CAPITAL PROJECTS FUND
The Capital Projects Fund accounts for the collection and disbursement of funds related
to capital improvements or significant capital equipment. The City annually updates and
issues a five-year capital improvement program (CIP). This program is the planning
guide for the City’s issuance of bonded debt and for the construction and replacement of
the City’s buildings and infrastructure. The first two years of the five-year capital
improvement program (CIP) are certified as part of the operating budget in the Capital
Projects Fund. The current five-year CIP is for years 2025-2029. Additional information
for the City’s five-year CIP program including maps and photos is available on the City’s
web page: https://www.icgov.org/budget under the Capital Improvement Program
heading.
Capital improvement projects involve the construction, purchase, or renovation of city
facilities or property. Most of the projects are specific, non-recurring major improvements
to the City's physical plant, are permanent in nature, and are greater than $25,000 and
have a useful life of three years or more. The City also budgets annually recurring
project funds for non-specified improvements of a specific nature; these funds are to be
spent on improvements that meet the same definition above. Funding sources for
capital improvement projects may be from operating funds, bond proceeds, grants,
donations, and a variety of other funding sources. The three largest sources of funds
are operating transfers in, bonded debt, and state and federal grants.
For the CIP for years 2025-2029, the total funding sources are $257,441,795, and the
total expenditures are $236,678,795. The difference between the total expenditures and
the total funding sources over the five-year period is a result of prior plan funding
sources that are being utilized to cover current plan expenditures such as engineering
and design.
The 2026 CIP expenditures of $65,940,345 will be certified as part of the fiscal year
2026 operating budget.
The 2026 CIP funding sources of $61,090,345 will also be certified as part of the fiscal
year 2026 operating budget. Budgeted fiscal year 2026 Capital Projects Fund revenues
and transfers in also include a transfer in from the TIF funds to reimburse for prior year
expenditures of $700 and other local government funding of $96,800 to be used on a
future project. Total Capital Projects Fund fiscal year 2026 budgeted revenues and
transfer in are $61,187,845.
The changes to the 2025 CIP are amended into the fiscal year 2025 operating budget.
The fiscal year 2025 Capital Projects Fund expenditure budget also includes totals from
the carry forward of prior year projects that must be re-appropriated with the State. The
amounts being carried forward from prior years are not included in the five-year CIP
totals. The revised Capital Projects Fund expenditures for fiscal year 2025 are
$151,501,795; the revised budget includes the 2025 CIP expenditures of $49,272,300
and prior year project carry forwards of $102,229,495.
The revised fiscal year 2025 Capital Projects Fund revenues and transfers in budget
also includes totals from the carry forward of prior year projects. The amounts being
carried forward from prior years are not included in the five-year CIP totals. The revised
Capital Projects Fund revenues and transfers in for fiscal year 2025 are $99,449,520;
the revised budget includes the 2025 CIP funding sources of $61,190,345 and a transfer
in from the TIF funds to reimburse for prior year expenditures of $200, and prior year
project carry forwards of $38,258,975.
Fund balance in the Capital Projects Fund primarily represents design fees for streets
projects that bonds haven’t been issued for from the current year and prior years. This
balance fluctuates based on the timing of the issuance of bonds and the timing of the
project expenditures. The estimated ending fund balance for fiscal year 2026 is -
$3,173,454.
2023 2024 2025 2025 2026 2027
Actual Actual Budget Revised Budget Projected
Fund Balance, July 1 46,227,340$ 50,866,819$ 9,401,437$ 53,724,321$ 1,579,046$ (3,173,454)$
Revenues:
Use Of Money And Property
Interest Revenues 1,134,737 2,376,549 - - - -
Intergovernmental
Federal Intergovernmental Revenue 3,938,874 1,487,116 28,650,000 8,844,505 19,583,942 8,600,000
Other State Grants 506,635 204,617 - 2,211,170 - 7,500,000
State 28E Agreements 92,907 85,177 185,200 638,600 113,700 150,000
Local 28E Agreements 30,000 30,000 - - 30,000 190,000
Charges of Fees & Services
Development Fees - 219,184 - - - -
Miscellaneous
Contributions & Donations 219,826 122,335 - 270,000 1,135,000 -
Printed Materials - - - -- -
Other Miscellaneous Revenue 879,316 291,829 - 2,450,160 - -
Other Financial Sources
Sale Of Assets 1,409,975 - - - - -
Debt Sales 9,941,862 11,616,402 16,350,000 49,501,575 13,830,000 16,858,000
Internal Service (Non-Budgetary):
ITS Fund 705 6,883 - - - -
Sub-Total Revenues 18,154,837 16,440,092 45,185,200 63,916,010 34,692,642 33,298,000
Transfers In:
Transfers-In from Governmental Funds 5,576,342 5,769,702 14,288,000 21,523,320 6,296,600 4,707,800
Transfers-In from Enterprise Funds 13,895,163 15,022,907 8,920,500 13,542,190 12,398,603 7,717,750
Miscellaneous Transfers-In 84,795 108,828 75,000 75,000 - -
Internal Service (Non-Budgetary):
Equipment Fund 1,000,000 - 7,400,000 - 7,700,000 -
Central Services Fund - - - 200,000 - -
ITS Fund 100,000 100,000 100,000 193,000 100,000 100,000
Sub-Total Transfers In 20,656,300 21,001,437 30,783,500 35,533,510 26,495,203 12,525,550
Total Revenues & Transfers In 38,811,137$ 37,441,529$ 75,968,700$ 99,449,520$ 61,187,845$ 45,823,550$
Expenditures:
Governmental:
General Government 264,101 400,031 50,000 236,800 450,000 325,000
Culture & Recreation 3,747,365 5,028,745 12,075,000 29,414,181 11,990,000 760,000
Community and Economic Dvlpmnt 34,685 737 - 360,540 - -
Public Safety 684,999 82,198 625,000 6,513,370 1,175,000 500,000
Public Works 18,218,651 15,021,835 28,297,794 37,480,878 23,962,800 32,857,800
Enterprise:
Parking Operations 1,872,052 826,923 1,450,000 3,799,388 1,100,000 1,300,000
Public Transportation 1,895 21,036 20,705,500 9,332,805 20,890,000 25,000
Wastewater Treatment 3,299,955 6,744,756 560,000 42,217,284 850,000 1,566,000
Water Operations 702,043 799,915 970,000 4,865,652 3,350,000 2,850,000
Refuse Operations - - - 300,000 - 897,500
Landfill 2,371,266 4,344,237 4,000,000 11,364,633 50,000 689,250
Storm Water 1,892,369 421,535 785,000 3,060,690 1,090,000 240,000
Airport 1,047,276 874,866 6,500,000 2,358,199 932,545 1,500,000
Internal Service (Non-Budgetary):
ITS Fund - 17,213 100,000 197,375 100,000 100,000
Sub-Total Expenditures 34,136,657 34,584,027 76,118,294 151,501,795 65,940,345 43,610,550
Transfers Out:
Capital Project Fund 35,000 - - - - -
Internal Service (Non-Budgetary):
ITS Fund - - - 93,000 - -
Sub-Total Transfers Out 35,000 - - 93,000 - -
Total Expenditures & Transfers Out 34,171,657$ 34,584,027$ 76,118,294$ 151,594,795$ 65,940,345$ 43,610,550$
Fund Balance, June 30 50,866,819$ 53,724,321$ 9,251,843$ 1,579,046$ (3,173,454)$ (960,454)$
Capital Projects Fund
Fund Summary
A3473 Airport Apron Expansion…..............................................................................523
A3474 Runway 7/25 Pavement Repairs…..............................................................................524
A3475 Runway 12/30 Pavement Repairs…..............................................................................525
A3478 Terminal Building Remodel/Reconstruction…..............................................................................526
A3481 Airport Solar…..............................................................................527
A3482 Taxiway Maintenance - Seal/Crack Repairs…..............................................................................528
A3483 HVAC Update…..............................................................................529
A3484 Fuel Storage Tank Fill Cabinet Replacement…..............................................................................530
