Loading...
HomeMy WebLinkAboutHIGHWAY 6 EAST WATER MAIN REPLACEMENT PROJECT 2024HIGHWAY 6 EAST WATER MAIN REPLACEMENT PROJECT 2024 02-Feb-2024 Plans, Specs, Project Manual, Engineer's Estimate 06-Feb-2024 Res No. 24-34: Setting a Public Hearing 12-Feb-2024 Notice of Public Hearing 20-Feb-2024 Res No. 24-49: Approving project manual and estimate of cost 22-Feb-2024 Notice to Bidders 19-Mar-2024 Res No. 24-63: Awarding contract 28-Oct-2025 Engineer's report 03-Nov-2025 Res No. 25-261: Accepting the work 05-Nov-2025 Performance, payment & maintenance bond F tir ♦ • R �' � rrrrrr ° ■rrs*s x irk, III" i NIL• let i PROJECT RO MANUAL FOR THE FORMAL HIGHWAY 6 EAST WATER MAIN REPLACEMENT PROJECT IOWA t February 2, 2024 - ,SSl4`% 'off % C13 BRADLEY W. 1. POETH rn %b38 row*N a U— 0005 CERTIFICATIONS PAGE I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. LO 212/2024 oeth Date License Number: 16536 My license renewal date is December 31, 20 24 Pages or sheets covered by this seal: Entire Bound Document Highway 6 East Water Main Replacement Project 0005 — Page 1 of 1 0010 TABLE OF CONTENTS PROJECT MANUAL 0005 CERTIFICATIONS PAGE 0010 TABLE OF CONTENTS 0100 NOTICE TO BIDDERS 0110 NOTICE OF PUBLIC HEARING 0200 INSTRUCTIONS TO BIDDERS Ell 1 1 Jat] 901--01 0500 CONTRACT 0510 PERFORMANCE, PAYMENT, AND MAINTENANCE BOND 0520 CONTRACT COMPLIANCE 0530 WAGE THEFT POLICY SUDAS STANDARD SPECIFICATIONS GENERAL SUPPLEMENTAL SPECIFICATIONS SUPPLEMENTAL SPECIFICATIONS SPECIAL PROVISIONS PLANS (UNDER SEPARATE COVER) Highway 6 East Water Main—yRepla e,m—ent Project tt- 0010 — Page 1 of 1 0100 NOTICE TO BIDDER,' p. HIGHWAY 6 EAST WATER MAIN REPLACEMENf$W-WECT Sealed proposals will be received by the City Clerk of the City of Iowa City, Iowa, until 3:00 P.M. on the 12th day of March 2024. Sealed proposals will be opened immediately thereafter. Bids submitted by fax machine shall not be deemed a "sealed bid" for purposes of this Project. Proposals received after this deadline will be returned to the bidder unopened. Proposals will be acted upon by the City Council at a meeting to be held in the Emma J. Harvat Hall at 6:00 P.M. on the 19th day of March, 2024, or at special meeting called for that purpose. The Project will involve the following: This project includes installation of approximately 2,100 LF of 16" ductile iron and PVC water main, with associated valves, hydrants, service connections, traffic control, pavement removal and surface restoration and is located at Highway 6 East between Fairmeadows Boulevard and Industrial Park Road. All work is to be done in strict compliance with the Project Manual prepared by Watersmith Engineering, of Muscatine, Iowa, which has heretofore been approved by the City Council, and are on file for public examination in the Office of the City Clerk. Each proposal shall be completed on a form furnished by the City and must be submitted in a sealed envelope. In addition, a separate sealed envelope shall be submitted containing a completed Bidder Status Form and a bid security executed by a corporation authorized to contract as a surety in the State of Iowa, in the sum of 10% of the bid. The bid security shall be made payable to the TREASURER OF THE CITY OF IOWA CITY, IOWA, and shall be forfeited to the City of Iowa City in the event the successful bidder fails to enter into a contract within ten (10) calendar days of the City Council's award of the contract and post bond satisfactory to the City (in the form shown in Section 0510) ensuring the faithful performance of the contract and maintenance of said Project, if required, pursuant to the provisions of this notice and the other contract documents. The City shall retain the bid security furnished by the successful bidder until the approved contract has been executed, the required Performance, Payment, and Maintenance Bond (as shown in Section 0510) has been filed by the bidder guaranteeing the performance of the contract, and the contract and security have been approved by the City. The City shall promptly return the checks or bidder's bonds of unsuccessful bidders to the bidders as soon as the successful bidder is determined or within thirty days, whichever is sooner. The successful bidder will be required to famish a Performance, Payment, and Maintenance Bond in an amount equal to one hundred percent (100%) of the contract price and in the form shown in Section 0510, said bond to be issued by a responsible surety approved by the City, and shall guarantee the prompt payment of all materials and labor, and also protect and save harmless the City from all claims and damages of any kind caused directly or indirectly by the operation of the contract, and shall also guarantee the maintenance of the improvement for a period of five (5) year(s) from and after its completion and formal acceptance by the City Council. Highway 6 East Water Main Replacement Project 0100 — Page 1 of 2 The following limitations shall apply to this Project: Late Start Date: April 29,2024 Substantial Completion Date: July 22, 2024 Final Completion Date'. September 30, 2024 Liquidated Damages: $500 per day All of the bid items listed in Section 0400 — Proposal shall be completed by the Substantial Completion Date except seeding. The Project Manual may be examined at the office of the City Clerk. Copies thereof and blank forms may be secured at the office of Technigraphics, a division of Rapids Reproductions, 415 Highland Ave, Suite 100, Iowa City, Iowa 52240, Phone: (319) 354-5950, Fax. (319) 354- 8973, Toll -Free: (800) 779-0091 Prospective bidders are advised that the City of Iowa City desires to employ minority contractors and subcontractors on City projects. A listing of minority contractors can be obtained from the Iowa Department of Inspections and Appeals at (515) 281-5796 and the Iowa Department of Transportation Contracts Office at (515) 239-1422. Bidders shall list on the Proposal the names of persons, firms, companies or other parties with whom the bidder intends to subcontract. This list shall include the type of work and approximate subcontract amount(s). The Contractor awarded the contract shall list on the Contract its subcontractors, together with quantities, unit prices and extended dollar amounts. By virtue of statutory authority, preference must be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa Statutes. The Iowa reciprocal resident bidder preference law applies to this Project. The City reserves the right to reject any or all proposals, and also reserves the right to waive technicalities and irregularities. Posted upon order of the City Council of Iowa City, Iowa. KELLIE GRACE, CITY CLERK M Highway East Water Main Replacement Project 0100 — Page 2 of 2 0110 NOTICE OF PUBLIC HEARING NOTICE OF PUBLIC HEARING ON PROJECT MANUAL AND ESTIMATED COST FOR THE HIGHWAY 6 EAST WATER MAIN REPLACEMENT PROJECT IN THE CITY OF IOWA CITY, IOWA TO ALL TAXPAYERS OF THE CITY OF IOWA CITY, IOWA, AND TO OTHER INTERESTED PERSONS: Public notice is hereby given that the City Council of the City of Iowa City, Iowa, will conduct a public hearing on the Project Manual, including the plans, specifications, contract, and estimated cost for the construction of the Highway 6 East Water Main Replacement in said city at 6:00 p.m. on the 20th day of February, 2024, said meeting to be held in the Emma J. Harvat Hall in the City Hall, 410 East Washington Street in said city, or if said meeting is cancelled, at the next meeting of the City Council thereafter as posted by the City Clerk. This project includes installation of approximately 2,100 LF of 16" ductile iron and PVC water main, with associated valves, hydrants, service connections, traffic control, pavement removal and surface restoration and is located at Highway 6 East between Fairmeadows Boulevard and Industrial Park Road. Said Project Manual and estimated cost are now on file in the office of the City Clerk in the City Hall in Iowa City, Iowa, and may be inspected by any interested persons. Any interested persons may appear at said meeting of the City Council for the purpose of making objections to and comments concerning said Project Manual or the cost of making said improvement. This notice is given by order of the City Council of the City of Iowa City, Iowa and as provided by law, Kellie K. Grace, City Clerk M CAI Highway 6 East Water Main Replacement Proj0110 — Page 1 of 1 0200 INSTRUCTIONS TO BIDDERS HIGHWAY 6 EAST WATER MAIN REPLACEMENT PROJECT 1 Optional Pre -Bid Meeting: a. Time, Date, and Location: Thursday February 29, 2024, 9:00am Engineering Conference room in City Hall (410 East Washington Street) 2. Bid Submittals: a, Time, Date and Location: 3:00 PM, March 12, 2024 City Clerk's Office 410 East Washington Street Iowa City, Iowa 52240 b. Submittals include two separate sealed envelopes: Envelope 1: Bid Security and Bidder Status Form Envelope 2: Proposal C. See Section 1020, as may be supplemented, for complete descriptions of proposal requirements and conditions. 3. Bidder Status: a. Use the Bidder Status Form included in Section 0405. b. Submit in accordance with 0200.2.b above. 0. See Section 0405 for the Worksheets Authorized to Transact Business and 875 Iowa Administrative Code Chapter 156 (73A), found at the following website: htt s://www.le is.iowa, ov/docstiactcha ter/08-15-2018.875.156. df, for assistance in completing the form. 4. Bid Security: a. Use the Bid Bond Form included in Section 0410. b. Submit in accordance with 0200.2.b above. C. Bid security is 10% of the total bid, including all added alternates (do not deduct the amount of deducted alternates). d, See Section 1020, as may be supplemented, for a complete description of the bid security requirements. 5. Progress and Schedule: a. Contract Times: Late Start Date: April 29, 2024 Substantial Completion Date: July 22, 2024 Final Completion Date: September 30, 2024 Liquidated Damages: $500 per day All of the bid items listed in Section 0400 — Proposal shall be completed by the Substantial Completion Date except seeding. b, Work Restrictions: i. No work shall be done between 10:00 pm and 7:00 am without the approval of the Engineer, with the exception of saw Gutting freshly poured concrete. ii. Notify the Engineer four days in advance of street closings so that a press release can be issued. No street may be closed without the Engineer's Highway 6 East Water Main Replacement Project 0200 — Page 1 of 3 approval and said notification. Community Events: i. The Contractor should look at community calendars to determine potential conflicts with planned construction activities and schedule. ii. The Contractor should make sure their activities are not impacting community events. iii. University of Iowa Graduation — May 9-1.2, 2024 iv. Iowa City Community School District Graduation — June 2, 2024 V. No work shall occur on University of Iowa Home Football game days. 6. Performance, Payment and Maintenance Bond* a, The successful bidder will be required to furnish a bond in an amount equal to one hundred percent (100%) of the contract price for a period of five (5) year(s) after its completion and formal acceptance by the City Council. b. Use the Performance, Payment, and Maintenance Bond Form included in Section 0510. C. See Section 1070, Part 3, as may be supplemented, for a complete description of the bonding requirements, 7, Insurance Requirements: a. The City of Iowa City is to be listed on the required insurance certificate, as an additional insured on a primary and non-contributory basis. Review this requirement with your insurance broker prior to bidding. b. See Section 1070, Part 3, as may be supplemented, for a complete description of the insurance requirements. 8. Taxes: a. Sales Tax Exemption Certificates will be issued according to Section 1020, 1.08 of the Supplemental Specifications. 