HomeMy WebLinkAbout05-01-2024 Planning & Zoning CommissionPLANNING AND ZONING COMMISSION
Wednesday, May 1, 2024
Formal Meeting — 6:00 PM
Emma Harvat Hall
Iowa City City Hall
410 E. Washington Street
Agenda:
1. Call to Order
2. Roll Call
3. Public Discussion of Any Item Not on the Agenda
4. Request: Expansion of Electric Transmission Line
Location: West terminus is MidAmerican's Northgate Substation, located within the City of
Iowa City. The east terminus is ITC Midwest's Rose Hollow Substation, located in
unincorporated Johnson County.
A petition filed by MidAmerican Energy Company for the construction of a new 161,000-volt
electric transmission line in Johnson County. Per Title 16, Public Works of the Iowa City
Municipal Code, the Planning and Zoning Commission is to make a recommendation to the
City Council.
5. Consideration of meeting minutes: April 3, 2024
6. Planning and Zoning Information
7. Adjournment
If you will need disability -related accommodations to participate in this meeting, please contact
Anne Russett, Urban Planning, at 319-356-5251 or arussett(a)iowa-city.org. Early requests are
strongly encouraged to allow sufficient time to meet your access needs.
Upcoming Planning & Zoning Commission Meetings
Formal: May 15 / June 5
Informal: Scheduled as needed.
AGENDA ITEM 4.
Request: Expansion of Electric Transmission Line
Location: West terminus is MidAmerican's Northgate
Substation, located within the City of Iowa City. The east
terminus is ITC Midwest's Rose Hollow Substation, located
in unincorporated Johnson County.
CITY O IOWA CITY
MEMORANDUM
Date: April 26, 2024
To: Planning and Zoning Commission and City Council
From: Ron Knoche, Public Works Director
Re: Proposed MidAmerican Energy Company Transmission Line Expansion
Backaround Information:
MidAmerican Energy Company (MidAmerican) has filed a petition with the Iowa Utilities Board for
a franchise to construct a new 161,000-volt electric transmission line in Johnson County. The
west terminus of this proposed transmission line is MidAmerican's Northgate Substation, located
within the municipal boundary of the City of Iowa City. The east terminus of the proposed
transmission line is ITC Midwest's Rose Hollow Substation, located within Johnson County but
outside the limits of the City of Iowa City. A map of the proposed route is attached.
The proposed transmission line expansion will be on or over the public right-of-way and it is
located partially within the municipal boundary of the City of Iowa City. As such, City Code chapter
16-2 applies. This memorandum is provided in accordance with Chapter 16-2 and provides a
staff recommendation for action on the proposal.
As outlined in section B of 16-2A-5, it is the role of the Planning and Zoning Commission to review
the materials submitted by the electrical utility company and make a recommendation to the City
Council. The Planning and Zoning Commission should consider:
a. The relationship of the proposed project to present and future economic development of
the area.
b. The relationship of the proposed project to the existing electrical utility system and parallel
existing utility routes.
c. The relationship of the proposed project to the present and future land use and zoning
ordinances.
d. The inconvenience or damage which may result to property owners as a result of the
proposed project.
Within sixty (60) calendar days of receipt of the recommendation of the Planning and Zoning
Commission, which shall include the director's recommendation, the City Council shall, by
resolution, either approve or disapprove said proposal based on the standards and criteria stated
above and on the recommendation received.
Analysis:
The proposed transmission line will follow an existing utility corridor on private property (outside
the public right-of-way) that includes existing overhead electric lines. The proposed transmission
line will cross an unimproved area of Harvest Road right of way south of 1-80 and an unimproved
area of 340t" Street NE north of 1-80 within the City of Iowa City. The proposed route is located
April 26, 2024
Page 2
adjacent to 1-80 and will provide a connection between two existing substations. Based on these
facts, the proposed transmission line expansion is not expected to significantly impact the public
right-of-way or the abutting property owner's enjoyment of their property, and therefore complies
with the purpose of City Code section 16-2.
Staff Recommendation:
Staff recommends approval of the proposed transmission line expansion.
Attachments:
1. Map of Proposed Route
2. Exhibit A — Description of transmission line installation
3. Exhibit B — Proposed and existing transmission and distribution lines
4. Exhibit C — Engineering specifications for transmission line installation
26149 y
320TH STt- 4"
35
'rlE eT cT
3
c I
N. SC
DHNSON
OUNTY
'r�
w
25 30 �% 29
31 32
6 110 00
FL -P
340TH ST su
Ar, —LA uj I i
F�PELINE
I(2 LINES)
T [BLVD.5
4
'L c�
su- -- -
/01 HERBERT ER
0250 105o imo 204]
GRAPHIC SCALE IN FEET
1 "=2(M'
LEGEND
PROPOSED 161kV LINE
EXISTING 161kV LINE
EXISTING 161kV LINE TO BE DOUBLE CIRCUITED
CORPORATE LIMITS
M
M
s
CIVIL ENGINEERS
LAND PLANNERS
LAND SURVEYDRS
LANDSCAPE ARGMTET5
ENVIRONMENTAL SPECIALISTS
1911 S. GILBERT ST.
I0VVA CITY, IO A 52244
(319}381-8282
www.mmsconsoitants. net
cake Revb1on
DAMES ICAN ENEM Y COMPAN Y
1161 �V TRANSMISSION LINE
HRTHTE SUBSTATION
TO ROSE HOLLOViol SUBTATI0K
JOHNSON COUNTY,
O1 A
MMS CONSULTANTS. IN _
Qdte,
DATE
cycd by. old Book No-
DMW 1358
Drov4n by- Ie=
D = 2 00'
Oher,ke,d Shook N�
A 1
Projer- Ng; j5p
4863 t141 C�pi 1
Exhibit A
Filed with the Iowa Utilities Board on February 21, 2024, E-22537
EXHIBIT A
161,000 V Nominal, (169,000 V Maximum)
Electric Transmission Line
Johnson County, Iowa
Northgate to Rose Hollow
The west endpoint of this line is on the Municipal Boundary of the City of Iowa City, Iowa
approximately 0.06 mile east and 0.01 mile south of the Northwest corner Section 6,
Township 79 North, Range 5 West of the 5th P.M., Johnson County, Iowa; The west
terminus of this line is MidAmerican Energy Company's Northgate Substation located
approximately 0.53 mile east and 0.02 mile south of the northwest corner of Section 1,
Township 79 North, Range 6 West of the 5th P.M., Johnson County, Iowa.
The east endpoint/terminus of this line is ITC Midwest's Rose Hollow Substation located
approximately 0.05 mile north and 0.27 mile east of the southwest corner of Section 32,
Township 80 North, Range 5 West of the 5th P.M., Johnson County, Iowa.
The west terminus of this line is MidAmerican Energy Company's Northgate Substation
located approximately 0.02 mile south and 0.53 mile east of the northwest corner of Section 1,
Township 79 North, Range 6 West of the 5th P.M., Johnson County, Iowa. Beginning at the west
endpoint of the line on the Municipal Boundary of the City of Iowa City, Iowa approximately
0.06 mile east and 0.01 mile south of the Northwest corner of Section 6, Township 79 North,
Range 5 West of the 5th P.M., Johnson County, Iowa; thence east on private property in the
north half of said Section 6 for approximately 0.21 mile, to a point in public road right of way,
0.26 mile east and 0.01 mile south of the northwest corner of said Section 6, adjacent to the south
right of way line of 340th St NE in the Northeast Quarter of the Northwest Quarter of said
Section 6; thence east in public right of way adjacent to the south right of way line of 340th St
NE and crossing Taft Ave in the north half of said Section 6 for approximately 0.75 mile, to a
point in public road right of way, 0.01 mile south of the northwest corner of Section 5, Township
79 North, Range 5 West of the 5th P.M., Johnson County, Iowa, adjacent to the south right of
way line of 340th St NE of said section 5; thence east in the public right of way adjacent to the
1
Filed with the Iowa Utilities Board on February 21, 2024, E-22537
south right of way line of 340th St NE in the north half of said Section 5 for approximately 0.24
mile, to a point in public road right of way, 0.24 mile east and 0.01 mile south of the northwest
corner of said Section 5, adjacent to the south right of way line of 340th St NE in the Northwest
Quarter of the Northwest Quarter of said Section 5; thence north crossing 340th St NE continuing
on private property for approximately 0.05 mile in the Southeast Quarter of the Southwest
Quarter of said Section 32, Township 80 North, Range 5 West of the 5th P.M., Johnson County,
Iowa; said point also being at the east endpoint/terminus at ITC Midwest's Rose Hollow
Substation located approximately 0.05 mile north and 0.27 mile east of the southwest corner of
Section 32, Township 80 North, Range 5 West of the 5th P.M., Johnson County, Iowa.
