HomeMy WebLinkAbout2025-2029 Capital Improvement Plan F Y 2 0 2 6 CAPITAL PROJECTS FUND Fund Summary Summary by Division Summary by Funding Source Annual Recurring Projects Project Summary by Name Unfunded Projects CAPITAL PROJECTS FUND The Capital Projects Fund accounts for the collection and disbursement of funds related to capital improvements or significant capital equipment. The City annually updates and issues a five-year capital improvement program (CIP). This program is the planning guide for the City’s issuance of bonded debt and for the construction and replacement of the City’s buildings and infrastructure. The first two years of the five-year capital improvement program (CIP) are certified as part of the operating budget in the Capital Projects Fund. The current five-year CIP is for years 2025-2029. Additional information for the City’s five-year CIP program including maps and photos is available on the City’s web page: https://www.icgov.org/budget under the Capital Improvement Program heading. Capital improvement projects involve the construction, purchase, or renovation of city facilities or property. Most of the projects are specific, non-recurring major improvements to the City's physical plant, are permanent in nature, and are greater than $25,000 and have a useful life of three years or more. The City also budgets annually recurring project funds for non-specified improvements of a specific nature; these funds are to be spent on improvements that meet the same definition above. Funding sources for capital improvement projects may be from operating funds, bond proceeds, grants, donations, and a variety of other funding sources. The three largest sources of funds are operating transfers in, bonded debt, and state and federal grants. For the CIP for years 2025-2029, the total funding sources are $257,441,795, and the total expenditures are $236,678,795. The difference between the total expenditures and the total funding sources over the five-year period is a result of prior plan funding sources that are being utilized to cover current plan expenditures such as engineering and design. The 2026 CIP expenditures of $65,940,345 will be certified as part of the fiscal year 2026 operating budget. The 2026 CIP funding sources of $61,090,345 will also be certified as part of the fiscal year 2026 operating budget. Budgeted fiscal year 2026 Capital Projects Fund revenues and transfers in also include a transfer in from the TIF funds to reimburse for prior year expenditures of $700 and other local government funding of $96,800 to be used on a future project. Total Capital Projects Fund fiscal year 2026 budgeted revenues and transfer in are $61,187,845. The changes to the 2025 CIP are amended into the fiscal year 2025 operating budget. The fiscal year 2025 Capital Projects Fund expenditure budget also includes totals from the carry forward of prior year projects that must be re-appropriated with the State. The amounts being carried forward from prior years are not included in the five-year CIP totals. The revised Capital Projects Fund expenditures for fiscal year 2025 are $151,501,795; the revised budget includes the 2025 CIP expenditures of $49,272,300 and prior year project carry forwards of $102,229,495. The revised fiscal year 2025 Capital Projects Fund revenues and transfers in budget also includes totals from the carry forward of prior year projects. The amounts being carried forward from prior years are not included in the five-year CIP totals. The revised Capital Projects Fund revenues and transfers in for fiscal year 2025 are $99,449,520; the revised budget includes the 2025 CIP funding sources of $61,190,345 and a transfer in from the TIF funds to reimburse for prior year expenditures of $200, and prior year project carry forwards of $38,258,975. Fund balance in the Capital Projects Fund primarily represents design fees for streets projects that bonds haven’t been issued for from the current year and prior years. This balance fluctuates based on the timing of the issuance of bonds and the timing of the project expenditures. The estimated ending fund balance for fiscal year 2026 is - $3,173,454. 2023 2024 2025 2025 2026 2027 Actual Actual Budget Revised Budget Projected Fund Balance, July 1 46,227,340$ 50,866,819$ 9,401,437$ 53,724,321$ 1,579,046$ (3,173,454)$ Revenues: Use Of Money And Property Interest Revenues 1,134,737 2,376,549 - - - - Intergovernmental Federal Intergovernmental Revenue 3,938,874 1,487,116 28,650,000 8,844,505 19,583,942 8,600,000 Other State Grants 506,635 204,617 - 2,211,170 - 7,500,000 State 28E Agreements 92,907 85,177 185,200 638,600 113,700 150,000 Local 28E Agreements 30,000 30,000 - - 30,000 190,000 Charges of Fees & Services Development Fees - 219,184 - - - - Miscellaneous Contributions & Donations 219,826 122,335 - 270,000 1,135,000 - Printed Materials - - - -- - Other Miscellaneous Revenue 879,316 291,829 - 2,450,160 - - Other Financial Sources Sale Of Assets 1,409,975 - - - - - Debt Sales 9,941,862 11,616,402 16,350,000 49,501,575 13,830,000 16,858,000 Internal Service (Non-Budgetary): ITS Fund 705 6,883 - - - - Sub-Total Revenues 18,154,837 16,440,092 45,185,200 63,916,010 34,692,642 33,298,000 Transfers In: Transfers-In from Governmental Funds 5,576,342 5,769,702 14,288,000 21,523,320 6,296,600 4,707,800 Transfers-In from Enterprise Funds 13,895,163 15,022,907 8,920,500 13,542,190 12,398,603 7,717,750 Miscellaneous Transfers-In 84,795 108,828 75,000 75,000 - - Internal Service (Non-Budgetary): Equipment Fund 1,000,000 - 7,400,000 - 7,700,000 - Central Services Fund - - - 200,000 - - ITS Fund 100,000 100,000 100,000 193,000 100,000 100,000 Sub-Total Transfers In 20,656,300 21,001,437 30,783,500 35,533,510 26,495,203 12,525,550 Total Revenues & Transfers In 38,811,137$ 37,441,529$ 75,968,700$ 99,449,520$ 61,187,845$ 45,823,550$ Expenditures: Governmental: General Government 264,101 400,031 50,000 236,800 450,000 325,000 Culture & Recreation 3,747,365 5,028,745 12,075,000 29,414,181 11,990,000 760,000 Community and Economic Dvlpmnt 34,685 737 - 360,540 - - Public Safety 684,999 82,198 625,000 6,513,370 1,175,000 500,000 Public Works 18,218,651 15,021,835 28,297,794 37,480,878 23,962,800 32,857,800 Enterprise: Parking Operations 1,872,052 826,923 1,450,000 3,799,388 1,100,000 1,300,000 Public Transportation 1,895 21,036 20,705,500 9,332,805 20,890,000 25,000 Wastewater Treatment 3,299,955 6,744,756 560,000 42,217,284 850,000 1,566,000 Water Operations 702,043 799,915 970,000 4,865,652 3,350,000 2,850,000 Refuse Operations - - - 300,000 - 897,500 Landfill 2,371,266 4,344,237 4,000,000 11,364,633 50,000 689,250 Storm Water 1,892,369 421,535 785,000 3,060,690 1,090,000 240,000 Airport 1,047,276 874,866 6,500,000 2,358,199 932,545 1,500,000 Internal Service (Non-Budgetary): ITS Fund - 17,213 100,000 197,375 100,000 100,000 Sub-Total Expenditures 34,136,657 34,584,027 76,118,294 151,501,795 65,940,345 