9. Contract Compliance: a. For all contracts of $25,000 or more, the successful bidder shall abide by the requirements of the City's Contract Compliance Program, as described in the Section 0520. 10. Wag(I'Theft Policy: a. For all contracts of $25,000 or more, the successful bidder shall abide by the requirements of the City's Wage Theft Policy, as described in Section 0530. 11. References: a. The successful bidder and all of its subcontractors are required to submit at least four (4) days prior to award three (3) references involving similar projects, including at least one municipal reference. Award of the bid or use of specific subcontractors may be denied if sufficient favorable references are not verified or based on past experience on projects with the City of Iowa City. b. References shall be addressed to the City Engineer and include the name, address and phone number of the contact person, for City verification. 12. Contract Documentation: a, The Contractor must demonstrate an active subscription to Doc Express (program by Info Tech, Inc.) is maintained. Doc Express will be used to process documentation, including, but not limited to, contract documents, change orders, Highway 6 East Water Main Replacement Project µF pN 0200 — Page 2 of 3 shop drawings, certificates, equipment lists, progress payments, and other electronic submittals. b. Record documentation is required on all projects in accordance with Section 1090, 1,08.E of the Supplemental Specifications. Liquidated damages will be considered if adequate record documentation is not submitted by the Final Completion Date, P Highway 6 East Water Main Replacement Project 0200 — Page 3 of 3 Highway 6 East Water Main Replacement Project 0200 — Page 3 of 3 INSERT IN ENVELOPE 2 0400 PROPOSAL HIGHWAY 6 EAST WATER MAIN REPLACEMENT PROJECT CITY OF IOWA CITY Please DO NOT USE the proposal included in the bound volume of the specifications. Separate copies of this form are contained with this document. The following documents must be submitted as printed. No alterations, additions, or deletions are allowed. If the Bidder notes a requirement in the contract documents that the Bidder believes will require a conditioned or unsolicited alternate bid, the Bidder must immediately notify the Engineer in writing. The Engineer will issue any necessary interpretation by an addendum. 7Fla =I- orl] rprom Address of Bidder: W TO: City Clerk City of Iowa City City Hall 410 East Washington Street -71 Iowa City, Iowa 52240 -r The undersigned bidder submits herewith bid security in the amount of $ , in accordance with the terms set forth in the Project Manual. The undersigned bidder, having examined and determined the scope of the Contract, hereby proposes to provide the required labor, services, materials and equipment and to perform the Project as described in the Project Manual, including Addenda and , and to do all work at the prices set forth herein. The undersigned bidder further proposes to do all "Extra Work" which may be required to complete the work contemplated, at unit prices or lump sums to be agreed upon in writing poor to starting such work. The undersigned bidder certifies that this proposal is made in good faith, and without collusion or connection with any other person or persons bidding on the work. The undersigned bidder states that this proposal is made in conformity with the Contract and agrees that, in the event of any discrepancies or differences between the various items included in the Contract, Supplemental Specification Section 1040, 1.03 shall govern. Highway 6 East Water Main Replacement Project µ 0400 — Page 1 of 6 INSERT IN ENVELOPE 2 BID ITEM DESCRIPTION UNITS ESTIMATED UNIT EXTENDED QUANTITY PRICE AMOUNT 1 ON -SITE TOPSOIL, CY 188 STRIP, STOCKPILE., SPREAD, 2* OFF -SITE CY 50 TOPSOIL 3 EXCAVATION, CY 27 CLASS 10 *4 BELOW GRADE SY 30 EXCAVATION - (CORE OUT) 5 SUBGRADE PREP SY 50 *6 GRANULAR 100 STABILIZATION, CLASS II TONS BACKFILL MATERIAL 7 SUBBASE, SY 188 GRANULAR, 6" 8 COMPACTION LS 1 TESTING *9 TRENCH TONS 50 FOUNDATION *10 REPLACEMENT 100 OF UNSUITABLE CY BACKFILL MATERIAL 11 TRENCH LS 1 COMPACTION TESTING 12 WATER MAIN, LF 594 TRENCHED, CL52 DUCTILE IRON, 16", WITH NITRILE GASKETS 13 WATER MAIN, LF 1529 TRENCHED, C900 PVC, 16" 14 WATER MAIN, LF 107 TRENCHED, CL52 DUCTILE IRON, 12", WITH NITRILE GASKETS 15 WATER MAIN, LF 12 TRENCHED, C900 PVC, 12" 16 FITTINGS, BURIED LBS 3260 Highway 6 East Water Main Replacement Project 0400 — Page 2 of 6 INSERT IN ENVELOPE 2 BID ITEM DESCRIPTION UNITS ESTIMATED QUANTITY UNIT EXTENDED PRICE AMOUNT 17 WATER MAIN EA I ABANDONMENT, 12" CAP 18 WATER MAIN LF 225 ABANDONMENT, FILL AND PLUG 19 WATER MAIN LF 96 REMOVAL, 16' 20 WATER MAIN LF 32 REMOVAL, 12" 21 CUT -IN EA 1 CONNECTION, 16" 22 CUT -IN EA 5 CONNECTION, 12" 23 VALVE, 16" EA 6 BUTTERFLY VALVE 24 VALVE, 12" GATE EA 4 VALVE 25 FIRE HYDRANT EA 5 ASSEMBLY *26 FIRE HYDRANT EA 1 ADJUSTMENT 27 FIRE HYDRANT EA 2 REMOVAL 28 VALVE REMOVAL, EA 3 12" 29 VALVE REMOVAL, EA 1 6-F 30 VALVE BOX EA 6 REMOVAL 31 REMOVAL OF SY 5 SIDEWALK 32 REMOVAL OF SY 37 DRIVEWAY 33 SIDEWALK, PCC, SY 5 4" 34 DRIVEWAY, SY 37 PAVED, PCC 7- 35 FULL DEPTH SY 134 PATCH, PCC 10" 36 FULL DEPTH SY 12 PATCH, 8", ASPHALT 37 TEMPORARY LS 1 TRAFFIC CONTROL 38 TEMPORARY AC 01 SEEDING, TYPE 5 Highway g—East ".'Water —Main} —Replacement --Project '--'--."'------'----- 040'0—Page 3of6 INSERT IN ENVELOPE 2 BID ESTIMATED UNIT EXTENDED ITEM DESCRIPTION UNITS QUANTITY PRICE AMOUNT 39 HYDROSEEDING, AC 0.7 TYPE 1 SEED MIX 40 SWPPP LF 2600 MEASURES - WATTLES, 9" 41 RIP RAP, CLASS E TN 14 42 INLET EA 1 PROTECTION DEVICE, SURFACEi APPLIED' 43 CONSTRUCTION LS 1 N) SURVEY T° 44 MOBILIZATION LS 1 45 CONCRETE LS 1 = WASHOUT TOTAL EXTENDED AMOUNT = $ The Bidder may submit computer -generated unit price table in accordance with the Special Provisions. 'This is a provisional quantity to establish a unit price in case this item is needed during construction. Highway 6 East Water Main Replacement Project 0400 — Page 4 of 6 INSERT IN ENVELOPE 2 The names of those persons, firms, companies or other parties with whom we intend to enter into a subcontract, together with the type of subcontracted work and approximate dollar amount of the subcontract, are as follows: NOTE. All subcontractors are subject to approval by City of Iowa C4, Highway 6 East Water Main Replacement Project 0400 — Page 5 of 6 INSERT IN ENVELOPE 2 The undersigned Bidder is alan: ❑ Individual, Sole Proprietorship ❑ Partnership ❑ Corporation ❑ Limited Liability Company ❑ Joint venture ❑ Other Its Public Registration Number issued by the Iowa Commissioner of Labor, pursuant to Section 91 C.5 of the Iowa Code is: Failure to provide said Registration Number shall result in the bid being read under advisement. A contract will not be executed until the Contractor is registered to do business in the State of Iowa. Bidder's Name Signature Printed Name Title Street Address City, State, Zip Code Telephone Number NOTE: The signature on this proposal must be an original signature in ink; copies, facsimiles, or electronic signatures will not be accepted. Highway 6 East Water Main Replacement Project 0400n— Page 6 of 6 INSERT IN ENVELOPE I 0405 BIDDER STATUS FORM All bidders must submit the following completed fixul to the governmen(ai body ivquesting bids per 875 Iowa Administrative Code Cli4lgq 1,56. .... ....... _.. To be completed by all bidders Part A- D Yes 0 No My company is authorised to transact business in Iowa. (To help yrw delermine tl)ywr Please review the W644heet: A whorization to Tratmact fiwdtrex&�. 0 Yes 0 No My company has an office to transact business in Iowa. 0 Yes 0 No My company's office in Iowa is suitable for more than receiving mail, telephone calls, and e-mail. 0 Yes 0 No My company has been conducting business in Iowa for at least 3 years prior to the first request for bids on this project. 0 Yes 0 No My company is not a subsidiary of another business entity or my company is a subsidiary of another business entity that would qualify as a resident bidder in Iowa. If you answered "Yes" for each question above, your company qualifies as a resident bidder. Please complete Parts B and D of this form. If you answered "No" to one or more questions above, your company is a non-resident bidder. Please complete Parts C and D of this form. To be completed by resident bidders Part B Date,;: to (njnjlddly�vyy) Dates: to ("imldd, yyyy) Dates: to (minleldlyyyy) You mqy attach additional sheet(s) if needed, Address City, State, Zip Code: Address-., City, State, Zip Code: Address: City, State, Zip Code: To be completed by non-resident bidders Part C_ 1. Narne of home state or foreign country reported to the Iowa Secretary of State: 2. Does your company's home state or foreign country offer preference to bidders who are residents.' 0 Yes 0 No 3. If you ans-wered "Yes" to question 2, identify each preference offered by yourcompany's home state or foreign country and the appropriate legal citation. You otay attach additional sheet(s) tf needed. To be completed by all bidders Part D I certify that the statements made on this document are true and complete to the best of my knowledge and I know that my failure to provide accurate and truthful infon-nation may be a reason to reject my bid. Finn Name: Signature: Date: Highway 6 East Water Main Replacement Project 0405 — Page 1 of 2 INSERT IN ENVELOPE 1 WORKSHEET: AUTHORIZATION TO TRANSACT BUSINESS This worksheet may be used to help complete Part A of the Resident Bidder Status form. If at least one of the following describes your business, you are authorized to transact business in Iowa. ❑ Yes ❑ No My business is currently registered as a contractor with the Iowa Division of Labor. ❑ Yes ❑ No My business is a sole proprietorship and I am an Iowa resident for Iowa income tax purposes. ❑ Yes ❑ No My business is a general partnership or joint venture. More than 50 percent of the general partners or joint venture parties are residents of Iowa for Iowa income tax purposes. ❑ Yes ❑ No My business is an active corporation with the Iowa Secretary of State and has paid all fees required by the Secretary of State, has filed its most recent biennial report, and has not filed articles of dissolution. ❑ Yes ❑ No My business is a corporation whose articles of incorporation are filed in a state other than Iowa, the corporation has received a certificate of authority from the Iowa Secretary of State, has filed its most recent biennial report with the Secretary of State, and has neither received a certificate of withdrawal from the Secretary of state nor had its authority revoked. ❑ Yes ® No My business is a limited liability partnership which has filed a statement of qualification in this state and the statement has not been canceled. ❑ Yes ❑ No My business is a limited liability partnership which has filed a statement of qualification in a state other than Iowa, has filed a statement of foreign qualification in Iowa and a statement of cancellation has not been filed. Yes ❑ No My business is a limited partnership or limited liability limited partnership which has filed a certificate of limited partnership in this state, and has not filed a statement of termination. ❑ Yes ❑ No My business is a limited partnership or a limited liability limited partnership whose certificate of limited partnership is filed in a state other than Iowa, the limited partnership or limited liability limited partnership has received notification from the Iowa Secretary of state that the application for certificate of authority has been approved and no notice of cancellation has been filed by the limited partnership or t.N9 limited liability limited partnership. ❑ Yes ❑ No My business is a limited liability company whose certificate of organization is filed in Iowa and has not filed a statement of termination. ❑ Yes ❑ No My business is a limited liability company whose certificate of organization is filed in a state other than Iowa, has received a certificate of authority to transact business in Iowa and the certificate has not been revoked or canceled. Highway 6 East WaterMainReplacement Project 0405-Page 24of 2 INSERT IN ENVELOPE 1 0410 BID BOND FORM HIGHWAY 6 EAST WATER MAIN REPLACEMENT PROJECT CITY OF IOWA CITY , as Principal, and , as Surety declare that we are held and are firmly bound unto the City of Iowa City, Iowa, hereinafter called "OWNER," in the amount of to pay said sum as herein provided. We as Principal and Surety further promise and declare that these obligations shall bind our heirs, executors, administrators, and successors jointly and severally. This obligation is conditioned on the Principal submission of the accompanying bid, dated for Highway 6 East Water Main Replacement Project. NOW, THEREFORE, (a) If said Bid shall be rejected, or in the alternate, (b) If said Bid shall be accepted and the Principal shall execute and deliver a contract in the form specified, and the Principal shall then furnish a security for the Principal's faithful performance of said Project, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Project, as agreed to by the City's acceptance of said Bid, then this obligation shall be void. Otherwise this obligation shall remain in full force and effect, provided that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the amount of the obligation stated herein. By virtue of statutory authority, the full amount of this bid security shall be forfeited to the Owner in the event that the Principal fails to execute the contract and provide the security, as provided in the Project Manual or as required by law. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its security shall in no way be impaired or affected by any extension of the time within which the Owner may accept such Bid or may execute such contract documents, and said Surety does hereby waive notice of any such time extension. The Principal and the Surety hereto execute this bid security this day of , A. a., 20 Witness (Seal) Principal By: (Title) M (Seal) Surety Witness (Attorney -in -fact) Attach Power -of -Attorney, if applicable Highway 6 East Water Main Replacement Project 0410 —Page 1 of 1 0500 CONTRACT HIGHWAY 6 EAST WATER MAIN REPLACEMENT PROJECT CITY OF IOWA CITY This Contract is made and entered into by and between the City of Iowa City, Iowa ("City"), and ("Contractor'). Whereas, the City has prepared certain Plans, Specifications, Proposal and Contract dated the 2nd day of February, 2024, for the Highway 6 East Water Main Replacement ("Project"), and Whereas, the City publicly solicited bids for construction of said Project; and Whereas, Contractor submitted a bid on the Project described in said Project Manual; and Whereas, the parties hereto now wish to enter into this Contract for the construction of said Project. Now, therefore, it is agreed: QV 1. The Contractor hereby agrees to perform the Project for the sums listed its Proposal including the total extended amount of $ which sums are incorporated herein by this reference. 2. This Contract consists of the Contract Documents, as defined in the So ttion 1010, 1.03, and the following additional component parts which are incorporated herein by reference: a. Contractor's Completed Bidder Status Form; attached hereto', and b. Contractor's Completed Contract Compliance Program (Anti - Discrimination Requirements) Assurance, if applicable, pursuant to Section 0200, attached hereto; and C. Contractor's Completed Wage Theft Affidavit, if applicable, pursuant to Section 0200, attached hereto. The above components are deemed complementary and what is called for by one shall be as binding as if called for by all, Wldhw-aT6 East —Water Main —Re—pla—ce-m—ent—Pr—oje—ct------'-'--"—'---'-0-50-0 --Pag--e 1 of 2 1 The names of those persons., firms, companies or other parties, acknowledged by the City, with whom we intend to enter into a subcontract, together with the type of subcontracted work and approximate dollar amount of the subcontract, are as follows (or shown on an attachment): NAME OF i SUBCONTRACTORS I TYPE OF WORK DATED this day of APPROXIMATE COSTS 20 (The City of Iowa City will date this Contract after all signatures are obtained) City Contractor By: BY: Signature of City Official Signature of Contractor Officer Printed Name of City Official ATTEST: By: City Clerk (for Formal Projects only) City Attorney's Office Printed Name of Contractor Officer Title of Contractor Officer ATTEST: By: . . ... .. ....... . (Company Official) 'Highway 6 East Water Main Replacement Project 0500 — Page 2 of 2 0510 PERFORMANCE, PAYMENT, AND MAINTENANCE BOND HIGHWAY 6 EAST WATER MAIN REPLACEMENT PROJECT CITY OF IOWA CITY Know All by These Presents: That we, as Principal (hereinafter the "Contractor" or "Principal") and as Surety are held and firmly bound unto City of Iowa City, Iowa, as Obligee referred I (hereinafter . fe to as "the Jurisdiction"), and to all persons who may be injured by any breadh.'of any of the conditions of this Bond in the penal sum of dollars ($ ), lawful money of the United States, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, legal representatives and assigns, jointly or severally, firmly by these presents. The conditions of the above obligations are such that whereas said Contractor entered into a contract with the Jurisdiction, bearing date the day of , (hereinafter the 'Contract") wherein said Contractor undertakes and agrees to construct the following described improvements: Installation of approximately 2,100 LF of 16" ductile iron and PVC water main, with associated valves, hydrants, service connections, traffic control, pavement removal and surface restoration and is located at Highway 6 East between Fairmeadows Boulevard and Industrial Park Road. To faithfully perform all the terms and requirements of said Contract within the time therein specified, in a good and workmanlike manner, and in accordance with the Contract Documents, It is expressly understood and agreed by the Contractor and Surety in this bond that the following provisions are a part of this Bond and are binding upon said Contractor and Surety, to -wit: Performance: The Contractor shall well and faithfully observe, perform, fulfill, and abide by each and every covenant, condition, and part of said Contract, by reference made a part hereof, for the above referenced improvements, and shall indemnify and save harmless the Jurisdiction from all outlay and expense incurred by the Jurisdiction by reason of the Contractor's default of failure to perform as required. The Contractor shall also be responsible for the default or failure to perform as required under the Contract and Contract Documents by all its subcontractors, suppliers, agents, or employees furnishing materials or providing labor in the performance of the Contract. 2, Payment: The Contractor and the Surety on this Bond hereby agreed to pay all just claims submitted by persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the performance of the Contract on account of which this Bond is given, including but not limited to claims for all amounts due for labor, materials, lubricants, oil, gasoline, repairs on machinery, equipment, and tools, consumed or used by the Contractor or any subcontractor, wherein the same are not satisfied out of the portion of the contract price the Jurisdiction is required to retain until completion of the improvement, but the Contractor and Surety shall not be liable to said persons, firms, or corporations unless the Highway 6 East Water Main Replacement Project 0510 —Page 1 of 4 claims of said claimants against said portion of the contract price shall have been established as provided by law. The Contractor and Surety hereby bind themselves to the obligations and conditions set forth in Chapter 573 of the Iowa Code, which by this reference is made a part hereof as though fully set out herein. 3. Maintenance: The Contractor and the Surety on this Bond hereby agree, at their own expense: A. To remedy any and all defects that may develop in or result from work to be performed under the Contract within the period of five year(s) (5) from the date of acceptance of the work under the Contract, by reason of defects in workmanship or materials used in construction of said work; B, To keep all work in continuous good repair; and C. To pay the Jurisdiction's reasonable costs of monitoring and inspection to assure that any defects are remedied, and to repay the Jurisdiction all outlay and expense incurred as a result of Contractor's and Surety's failure to remedy any defect as required by this section. 4. General: Every Surety on this Bond shall be deemed and held bound, any contract to the contrary notwithstanding, to the following provisions: A. To consent without notice to any extension of time to the Contractor in which to perform the Contract; B. To consent without notice to any change in the Contract or Contract Documents, which thereby increases the total contract price and the penal sum of this bond, provided that all such changes do not, in the aggregate, involve an increase of more than 20% of the total contract price, and that this bond shall then be released as to such excess increase; and C. To consent without notice that this Bond shall remain in full force and effect until the Contract is completed, whether completed within the specified contract period, within an extension thereof, or within a period of time after the contract period has elapsed and the liquidated damage penalty is being charged against the Contractor. D. That no provision of this Bond or of any other contract shall be valid that limits to less than five year(s) (5) after the acceptance of the work under the Contract the right to sue on this Bond. E. That as used herein, the phrase "all outlay and expense" is not to be limited in any way, but shall include the actual and reasonable costs and expenses incurred by the Jurisdiction including interest, benefits, and overhead where applicable. r Accordingly, "all outlay and expense" would include but not be limited to all contract or employee expense, all equipment usage or rental, materials, testing, outside -." experts, attorneys fees (including overhead expenses of the Jurisdiction's staff attorneys), and all costs and expenses of litigation as they are incurred by the : = `` Jurisdiction. It is intended the Contractor and Surety will defend and indemnify the �= Jurisdiction on all claims made against the Jurisdiction on account of Contractor's failure to perform as required in the Contract and Contract Documents, that all agreements and promises set forth in the Contract and Contract Documents, in approved change orders, and in this Bond will be fulfilled, and that the Jurisdiction will be fully indemnified so that it will be put into the position it would have been in had the Contract been performed in the first instance as required. Highway 6 East Water Main Replacement Project 0510 — Page 2 of 4 In the event the Jurisdiction incurs any "outlay and expense" in defending itself against any claim as to which the Contractor or Surety should have provided the defense, or in the enforcement of the promises given by the Contractor in the Contract, Contract Documents, or approved change orders, or in the enforcement of the promises given by the Contractor and Surety in this Bond, the Contractor and Surety agree that they will make the Jurisdiction whole for all such outlay and expense, provided that the Surety's obligation under this bond shall not exceed 125% of the penal sum of this bond. In the event that any actions or proceedings are initiated regarding this Bond, the parties agree that the venue thereof shall be Johnson County, State of Iowa. If legal action is required by the Jurisdiction to enforce the provisions of this Bond or to collect the monetary obligation incurring to