The total distance of this 161,000 V transmission line in Johnson County, Iowa, is
approximately 1.25 miles.
2
Exhibit B
Filed with the Iowa Utilities Board on February 21, 2024, E-22537
END POINT/
TERMINUS
END POINT/
FEATURES
R-6W
R-�w
Al THE
TERMINUS
ITC MIDWEST
AT THE.
ROSE HOLLOW
RC MIDWEST
ROSE HOLLOW
RAPID CREEK
RD NE
SUBSTATION IN THE
SE 114, SW 114 SEC. 32 '
3 SIJ6STATION IN THE
SE 114, SW 114 SEC. 32
T-SON, R-5W, 5TH P.M.
INTERSTATE HWY
T-80N, R-5W, 5TH P.M.
'
JOHNSON COUNTY, IOWA
IOWA CITY
JOHNSON COUNTY, IOWA
CORPORATE BOUNDARY
2
1
Qa STATE HWY
PRIMARY ROAD
2
h
36
J
31 3
B 5 4
SECONDARY ROAD
t LYNDEN DR
,
SECTION LINE
3 340TH 5757 NE
— --
, M1 3
CORPORATE LIMITS
DETAIL 1
�cgTI
a DETAIL 1
=
��¢
LYNDENW s
;S—
— — DESIGNATES PORTION OF
J—�
NE
6 1
a
PROPOSED TRANSMISSION
_ �.- - i1'•;
7
�J 4
GRAHAM 71NP
-
CIRCUIT THAT IS WITHIN
CORPORATE LIMITS
T-80N -
340TH ST NE
SCO7iTWP
— _
T-i9N _-` .! ; s
~a
5
SUBSTATION
3
4
ITC MIDWEST
c
I
COMMUNICATION TOWER
SCOTT BLVD
$o
--
RIVERS I STREAMS
I
6 HI POINT
GOLF COURSE
N
I
�P�Spca
{
Y
\END
TERMINUS POINT
AT THE MIDAMERICAN AT THE MUNICIPAL BOUNDARY
IOWA CITY —
ENERGY COMPANY OF THE CITY OF IOWA CITY
CORPORATE
NORTHGATE SUBSTATION IN THE NW 114, NW 114 SEC. 6
BOUNDARY
IN
THE NE 1/4, NE 114, SEC. 1 T-79N, R-5W, 5TH P.M.
T-79N, R-6W, 5TH P.M. JOHNSON COUNTY, IOWA
JOHNSON COUNTY, IOWA
W
E
JOHNSON
S
ELECTRIC TRANSMISSION LINE TO BE FRANCHISED
UNDERGROUND PIPELINE COMPANIES
RURAL WATER DISTRICT
MAfJMUM
MAP SYMBOL NOMINAL LENGTH GF
OPERATINGOWNER
MAGELLAN MIDSTREAM PARTNERS, LLC
a
IOWA CITY WATER DEPARTMENT
AND NOTATION VOLTAGE p TA�GEG LINE (MILES)
ONE WILLIAMS CENTER
410 EAST WASHINGTON ST
- - - TULSfi CR 74172
IOWA CITY, IOWA 52240
MIDAMERICAN ENERGY COMPANY �Z•.. MIDAMERICAN ENERGY COMPANY
161 kV 169 kV 128 ML 666 GRAND AVE-, P. D. BOX 657 S66 GRAND AVE., P.O.BOX 657
DES MOINES. IA 50306.0657
DES MOINES, IA 5)""657
COMMUNICATION COMPANIES
LUMEN LIBERTY COMMUNICATION S
ELECTRIC TRANSMISSION LINES
ELECTRIC DISTRIBUTION LINES
MMONROEULA71n3RIVE WESTLBI ERTY, A52776
o vaMl
1 MI
MAP SYMBOL NOMINAL OMER
hNP 9YMDOL
AND NUFATION YVI.Twe OWNED!
IOWA COMMLINICATIONS NETWORK
GRIMES STATE OFFICE BLDG.
SCALE
AND NOTATION VOLTAGE
I
400 E. 147H ST.
DES MOINES, IA 50319
MIDAMERICAN ENERGY COMPANY
13 kV MIDAMERICAN ENERGY COMPANY
666 GRAND AVE., P. O- BOX 657
VERIZON
161 kV 666 GRAND AVE-, P- O. BOX 657
16
DES MOINES, IA 5(k. 8 0657
ONE VERIZON WAY
MIDAMERICAN ENERGY COMPANY
DES MOINES, IA 50306.0657
® 132 kV MIDAMERICAN ENERGY COMPANY
BASKING RIDGE, NJ 0700
SOUTH SLOPE COOPERATIVE
ITO MIDWEST LLC
3 4YUG 666 GRAND AVE., P. O. BOX 657
FRANCHISE FOR A 161 kV
161 W In 5TH ST SE
CEDAR RAPIDS, IA 52401
- - - fig- - - DES MOINES, IA 50306-0657
ELECRIC CO-OP
990 N FRONT ST-
NORTH LIBERTY, IA 52317
TRANSMISSION LINE I N
MIDWEST
O 7'I %INN9S RCO.EC DRRAL
1 0
MEOIACOM IDWA CITY
69 kV 123,97H
MARION. IOWA ! 2
546 SO[1THGATE AVE
CEDAR RAPIDS. IA 52A01
247 kV LINK CO RURAL ELECRIC CO-OP
13
IOWA CITY, IA 52240
CIPCO - CENTRAL IDWA POWER COOPERATIVE
60 kV 26CO GRAND AVENUE SUITE M0
0 B UG 6695MARREGIOWA 52302
- -U9- -
1M1R D AVE UNr SUITE S
JOHNSON
DES MOINES, IA 50312
12LINN CO RURAL ELECRIC COOP
CEDAR RAPIDS, €A 52404
O .300kV 56"REC OR
WINOSTREAM COMMUN ICA[IONS
.( DESIGNATES THAT TRANSIA29ION CIRCUIT
MARION, IOWA 52302
4001 RODNEY PARHAM RD-
�+
COUNTY,
TO BE FRANCHISED WILL BE DOUBLE CI RCUI7
WITH EXISTING TRANSMISSION CIRCUIT
�� LINN CO RURAL ELECRIC COAP
71 kV wJ5 REC DR.
LITTLE ROCK, AR 72212
WHICH lS TO BE REMOVED AND REB[11LT
L - i 1 0 MARION, IOWA 52302
ON NETWORK SERVICES
IOWA
RE
TO BE REMOVED
7T60
77B0 OFFICE PLAZA OR. 5.
PLAZA
WESTOESMOINES,056266
EXHIBIT B
Exhibit C
Filed with the Iowa Utilities Board on February 9, 2024, E-22537
EXHIBIT C
Engineering Specifications for an Overhead Transmission Line
Segment 1 of 2
PRINCIPAL CIRCUIT
1. Name of Petitioner: MidAmerican Energy Company
2. Name or Circuit Number of Line: MidAmerican Energy Northgate Substation to ITC Midwest
Rose Hollow Substation
3. Length of Segment: 0.76 miles
4. Segment is located in the following sections, townships, and ranges: Section 6, T-79N, R-5W
and Section 32, T80N, R5W
5. Segment will be constructed in 2024.
6. Segment will be maintained in accordance with the Iowa Electrical Safety Code and the 2017
Edition of the National Electrical Safety Code.
7. Maximum Capable of Operating Voltage: 169 kVAC Nominal Operating Voltage: 161 kVAC
8. Construction Grade: B Typical Span: 288 ft. Maximum Span: 341 ft.
9.
10
11
12
Vertical Overhead Clearance Requirement* for the Phase Conductors
Surface
Basic
Clearance
+ Voltage Adder +
Additional
Adders
= Clearance
Open Ground
18.5 ft.
+ 2.6 ft. +
ft.
= 21.1 ft.
Roads
18.5 ft.
+ 2.6 ft. +
ft.
= 21.1 ft.
no RR crossings
ft.
+ ft. +
ft.
= ft.
no water surfaces
ft.
+ ft. +
ft.
= ft.
I he Iowa Electrical Satety Uode and the applicable edition of the NESU should both be reterenced to determine the conditions at
which the above clearances apply.
Phase Conductors:
13. Code Word: T-2 Dove Size: 1113 kcmil equivalent Stranding: 2617 Material: ACSR
Shield Wire(s):
14. Size: OPGW (36 fiber 0.587") Stranding: 1114 Material: Aluminum pipe/Aluminum clad steel
15. Frequency of Shield Wire Grounding (if applicable): At each structure
16
17
18
19
20
21
22
Typical Insulators
Post Type
Suspension Type
Tan. / Ang.