43,610,550 Transfers Out: Capital Project Fund 35,000 - - - - - Internal Service (Non-Budgetary): ITS Fund - - - 93,000 - - Sub-Total Transfers Out 35,000 - - 93,000 - - Total Expenditures & Transfers Out 34,171,657$ 34,584,027$ 76,118,294$ 151,594,795$ 65,940,345$ 43,610,550$ Fund Balance, June 30 50,866,819$ 53,724,321$ 9,251,843$ 1,579,046$ (3,173,454)$ (960,454)$ Capital Projects Fund Fund Summary A3473 Airport Apron Expansion…..............................................................................523 A3474 Runway 7/25 Pavement Repairs…..............................................................................524 A3475 Runway 12/30 Pavement Repairs…..............................................................................525 A3478 Terminal Building Remodel/Reconstruction…..............................................................................526 A3481 Airport Solar…..............................................................................527 A3482 Taxiway Maintenance - Seal/Crack Repairs…..............................................................................528 A3483 HVAC Update…..............................................................................529 A3484 Fuel Storage Tank Fill Cabinet Replacement…..............................................................................530 A3485 Wildlife Assessment…..............................................................................531 A3486 Tractor Broom…..............................................................................532 B4343 Carpet and Furnishings Replacement…..............................................................................533 I4721 Fiber Infill & Cameras…..............................................................................534 K1003 Senior Center Interior Improvements - Phase I…..............................................................................535 K1004 Senior Center Interior Improvements - Phase II…..............................................................................536 L3333 Compost Pad Improvements & Expansion…..............................................................................537 L3335 Landfill Dual Extraction System Expansion…..............................................................................538 L3348 Site Flow Improvements…..............................................................................539 L3349 Landfill Future Cell - Northeast Expansion…..............................................................................540 L3350 Cell FY23 Horizontal Gas Collectors…..............................................................................541 L3351 Refuse Truck…..............................................................................542 L3352 Trash Truck Upgrade…..............................................................................543 L3353 Recycling Transfer Station…..............................................................................544 M3631 Annual Stormwater Improvements…..............................................................................545 M3634 Rundell Street Pump Station Vault Modifications…..............................................................................546 M3635 River Street Storm Sewer Improvements…..............................................................................547 M3637 Peterson Street Storm Sewer Improvments…..............................................................................548 P3953 Equipment Maintenance Facility replacement…..............................................................................549 P3988 Entrance Way Improvements…..............................................................................550 P3991 Carson Farms Stormwater Retention Basin…..............................................................................551 R4129 City Hall - Other Projects…..............................................................................552 Capital Project Funds Project Listing R4130 Parks Annual Improvements/Maintenance/ADA…..............................................................................553 R4206 Intra-city Bike Trails/Bridges…..............................................................................554 R4227 Hwy 6 Sidepath - Broadway to Fairmeadows…..............................................................................555 R4229 City Park Pool Replacement…..............................................................................556 R4330 Annual Recreation Center Improvements…..............................................................................557 R4346 Palisades Park Development…..............................................................................558 R4358 City Park Shelters & Restroom Replacement…..............................................................................559 R4362 Napoleon Park Softball Fields 5-8 Renovation…..............................................................................560 R4372 Terrell Mill Skate Park Redevelopment…..............................................................................561 R4380 Annual Contracted Tree Planting…..............................................................................562 R4381 Event Facility Improvements…..............................................................................563 R4384 Benton Hills Playground Replacement…..............................................................................564 R4388 ADA Elevator Improvements…..............................................................................565 R4389 N. Market Square Playground Replacement…..............................................................................566 R4390 Reno Street Park Renovations…..............................................................................567 R4392 Westside Park Land Acquisition…..............................................................................568 R4400 Mercer Shelter Replacement…..............................................................................569 R4401 Parks Storage Building…..............................................................................570 R4406 RALRC Structural Cables…..............................................................................571 R4407 Mercer & RALRC HVAC Replacement…..............................................................................572 R4408 Columbarium Construction/Expansion…..............................................................................573 R4412 RALRC Roof…..............................................................................574 R4413 UV Disinfectant Systems for Pools…..............................................................................575 R4414 Mercer Scanlon Tuckpointing…..............................................................................576 R4415 Mercer Scanlon