A3485 Wildlife Assessment…..............................................................................531
A3486 Tractor Broom…..............................................................................532
B4343 Carpet and Furnishings Replacement…..............................................................................533
I4721 Fiber Infill & Cameras…..............................................................................534
K1003 Senior Center Interior Improvements - Phase I…..............................................................................535
K1004 Senior Center Interior Improvements - Phase II…..............................................................................536
L3333 Compost Pad Improvements & Expansion…..............................................................................537
L3335 Landfill Dual Extraction System Expansion…..............................................................................538
L3348 Site Flow Improvements…..............................................................................539
L3349 Landfill Future Cell - Northeast Expansion…..............................................................................540
L3350 Cell FY23 Horizontal Gas Collectors…..............................................................................541
L3351 Refuse Truck…..............................................................................542
L3352 Trash Truck Upgrade…..............................................................................543
L3353 Recycling Transfer Station…..............................................................................544
M3631 Annual Stormwater Improvements…..............................................................................545
M3634 Rundell Street Pump Station Vault Modifications…..............................................................................546
M3635 River Street Storm Sewer Improvements…..............................................................................547
M3637 Peterson Street Storm Sewer Improvments…..............................................................................548
P3953 Equipment Maintenance Facility replacement…..............................................................................549
P3988 Entrance Way Improvements…..............................................................................550
P3991 Carson Farms Stormwater Retention Basin…..............................................................................551
R4129 City Hall - Other Projects…..............................................................................552
Capital Project Funds
Project Listing
R4130 Parks Annual Improvements/Maintenance/ADA…..............................................................................553
R4206 Intra-city Bike Trails/Bridges…..............................................................................554
R4227 Hwy 6 Sidepath - Broadway to Fairmeadows…..............................................................................555
R4229 City Park Pool Replacement…..............................................................................556
R4330 Annual Recreation Center Improvements…..............................................................................557
R4346 Palisades Park Development…..............................................................................558
R4358 City Park Shelters & Restroom Replacement…..............................................................................559
R4362 Napoleon Park Softball Fields 5-8 Renovation…..............................................................................560
R4372 Terrell Mill Skate Park Redevelopment…..............................................................................561
R4380 Annual Contracted Tree Planting…..............................................................................562
R4381 Event Facility Improvements…..............................................................................563
R4384 Benton Hills Playground Replacement…..............................................................................564
R4388 ADA Elevator Improvements…..............................................................................565
R4389 N. Market Square Playground Replacement…..............................................................................566
R4390 Reno Street Park Renovations…..............................................................................567
R4392 Westside Park Land Acquisition…..............................................................................568
R4400 Mercer Shelter Replacement…..............................................................................569
R4401 Parks Storage Building…..............................................................................570
R4406 RALRC Structural Cables…..............................................................................571
R4407 Mercer & RALRC HVAC Replacement…..............................................................................572
R4408 Columbarium Construction/Expansion…..............................................................................573
R4412 RALRC Roof…..............................................................................574
R4413 UV Disinfectant Systems for Pools…..............................................................................575
R4414 Mercer Scanlon Tuckpointing…..............................................................................576
R4415 Mercer Scanlon Roof…..............................................................................577
R4416 Office addition Police Investigations…..............................................................................578
R4417 City Hall Fire Alarm and Strobe Upgrade…..............................................................................579
R4418 Harlocke Hill Park Playground Replacement…..............................................................................580
R4419 Park Paving Improvements…..............................................................................581
R4420 Ped Mall Fountain Replacement…..............................................................................582
R4421 Hwy 1/6/Riverside Trail…..............................................................................583
S3814 Annual Traffic Signal Projects…..............................................................................584
S3816 Traffic Calming…..............................................................................585
S3822 Curb Ramps-ADA…..............................................................................586
S3824 Annual Pavement Rehabilitation…..............................................................................587
S3826 Underground Electrical Facilities…..............................................................................588
S3827 Bicycle Master Plan Implementation…..............................................................................589
S3910 Annual Bridge Maintenance & Repair…..............................................................................590
S3946 Court Street Reconstruction…..............................................................................591
S3952 Dodge Street Reconstruct - Governor to Burlington…..............................................................................592
S3953 Market St & Jefferson St Two-Way Conversion…..............................................................................593
S3955 N. Gilbert Street Reconstruction…..............................................................................594
S3959 Taft Avenue Reconstruct - Am Legion to Lwr West Br…..............................................................................595
S3960 Oakdale Blvd Extension - Alignment Study…..............................................................................596
