform Plumbing Code two feet must be maintained between a building and another building's sewer line. January10, 2025 Page 3 10 City response. The City is not aware of the exact location of the private building sewer serving 425 E Davenport Street. The City is aware of the location where a sewer enters the City's main sewer line, but has no knowledge whether this is a straight line. See Attachment 3, which are emails and a map from J.J. Wombacher of the City Water Division (pages 25-28). Sections 721.1 and 721.2 are set forth below. 721.1 Building Sever. Except as provided in Section 721.2, no building sewer shall be located in a lot other than the lot that is the site of the building or structure served by such sewer nor shall a building sewer be located at a point having less than the minimum distances referenced in Table 721.1. (emphasis added) TABLE 721.1 MINIMUM I- ORT17ONTAL DISTANCE REQUIRED FROM BUILDING SEWER (feet) Buildin s or structures' 2 Property line adjoining private property Clear Water supply wells 503 Streams 50 On -site domestic water service line 14 Public water main 105,6 ' Including porches and steps, whether covered or uncovered; breezeways; roofed port-cochere; roofed patios; carports; covered walks; covered driveways; and similar structures or appurtenances. 2 See also Section 312.3 3 Drainage piping shall clear domestic water supply wells by not less than 50 feet (15240 mm). This distance shall be permitted to be reduced to not than less than 25 feet (7620 mm) where the drainage piping is constructed of materials approved for use within a building 4 See Section 720.0. 5 For parallel construction. 6 For crossings, approval by the Health Department or the Authority Having Jurisdiction shall be required. 721.2 Abutting Lot. Nothing contained in this code shall be construed to prohibit the use of all or part of an abutting lot to: (1) Provide access to connect a building or sewer to an available public sewer where proper cause and legal easement, not in violation of other requirements, has been first established to the satisfaction of the Authority Having Jurisdiction. (2) Provide additional space for a building sewer where the proper cause, transfer of ownership, or change of boundary, not in violation of other requirements, has been first established to the satisfaction of the Authority Having Jurisdiction. The instrument recording such action shall constitute an agreement with the Authority Having Jurisdiction and shall clearly state and show that the areas so joined or used shall be maintained as a unit during the time they are so used. Such an agreement shall be recorded in the office of the County Recorder as part of the conditions of ownership of said properties, and shall be binding on heirs, successors, and assigns to such properties. A copy of the instrument recording such proceedings shall be filed with the Authority Having Jurisdiction. (emphasis added) Section 721.1 provides the sewer must be on the lot served by the sewer, which is 425 E Davenport, with one exception. The exception is the sewer may be on an abutting lot if Section 721.2 is satisfied. 319 N Van Duren and 425 E Davenport are not abutting properties. Because they are not abutting properties, Section 721.1 and Table 721.1 January 10, 2025 Page 4 11 are not applicable. There is no provision in the Plumbing Code regulating the situation where the private sewer not only goes through the abutting property but also a non - abutting property. Therefore, Section 721.1 is not violated. Further, even in the case of an abutting lot, there must be "a legal easement ... to the satisfaction of the Authority Having Jurisdiction" or an "agreement ... recorded in the office of the County Recorder." Assuming for the sake of argument, the Plumbing Code regulates construction on a non -abutting lot, the requirements for using an abutting lot must apply, and the City has not approved an easement and there is no recorded agreement. Moreover, only a Judge can determine if an easement exists if there is no recorded easement. As a result, the existing building sewer serving 425 E Davenport Street that crosses 319 N Van Buren Street is a civil issue between property owners, and the private building sewer crossing 319 N Van Buren Street needs to be resolved between the property owners. The City is willing to allow the existing building sewer serving 425 E Davenport Street to remain in place, even if it is under the new home constructed at 319 N Van Buren Street, with the understanding that a building sewer is required for 425 E Davenport Street to meet the single-family dwelling use standards and 425 E Davenport Street must be maintained as a functional building sewer. This can also be achieved by relocating the building sewer service. 4. Alleged Error. The project at 319 North Van Buren is to be built directly on top of Mr Moore's sewer, meaning that this two foot distance requirement has not been met. City response. Mr. Moore does not allege a specific provision in Chapter 7 of the Plumbing Code is violated. Presumably he is referencing Table 721.1. The City is not aware of the exact location of the building sewer serving 425 E Davenport Street. Further, the 2-foot requirement in Table 721.1 is not applicable because the new building is not on 425 E Davenport, it is not on an abutting property, and no Judge has determined there is an easement. See the response to Paragraph No. 3 above. With that said, the City is willing to allow the existing building sewer serving 425 E Davenport Street to remain in place, even if it is under the new home constructed at 319 N Van Buren Street, with the understanding that building a sewer is required for 425 E Davenport Street to meet the single-family dwelling use standards and 425 E Davenport Street must be maintained as a functional building sewer. This can also be achieved by relocating the building sewer service. 5. Alleged Error. Under Section 718.3 of the Uniform Plumbing Code any plumbing materials used under a building must be approved for under -building use. City response. Section 718.3 governs the installation of new sewers, not the construction of a new building over an existing sewer. Therefore, there is no violation of Section 718.3. Section 718.3 provides: 718.3 Protection from Damage. No building sewer or other drainage piping or part thereof, which is constructed of materials other than those approved for use under or within a building, shall be installed within 2 feet (610 mm) of a building or structure, or part thereof, nor less than 1 foot (305 mm) below the surface of the ground. The January 10, 2025 Page 5 12 provisions of this subsection include structures such as porches and steps, whether covered or uncovered; breezeways; roofed porte cochere; roofed patios; carports; covered walks; covered driveways; and similar structures or appurtenances. (emphasis added) 6. Alleged Error. Mr Moore's sewer line is believed to be over 100 years old and is made of materials which have not been approved for under -building use. City response_. Mr. Moore does not allege a provision in Chapter 7 of the Plumbing Code is violated. Presumably he is referencing Section 312.3. Section 312.3 regulates the installation of new sewers, not the construction of a new building over an existing sewer, and therefore there is no violation of this provision. Material used for the building sewer at 425 E Davenport Street is unknown to City. 312.3 Building Sewer and Drainage Piping. No building sewer or other drainage piping or part thereof, constructed of materials other than those approved for use under or within a building shall be installed under or within 2 feet (610 mm) of a building or structure, or less than 1 foot (305 mm) below the surface of the ground. (emphasis added) 7. Alleged Error, When Mr Moore attempted to discuss the location of his sewer line and possible alternatives with the contractor he was threatened with trespass and the police were called on him. City response. This is not a violation of the Plumbing Code and irrelevant to this appeal. CONCLUSION The City did not violate any provision in the Plumbing Code in issuing the building permit. 13 ATTACHMENT 1 14 October 8, 2024 David and Lysa Moore 425 E Davenport St. Iowa City, IA 52245 Dear David and Lysa, AkFlu CITY OF IOWA CITY UNESCO CITY OF LITERATURE 410 East Washington Street Iowa City, Iowa 52240-1826 319-356-5000 r WWJcgov.org As you may be aware the vacant lot at 319 N. Van Buren Street is for sale. Prospective buyers have brought to the City's attention that the sanitary sewer service for your property at 425 E Davenport Street runs south through the rear yard of 323 N Van Buren Street and 319 N Van Buren Street. The image below was provided by the Iowa City Wastewater Division and shows the approximate locations of the sanitary sewer services for the referenced properties. As far as we are aware at this time, the sewer service line from your property is not a city owned sanitary service line nor main line and is not located in an easement between private property owners. 4 rq C. eo 111111111.1 October 8, 2024 Page 2 As the owners of 425 E Davenport Street, it is your responsibility to provide a sanitary sewer service connection from the dwelling on the property to the to the City's main sewer line. It is not the responsibility of the City. The City is advising the owner or potential buyers of 319 N Van Buren Street to consult a private attorney regarding the matter of the private sanitary sewer service across the property. We would advise you to do the same. The presence of the private sanitary sewer service for 425 E Davenport Street crossing 319 N Van Buren Street will not prevent a building permit for 319 N Van Buren Street being issued. Please reach out to me if you have any questions that I can answer on this issue Sincerely, Tim Hennes Senior Building Inspector City of Iowa City 319-356-5122 then nes(c-piowa-city.org cc: Prestige Properties Development, LLC (owner of 319 N. Van Buren St) Andrew J and Lindsey R Litton (owners of 323 N Van Buren St) 16 ATTACHMENT 2 17 d , City of Iowa City orvovrnvaciry Building (Residential) Permit Permit #: BLDR24-0483 Parcel M. 1010162004 Issued Date: November 22, 2024 Expiration Date: July 01, 2025 Project Address: 319 N VAN BUREN ST Project: Iowa City (Original Town) Plat Iowa City, IA 52245 Owner: Contractor: IA Drywall Address: Address: Phone: Phone: (319) 621-9773 Project Details SQ Ft: 2,287 Valuation: $0.00 Description: New 2-story SFD wl basement. 