N/A
Strain
String of 12 Bells
Manufacturer
Hubbell
Sediver
Catalog number
P300053SO 130
N 141146
Dry Flashover
550 kV
kV
690 kV
Wet Flashover
500 kV
kV
490 kV
Impulse Flashover, +
855 kV
kV
1,150 kV
Impulse Flashover, —
950 kV
kV
1,160 kV
Rev. 6/2020
Filed with the Iowa Utilities Board on February 9, 2024, E-22537
- 2 - Rev. 6/2020
Filed with the Iowa Utilities Board on February 9, 2024, E-22537
Typical Structures:
23. Structures Typically are: Wood Poles
24. Typical Height After Installation: 60-78 ft.
Typical Wood Pole:
25. Species: Douglas Fir Treatment: 112"Pentrix plus Life Span(Penta) Class: H3-H6 Length: 70-
90 ft.
Steel Structures:
26. Steel Pole or Tower Material: Weathering directly embedded or with concrete foundation and
anchor bolts
27. H-Frame Structure Bracing Type: NIA
Spacing Between H-Frame Poles: NIA ft.
28. Support Arm Type: NIA Material: NIA Dimensions: NIA
29
Guys are: NIA Guy Markers are: NIA,
SECOND TRANSMISSION CIRCUIT (if applicable)
30. Name of Owner: NIA
31. Name or Circuit Number of Line: NIA
32. If Franchised Separately, Docket Number of Order Granting Franchise: NIA
33
34
35
36
37
03
39
40
41
42
43
44
45
Maximum Capable of Operating Voltage: "Nominal Operating Voltage: "
Vertical Overhead Clearance Requirement* for the Phase Conductors
Surface
Basic
Clearance
+ Voltage Adder +
Additional
Adders
= Clearance
Opera Ground
ft.
+ ft. +
ft.
= ft.
Roads
ft.
+ ft. +
ft.
= ft.
no RR crossings
ft.
+ ft. +
ft.
= ft.
no water surfaces
ft.
+ ft. +
ft.
= ft.
The Iowa Electrical Safety Code and the applicable edition of the NESC should both be referenced to determine the conditions at
which the above clearances apply.
Phase Conductors:
Code Word: NIA Size: NIA Stranding: NIA Material: NIA
Typical Insulators
Post Type
Suspension Type
Tan. / Ang.
(select)
Strain
(select)
Manufacturer
Catalog number
Dry Flashover
kV
kV
kV
Wet Flashover
kV
kV
kV
Impulse Flashover, +
kV
kV
kV
Impulse Flashover, —
kV
kV
kV
- 3 - Rev. 6/2020
Filed with the Iowa Utilities Board on February 9, 2024, E-22537
46. Support Arm Type: NIA Material: NIA Dimensions: NIA
DISTRIBUTION UNDERBUILD (if applicable)
47. Name of Owner: NIA
48. Nominal Voltage: NIA
49
50
51
52
53
54
55
56
57
58
Number of Distribution Phase Conductors: NIA
Neutral is Multi -grounded Multi -Grounding Frequency: NIA
Vertical Overhead Clearance Requirement* for the Phase Conductors
Surface
Basic Clearance
+ Additional Adders =
Clearance
Open Ground
ft.
+ ft. -
ft.
Roads
ft.
+ ft. -
ft.
Railroads
ft.
+ ft. -
ft.
Water
ft.
+ ft. =
ft.
The Iowa Electrical Satety Gode and the applicable edition of the NESG should both be reterenced to determine the conditions at
which the above clearances apply.
Vertical Overhead Clearance Requirement* for the Neutral Conductor (if applicable)
Surface
Basic Clearance
+ Additional Adders =
Clearance
Open Ground
ft.
+ ft. =
ft.
Roads
ft.
+ ft. =
ft.
Railroads
ft.
+ ft. =
ft.
Water
ft.
+ ft. =
ft.
I he Iowa Electrical 5atety Gode and the applicable edition of the NESG should both be referenced to determine the conditions at
which the above clearances apply.
59. Support Arm Type: NIA Material: NIA Dimensions: NIA
TYPICAL STRUCTURE DRAWING
60. A drawing of a typical tangent structure, as described in the instructions, has been attached.
ADDITIONAL DRAWINGS REQUIRED FOR NEW CONSTRUCTION
61. Angle structures will not be used in this segment of line. A drawing of a typical angle structure,
as described in the instructions, has not been attached.
62. Dead-end structures will be used in this segment of line. A drawing of a typical dead-end
structure, as described in the instructions, has been attached.
ADDITIONAL DRAWINGS REQUIRED FOR ALL DOCKETS
63. There are no grain bins along this segment of line. Drawings showing the clearance envelope
for each grain bin in relation to the subject line are not required.
64. There are no conductor crossings along this segment of line. Drawings showing the conductor
crossing clearance envelope for each crossing in relation to the subject line are not required.
- 4 - Rev. 6/2020
Filed with the Iowa Utilities Board on February 9, 2024, E-22537
65. There are no structures along this segment of line. Drawings showing the clearance envelope
for each structure in relation to the subject line are not required.
- 5 - Rev. 6/2020
6"
10'-6"
65.6"
5-0"
GROUNDING
DETAIL
EXHIBIT C
161 kV TRANSMISSION LINE SEGMENT
MIDAMERICAH TYPICAL WOOD 1 OF 2
E N E RGY COMPANY TANGENT STRUCTURE REV. NO. I DATE
0 1/22/24
1
A A
T
GROUND
B" 3
LUG
SECTION A -A
B B
3"
7'-0'
N
7'-0"
SECTION B-B
GROUND
LUG
2'-0"
#4 COPPERWELD ;
COPPERBONDED
GROUND ROD
GROUNDING
DETAIL
EXHIBIT C
MID MERICAN 161 KV TRANSMISSION LINE SEGMENT
A
E N E RGY COM PANY. TYPICAL STEEL DEAD-END OF 1
REV. NO.
DATE
0 513119
Filed with the Iowa Utilities Board on February 9, 2024, E-22537
HUBBELL
Power Systems, Inc.
Quadri*Sil Horizontal Line Post
Insulator
By OHIO BRASS
Catalog # P300053SO130
3" Line Post, Standard Leak, Two Hole Blade, Steel Flat Base
with 8"x10" holes for 3/4" bolts, 9"x13" holes for 7/8" bolts, and
14" CL holes for 1" bolts.
Features
• Made from hydrophobic silicone polymer
General
Cantilever Bending Strength -
4720 LB
Max.
Cantilever Bending Strength -
2360 LB
Routine
Fitting - Ground End
Steel Flat
Fitting - Live Line End
Tear Drop Blade
Number of Sheds
44
Shed Style
Uniform
Dimensions
Angle
14
Diameter - Shed(s)
8.2
Length
12 in
Length - Effective
65.6 in
Rod Diameter
3.000 in
Width
9 in
�Hu ELL) A proud member of the Hubbell Family.
*Representative Image
Electrical Ratings
Arc Distance - Dry 55.7 (1415MM)
Creep and Leakage Distance 167.7 (4260MM)
Critical Impulse Flashover 950
(CIFO) - Negative
Critical Impulse Flashover 855
(CIFO) - Positive
Flashover Voltage - 60 Hz Dry 550
Flashover Voltage - 60 Hz 500
Wet
Voltage Rating 161 kV
Product Assets
Catalogs - Quadri'Sil Suspension & Line Post Insulators
Catalog (CA08051E)
Video - Ohio Brass Insulator Crate Packaging (VIO816E)
Video - Ohio Brass Proper Insulator Handling (V108008E)
Video - Ohio Brass Polymer Insulator Tester (V108041E1015)
:2023 Hubbell Incorporated. Ail rights reserved.
013-P300053S0130-SPEC-EN 1 REV 9/2023
Filed with the Iowa Utilities Board on February 9, 2024, E-22537
Ball & Socket coupling
Standard type=
rD4:D
CATALOG No
NJ(111146
N1001146 1
53-3
112)146
52-5
F3141t4fi Ni661145
52-5
N1I1QJi46
52-8
52-3
14211156
52-11
F3001195
ANSI class 52-3
BETE rind Wket rdupling
Type 3
Type 9
Type2
Type 1
Type K
Type K
Type K
IEC 2a
MECHAN [CAL CHARACTERISTICS
Lo hiried MM LtrengUS
it's
15-OM
22At10
25-OUD
311
3b.DDU
40.L>sJ0
50Ao0
643-OQO
AN
A'
1170
120
176
160
f 80
222
300
Impact i rtegth
In -Rs
400
40C
4GO
4M
43D
4DG
400
400
N-rrr
45
43
45
45
45
45
45
45Teiriiwa
prcaf
III
7-5co
11 'COD
12.500
15.DDO
le.00o
20.pD3
25.000
33. 1)
YN
W
so
fit?