Roof…..............................................................................577 R4416 Office addition Police Investigations…..............................................................................578 R4417 City Hall Fire Alarm and Strobe Upgrade…..............................................................................579 R4418 Harlocke Hill Park Playground Replacement…..............................................................................580 R4419 Park Paving Improvements…..............................................................................581 R4420 Ped Mall Fountain Replacement…..............................................................................582 R4421 Hwy 1/6/Riverside Trail…..............................................................................583 S3814 Annual Traffic Signal Projects…..............................................................................584 S3816 Traffic Calming…..............................................................................585 S3822 Curb Ramps-ADA…..............................................................................586 S3824 Annual Pavement Rehabilitation…..............................................................................587 S3826 Underground Electrical Facilities…..............................................................................588 S3827 Bicycle Master Plan Implementation…..............................................................................589 S3910 Annual Bridge Maintenance & Repair…..............................................................................590 S3946 Court Street Reconstruction…..............................................................................591 S3952 Dodge Street Reconstruct - Governor to Burlington…..............................................................................592 S3953 Market St & Jefferson St Two-Way Conversion…..............................................................................593 S3955 N. Gilbert Street Reconstruction…..............................................................................594 S3959 Taft Avenue Reconstruct - Am Legion to Lwr West Br…..............................................................................595 S3960 Oakdale Blvd Extension - Alignment Study…..............................................................................596 S3963 Burlington Street Bridge Replacement…..............................................................................597 S3981 Camp Cardinal / Kennedy Parkway - Ped Accom…..............................................................................598 S3982 North Dodge St / ACT Circle - Signalization…..............................................................................599 S3983 Iowa Avenue Improvements…..............................................................................600 S3987 Pedestrian Refuge Island Project…..............................................................................601 S3988 Friendship St, Evans St, Manitou Tr Swk Infill…..............................................................................602 T3004 Parking Facility Restoration Repair…..............................................................................603 T3026 Tower Place Drainage Modifications…..............................................................................604 T3055 Transit Maintenance Facility Relocation…..............................................................................605 T3059 Transit Interchange and Bus Stop Improvements…..............................................................................606 T3070 Replace Door-Door Closures in Parking Facilities…..............................................................................607 T3071 Way-finding Sign Refresh in Parking Facilities…..............................................................................608 T3072 On-Street Meter Replacement…..............................................................................609 T3073 Tower Place HVAC Replacement…..............................................................................610 T3074 Capitol Street Ramp N Stairwell Lobby Remodel…..............................................................................611 T3075 Transit Automatic Passenger Counters…..............................................................................612 V3101 Annual Sewer Main Replacement…..............................................................................613 V3162 Benton Street Trunk Sewer Improvements…..............................................................................614 V3169 Napoleon Lift Station Improvements…..............................................................................615 V3174 Aeration Equipment Improvements…..............................................................................616 V3175 Wastewater Treatment Facility Imp 2022…..............................................................................617 V3177 HVAC Replacement…..............................................................................618 V3179 Rotating Drum Thickener Replacement 1 and 2…..............................................................................619 V3182 Equalization Basin Resurfacing …..............................................................................620 V3183 Effluent Water Pump Station Improvements…..............................................................................621 V3184 Wastewater Digester Gas Improvements…..............................................................................622 V3185 WW Treatment Plant Secondary Clarifier Repairs…..............................................................................623 W3300 Bradford Drive Water Main Replacement…..............................................................................624 W3314 High Service Pump VFD Replacement…..............................................................................625 W3322 Collector Well #1 Reconstruction…..............................................................................626 W3325 Roof Replacements…..............................................................................627 W3326 Treatment Process Update…..............................................................................628 W3327 Melrose Water Main Camp Cardinal to 218…..............................................................................629 W3328 Powerhouse Dam Rehabilitation…..............................................................................630 W3329 GSR Upgrade and Repairs…..............................................................................631 W3330 Water Plant Flowmeter Replacement…..............................................................................632 W3332 American Legion PRV Integration& Peninsula Antenna…..............................................................................633 