4 bedrooms, 2 car garage. Permit Fees Name Amount Paid Due Building Permit Fee (Residential) $756.00 $756.00 $0.00 Electronic Plan and Document Fee $28.00 $28.00 $0.00 Plan Review Fee Residential $756.00 $756.00 $0,00 Electrical New $100.00 $100.00 $0.00 Building Sewer and/or Water $50.00 $50.00 $0.00 Mechanical New $100.00 $100.00 $0.00 Plumbing - New $100.00 $100.00 $0.00 Totals: $1,890.00 $1,890.00 $0.00 dv i d ;,: ;separate permi'-5 , �yuired for building, electrical plumbing, heating, air conditioning, or signs. This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work is commenced. All provisions of laws and ordinances governing this work must be complied with whether specified herein or not. This permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. Notice Insert a permit notice prefix in the report text bank, entry: Permit —Notice Number of Dwelling Units: 1 Basement Finished: Yes Number of Stories: 2 Zoning District: RNS-12 Number of Parking Spaces: 3 Fire Sprinkler: None Property in Flood Hazard Area: No Footprint of Structure: 1120 Lot Size: 2800 Certificate of Occupancy Required: Yes Building Official Additional Information Date Page 1 of 1 410 E. Washington Street, Iowa City, Iowa 52240 - (319) 356-5120 NORTH al 5 10 GRAPHIC SCALE IN FEET 1'=l(Y APPLICANT: J & R HOMES LLC HEIGHT ABOVE AVERAGE GRADE = 24'-10'' LEGAL: SOUTH 35' OF LOT 1. BLOCK 4B ROOF MIDPOINT 22'-6- ADDRESS: 319 N VAN BUREN STREET AVERAGE GRACE = 15.65% - 662.77 ZONING: RNS-12; F-10% S-5. R-20' FFE - 685.82 'THES:. THESE DRAWINGS WERE PREPARED IN ACCORDANCE I pgON DED aUILCING PLANS AND APPROVED AT THE DIRECTIVE TOW - 684.01 OF THE APPLICANT, IT IS THE RESPONSIBILITY OF THE •ALL PROPERTY PINS SHALL BE VISIBLE AND MARKED GENERAL CONTRACTOR TO VERIFY ALL APPROVED PERMIT BUILDING COVERAGE - 39.3% DOCUMENTATION PRIOR TO CONSTRUCTION. MMS DURING THE ENTIRE CONSTRUCTION PROCESS. CONSULTANTS, INC, IS NOT RESPONSIBLE FOR ANY LOT AREA - 2,842 SF INCONSISTENCIES IN WHAT HAS BEEN PROMUED AND REPRESENTED ON THESE DRAWINGS MITHOUT OUR EXPRESSED BUILDINC AREA = 1.117 SF KNOWLEDGE AND APPROVAL ALL CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE STATE ANp/OR LOCAL CODES. CIVIL ENGINEERS LAND PLANNERS LAND SLIRVEYCRS LANDSCAPE ARCHITECTS ENVIRONMENTAL SPECIALISTS 1917 S. GI011 ST. IOWA CITY, IOWA 52240 (319)351-8282 www.mmaeonsu Gants.net Cute I Revlslon SITE PLAN SOUTH W OF LOT 1, BLOCK 48 IOWA CITY JOHNSON COUNTY IOWA MMS CONSULTANTS, INC. Oats: 11 /20/2024 0.eIved 4y: Flekd Book No: HEH Drawn 4y S.-le: HEM Chocked oy. Sheet No: LRS 1 Project No: 1OB90-00B ec 2 4 DESIGN `s �ag�a am3� S 2 NINHH Q O U � Z W O_ 00 F �S 7 i.v -- � Z m COVER rtqurtumu. 1511111624 Puthnt ��a% C1toAar A040 u Reviewed for Code Compliance e DESIGN 1-1rc! w'a11 1­ q w ­1 m;,b o" m­1 E - Q.. 2.0 =2- flu 2.21 C X �11 GE F­ r. 0 U c z cr) LLI LLJ x z o z ■ El —111 —1 ILL BASEMENT AND L. mwe a FOUNDATION r FLOOR PLANS ERS�ttLT A LEVEL FLOOR 7— 5235a' 114 1�' I I I I I j 3 1 Ilt lam4 Al 00 n FRONT ELEVATION Its 9 t1 kiica�EN ELEVATION A v tn^ e t•-o- -------------- I."I �E°PG.o nnpe�0w'+cn� b wrcxa xnwsaavas a AeeRhK�xWw"]ee crrWan¢Karxv ------- wooNsvMer�.mex . RDORMLt'+xwnoo ------- dl LWx ryak`,xNvxw® E4WTWC4 - 11 MEdNLEVELp - - p — - — w V t!a'=1'-0' IMEN �ml --- I own 11l7lmlm (D //R EN ELEVATION a Jf2•�1•-P wen mme WC tYPL & A GOpFNEI@'6MGRWGTO RwwETO Yn- of ierteaaa 4Y N nc fl%E'Ltwwsed TRusttsxtemeee �.a�eµ'me � I az• ]v �voa�x 000a ; ]ter �cFwx'NmxucTwi mre ao• Y?fxpR� R 1 YP A GNLAEVMuBMERxeBnTtax� t4 vxs� im ttss�r tx AxEme( ] ar w �Tc� OINEGLOOPUTJuf t ,0' I SP MMC£OocP O.Y�MNfE NTPRrt tG sCYFraAcm Tswevr®c aPnnnNfE�ws'tP u0.ig9 �R [SGEEL. n. �NMcu"�0wrr�o w'Er�.�mnit��urc�t .a E�-va+rat�ai. i°w1"�uoeo�"vr�w H°"'' ' nea:�e�anr�.x I � i 2 9EOONO LEVEL FLOOR PLAN. 1116 GO' ® O X MAIN LEVEL FLOOR PUW SNGN'cR LOCATgN F(M r. NANOICP.PACCESS ' va' MAIN LEVEL FLOOR — r. RA44P FOR NANOICAR AOCE55 DESIGN sh!.o noYoMM.e FOERDFWszk�S 'o u�iimt$�i�`W 8E MAIN AND SECOND LEVEL FLOOR PLANS nqm nn,nam o,.nw AWhox '. cnreacy ca.r.r ' i a� Ik � � b� Qa a'rwre �. AUPSYNIFn�rn_m � INPL[.9���Evn�wS i*sa�c •i, � o��� V3g g� ,y,�td:��t 6sY�a 1 II I fjli:l 1 I I. j,�il I v sclxaasemee � 00@TWBP �DTti6+8. 0 BYusG �o � =�x�^•w,yu��� ` 1 I 4 W¢¢E�WN.CEW FAaMfGOPF16'IGTO5WxE9. �3odw 25� I f twlr�vinn�s��n"u��avxenwm� ���mu���SE�a �,� '� >. a xnaux � e.we s,c�oecron k — _ sacordP � secoM_Lew� so-sN«eo�crea NN! Is na aeerxgc w,da, nM Is nix ill II �J ma pmng PetleYSWiv pmn4:o vrynl - b and m�wtl lo! IM1is m:etl on�plans �''ryI L I Maln Lsvel Maln U 0 t FRONT ELE4VATiPN 11-0- • 1'-0' U BA4K ELEVATION Q O Z Q m � Z M s nd fie! — _ m c.19 s — em Caitins 11 e 4 ELEVA-nON5 pi ❑ — Mamoew ❑ ❑ ❑ ❑ J _ laxm la.e� P-P RI4 T910EELEVAT[ON t1.= t.-0. a LEFT SIDEELEVATION 114' .t'T P.Mirmt. 1RM112024 pu.np Arrtlwr emp Chetlrer Al03 I AaiMkMea '� N �„L,xNLN,l�rn�1 Q 1 - Rrn[ sr•S4 Ox ����S��F xwCR4c d.'uW.itr wuxlx �M.x �z�es TYfcoc 1 n ww.GEwnLt8ME �n55eOC.� ��� �~g=F 6 W Aug- SeCOm41J�V�ya� � --1SIipT1 � E�sµcxPo6�Tsm[Wo� io�eE�� esaixurmiw '� atA Pd� �&� $ $o�� �- `[j�'k[�j i f V LJ, Lf IWax ®Plawnxuexeam 000�no .cwrLx �'.r�ioaaowrwxwrvant �newrcXexar.sc.z4=go ix �ancEre�xo�sxwvcz 0.00PmAYf d aw Li m. leE.tx WNE��OB19Vi same osV����,� s -H mlro¢+ 'a=maan56 �i u 06� � .so o � FlAE PJGE asuw waollw VERIFY NVMBEA OF RISERS TYP, STAIR SECTION WEr Q} C] b F 1 a Q � F.13ECT30N 1 � F1J raual LNnINGr'� wuxcL mxlsswnr w LLI LLL1 a m GP6VM WILD ��j��j��� Y � mPRi WICNYUTE G� g �L ~/ 7 w `Arin� o000 � o � iw end Lem �o�-o^ revssrmr �� �� {.AND g AxCnOR90.T8V ixG�r IME e DETAILS e II § Al.ELxxlw�� �A rm�wx�x z BF_C'iiON� Ixmxnv xc5�FaRCEC� AWTo. n VWI.sLad - W 24 ATTACHMENT 3 25 Tires Hennes From: A Wombacher Sent: Thursday, January 9, 2025 10:00 AM To: Tim Hennes; Tim Wilkey Subject: RE: 319 Van Buren the main is approximately 12' deep in the alley. The lateral enters at 9'oclock. (north side) of the pipe. Thanks! A Wombacher Senior Maintenance Worker Wastewater Collections Cell: 319 6311144 Email: !j-Wombacher Iowa-cityorg From: Tim Hennes <thennes@iowa-city.org> Sent: Thursday, January 9, 2025 8:33 AM To: A Wombacher <JJWombacher@iowa-city.org>; Tim Wilkey <TWilkey@iowa-city.org> Subject: RE: 319 Van Buren Thanks JJ, Remind me of the depth of the sewer main in the alley. Also, the active service that is at 111' is on the side of the main and not on the top, correct? Tim Hennes Senior Building Inspector City of Iowa City 319-356-5122 thennes@iowa-city.org From: A Wombacher <JJWombacher iowa�city.org> Sent: Thursday, January 9, 2025 7:42 AM To: Tim Hennes <thennes�lowa-city.org>; Tim Wilkey <TWilke iowamci r > Subject: RE: 319 Van Buren All we know for certain is that there is an active service 111' east of the manhole in the alley between Gilbert St and Van Buren St. We are making an educated guess that this is the service for 425 Davenport. I do NOT know where the service comes out of 425 or the path it takes to get to the city main. If this information is needed, it is the property owners responsibility to have their service televised and located by a private contractor. If there is anything else I can do to help let me know! Thanks! A Wombacher Senior Maintenance Worker i Wastewater Collections Cell: 319 6311144 Email: !I-wombacher@iowa-cityorg From: Tim Hennes <thennes iowa-city.org> Sent: Wednesday, January 8, 2025 10:44 AM To: JJ Wombacher <JJWombacher iowa-cit .or >; Tim Wilkey <TWilke iow6-cit ,or > Subject: RE: 319 Van Buren 26 JJ, When we talked did I understand you correctly to say you know where the private sewer for 425 E Davenport connects to the city main and you know where it comes out of the house but the route between the two place is unknown? Or is it that you know where it connects to the city main and not where it comes out of the house at 425 E Davenport? If you have a minute would you give me a call? Tim Hennes Senior Building Inspector City of Iowa City 319-356-5122 thennes@iowa-city.or From: JJ Wombacher <JJWombacher iowa-cit .or > Sent: Monday, December 30, 2024 10:11 AM To: Tim Hennes <thennes iowa-cit .or >; Tim Wilkey <TWIIkeY@lowa-city.org> Subject: 319 Van Buren Team, From a video inspection on 4/4/2023 1 have noted these active services that would possibly serve houses on the north side of sewer line 016-75_016-70 (line in the alley south of Davenport between Gilbert and Van Buren). The video was recorded with the flow from manhole 016-75 to manhole 016-70 (west to east). 59' downstream 9 o'clock 111' downstream 9 o'clock 125' downstream 12 o'clock (picture attached, appears to turn back to the south but unable to verify) 180' downstream 9 o'clock 186' downstream 9 o'clock The service at 125' was not on our map, I will include a pdf of its general location as well. (indicated by a dark green line with an arrow. (This indicates where the connection to our main is and does not represent location or direction of the actual service line) if you would like to view the video in its entirety I am more than willing to drop it in a file somewhere, if file path is provided. Unfortunately it is just a little to large to send through email. If there is anything else I can help with, I am more than happy to assist! Thanks! JJ Wombacher Senior Maintenance Worker 27 Wastewater Collections Cell: 319 6311144 Email: jl-wombacher_@iowa-city.org 125, downstreani of t rr :. ti r•, ivId 0,16-75. The line - i-a%jvn on this map {.: °h does not represent 323- _ - _ location or direction "he service. it is r,nly a representation �• ` of where a service connects to the city �.� main. because the }°� I service is tapped into x ,• ' f lie top of the pipe, ' fl l4 v ve are unable to } �' •�:^ mrify dl rection- 319 { IJ y _I .4 5�• f '�,D 16- 70 A [V Go 29 : 1.. I. 30 MPTER SANITARY 0F!A NAGS :. .Part 1- Drainage Sy-std t' s. 701.3.3 Type. Fittings used for drainage shall be of the drainage type, have a smooth interior vVater'way, and b'e constructedto, allow'/4 inch per foot (20.8 mm/rn) grade. 7010 General 701.4 Continuous Vllastes. Continuous wastes and fixture i 01:1 �4(�pile bll�ty t lus ghaptei' shall govern the materials, tailpieces shall be constructed from the materials specified in do W and 'installation df sanitary 'drainage' systems and Section 701.2 for drainage piping, provided, however, that builclitg sewers such connections where exposed or accessible shall be per 7012`�ralnage Piping Materials for drainage piping shall mitted to be of seamless drawn brass not less than No. 20 B be maccordance with oixe of the referenced standards in & S Gauge (0.032 inches) (0.8 min). fable 701.2 except that: 701.5 Lead. (Sce Chapter 17) Sheet lead shall comply `with I (1) 'NC: gal�aiiized wroLighf"ft6n or galvanized steel pipe the following: i shall be.used underground and shall be kept not less than (1) For safe pans -- not less than 4 pounds per square,foot . 