&A
80
90
T11
T56
DIMENSIONS
018.e lD3
in
19
1D
10
TO
11
11
11
1214
man
2S
255
255
255
28C
280
2SO
320
5pntifig is3
in
5 h.
5 it
S 14
5 34
5 3M
5 34
6Ife
711116
min
Tu
ME
MY
T46
1`46
NIS
r56
r95
Leakage distance
in
12 !r
12 are
1254
12 sm
is
Is
15
19
mm
321r
322T
320
320
38C
360
3W
aw
ELECTRICAL CHARACTERISfItS
L-1r 9uenry dry ltashourr
kV
90
So
80
a0
BD
Bo
a0
95
Low frequency wei ileehaver
kV
51
SID
51i
50
5o
5o
SD
55
[ritual wrpur a 1te fsnvek r
kV
125
125
125
US
125
125
t40
145
Critical 'Fmpuat lulhov=r -
kV
130
13D
13D
130
130
130
14C
145
Low frequency puncaure v Fuge
kV
110
130
133
1M
136
130
130
130
RLV low Irequenty tilt v,Atege
kV
19
I D
10
to
10
10
10
10
Mbrr_ RIV At 1 MHk
pV
50
5c
So
So
So
5G
50
so
RACKING AND SHIRRING DATA
Appear, rretweight per unit
111
0.8
0.0
a.6
B.B
13.2
14-1
16
24
No of irculetor6 per trati
6
6
6
6
6
5
6
5
Vbkone per ar8te
Nt
1.977
1.977
1.977
1-977
2.472
2.472
2.472
3.531
Gross weight per teal=
ika
59-5
59.5
59.5
70.5
97
101.4
11 D.2
163.1
No. of it u aua per pa9.et
72196
F2196
72146
72rA
54
54
54
45
Vnirrne per pallet
its
3531a9-d
3531a94
5 31a9_a
35349 d
42.3
42.3
a23
as_9
Gross weight per paled
16e
7491970
749197C
7491970
37011157
Sal
9133
1003
1234
Former designation
N12
M14
Nib
Nis
N21
-
II
C.sicrr I:ro7�:ii, nai shown hero- errs aim awls6lo
Corrosion prevention solutions
€orrosicin ;preverdion ring
In severely corrosive marine and industrial atmospheres, the galvanized gating an
suspension insulator pins may deteriorate over time and be followed by corrosion of
the pin itself- To prevent this form of pin damage, Sediver can supply, when needed
insulators equipped with a corrosion retardation ring made of high -purity zinc. The
insulators are than designated by " Il M14f146 becomes N141146DCj.
Heavy galvanization
All Sediver ferrous rretal fittings are hot -dip galvanized. NEC 60383•1, ,4STIVi A153.82
require a zinc coating mass of 600 g2m2 - or BS 11 In severe conditions, where this
standard protection is known to be Insufficient, Sediver offers enhanced protection of
the cap and the pin by increasing the thickness of zinc from 83 pm to 110 pin, err
up to 125 12m.
8
Filed with the Iowa Utilities Board on February 9, 2024, E-22537
Sediver° toughened glass suspension insulators
ANSI string electrical ratings
Standard profile
Standard profile suspension insulator string flashover voltages based on the test procedure of the American
Standard ANSI C 29.213.
Catalog N100/146 - N14/146
No
Low frequency
Number flashover voltage
of (kv)
units
DRY WET
- N 180/146
Critical impulse
flashover voltage
(kV)
+ -
N21/156
Low frequency
flashover voltage
(kV)
DRY WET
2 145 90
220 225
145
90
3 205 130
315 320
210
130
4 270 170
410 420
275
170
5 325 215
500 510
330
215
6 380 255
595 605
385
255
7 435 295
670 695
435
295
8 485 335
760 780
490
335
9 540 375
845 860
540
375
10 590 415
930 945
595
415
11 640 455
1015 1025
645
455
12 690 490
1105 1115
695
490
13 735 525
1185 1195
745
525
14 785 565
1265 1275
790
565
15 830 600
1345 1360
840
600
16 875 635
1425 1440
890
635
17 920 670
1505 1530
935
670
18 965 705
1585 1615
980
705
19 1010 740
1665 1700
1025
740
20 1050 775
1745 1785
1070
775
21 1100 810
1825 1870
1115
810
22 1135 845
1905 1955
1160
845
23 1180 880
1985 2040
1205
880
24 1220 915
2065 2125
1250
915
25 1260 950
2145 2210
1290
950
26 1300 985
2220 2295
1330
958
27 1340 1015
2300 2380
1370
1015
28 1380 1045
2375 2465
1410
1045
29 1425 1080
2455 2550
1455
1080
30 1460 1110
2530 2635
1490
1110
eseTh electrical ratings are applicable to Seive suspension insulator strings not equipped with arcing devices or grading rings.
According to the American Standard the average value of three tested strings shall equal or exceed:
95% of the guaranteed values as given in the data sheet, for low frequency dry flashover,
14 90% of the guaranteed values as given in the data sheet, for low frequency wet flashover,
192% of the guaranteed values as given in the data sheet, for critical impulse flashover.
Critical impulse
flashover voltage
(kV)
230 230
325 330
425 440
515 540
610 630
700 720
790 810
880 900
970 990
1060 1075
1150 1160
1240 1245
1330 1330
1415 1420
1500 1510
1585 1605
1670 1700
1755 1795
1840 1890
1925 1985
2010 2080
2095 2175
2180 2270
2260 2365
2390 2465
2470 2555
2570 2650
2650 2740
2740 2830
Filed with the Iowa Utilities Board on February 9, 2024, E-22537
Alcoa Fuj ikura Ltd. Specification No.: DNO-4711
Tel ecommuni cati ons D i vi Si on 10
43L
D0 Rgevican, SC334 �2 Circle AC-77/587
Completed Cable Detailsfor Optical Ground Wire
Section 1.0 Introduction
Features and Bend is Thi s cabl e deg gn i s a very economi cal opti cal ground wi re deg gn
provi di ng f ul l functi oral ity and rel i abi I ity for a I ow pri ce.
The I oose tube core al i ows the f i bers to move, el i mi nazi ng f i ber strai in at operati ng teng ons.
The al umi num pi pe provi des a hermeti c seal and excel I ent crush reg stance, whi I e al so
providing an effective path for fault currents
The outer wi res are custom -matched to the deg gn to provi de the opti mal I evel of conductivi ty,
strength, and I i ghtni ng red stance, whi I e mai ntai ni ng the smal I est di amber and I i ghtest wei ght
possi bl e.
A I I of A FL's aeri al cabl es are deg gned for a 40 year proj ected I i fe.