S3963 Burlington Street Bridge Replacement…..............................................................................597
S3981 Camp Cardinal / Kennedy Parkway - Ped Accom…..............................................................................598
S3982 North Dodge St / ACT Circle - Signalization…..............................................................................599
S3983 Iowa Avenue Improvements…..............................................................................600
S3987 Pedestrian Refuge Island Project…..............................................................................601
S3988 Friendship St, Evans St, Manitou Tr Swk Infill…..............................................................................602
T3004 Parking Facility Restoration Repair…..............................................................................603
T3026 Tower Place Drainage Modifications…..............................................................................604
T3055 Transit Maintenance Facility Relocation…..............................................................................605
T3059 Transit Interchange and Bus Stop Improvements…..............................................................................606
T3070 Replace Door-Door Closures in Parking Facilities…..............................................................................607
T3071 Way-finding Sign Refresh in Parking Facilities…..............................................................................608
T3072 On-Street Meter Replacement…..............................................................................609
T3073 Tower Place HVAC Replacement…..............................................................................610
T3074 Capitol Street Ramp N Stairwell Lobby Remodel…..............................................................................611
T3075 Transit Automatic Passenger Counters…..............................................................................612
V3101 Annual Sewer Main Replacement…..............................................................................613
V3162 Benton Street Trunk Sewer Improvements…..............................................................................614
V3169 Napoleon Lift Station Improvements…..............................................................................615
V3174 Aeration Equipment Improvements…..............................................................................616
V3175 Wastewater Treatment Facility Imp 2022…..............................................................................617
V3177 HVAC Replacement…..............................................................................618
V3179 Rotating Drum Thickener Replacement 1 and 2…..............................................................................619
V3182 Equalization Basin Resurfacing …..............................................................................620
V3183 Effluent Water Pump Station Improvements…..............................................................................621
V3184 Wastewater Digester Gas Improvements…..............................................................................622
V3185 WW Treatment Plant Secondary Clarifier Repairs…..............................................................................623
W3300 Bradford Drive Water Main Replacement…..............................................................................624
W3314 High Service Pump VFD Replacement…..............................................................................625
W3322 Collector Well #1 Reconstruction…..............................................................................626
W3325 Roof Replacements…..............................................................................627
W3326 Treatment Process Update…..............................................................................628
W3327 Melrose Water Main Camp Cardinal to 218…..............................................................................629
W3328 Powerhouse Dam Rehabilitation…..............................................................................630
W3329 GSR Upgrade and Repairs…..............................................................................631
W3330 Water Plant Flowmeter Replacement…..............................................................................632
W3332 American Legion PRV Integration& Peninsula Antenna…..............................................................................633
W3333 Relocate Bulk Water Station…..............................................................................634
W3334 Water Rate Study…..............................................................................635
W3335 East Elevated Storage…..............................................................................636
W3336 Rochester GSR & Water Main Improvements…..............................................................................637
Y4446 Body Cameras & In Car Video Systems…..............................................................................638
Y4447 Animal Shelter Standby Generator…..............................................................................639
Y4449 Animal Shelter-Training Annex…..............................................................................640
Z4406 Fire Apparatus Replacement Program…..............................................................................641
Z4411 Fire Station #5 Construction and #3 Replacement…..............................................................................642
Z4413 Rehab of Sleeping Areas & Alerting System Station1…..............................................................................643
Z4414 Flooring/Furniture Station 1…..............................................................................644
Project Name Description Unfunded Amt
1 - Bridges
1 Iowa Avenue Culvert This project will include the removal and replacement of the
existing reinforced concrete box culvert with a new three-
sided arch culvert. The project will also include removal and
replacement of slope protection adjacent to the bridge on
Ralston Creek, removal and replacement of street pavement
and sidewalk, and site restoration.
$3,500,000
2 F Street Bridge This project involves the removal and replacement of the
existing corrugated metal arch bridge with a larger bridge.
$773,000
3 Fourth Avenue Bridge This project will replace the bridge over the South Branch of
Ralston Creek at Fourth Avenue and will include sidewalks.
Possibility of approximately $75,000 state funding.
$773,000
4 Sixth Avenue Bridge This project involves the removal and replacement of the
existing twin box culvert with a larger bridge.
$773,000
5 Third Avenue Bridge This project will include the removal and replacement of the
existing concrete bridge with a new single-span reinforced
concrete box culvert. The project will also include removal
and replacement of slope protection adjacent to the bridge on
Ralston Creek South Branch, removal and replacement of
street pavement, and storm sewer improvements.
$650,000
6 First Avenue Bridge This project will be a comprehensive concrete rehabilitation of
the Iowa Ave Bridge over the Iowa River. Additional repair
items will include sidewalks, approach pavement, expansion
joints, pedestrian handrails and painting.
$2,250,000
2 - Streets
7 Brookland Park Drive Rehabilitation This project will include reconstruction of Brookland Park
Drive and updates to utilities.
$1,450,000
8 Dodge St - Burlington To Bowery Street reconstruction and storm sewer improvements. This is
a joint project with the IDOT.
$13,250,000
9 Dubuque Rd Paving - Bristol To
Dodge
Reconstruct and upgrade to urban cross sections.$1,339,000
10 Dubuque Street Access Road And
Traffic Signal
This project will construct an access drive from the north end
of Laura Dr to Dubuque Street, south of the Interstate 80 /
Dubuque St interchange. May also facilitate a second means
of access from the Peninsula area to Dubuque St.