6inches (I52 min) aboveground. (lb/ft2) (19 kg/m2) or V6 of an inch (1.6 iidtfi) thlc (2)Ab's .a ct, PVC ;D" , piping installations shall be (2) For (lashings or vent terminals — not less than 3 lb/ft2 (15' installed.in accordance with applicable standards refer- kg/m2) or 0.0472 of an inch (1.2 mm) thick. enced. zn -:Table .701.2 aria Chapter .14 "Firestop Protec- (3) Lead bends and lead traps shall be not less than''/s of an t14n " cept ox individual single-family dwelling units, inch (3.2 mm) in wall thiekness; ziiaterials'.expoged within ducts or plenums shall have a 701.6 Caulking Ferrules. Caulking ferrules shall be man- dame=spread rode `nf ivt more than 2S and asmoke- i fa6turod from copper or co�per alloy and shall be in accor- dovoloped index of n0A i ioie than 50, where tested in dance with Table 701.6. 4accotdaxcee with ASTM E84 or UL 723. Plastic piping 7017 Soldering Bushings. Soldering bushings shall be installed in pleiiuins .shall,be tested in accordance with of copper or copper alloy and'shall be in aord ccance with all requirements o£:ASTMT184 or UL 723. Mounting Table 701,7. alSthod§', supports.and s m-plo sizes of materials for test - ink that are not sp..( f p'd in ASTM E84 or UL 723 shall TABLE 701.6 CAULKING FERRULES (3) No vitrified clay pipe" or fittings shall be used aboveground or wh676 pressurized by a pump or ejector, They shall be kept not less than 12 inches (305'mm) belowground, (4) Copper or copper a1loy.tab e:for drainage and vent piping shall have a weight bfnot less than that of copper or cop- PIPE SIZE; (inches) INSIDE DIAMETER (inches) LENGTH (inches.). MINIMUPMEIGHT EACH pounds ounces 7-. 2�/$ 3 31/4 41 1 12 4 41/4 _L 4/2 2 8 per alloy drainage tube Vy e; OW V: For SI units: 1 inch = 25 mm, 1 pound = 0.453 kg, 1 ounce = 0.02834 kg (5} Stahiles:5 ,steel 304 pipe and fittings shall not be installed TABLE 701.7 . umcrgrobnd and shall be koptnotless thani-6 inches (152 SOLDERING BUSHINGS min a eve round. . (6) Cast-iron soil pipe and. fittings and the stainless -steel cou- pliiigs used to join these products shall be listed and tested in. accordance wjth standards referenced in Table 701:2. Such pipe acid fittings shall be marked with the country of, origin, m4mifactu e?s name or registered PIPE SIZE (inches) MINIMUM WEIGHT EACH PIPE SIZE (Inches)' MINIMUM WEIGHT EACH = pounds- ounces pounds ounces 11/4 0 6 21h 1 6... 1%z 0 8 3 2 0 2 0 14 4 .3 ,8 .. trademark as defined in the product standards, the third For S1 11 units: 1 inch = 25 min, I pound = 0,453 kg, 1 ounce = 0.02834 kg party certifier's mark, and_the class of the pipe or fitting. 701A Drainage Fittings. Materials for drainage fittings 702,0 Fixture Unit Equivalents.. shall `comply'with the -'applicable standards referenced in 702.1 Trap Size. The unit equivalent of plumbing fixtures Table 701.2 of the same diameter as the piping -served, and shown in Table 702.1 shall be based on the alze' of -the trap such fittings shall be compatible with the type of pipe used: required, and the unit equivalent of fixtures and devices -not 701.3.1 Screw.ed Pipe. Fittings on screwed pipe shall shown in Table 702.1 shall be based on the size of trap or trap be of the recessed drainage type. Burred ends shall be arm. reamed to rthe fall bore of the pipe: Maximum drainage fixture units for a fixture trap and 701.3.2 Threads. The threads of drainage fittings shall trap arm loadings for sizes up to 4 inches (100 mm) shall be . be tapped to allow 1/4 inch per foot (20.8 mm/m) grade. in accordance with Table 702.1(1). 2Q21 UNIFORIUI pM ilfUlE311�1U 06E)E ' ki i 7 SANITARY DRAINAGE 31 TABLE •7.01.2 MATERIALS FOR DRAIN, WASTE; VENT PIPE AND FIT-rINGS. UNDERGROUND. DRAIN, WASTE, ABOVEGROUND DR111iV, Wh STE, BUILDING SEWER' REFERENCED STAN- REFERENCED STANDARO.(S) " MATERIAL VENT PIPE AND' VENT PIPE AND PIPE AND FITTINGS DARD(S) PIPE FITTINGS FITTINGS FITTINGS ABS (Schedule 40) ASME A112.4.4, . . X X X ASTM D2661, ASTM D2661 ASTM D2680* ASTM D2680* Cast -Iron ASTM A74 ASME 1316.12, , ASTM A74, X x X ASTM A888, ASTM A8$8, CISPI301 CISPI301 Co -Ex trudedABS (Schedule 40) ASME Al.12.4.4, X x X ASTM F628 ASTM D2661, ASTM D2680* Co -Extruded Composite ASME Al12.4.4, (Schedule 40) ASTM D2661, X X X ASTMP1488 ASTM D2665, ASTM F794*, ASTM F1866 Co -Extruded PVC (Schedule 40) ASME 266 ASTMD2665, X X X ASTM F794*, ASTM F 1760 ASTM F1336*, ASTM F1866 Copper and Copper Alloys (Type ASTM B43, DW ASTM B751 ASME B 16.23, X X X ASTM B251, ASME B 16.29 ASTM B302, ASTM B306 Galvanized Malleable Iron — X — — ASME 13163. Galvanized Steel . — X ASTM A53 — Polyethylene x ASTM F714, - ASTM F894 PVC (Schedule 40) ASTM D1785, ASME A112,4.4, ASTM D2665, x X X ASTM D2665, ASTM F794*, ASTM F794* ASTM F 1966 PVC (Sewer and Drain) — X ASTM D2729 ASTM D2729 PVC PSM — — X ASTM D3034 ASTM D3034 Stainless Steel 304 x — ASME At 12.3.1 ASME At 12.3.1 Stainless Steel 316L X X X ASME Al 12.3.1 ASME At 12.3.1 Vitrified Clay (13xtra strength) _ - x ASTM C700 ASTM C700 * For building sewer applications. 128 2021 UNIFORM PLUMBING CODE SANITARY DRAINAGE 32 TABLE 702.1 DRAINAGE FIXTURE UNIT VALUES (DFU) PLUMBING APPLIANCES, APPURTENANCES, OR FIXTURES MINIMUM SIZE TRAP AND TRAP ARM? (Inches) PRiVATE 'PUBLIC ASSEMBLY" Bathtub or Coinbinatiori Bath/Shower 16 2.0 2.0 - Bidet 1 V4 1.0 - - Bidet H6 2.0 - - Clothes Washer, domestic, standpipe' 2 3.0 3.0 3.0 Dental Unit, cuspidor IA - 1.0 1.0 Dishwasher, doiriestic,,with independent drain' 1 6 2.0 2.0 2.0 Drinking Fountain or Water Cooler 1 V4 0.5 0.5 1.0 Food Waste Disposer, commercial 2 - 3.0 3.0 Floor Drain, emergency 2 -- 0.0 0,0 Floor Drain (for additional sizes see Section 702,0) 2 2.0 -2.0 10 Shower, single -head trap V 2.0 2,0 2,0 lVlulti-head, each additional 2 1.0 1.0 1,0 Lavatory 1'/4 1.0 1.0 1.0 Lavatgries in sots l'h 2.0 2.0 2.0 Washfmutain 1'/2 2,0 2,0 Washfountain 2 - 3.0 3.0' Mobile Home, trap 3 12,0 = - Rcceptor,,indirect waste''3 1'h See footnota"3 Receptor, indirect waste';4 Receptor, indirect waste' 2 3 - See footnote'•4 See footnote' Sinks - - - Bar i'h 1.0 - Bar2 1'h - 2.0 20 Clinical 3 - 6.0 6.0 Commercial with food waste' 1'/2 - 3.0 3,0 Exam Room 1'/2 --- 1.0 Special Purpose' 1'/2 2.0 3.0 3,0 Special Purpose 2 3.0 4.0 4.0 Special Purpose 3 --- 6.0 6,0 Kitchen, domestic' (with or without food waste disposer, dishwasher, or both) 1'/z 2.0 2.0 - Laundrya (with or without discharge from a clothes washer) 1'h 2.0 2.0 2.0 Service or Mop Basin 2 - 3.0 3.0 Service or Mop Basin 3 - 3,0 3.0 Service, flushing rim 3 - 6,0 6,o Wash, each set of faucets - - 2.0 2.0 Nonwater Urinal with Drain Cleansing Action 2 1.0 1.0 1.0 Urinal, integral trap 1 0 GPP J 2 2,0 2.0 5,0 Urinal, integral trap greater than 1.0 GPF 2 2.0 •2.0 6.0 Urinal, exposed trap2 1 2.0 2.0 5.0 Water Closet, 1.6 GPF Gravity Tank' 3 3.0 4.0 .6.0 Water Closet, 1,6 GPF Flushometer Tank' 3 3.0 4.0 6.0 Water Closet, 1.6 GPF F'lushometer Valve6 3 3.0 4.0 6.0 Water Closet, greater than 1.6 GPF Gravity Tank6 _3 4.0 6.0 8.0 Water Closet, greater than 1.6 GPF Flushometer Valve' 3 4.0 6.0 8:0 For SI units: 1 inch = 25 mm Notes: ' Indirect waste receptors shall be sized based on the total drainage capacity of the fixtures that drain thereinto, in accordance with Table 702.2. a Provide a 2 inch (50 mm) minimum drain. 3 For refrigerators, coffee urns, water stations, and similar low demands. 4 For commercial sinks, dishwashers, and similar moderate or heavy demands. 5 Buildings having a clothos-washing area with clothes washers in a battery of three or more clothes -washers shall be rated at 6 ftxture units each for purposes of sizing common horizontal and vertical drainage piping, 6 Water closets shall be computed as 6 fixture units where determining septic tank sizes based on Appendix H of this code. 7 'Trap sizes shall not be increased to the point where the fixttu'e discharge is capable of being inadequate to maintain their self -scouring properties. s Assembly [Public Use (see Table 422,1)]. 9 For a bathtub to shower retrofit, a 11/2 inch (40 mm) trap and trap arm shall be permitted with a maximum shower size of 36 inches (914 mm) in width and I 60 inches (1524 mm) in length. See Section 408.5 and Section 408.6. 2021 UNIFORM PLUMBING CODE 129 SANITARY DRAINAGE 33 TABLE 702.1(1) MAXIMUM DRAINAGE FIXTURE UNITS FOR A TRAP ANDTRAP ARM* SIZE OF TRAP AND TRAP ARM (inches) DRAINAGE FIXTURE -UNIT VALUES (DFU) 1 %n 1 unit 1'/a 3 units 2 4 units 3 6 units 4 8 units - For SI Units: 1 inch = 25 mm * Exception: On self-service laundries. 702.2 Intermittent Flow. Drainage fixture units for inter- mittent flow into the drainage system shall be computed on the rated discharge capacity in gallons.per minute (gpm) (L/s) in accordance with Table 702.2, TABLE 7022 DISCHARGE CAPACITY IN GALLONS PER MINUTE FOR . INTERMITTENT FLOW ONLY' GPM FIXTURE UNITS Up to 71/2 . Equals 1 Fixture Unit Greater than 7%2 to 15 Equals 2 Fixture Units Greater than 15 to 30 Equals 4 Fixture. tJnits Greater than 30 to 50 Equals 6 Fixture Units For SI units: 1 gallon per minute = 0.06 L/s * Discharge capacity exceeding 50 gallons per minute (3.15 L/s) shall be determined by the Authority Having Jurisdiction. 702.3 Continuous Flow. For dcontinuous flow into a drainage system, such as from a pump, sump ejector, air con- ditioning equipment, or similar device, 2 fixture units shall be equal to each gallon per minute (gpm) (L/s) of flow. 703.0 Size of Drainage Piping. 703.1 Minimum Size. The minimum sizes of vertical, hor- izontal, or both drainage piping shall be determined from the total of fixture units connected thereto, and additionally, in the case of vertical drainage pipes, in accordance with their length. 703.2 Maximum Number of Fixture Units. Table 703.2 shows the maximum number of fixture units allowed on a vertical or horizontal drainage pipe, building drain, or build- ing sewer of a given size; the maximum number of fixture units allowed on a branch interval of a given size; and the maximum length (in feet and meters) of a vertical drainage pipe of a given size. 703.3 Sizing per Appendix C. For alternate method of sizing drainage piping, see Appendix C. 704.0 Fixture Connections (Drainage). 704.1 Inlet Fittings. Drainage piping shall be provided with approved inlet fittings for fixture connections, correctly located according to the size and type of fixture proposed to be connected. 704.2 Single Vertical Drainage Pipe. Two fixtures set batik -to -bank;' or side -by -side, within the distance allowed between a trap and its vent, shall be permitted to be served by a single vei•fical. dtain'&ge pipe pt6vided that each fixture wastes separately into an approved double -fixture fitting hav- ing inlet openings at the'sariie level`. 