W3333 Relocate Bulk Water Station…..............................................................................634 W3334 Water Rate Study…..............................................................................635 W3335 East Elevated Storage…..............................................................................636 W3336 Rochester GSR & Water Main Improvements…..............................................................................637 Y4446 Body Cameras & In Car Video Systems…..............................................................................638 Y4447 Animal Shelter Standby Generator…..............................................................................639 Y4449 Animal Shelter-Training Annex…..............................................................................640 Z4406 Fire Apparatus Replacement Program…..............................................................................641 Z4411 Fire Station #5 Construction and #3 Replacement…..............................................................................642 Z4413 Rehab of Sleeping Areas & Alerting System Station1…..............................................................................643 Z4414 Flooring/Furniture Station 1…..............................................................................644 Project Name Description Unfunded Amt 1 - Bridges 1 Iowa Avenue Culvert This project will include the removal and replacement of the existing reinforced concrete box culvert with a new three- sided arch culvert. The project will also include removal and replacement of slope protection adjacent to the bridge on Ralston Creek, removal and replacement of street pavement and sidewalk, and site restoration. $3,500,000 2 F Street Bridge This project involves the removal and replacement of the existing corrugated metal arch bridge with a larger bridge. $773,000 3 Fourth Avenue Bridge This project will replace the bridge over the South Branch of Ralston Creek at Fourth Avenue and will include sidewalks. Possibility of approximately $75,000 state funding. $773,000 4 Sixth Avenue Bridge This project involves the removal and replacement of the existing twin box culvert with a larger bridge. $773,000 5 Third Avenue Bridge This project will include the removal and replacement of the existing concrete bridge with a new single-span reinforced concrete box culvert. The project will also include removal and replacement of slope protection adjacent to the bridge on Ralston Creek South Branch, removal and replacement of street pavement, and storm sewer improvements. $650,000 6 First Avenue Bridge This project will be a comprehensive concrete rehabilitation of the Iowa Ave Bridge over the Iowa River. Additional repair items will include sidewalks, approach pavement, expansion joints, pedestrian handrails and painting. $2,250,000 2 - Streets 7 Brookland Park Drive Rehabilitation This project will include reconstruction of Brookland Park Drive and updates to utilities. $1,450,000 8 Dodge St - Burlington To Bowery Street reconstruction and storm sewer improvements. This is a joint project with the IDOT. $13,250,000 9 Dubuque Rd Paving - Bristol To Dodge Reconstruct and upgrade to urban cross sections.$1,339,000 10 Dubuque Street Access Road And Traffic Signal This project will construct an access drive from the north end of Laura Dr to Dubuque Street, south of the Interstate 80 / Dubuque St interchange. May also facilitate a second means of access from the Peninsula area to Dubuque St. $2,000,000 11 Emerald Street Diamond Grinding This project will diamond grind all of Emerald Street to remove the slab warping that interferes with the use of this street by fire trucks. $212,000 12 Gilbert / Us 6 Intersection Left Turn Lanes Reconstruct the intersection of Gilbert & US 6 to include dual left turn lanes on Gilbert St. $4,840,000 13 Gilbert St Iais Underpass This project relocates the sidewalks of the Gilbert St. underpass at the IAIS Railroad. The sidewalks are moved further from the street and existing erosion problems are addressed. $327,000 14 Old Hwy 218 Streetscape Streetscape improvements on Old Hwy 218 entrance - Sturgis Ferry Park to US Hwy 6. This project includes landscaping, lighting and sidewalk improvements. The project should be coordinated with Sturgis Ferry Park upgrade and /or Riverside Drive Redevelopment project. $812,000 15 Highway 965 Extension This project will be initial phase of constructing Hwy 965 extended from the south side of Hwy 218 to Melrose Avenue to arterial standards. $9,167,000 16 Mccollister - Sycamore St To Scott Blvd Extend proposed McCollister Boulevard from Sycamore Street to Scott Boulevard. $9,088,000 17 Muscatine Avenue Reconstruction, Iowa To First Ave This project will reconstruct Muscatine Avenue from Iowa Avenue to 1st Avenue. $10,510,000 City of Iowa City Capital Improvement Program Unfunded Projects Project Name Description Unfunded Amt City of Iowa City Capital Improvement Program Unfunded Projects 18 Oakdale Blvd This project would construct an extension north across I-80 to a new intersection with Iowa Hwy 1. $15,000,000 19 Oakdale Blvd-Hwy 1 To Prairie Du Chien Rd This project would construct Oakdale Blvd from Hwy 1, west to Prairie Du Chien Road. $8,240,000 20 Peninsula Secondary Access Road This project will establish a more reliable access to the Peninsula neighborhood by either elevating Foster Rd from Laura Dr to No Name road by creating a secondary access to the area. This project will not be necessary if the Taft Speedway Levee Project is constructed. $2,883,000 21 Riverside Drive Streetscape Phases II to V of the South Riverside Drive Streetscape Master Plan, which includes improvements to the west side of Riverside Drive from Benton to Hwy 6 and the east side of Riverside from Myrtle to Hwy 6. Project includes consolidation of driveways, undergrounding of utilities, and installation of sidewalks and landscaping. $2,650,000 22 Rohret Rd Improvements- Lakeshore To Limits Project will reconstruct Rohret Rd to urban standards.