$2,000,000
11 Emerald Street Diamond Grinding This project will diamond grind all of Emerald Street to
remove the slab warping that interferes with the use of this
street by fire trucks.
$212,000
12 Gilbert / Us 6 Intersection Left Turn
Lanes
Reconstruct the intersection of Gilbert & US 6 to include dual
left turn lanes on Gilbert St.
$4,840,000
13 Gilbert St Iais Underpass This project relocates the sidewalks of the Gilbert St.
underpass at the IAIS Railroad. The sidewalks are moved
further from the street and existing erosion problems are
addressed.
$327,000
14 Old Hwy 218 Streetscape Streetscape improvements on Old Hwy 218 entrance -
Sturgis Ferry Park to US Hwy 6. This project includes
landscaping, lighting and sidewalk improvements. The
project should be coordinated with Sturgis Ferry Park
upgrade and /or Riverside Drive Redevelopment project.
$812,000
15 Highway 965 Extension This project will be initial phase of constructing Hwy 965
extended from the south side of Hwy 218 to Melrose Avenue
to arterial standards.
$9,167,000
16 Mccollister - Sycamore St To Scott
Blvd
Extend proposed McCollister Boulevard from Sycamore
Street to Scott Boulevard.
$9,088,000
17 Muscatine Avenue Reconstruction,
Iowa To First Ave
This project will reconstruct Muscatine Avenue from Iowa
Avenue to 1st Avenue.
$10,510,000
City of Iowa City
Capital Improvement Program
Unfunded Projects
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
18 Oakdale Blvd This project would construct an extension north across I-80 to
a new intersection with Iowa Hwy 1.
$15,000,000
19 Oakdale Blvd-Hwy 1 To Prairie Du
Chien Rd
This project would construct Oakdale Blvd from Hwy 1, west
to Prairie Du Chien Road.
$8,240,000
20 Peninsula Secondary Access Road This project will establish a more reliable access to the
Peninsula neighborhood by either elevating Foster Rd from
Laura Dr to No Name road by creating a secondary access to
the area. This project will not be necessary if the Taft
Speedway Levee Project is constructed.
$2,883,000
21 Riverside Drive Streetscape Phases II to V of the South Riverside Drive Streetscape
Master Plan, which includes improvements to the west side of
Riverside Drive from Benton to Hwy 6 and the east side of
Riverside from Myrtle to Hwy 6. Project includes
consolidation of driveways, undergrounding of utilities, and
installation of sidewalks and landscaping.
$2,650,000
22 Rohret Rd Improvements-
Lakeshore To Limits
Project will reconstruct Rohret Rd to urban standards.$1,813,000
23 South Gilbert Street Improvements Reconstruction from Benton Street to Stevens Drive. This
project does not include improvements to the Gilbert St. /
Highway 6 intersection.
$4,326,000
24 South Arterial And Bridge, Us218
To Gilbert Street
Construction of a south arterial street and bridge over the
Iowa River, connecting from Old Hwy 218/US 218
interchange on the west side of the Iowa River to Gilbert
Street/Sycamore 'L' intersection .
$15,987,000
25 Sycamore-Hwy 6 To Highland This project involves additional lanes to improve capacity and
storm sewer improvements.
$750,000
26 Sycamore Street - East-West Leg
From "L" To South Gilbert
This project will reconstruct Sycamore Street to arterial
standards using the Complete Streets Policy. This phase will
be the east-west leg of Sycamore Street.
$3,040,000
27 Taft Avenue – Herbert Hoover Hwy
To Lower West Branch
Reconstruct Taft Avenue from Herbert Hoover Hwy to Court
Street.
$5,000,000
28 Taft Avenue – American Legion
Road To 420th Street
Reconstruct Taft Avenue from American Legion Road to
Herbert Hoover Hwy.
$12,300,000
29 Laura Drive Reconstruction Reconstruction of entire length of Laura Drive to standard two
lane width with curb, storm sewer and sidewalk.
$2,000,000
30 Linn Street Reconstruction,
Burlington To Iowa
This project is part of the downtown streetscape master plan.
This project reconstructs Linn Street from Burlington Street to
Iowa Avenue. Project also improves sidewalk pavement,
addresses critical update to water main, replaces and
relocates storm sewer between Washington & Iowa.
$1,935,000
31 Clinton Street Streetscape Improve Clinton Street Streetscape south of Burlington Street
consistent with the Riverfront Crossings Plan. Minor
pavement improvements and lane striping a part of project.
$1,500,000
32 Kimball Road Reconstruction Reconstruct Kimball road from N. Gilbert Street to N.
Governor Street. Project includes 22 foot wide PCC street
and a 5 foot wide sidewalk on one side of the street, new 8"
DIP water main, new storm sewer, and sanitary service
improvements.
$3,480,000
33 Interstate 80 Aesthetic
Improvements
Landscaping and aesthetic treatments in the Interstate 80
corridor. The objective of this project is to mitigate the visual
impact of the addition of a third lane to I-80 and to provide
cohesive and pleasing feel to the Iowa City corridor.
$300,000
34 Towncrest Drive Reconstruction A private street that the property owners would dedicate the
right of way to the City, and the City will reconstruct. Parking
along and adjacent to the right of way will be reconfigured to
better facilitate vehicle movement and pedestrian safety.
$600,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
35 Gilbert Street Functional Design -
Hwy 6 To Kirkwood
Obtain consulting services to provide a functional design of
Gilbert Street between Hwy 6 & Kirkwood Avenue. The
functional design should take into account all previous design
work completed for the corridor.
$60,000
36 Foster Road Elevation This project will reconstruct and elevate Foster Road from No
Name Street to Dubuque Road.
$7,800,000
37 Camp Cardinal Blvd / Kennedy
Parkway - Roundabout
This project will construct a roundabout at Camp Cardinal
Boulevard / Kennedy Parkway. This project is intended for the
unfunded list of projects.