704.3 Commercial Sinks. Pot sinks, scullery sinks, dish- washing sinks, silverware. sinks, and other. similar fixtures shall be connected directly to the drainage,systern.,A floor drain shall be provided adjacent to, the fixture and shall be connected on the sewer side of.the sink. No, outer drainage line shall be connected between the floor drain waste con- nection and the fixture drain. The fixture and floor.drain shall be trapped and vented in accordance with this code. 705.0 Joints and Connections. 705.1 ABS and ABS Co -Extruded Plastic Pipe and Joints. Joining methods for ABS plastic pipe and fittings shall be installed .in accordance with the manufacturcr's installation instructions and shall comply with Section 705.1.1 through Section 705.1.3. 705.1.1 Mechanical Joints. Mechanical'joints shall be designed to provide a permanent seal and shall be of the mechanical or push�on joint. The push=on joint shall include an elastomeric gasket that complies with AASTM D3212 and shall provide a compressive force against the spigot and socket after assembly to provide a permanent seal.. 705.1.2 Solvent Cement Joints. Solvent cement joints for ABS pipe and fittings shall be clean from dirt and moisture. Pipe shall be cut square and shall be deburred, Where surfaces to be joined are cleaned, and free of dirt, moisture, oil, and other foreign material, the solvent cement that complies with ASTM D2235 shall be applied to all joint surfaces: Joints shall be made while both the inside socket surface and outside surface ofpipe are wet with solvent cement. Hold joint in place and undisturbed for I minute after assembly. 705.1.3 Threaded Joints. Threads shall comply with ASME B 1.20.1. A minhirum of Schedule 80 shall be per- mitted to be threaded. Molded threads on adapter fittings for the transition to threaded joints shall be permitted, Thread sealant compound shall be applied to male threads, insoluble in water, and nontoxic. The joint between 'the pipe and transitionfitting shall be of the solvent cement type, Caution shall be used during assembly to prevent over tightening of the ABS components once the thread sealant compound has been applied. 705.2 Cast -Iron Pipe and Joints. Joining methods for cast-iron pipe and fittings shall be installed in accordance with the manufacturer's installation instructions and shall comply with. Section 705.2.1 or Section 705.2.2. . 705.2.1 Caulked Joints. Caulked joints `shall be fipnly packed with oakum or hemp and filled with nnolten lead to a depth.of not less than 1 inch (25.4 mm) in one continuous pour. The lead shall be caulked thor- oughly at the inside and outside edges of the joint. After 130 2021 UNIFORM PLUMPING CODE SANITARY DRAINAGE 34 TABLE 703.2 MAXIMUM UNIT LOADING_ AND MAXIMUM LENGTH OF DRAINAGE AND VENT PIPING SIZE OF PIPE (inches) 1t/a 11/z 2 3 4 5 .6 8 10 12 Maximum Units Drainage Piping` Vertical 1 227 163 484 256 600 1380 3600 5600 8400 Horizontal 1. 17 83 354 216' 428' 720' 264W 4680' 8200' 1Viaxiniuni Length Drainage Piping Vertical, {feet) 45 65 85 212 300 390 510 750 — — Horizontal (unlimited) Vem Piping Horizontal and Vertical' Maximum Units 1 83 24 84 256 600 1380 3600 Maximum. Lengths, (feet) 45 60 120 I 212 300 390 510 750 For si units: 1 inch= 25 mm, 1 foot = 304.8 mm 1►Intes: 1 Excluding trap arm. z Except for sinks, urinals, and dishwashers -- exceeding l fixhrre unit. 3 Except far six -unit traps or wate£ closets. 4 Not to exceed five water closets or five six -unit traps.. s Based on I1/4 inch per foot (20.8 mm/m)'slope. For �i of an.inch per foot (10.4 b*m) slope, multiply horizontal fixture units by a factor of 0.8. 6 The diameter of an individual vent shall be not less than 1 %4 inches (32 mm) nor lass than one-half the diameter of the drain to which it'is connected. fixture unit load values for drainage and vent piping shall be computed from Table 702.1 and Table 702.2. Not to exceed one-third of the total permitted length of a vent shall be permitted tb be installed in a horizontal position. Whore vents are increased one pipe size for their entir6 length, the.maximum length limita- tions speeifled is this liable do not apply. Ws table is in accordance with the requirements of Section 901.3. 1 7 Up to B publie lavatories are permitted to be installed on a Ph inch (40 mm) vertical branch or horizontal sanitary branch sloped at 1/4 inch per foot (20.8 mm/in). caulking, the furished joint shall not exceed 4 of an inch shall be tightened using an approved calibrated torque (3.2 mm) below the rile of the hub. No paint, varnish, or wrench specifically set by the manufacturer of the cou- 9ther coatings shall be permitted on the joining material plings. until after the joint has been tested and approved. 705.3 Copper or Copper Alloy Pipe (DWV) and 705.2.2 Mechdnioal Joints and Compression Joints. Joining methods for copper or copper alloy pipe and Joints. Mechanical joints for cast-iron pipe and fittings fittings shall be installed in accordance with the manufac- shall be of the elastomeric compression type or mechan- turer's installation instructions and shall comply with Section ical joint couplings. Compression type joints with an 705.3.1 through Section 705.3.4: elastomeric gasket for cast-iron hub and spigot pipe shall 705.3.1 grazed Joints. Brazed joints between copper comply with ASTM C564 and be tested in accordance or copper alloy pipe and fittings shall be made with braz- witll ASTM C1563. Hub and spigot shall be clean and ing alloys having a liquid temperature above 1000°F free of dirt,- mud, sand, and foreign materials. Cut pipe (538°C). The joint surfaces to be brazed shall be cleaned shall be free from sharp. edges. Fold and insert gasket into bright by either manual or inechanieal means. Piping the hub. Lubricate the joint following manufacturer's shall be cut square and reamed to full inside diameter. instructions. Insert spigot into hub until the spigot end of Brazing flux shall be applied to the joint surfaces where the pipe bottom out in the hub. Use the same procedure required by manufacturer's recommendation. Brazing for the installation of fittings. filler metal shall conform to AWS A5,8 and shall be A mechanical joint shielded coupling type for hub- applied at the point where the pipe or tubing enters the less cast-iron pipe and fittings shall have a'metallic shield socket of the fitting. that complies with ASTM A1056, ASTM C1277, ASTM 705.3.2 Mechanical Joints. Mechanical joints in cop- C 1540, or CISPI 310. The elastomeric gasket shall cam- per or copper alloy piping shall be made with a mechan- -ply with ASTM C564. Hubiess cast-iron pipe and fittings ical coupling with grooved end piping or approved joint shall be clean and free of dirt, mud, sand, and foreign designed for the specific application. materials. Cut pipe shall be free from sharp edges. Gas- ket shall be placed on the end of the pipe or fitting and 705.3.3 Soldered Joints. Soldered joints between the stainless steel shield and clamp assembly on the end copper or. copper alloy pipe and fittings shall be made in of the other pipe or fitting. Pipe or fittings shall be seated against the center stop inside the elastomeric sleeve. accordance with ASTM B828 with the following sequence of joint preparation and operation as follows: Slide the stainless steel shield and clamp assembly into measuring and cutting, reaming, cleaning, fluxing, a position centered over the gasket and tighten. Bands assembly and support, heating, applying the solder, cool- 2021 UNIFORM PLUMBING CODE 131 SANITARY DRAINAGE 35 ing, and cleaning._ Pipe shall be. cut square and reamed to. the full inside diarneter including the r' 6noyal ofburrs oil the outside of the pipe'. "Suzfaces. to be'joined shall be cleaned bright by manual or mechanical means. Flux shall be applied to pipe and fittings and shall conform to ASTM B813, and shall becotue noncorrosive and non- toxic after soldering. Insert pipe into the base of the fttting and remove excess flux. Pipe and fitting shall be sup- ported to ensure a uniform capillary space around the joint. Heat shall be'appliedusing air or fuel torch with the flame peipendicular to the pipe using acetylene or an LP gas. Preheating shall depend on the size of the joint. The flame shall be moved to the. fitting cup and alternate between the pipe and fitting. Solder conforming to.ASTM 1332 shall be applied to the joint surfaces until capillary action draws the molten solder into the cup. Joint surfaces shall not be disturbed until cool, and any remaining flux residue shall be cleaned. 705.3A Threaded Joints. Threaded joints for copper or copper alloy pipe ahali be made' with pipe threads that com- ply with ASME B 1.20.1. Thread sealant tape or compound shall be applied only to finale threads, anti, such material slfill be. approved types, insoluble in water; and nontoxic. 705.4 Galvianized Steel Pipe and Joints. Joining meth- ods for galvanized steel pipe and fittings shall be installed in accordance with the manufacturer's installation instruction s and shall comply with Section 705A.1 or Section 705.4.2. 705,4.1 Illiochanie'al Joints. Mechanical joints shall be made with an elastomeric gasket: 705.4.2 Threaded Joints. Threaded joints shall be made with pipe threads that comply With AVE B 1.20. J . Thread sealant tape or compound shall be applied only to male threads, and such material shall be of approved types, insoluble in water, and nontoxic. 705.5 Polyethylene (PE) Sewer Pipe. Polyothylene (PE)- se.wer pipe or tubing and: fitting joining methods shall be installed in accordance with the manufacturer's installation instructions and shall comply with Section,705.5.1 through Section 705.5.1.3, 705.5.1 Heat -Fusion Joints. Heat -fusion joints between PE sewer pipe or tubing and fittings shall be assembled in accordance with Section 705.5.1.1 through Section 705.5.1.3 using butt -fusion, electro-fusion, or socket -fusion heat methods. Do not disturb the joint until cooled to ambient temperature. 705.5.1.1 Butt -fusion Joints. Butt -fusion joints for PE pipe shall be installed in accordance with ASTM F2620 and shall be made by heating the pre- pared ends of two pipes, pipe and fitting, or two fit- tings by holding ends against a heated clement. The heated element shall be teinoved when the required melt or times are obtained and heated ends shall be placed together with applied force. Do riot disturb the joint until cooled to ambient temperature. 