Section 2.0 Cable Component Cross Sectional Views
Rgpresentative Loose Buffer Tube
Buffer Tube
(Gel Fi I I ed)
Opti cal Fi bers
RepresentativeAluminum PipeDe9gn*
* Reference Section 3.0 for actual wirediameters and c
Al umi num Clad
® � Steel Strands
— Aluminum Pipe
Representative Three Buffer Tube Design
Binder Tape
Optical Units
(Three)
DNO-4711 4/27/2004 Version 7.6
Printed on 4/27/2004
Page 1 of 3
Filed with the Iowa Utilities Board on February 9, 2024, E-22537
Alcoa Fuj ikura Ltd. a
Tel ecommuni ceti ons Divi s on
Section 3.0 Completed Cable Detailsfor Optical Ground Wire
Nominal Cable Size
A C-77/587
Component Diameters Count
Center
AI urr-i num R pe 1
------------------------------------------------------------------------------
L ayer 1
Aluminum Clad Steel (20.3% IAC) 14
------------------------------------------------------------------------------
Component Areas
Center
AI un�i num R pe
-------------------------------------------------------------------------------
L ayer 1
Aluminum % A
-------------------------Clad--------Steel-----(20.3------------I----C) -------------------------
Total Conductor Area
9.60 mr 0.3780 i n
----------------------------------------------------------------------
2.65 mr 0.1043 i n
----------------------------------------------------------------------
42.68 mrf 0.0661 i
77.22 mm'- 0.1197 i r�
--- -------------
119.89 mr -F 0.1858 i r-F
Calculated Breaking Load
Maximum Cable Design Tension
10,122 kg
8,098 kg
22,315 IbE
17,852 Ibs
Approximate Cable Diameter
14.9 mT
0.587 it
Approximate CableWdght
652 kg/km
2,312 Ibs(mile
Calculated d.c. Resistance (20"M
0.4288 Ohmslkm
0.6901 Ohms'mile
Modulusof Elasticity
12,571 kgtmrr- 17,879 kpsi
Coefficient of Ling Expansion
1.46E-05 VOC 8.10E-06 11°F
Short Circuit Rating (400CAmbient)
104 (kA)2-sec - - -
Short Circuit Duration 1 sec
Current 10.2 kA ---
Maximum CableTemperature
210 °C 410 °F
Lay Direction Layer 1
Left
Alcoa Sag10TM Chart Number
1-1450
D N 0-4711 4/27/2004 V ersi on 7.6 Page 2 of 3
Pri nted on 4127/2004
Filed with the Iowa Utilities Board on February 9, 2024, E-22537
Alcoa Fuj ikura Ltd. a
Tel ecommuni cati ons Di vi si on
Section 4.0 Fiber Characteristics
M axi mum Attenuati on
0.40 dB/km 1310 nm
0.30 dB/km 15M nm
Fi ber
Unit R ber Type Count
Blue
SM F-28e 100kpsi fibers
12
Orange
SM F-28e 100kpsi fibers
12
Green
SM F-28e 100kDsi fi bers
12
Total Fiber Count 36
Fiber 1 Unit Color Code
Fiber No
1
1 2
1 3
1 4
1 5
1 6
1 7
1 8
1 9
1 10
1 11
1 12
Color
I Blue
I Orangel
Green
I Brown
I Slate
I White
I Red
I Blade
I Ydlow
IViolet
I Rose
I Aqua
Desi gns wi th more than 12 f i bers per tubes wi I I use the standard col or code and appropri ate stri pes or
bindersfor identification of the fibers
Section 5.0 1 nstallation Recommendations
Recommended i nstal I ati on and cabl a end preparati on procedures for thi s cabl a are outl i ned i n
the fol I owi ng AI oca Fuj i kura Ltd. documents
Recommended I nstal I ati on Procedures for Composite Opti cal Ground Wi re
I nstal I ati on I nstructi ons for I nstal I i ng Opti cal Ground WireinanAlcoaFuj ikuraLtd.
Spl ice Encl osur e
End of Specification
D N 0-4711 4/27/2004 V ersi on 7.6 Page 3 of 3
Pri nted on 4127/2004
AGENDA ITEM 5.
April 3, 2024 Meeting Minutes
MINUTES PRELIMINARY
PLANNING AND ZONING COMMISSION
APRI L 3, 2024 —6:00 PM —FORMAL MEETING
E M M A J. HARVAT HALL, CITY HALL
MEMBERS PRESENT: Susan Craig, Maggie Elliott, Mike Hensch, Billie Townsend, Chad
Wade
MEMBERS ABSENT: Maria Padron, Scott Quellhorst
STAFF PRESENT: Madison Conley, Sara Hektoen, Anne Russett, Parker Walsh
OTHERS PRESENT: Tom Anthony, Will McBride, Barbel Anderson, Gina Landau, Jerry
Full
RECOMMENDATIONS TO COUNCIL:
By a vote of 5-0 the Commission recommends approval of SUB23-0009, an application
submitted by Barbel Anderson for a combined preliminary and final plat of Bab's First Addition, a
3.74 acres subdivision containing two residential lots and two outlets located at 1310 Cedar
Street.
By a vote of 5-0 the Commission recommends approval of SUB23-0011 an application submitted
by Northgate Land LLC for a combined preliminary and final plat of Highlander Development
Fifth Edition, a 39.96 acre subdivision containing one commercial lot, one outlot for stormwater
management and two outlots reserved for future development.
CALL TO ORDER:
Hensch called the meeting to order at 6:00 PM.
PUBLIC DISCUSSION OF ANY ITEM NOT ON THE AGENDA:
None.
CASE NO. SUB23-0009
Location: 1310 Cedar St
An application for a combined preliminary and final plat for Bab's First Addition, a 3.74-acre
subdivision containing two residential lots and two outlots to accommodate two single-family
homes.
Russett began the staff report showing the zoning map and noted the property is zoned RS-5.
She also noted there is a lot of City land around this property, Reno Street Park is to the west
and then Oakland Cemetery and Hickory Hill Park are to the north and east and all are zoned
Public but most of the rest of the area is zoned single family residential. In terms of background
1310 Cedar Street is a historically significant site, there's a Greek Revival home that's on the
property now which will remain as part of this subdivision. This site has never been subdivided,
and the request is to create one new residential lot for one new single-family home with the
existing home remaining at 1310 Cedar Street. Russett showed the combined preliminary and
final plat noting it's 3.74 acres with two outlots and two residential lots. The existing home will be
Planning and Zoning Commission
April 3, 2024
Page 2 of 12
located on what will become lot two and is about two acres. Lot one is where the new single-
family home will go, which is one acre and then there are two outlots. Outlot A will be dedicated
to the City of Iowa City and outlot B will remain under current ownership and be private open
space not to be developed. Both lots will be accessed from Cedar Street and there's existing
water and sanitary sewer service in this area. Russett noted however there is not a sidewalk
currently so a five-foot sidewalk will need to be installed as part of this request.
Russett stated this is an infill development, which is encouraged by goals and policies in the
Comprehensive Plan, which encourage development in areas that already have infrastructure
and services. In terms of environmentally sensitive areas, the proposed subdivision is exempt
from the sensitive areas ordinance since they are only proposing to build one single family home
and disturbing less than 20,000 square feet. In terms of neighborhood open space, the applicant
is required to either dedicate land or provide a fee in lieu to satisfy the neighborhood open space
requirement and they have opted to dedicate outlot A to the City of Iowa City for an extension of
Oakland Cemetery which meets the neighborhood open space requirements. Stormwater
Management is going to be provided on site through a detention basin which the City's public
works staff has reviewed.
Staff received one piece of correspondence in support of this subdivision which was provided to
the Commission.
Staff recommends approval of SUB23-0009, an application submitted by Barbel Anderson for a
combined preliminary and final plat of Bab's First Addition, a 3.74 acres subdivision containing
two residential lots and two outlots located at 1310 Cedar Street.
Next steps are that this will be going to City Council on April 16.
Craig noted two things, first, the detention basin easement looks like it's right in the middle of the
lot where she assumes they're going to build a house. Russett noted that may be a question for
the applicant's engineer, but it is a one -acre lot which is a pretty large lot. In addition to that, they
wanted to limit their impact to less than 20,000 square feet so as not to trigger the sensitive
areas ordinance, so the development of the home, the driveway, and the detention basin is all in
one area.
Craig also wanted to discuss outlot B, and that it's just a piece of property that is owned by the
owners and will just sit there untouched forever. Russett noted outlot B was actually requested
by staff. The original application request was to do a one -acre lot for the development of the new
home without the outlot but that would have created lot two as a flag lot and to avoid a flag lot,
but to allow the one -acre lot one, staff requested that outlot be created as private open space,
not to be developed, to comply with the City's subdivision regulations.
Hensch acknowledged the limit to impact is under 20,000 square feet so sensitive areas
ordinance doesn't apply but are there any sensitive slopes or wooded areas on this parcel.
Russett noted the only developable lot is smaller in size than the 2-acre woodland minimum and
she doesn't think there's any significant slopes on it either.
Hensch asked for the public's edification why, in this instance, is there both a preliminary and a
final plat being presented at the same time when usually those are split. Russett explained that
they opted to combined them to make the process more streamlined for the applicants since this
Planning and Zoning Commission
April 3, 2024
Page 3 of 12
is a very small area and there's no infrastructure besides the sidewalk.
Wade asked if this will be the only area with a sidewalk on this side of the street. Russett noted
no other houses there currently have sidewalks but there is a new home going in further east,
which will require a new sidewalk and eventually over time hopefully it all connects.
Hensch opened the public hearing
Tom Anthony (Shoemaker & Haaland) the one that prepared the plat with the cooperation of
staff, the applicants, attorneys and everybody else who gets wrapped up in these kinds of things.
To address the one question about the stormwater management, Anthony noted they started off
hoping they could do rain gardens to alleviate most of the earth and just get it at a level which
satisfied the stormwater management. However, mathematically there was not really enough
storage available in a rain garden so they are actually combining the two and plan to make a rain
garden inside the detention basin. It will be close to the house and actually will be part of their
backyard gardening area and still maintain the stormwater storage facility at the same time. It is
a new innovative way to do that but with the small area they didn't have much to work with. For
the stormwater management they are only catching water from the rooftops and the driveway
and the yard so they were able to get that to fit in that small area. They'll also get to do
landscaping and put plantings in there.