$2,058,839
38 Kirkwood Ave to Capitol Street
Connection
The extensions of these streets plays an important part in the
overall development of the Riverfront Crossings area. It will
also improve access and the traffic circulation in this area.
This project does not include any costs necessary for the
property acquisitions.
$3,100,000
39 Gilbert Street Lighting &
Landscaping Improvements
This project will provide landscaping and street/pedestrian
lighting on Gilbert Street from College Street to the Gilbert
Street Bridge over Ralston Creek
$975,000
40 Washington Street Recon - Madison
to Clinton
This project will reconstruct Washington Street from Madison
Street to Clinton Street and will include new street pavement,
sidewalk, curb ramps, utility repairs/improvements and other
associated work.
$2,700,000
41 Friendship Sidewalk Infill - 5th Ave
to 7th Ave
This project will construct a 5' wide ADA sidewalk on
Friendship Street between 5th Ave and 7th Ave
$210,000
42 Herbert Hoover Highway - Turn
Lanes
This project will construct dedicated left-turn lanes (or a
center left-turn lane) on Herbert Hoover Highway at American
Pharoah Drive, Hanks Drive and Thunder Gulch Road. This
project is intended to be placed on the unfunded list of
projects until the pending traffic study is complete.
$6,400,000
43 Lakeside Drive Crosswalk
Improvements
This project generally includes the construction of a raised
midblock crosswalk on Lakeside Drive between Aniston
Street and Amber Lane at the Sycamore Greenway Trail
$240,000
44 Linn Street Reconstruction This project includes the reconstruction of three blocks of
brick street along Linn Street from Bloomington Street to
Church Street
$3,650,000
45 Park Road Reconstruction - Rocky
Shore to Riverside
Reconstruction of Park Road from Rocky Shore Drive to the
west project limits of the Gateway Project, approximately
Riverside Drive. This project will include new street
pavement, sidewalk, utility improvements and other
associated work.
$7,500,000
46 Kitty Lee Road SW Improvements This project is necessary to provide an adequate secondary
access for the future Carson Farms and other developments
in the area.
$7,700,000
47 Ridgewood Lane Reconstruction This project includes complete reconstruction of Ridgewood
Lane and a portion of Virginia Drive, as well as water main
and storm sewer replacement.
$700,000
3 - Transportation Services
48 Rock Island Railroad Depot
Restoration
Preparation of Old Rock Island Railroad Depot for Amtrak
service, including platform construction, lighting, utilities,
passenger information display, ticketing kiosks, canopy,
warming shelter, signage, parking, and accessibility
improvements.
$5,381,000
49 Replacement of LED fixtures in
Parking Facilities
Project to replace all LED fixtures in the Court Street
Transportation Center, Capitol Street ramp, Dubuque Street
ramp, Tower Place ramp, Chauncey Swan Ramp, and fixtures
in other facilities as they age out of production.
$200,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
4 - Ped & Bike Trails
50 Iowa River Trail, Highway 6 To
Sturgis Ferry Park
This project will extend the Iowa River Trail from just north of
Highway 6 to Sturgis Ferry Park on the west side of the Iowa
River.
$1,180,000
51 Iowa River Trail, Gateway Segment Construction of a trail extension adjacent to (east) of the Iowa
River between Park Road and the University of Iowa
pedestrian bridge.
$500,000
52 Windsor Ridge Trail Extension The project includes the extension of a 10' wide trail along
north Branch of Snyder Creek from Scott Boulevard to
American Legion Road.
$1,200,000
53 Old Highway 218 Trail/Wide
Sidewalk
This project will construct an 8' wide sidewalk adjacent to Old
Highway 218 between Sturgis Ferry Park and McCollister
Boulevard.
$550,000
54 Crandic Railroad Rails-To-Trails
Project
The project removes the existing Crandic tracks and
repurposes the existing corridor for a 10' multi-use trail
approximately between Oakdale Boulevard in Coralville to
Gilbert Street in Iowa City (approximately 6.1 miles). Iowa
City's portion of the project is approximately 1.75 miles.
$1,575,000
55 Myrtle Ave Sidewalk Infill The project will construct sidewalk along the north side of
Myrtle Avenue between Greenwood Drive and Olive in order
to fill in a gap in the City’s sidewalk network.
$155,000
56 Willow Creek Trail - Phase Iii Construct a trail from Willow Creek Drive, under Highway
One, around perimeter of airport, to connect with Iowa River
Corridor (IRC) Trail.
$870,000
57 Willow Creek Trail-West Connect Willow Creek Trail from its current west terminus via
a tunnel under Highway 218, to connect with the trail in
Hunters Run Park and further west.
$2,814,000
58 Fairmeadows Trail Addition of a loop trail and connections to the bikeways in the
surrounding neighborhood.
$125,000
59 Southgate Ave - Iowa River Trail
Connector
This project will construct a cul-de-sac at the west terminus of
Southgate Ave as well as 8' wide trail connection from
Southgate Ave to the Iowa River Trail.
$300,000
60 Napoleon-Riverfront Crossings Trail
Segment Repl
Replacement of the asphalt trail from Napoleon Park to
Riverfront Crossings Park with a 10' wide concrete trail (1.25
miles). This will include a new spur connecting the trail to
Southgate Ave
$720,000
61 Whispering Meadows Trail
Improvements
Current trail infrastructure is reaching end of life and needs
replaced in order to continue to serve park users.
$250,000
62 Stone Bridge Park Development Funding to develop new neighborhood parks in emerging or
underserved locations. 2026 improvements in soon to be
acquired location in the Stone Bridge Subdivisions to include
playground, shelter, or other park features.
$275,000
5 - Wastewater
63 North Branch Dam Trunk Sewer This project extends easterly along Ralston Creek from the
North Branch Dam to Scott Boulevard.
$3,860,000
64 Northeast Trunk Sewer Reconstruction of an under-sized sewer through the
northeast neighborhoods.