the benefit of the Jurisdiction, the Contractor and the Surety agree, jointly, and severally, to pay the Jurisdiction all outlay and expense incurred therefor by the Jurisdiction. All rights, powers, and remedies of the Jurisdiction hereunder shall be cumulative and not alternative and shall be in addition to all rights, powers, and remedies given to the Jurisdiction, by law. The Jurisdiction may proceed against surety for any amount guaranteed hereunder whether action is brought against the Contractor or whether Contractor is joined in any such action(s) or not. Now therefore, the condition of this obligation is such that if said Principal shall faithfully perform all the promises of the Principal, as set forth and provided in the Contract and in this Bond, then this obligation shall be null and void, otherwise it shall remain in full force and effect. When a work, term, or phrase is used in this Bond, it shall be interpreted or construed first as defined in this Bond and the Contract: second, if not defined in the Bond or Contract, it shall be interpreted or construed as defined in applicable provisions of the Iowa Code; third, if not defined in the Iowa Code, it shall be interpreted or construed according to its generally accepted meaning in the construction industry; and fourth, if it has no generally accepted meaning in the construction industry, it shall be interpreted or construed according to its common or customary usage. Failure to specify or particularize shall not exclude terms or provisions not mentioned and shall not limit liability hereunder. The Contract is hereby made a part of this Bond. Highway 6 East Water Main Replacement Project 0510 — Page 3 of 4 PRINCIPAL: SURETY: Printed Name of Contractor Officer Surety Company Name By By Signature of Contractor Officer Signature of Attorney -in -Fact Officer Title of Contractor Officer Printed Name of Attorney -in -Fact Officer 4J2 Company Name of Attorney -in -Fact Company Address of Attorney -in -Fact CO. U- City, State, Zip Code of Attorney -in -Fact P� Telephone Number of Attorney -in -Fact NOTE: 1 All signatures on this performance, payment, and maintenance bond must be original signatures in ink; copies, facsimile, or electronic signatures will not be accepted. 2. This bond must be sealed with the Surety's raised, embossing seal. 3. The Certificate or Power of Attorney accompanying this bond must be valid on its face and sealed with the Surety's raised, embossing seal. 4. The name and signature of the Surety's Attorney-in-Fact/Officer entered on this bond must be exactly as listed on the Certificate or Power of Attorney accompanying this bond. Highway 6 East Water Main Replacement Project 0510 — Page 4 of 4 0520 CONTRACT COMPLIANCE SECTION I - GENERAL POLICY STATEMENT It is the policy of the City of Iowa City to require equal employment opportunity in all City contract work, This policy prohibits discrimination by the City's contractors, consultants and vendors and requires them to ensure that applicants seeking employment with them and their employees are treated equally without regard to age, color, creed, disability, gender identity, marital status, national origin, race, religion, sex, or sexual orientation. It is the City's intention to assist employers, who are City contractors, vendors or consultants, in designing and implementing equal employment opportunity so that all citizens will be afforded equal accessibility and opportunity to gain and maintain employment. Provisions: 1. All contractors, vendors, and consultants requesting to do business with the. City must submit an Equal Opportunity Policy Statement before the execution of the contract. 2. All City contractors, vendors, and consultants with contracts of $25,000 or more (or less if required by another governmental agency) must abide by the requirements of the City's Contract Compliance Program. Emergency contracts may be exempt from this provision at the discretion of the City. Regardless of the value of the contract, all contractors, vendors, and consultants are subject to the City's Human Rights Ordinance, which is codified at Article 2 of the City Code. 3. Contracting departments are responsible for assuring that City contractors, vendors, and consultants are made aware of the City's Contract Compliance Program reporting responsibilities and receive the appropriate reporting forms. A notification of requirements will be included in any request for proposal and notice of bids. 4. Prior to execution of the contract, the completed and signed Assurance of Compliance (located on 0520 — Pages 2 and 3) or other required material must be received and approved by the City. 5. Contracting departments are responsible for answering questions about contractor, consultant and vendor compliance during the course of the contract with the City. 6. All contractors, vendors, and consultants must refrain from the use of any signs or designations which are sexist in nature, such as those which state "Men Working" or "Flagman Ahead," and instead use gender neutral signs. 7. All contractors, vendors, and consultants must assure that their subcontractors abide by the City's Human Rights Ordinance. The City's protected classes are fisted at Iowa City City Code Section 2-3-1. Highway 6 East Water Main Replacement Project 0520 — Page 1 of 6 SECTION 11 - ASSURANCE OF COMPLIANCE The following sets forth the minimum requirements of a satisfactory Equal Employment Opportunity Program which will be reviewed for acceptability, PLEASE RETURN PAGES 2 THROUGH 3 OF THIS SECTION TO THE CONTRACTING DEPARTMENT PRIOR TO THE EXECUTION OF THE CONTRACT. With respect to the performance of this contract, the contractor, consultant or vendor agrees as follows. (For the purposes of these minimum requirements, "contractor" shall include consultants and vendors.) 1 The contractor will not discriminate against any employee or applicant for employment and will take affirmative efforts to ensure applicants and employees are treated during employment without regard to their age, color, creed, disability, gender identity, marital status, national origin, race, religion, sex, or sexual orientation. Such efforts shall include, but not be limited to the following: employment, promotion, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. 2. The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that it is an equal opportunity employer. Note: Contracts that are federally funded are subject to Executive Order No. 11246, as amended, and the regulations (see generally 29 U.S.C. § 1608 et seq.) and relevant orders of the U.S. Secretary of Labor. The Secretary of Labor, and not the City, enforces said regulations and orders. 3. Provide a copy of your written Equal Employment Opportunity policy statement. Where is this statement posted? 4. What is the name, telephone number and address of your business' Equal Employment Opportunity Officer? (Please print) Phone Number Street Address City, State, Zip Code Highway 6 East Water Main Replacement Project 0520 — Page 2 of 6 5, The undersigned agrees to display, in conspicuous places at the work site, all posters required by federal and state law for the duration of the contract. NOTE: The City can provide assistance in obtaining the necessary posters. 6. How does your business currently inform applicants, employees, and recruitment sources (including unions) that you are an Equal Employment Opportunity employer? The above responses are true and correctly reflect our Equal Em ployment Opportunity policies. Business Name Phone Number Signature Title Print Name Date ry Highway 6 East Water Main Replacement Project 0520 — Page 3 of 6 SECTION III - SUGGESTED STEPS TO ASSURE EQUAL EMPLOYMENT OPPORTUNITIES COMPANY POLICY Determine your company's policy regarding equal employment opportunities. Document the policy and post it in a conspicuous place so that it is known to all your employees. Furthermore, disseminate the policy to all potential sources of employees and to your subcontractors asking their cooperation. The policy statement should recognize and accept your responsibility to provide equal employment opportunity in all your employment practices. In regard to dissemination of this policy, this can be done, for example, through the use of letters to all recruitment sources and subcontractors, personal contacts, employee meetings, web page postings, employee handbooks, and advertising. 2. EQUAL EMPLOYMENT OPPORTUNITY OFFICER Designate an equal employment opportunity officer or, at minimum, assign someone the responsibility of administering and promoting your company's Equal Employment Opportunity program. This person should have a position in your organization which emphasizes the importance of the program. 3. INSTRUCT STAFF Your staff should be aware of and be required to abide by your Equal €41ployment Opportunity program. All employees authorized to hire, supervise, promote, 4discharge employees or are involved in such actions should be trained and required to comply with your policy and the current equal employment opportunity laws. 4. RECRUITMENT (a) Let potential employees know you are an equal opportunity employer. This can be done by identifying yourself on all recruitment advertising as "an equal opportunity employer". (b) Use recruitment sources that are likely to yield diverse applicant pools. Word-of-mouth recruitment will only perpetuate the current composition of your workforce. Send recruitment sources a letter annually which reaffirms your commitment to equal employment opportunity and requests their assistance in helping you reach diverse applicant pools. (c) Analyze and review your company's recruitment procedures to identify and eliminate discriminatory barriers. (d) Select and train persons involved in the employment process to use objective standards and to support equal employment opportunity goals. (e) Review periodically job descriptions to make sure they accurately reflect major job functions. Review education and experience requirements to make sure they accurately reflect the requirements for successful job performance. (f) Review the job application to ensure that only job related questions are asked. Ask yourself "is this information necessary to judge an applicant's ability to perform the job applied for?" Only use job -related tests which do not adversely affect any particular group of people. (g) Monitor interviews carefully. Prepare interview questions in advance to assure that they are only job related. Train your interviewers on discrimination laws. Biased Highway 6 East Water Main Replacement Project 0520 — Page 4 of 6 and subjective judgments in personal interviews can be a major source of discrimination. (h) Improve hiring and selection procedures and use non -biased promotion, transfer and training policies to increase and/or improve the diversity of your workforce representation. Companies must make sure procedures for selecting candidates for promotion, transfer and training are based upon a fair assessment of an employee's ability and work record. Furthermore, all companies should post and otherwise publicize all job promotional opportunities and encourage all qualified employees to bid on them. For your information is a copy of Section 2-3-1 of the City Code which prohibits certain discriminatory practices in employment can be found at: https://codelibrary.amlegal,com/co,des/iowacityia/latest/iowacity !a/0-0-0-631#JD 2-3-1. Please note that the protected characteristics include some not mandated for protection by Federal or State law. As a contractor, consultant or vendor doing business with the City of Iowa City you are required to abide by the provisions of the local ordinance in conjunction with your performance under a contract with the City. t­) ry 0"� Highway 6 East Water Main Replacement Project 0520 — Page 5 of 6 SAMPLE: EQUAL EMPLOYMENT OPPORTUNITY