Hensch acknowledged kudos for doing something with the detention basin, as a lot of times it
just becomes a clustered mess because they're not maintained. Anthony explained doing
something innovative like this, from an engineering perspective, they call them teacup detention
because it's so small, normally they're measured in acre feet, these are measured in acre inches.
He stated it's very small, but it does its job. There's one out at the Moose Lodge right in their
front yard that is about the size of this area and it's working great.
Will McBride (419 Pleasant Street) and his husband are neighbors with Babs Anderson. The
original property is Babs and they've been neighbors for five years. They love their home, but it's
an older home and they now have a toddler and a second baby on the way, so they have
determined that their house isn't a great fit for their growing family. They love the neighborhood
and being close to the parks, being able to walk downtown and there's a lot of serenity that exists
in their little street with all the wildlife. Renovating the house wasn't something that was going to
be viable so they talked to Babs about it and her situation was that she has been in her house for
quite some time and financially it's become a burden, and this is going to be a way to help her
stay in her home and she can remain their neighbor. McBride noted Babs has been approached
by other people to significantly develop this land and that was something that none of them
wanted to see happen because it is very special. Their intention is pure and very honest, they
have a dream home, nothing too over the top, but something that will work for them. He stated
they're both healthcare providers and are rooted in the community, their families live here, and
they're planning to make this their forever home. They are not a corporation or trying to do
anything sinister, they love Iowa City and this location and want to stay there.
Barbel Anderson (1310 Cedar Street) is known as Babs. She stated this addition is actually the
location where Tom and Isabel Turner originally lived, and 1310 Cedar Street is also the original
Rose Hill. The inside log cabin was Captain Frederick Macy Irish, who moved there when there
was no Iowa City and not even a state of Iowa, it was just the territory of Iowa that was opened
up for a settlement. The capital at that time was Burlington, and Captain Irish, Chauncey Swan,
Planning and Zoning Commission
April 3, 2024
Page 4 of 12
John Reynolds, and one last person decided Burlington was too far south and Iowa City was a
good place to have the new capital of the then territory of Iowa. Anderson stated she was born
and raised in Germany and never imagined she would end up here but she really loves America
and loves Iowa City. Her husband Roger and her actually built a house at 1421 Cedar Street,
and his previous house was on Rundell Street, which was in the floodplain, so he said they
needed to have a bigger house and he never wanted to live anywhere in the floodplain again.
She noted Cedar Street and the Hickory Hill Park are probably the highest location and at night
in the wintertime when all the trees have lost their leaves, they can actually see the lights of the
Sycamore Mall and when downtown was flooded there wasn't a drop of water on their street. Her
husband wanted the land because he wanted to live on a farm but she's a city girl and lived in
Munich, Germany, so they found a lot and built a house down the street at 1421 Cedar. The
owners before them were Tom and Isabel Turner and she was very well known to the city of
Iowa City and when they passed away this whole property came up for sale. It was actually
auctioned at First National Bank and they were able to buy the property. When they bought the
property, Mr. Trueblood was parks and recreation manager and he had written a letter saying
that they wanted to buy one acre to add to Oakland Cemetery but at that time her husband
wanted to have the land and didn't want to sell it. However, now she has decided she will sell
one acre to Oakland cemetery. Anderson also noted the part adjoining Oakland Cemetery is
called the Evergreen Garden and there are many different varieties of evergreens. Actually, the
whole 1310 Cedar Street lot is on the tree walk, there's a map from the City where people can
walk around the area and the many, many beautiful trees. She is also happy to help her two
wonderful neighbors who are going to buy the one acre, it will be so great for their children to be
able to run and have a big place where they can play football or baseball or soccer. And, at the
same time she is able to give a piece of that Evergreen Garden to the cemetery. Anderson
stated she does not understand about the runoff thing, the land actually is the highest where the
house is built and towards the backside is what they call a ravine and the ravine they are told
was an original well when Captain Irish built a log cabin and live there. The ravine and the low
area go all the way to Ralston Creek so whenever there is a rainfall the water goes away, they
have never had any flooding.
Hensch closed the public hearing.
Elliott moved to recommend approval of SUB23-0009, an application submitted by Barbel
Anderson for a combined preliminary and final plat of Bab's First Addition, a 3.74 acres
subdivision containing two residential lots and two outlets located at 1310 Cedar Street.
Craig seconded the motion.
A vote was taken and the motion passed 5-0.
CASE NO. SUB23-0011
Location: North of Northgate Drive and East of N. Dodge St./Hwy 1
An application for a combined preliminary and final plat for Highlander Development Fifth
Addition, a 39.96-acre subdivision containing one lot and three outlots to create one developable
2.22-acre commercial lot.
Russett stated this is another combined preliminary and final plat for an area off Northgate and is
a commercial subdivision. She shared an aerial of the site as well as the existing zoning map. It's
Planning and Zoning Commission
April 3, 2024
Page 5 of 12
currently zoned CO-1 and the area to the east and west is an ID zone and most of that is under
agricultural operation, and the existing commercial areas to the south are zoned CO-1. In terms
of background, this land was annexed in the late 1960s, early 1970s. In 2015, it was rezoned to
CO-1 and then in 2016 Council approved a plat for this area, Highlander Development Fourth
Addition, Part One. That plat contained 10 commercial lots with an outlot for stormwater
management. The plat also shows the extension of Northgate Drive and some east/west streets
for connectivity. At this time no improvements have been made to build this area and no street
infrastructure or utility infrastructure was done. Therefore, the landowners would like to re -
subdivide this land to create just one buildable commercial lot, one outlot for stormwater
management and two outlots reserved for future development.
Russett shared the proposed plat, again the whole area is 39.96 acres, she pointed out where
the one buildable commercial lot is located, two outlots for future development and noted the lot
for stormwater management is in the same location that was originally approved. Russett stated
there is no sidewalk in this area, so a sidewalk would need to be installed as part of any
development in this area.
The Comprehensive Plan identifies this area as appropriate for an Office Research Development
Center, which aligns with the rezoning that happened in 2015 to CO-1. However, at this time
there is a decline in the need for office space and commercial office uses so the applicant and
the landowner would like to replat this to remove most of those commercial lots. She stated there
are no environmentally sensitive areas on the plat and the areas where the two outlots are, the
31 acres, would need another subdivision for development to occur in those areas. Stormwater
Management again is being provided by outlot A and Public Works is working with the owner to
ensure adequate stormwater management is provided for any development on lot one.
Russett noted in terms of correspondence, staff received one email with some concerns
regarding the fact that Northgate dead ends and it's a one way in and one way out. There were
also concerns about stormwater management, the building style of any new development and
the height and that correspondence was forwarded to the Commission.
Staff recommends approval of SUB23-0011 an application submitted by Northgate Land LLC for
a combined preliminary and final plat of Highlander Development Fifth Edition, a 39.96 acre
subdivision containing one commercial lot, one outlot for stormwater management and two
outlots reserved for future development.
Next steps are after the Commission makes a recommendation it will go to City Council.
Elliott noticed on the original plat there was extension for Oakdale Boulevard and will that still
part of this development. Russett explained no that would be vacated and that would be an
outlot for future development. And again, any future development would need to be subdivided at
a future date. Elliott asked if it is no longer the plan to have the Oakdale go through. Russett
stated the plan is still for an Oakdale extension, when that land gets subdivided in the future for
development it would need to accommodate the Oakdale extension which would likely somehow
connect back to North Dodge.
Wade asked why they are re -subdividing it now versus just following the existing plat, lot one
seems to be the same size regardless. Russett explained the big difference is the outlot
reserved for future development, which is a different boundary than what was originally platted.
Planning and Zoning Commission
April 3, 2024
Page 6 of 12
Additionally, she believes their intent is to sell the land. Hekteon noted also, with the original plat
there were certain infrastructure installation requirements and this backs away from those
obligations.
Townsend asked if there is any idea of what's going to go on the lot. Russett replied no.
Townsend asked how high of a building could go there and Russett explained 25 feet, unless it's
a hospital use which allows up to 65 feet.