$1,813,000 23 South Gilbert Street Improvements Reconstruction from Benton Street to Stevens Drive. This project does not include improvements to the Gilbert St. / Highway 6 intersection. $4,326,000 24 South Arterial And Bridge, Us218 To Gilbert Street Construction of a south arterial street and bridge over the Iowa River, connecting from Old Hwy 218/US 218 interchange on the west side of the Iowa River to Gilbert Street/Sycamore 'L' intersection . $15,987,000 25 Sycamore-Hwy 6 To Highland This project involves additional lanes to improve capacity and storm sewer improvements. $750,000 26 Sycamore Street - East-West Leg From "L" To South Gilbert This project will reconstruct Sycamore Street to arterial standards using the Complete Streets Policy. This phase will be the east-west leg of Sycamore Street. $3,040,000 27 Taft Avenue – Herbert Hoover Hwy To Lower West Branch Reconstruct Taft Avenue from Herbert Hoover Hwy to Court Street. $5,000,000 28 Taft Avenue – American Legion Road To 420th Street Reconstruct Taft Avenue from American Legion Road to Herbert Hoover Hwy. $12,300,000 29 Laura Drive Reconstruction Reconstruction of entire length of Laura Drive to standard two lane width with curb, storm sewer and sidewalk. $2,000,000 30 Linn Street Reconstruction, Burlington To Iowa This project is part of the downtown streetscape master plan. This project reconstructs Linn Street from Burlington Street to Iowa Avenue. Project also improves sidewalk pavement, addresses critical update to water main, replaces and relocates storm sewer between Washington & Iowa. $1,935,000 31 Clinton Street Streetscape Improve Clinton Street Streetscape south of Burlington Street consistent with the Riverfront Crossings Plan. Minor pavement improvements and lane striping a part of project. $1,500,000 32 Kimball Road Reconstruction Reconstruct Kimball road from N. Gilbert Street to N. Governor Street. Project includes 22 foot wide PCC street and a 5 foot wide sidewalk on one side of the street, new 8" DIP water main, new storm sewer, and sanitary service improvements. $3,480,000 33 Interstate 80 Aesthetic Improvements Landscaping and aesthetic treatments in the Interstate 80 corridor. The objective of this project is to mitigate the visual impact of the addition of a third lane to I-80 and to provide cohesive and pleasing feel to the Iowa City corridor. $300,000 34 Towncrest Drive Reconstruction A private street that the property owners would dedicate the right of way to the City, and the City will reconstruct. Parking along and adjacent to the right of way will be reconfigured to better facilitate vehicle movement and pedestrian safety. $600,000 Project Name Description Unfunded Amt City of Iowa City Capital Improvement Program Unfunded Projects 35 Gilbert Street Functional Design - Hwy 6 To Kirkwood Obtain consulting services to provide a functional design of Gilbert Street between Hwy 6 & Kirkwood Avenue. The functional design should take into account all previous design work completed for the corridor. $60,000 36 Foster Road Elevation This project will reconstruct and elevate Foster Road from No Name Street to Dubuque Road. $7,800,000 37 Camp Cardinal Blvd / Kennedy Parkway - Roundabout This project will construct a roundabout at Camp Cardinal Boulevard / Kennedy Parkway. This project is intended for the unfunded list of projects. $2,058,839 38 Kirkwood Ave to Capitol Street Connection The extensions of these streets plays an important part in the overall development of the Riverfront Crossings area. It will also improve access and the traffic circulation in this area. This project does not include any costs necessary for the property acquisitions. $3,100,000 39 Gilbert Street Lighting & Landscaping Improvements This project will provide landscaping and street/pedestrian lighting on Gilbert Street from College Street to the Gilbert Street Bridge over Ralston Creek $975,000 40 Washington Street Recon - Madison to Clinton This project will reconstruct Washington Street from Madison Street to Clinton Street and will include new street pavement, sidewalk, curb ramps, utility repairs/improvements and other associated work. $2,700,000 41 Friendship Sidewalk Infill - 5th Ave to 7th Ave This project will construct a 5' wide ADA sidewalk on Friendship Street between 5th Ave and 7th Ave $210,000 42 Herbert Hoover Highway - Turn Lanes This project will construct dedicated left-turn lanes (or a center left-turn lane) on Herbert Hoover Highway at American Pharoah Drive, Hanks Drive and Thunder Gulch Road. This project is intended to be placed on the unfunded list of projects until the pending traffic study is complete. $6,400,000 43 Lakeside Drive Crosswalk Improvements This project generally includes the construction of a raised midblock crosswalk on Lakeside Drive between Aniston Street and Amber Lane at the Sycamore Greenway Trail $240,000 44 Linn Street Reconstruction This project includes the reconstruction of three blocks of brick street along Linn Street from Bloomington Street to Church Street $3,650,000 45 Park Road Reconstruction - Rocky Shore to Riverside Reconstruction of Park Road from Rocky Shore Drive to the west project limits of the Gateway Project, approximately Riverside Drive. This project will include new street pavement, sidewalk, utility improvements and other associated work. $7,500,000 46 Kitty Lee Road SW Improvements This project is necessary to provide an adequate secondary access for the future Carson Farms and other developments in the area. $7,700,000 47 Ridgewood Lane Reconstruction This project includes complete reconstruction of Ridgewood Lane and a portion of Virginia Drive, as well as water main and storm sewer replacement. $700,000 3 - Transportation Services 48 Rock Island Railroad Depot Restoration Preparation of Old Rock Island Railroad Depot for Amtrak service, including platform construction, lighting, utilities, passenger information display, ticketing kiosks, canopy, warming shelter, signage, parking, and accessibility improvements. $5,381,000 49 Replacement of LED fixtures in Parking Facilities Project to replace all LED fixtures in the Court Street Transportation Center, Capitol Street ramp, Dubuque Street ramp, Tower Place ramp, Chauncey Swan Ramp, and fixtures in other facilities as they age out of production. $200,000 Project Name Description Unfunded Amt City of Iowa City Capital Improvement Program Unfunded Projects 4 - Ped & Bike Trails 50 Iowa River Trail, Highway 6 To Sturgis Ferry Park This project will extend the Iowa River Trail from just north of Highway 6 to Sturgis Ferry Park on the west side of the Iowa River. $1,180,000 51 Iowa River Trail, Gateway Segment Construction of a trail extension adjacent to (east) of the Iowa River between Park Road and the University of Iowa pedestrian bridge. $500,000 52 Windsor Ridge Trail Extension The project includes the extension of a 10' wide trail along north Branch of Snyder Creek from Scott Boulevard to American Legion Road. $1,200,000 53 Old Highway 218 Trail/Wide Sidewalk This project will construct an 8' wide sidewalk adjacent to Old Highway 218 between Sturgis Ferry Park and McCollister Boulevard. $550,000 54 Crandic Railroad Rails-To-Trails Project The project removes the existing Crandic tracks and repurposes the existing corridor for a 10' multi-use trail approximately between Oakdale Boulevard in Coralville to Gilbert Street in Iowa City (approximately 6.1 miles). Iowa City's portion of the project is approximately 1.75 miles. $1,575,000 55 Myrtle Ave Sidewalk Infill The project will construct sidewalk along the north side of Myrtle Avenue between Greenwood Drive and Olive in order to fill in a gap in the City’s sidewalk network. $155,000 56 Willow Creek Trail - Phase Iii Construct a trail from Willow Creek Drive, under