POLICY To all employees of This Company and its employees shall not discriminate against any employee or applicant for employment based on his or her age, color, creed, disability, gender identity, marital status, national origin, race, religion, sex, or sexual orientation. The anti -discrimination policy extends to decisions involving hiring, promotion, demotion, or transfer', recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. Further, this Company and its employees will provide a working environment free from such discrimination. All employees are encouraged to refer minority and women applicants and applicants with disabilities for employment. The Equal Employment Opportunity Officer for the is: Name: Address: Telephone: NOTE: This is a SAMPLE ONLY.. You may wish to confer with your Equal Employment Opportunity (EEO) officer or legal counsel to formulate a policy which specifically meets the needs of your company. Highway 6 East Water Main Replacement Project 0520 — Page 6 of 6 0530 -WAGE THEFT POLICY It is the policy of the City of Iowa City, as expressed by City Council Resolution No. 15-364 adopted on November 10, 2015, not to enter into certain contracts with, or provide discretionary economic development assistance to, any person or entity (including an owner of more than 25% of the entity) who has admitted guilt or liability or been adjudicated guilty or liable in any judicial or administrative proceeding of committing a repeated or willful violation of the Iowa Wage Payment Collection law, the Iowa Minimum Wage Act, the Federal Fair Labor Standards Act or any comparable state statute or local ordinance, which governs the payment of wages, for a period of five (5) years from the date of the last conviction, entry of plea, administrative finding or admission of guilt. (hereinafter "Wage Theft Policy") 1. Application. The Wage Theft Policy applies to the following: a. Contracts in excess of $25,000 for goods, services or public improvements. b. Contracts for discretionary economic development assistance. "Discretionary" economic development assistance shall mean any economic development assistance provided by the City of Iowa City that is not required by law. 11. Exceptions. The Wage Theft Policy does not apply to emergency purchases of goods and services, emergency construction or public improvement work, sole source contracts excepted by the City's purchasing manual, cooperative/piggyback purchasing or contracts with other governmental entities. Ill. Affidavit. The contracting entity must complete the attached affidavit showing compliance with the Wage Theft Policy and provide it to the Contracting Department prior to the execution of the contract. Contract provision: Any contract to which this policy is applicable will include the following contract provision: If the City becomes aware that a person or entity (including an owner of more than 25% of the entity) has admitted guilt or liability or been adjudicated guilty or liable in any judicial or administrative proceeding of committing a repeated or willful violation of the Iowa Wage Payment Collection law, the Iowa Minimum Wage Act, the Federal Fair Labor Standards Act or any comparable state statute or local ordinance, which governs the payment of wages, within the five (5) year period prior to the award or at any time after the award, such violation shall constitute a default under the contract. IV, Waivers. If a person or entity is ineligible to contract with the City as a result of the Wage Theft Policy it may submit a request in writing indicating that one or more of the following actions have been taken: a. There has been a bona fide change in ownership or control of the ineligible person or entity; b. Disciplinary action has been taken against the individual(s) responsible for the acts giving rise to the violation(s); Highway 6 East Water Main Replacement Project 0530 — Page 1 of 3 C. Remedial action has been taken to prevent a recurrence of the acts giving rise to the disqualification or default; or d. Other factors that the person or entity believes are relevant. The City Manager or Designee shall review the documentation submitted, make any inquiries deemed necessary, request additional documentation if warranted and determine whether a reduction in the ineligibility period or waiver is warranted. Should the City Manager or Designee determine that a reduction or waiver of the ineligibility period is warranted the City Manager or Designee shall make such recommendation to the City Council. The City Council will make a final decision as to whether to grant a reduction or waiver. Highway 6 East Water Main Replacement Project 0530 — Page 2 of 3 WAGE THEFT AFFIDAVIT 1, , certify under penalty of perjury and pursuant to the laws of the State of Iowa that the following is true and correct: 1 1 am the [position] of [-contracting entity"] and have the authority to execute this affidavit on behalf of said contracting entity and any person or entity with an ownership interest in said contracting entity of more than 25%. 2, Neither ["contracting entity"] nor any person or entity with an ownership interest of more than 25% of said contracting entity has been adjudicated guilty or liable in any judicial or administrative proceeding of committing a repeated or willful violation of the Iowa Wage Payment Collection law, the Iowa Minimum Wage Act, the Federal Fair Labor Standards Act or any comparable state statute or local ordinance, which governs the payment of wages in the last 5 years. Signature ry 9R Highway 6 East Water Main Replacement Project 0530 — Page 3 of 3 SUDAS STANDARD SPECIFICATIONS The City of Iowa City has adopted the SUDAS Standard Specifications for use on all public improvement projects and construction within the public right-of-way. The SUDAS Standard Specifications are incorporated herein by reference. Copies of the current version of the SUDAS Standard Specifications Manual can be obtained from the SUDAS website at: https:Hiowasudas.org/manuals/specifications-manual/. These specifications are kept on file in the City Engineer's Office and will be made available for viewing by City staff and the public. Previous editions of the SUDAS Standard Specifications can be found here: https:!/iowasudas.orglarchived-specifications/. Co N Ai Wighway 6 East Water Main Replacement Project Page 1 of 1 GENERAL SUPPLEMENTAL SPECIFICATIONS The City of Iowa City has adopted the General Supplemental Specifications for use on all public improvement projects and construction within the public right-of-way, The General Supplemental Specifications are incorporated by reference. Copies of the General Supplemental Specifications can be obtained from the website at: https:/Iiowasudas.or-q/supplementaI-specifications/. These specifications are kept on file in the City Engineer's Office and will be made available for viewing by City staff and the public. Highway G East Water Main Replacement Project Page 1 of 1 SUPPLEMENTAL SPECIFICATIONS The City of Iowa City has adopted the Supplemental Specifications to the 2023 Edition of the SUDAS Standard Specifications Manual for use on all public improvement projects and construction within the public right-of-way. The Supplemental Specifications are incorporated herein by reference- Copies of the current version can be obtained at: httpsJ1wwwJow2- city. org/webl ink/O/edoc/ 1 845668/C I C1%20Supplemental %20Specs.pdf or are available in the City Engineering Division Office, Highway 6 East Water Main Replacement Project Page 1 of 1 SPECIAL PROVISIONS The City of Iowa City allows bidders to submit a computer -generate attachment, hereinafter referred to as unit price attachment, in lieu of completing that portion of the Proposal identifying the bid items, description, unit, quantity, and unit prices. See Section 1020, 1.09.13, for details on preparing a computer -generated unit price attachment. This project includes several additional modifications to the SUDAS Standard Specifications beyond the Supplemental Specifications referenced earlier in this Project Manual. Measurement and Payment for items that are not covered by a measurement and payment item in either SUDAS or Iowa City Supplemental Specifications: 5010-999-A, Cut -In Connection, 12" 5010.999-A, Cut -In Connection, 16" Measurement & Payment by each cut -in connection made. The unit price for each item includes, but is not limited to advanced coordination with City of Iowa City for required customer notices and outages; measuring, cutting, and removing section of existing water pipe, plug, or fitting; dewatering and cleaning existing water pipe; furnishing and using all temporary plugs and disinfectant to prevent contamination of existing water pipe, polyethylene wrap; furnishing and installing coupling, sleeve(s), gaskets, mechanical joint gland, restraining devices; leak. testing; bracing, connecting now water pipe to existing water pipe, fitting, or valve; excavation; backfill; compaction; and furnishing all labor, materials and equipment necessary to complete work. Measurement and Payment for items that have a measurement and payment item in either SUDAS or Iowa City Supplemental Specifications, and are further modified or clarified. The original measurement and payment description applies, except as modified as follows: 90110-13, Hydraulic Seeding, Fertilizing, and Mulching, Type I Seed Mix, Unit price also includes watering and warranty. 9040-F-1, SWPPP Measures — Wattles, Unit price includes installation, removal, and maintenance of wattles due to any rain event occurring while the measure is installed. 9040-T-1, Inlet Protection Devices, Unit price includes installation, removal, and maintenance of inlet protection devices due to any rain event occurring while the measure is installed...' Highway 6 East Water Main Replacement Project Page 1 of 1 PLANS (UNDER SEPARATE COVER) SHEET NUMBER TITLE REVISION NUMBER A.1 COVER SHEET 0 A.2 A.3 OVERVIEW MAP, SHEET INDEX PHASING PLAN 0 0 B.1 DETAILS 0 C.1 QUANTITIES AND NOTES 0 C.2 C.3 ESTIMATE REFERENCE NOTES TABULATIONS 0 0 F.1 REMOVALS 0 J.1 TRAFFIC CONTROL PHASE 1, 2, 2B 0 J.2 J.3 TRAFFIC CONTROL PHASE 3 TRAFFIC CONTROL PHASE 4 0 0 MWMA PLAN AND PROFILE 0 MWM.2 MWM.3 PLAN AND PROFILE _ __ __.._ _ .. _ PLAN AND PROFILE 0 _. ------ -- 0 M W M.4� __-_- PLAN N AND PROFILE 0 MWM.5 PLAN AND PROFILE 0 MWM.6 PLAN AND PROFILE 0 cry Highway 6 East Water Main Replacement Project Page 1 of 1 CITY OF IOWA CITY LEGEND OSANITARY MANHOLE UTILITY POLE UTILITY POLE WITH GUYS (9�� WATER SERVICE )QQ z�O FIRE HYDRANT xGATE VALVE REDUCER — W PROPOSED WATER MAIN — Wx EXISTING WATER MAIN G x EXISTING NATURAL GAS — ESx EXISTING OVERHEAD ELECTRIC — SS x EXISTING SANITARY SEWER — SDx EXISTING STORM DRAIN — C x — EXISTING TELECOM UTILITY — SF SILT FENCE HWY 6 EAST WATER MAIN REPLACEMENT PROJECT CITY OF IOWA CITY IOWA CITY, IOWA CIP NO. W3320 DRAWING LIST SHEET NUMBER TITLE REVISION NUMBER A.1 COVER SHEET 0 A.2 OVERVIEW MAP, SHEET INDEX 0 A.3 PHASING PLAN 0 B.1 DETAILS 0 C.1 QUANTITIES AND NOTES 0 C.2 ESTIMATE REFERENCE NOTES 0 C.3 TABULATIONS 0 F.1 REMOVALS 0 1.1 TRAFFIC CONTROL PHASE 1, 2, 2B 0 1.2 TRAFFIC CONTROL PHASE 3 0 1.3 TRAFFIC CONTROL PHASE 4 0 MWM.1 PLAN AND PROFILE 0 MWM.2 PLAN AND PROFILE 0 MWM.3 PLAN AND PROFILE 0 MWM.4 PLAN AND PROFILE 0 MWM.5 PLAN AND PROFILE 0 MWM.6 PLAN AND PROFILE 0 PROPERTY LINE LOCATION MAP r 7 EXISTING OVERHEAD TELEPHONE LINE �Oly I ST 3RD AVE BRADFORD DR Gs J ST c9J� 2ND AVE SOUTHEAST JUNIOR HIGH MERCER �pJ PARK IOWA CITY CO FULL DEPTH PAVEMENT, DRIVEWAY, OR SIDEWALK REMOVE AND REPLACE ABBREVIATIONS APPROX APPROXIMATE MARKETPLACE LOWER MUSCATINE RD PROJECT LOCATION DI DUCTILE IRON DIP DUCTILE IRON PIPE LF LINEAR FEET r HwY6 HWY6 e� FAIRMEADOWS LT LEFT MIN MINIMUM PVC POLYVINYL CHLORIDE BLVD FQ atirq �1 �o 4? RT RIGHT OW RIGHT OF WAY ST STA STATION I I I I I I�c�Ra HWY6 Know what's below. Call