Hensch opened the public hearing
Gina Landau (Navigate Homes) is representing the Northgate land and stated the reason for
doing this is mainly because there was no longer a need, especially in this area, for office parks
or commercial office areas post COVID. There are already a number of buildings out there that
are vacant so there's no reason for more. She noted in 2016 when that Fourth Edition was
approved it just wasn't working as far as to put a street in and do all the infrastructure, so they
pulled back which come to find out was probably good after what happened in 2020 because
otherwise they'd have all of the rest of those buildings sitting empty. Landau stated the real
reason for this re -subdivision is so they can sell this land off and have it remain as farmland. It's
been farmed, even though Navigate Homes owns it, and they've had the same tenant farmer
farming it for years and years. The plan is hopefully to sell it to the neighbors and the same
farmer is going to farm it. Navigate Home is just going to keep that one commercial lot but there's
no current plans for that commercial lot. Of course, when they would build they would have to
conform to the requirements for the city of Iowa City. Landau also noted when Highlander First
was approved in the early 2000s apparently they considered a second access through one of the
parking lots, in the sub dividers agreement, she doesn't quite know how because that wouldn't fly
with Code now, but she understands the access question and eventually the plan would be to
have connectivity and access with the Oakdale Boulevard extension. She did receive from City
Engineering a document showing how Oakdale Boulevard would cut through and there is
currently an update to the Capital Improvement Plan for 2025 for that extension but as
mentioned, anyone wanting to subdivide those two outlots would have to follow that plan and
dedicate that right-of-way for the future Oakdale Boulevard.
Jerry Full (Partner, Liberty Growth) stated they own lot six in the older development. They've
owned that lot and built a building for Shive Hattery but they moved across street, they had a
new tenant after a couple of years of vacancy but now it's vacant again because of COVID. He
stated they have owned that lot for 28 years and most of the owners out there didn't know an
association formed for that group of lots. He explained 22 years after they bought their lot, in
2020, they had a meeting of all the landowners up there to see about forming this association
because all of a sudden Southgate was saying they had to fix the creek behind their lot, behind
the music school, behind the dental school, and the work was going to cost $120,000 or so they
had multiple meetings about that and hired counsel to give them advice. They decided they'd use
square footage ownership percentage to decide how to pay the legal fees and the lawyer but
less than half of the owners on that property contributed to the legal fees. So last week is when
they got this letter about the change that they're addressing tonight but one month before that
they got a letter from the City saying that as landowners up there they have to fix that creek.
They had let that association go away because nobody had any interest and only a few were
footing the legal bills. Others all had plenty of money to pay, Mercy Hospital is an owner up
there and they didn't pay any. Anyway, Full noted they're pretty unhappy about how Southgate
has dealt with them and that it was 22 years from the time they bought the land to an association
Planning and Zoning Commission
April 3, 2024
Page 7 of 12
being formed, an association was supposed to be formed it formed in 1995 but their first meeting
was in 2017, which likely was called for because they wanted the individual owners to fix it. Full
thinks Southgate should be responsible for doing most of that creek work and he really would like
to see something addressed about that issue before this plat is improved, because they're not
part of that association. Southgate said that they would pay for a bunch of the legal fees and pay
for some amount of any repair they did as an association, but they didn't even pay for all their
share of the legal fees. Full stated there are issues in that area, they got a letter from the City a
month and a half ago about they need to fix that creek but he's not going to enter into a contract
himself or with his group to fix that creek when they know half the people in that area who are
theoretically responsible for it won't pay their share and he would have to go to court to get those
people to pay. Full is unsure of how the City is going to deal with the issue of that creek because
all the land on the other side of the creek isn't responsible whatsoever for the flood management
waste or street water management plan, not at all. Additionally, there were several buildings, big
ones, that were exempt from being part of that association from the get -go, who are dumping
water into that creek so something's got to happen and they're saying it has to be done by July 1,
but who's going to do it, the association doesn't exist anymore. Full just wanted to bring that to
the attention of the Commission.
Hensch closed the public hearing.
Elliott moved to recommend approval of SUB23-0011 an application submitted by
Northgate Land LLC for a combined preliminary and final plat of Highlander Development
Fifth Edition, a 39.96 acre subdivision containing one commercial lot, one outlot for
stormwater management and two outlots reserved for future development.
Townsend seconded the motion.
Hensch asked if what Mr. Full brought up about this creek involve any the land involved in this
application. Russett replied it does, lot one would need to provide stormwater management and
meet the requirements before they were able to develop. Hensch asked if the stormwater
management plan has been approved by the City Engineer. Russett explained the stormwater
management area was approved with the Fourth Addition, but the letter Mr. Full is referring to is
a letter that Public Work staff sent because the facility isn't functioning property. Public Works
has done a proactive inspection of these facilities around the City and for the ones that aren't
working they have reached out to the property owners that are responsible for maintenance and
told them that something needs to be fixed. So, before Navigate Homes can build on lot one
they're going to have to be able to provide the stormwater management either on that lot or if
they want to connect to the existing system, that existing system would need to be fixed.
Everything would need to be approved by the City Engineer.
Hekteon noted the stormwater management easement was established with the Highlander First
Addition. As an obligation of public record it should show up in the abstract when one purchases
property but it has always been the owners obligation. Who the owner is has changed through
the years, but when it was first platted it said the owner will construct this detention facility in
accordance with plans approved by the City and they had the ability to pass that onto an owner's
association which is what they did here. That has been the nature of that relationship since the
First Addition was established, and with each subsequent plat it has remained on the land, and
essentially that language has remained the same in all the various subdivider's agreements and
would continue with this Fifth Addition plat. If they want a building permit they have to
Planning and Zoning Commission
April 3, 2024
Page 8 of 12
demonstrate that the facility is functioning as it was originally designed
Hensch stated as far as the Commissioners are concerned, their responsibility is to determine if
this preliminary and final plat complies with City Code and that the stormwater management
issue will subsequently be approved by the City Engineer because they're not engineers and
shouldn't get involved these engineering issues.
Hekteon noted additionally it is not their responsibility to mediate the interpersonal conflicts or
disagreements among the owners out there.
Craig stated they have heard this before, issues of a developer that develops a piece of land,
commercially, residentially, whatever, and then walks away, giving legal responsibility to a group
that either has no idea they have the responsibility, or they don't care nor are willing to do their
part, to maintain it. It's a mess. She has sympathy for everybody, but the law is the law.
Hensch agreed, this seems to be a reoccurring problem with homeowner's associations where
the developer creates an area and the HOA is responsible, this is not an uncommon issue.
A vote was taken and the motion passed 5-0.
PRESENTATION AND DISCUSSION ON THE 2023 IOWA CITY RESIDENTIAL
DEVELOPMENT ANALYSIS:
Russett stated every calendar year urban planning staff does an analysis of residential
development that occurred within that year, it's not necessarily built that year but they looked at
final plats. They look at building permits and other things to track as to whether residential
development activity is keeping pace with residential needs in Iowa City. Russett wanted to
review some of the key takeaways from the analysis and go through some of the charts and
maps that were included in the report in agenda packet.
2023 had more subdivision activity than the past few years, but single-family lot creation is still
low compared to historic trends. This is especially true when they don't include the manufactured
housing units that were approved with the Iowa River Mobile Home Park which was a rezoning
that came to the Commission but when they final platted that piece of property it ended up
allowing 35 new single family homes. In addition, most of the new multifamily capacity is due to
the West Riverfront redevelopment project on the corner of Myrtle and Riverside. The next
takeaway is that the total number of dwelling units permitted exceeded 10-year trends, but
single-family permits are still at an all-time low. In addition, the number of dwelling units
demolished was a little elevated in 2023, again most of that was due to the redevelopment at the
Myrtle and Riverside project which resulted in the demolition of 109 units. Staff also took a look
at the University Impact Area this year and the development activity in that area was higher, but
again a lot of that is due to the West Riverfront redevelopment, which is in the University Impact
Area. Other than that, the trend that they're seeing in the University Impact Area is a conversion
of duplexes to single-family homes. Staff looked at the supply of vacant lots, and that has
increased since 2022, though several subdivisions still do not have infrastructure in place, but
that should improve in the coming years. Lastly, if permitting trends from 2020 and 2023
continue, the City is expected to only meet 75% of its demand for new housing by 2030 which is
a deficit of over 1000 dwelling units. Looking at final plat activity, more lots were created in 2023
Planning and Zoning Commission
April 3, 2024
Page 9 of 12
than is typical, but recent trends again in single-family lot creation is low. Russett showed a chart
with the anticipated dwelling units based on lots platted noting single-family detached is down
from a 10-year average, duplexes are actually up and that's probably in large part due to the plat
on the west side of the City off Camp Cardinal Boulevard, and multifamily is up again because of
the West Riverfront final plat which had almost 300 units.