705.5.1.2 Electro-Fusion Joints. E.lectro-fusion joints shall be heated internally by a conductor at the interface of the joint, Fittings shall comply with ASTM F1055 £or the petTorxxiance requiremeiits %of polyethylene electro=fusion fittings. The specified electro-fusion cycle used to form the joint requites i onsideration of the.propertics of•the materials being joined, the design of the fitting being used; and the erivironmoiital conditions: Align and restrain fitting to pipe to .p relentuoyement and°apply.: electric cur- m rent to .lh6 : ttting. lurh off the e6teitt when the required time has: eiapsed,to beat the joint. Do. not disturb the j oint until cooled to Ambient temperature. 705.5.1.3 Socket-FVudion Joints Socket`fusion joints shall be installed in.dccb:r&uce with ASTM F2620 and -shall be made by.sriitirJfaneouslyheating the outside surface of a pipe end and. the inside. of a fitting socket. Where the required melt.is obtained, the pipe and tilting shall be joined by inserting one into the other with applied force. Do not disturb the joint until cooled to ambient temperature.: 705:6 PVC and PVC Co -Extruded Plastic Pike and Joining Methods. Joitiiiig tnath6ds'for'PVCplasfiC pipe and fittings shall be installed m accordance with the manu- facturer's installation tnsiruetions and shall c_ oxnply with Sec- tion 745.6,1 through Section 705 6.3.. 705.6.1 Mchanioal J®ints. Mechanical joints shall be designed to provide a permanent seal and shall be of the mechanical or push-oti joint'type. The push -on joint shall include an elastomeric gasket that complies with ASTM D3212 and §hallprovide a.compressive force against the siiigot and socket after assembly to provide.a permanent seal. 705.6.2. Solvent Cement Joints, Solvent cement joints for'PVC pipe and fittings 'shali be clean from dirt and moisture. Pipe shall be' cut square, and pipe shall be deburred. Where surfaces io be joined are cleaned and free of dirt, moisture, oil, and other foreignmaterial, apply pruner purple in color that complies with ASTM F656. Primer shall be applied to the surrface of the pipe and fit- ting is softened. Solvent cementthatcomply with ASTM D2564 shall be applied to all joint surfaces. Joints shall be made while both the inside socket surface and outside sur- face of pipe are wet with solvent`cement. Hold joint in place and undisturbed for l minute after.assembly. 705.6.3 Threaded Joints. Threads shall comply with ASME B 1.20.1. A minimum of Schedule 80 shall be per- mitted -to be threaded. Molded threads on adapter fittings for the transition to threaded joints shall be permitted. Thread sealant compound that is compatible with the pipe and fitting, insoluble in water and nontoxic shall be applied to male threads. The joint between the pipe and transition fitting shall be of the solvent cement type. Cau- tion shall be used during assembly to prevent over tight- ening. of the PVC components once the thread sealant has been applied: Female PVC threaded'iittiugs shall be used with plastic male threads only. 705.7 Stainless Steel Pipe and Joints. Joining meth-' ods for stainless steel pipe and fittings shall be installed in 132 2021 UNIFORM PLUMBING CODE SANITARY DRAINAGE 36 accordance with the manufacturer's` installation.instructions and shall coi pply with ,Section 705.7.1 of Section 705;7.2; 705<7.1 Mechanical Joints.; Mechanical, joints between stainless steel pipe. and fittings shall be of the compression; grooved coupling, hydraulic press -connect fittings, or flanged. 705 72' Welded Joints. Wo)ded joints: between stain- less steel plipp.-and fittrtigs shall be rr 4b -in accordance vc u 1vIE A 11,2.3 1 and'shall be welded autogehously. ,Pipe shall.lie cleaned, free ofsoale and clontaminating giai1icles,. Pipe shall be citt with a cornbia loon cutting and beveling tool that provides: a square cut, and free of burrs Mineral oil lubricant slip l'be used during the cut- ting and beveling process. 700.0Vitrified clay Pipe.a.nd.Joints. Joining methods for vitrified clay pipe and fittings shall be installedin accor- dance with the manufacturer's installation instructions and shall comply with Section 765.8.1. ' 705.13.1'Mec6 ha,'al Joints. 1Vlechanicaf joints shall be'desigried to provide a permanent seal and shall be of the mechanical or push -on joint type.. The push -on joint shall include an elastomeric gasket that complies with kgTM. 'C42.5 and shall provide a compressive force against the spigot and socket aftor assembly to provide a permanent seal. 705.9 Spdc16l Joint's. Special joints shall comply with Sec- tion 705.9.1 through. Section 705.9A. 705.9.1 Slip Joints. In fixture drains and traps, slip joints of approved materials shall be permitted to be used in accordance with their approvals. 705,9.2 Expansion Jolnta. Expansion joints shall be accessible; except where in vent piping or drainage stacks, and shall be pemitted to be used where necessary to pro- vide for expansion ;and contraction of the pipes. 705.9.3 Grotand Joint, Flared, or Ferrule Con- nections. Copper or copper alloy ground jointflared, or ferrule -type connections that allow adjustment of tubing, but provide a rigid joint where made up, shall not be con- sidered as slip joints. 705.9ATransition Joint. A solvent cement transition joint between ABS and PVC building drain and building sewer shall be made using listed transition solvent cement in accordance with ASTM D313 g. 705.10 Joints Between Various Materials. Joints between various materials shall be installed in accordance with the manufacturer's installation instructions and with Section 705,10.1 through Section 705.10..4. Mechanical couplings used to join different materials_ shall comply with ASTM C1173 for belowground use, ASTM C1460 for aboveground use, or ASTM C1461 for aboveground and below' ground use. 765.10.1 Copper or Copper Alloy Pipe to Cast - Iron Pipe. Joints fivrn copper' or copper alloy pipe or tubing to cast-iron pipe shall be inade with a listed com- pression -type joint or copper alloy ferrule. The copper or copper alloy pipe or tubing shall be soldered or brazed to the ferrule, and the ferrule shall be joined to the cast- iron hub by a compression or caulked joint. 705.10.2' Copper or Copper Alloy Pipe to Threaded Pipe Joints. Joints from copper or copper alloy pipe or tubing to. threaded pipe shall be made by the itse of a listed copper alloy adapter or dielectric fit- ting: The joint between the copper or copper alloy pipe and the fitting shall be a soldered or brazed, and the con- nection between the threaded and the fittings shall be made with a standard pipe size threaded joint. 705.10.3 Plastic Pipe ta.Other Materials. Where connecting plastic pipe to other types of plastic or other types of piping material; approved listed adapter or tran- sition fittings- and listed for the specific transition intended shall be used. 705.10.4 Stainless Steel Pipe to Other Materials. Where connecting stainless steel pipe to other types of piping, listed mechanical joints of the compression type and listed for the specific transition intended shall be used. 706.0 Ganges in Direction of Drainage Flow. 706.1 Approved Fittings. Changes in the direction of drainagepipiiig shall be made by the appropriate use of approved fittings and shall be of the angles presented by a one -sixteenth bend, one -eighth bend, or one -sixth bend, or other approved fittings of equivalent sweep. 706.2 Horizontal to Vertical. Horizontal drainage lines, connecting with a vertical stack, shall enter through 45 degree (0.79 rad) wye branches, 60 degree (1.05 rad) wye branches, combination wye and one -eighth bend branches, sanitary tee or sanitary tapped tee branches, or other approved fittings of equivalent sweep. No fitting having more than one inlet at the same level shalt be used unless such fitting is constructed so that the discharge from one inlet cannot readily enter any other inlet. Double sanitary tees shall be permitted to be used where the barrel of the fitting is not less than two pipe sizes larger than the largest inlet, (pipe sizes recognized for this purpose are 2 inches, 2E/a inches, 3 inches, 3'/z inches, 4 inches, 4'/2 inches, 5 inches, 6 inches, etc.) (50 mm, 65 mm, g0 mm, 90 mm, 100 mm, 11.5 mm, 125 mm, 150 mm, etc.). 706.3 Horizontal to Horizontal. Horizontal drainage lines connecting with other horizontal drainage lines shall enter through 45 degree. (0.79 rad) wye branches, combination wye. and one -eighth bend branches, or other approved fittings of equivalent sweep. 706.4 Vertical to Horizontal. Vertical drainage lines con- -necting with horizontal drainage lines shall enter through 45 degree (0.79 rad) wye branches, combination wye and one - eighth bend branches, or other approved fittings of equiva- lent sweep. Branches or offsets of 60 degrees (1.05 rad) shall be permitted to be used where installed in a true vertical posi- tion. 707.0 Cleanouts. 70Z 1 Plug. Each cleanout fitting for cast-iron pipe shall con- sist of a cast-iron or copper alloy body and an approved plug. 2021 UNIFORM PLUMBING CODE 133 SANITARY DRAINAGE 37 Each cleanout for galvanized wrought iron, galvanized steel, copper, or copper alloy pipe shall consist of a plug as` speci- fled in Table 707.1, or a standard weight copper alloy `cap; or an approved ABS or. PVC plastic plug, or; ari approved stain- less steel 'cleanout of plug..Plugs shall shave ralsed square heads or approved,countersunk rectangular: slots. -TABLEAM-1. CLEANOUTS SIZE OP PIPE (Inches) SIZE OF CLEANOUT '(inches} THREADS (per Inches} l ih I %2 . 1111h 2 1'1h t M 21A 2 th 8 3 2 V2 8 4 & larger 3 !/2- 8 For 5I units; t inch = 25 mm 707.2 Approved: Each cleanout fitting and each cleanout plug or cap shall be of an approved type. A list of ,approved standards for Cleanouts are referenced in Table 707.2. TABLE 707.2 CLEANOUT MATERIALS FOR DRAIN, WASTE, AND VENT MATERIAL STANDARD., ' ABS ASTM D266I, CSA B79, 1APM0 IGC 78, IAPMO IGC 224 Cast Iron ASME Al 12.36.2, ASTM A888, CISPZ 301, CSA B79, IAPMO IGC 224 Copper or Copper Alloy ASME At 12.36.2, CSA B79 Ductile Iron' CSA B79 Elastomers CSA 1379; IAPMO PS 90 Polyethylene (PE) CSA B7.9 Polypropylene (PP) CSA B79 PVC ASTM D2665, CSA 1379, IAPMO IGC 78, IAPMO IGC 224 Polyvinylidene Fluoride (PVDF') CSA B79 Stainless Steel CSA B79 70Z3 Watertight and Gastight. Cleanouts shall be designed to be watertight and gastight. 