before you dig. BURIED UTILITES ARE SHOWN ACCORDING TO AVAILABLE INFORMATION. CONTRACTOR SHALL LOCATE ALL UTILITIES PRIOR TO EXCAVATION. THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS) STANDARD SPECIFICATIONS, GENERAL SUPPLEMENTAL SPECIFICATIONS, SUPPLEMENTAL SPECIFICATIONS AND SPECIAL PROVISIONS. IOWA ONE CALL - UTILITY CONTACT INFORMATION CENTURYLINK/ LUMEN MEDIACOM IOWA CITY Contact Name : Sadie Hull Contact Name : Darwin Driscoll Contact Phone: (918) 547-0147 Contact Phone:845-204-5742 Contact Email: sadie.hull@lumen.com Contact Email: ddriscoll@mediacomcc.com IOWA CITY COMMUNITY SCHOOL DISTRICT MIDAMERICAN ENERGY -GAS Contact Name : Justin Miller Contact Name : Carson Hemphill Contact Phone: (319) 688-1292 Contact Phone: (319) 341-4461 Contact Email: miller.justin@iowacityschools.org Contact Email: crhemphill@midamerican.com IOWA CITY RIGHT-OF-WAY TECHNICIAN MIDAMERICAN ENERGY -ELECTRIC Contact Name: Josh Rohret Contact Name : Lindsay Houston Contact Phone: (319) 930-1917 Contact Phone: (319) 341-4419 Contact Office: (319) 356-5438 Contact Email: lindsay.houston@midamerican.com IOWA CITY TRAFFIC ENGINEERING UNIVERSITY OF IOWA Contact Name: Brock Holub Contact Name : Chris Hatland Contact Phone: (319) 356-5482 Contact Phone: Contact Email: brock-holub@iowa-city.org Contact Email: chris-hatland@uiowa.edu IOWA CITY WASTEWATER DIVISION ON -CALL AUREON NETWORK SERVICES COLLECTIONS Contact Name : Jeff Klocko Contact Phone: (319) 631-1144 Contact Phone:5158300445 Contact Email: jeff.klocko@aureon.com IOWA CITY WATER DIVISION Contact Name: Water Office UNITE PRIVATE NETWORKS, LLC Contact Phone: (319) 356-5160 Contact Name : Joe Kilzer Contact Email: water@iowa-city.org Contact Phone: 8164253556 Contact Email: upngis@upnfiber.com IMON COMMUNICATIONS, LLC Contact Name : Matthew Kearney Contact Phone: (319) 261-4640 Contact Email: matthew.kearney@imon.net I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed ESSIO,tq�,,, Pr ssional Enginee nder the laws of the State of Iowa. zyo BRADLEv w' �Z'= W 2/2/2024 "'• ROETH •• m 165% Ignature Date *.• :: ` Bradley W. Roeth My license renewal date is \ .o P•• License Number 16536 December 31, 2024 nunnmao���\0 Sheets covered by this seal: ALL DRAWINGS CITY OF IOWA CITY ENGINEERING DIVISION APPROVED FOR CONSTRUCTION CITY ENGINEER DATE I w '° a F 0 z � a w <�Qo w w = 3 a 0 < LU � w =Z'o a° U a SHEET IDENTIFICATION A.1 1 z 3 4 5 A CONTROL POINTS POINT I N (FT) E (FT) ELEV. (FT) DESCRIPTION CPol 602,545.10 2,187,494.72 678.57 MAG NAIL CP02 602,575.53 2,187,470.76 678.81 MAG NAIL CP03 603,390.21 2,186,376.49 692.47 MAG NAIL CP04 603,476.42 2,186,277.69 693.41 MAG NAIL CP324 602,207.48 2,187,456.48 679.30 "X" ON CURB BENCHMARKS BM01 602,144.27 2,187,924.51 680.00 MAG NAIL IN CONCRETE CP03 \ < x°O SEE SHEET MWM.6 / lk \ \ 6'x \ \ SEE SHEET MWM.5 b >x �\ 2876 ip 19. \ '° ♦ SEE SHEET MWMA \ 00 r , 2500 ?x 00 Et \ 7,TxCP02 � CP01 SEE SHEET MWM.3 \� v A ,> \ a \x SEE SHEET MWM.2 CP324 z # 1614 t� 7 a A. / 120 SEE SHEET MWM.1 0 100, 2w U W a I. Z a w o 3 O a Wag a3 O J W 3a1LU 05 =7�03 TOf Y o Z O O w 3 SHEET IDENTIFICATION A.2 I I I I P & G PHOENIX - t *'. .A 16" CUT -IN CONNECTION imp � 12" CUL-IN �OT�NECjImN I 16%CAP I I * rJ r- w_ w x INSTALL NEW 16" BUTTERFLY VALVE ' 16" CAP .:,;' wx - SWITCH 12" SERVICE TO NEW MAIN HYDRANT ASSEMBLY j_ - SWITCH 12" SERVICE TO NEW MAIN i INSTALL NEW 16" BUTTERFLY VALVE— I "s... CLOSE 16 VALVE EAST OF SERVICE LINE CLOSE 6" VALVE L3� CAP 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+9D 14+00 .._.15tL10.-.. 16+00 77+00 18+00W � I W... �. Wt ��rr . —_— 3T, +� W —�, 1 W �I W W W yy" — ^�� CONSTRUCT 16" WATER MAIN REMOVE EXISTING 12" VALVE AND MAIN. CONNECT TO NEW MAIN o INSTALL 12" TEMPORARY CAP ON EXISTING MAIN J INSTALL NEW 16" BUTTERFLY VALVE ABANDON 6" MAIN ACROSS HIGHWAY 6. «— INSTALL HYDRANT AT END OF 6" WATER MAIN ON FRONTAGE ROAD LEGEND PHASE 1 PHASE 2 PHASE 3 PHASE 4 THE FOLLOWING IS A SUGGESTED PHASING PLAN. CONTRACTOR IS REQUIRED TO DEVELOP A CONSTRUCTION SEQUENCE THAT MAINTAINS CUSTOMER SERVICE THROUGHOUT PROJECT WITHIN ALLOWABLE SERVICE DISRUPTIONS. CONTRACTOR SHALL COORDINATE PROPOSED PHASING PLAN WITH ENGINEER. PHASE 1: 1. ISOLATE EXISTING 16" MAIN FROM PHOENIX SERVICE LINE TO INDUSTRIAL PARK RD. SUBMIT SHUTDOWN APPLICATION TO CITY MINIMUM 7-DAYS IN ADVANCE. CITY TO PERFORM VALVE OPERATIONS. CONTRACTOR TO INSTALL 12" CAP. a. CLOSE 16" VALVE EAST OF PHOENIX SERVICE LINE. (STA 15+39) b. CLOSE 6" WATER MAIN WEST OF INDUSTRIAL PARK ROAD. (STA 17+34) c. CLOSE 12" VALVE ON SOUTH SIDE OF HIGHWAY 6 CROSSING. d. CLOSE 12" VALVE FEEDING INDUSTRIAL PARK ROAD, (STA 21+11) (TO MINIMIZE DRAINAGE). e. CLOSE 16" VALVE NEAR HIGHWAY 6 RIVIERA INTERSECTION. f. CLOSE 6" VALVE NEAR HIGHWAY 6 RIVIERA INTERSECTION. g. INSTALL TEMPORARY 12" CAP ON EXISTING MAIN AT STA 20+90. h. REOPEN VALVES AT RIVIERA AND 12" VALVE AT INDUSTRIAL PARK ROAD TO SUPPLY WATER TO INDUSTRIAL PARK ROAD FROM THE EAST. PHASE 3: 1. CONSTRUCT WATER MAIN FROM INDUSTRIAL PARK ROAD TO STA 1+50. TIE OVER PHOENIX SERVICE LINE TO NEW MAIN. a. CONSTRUCT TO STA 15+00. b. DISINFECT, FLUSH, AND TEST WATER MAIN. c. CLOSE 16" VALVE AT STA 7+00. d. SWITCH OVER PHOENIX SERVICE LINE TO NEW MAIN. (STA 15+35) e. CONSTRUCT WATER MAIN TO STA 8+00. f. DISINFECT, FLUSH, AND TEST WATER MAIN. g. CONSTRUCT WATER MAIN TO STA 1+50. h. DISINFECT, FLUSH, AND TEST WATER MAIN. PHASE 2: 1. CONSTRUCT WATER MAIN AT INDUSTRIAL PARK ROAD INTERSECTION. ABANDON 6' MAIN CROSSING HIGHWAY 6. a. INSTALL 16" X 12" CROSS. (STA 20+80). b. INSTALL 16" VALVE WEST OF CROSS (STA 20+76). c. INSTALL 12" VALVE SOUTH OF CROSS (STA 30+17) AND CONNECT TO 12" MAIN. d. INSTALL 16" MAIN EAST TO 16" VALVE (STA 21+03). e. INSTALL 12" MAIN NORTH TO 12" VALVE (STA 30+71). f. INSTALL HYDRANT ASSEMBLY. g. DISINFECT, FLUSH, AND TEST WATER MAIN. h. CONSTRUCT 12" CUT -IN CONNECTIONS NORTH AND EAST. (STA 30+88 AND STA 21+23) I. CONSTRUCT 16" WATER MAIN TO WEST SIDE OF INDUSTRIAL PARK ROAD. (STA 20+00). REFER TO TRAFFIC CONTROL DRAWINGS. j. REMOVE HYDRANT AND TEE ON INDUSTRIAL PARK ROAD. (STA 31+17) k. INSTALL HYDRANT AND ABANDON 6" MAIN ON FRONTAGE ROAD. PHASE 4: 1. COMPLETE WATER MAIN CONSTRUCTION. SWITCH P & G SERVICE LINE TO NEW MAIN. P & G SERVICE LINE IMPACTS THEIR PRODUCTION. PROVIDE 30-DAY ADVANCED NOTICE OF SERVICE OUTAGE, SO THAT A PRODUCTION SHUTDOWN CAN BE SCHEDULED. ONCE IT IS SCHEDULED, THE OUTAGE DATE MUST BE HELD. a. CONSTRUCT WATER MAIN TO STA 0+20. b. DISINFECT, FLUSH, AND TEST WATER MAIN. c. INSTALL 16" CAP AT STA 2+10. d. SWITCH P&G SERVICE LINE AT STA 2+10 TO NEW MAIN. e. CONSTRUCT CUT -IN CONNECTION AT STA 0+00. f. CAP ABANDONED MAIN AT STA 0+10 AND STA 2+20. I I o I N REMOVE HYDRANT a + I c� L.L I < 0 INSTALL NEW 16" V J BUTTERFLY VALVE �2�0�+f 000 W ' —z— INSTALL ION 12" CAP ON EXISTING MAIN REMOVE EXISTING 12" VALVE AND MAIN,CONNECT TO NEW MAIN INSTALL 12" TEMPORARY C EXISTING MAIN (PHASE 1) HWY 6 I I 12" CUT -IN CONNECTION HYDRANT ASSEMBLY a LOPAREX REMOVE HYDRANT w, w; n CLOSE 12" VALVE (TEMPORARY) 1 23 12" CUT -IN CONNECTION CLOSE 12" VALVE 0 100' 2W tJ EW 16" Y VALVE —' gr 21+ CLOSE 12" BUTTERFLY VALVE (2'SOUTH, 6' EAST OF HYDRANT) 2800' ;CLOSE 7 EXISTING HYDRANTASSEMBLY� CUT -IN 12' WATER" NNECTION VALVE CLOSE 6" VALVE (TEMPORARY) (4' SOUTH, 6' WEST OF HYDRANT) /J 6" WATER MAIN J ENLARGED PLAN AT INDUSTRIAL PARK RD CLOSE 12" VALVE ILL " 0 1a 20' 4v- fi O ... a z z r < Q r 2 v 30 a a_ 0 Z <aot= U i w0¢ (n r ra is I w RIVIERA BLVD VALVE CLOSURES PLAN SHEET IDENTIFICATION 2 A.3 -6 NOTES: 1. REFER TO THE CONTRACT DOCUMENTS FOR SPECIFIC MATERIAL AND PLACEMENT REQUIREMENTS. 2. CONSOLIDATE AND MODERATELY COMPACT BY SLICING WITH A SHOVEL OR USING OTHER APPROVED TECHNIQUES. 3. COMPACT TO AT LEAST 95% STANDARD PROCTOR DENSITY. 4 PROTECT PIPE. ACCESSORIES, AND APPURTENANCES DURING PLACEMENT AND COMPACTION OF BEDDING AND BACKFILL MATERIALS. KEY: OD - OUTSIDE DIAMETER OF PIPE D = INSIDE DIAMETER OF PIPE TW = MINIMUM TRENCH WIDTH AT TOP OF PIPE = 00+18' OR 1.25XOD+17 (WHICHEVER IS GREATER) d MINIMUM DEPTH OF BEDDING MATERIAL BELOW PIPE - 00/8 OR 4' (WHICHEVER IS GREATER) BURY DEPTH SPRINGLINE OF COMPACT BEDDING MATERIAL LEGEND CLASS I BEDDING MATERIAL CLASS II BACKFILL MATERIAL OVER-E(CAVATKNN AND FOUNDATION STONE PAVEMENT SUBBASE 0 UNDISTURBED EARTH IF SUBGRADE TREATMENT IS SPECIFIED. 2 MINIMUM OF SUITABLE CLASS III / NA / IVB BACKRLL MATERIAL TO BE USED INSTEAD OF CLASS II BACKFILL MATERIAL FINAL TRENCH BACKFILL COMPACT TO AT LEAST 95%STANDARD PROCTOR DENSITY UP TO THE FINAL ONE FOOT. THE FINAL ONE FOOT SHOULD BE COMPACTED TO AT LEAST 98%STANDARD PROCTOR DENSITY. SECONDARY BACKFILL. SEE NOTE 3 PRIMARY BACKFILL, SEE NOTE 3 HAUNCH SUPPORT, SEE NOTE 2 PIPE BEDDING OVER -EXCAVATION AND FOUNDATION STONE, REQUIRED ONLY WHEN SPECIFIED IN THE CONTRACT DOCUMENTS OR WHEN DIRECTED BY THE ENGINEER (SEE 3010. 2.05 AND 3.010) IO WA CITY orvisw SPECIFIC TRENCH BEDDING AND BACKFILL ZONES PRESSURE PIPE - DIP OR PVC(C-900) FIGURE3010.20I UNDER OR WITHIN FIVE FEET OF PAVEMENT SHEET 3OF 8 r� aX4 TRACER WIRE TERMINAL BOX AT GROUND LEVEL(D WIRE CONNECTING GROUND ROD TO TERMINAL BOX IS A SEPARATE WIRE FROM THE WIRE TO THE HYDRANT RUN FIRE HYDRANT BARREL Q FIRE HYDRANT VALVE " GROUNDROD® Q3 \ FIRE HYDRANT TEE \ - DO NOT RUN WIRE �� = " EXISTING WATER MAIN UP VALVE BOX "= NEW WATER MAN SPLICE POSSIBLE SPLICE i = TAPE WIRE AT MIDPOINT OF EACH PIPE LENGTH (TYP) / Q BARREL TO WIRE UP FIRE RE TTERMINAL TERMINALS I�RNALLEND OF TRACER WICER BOX AND THEN DOWN TO GROUND ROD. EXISTING LOCATE WIRE OO CLAMP TRACER WIRE TO GROUND ROD AT SYSTEM GROUND ROD® TERMINATION POINTS. SPLICE 3Q PLACE GROUND RODS 8' TO 1(r AWAY FROM PIPE AND IN CONTACT WITH NATIVE SOIL. REVISED JAMIARY 2022 IO WA CITY D-, -H TRACER WIRE INSTALLATION WITH EXISTING LOCATE WIRE FIGURE 5010102 '1 °T FR13 NOTES: I. REFER TO THE CONTRACT DOCUMENTS FOR SPECIFIC MATERIAL AND PLACEMENT REOUIREMENTS. 2. CONSOLIDATE AND MODERATELY COMPACT BY SLICING WITH A SHOVEL OR USING OTHER APPROVED TECHNIQUES. 3. COMPACT TO AT LEAST 95% STANDARD PROCTOR DENSITY 4. PROTECT PIPE. ACCESSORIES, AND APPURTENANCES DURING PLACEMENT AND COMPACTION OF BEDDING AND BACKFILL MATERIALS. KEY: OD - OUTSIDE DIAMETER OF PIPE D - INSIDE DIAMETER OF PIPE TW = MINIMUM TRENCH WIDTH AT TOP OF PIPE = OD+18' OR EMOD+17 (WHICHEVER IS GREATER) d MINIMUM DEPTH OF BEDDING MATERIAL BELOW PIPE - OD/8 OR 4' (WHICHEVER IS GREATER) BUF COMPACT BEDDING MATERIAL LEGEND CLASS I BEDDING MATERIAL CLASS II BACKFILL MATERIAL CLASS III / NA / NB SUITABLE BACKRLL MATERIAL OVER -EXCAVATION AND FOUNDATION STONE CLASS V BACKFILL MATERIAL (E.G. TOPSOIL) UNDISTURBED EARTH FINAL TRENCH BACKFILL COMPACT TO AT LEAST 95%STANDARD PROCTOR DENSITY WITHIN RIGHT-OF-WAY AND 90%STANDARD PROCTOR DENSITY OUTSIDE THE RIGHT-OF-WAY: OBTAIN REQUIRED COMPACTION WITHIN A SOIL MOISTURE RANGE OF OPTIMUM MOISTURE TO 4%ABOVE OPTIMUM MOISTURE CONTENT SECONDARY BACKFILL. SEE NOTE 3 PRIMARY BACKFILL. SEE NOTE 3 HAUNCH SUPPORT, SEE NOTE 2 PIPE BEDDING OVER -EXCAVATION AND FOUNDATION STONE. REOUIRED ONLY WHEN SPECIFIED IN THE CONTRACT DOCUMENTS OR WHEN DIRECTED BY THE ENGINEER (SEE 3010, 2.05 AND 3 O1.D) /'� SPECIFIC TRENCH BEDDING AND BACKFILL ZONES FIGURE 3010.211 10 WA 1. I T Y orvlslon PRESSURE PIPE - DIP OR PVC (Cl")$HEFT 4 OF e IN UNPAVED AREA i ALL FITTINGS AND VALVES HYDRANT - 4.5' FOR MAIN SHALL BE RESTRAINED. 3-0' RADIAL CLEAR SPACE - / SMALLER THAN 17 AND 5.25' / FOR 12. MAIN AND LARGER TRACER WIRE TERMINAL BOX PLACE STORZ PUMPER NOZZLE BETWEEN HYDRANT AND HYDRANT VALVE. IN CONCRETE: PLACE I'FROM 4RREL WRH IN GRASS: TAPE TO HYDRANT BARREL WITH 2X4 SCRAP OF WOOD INSTALLED BETWEEN BOX AND BARREL TO MACE SURE THE i / METALS DO NOT TOUCH. 