Highway One, around perimeter of airport, to connect with Iowa River Corridor (IRC) Trail. $870,000 57 Willow Creek Trail-West Connect Willow Creek Trail from its current west terminus via a tunnel under Highway 218, to connect with the trail in Hunters Run Park and further west. $2,814,000 58 Fairmeadows Trail Addition of a loop trail and connections to the bikeways in the surrounding neighborhood. $125,000 59 Southgate Ave - Iowa River Trail Connector This project will construct a cul-de-sac at the west terminus of Southgate Ave as well as 8' wide trail connection from Southgate Ave to the Iowa River Trail. $300,000 60 Napoleon-Riverfront Crossings Trail Segment Repl Replacement of the asphalt trail from Napoleon Park to Riverfront Crossings Park with a 10' wide concrete trail (1.25 miles). This will include a new spur connecting the trail to Southgate Ave $720,000 61 Whispering Meadows Trail Improvements Current trail infrastructure is reaching end of life and needs replaced in order to continue to serve park users. $250,000 62 Stone Bridge Park Development Funding to develop new neighborhood parks in emerging or underserved locations. 2026 improvements in soon to be acquired location in the Stone Bridge Subdivisions to include playground, shelter, or other park features. $275,000 5 - Wastewater 63 North Branch Dam Trunk Sewer This project extends easterly along Ralston Creek from the North Branch Dam to Scott Boulevard. $3,860,000 64 Northeast Trunk Sewer Reconstruction of an under-sized sewer through the northeast neighborhoods. $5,221,000 65 Sanitary Sewer Extension - Scott To Hickory Trail This project includes the design and construction of a sanitary sewer trunk extension between Scott Boulevard and Hickory Trail. $790,000 66 New Cold Storage Building Construct 90' by 40' covered roof area with open side similar to the Sludge Storage area. Building to be the same dimension of the existing cold storage building. $360,000 Project Name Description Unfunded Amt City of Iowa City Capital Improvement Program Unfunded Projects 67 Geo-Thermal Hvac Conversion Project would include the conversion of the HVAC system to Geo-Thermal. Installation of Geo-thermal loops, new pump systems, new chiller, and improved controllers required to operate the system. $300,000 68 Secondary Calrifier 5300-5400 Repairs This project will replace the rake mechanisms and drives for Calrifiers C5300 and 5400 that were new in 2002 and part of WWTP upgrades. $864,000 69 Heat for Cold Storage Building Project would require the addition of natural gas fired area heaters. Initially the heat load would be enough to keep the building above freezing. When the digester rehabilitation project proceeds, glycol heating from the digester boilers would be included that project. Glycol piping would be routed under the parking lot and drive to the building to new heating units. $123,000 70 Aeration Eqiuipment Improvements Phase 1 Replace the remaining mixers in the aeration trains 1 - 4 with high efficiency mixers matching those placed in Cell 9 of trains 1-4 and replace mixers in the high strength tank. This would be total of 30 mixers. $2,978,000 71 Aeration Eqiuipment Improvements Phase 2 (Lamson) Replace Lamson 300 HP Centrifugal Blower with a High- Speed Turbo Blower including any ancillary equipment, pipe modifications and PLC programing. We currently utilize service contract for yearly maintenance for two existing high- speed blowers installed. We would want to require service contract for hte new high speed blowers once the warrenty period had expired. $1,911,000 72 Hawkeye Lift Station Rehabilitation includes demolishing the existing building, converting the station to a wet-well valve vault with surface hatches for pump access, basket screening, new standby generator, replace 20 year old pump, new controls, valve vault with bypass capacity, new security fence, landscaping and access road improvements. The station would be plumbed for future expansion, but would not include additional pumps. $1,645,000 73 Peninsula Control Panel and Pump Improvement The project includes the replacement of the control panel and aquisistion of a redundent pump. $130,000 74 Effluent Water Pump Station Improvements Install a fourth Effluent Water Pump to serve the in plant distribution system and soccer park irrigation system. Work includes rebuilding of the Amiad filtration system. $76,000 75 UV Building and Storage Build a 40' x 60' structure over Ultra Violet disifection structure for protection and for storage of the UV bank modules during the off season. Project will include buillding heat and electrical supply. Funds requested below are for design with construction to follow in 2029. $1,100,000 76 Wastewater Division Master Plan Perform a master plan for the Wastewater Division looking forward for the next 20 years. The study will include the wastewater treatment plant, all sanitary lift stations, and the sanitary sewer collection system. $299,000 6 - Water 77 West Side Ground Storage Reservoir Construction of a two million gallon ground or elevated storage reservoir with associated pumping station and generator west of US-218. Current land acquired for this reservoir is southeast of the Slothower Rd at Hebl Ave intersection. $15,000,000 Project Name Description Unfunded Amt City of Iowa City Capital Improvement Program Unfunded Projects 78 Collector Well #1 Rehabilitation Clean two of the existing laterals and cap one existing lateral of Collector Well #1. Install two new 12-inch laterals to increase the production capacity of this raw water well. $3,000,000 79 Water Treatment Plant Filter #6 Buildout Add underdrains, granular media, controls, and instrumentation to filter bay #6. This bay was left unfinished to allow for future expanded production. The project will also repair or replace a number of filter control valves. The project will be informed by the Treatment Study. $1,500,000 80 Well Field Electrical Cable Replacement Replace aging medium voltage (13,200V) cabling and install communication fiber to wells at the Water Plant and Peninsula sites. $1,000,000 81 Lee/Highwood Street Water Main Replacement This is a water main replacement project with respective street and sidewalk replacement at Lee Street and Highwood Street. Approximately 550 feet of 6" cast-iron pipe (vintage 1951) will be replaced with 6" PVC pipe. Approximately 300 feet of PVC will be installed where no pipe has existed previously. $1,000,000 82 Deforest Ave Water Main Replacement Approximately 500 feet of 6-inch cast-iron pipe (vintage 1958) will be replaced with 500 feet of 8-inch PVC on the 900 block of Deforest Avenue. $700,000 83 Giblin Drive Water Main Replacement This is a water main replacement project with respective street and sidewalk replacement. Approximately 620 feet of 6- inch cast-iron pipe (vintage 1953) will be replaced with 8" PVC. $600,000 84 Sixth Avenue Water Main Replacement