70Z4 Location. Each horizontal drainage pipe shall be pro- vided with a cleanout at its upper terminal, and each run of piping, that is more than 100 feet (30 480 mm) in total devel- oped length, shall be provided with a cleanout for each 100 feet (30 480 mm), or fraction thereof, in'length of such pip- ing. An additional cleanout shall be provided in a drainage line for each aggregate horizontal change in direction exceed- ing 135 degrees (2.36 tad). A cleanout shall be installed 'above the fixture .connection fitting, serving each urinal, regardless of the location of the urinal in the building. Exceptions (1) Cleanouuts shall be peh*tted'to be omitted oha' hotizon- tal drain.line less thd' 5 feet (1524 min) in ierigth.unless such lino is serving sinks, or urinals (2) Cleanotts shall be permitted tp be omitted on a houzon- tal drainage pipe installed on a slope bf -72degree`s (1.26 sad) : less from the veiical t ngle'(one-fifth bend). (3) Excoptingg the building drain, its_ hoiW tal blanches, kitchen sinks; and "urinals, a-: cleanout, shalt, not be J required on a pipe. or pl " that is above`the floor level of the love est Hoot of the, building; s �y. {4} An appipyed type:of two=Way cleanout fittnigt installed inside the building wall near the connection. between the building drain and the building setiyer or installed outside of a building'at the lower en4 of a building draizi and extended tb grade, shall be permitted to"be siib tituted for an upper terminal cleanout. 70.Z5 Cleaning. Each cleanout shall be installed so that it opens to allow cleaning in the direction of flow of the soil or waste or at right angles thereto 'and, except in the case of Wye bianch. and end -of line Cleanouts, shall.be installed vertically above the flovv line of;the pipe'. ' 70Z6Extension. Each cleanout extension shall be.coasid- ered as drainage piping and each 90 degree (137 rad) cleanout extension shall be extended, from-awye-type fitting or other approved fitting of equivalent sweep. 707.7 Interceptor, Each cleanout for an interceptor shall be outside of such intcrceptor. 70Z8 ,access. Each cleanout, unless installed under an approved cover plate, shall be above grade, readily accessible, and so located as to serve the purpose for which it is intended. Cloanouts located under cover plates shall be so installed as to provide the clearances and accessibility required by this section. 70Z9 Clearance. Each cleanout in piping 2 inches (50 min) or less in size shall be so installed that. there is a clearance of not less than 18 inches (457 mm) by 18 inches (457 mm) in front of the cleanout. Cleanouts in piping exceeding 2 inches (50 mm) shall have a clearance of not less than 24 inches (610 ram) by 24 inches (610 min) in front of the cicanout. Cleanouts in under -floor piping shall be extended to or above the finished floor or shall be extended outside the _building where there is less than 18 inches (457 morn.) vertical overall, allowing'far obstructions such as ducts, beams, and piping, and 30 inches of (762 min) horizontal clearance from the means of access to such cleanout. No under -floor cloanout shall be located exceeding 5 feet (1524 mm) from an access door, trap door, or crawl hole. 70Z10 Fittings. Cleanout fittings shall be'not less in size than those given in Table 707.1. 70Z11 Pressure Drainage Systems. Cleanouts shall be provided for pressure drainage systems as classificd under Section 710.,7. 70Z12 Countersunk Cleanout Plugs. Countersunk cleanout plugs shall be installed where raised heads cause a hazard. 134 2021 UNIFORM PLUMBING CODE SANITARY DRAINAGE 38 70713.1-luble.s.s Bl1nd.P➢ugs, Where a hubless blind plug 'is used fqr a required cleanout, the complete coupling and plug shall be .accessible for removal' otreplagemeut. - 707.14V6p Aims, .Cleanouts.fb.r tap.aroms.shall,be.lnstalled in accordance; with Section, 70- .6 Gra. e 1 Horixoritai ®r irlage Piping=. 708.1 _ General Horizontal drainage. piping. shall be run in ,practical altgniient and a uniform slope of not less than 'Airicld per. foof, (20.$. nan�Lm) or 2 percent toward the point of disposal provided that, where it is unpractical due, to the depth of the street.sewer, to the set tictaral features, or to the arrange- ment of a building or structure to obtain a slope Of'/4inch per foot.(20,8 rnm/n) or 2 percent, such pipe or piping 4 inches (100 Warn) or larger in diameter shall* permitted to have a slope of not less than 1/a inch per foot (10.4 mn./m) or 1 per- cent, where first approved by the Authority Having ,furisdic- tion. 709.0 Gravity Drainage Required, 709.1_ General. Where practicable, plumbing fixtures shall be drained to -the public server_ or private sewage disposal sys- tem by gravity. 710.6 Drainage of Fixtures Located Qelow the Nutt Upstrearrr larihofe or �6 dw the Maln'Sewer Level. y10,1 ba&116w Prote6t116n, Futures installed on a floor level that is lower than the next upstream manhole cover of the public, or private sewer shall be protected from backflow of sewage by installing an approved tyke of backwater valve. Fixtures on such floor level that are not -below the next upstream manhole cover shall not be required to be protected by a backwater valve. Fixtures on floor levels above such ele- vation shall not discharge through the backwater valve. Cleanouts for drains that pass through a backwater valve shall be clearly identified with a permanent label stating "backwa- ter valve downstreaft" 710.2 Sewage Discharge. Drainage piping serving fix-. lures that are located below the crown level of -the main sewer shall'discharge into an approved watertight sump or receiving tank, so located as to receive the sewage or wastes by grav- ity. From such sump or receiving tank, the sewage or Ether liquid wastes shall be lifted and discharged into the building drain or building sewer by approved ejectors, pumps, or other equally efficient approved mechanical devices. 710.3 Sewage Ejector and Pumps. A sewage ejector or sewage pump receiving the discharge of water closets or uri- nals; (1) Shall have a discharge capacity of not less than 20 gpm .(1.26 Us), , (2) fn.single dwelling units, the ejector or pump shall be capable of passing an 1'12. inch (38 mm) diameter solid ball, and the discharge piping of each ejector or pump shall have a backwater valve and gate valve, and be not less than 2 inches (50 nun) in diameter. (3) in other than single -dwelling units, the ejector or pu nap shall be capable of.passing a 2 inch (51 nun) diameter solid ball, and the discharge piping of each ejector or pump shall have a backwater valve and gate valve, and be not less than 3 inches (80 mm) in diameter. 710.4 Discharge Line. The discharge line from such ejec- tor, pump, or another mechanical device shall be of approved pressure -rated material and be provided with an accessible backwater orswing check valve and gate or ball valve.. Where the gravity drainage line to which such discharge line con- nects is horizontal, the method of connection shall be from the top through a wye branch fitting. The gate or ball valve shall be located on the discharge side of the backwater or check valve. Gate or ball valves, where installed in drainage piping, shall be fullway type with working.parts of corrosion -resistant metal. Sizes 4 inches (100 mm) or more in diameter shall have cast-iron bodies and sizes less than 4 inches (100 mm), cast-iron or copper alloy bodies. 710.5 Size of Building Brains and Sewers. Building drains or building sewers receiving a discharge from a,pump or ejector shall be adequately sized to prevont overloading. Two fixture units shall be allowed for each gallon per minute (L/s) of flow. 710.6 Backwater Valves. Backwater salves, gate valves, fullway balLvalves, unions, motors, compressors, air tanks, and other mechanical devices required by this section shall be located where they will be accessible for inspection and repair and, unless continuously exposed, shall be enclosed in a in pit fitted with an adequately sized removable cover. Backwater valves shall comply with ASME Al 12.14.1; and have bodies of cast-iron, plastic, copper alloy, or other approved materials; shall have noncorrosive bearings, seats, and self -aligning discs; and shall be constructed to ensure a positive mechanical seal. Such backwater valves shall remain open during periods of low flows to avoid screening of solids and shall not restrict capacities or cause excessive turbulence during peak loads. Unless otherwise listed, valve access cov- ers shall be bolted type with gasket, and each valve shall bear the manufacturer's name cast into the body and the cover. 710.7 Drainage and Venting Systems. The drainage and venting systems, in connection with fixtures, sumps, receiv- ing tanks, and mechanical waste -lifting devices shall be installed under the same requirements as provided for in this code for gravity systems. 710.8 rump and Receiving Tank Construction. Sumps and receiving tanks shall be watertight and shall be con- structed of concrete, metal, or other approved materials. Where constructed of poured concrete, the walls and bottom shall be .adequately reinforced and designed to recognized acceptable standards. Metal sumps or tanks shall'be of such thickness as to serve their intended purpose and shall be treated internally and externally to resist corrosion. 710.9 Alarm. Such sumps and receiving tanks shall be auto- matically discharged and, wherein a "public use" occupancy, 2021 UNIFORM PLUMBING CODE Q 135 SANITARY DRAINAGE 39 shall be provided with dual pumps or ejectors arranged to function .alternately in normal use and independently in case of overload or mechanical failure. The pumps shall have an audio and visual alarm, readily accessible, that signals pump failure or an overload condition. The lowest inlet shall have a clearance of not less than 2 inches (51 mm) from the high- water or "starting" level of the -sump. 710.10 Sump and Recelving Tank Covers and Vents. Sumps and receiving tanks shall be provided with substantial covers having a bolt -and -gasket -type manhole or equivalent opening to permit access for inspection, repairs, and clean- ing. The top shall be provided with a vent pipe that shall extend separately through the roof or, where permitted, be combined with other vent pipes. Such vent shall be large enough to maintain atmospheric pressure within the sump under normal operating conditions and, in no case, shall be less in size than that required by Table 703.2 for the number and type of fixtures discharging into the sump, nor less than 1'/a inches (40 inm) in diameter. Where the preceding require- ments are met and the vent, after leaving the sump, is com- bined with vents from fixtures discharging into the sump, the size of the combined vent need not exceed that required'for the total number of fixtures discharging into the sump. No vent from an air -operating sewage ejector shall combine with other vents. 710.11 AirTanks. Air tanks shall be so proportioned as to be of equal cubical capacity to the ejectors connected in addi- tion to that in which there shall be maintained an air pressure of not less than 2 pounds per foot (lb/ft) (3 kg/m) of height the sewage is to be raised. No water -operated ejectors shall be permitted. 