$5,221,000
65 Sanitary Sewer Extension - Scott To
Hickory Trail
This project includes the design and construction of a sanitary
sewer trunk extension between Scott Boulevard and Hickory
Trail.
$790,000
66 New Cold Storage Building Construct 90' by 40' covered roof area with open side similar
to the Sludge Storage area. Building to be the same
dimension of the existing cold storage building.
$360,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
67 Geo-Thermal Hvac Conversion Project would include the conversion of the HVAC system to
Geo-Thermal. Installation of Geo-thermal loops, new pump
systems, new chiller, and improved controllers required to
operate the system.
$300,000
68 Secondary Calrifier 5300-5400
Repairs
This project will replace the rake mechanisms and drives for
Calrifiers C5300 and 5400 that were new in 2002 and part of
WWTP upgrades.
$864,000
69 Heat for Cold Storage Building Project would require the addition of natural gas fired area
heaters. Initially the heat load would be enough to keep the
building above freezing. When the digester rehabilitation
project proceeds, glycol heating from the digester boilers
would be included that project. Glycol piping would be routed
under the parking lot and drive to the building to new heating
units.
$123,000
70 Aeration Eqiuipment Improvements
Phase 1
Replace the remaining mixers in the aeration trains 1 - 4 with
high efficiency mixers matching those placed in Cell 9 of
trains 1-4 and replace mixers in the high strength tank. This
would be total of 30 mixers.
$2,978,000
71 Aeration Eqiuipment Improvements
Phase 2 (Lamson)
Replace Lamson 300 HP Centrifugal Blower with a High-
Speed Turbo Blower including any ancillary equipment, pipe
modifications and PLC programing. We currently utilize
service contract for yearly maintenance for two existing high-
speed blowers installed. We would want to require service
contract for hte new high speed blowers once the warrenty
period had expired.
$1,911,000
72 Hawkeye Lift Station Rehabilitation includes demolishing the existing building,
converting the station to a wet-well valve vault with surface
hatches for pump access, basket screening, new standby
generator, replace 20 year old pump, new controls, valve
vault with bypass capacity, new security fence, landscaping
and access road improvements. The station would be
plumbed for future expansion, but would not include
additional pumps.
$1,645,000
73 Peninsula Control Panel and Pump
Improvement
The project includes the replacement of the control panel and
aquisistion of a redundent pump.
$130,000
74 Effluent Water Pump Station
Improvements
Install a fourth Effluent Water Pump to serve the in plant
distribution system and soccer park irrigation system. Work
includes rebuilding of the Amiad filtration system.
$76,000
75 UV Building and Storage Build a 40' x 60' structure over Ultra Violet disifection structure
for protection and for storage of the UV bank modules during
the off season. Project will include buillding heat and electrical
supply. Funds requested below are for design with
construction to follow in 2029.
$1,100,000
76 Wastewater Division Master Plan Perform a master plan for the Wastewater Division looking
forward for the next 20 years. The study will include the
wastewater treatment plant, all sanitary lift stations, and the
sanitary sewer collection system.
$299,000
6 - Water
77 West Side Ground Storage
Reservoir
Construction of a two million gallon ground or elevated
storage reservoir with associated pumping station and
generator west of US-218. Current land acquired for this
reservoir is southeast of the Slothower Rd at Hebl Ave
intersection.
$15,000,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
78 Collector Well #1 Rehabilitation Clean two of the existing laterals and cap one existing lateral
of Collector Well #1. Install two new 12-inch laterals to
increase the production capacity of this raw water well.
$3,000,000
79 Water Treatment Plant Filter #6
Buildout
Add underdrains, granular media, controls, and
instrumentation to filter bay #6. This bay was left unfinished
to allow for future expanded production. The project will also
repair or replace a number of filter control valves. The project
will be informed by the Treatment Study.
$1,500,000
80 Well Field Electrical Cable
Replacement
Replace aging medium voltage (13,200V) cabling and install
communication fiber to wells at the Water Plant and
Peninsula sites.
$1,000,000
81 Lee/Highwood Street Water Main
Replacement
This is a water main replacement project with respective
street and sidewalk replacement at Lee Street and Highwood
Street. Approximately 550 feet of 6" cast-iron pipe (vintage
1951) will be replaced with 6" PVC pipe. Approximately 300
feet of PVC will be installed where no pipe has existed
previously.
$1,000,000
82 Deforest Ave Water Main
Replacement
Approximately 500 feet of 6-inch cast-iron pipe (vintage 1958)
will be replaced with 500 feet of 8-inch PVC on the 900 block
of Deforest Avenue.
$700,000
83 Giblin Drive Water Main
Replacement
This is a water main replacement project with respective
street and sidewalk replacement. Approximately 620 feet of 6-
inch cast-iron pipe (vintage 1953) will be replaced with 8"
PVC.
$600,000
84 Sixth Avenue Water Main
Replacement
This is a water main replacement project with respective
street and sidewalk replacement. Approximately 650 feet of 6-
inch cast-iron pipe (vintage 1974) will be replaced with 8"
PVC.
$600,000
85 Lime Lagoon Outlet Structure
Modifications
Modify the lagoon outlet structure to an open channel design.
This project will be informed by the Treatment Study.
$500,000
86 Market Street Water Main - Madison
To Clinton
Extend 20-inch water main from Madison to Clinton on Market
St. Tie in 12-inch on Clinton St. to 16-inch at Bloomington St.
This project will be preceded by the abandonment of the 20-
inch main along the old Davenport St right-of-way between
dormitories.
$3,000,000
87 Bloomington Gsr Decommissioning Decommission the Bloomington ground storage reservoir
within the University of Iowa Campus Parking Ramp and
return the space to the University of Iowa per the associated
28E agreement. The 28E agreement expires on December
31, 2038. (Resolution No. 88-176)
500,000$
88 Soda Ash Replacement Remove the existing soda ash and ammonia chemical feed
systems. Replace the existing powdered soda ash feed
system with a liquid soda ash feed. The use of soda ash is
to increase alkalinity of the source water for lime softening
purposes. This is necessary if drawing from the river. This
project will be informed by the Nutrient Study.