1'4i MIN VALVE BOX MAIN TRENCH FINAL GRADE TRENCH 5'MAX BACKFILL SPLICE TO MAN TRACING '-, WIRE OR SET ADDITIONAL GROUND ROD -�; 5'-6'MIN 6' GATE VALVE (� FITTING (TYP) ',tj TRACER WIRE OW)- i WATER MAN (TYP) _j THRUST BLOCK BACKFILL WITH CLEAN AS REQUIRED , 2-12' CRUSHED STONE / TO 18'ABOVE BOTTOM •\ OF HYDRANT BASE `\\ — ANCHOR OR SWIVEL TEE \� SOLID CONCRETE BOX SOLID CONCRETE BOX SIX10 CONCRETE BLOCK GROUND ROD (IN CONTACT WITH NATIVE SOIL) JANUARY 2023 r T, ,L C i�l 0 A orvisoru CITY TYPICAL VALVE AND HYDRANT ASSEMBLY FIGURE 502D.201 "I" ALL FITTINGS AND VALVES SHALL BE RESTRAINED. — TRACER WIRE TERMINAL BOX PLACE BETWEEN HYDRANT AND / HYDRANT VALVE. IN CONCRETE: PLACE V FROM HYDRANT. IN GRASS: TAPE TO HYDRANT BARREL WITH 2X4 SCRAP OF THRUST BLOCK / WOOD INSTALLED BETWEEN BOX \ AND BARREL TO MAKE SURE THE METALS DO NOT TOUCH. PLUG —� -�� GATEVALVE 0 FITTING (TYP) L• THRUST BLOCK SOLID CONCRETE BOX / 1 / AS REQUIRED '� SWIVEL OR ANCHOR TEE — HYDRANT- FOR MAN \ SMALLER THAN 17 AND 5.25' WATER MAN (TYP) — -- SOUD CONCRETE BOX\ FOR 17 MAN AND LARGER EXTEND TRACER WIRE -_ � �` GROUND ROD (IN CONTACT TO END OF PIPE ---------- WITH NATIVE SOIL) JANUARY 2023 { ] IOIY:h l 1 i } DrvisNEN DEADEN. HYDRANT DETAIL 11 G1RE5020202 F U W K a a a w U 3 (n � f a � J ag 0U F- °3 0 =Z�o Q U 0' W F a 3 SHEET IDENTIFICATION B.1 GENERAL NOTES PROJECT QUANTITIES 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE IOWA STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS) STANDARD SPECIFICATIONS, CITY SUPPLEMENTAL SPECIFICATIONS, AND SPECIAL PROVISIONS, UNLESS OTHERWISE SPECIFIED IN THESE PLANS. 2. CONSTRUCTION ADMINISTRATION WILL BE PERFORMED BY THE CITY OF IOWA CITY. 3. LIMITS OF CONSTRUCTION SHALL BE AS SHOWN ON THE PROJECT PLANS. THE CONTRACTOR SHALL GET AUTHORIZATION FROM THE ENGINEER PRIOR TO PERFORMING ANY 3 WORK ON PRIVATE PROPERTY. THE CONTRACTOR SHALL CONFINE ALL ACTIVITIES TO WITHIN THE LIMITS OF CONSTRUCTION, UNLESS AUTHORIZED BY THE ENGINEER AND PRIVATE PARTIES IN WRITING. 4. THE CONTRACTOR SHALL MAINTAIN ACCESS TO INDIVIDUAL PROPERTIES THROUGHOUT THE CONSTRUCTION OF THE PROJECT EXCEPT FOR TEMPORARY LIMITATIONS DUE TO CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL NOTIFY PROPERTY OWNERS 48 HOURS IN ADVANCE OF CONSTRUCTION ACTIVITIES THAT WILL TEMPORARILY LIMIT OWNER ACCESS TO THEIR PROPERTY. ^^ I 5. ALL TREES, SHRUBS AND VEGETATION SHALL REMAIN AND BE PROTECTED FROM DAMAGE UNLESS SPECIFICALLY NOTED AS "REMOVE" OR "CLEAR AND GRUB" ON THE PROJECT PLANS AND AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL TAKE SPECIAL PRECAUTIONARY MEASURES REQUIRED TO PREVENT INJURY OR DAMAGE TO TREE OR SHRUB ROOT SYSTEM. 6. PEDESTRIAN TRAFFIC CONTROL MAY CHANGE AS THE PROJECT PROGRESSES. THE CONTRACTOR SHALL PROVIDE APPROPRIATE SIGNAGE AND FENCING THAT WILL SAFELY - DIRECT PEDESTRIANS AROUND THE CONSTRUCTION AREA(S). PEDESTRIAN TRAFFIC CONTROL SHALL INCLUDE ANY AND ALL SIGNAGE SUCH AS "SIDEWALK CLOSED", "SIDEWALK CLOSED -USE OTHER SIDE", AND "SIDEWALK <WITH APPROPRIATE DIRECTIONAL ARROWS>" AS DEEMED NECESSARY BY THE ENGINEER. 7. DURING REMOVAL AND CONSTRUCTION THE CONTRACTOR SHALL USE ALL MEANS NECESSARY TO CONTROL DUST SPREADING FROM ALL WORK AND STAGING AREAS. DUST CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE APPLICABLE SPECIFICATIONS AND APPROVED BY THE ENGINEER, AND SHALL BE INCIDENTAL. 8. PAVEMENT REMOVAL AND REPLACEMENT LIMITS TO BE FIELD VERIFIED AND APPROVED BY ENGINEER PRIOR TO REMOVAL. ALL PAVEMENT REMOVAL REQUIRES FULL DEPTH SAW CUT. 9. SEED ALL AREAS WITH SUDAS TYPE 1 SEED MIXTURE. 10. DO NOT PARK VEHICLES, EQUIPMENT OR STORE MATERIALS WITHIN 4 FEET OF ROADWAY OPEN TO TRAFFIC. 11. PROTECT UTILITY POLES, LINES, AND APPURTENANCES NOT SHOWN FOR RELOCATION. 12. RESET ALL PROPERTY PINS DISTURBED BY CONSTRUCTION, PINS RESET BY PROFESSIONAL LAND SURVEYOR. COST IS INCIDENTAL TO CONSTRUCTION. 13. PROTECT ALL SURFACING NOT INDICATED FOR REMOVAL FROM DAMAGE DURING CONSTRUCTION. 14. PCC PAVEMENT SHALL BE C-SUD MIX. 15. WORK DURING AN EMERGENCY: THE CONTRACTOR SHALL PERFORM ANY WORK AND SHALL FURNISH AND INSTALL ANY MATERIALS AND EQUIPMENT NECESSARY DURING AN EMERGENCY ENDANGERING LIFE OR PROPERTY. IN ALL CASES THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF THE EMERGENCY AS SOON AS PRACTICAL, BUT SHALL NOT WAIT FOR INSTRUCTIONS BEFORE PROCEEDING TO PROPERLY PROTECT BOTH LIFE AND PROPERTY. 16. MAINTENANCE AND CONTROL OF TRAFFIC: PROPERLY CONSTRUCTED AND LIGHTED BARRICADES SHALL BE PROVIDED BY THE CONTRACTOR AS NEEDED TO PROTECT HIS WORK FROM TRAFFIC. "NO PARKING" SIGNS WILL BE FURNISHED BY THE CITY TO FACILITATE REMOVAL OF PARKED CARS AHEAD OF THE SCHEDULED WORK. PLEASE NOTIFY THE CITY AT LEAST FOUR DAYS IN ADVANCE OF THE CONSTRUCTION. NO PARKING SIGNS NEED TO BE POSTED FOR AT LEAST 48 HOURS. 17. EXPANSION JOINTS: EXPANSION JOINTS WILL BE REQUIRED ADJACENT TO THE EDGES OF ALL DRIVEWAYS WHEN REPLACING SIDEWALK SECTION(S) LOCATED THROUGH DRIVEWAYS. EXPANSION JOINTS SHALL BE INSTALLED ADJACENT TO ALL STREETS AND STEPS. EXPANSION JOINTS SHALL BE SEALED. JOINTS SHALL BE DONE IN ACCORDANCE WITH SUDAS STANDARD SPECIFICATIONS AND DETAILS. 18. CONTRACTION JOINTS AND FINISH: CONTRACTION JOINTS SHALL BE FORMED IN THE NEW PAVEMENT TO MATCH, IN APPEARANCE, THOSE JOINTS IN THE ADJACENT PAVEMENT AND IN A WORKMANLIKE MANNER. CONTRACTION JOINTS SHALL BE SPACED AT INTERVALS EQUAL TO THE WIDTH OF THE PAVEMENT, OR AS DIRECTED BY THE ENGINEER. PAVEMENT SHALL HAVE A UNIFORM TEXTURE WITH A BROOM FINISH. PAVEMENT SHOULD MATCH THE EXISTING ADJOINING SIDEWALK FOR FRAMING AND TEXTURE. 19. DOWELING: EXISTING SIDEWALKS SHALL BE DOWELED TO NEW SECTIONS OF SIDEWALK USING 12" LENGTHS OF #4 REBAR. THE REBAR SHALL BE PLACED AT 1'- 0" ON CENTER, DRILLED 6" INTO THE EXISTING SIDEWALK AND CONCRETE DUST REMOVED BEFORE EPDXY GROUTED INTO PLACE. SEE FIGURE 7030.301 FOR DOWELING DETAILS. 20. FINISH GRADING, SEEDING AND MULCHING: AREAS DISTURBED ADJACENT TO REPAIRS SHALL BE FINISHED, FINE GRADED WITH TOPSOIL, SEEDED, FERTILIZED AND MULCHED WITH TYPE 1 SUDAS MIXTURE. 21. VALVES AND TREE ROOTS: UPON EXCAVATION, IF VALVES OR TREE ROOTS ARE ENCOUNTERED, CONTACT CITY PERSONNEL PRIOR TO PROCEEDING. PAVEMENT CONTAINING VALVES WILL BE EVALUATED ON A CASE BY CASE BASIS. TREE ROOTS SHALL BE EVALUATED BY THE CITY FORESTER. A RESPONSE WILL BE AVAILABLE ON A COURSE OF ACTION WITHIN TWO BUSINESS DAYS. 22. THE CONTRACTOR SHALL CONTINUOUSLY MAINTAIN ADEQUATE PROTECTION OF ALL ITS WORK FROM DAMAGE AND SHALL PROTECT THE JURISDICTION'S PROPERTY AND ADJACENT PRIVATE PROPERTY FROM INJURY OR LOSS ARISING IN CONNECTION WITH THE WORK. THE CONTRACTOR SHALL REPAIR OR RESTORE ANY SUCH DAMAGE, INJURY, OR LOSS TO JURISDICTION PROPERTY OR ADJACENT PRIVATE PROPERTY. 23. PAVEMENT CURING SHALL BE DONE IN ACCORDANCE WITH SECTION 7010. UTILITY NOTES 1. WHERE PUBLIC AND PRIVATE UTILITY FIXTURES ARE SHOWN AS EXISTING ON THE PLANS OR ENCOUNTERED WITHIN THE CONSTRUCTION AREA, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO: 1.1. NOTIFY THE OWNERS OF THOSE UTILITIES PRIOR TO THE BEGINNING OF ANY CONSTRUCTION. 1.2. COORDINATE OPERATIONS WITH UTILITIES 1.3. AFFORD ACCESS TO THESE FACILITIES FOR NECESSARY MODIFICATION OF SERVICES. 1.4. DETERMINE EXISTENCE AND EXACT LOCATION OF UNDERGROUND UTILITIES AND AVOID DAMAGE THERETO. 1.5. PRIOR TO BEGINNING CONSTRUCTION, PROVIDE LABOR AND EQUIPMENT NECESSARY TO DETERMINE THE EXACT LOCATION AND ELEVATION OF ALL UTILITY CROSSINGS WHICH MAY RESULT IN CONFLICTS TO PROPOSED IMPROVEMENTS. 2. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS AND RECORDS, AND THEREFORE THEIR LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY. 3. IT IS POSSIBLE THERE MAY BE OTHER UNDERGROUND FACILITIES, THE EXISTENCE OF WHICH IS PRESENTLY NOT KNOWN OR SHOWN. NO CLAIMS FOR ADDITIONAL COMPENSATION WILL BE ALLOWED TO THE CONTRACTOR FOR ANY INTERFERENCE OR DELAY CAUSED BY SUCH WORK. 4. THE CONTRACTOR IS REQUIRED TO UTILIZE THE UTILITY ONE -CALL SERVICE AT (800)-292-8989 AT LEAST 48 HOURS PRIOR TO EXCAVATING ANYWHERE ON THE PROJECT. 5. KNOWN UTILITY CONFLICTS ARE BEING RESOLVED BY EACH RESPECTIVE UTILITY COMPANY. UTILITY CONFLICTS DISCOVERED DURING CONSTRUCTION WILL BE ADDRESSED AT THE TIME OF DISCOVERY. WATER MAIN CONSTRUCTION NOTES BID ITEM SUDAS ITEM CODE TITLE UNIT PLAN CITY 1 2010-D1 ON -SITE TOPSOIL, STRIP, STOCKPILE, SPREAD CY 188 2* 2010-D3 OFF -SITE TOPSOIL CY 50 3 2010-E EXCAVATION, CLASS 10 CY 27 4* 2010-F BELOW GRADE EXCAVATION (CORE OUT) SY 30 5 2010-G SUBGRADE PREP SY 50 6* 2010-H GRANULAR STABILIZATION, CLASS II BACKFILL MATERIAL TONS 100 7 2010-1 SUBBASE, GRANULAR, 6" SY 188 8 2010-M COMPACTION TESTING LS 1 9* 3010-C TRENCH FOUNDATION TONS 50 10* 3010-D REPLACEMENT OF UNSUITABLE BACKFILL MATERIAL CY 100 11 3010-F TRENCH COMPACTION TESTING LS 1 12 5010-A1 WATER MAIN, TRENCHED, CL52 DUCTILE IRON, 16", WITH NITRILE GASKETS LF 594 13 5010-A1 WATER MAIN, TRENCHED, C900 PVC, 16" LF 1529 14 5010-A1 WATER MAIN, TRENCHED, CL52 DUCTILE IRON, 12", WITH NITRILE GASKETS LF 107 15 5010-A1 WATER MAIN, TRENCHED, C900 PVC, 12" LF 12 16 5010-C2 FITTINGS, BURIED LBS 3260 17 5010-F WATER MAIN ABANDONMENT, 12" CAP EA 1 18 5010-G WATER MAIN ABANDONMENT, FILL AND PLUG, 6" LF 225 19 5010-H WATER MAIN REMOVAL, 16" LF 96 20 5010-H WATER MAIN REMOVAL, 12" LF 32 21 5010-999-A CUT -IN CONNECTION, 16" EA 1 22 5010-999-A CUT -IN CONNECTION, 12" EA 5 23 5020-A VALVE, 16" BUTTERYFLY VALVE EA 6 24 5020-A VALVE, 12" GATE VALVE EA 4 25 5020-C FIRE HYDRANT ASSEMBLY EA 5 26* 5020-1 FIRE HYDRANT ADJUSTMENT EA 1 27 5020-1 FIRE HYDRANT REMOVAL EA 2 28 5020-K VALVE REMOVAL, 12" EA 3 29 5020-K VALVE REMOVAL, 6" EA 1 30 5020-L VALVE BOX REMOVAL EA 6 31 7030-A1 REMOVAL OF SIDEWALK SY 5 32 7030-A3 REMOVAL OF DRIVEWAY SY 37 33 7030-E SIDEWALK, PCC, 4" SY 5 34 7030-H1 DRIVEWAY, PAVED, PCC 7" SY 37 35 7040-A FULL DEPTH PATCH, PCC, 10" SY 134 36 7040-A FULL DEPTH PATCH, 8", ASPHALT SY 12 37 8030-A TEMPORARY TRAFFIC CONTROL LS 1 38 9010-A TEMPORARY SEEDING, TYPE 5 AC 0.7 39 9010-B HYDROSEEDING, TYPE 1 SEED MIX AC 0.7 40 9040-F1 SWPPP MEASURES - WATTLES, 9" LF 2600 41 9040-1 RIP RAP, CLASS E TN 14 42 9040-T1 INLET PROTECTION DEVICE, SURFACE APPLIED EA 1 43 11010-A CONSTRUCTION SURVEY LS 1 44 11020-A MOBILIZATION LS 1 45 11050-A CONCRETE WASHOUT LS 1 PROVISIONAL QUANTITIES TO ESTABLISH A UNIT PRICE IN CASE ITEMS ARE NEEDED DURING CONSTRUCTION. 1. STATIONING IS ALONG THE CENTERLINE OF THE WATER MAIN, UNLESS NOTED OTHERWISE. 2. ALL WATER MAIN, FITTINGS, VALVES, AND SERVICE CURB STOPS TO BE WITHIN RIGHT-OF-WAY. 3. POTHOLE EXISTING WATER MAIN, WATER SERVICES, AND SANITARY SEWER SERVICES AT LEAST 60 FT IN ADVANCE TO VERIFY LOCATION PRIOR TO INSTALLING NEW WATER MAIN. ADJUST ALIGNMENT OF NEW WATER MAIN AS NECESSARY TO AVOID HORIZONTAL AND VERTICAL CONFLICTS. POTHOLING AND MINOR ADJUSTMENTS ARE INCIDENTAL TO CONSTRUCTION OF WATER MAIN. 4. WATER MAIN SHALL NOT PASS THROUGH NOR CONTACT A SEWER OR SEWER MANHOLE. MINIMUM SEPARATION DISTANCES AS LISTED IN SUDAS SPECIFICATIONS. 5. REPLACE SEWER SERVICES LINES DAMAGED BY CONSTRUCTION (INCIDENTAL TO CONSTRUCTION). 6. PROVIDE AND INSTALL BENDS AND FITTINGS NECESSARY TO INSTALL NEW WATER MAIN. VERIFY LOCATION AND DEPTH OF EXISTING SERVICES AND WATER MAIN PRIOR TO CONSTRUCTION NEW WATER MAIN, ADJUST ALIGNMENT AND DEPTH OF NEW WATER MAIN AS NECESSARY FOR CONSTRUCTION. 7. PROVIDE TEMPORARY SERVICE LINE RELOCATION TO MAINTAIN WATER SERVICE IF SERVICE IS IN CONFLICT WITH NEW WATER MAIN (INCIDENTAL TO CONSTRUCTION). 8. RESTRAIN ALL JOINTS. 9. MATERIALS LIST AND AS-BUILTS ARE REQUIRED PRIOR TO WATER MAIN TESTING, 10. COORDINATE FLUSHING OF MAIN AND OPERATION OF EXISTING VALVES WITH WATER DEPARTMENT. PROVIDE EQUIPMENT AND MATERIALS NECESSARY TO REDUCE CHORINE TO AN ACCEPTABLE LEVEL PRIOR TO FLUSHING WATER MAIN. 11. SET WATER VALVE BOXES FLUSH WITH PROPOSED GRADE WITH OPERATING NUT CENTERED UNLESS NOTED OTHERWISE. 12. TRENCHES ARE TO BE BACKFILLED IN ACCORDANCE WITH SECTION 3010. 13. CONTRACTOR IS RESPONSIBLE FOR TRENCH COMPACTION TESTING FOR BACKFILLING OF EXCAVATIONS, INCLUDING BORE PITS AND SERVICE CONNECTIONS. 14. CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OF ANY WATER MAIN BREAKS WITHIN THE CONSTRUCTION LIMITS. 