710.12 Grinder Pump Ejector. Grinder pumps shall be permitted to be used. 710.12.1 Discharge Piping. The discharge piping shall be sized in accordance with the manufacturer's installation instructions and shall be not less than 1'/4 inches (32 mm) in diameter. A check valve and fullway- type shutoff valve shalt be located on the discharge line. 710.13 Macerating Toilet Systems and Pumped Waste Systems. Fixtures shall be permitted to discharge to a macerating toilet system, or pumped waste system shall be permitted as an alternate to a sewage pump system where approved by the Authority Having Jurisdiction. Such systems shall comply with A,SME A 112.3.4/CSA B45.9 and shall be installed in accordance with the manufacturer's installation instructions. 710.13.1 Sumps. The sump shall be watertight and gastight. 710.13.2 Discharge Piping. The discharge piping shall be sized in accordance with manufacturer's instruc- tions and shall be not less than 1/4 of an inch (20 mm) in diameter. The developed length of the discharge piping shall not exceed the manufacturer's instructions. A check valve and fullway-type shutoff valve shall be located within the discharge line or internally within the device. 710.13.3 Venting. The plumbing fixtures that discharge into the macerating device shall be vented in accordance with this code. The sump shall be vented in accordance with the manufacturer's instructions, and such vent shall be permitted to connect to the fixture venting.. 711.0 Scads Relief. 711.1 General. Drainage connections shall not be made into a drainage piping system 'Within 8 feet (2438 mm) of a verti- cal to horizontal change of direction of a stack containing suds -producing fixtures. Bathtubs, laundries, washing machine standpipes, kitchen sinks, and dishwashers shall be considered suds -producing fixtures. Where parallel vent stacks are required, they shall connect to the drainage stack at a point 8 feet (2438 mm) above the lowest point of the drainage stack. Exceptions: (1) Single-family residences. (2) Stacks receiving the discharge from less than three sto- ries of plumbing fixtures. 712.0 Testing. 712.1 Media. The piping of the plumbing, drainage, and venting systems shall be tested with water or air except that plastic pipe shall not be tested with air. The Authority Hav- ing Jurisdiction shall be permitted to require the removal of cleanouts, etc., to ascertain whether the pressure has reached all pants of the system. After the plumbing fixtures have boon set and their traps filled with water, they shall be submitted to a final test. 712.2 Water Test. The water test shall be applied to the drainage and vent systems either in its entirety or in sections. Where the test is applied to the entire system, openings in the piping shall be tightly closed, except the highest opening, and the system filled with water to the point of overflow. Where the system is tested in sections, each opening shall be tightly plugged, except the highest opening of the section under test, and each section shall be filled with water, but no section shall be tested with less than a 10 foot head of water (30 kPa). In testing successive sections, not less than the upper 10 feet (3048 mm) of the next preceding section shall be tested, so that no joint or pipe in the building (except the uppermost 10 feet (3048 mm) of the system) shall have been submitted to a test of less than a 10 foot head of water (3010a), The water shall be kept in the system, or in the portion under test, for not less than 15 minutes before inspection starts. The system shall then be tight at all points. 712.3 Air Test. The air test shall be made by attaching an air compressor testing apparatus to a suitable opening and, after closing all other inlets and outlets to the system, forcing air into the system until there is a uniform gauge pressure of 5 pounds -force per square inch (psi) (34 IcPa) or sufficient to balance a column of mercury 10 inches (34 kPa) in height. The pressure shall be held without the introduction of addi- tional air for a period of not less than 15 minutes. 136 2021 UNIFORM PLUMBING CODE SANITARY DRAINAGE 40 Part 11— Building Sewers. 713.0 Sewe.r Requited. 713.1 Where Required.Abuildinginwhich plumbing fix - tares are installed and premises having drainage piping thereon shall have a connection to a public- or private sewer, except as provided ih Section 713.2, and'Seetion 713.4. 713:2 Private Sewage Disposal System. Whore no pub - lie sewer intended to serve a lot or premises is available in a thoroughfare or right of way abutting such lot or premises, drainage piping from a building or works shall be connected to an approved private sewage disposal system. 713.3 Public Sewer. Within the limits prescribed by Sec- tion 713.4 hereof, the rearrangement or subdivision into smaller parcels of a lot that abuts and is served by a public sewer shall not be deemed cause to permit the construction of a private sewage disposal system, and plumbing or drainage systems on a smaller parcel or parcels shall connect to the public sewer. 713.4 Public Sewer Availability. The public sewer shall be permitted to be considered as not being available where such public sewer or a building or an exterior drainage facil- ity connected thereto is located more than 200 feet (60 960, mm) from a proposed building or exterior drainage facility on a lot or premises that abut and is served by such public sewer. 713.5 Permit. No permit shall be issued for the installation, alteration, or repair of a private sewage disposal system, or part thereof, on a lot for which a connection with a public sewer is available. 713.6 Lot. On every lot or premises hereafter connected to a public sewer, plumbing, and drainage systems or parts thereof on -such lot or premises shall be connected with such public sewer. 713.7 Installation. In cities, counties, or both where the installation of building sewers is under the jurisdiction of a department other than the Authority Having Jurisdiction, the provisions of this code relating to building sewers need not apply. Exception: Single-family dwellings and buildings or struc- tures accessory thereto, existing and connected to an approved private sewage disposal system prior to the time of connecting the premises to the public sewer shall be permit- ted, where no hazard, nuisance, or insanitary condition is evi- denced, and written permission has been obtained from the Authority Having Jurisdiction, remain connected to such properly maintained private sewage disposal system where there is insufficient grade or fall to permit drainage to the sewer by gravity. 714.0 Damage to Public Sewer or Private Sewage Disposal System. 714.1 Unlawful Practices. It shall be unlawful for a per- son to deposit, by means whatsoever, into a plumbing fixture, floor drain, interceptor, sump, receptor, or device which is connected to a drainage system, public sewer, private sewer, septic tank, or cesspool, ashes; cinders; solids; rags; flamma- ble, poisonous, or explosive liquids or gases; oils; grease; and whatsoever that is capable of causing damage to the public sewer, private sewer, or private sewage disposal system. 714.2 Prohibited Water Discharge. No rain, surface, or subsurface water shall be connected to or discharged into a drainage system unless first approved by the Authority Hav- ing Jurisdiction. 714.3 Prohibited Sewer Connection. No cesspool, sep-+ tic tank, seepage pit, or drain field shall be, connected to a public sewer or to a building sewer leading to such public sewer. 714.4 Commercial Food Waste Dlsposer. The Author- ity Having Jurisdiction shall review before approval, the installation of a commercial food waste disposer connecting to a private sewage disposal system. 714.5 Tanks. An approved type, watertight sewage or waste- water holding tank, the contents of which, due to their char- acter, shall be periodically removed and disposed of at some approved off -site location, shall be installed where required by the Authority Having Jurisdiction or the Health Officer to prevent anticipated surface or subsurface contamination or pollution, damage to the public sewer, or other hazardous or nuisance conditions. 716.0 Building Sewer Materials. 715.1 Materials. The building sewer, beginning 2 feet (610 mm) from a building or structure, shall be of such matcrials as prescribed in this code. 715.2 .coining Methods and Materials. Joining methods and materials shall be as prescribed in this code. 715.3 Existing Sewers. Replacement of existing building sewer and building storm sewers using trenchless methodol- ogy and materials shall be installed in accordance with ASTM F1216, ASTM F2561, ASTM F2599, or ASTM F3240. , 716.0 Markings. 716.1 General. Pipe, brick, block, prefabricated septic tanks, prefabricated septic tank or seepage pit covers, or other parts or appurtenances incidental to the installation of building sew ers or private sewage disposal systems shall be in accordance with the approval requirements of Chapter 3 of this code. 717.0 Size of Building Sewers. 717.1 General. The minimum size of a building sewer shall be determined on the basis of the total number of fixture units drained by such sewer, in accordance with Table 717.1. No building sewer shall be smaller than the building drain. For alternate methods of sizing building sewers, see Appendix C. 2021 UNIFORM PLUMBING COOK 01 137 SANITARY DRAINAGE 41 TABLE 717.t MAXIMUM/MINIMUM FIXTURE UNIT LOADING ON BUILDING SEWER PIPING* SIZE OF PIPE (Inches) SLOPE (inches per foot) 1/16 i/e /a 6 and smaller (As specified in Table 703.21 No minimum loading) 8 1 1950/1500 2800/625 3900/275 10 3400/1600 4900/675 6800/300 t2 s600/1700 s000/725 11200/325 For Sl units: 1 inch = 25 mm, I inch per foot = 83.3 rm-ri ni * See also Appendix H, Private Sewage Disposal Systems. For alternate methods of sizing drainage piping, see Appendix C. 718.0 Grade, Support, and Protection of Building Sewers. 718.1 Slope. Building sewers shall be run in practical align- ment and at a uniform slope of not less than 1/a inch per foot (20.8 mmfm) toward the point'of disposal. Exception: Where approved by the Authority Having Juris- diction and where it is impractical, due to the depth of the street sewer or to the structural features or the arrangement of a building or structure, to -obtain a slope of/a inch per foot (20.8 mm/m), such pipe or piping 4 inches (100 mm) through 6 inches (150 mm) shall be permitted to have a slope of not less than 'Is inch per foot (10.4 mm/w) and such piping 8 inches (200 mm) and larger shall be permitted to have a slope of not less than''/16 inch per foot (5.2 mm/m). 718.2 Support. Building sewer piping shall be laid otr a firm bed throughout its entire length, and such piping laid in madc or filled-iu ground shall be Iaid on a bed of approved materi- als and shall be properly supported as required by the Author- ity Having Jurisdiction. 