1,000,000$
89 Sand Pit Pumping Station
Rehabilitation
Clean and inspect the laterals of the Sand Pit Pumping
Station. Replace and repair the lateral isolation valves and
operators.
1,000,000$
90 East Side Water Tower Construct a two million gallon ground or elevated storage
reservoir within the East Pressure Zone.
15,000,000$
91 Sycamore Gsr Replacement Replace the two million gallon ground storage reservoir
located on Sycamore Street with a ground or elevated two
million gallon storage tank along McCollister Blvd.
15,000,000$
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
92 Melrose & Westgate 16-Inch Water
Main
Install 16-inch water main parallel to the existing water main
on Melrose Ave from Dublin Rd to Westgate St and on
Westgate St from Melrose Ave to Benton St. This project
would reduce velocity headloss from the Emerald ground
storage reservoir to customers west of US-218, increasing
service pressure. This project will be evaluated by hydraulic
modeling after the West Side GSR project is completed.
6,000,000$
93 Hvac System Replacement &
Remove Process Area Heaters
Replace and upgrade aging HVAC equipment and controls at
the water treatment facility. Remove gas overhead heaters
and associated gas lines, electrical, and exhaust piping. The
heaters are not used and in time pose a safety hazard.
2,500,000$
94 Teeters Ct Water Main
Replacement
Replace approximately 410 linear feet of 6-inch 1950 cast
iron water main on Teeters Ct. The water main has
experienced three main breaks and services Lincoln
Elementary.
500,000$
95 Hwy 6 (Industrial Park Rd To
Riveria)
Replace approximately 1,400 linear feet of 12-inch 1971
ductile iron water main on Highway 6. The water main has
experienced two water main breaks. Due to the size of the
water main, it's proximity to the Sycamore reservoir, and 16-
inch water main on the north side of Highway 6, breaks tend
to cause large system disruptions.
1,000,000$
96 Southlawn Dr Water Main
Replacement
Replace approximately 1,100 linear feet of 6-inch 1962 cast
iron water main on Southlawn Dr (800-900 blk). The water
main has experienced 10 main breaks and services Lucas
Elementary.
700,000$
97 Pwf Water Material Outdoor
Covered Storage
Installation of paving and covered outdoor material storage
structures to protect water distribution materials from the
elements.
100,000$
98 Water Plant And Gsr Gate
Replacement
Replace the (3) water plant site gates and the (3) GSR gates
(Rochester, Emerald, and Sycamore).
100,000$
99 Highway 1 from Miller Ave to
Hudson Ave Water Main
Replacement
Replace approximately 400 feet of 1984 12-inch water main
on Highway 1 between Miller Ave and Hudson Ave. The work
would also simplify the utility network in the area.
700,000$
100 Hwy 6 from Rocky Shore Dr to
Newton Rd & Rocky Shore Dr from
Hwy 6 to Dill St Water Main
Replacement
Replace approximately 800 feet of 1994 16-inch water main
on Hwy 6 between Rocky Shore Dr and Newton Rd & replace
400 feet of 1967 12-inch on Rocky Shore Dr from Hwy 6 to
Dill St.
1,000,000$
101 Pleasant St from Cedar St to
Davenport St Water Main
Replacement
Replace approximately 350 feet of 1948 2-inch water main on
Pleasant St from Cedar St to Davenport St
400,000$
7 - Stormwater
102 Carson Lake Regional Storm Water Construction of a regional storm water management facility on
the middle branch of Willow Creek immediately west of
Highway 218. This facility will serve development west of
Highway 218 and south of Rohret Road.
$1,160,000
103 Riverfront Crossings Storm Sewer Storm sewer improvements in the Central Crossings Sub-
District.
$1,375,000
104 Iowa Avenue Culvert Repairs This project will repair a box culvert that carries Ralston Creek
under Iowa Avenue.
$348,000
105 N. Branch Basin Excavation Aerial mapping done for the update to the flood plain maps
revealed that sedimentation has consumed a portion of the
capacity of the facility. This basin is located in Hickory Hill
Park.
$135,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
106 Olympic Court Storm Water Storm sewer retrofit to relieve localized flooding from storm
water runoff.
$464,000
107 Sunset Street Storm Sewer The area just north and south of Kineton Green, east of
Sunset, has experienced back yard flooding and drainage
problems.
$440,000
108 Riverside Drive & Arts Campus
Storm Sewer
This will be a joint project with the University of Iowa to
upgrade the Riverside Drive / Arts Campus storm sewer and
lift station to perform better during future floods.
$1,000,000
8 - Parks & Recreation
109 Waterworks Park Boat Ramp This project is to add a boat ramp to access the Iowa River in
the northeast corner of Waterworks Park. Improvements
include a boat ramp, boat trailer parking, a boat dock, and an
access road.
$250,000
110 Riverfront Crossings Park - Phase 4 Phase 4 of the Riverfront Crossings Park master plan adds a
new river access, an amphitheater, a kayak launch, and new
river trails.
$1,353,000
111 Riverfront Crossings Park Restroom
& Bridge
Construction of second restroom/shelter by Nature Play and
second bridge to 2nd Street; also includes removing an
abandoned trunk sewer line.
$910,000
112 Iowa River Trail, Benton To
Highway 6
This project will extend the Iowa River Trail from Benton St to
Highway 6, on the west side of the Iowa River. Future
phases of the trail could extend to Sturgis Ferry Park and on
top of the west side levee to McCollister Blvd.
$1,700,000
113 Lower City Park Master Plan
Improvements
Implement changes to make the park more resilient to
flooding. Follows from the 2015 master plan.
$23,268,522
114 East Side Sports Complex
Improvements
Build out of a new 73 acre park on the City’s east side. The
park includes expansion of various field sports as well as
serves as a neighborhood amenity. Follows from the 2015
master plan.