This is a water main replacement project with respective street and sidewalk replacement. Approximately 650 feet of 6- inch cast-iron pipe (vintage 1974) will be replaced with 8" PVC. $600,000 85 Lime Lagoon Outlet Structure Modifications Modify the lagoon outlet structure to an open channel design. This project will be informed by the Treatment Study. $500,000 86 Market Street Water Main - Madison To Clinton Extend 20-inch water main from Madison to Clinton on Market St. Tie in 12-inch on Clinton St. to 16-inch at Bloomington St. This project will be preceded by the abandonment of the 20- inch main along the old Davenport St right-of-way between dormitories. $3,000,000 87 Bloomington Gsr Decommissioning Decommission the Bloomington ground storage reservoir within the University of Iowa Campus Parking Ramp and return the space to the University of Iowa per the associated 28E agreement. The 28E agreement expires on December 31, 2038. (Resolution No. 88-176) 500,000$ 88 Soda Ash Replacement Remove the existing soda ash and ammonia chemical feed systems. Replace the existing powdered soda ash feed system with a liquid soda ash feed. The use of soda ash is to increase alkalinity of the source water for lime softening purposes. This is necessary if drawing from the river. This project will be informed by the Nutrient Study. 1,000,000$ 89 Sand Pit Pumping Station Rehabilitation Clean and inspect the laterals of the Sand Pit Pumping Station. Replace and repair the lateral isolation valves and operators. 1,000,000$ 90 East Side Water Tower Construct a two million gallon ground or elevated storage reservoir within the East Pressure Zone. 15,000,000$ 91 Sycamore Gsr Replacement Replace the two million gallon ground storage reservoir located on Sycamore Street with a ground or elevated two million gallon storage tank along McCollister Blvd. 15,000,000$ Project Name Description Unfunded Amt City of Iowa City Capital Improvement Program Unfunded Projects 92 Melrose & Westgate 16-Inch Water Main Install 16-inch water main parallel to the existing water main on Melrose Ave from Dublin Rd to Westgate St and on Westgate St from Melrose Ave to Benton St. This project would reduce velocity headloss from the Emerald ground storage reservoir to customers west of US-218, increasing service pressure. This project will be evaluated by hydraulic modeling after the West Side GSR project is completed. 6,000,000$ 93 Hvac System Replacement & Remove Process Area Heaters Replace and upgrade aging HVAC equipment and controls at the water treatment facility. Remove gas overhead heaters and associated gas lines, electrical, and exhaust piping. The heaters are not used and in time pose a safety hazard. 2,500,000$ 94 Teeters Ct Water Main Replacement Replace approximately 410 linear feet of 6-inch 1950 cast iron water main on Teeters Ct. The water main has experienced three main breaks and services Lincoln Elementary. 500,000$ 95 Hwy 6 (Industrial Park Rd To Riveria) Replace approximately 1,400 linear feet of 12-inch 1971 ductile iron water main on Highway 6. The water main has experienced two water main breaks. Due to the size of the water main, it's proximity to the Sycamore reservoir, and 16- inch water main on the north side of Highway 6, breaks tend to cause large system disruptions. 1,000,000$ 96 Southlawn Dr Water Main Replacement Replace approximately 1,100 linear feet of 6-inch 1962 cast iron water main on Southlawn Dr (800-900 blk). The water main has experienced 10 main breaks and services Lucas Elementary. 700,000$ 97 Pwf Water Material Outdoor Covered Storage Installation of paving and covered outdoor material storage structures to protect water distribution materials from the elements. 100,000$ 98 Water Plant And Gsr Gate Replacement Replace the (3) water plant site gates and the (3) GSR gates (Rochester, Emerald, and Sycamore). 100,000$ 99 Highway 1 from Miller Ave to Hudson Ave Water Main Replacement Replace approximately 400 feet of 1984 12-inch water main on Highway 1 between Miller Ave and Hudson Ave. The work would also simplify the utility network in the area. 700,000$ 100 Hwy 6 from Rocky Shore Dr to Newton Rd & Rocky Shore Dr from Hwy 6 to Dill St Water Main Replacement Replace approximately 800 feet of 1994 16-inch water main on Hwy 6 between Rocky Shore Dr and Newton Rd & replace 400 feet of 1967 12-inch on Rocky Shore Dr from Hwy 6 to Dill St. 1,000,000$ 101 Pleasant St from Cedar St to Davenport St Water Main Replacement Replace approximately 350 feet of 1948 2-inch water main on Pleasant St from Cedar St to Davenport St 400,000$ 7 - Stormwater 102 Carson Lake Regional Storm Water Construction of a regional storm water management facility on the middle branch of Willow Creek immediately west of Highway 218. This facility will serve development west of Highway 218 and south of Rohret Road. $1,160,000 103 Riverfront Crossings Storm Sewer Storm sewer improvements in the Central Crossings Sub- District. $1,375,000 104 Iowa Avenue Culvert Repairs This project will repair a box culvert that carries Ralston Creek under Iowa Avenue. $348,000 105 N. Branch Basin Excavation Aerial mapping done for the update to the flood plain maps revealed that sedimentation has consumed a portion of the capacity of the facility. This basin is located in Hickory Hill Park. $135,000 Project Name Description Unfunded Amt City of Iowa City Capital Improvement Program Unfunded Projects 106 Olympic Court Storm Water Storm sewer retrofit to relieve localized flooding from storm water runoff. $464,000 107 Sunset Street Storm Sewer The area just north and south of Kineton Green, east of Sunset, has experienced back yard flooding and drainage problems. $440,000 108 Riverside Drive & Arts Campus Storm Sewer This will be a joint project with the University of Iowa to upgrade the Riverside Drive / Arts Campus storm sewer and lift station to perform better during future floods. $1,000,000 8 - Parks & Recreation 109 Waterworks Park Boat Ramp This project is to add a boat ramp to access the Iowa River in the northeast corner of Waterworks Park. Improvements include a boat ramp, boat trailer parking, a boat dock, and an access road. $250,000 110 Riverfront Crossings Park - Phase 4 Phase 4 of the Riverfront Crossings Park master plan adds a new river access, an amphitheater, a kayak launch, and new river trails. $1,353,000 111 Riverfront Crossings Park Restroom & Bridge Construction of second restroom/shelter by Nature Play and second bridge to 2nd Street; also includes removing an abandoned trunk sewer line. $910,000 112 Iowa River Trail, Benton To Highway 6 This project will extend the Iowa River Trail from Benton St to Highway 6, on the west side of the Iowa River. Future phases of the trail could extend to Sturgis Ferry Park and on top of the west side levee to McCollister Blvd. $1,700,000 113 Lower City Park Master Plan Improvements Implement changes to make the park more resilient