718.3 Protection from Damage. No building sewer or other drainage piping or part thereof, which is constructed of materials other than those approved for use under or within a building, shall be installed under or within 2 feet (610 mm) of a building or structure, or part thereof, nor less than 1 foot (305 mm) below the surface of the ground. The provisions of this subsection include structures such as porches and steps, whether covered or uncovered; breezeways; roofed porte cochere; roofed patios; carports; covered walks; covered driveways; and similar structures or appurtenances. 719.0 Cleanouts. 719.1 Locations. Cleanouts shall be placed inside the build- ing near the connection between the building drain and the building sewer or installed outside the building at the lower end of the building drain and extended to grade. Additional building sewer cleanouts shall be installed at intervals not to exceed 100 feet (30 480 mm) in straight nuns and for each aggregate horizontal change in direction exceed- ing 135 degrees (2.36 rad). 719.2 No Additional Cle6hoidts. Where abuilding sewer or a branch thereof does not exceed 10 feet (3048 mm) in length and is a straight-line projection fr:Dm..,a bwding. ftain that is provided with a cleanout, no cle�nout will be, required at its point of ionnection to the bttrldizig drain. 719.$' Building Sewer C1ean'ogts. Required building sewer cleanouts shall be extended to grade and shall be.in accordance_ with the appropriate sections. of cleanouts, Sec f, tion 707.6, for sizing, co is ctitin, and matei als. Where building sewers are loeated under, buildings, -the ,eleaiad'at. requirements of Section. 707.0 shall apply. 719.4 Cleaning. Each cleanoui shall lie installed so that it opens to allow cleaning in.the direction of flow of the soil or waste or at right angles thereto and, except in the case ofwye branch and end -of line cleanouts, shall be installed vertically above the flow line of the pipe. 714.5 Access. Cleanouts installed tinder concrete or asphalt paving shall be made accessible by yard boxes or by extend- ing flush with paving with approved materials and shall be adequately protected. 719.6 Manholes. Approved manholes shall be permitted to 6a installed in lieu of cleanoiits, wheie'frrst approved by the Authority Having Jurisdiction.. The maximum clistanoe between manholes shall not exceed 300 feet (911 440 mm): The inlet and outlet connections shall be made by the use of a flexible compression joint not less than 12 inches (305 mm) and not exceeding 3 feet (914 mm) from the manhole. No flex- ible compression joints shall be embedded in the manhole base. 720.0 Sewer and Water Pipes. 720.1 General. Building sewers or drainage piping of clay or materials that are not approved for use within a building shall not be nin or laid in the same trench as the water pipes unless the following requirements are met; (1) The bottom of the.water pipe, at points, shall be notless than 12 inches (305 mm) above the top of the sewer or drain line. (2) The water pipe shall be placed on a solid shelf excavated at one side of the common trench with a clear horizontal distance of not less than 12 inches (305 mm) from the sewer or drain line. (3) Water pipes crossing sewer or drainage piping con- stiucted .of clay or materials that are not approved for use within a -building shall be.laid not less than ,12 inches (305 mm) above the sewer or drain pipe. For the purpose of this section, "within a building" shall mean within the fixed limits of the building foundation. 721.0 Location. 721.1 Building Sewer. Except as provided in Section 721.2, no building sewer shall be located in a lot other than the louthat is the site of the building or structure served bysiich se' WetnC shall a building wwerbe located at a point having less than the minirrnim distances referenced in Table 721.1, 138 2621 UNIFORM PLUMaiNG CODE SANITARY DRAINAGE W TABLE 721.1 MINIMUM HORIZONTAL -DISTANCE REQUIRED FROM BUILDING`S'EWER (feet) Buildings or structurest 2 Property line adjoining private property Clean Water supply wells 503 ,Streams 50 On -site domestic water service line 0 Public water main ` fps, 6 For SI units: I foot: 304.9 mm Notes: r Including porches and steps, whether covered or -uncovered; breezeways; roofed poste-cochere; roofed patios; carports; covered walks; covered driveways; and similar structures or appurtenances. Z See also Section 312.3, 3 Drainage piping shall clear domestic water supply wells by not less than 50 feet (15 240 mm). This distance shall be permitted to be reduced to not less than 25 feet (7620 mm) where the drainage piping is constructed of materials approved for use within a building, 4 See Section 720.0. S For parallel construction. 6 For crossings, approval by the Health Department or the Authority Hav- ing Jurisdiction shall be required. 721.2-Abutting Lot. Nothing contained in this code shall be construed to prohibit the use of all or part of an abutting lot, to: (1) Provide access to connect a building sewer to an avail- able public sewer where proper cause and legal ease - meat, not in violation of other requirements, has been first established to the satisfaction of the Authority Hav- ing Jurisdiction. (2) Provide additional space for a building sewer where the propef cause, transfer of ownership, or change ofbound- ary, not in violation of other requirements, has been first established to the satisfaction of the Authority Having Jurisdiction. The instrument recording such action shall constitute an.agreement with the Authority Having Juris- diction and shall clearly state and show that the areas so joined or used shall be maintained as a unit during the time they are so used. Such an agreement shall be recorded in the office of the County Recorder as part of the conditions of ownership of said properties, and shall be binding on heirs, successors, and assigns to such prop- erties. A copy of the instrument recording such proceed- ings shall be filed with the Authority Having Jurisdiction, 722.0 Abandoned Sewers and Sewage Disposal Facilities. 722.1 wilding (Douse) Sewer. An abandoned building (house) sewer, or part thereof, shall be plugged or capped in an approved manner within 5 feet (1524 nim) of the property line. ' 722.2 Cesspools, SepticTanks, and Seepage Fits. A cesspool, septic tank, and seepage pit that has been abandoned or has been discontinued otherwise from further use, or to which no waste or soil pipe from a plumbing fixture is con- nested, shall hdve the sewage removed therefrom and be com- pletely filled with earth, sand, gravel, concrete, or other approved material. 722.3 Filling. The top cover or arch over the cesspool, sep- tic tank, or seepage pit shall be removed before filling, and the filling shall not extend above the top of the vertical portions of the sidewalls or above the level of the outlet pipe until inspection has been called and the cesspool, septic tank, or seepage pit has been inspected. After such inspection, the cesspool, septic tank, or seepage pit shall be filled to the level of the top of the ground. s 722.4 Ownership. No person owning or controlling a cesspool, septic tank, or seepage pit on the premises of such person or in that portion of a public street, alley, or other pub- lic property abutting such premises, shall fail, refuse, or neg- lect to comply with the provisions of this section or upon, receipt of notice so to comply from the Authority Having Jurisdiction. 722.5 Disposal Facilities. Where disposal facilities are abandoned consequent to connecting premises with the pub- lic sewer, the perniittee making the connection shall fill aban- doned facilities in accordance with the Authority Having Jurisdiction within 30 days from the time of connecting to the public sewer. 723.0 Building SewerTest. 723.1 General. Building sewers shall be tested by plugging the end of the building sewer at its points of connection to the public sewer or private sewage disposal system and com- pletely filling the building sewer with water from the lowest to the highest point thereof, or by approved equivalent low- pressure air test. Plastic DWV piping systems shall not be tested by the air test method. The building sewer shall be watertight. 2021. UNIFORM PLUMBING CODE 139 43 ATTACHMENT 5 THE LOCATION FROM THE PRIVATE SEWER FROM 425 E. DAVENPORT ST. TO CITY FAIN 0S UNKNOWN. IT MAY RE A STRAIGHT LINE, BUT IT MAY NOT BEn CITY SEWER MAIN 425 E. DAVENPORT ST. PRIVATE BUILDING SEWER ENTERS CITY MAIN 45 319 N Van Buren St. elm Summary of Resistance to W Response to Dave Moore Appeal to Board of Appeal Comes now, the undersigned attorney, by and for Rob Maher and Jamie Maher, and hereby Submits the fallowing in defense of the appeal filed by Dave Moore. 1. The Board of Appeal is to: "deckle appeals of orders, decisions or determinations made by City staff relative to the application and interpretation of the Iowa City Building, Electrical, Mechanical, Plumbing, Dangerous Buildings, Fire and Housing Codea. See Bylaws Iowa City Board of Appeals, Article V, Section 1. 2. Dave Moore's appeal claims the new residence violates the Uniform Plumbing Code (the "Plumbing Code") 3. There is no indication in the appeal what "Decision" or "Determination" made by city staff relative to the Plumbing Code that is at issue in this case 4. The Plumbing Code applies to new construction only. Spec if] catty, it only applies to the new home to be constructed on 219 N. Van Buren. 5. The new home to be built on 319 N. Van Buren complies with the Plumbing Code. 6. Any claim the Plumbing Code applies to any pipe currently in the ground, or pipe that was installed 100 years ago is misplaced. 7. The Plumbing Code does not apply to any pipe in the ground that may service Mr. Moore's home. S. There are provisions in the Plumbing Cade that allows for structures to be Will over underground pipes. 9. ,any dispute between Mr. Moore and the owners of the 319 N. Van Buren is a private matter and not within the jurisdiction of the Board of Appeals. 10. There is no evidence as to the actual location and depth of Mr. Moore's sewer line. 11. Mr. Moore does not have any easement over 319 N. Van Buren. 12. Rob Maher and Jamie Maher reserve the right to assert additional defenses at the time of the hearing. Wherefore, Rob Maher and Jamie Maher respectfully respect the Board of Appeals deny Dave Moore's appeal, and for such other relief as the Board deems just and equitable. SIMMONSYFX E 1v40Y-ER BERGMAN PLC M. Matthew J. Adam, AT000036 1150 5"' Street, Suite 170 Coralville, IA 52241 Telephone: (319) 354-10I9 Fax: (319) 354-1760 Email: com.