$14,034,794
115 Scott Park Driveway and Parking Replace the chipseal driveway and parking area at Scott Park
with a concrete surface and reconfigure the lot to more
effeciently serve additional parking
$275,000
116 Robert A. Lee Recreation Center
Pool Filter & HVAC
Post 2021 Recreation Master Plan- moved RALRC pool and
HVAC project to FY27, updated costs to replace RALRC
existing pool filtration system, add a UV disinfectant system,
upgrade deteriorated iron piping under deck, surge tank
replacment and add dehumidication HVAC system to bring
facility to current building code compliancy for air quality.
$4,060,000
117 Thornberry and Rita's Ranch Dog
Park Improvements
This project will replace and or improve trails, fencing and
other amenities at Thornberry and Rita's Ranch Dog Parks.
Thornberry will include trail resurfacing and fencing repairs.
Rita's Ranch will include a new loop trail and fencing repairs.
Both parks may include other site amenity updates.
$300,000
118 Court Hill Park Basketball Court
Renovation
Replace Court Hill Park Basketball Court and add accessible
path from trail.
$100,000
119 Kickers Playground Replacement Replace one of the playgrounds at Kickers Soccer Fields.$150,000
120 Hickory Hill Park Scott Blvd
Entrance
Entrance, parking lot, restroom, and trail connections on
parcel number 1002477001 of Hickory Hill Park adjacent to
Scott Blvd.
$575,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
121 South Hickory Hill Park Shelter
Replacement
Replace large picnic shelter in South Hickory Hill Park.$250,000
122 Mercer Scanlon Floor Replacement Replacement of tile flooring through central section of Mercer-
Scanlon Building.
$300,000
123 Riverfront Crossing Band Shell and
Storage Room
Build a permanent band shell at north end of ellipse in
Riverfront Crossing Park to accommodate performances in
the area and enclosure of the back end of the restroom
building to make a year round storage space for large event
equipment.
$300,000
124 Community Garden Enhancements Upgrades and Maintenance for Wetherby and Kiwanis
Community Garden Spaces included adding accessible,
paved paths both to and within each garden, adding fencing
to deter deer, adding additional water sources and
composting areas. Chadek Green was recently completed
and Reno Street Park gardens will be addressed as part of
larger park renovation.
$300,000
125 Oak Grove Park Renovations Oak Grove Park renovations including replacing aged
playground, replacing basketball court (full rebuild) and
adding paths for accessibility.
$400,000
126 City Park Baseball Restroom Update and add capacity to restroom facilities for the City
Park Baseball fields.
$500,000
127 Napoleon Park Softball Restroom
and Storage
Replace restroom/storage building at Napoleon Park Softball.
Remove and replace current structure with single user
restrooms and dedicated storage.
$500,000
9 - Other Projects
128 Burlington Street Median Construct the Burlington Street median from Gilbert Street to
Madison Street. Project includes relocation of water and
sewer utilities. This project will require a traffic signal
preemption system. (Part of the Riverfront Crossings
amendment to City-University URA).
$1,973,000
129 City Hall Relocation Relocate and expand / modernize City Hall and City Council
Chambers.
$12,000,000
130 Police Evidence Storage Facility Construction of a permanent evidence storage facility.$929,000
131 Central Police Station Relocation Relocate and expand / modernize Central Police Station. $19,000,000
132 Fire Station #1 Relocation Relocate and expand / modernize Central Fire Station #1. $11,593,000
133 Fire Station #6 Construction of Fire Station #6 in the Southwest Planning
District.
$2,898,000
134 Flood Buyouts This project will provide funds for the purchase of houses in
designated flood hazard buyout areas after FEMA and CDBG
buyout programs have ended.
$530,000
135 Riverside Drive Redevelopment This project includes methane abatement, excavation, and fill
at the 7 acre site owned by the City at Riverside Dr. and Hwy
6. This site preparation would allow for marketing of this
property for commercial development.
$2,527,000
136 Airport Equipment Shelter Snow removal equipment was previously stored in United
Hangar. Equipment Shelter would provide enclosed storage
for equipment.
$337,500
137 Airport Perimeter Road Construction perimeter road for maintenance and fueling
vehicles to travel to south development area.
$267,700
138 South Airport Site Development South General Aviation area site development with access
roadway and utilities.
$2,125,100
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
139 Summit Street Historic Plan Streetscape and intersection elements through Summit Street
Historic District.
$302,000
140 Traffic Signal Pre-Emption System This project will install a city-wide Geographic Information
System based traffic signal pre-emption system for
emergency vehicles. This system is necessary if the
Burlington St Median Project is constructed between Madison
St and Gilbert St.
$1,221,000
141 Iowa Interstate Railroad Quiet
Zones
The Quiet Zones project would be for design and
implementation of required upgraded warning devices and
physical infrastructure (medians and gates) for four at-grade
street crossings. The upgrades would improve safety at each
crossing and reduce the need for trains to sound their horns.
$1,000,000
142 Burlington Street Dam Modification of the Burlington Street Dam to address public
safety concerns, improve riverbank stability, improve fish
habitat, and create recreational opportunities.
$6,435,000
143 Excavator for compost operations This machine would be used primarily in the compost and
wood chip facility at the landfill to assist in safely grinding
incoming materials.
$280,000
144 Material Vending Machine-Remote
Book Returns
Purchase and installation of two library material vending
machines and two new remote book returns to be located at
$300,000
145 ICPL Children's Room Shelving Remove original (built-in) media shelving along the interior
east wall of the Children's Room and replace with shelving
that can accommodate current formats and reflects modern
materials usage. New shelving will be modular and flexible to
allow for reuse in a larger, future renovation of the Children's
Room. Existing shelving was designed to hold CDs, which
were a significant part of the Children's circulating collection
for several years. The shelves have been modified multiple
times in an attempt to maximize their useful life.
$71,500
Total - Unfunded Projects
413,001,955$