to flooding. Follows from the 2015 master plan. $23,268,522 114 East Side Sports Complex Improvements Build out of a new 73 acre park on the City’s east side. The park includes expansion of various field sports as well as serves as a neighborhood amenity. Follows from the 2015 master plan. $14,034,794 115 Scott Park Driveway and Parking Replace the chipseal driveway and parking area at Scott Park with a concrete surface and reconfigure the lot to more effeciently serve additional parking $275,000 116 Robert A. Lee Recreation Center Pool Filter & HVAC Post 2021 Recreation Master Plan- moved RALRC pool and HVAC project to FY27, updated costs to replace RALRC existing pool filtration system, add a UV disinfectant system, upgrade deteriorated iron piping under deck, surge tank replacment and add dehumidication HVAC system to bring facility to current building code compliancy for air quality. $4,060,000 117 Thornberry and Rita's Ranch Dog Park Improvements This project will replace and or improve trails, fencing and other amenities at Thornberry and Rita's Ranch Dog Parks. Thornberry will include trail resurfacing and fencing repairs. Rita's Ranch will include a new loop trail and fencing repairs. Both parks may include other site amenity updates. $300,000 118 Court Hill Park Basketball Court Renovation Replace Court Hill Park Basketball Court and add accessible path from trail. $100,000 119 Kickers Playground Replacement Replace one of the playgrounds at Kickers Soccer Fields.$150,000 120 Hickory Hill Park Scott Blvd Entrance Entrance, parking lot, restroom, and trail connections on parcel number 1002477001 of Hickory Hill Park adjacent to Scott Blvd. $575,000 Project Name Description Unfunded Amt City of Iowa City Capital Improvement Program Unfunded Projects 121 South Hickory Hill Park Shelter Replacement Replace large picnic shelter in South Hickory Hill Park.$250,000 122 Mercer Scanlon Floor Replacement Replacement of tile flooring through central section of Mercer- Scanlon Building. $300,000 123 Riverfront Crossing Band Shell and Storage Room Build a permanent band shell at north end of ellipse in Riverfront Crossing Park to accommodate performances in the area and enclosure of the back end of the restroom building to make a year round storage space for large event equipment. $300,000 124 Community Garden Enhancements Upgrades and Maintenance for Wetherby and Kiwanis Community Garden Spaces included adding accessible, paved paths both to and within each garden, adding fencing to deter deer, adding additional water sources and composting areas. Chadek Green was recently completed and Reno Street Park gardens will be addressed as part of larger park renovation. $300,000 125 Oak Grove Park Renovations Oak Grove Park renovations including replacing aged playground, replacing basketball court (full rebuild) and adding paths for accessibility. $400,000 126 City Park Baseball Restroom Update and add capacity to restroom facilities for the City Park Baseball fields. $500,000 127 Napoleon Park Softball Restroom and Storage Replace restroom/storage building at Napoleon Park Softball. Remove and replace current structure with single user restrooms and dedicated storage. $500,000 9 - Other Projects 128 Burlington Street Median Construct the Burlington Street median from Gilbert Street to Madison Street. Project includes relocation of water and sewer utilities. This project will require a traffic signal preemption system. (Part of the Riverfront Crossings amendment to City-University URA). $1,973,000 129 City Hall Relocation Relocate and expand / modernize City Hall and City Council Chambers. $12,000,000 130 Police Evidence Storage Facility Construction of a permanent evidence storage facility.$929,000 131 Central Police Station Relocation Relocate and expand / modernize Central Police Station. $19,000,000 132 Fire Station #1 Relocation Relocate and expand / modernize Central Fire Station #1. $11,593,000 133 Fire Station #6 Construction of Fire Station #6 in the Southwest Planning District. $2,898,000 134 Flood Buyouts This project will provide funds for the purchase of houses in designated flood hazard buyout areas after FEMA and CDBG buyout programs have ended. $530,000 135 Riverside Drive Redevelopment This project includes methane abatement, excavation, and fill at the 7 acre site owned by the City at Riverside Dr. and Hwy 6. This site preparation would allow for marketing of this property for commercial development. $2,527,000 136 Airport Equipment Shelter Snow removal equipment was previously stored in United Hangar. Equipment Shelter would provide enclosed storage for equipment. $337,500 137 Airport Perimeter Road Construction perimeter road for maintenance and fueling vehicles to travel to south development area. $267,700 138 South Airport Site Development South General Aviation area site development with access roadway and utilities. $2,125,100 Project Name Description Unfunded Amt City of Iowa City Capital Improvement Program Unfunded Projects 139 Summit Street Historic Plan Streetscape and intersection elements through Summit Street Historic District. $302,000 140 Traffic Signal Pre-Emption System This project will install a city-wide Geographic Information System based traffic signal pre-emption system for emergency vehicles. This system is necessary if the Burlington St Median Project is constructed between Madison St and Gilbert St. $1,221,000 141 Iowa Interstate Railroad Quiet Zones The Quiet Zones project would be for design and implementation of required upgraded warning devices and physical infrastructure (medians and gates) for four at-grade street crossings. The upgrades would improve safety at each crossing and reduce the need for trains to sound their horns. $1,000,000 142 Burlington Street Dam Modification of the Burlington Street Dam to address public safety concerns, improve riverbank stability, improve fish habitat, and create recreational opportunities. $6,435,000 143 Excavator for compost operations This machine would be used primarily in the compost and wood chip facility at the landfill to assist in safely grinding incoming materials. $280,000 144 Material Vending Machine-Remote Book Returns Purchase and installation of two library material vending machines and two new remote book returns to be located at $300,000 145 ICPL Children's Room Shelving Remove original (built-in) media shelving along the interior east wall of the Children's Room and replace with shelving that can accommodate current formats and reflects modern materials usage. New shelving will be modular and flexible to allow for reuse in a larger, future renovation of the Children's Room. Existing shelving was designed to hold CDs, which were a significant part of the Children's circulating collection for several years. The shelves have been modified multiple times in an attempt to maximize their useful life. $71,500 Total - Unfunded Projects 413,001,955$