Elliott noted it seems that what they want is more duplex and multifamily in order to meet the
need. Russett agreed and acknowledged it may be a shift due to people's price point and that
it's harder to purchase a single-family home. So maybe there's more of a need for smaller duplex
and attached single-family type uses.
Russett showed a chart of the anticipated dwelling units by lots platted from 2014 to 2023 again
noting the huge jump in multifamily is attributed to the West Riverfront redevelopment, which
typically they wouldn't see in final plat data because most redevelopment doesn't require a final
plat but the West Riverfront did.
Elliott asked about the development on Dubuque Street and if that is included in this. Russett
replied it was permitted in 2022 so it was included in that data and is under construction now. It
was not platted so that might be why it's not showing up on this chart.
Russett next talked about new dwelling units based on building permits issued. The total number
of units permitted in 2023 is above recent averages, almost exclusively due to multifamily units,
and again permits for single-family are down. They did add accessory dwelling units this year so
they are going to try to keep track of that moving forward and it'll be interesting to see if the
changes made to the zoning code will result in more accessory dwelling units. Russett showed a
map of building and demolition permits. For the University Impact Area, the West Riverfront
project was the main thing that happened in the University Impact Area, other than there were
three building permits for single-family detached homes, one accessory dwelling unit, three
duplexes converted to single-family and then one commercial building converted to a duplex use.
Russett noted the conversion from duplexes to single-family is something they talked about a lot
last year when they were going through those text amendments, they were looking at data and
the trends in permit activity, especially for duplexes and the interesting thing is that in areas
where duplexes aren't allowed they're not seeing single-family to duplex conversion, they're
seeing duplex to single-family conversion. Staff also looked at the City's vacant lot supply and
did a build out analysis of vacant lots applied to estimate how long it would take for the current
number of vacant buildable lots to be developed based on the 10-year average of building
permits issued by type. Currently they have about 2.3 years of vacant single-family lots, 4.7 of
attached single-family and then 1.6 years for both duplex and multifamily. The anticipated build
out timeframe for vacant single-family lots actually increased from 2022 and that is due to the low
building permit numbers seen in 2023.
Wade asked if that include lots that have been out in inventory for a while, infill lots versus a new
lot. Russett stated it includes both newly created and infill vacant lots. However, it doesn't include
the lots that were created that don't have infrastructure.
Craig asked if the multifamily housing lots, the development across from the fire station off
Dodge Street were included in this count. Russett confirmed they are in this count.
Russett noted the last thing that they looked at was projected housing need versus projected
Planning and Zoning Commission
April 3, 2024
Page 10 of 12
development. She shared a chart shown in dwelling units and stated one of the most important
things that they do in planning is forecast what they need to accommodate in new residential
growth. What they are seeing is the need for dwelling units by 2030 is 4610 new units and the
projected amount at this point is 3550 new units, a deficient of about just over 1000 units. Iowa
City can only accommodate 77% of the projected demand at this point. Lack of supply can lead
to increased competition for limited supply of residential lots and housing, which can increase
cost. Additionally, a lack of supply can also push development to other nearby communities,
which can cause homes to be further away from employment centers. Therefore, it's important to
continue to encourage residential growth in areas where it's appropriate like these infill sites like
the 1310 Cedar Street that they saw tonight, and in some of the designated growth areas at the
fringe of the community where they anticipate annexing land for future development.
Elliott asked if any the changes that were made in the Code recently expand the ability of single-
family lots to be duplex lots. Russett confirmed yes, they could be platted as duplex or single-
family even in the midblock.
Hensch noted the status certainly shows that there's a challenge placed to the Commission and
City Council to get new development to occur for housing and it looks like that annexation that
was not approved several years ago by Council was a mistake. They've got to have developable
areas, if there is a deficit of 1000 units that means demand is going to greatly outstrip supply,
which means costs of housing are going to proportionally or not proportionately increase. No one
ever wants development in their neighborhood, but this shows that they have to be advocates for
development, because this 1000-unit deficit is not going to solve itself.
Craig stated there is also an infrastructure issue, everything is so expensive. The cost for lots
and for infrastructure in Monument Hills is extensive, the roads, the sewers, the stormwater work
and getting all the utilities in there. Having been in Iowa City for decades and lived on the east
side of town it's been interesting to see the development, when they see something that takes a
decade or more to get done like Scott Boulevard, year after year of trying to get that road built
and connected and then finally it gets done and then development occurs around it, that's what it
takes. She thinks back to when they had several issues related to the west side of town and
talking about 965 coming down at some point, that would lead to some development on the west
side so what's the timing of that.
Russett stated the 965 alignment is actually just east of where the landfill is so that's in
unincorporated Johnson County but might be on an unfunded capital improvement plan.
However, there's there is no development out there at this point and even the area to the east
doesn't have sanitary sewer capabilities so it's going to be a long time before that area develops
and that road is built.
Elliott asked about that development that had Oaknoll and a potential school out behind
Menards. Russett noted some of that land is currently for sale and Oaknoll owns land out there
but it can't be annexed though because they're not adjacent to the City. They anticipate
development coming from the north off of Rohret Road first.
Russett showed some patted residential area where development is potential. There's potential
in Monument Hills, the Tamarack area off of Scott has mostly been built but there's still a little bit
of development potential. Out on Camp Cardinal Boulevard lots and plats have been approved,
but no infrastructure is in place yet that would allow for the many duplex units and some
Planning and Zoning Commission
April 3, 2024
Page 11 of 12
multifamily planned. There's still some potential off Preston Lane and there's some construction
going on there right now. There are still some vacant lots in Churchill Meadows and further south
off Sycamore there was a plat approved years ago and they just started putting in the
infrastructure that would allow for some attached single family and single family.
Craig asked what happens when something like the Mayflower goes from the University to
private ownership. Russett stated first it would have to be rezoned and then likely it will be
counted through the building permit data. For this particular study they're looking at subdivisions
and building permits and also vacant lots. They're looking at the potential with the platted lots
where nothing is built there yet, but there's a potential for a new unit.
Wade asked if they have this data available that breaks those down by ownership type, like
Riverfront is going to be rental versus actually ownership. Russett stated they would have to look
at rental permit data.
Townsend asked with all this building going on, and everything becoming more and more
expensive, where are they on affordable housing. Russett stated part of the reason they want to
do this study and share this data is to show they're not meeting demand, they need more
housing, there's not a lot of building activity going on, and they need to see more housing. That
doesn't mean that the new housing is going to be income restricted to people at 40% AMI
because they can't just look at providing income restricted units, it has to be multiple things that
they're doing, providing financial assistance for income restricted housing, making sure that
they're getting a diversity of housing types and that regulations aren't a barrier to building more
housing. There's no silver bullet and they're trying to approach it in multiple different ways.
Townsend noted on Good Morning America the other day there was a story regarding how it's
almost more efficient to rent than to buy right now with the interest rate which is frightening.
Everything is so expensive.
CONSIDERATION OF MEETING MINUTES: FEBRUARY 21, 2024:
Elliott moved to approve the meeting minutes from February 21, 2024. Wade seconded the
motion, a vote was taken and the motion passed 5-0.
PLANNING AND ZONING INFORMATION:
Russett stated she sent an email out today about the planning consult and reminded them to
mark their calendars for four o'clock on the 16th for the Bloomington Street landmark rezoning.
Also the CI-1 to CC-2 rezoning the City initiated for the properties in Southgate was approved by
Council last night.
ADJOURNMENT:
Townsend moved to adjourn, Craig seconded and the motion passed 5-0
PLANNING & ZONING COMMISSION
ATTENDANCE RECORD
2023-2024
3/1
4/5
4/19
6/21
7/5
7/19
8/2
8/16
10/4
10/18
11/15
12/6
12/20
1/17
2/7
2/21
4/3
CRAIG, SUSAN
X
X
X
X
X
X
X
X
X
X
X
X
O/E
X
X
X
X
ELLIOTT, MAGGIE
X
X
X
X
X
X
X
X
X
X
X
X
X
X
O/E
X
X
HENSCH, MIKE
X
X
X
X
O/E
X
X
X
X
X
X
X
X
X
X
X
X
PADRON, MARIA
X
I X
X
X
X
O/E
X
X
X
X
X
I O/E
X
X
X
X
O/E
QUELLHORST, SCOTT
-- --
-- --
-- --
-- --
-- --
-- --
-- --
X
X
X
X
X
X
X
X
X
O/E
SIGNS, MARK
O/E
X
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
-- --
TOWNSEND, BILLIE
X
X
X
X
X
X
O/E
X
X
X
X
X
X
X
X
X
X
WADE, CHAD
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
KEY:
X = Present
O = Absent
O/E = Absent/Excused
--- = Not a Member