15. CITY MAINTAINS SALVAGE RIGHTS ON ALL REMOVED HYDRANTS, VALVE BOXES, AND LIDS. 16. ANY SERVICE LINE FOUND TO CONTAIN LEAD SHALL BE ENTIRELY REPLACED FROM THE MAIN TO THE METER. 17. POLY WRAP SHALL BE V-BIO, NO EXCEPTIONS, INCIDENTAL TO CONSTRUCTION. 18. HYDRANTS SHALL HAVE 5.25 INCH MAIN VALVE OPENING WHEN INSTALLED ON WATER MAIN 12 INCHES OR GREATER WITH STORZ PUMPER NOZZLE, PENTAGON NUT, WITH LATCHES AND CHAINS. 19. IF WATER MAIN IS INSTALLED BY TRENCHLESS METHODS, THEN INSTALL TWO INDEPENDENT TRACER WIRES. V Lu z_ V z w 0 w U (n w W o F a O v~z< Z ¢ w U 3 Q w 3 Z 'a 5 C) Q 3 a U Lu o z o 3 W Pz O F Q U F Z a 3 � SHEET IDENTIFICATION C.1 z :s 1a 5 Z d z V t 3 ma $ as C o w U 0 z 0 U E w k w �m m E y g r N o z w � Z= o a ~ U w ¢ z >3a r w � NmU Upp �pj a 3 N w r F w Q z a w uri a U w U w a w U 30 Y ag w A Z o � Q a � 3 U) w SHEET IDENTIFICATION C.2 BID ITEM SUDAS REF. CODE UNIT DESCRIPTION ESTIMATE REFERENCE NOTES 1 2010-D1 CY ON -SITE TOPSOIL, STRIP, STOCKPILE, SPREAD BASED ON 6" DEPTH 2' 2010-D3 CY OFF -SITE TOPSOIL 3 2010-E CY EXCAVATION, CLASS 10 REMOVAL OF EXISTING 4` 2010-F SY BELOW GRADE EXCAVATION (CORE OUT) 5 2010-G SY SUBGRADE PREP 6' 2010-H TONS GRANULAR STABILIZATION, CLASS II BACKFILL MATERIAL 1 2 3 4 5 C7 �� Fes' FF ua Z p� V �z 3a m a W ki o C 9 w IL w UHWY 6 0 0 i U H U Z N 2? U� W LL W m m W 19 o � T w C m 55 By�N N O Z U�� ZaN is = awa W y W O a U ?iQ � W Z 3 2Q y ui U . 0 a c� a: Q U W 0 a Z - a Z w 0 3 p �w<o As {tf J.3 )z�.t< x z o Q 1 w SHEET IDENTIFICATION C.3 WATER MAIN NO. ALIGNMENT APPROX. START APPROX. END SIZE (IN) TYPE APPROX STATION STATION LENGTH (FT) 1 HWY6 0+00 15+28.96 16 C-900PVC 1529 2 HWY 6 2+16.50 12 SERVICE, C-900 PVC 12 3 HWY6 15+28.% 21+23.27 16 DUCTILE IRON W/NITRILE 594 GRIPPER GASKETS 4 HWY6 15+34.88 12 SERVICE, DUCTILE IRON W/ 23 NITRILE GRIPPER GASKETS 5 IND PARK RD 30+14.83 30+88.70 12 DUCTILE IRON W/NITRILE 74 GRIPPER GASKETS 6 IND PARK RD 31+13.00 31+22.34 12 DUCTILE IRON W/NITRILE 10 GRIPPER GASKETS WATER MAIN FITTINGS NO. ALIGNMENT APPROX. STATION TYPE WEIGHT(LBS) 1 HWY 6 0+02.88 45 DEGREE ELBOW, 16" MJ 202 2 HWY 6 0+20.98 45 DEGREE ELBOW, 16" MJ 202 3 HWY 6 0+36.95 TEE, 16"X 6", MJ 229 4 HWY 6 2+16.50 TEE, 16"X 12", MJ 281 S HWY 6 7+90.48 TEE, 16"X 6", MJ 229 6 HWY 6 15+34.89 TEE, 16"X 12", Ml 281 7 HWY 6 15+41.57 TEE, 16"X 6", MJ 229 8 HWY 6 17+05.02 (FRONTAGE RD) TEE, 6", MJ 57 9 ND PARK RD 30+22.09 CROSS, 16"X 12" MJ 410 10 HWY 6 21+06.50 45 DEGREE ELBOW, 16" MJ 202 11 HWY 6 21+17.42 46 DEGREE ELBOW, 16" MJ 202 12 HWY 6 21+20.40 REDUCER, 16"X 12" MJ 125 13 IND PARK RD 30+32.56 45 DEGREE ELBOW, 12" MJ 301 14 IND PARK RD 30+39.86 46 DEGREE ELBOW, 12" MJ 101 15 IND PARK RD 30+73.30 TEE, 12"X 6", MJ 113 TOTAL WEIGHT 2964 ADD 10% 296 BID QUANTITY 3260 FIRE HYDRANTS NO. ALIGNMENT APPROX. STATION COMMENTS 1 HWY6 0+36.39 HYDRANT ASSEMBLY 2 HWY6 7+90.44 HYDRANT ASSEMBLY 3 HWY6 15+41.50 HYDRANT ASSEMBLY 4 HWY 6 17+p5.05 (FRONTAGE RD) DEAD END HYDRANT ASSEMBLY S IND PARK RD 30+73.30 HYDRANT ASSEMBLY VALVE NO. ALIGNMENT APPROX. STATION TYPE 1 HWY 6 0+23.50 MJ BUTTERFLY VALVE, 16" 2 HWY 6 0+40.86 MJ BUTTERFLY VALVE, 16" 3 HWY 6 2+16.50 MJ GATE VALVE, 12", SERVICE 4 HWY 6 7+84.98 MJ BUTTERFLY VALVE, i6" S HWY 6 15+29.58 MJ BUTTERFLY VALVE, 16" 6 HWY 6 IS+34.88 MJ GATE VALVE, 12", SERVICE 7 HWY 6 20+75.94 MJ BUTTERFLY VALVE, 16" 8 HWY 6 21+03.38 MJ BUTTERFLY VALVE, 16" 9 IND PARK RD 30+17.48 MJ GATE VALVE, 12" 10 IND PARK RD 30+76.53 MJ GATE VALVE, 12" FIRE HYDRANTS REMOVAL NO. ALIGNMENT APPROX. STATION COMMENTS 1 HWY6 0+32.00 REMOVAL 2 IND PARK RD 31+23.00 REMOVAL PAPS NO. ALIGNMENT APPROX. STATION TYPE BID ITEM 1 HWY 6 0+08.76 CAP, 16" 5010-H 2 HWY 6 0+32.00 CAP, 6" 5010.1 3 HWY 6 2+10.84 CAP, 16" 5010-H 4 HWY 6 2+24.60 CAP, 16" 5010.H 5 HWY 6 IS+32.66 CAP, 16" 5010.H 6 HWY 6 17+OS.00 (FRONTAGE RD) CAP, 6" SO30-G 7 HWY 6 17+34.70 CAP, 6" SO30-6 8 HWY 6 IND PARK RD 20+74.18 30+16.07 CAP, 12" 5010.H 9 ND PARK RD 30+85.23 CAP, 12" 5010.H 10 ND PARK RD 30+15.46 CAP, 12" 5010.E 11 IND PARK RD 30+85.21 CAP, 12" 5010.H IF O D Wx— Al-, W. < w 4" PCC SIDEWALK, 5 SY ROW (APPROX.) 7 1 ROW (APPROX) 10" PCC PAVEMENT, 42 SY ROW (APPROX.)-07i PCC DRIVEWA7 SY 4E D lo" PCC PAVE 7" PCC DRIVEWAY, 20 SY G ro FO, F • po 0 9 'FO�-- FO 28 LF CURB 1 4+n x I w,----*&*GG--� -- 7+0 1 5 7+0 8+ w 9+0n W� 46+40 T— wx x FO I I - 1 11 x LT X FOx FO.— lox— FO,::::== FO,— ICI,— 10,— FO,— IOX 8 ASPHALT, 12 SY x F 0,+ HWY 6 HWY 6 HWY 6 N HWY 6 HWJ 10" PCC PAVEMENT, 92 SY E HW Y 6 HWY 6 HWY 6 HWY 6 H 6 - SS - SSA- SS B ROW (APPROX.) A-- - W� ROW (APPROX.) ROW (APPROX.) F.1 FRONTAGE RD FRONTAGE RD RONTA ry ME R- po . 4" PCC SIDEWALK, 5 SY 7F w w ti1 X, 1v 0 7" PCC DRIVEWAY, 17 SY LOPAR < EX DRIVEWAY 7" PCC DRIVEWAY, 20 SY 10 12'- 3" 6-1 0 ss x ow 14 LF 16" WATER MAIN 8-LD Z LF 12" WATER MAIN 1, Zm 8 W FO. - FO x IK FO�— F 'Pox ATER MAIN FO w 3: < x Gx Gx G,� i�`� 2 6� G� G�— F Fo� FO F3 FO FO FO Fo� SS x w w x� FO FO�— wk— W. w*— A) x po 2+ FO lo x FO I -Y' �u 71 LF 16" WATER MAIN T, 9 2 SS [�4 28 LF FO 10" PCC PAVEMENT, B s x Fox— FO FO xs o s x wl FOx— F01 %F.ss ss s x 8" ASPHALT, 12 SY x Fox 00 9+010 o i— w 21+2 < 10' PCC PAVEMENT, 42 SY I E G,�-- G Gx z t= ES < w u FO 1. FO ES —ES� 2 < < FO x sl Po ------ w 3: > u o FO,— o 0 Fox- FO o FO FO w o x o FO o 16 LF 12"WATER MAIN K < 8 LF 12" WATER MAIN w INDUSTRIAL PARK ROAD TO REMAIN ACCES IBLE FOR RESIDENTS, MAIL, SOLID WASTE, AND HWY I EMERGENCY VEHICLES THROUGHOUT PROJECT W 211' 40' llk 0 lo, 2U W HEET _ENLARGED PLAN- FAIRMEADOWS BLV.D ENLARGED PLAN- INDUSTRIAL PARK ROAD IDENTFCATION HYDRANT REMOVAL SIGN LEGEND: SIGN 1 SIGN 2 SIGN 4 SCLOSEDK' SIGN 5 ,>,> ,> SIGN 6 SIGN 7 SIGN 8 SIGN 9 124 FEB -_ All Roo, SIGN 1 Ny Of Q I � 1001- 0" I n/ f— — — — — (2)12 FT LANES SIGN 3 \ CHANNELIZING DEVICE ^ 14+00 15+00 16+00 17+00 18+00 19+00 20+00 +--- IW —i— W I W I--�— W —+—� W- I—® >1MM----- gMMN W I I CONSTRUCT INDUSTRIAL PARK ROAD HALF AT A TIME. SWITCH TRAFFIC CONTROL AS NEEDED. HWY 6 SIGN 3 N YTA; SIGN 1 �y Q Q. I � I CHANNELIZING �/ N I DEVICE 100,-0„ Ld_ +— F CHANNELIZING Q Z MAINTAIN 1 LANE OPEN DRIVEWAY AT ALL TIMES DEVICE 1 — (2)12 FT LANES 21+00 MMMK W I 1+23 SIGN 5 MAINTAIN 1 LANE OPEN DRIVEWAY AT ALL TIMES CLOSURE MUST ALLOW SEMI TURNING MOVEMENT W O v SIGN 2 w +00 1+23 HWY 6 M HWY 6 CHANNELIZING DEVICE D 1 100 PHASE 213 SIGN 1 540 FT CHANNELIZING DEVICE SIGN 10 HWY 6 HWY 6 HWY 6 SIGN 1540 FT SIGN 11 � SIGN 3 �yLJI CHANNELIZING DEVICE SIGN 1 — -- ONTAGE RD FRONTAGE RD 3 .z, SIGN 1 SIGN 4 ►� SIGN 4 ��� Lu ' V R_JT 100 FTui v / SIGN 3 4 �3SIGN 1 PHASE 1, 2 & 213 TRAFFIC CONTROL FOR CLOSURE AND DETOUR NOTES: 1. PROVIDE 1 WEEK NOTICE TO ENGINEER AND BUSINESSES PRIOR TO STREET OR DRIVEWAY CLOSURE. 2. RESTORE DRIVEWAYS WITH PAVEMENT OR TEMPORARY COMPACTED GRANULAR BACKFILL AND RE -OPEN AT END OF EACH WORK DAY. 3. ALL TRAFFIC CONTROL TO FOLLOW SUDAS STANDARD DETAILS AND MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). 4. STREET AND SIDEWALK CLOSURE AND DETOURS, SUDAS 8030.101, 8030.104, 8030.112, AND 8030.119. 5. CONTRACTOR SHALL MAINTAIN MINIMUM 11 FEET OPEN TRAVEL WIDTH FOR ONE-WAY, ALTERNATING AND SIDE BY SIDE TWO LANE TRAFFIC. 6. COORDINATE WITH CITY STREET DIVISION FOR ALL SIGN REMOVALS. CONTRACTOR TO PROVIDE TEMPORARY STOP SIGNS IF NEEDED. SIGN POSTS DAMAGED BY CONTRACTOR SHALL BE REPLACED AT NO ADDITIONAL COST TO CITY. 7. POSTED SPEED LIMIT ON INDUSTRIAL PARK ROAD, FRONTAGE ROAD, LOWER MUSCATINE ROAD IS 25 MPH AND 45 MPH ON HWY 6. 8. PROVIDE FLAGGERS AS NECESSARY TO CONSTRUCT IMPROVEMENTS, INCIDENTAL TO TRAFFIC CONTROL. HWY 6 SIGN 3 J 0 Um j a O : H m 3m o'm N r ooN Wj 3?a za oN c�wg wNw 0 a U = K z ~ Q a u 3: m 2.3 W � � a 3 0 sm lw ` -� W J a O m IX N a z a H a w U o Z m w a O N a0ot U = w o a V g rc o LL =zt-_ LL Q a Q = W ~ a 3 SHEET IDENTIFICATION J.1 1 L SIGN LEGEND: SIGN 1 r SIGN 2 SIGN 3 " SIGN 4 SIGN 5 SIGN 6 SIGN 7 SIGN 8 SIGN 9 SIGN 10 SIGN 11 3 1M1 { O MOVE 500 FT OF SHOULDER CLOSURE WITH WATER MAIN WORK Q < — — — 500 FT 40 FT (TYP) JSCATINE RD — -_ _ _ __ _ — _ — o+oo — lit ��� 1+00 2+ 3+00 W IT 4+00 W 5+00 6+00 7+00 8+00 9+00 1 +00 11+00 12+00 13+00 14+00 15+001 16+00 1' 18+00 I I— 4 W I I l--- W f 1 W I—�-- — W I —i F WI 1 W I I�—+ WI_ i 1 W o� SIGN 3 % 0 o o a o e HWY6 HWY6 HWY6 HWY6 HWY6 _— CHANNELIZING DEVICE J HWY6 HWY6 HWY6 HWY6 = HWY6 700 FT — 350 FT �--{ 23 SIGN 2 SIGN 1 = HWY6 r HWY6 It " FRONTAGE RD -:7 FRONTAGE RD = FRONTAGE RD ax4lilt, o W 4 r Y O PHASE 3 TRAFFIC CONTROL FOR CLOSURE AND DETOUR NOTES: 1. PROVIDE 1 WEEK NOTICE TO ENGINEER PRIOR TO SHOULDER CLOSURE. 2. ALL TRAFFIC CONTROL TO FOLLOW SUDAS STANDARD DETAILS AND MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). 3. STREET AND SIDEWALK CLOSURE AND DETOURS, SUDAS 8030.101, 8030.113, 8030.116, 8030.117 AND 8030.119. 4. CONTRACTOR SHALL MAINTAIN MINIMUM 11 FEET OPEN TRAVEL WIDTH FOR ONE-WAY TRAFFIC. 5. COORDINATE WITH CITY STREET DIVISION FOR ALL SIGN REMOVALS. CONTRACTOR TO PROVIDE TEMPORARY STOP SIGNS IF NEEDED. SIGN POSTS DAMAGED BY CONTRACTOR SHALL BE REPLACED AT NO ADDITIONAL COST TO CITY. 6. POSTED SPEED LIMIT ON INDUSTRIAL PARK ROAD, FRONTAGE ROAD, LOWER MUSCATINE ROAD IS 25 MPH AND 45 MPH ON HWY 6. 7. PROVIDE FLAGGERS AS NECESSARY TO CONSTRUCT IMPROVEMENTS, INCIDENTAL TO TRAFFIC CONTROL. V w J t O a � 4 w V 3 Z a O w 'a a C) U U) =7 w p _ = z 0 U- a Q U Q iY W r a 3 SHEET IDENTIFICATION J.2 SIGN 3 SIGN 4 e os W ^QO N V LAI �w ­ti !: °u =�t lPe- a . SIGN 3 SIGN 1 RDAD SIGN 5 C�DSED AHEAD SIGN 5 (EAST OF S 1 ST AVE INTERSECTION) SIGN 6 u SIGN (EAST OF S 1ST AVE INTERSECTION) SIGN 7 SIGN8 uEr E=ac�o CROSS MERE SIGN 9 l J SIGN 10 SIGN 11 31 LOWER MUSCATINE RD SIGN SIGN SIGN CHANNELIZING DEVICE ' --- - - - - 0+ W Z SIGN 1 SIGN 4 0 2+0 3+00 4+00 5+00 6+00 7+00 SIGN 3 o W W I IW I W I— --i-- yy W SIGN 4 � 1 SIGN 2 540 FT 540 FT CHANNELIZING DEVICE SIGN 6 LANE CLOSED SIGN 1 Ee HWY 6 HWY 6 SIGN 9 CHANNELIZING DEVICE SIGN 7 LANE CLOSED HWY 6 SIGN 8 I 5?0 FT SIGN 1_/ 540 FT J m U) SIGN 3 I h HWY6 PHASE 4 TRAFFIC CONTROL FOR CLOSURE AND DETOUR v I u !1 z WI" - HWY E SIGN 3 NOTES: 1. FAIRMEADOWS CLOSURE WILL BE SUBJECT TO DISCUSSIONS WITH P & G. PROVIDE 4 WEEKS NOTICE TO ENGINEER PRIOR TO FAIRMEADOWS BOULEVARD CLOSURE. F 2. RESTORE DRIVEWAYS WITH PAVEMENT OR TEMPORARY COMPACTED GRANULAR BACKFILL AND RE -OPEN AT END OF EACH WORK DAY. w 3 JO 3. ALL TRAFFIC CONTROL TO FOLLOW SUDAS STANDARD DETAILS AND MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). a Of v~ z < W W U 3 Z Lu 4. STREET AND SIDEWALK CLOSURE AND DETOURS, SUDAS 8030.101, 8030.113, 8030.116, 8030.117 AND 8030.119. a < o O W U Q 5. CONTRACTOR SHALL MAINTAIN MINIMUM 11 FEET OPEN TRAVEL WIDTH FOR ONE-WAY TRAFFIC. x 3 LL d lL i = z O 6. COORDINATE WITH CITY STREET DIVISION FOR ALL SIGN REMOVALS. CONTRACTOR TO PROVIDE TEMPORARY STOP SIGNS IF NEEDED. SIGN POSTS DAMAGED BY CONTRACTOR SHALL BE REPLACED AT NO ADDITIONAL COST TO CITY. w F_ 7. POSTED SPEED LIMIT ON INDUSTRIAL PARK ROAD, FRONTAGE ROAD, LOWER MUSCATINE ROAD IS 25 MPH AND 45 MPH ON HWY 6. a 3 8. PROVIDE FLAGGERS AS NECESSARY TO CONSTRUCT IMPROVEMENTS, INCIDENTAL TO TRAFFIC CONTROL. SHEET IDENTIFICATION J.3 )1 PHASE 3 IPHASE 2 7J2000 W FO r y � I I N ry I o 0 0 0+- n r14'-0" I o: N 12" VALVE 12"X6"TEE N TRAFFIC LIGHT OVERHEAD HORIZONTAL BEAM J FO x F' FO FO % f x% - FO x � FO FO x o % FO FO x _ SS x SS x I SS x GAS CROSSING FO FO W W > I W 16" BUTTERFLY VALVE - ES % ES FS x .—_ __ 16" X 12" CROSS � FO x—�O X-_-�---- -_ 12" CAP (PHASE 2) GAS CROSSING J / 12" VALVE —/ Fox—FO I. FO / REMOVE EXISTING 12" VALVE J I PROPOSED 12" DI WATER MAIN I EXISTING 20" CASING PIPE I i I 6HWY , Fox FO x wv L I 3 I 4 I 12" DI WATER MAIN REMOVE HYDRANT AND TEE INDUSTRIAL PARK RD PROFILE DUCTILE IRON WITH NITRILE GRIPPER GASKETS 685 EXISTING 20' CASING PIPE oX FIBER OPTIC (UPN) EXISTING 12" WATER MAIN O ELECTRIC GAS (4") (TO BE RELOCATED BY MID AMERICAN) ROW (APPROX.) FIBER OPTIC LUMEN \ 12" VALVE (LUMEN) FIBER OPTIC (CITY) EXISTING SURFACE FIBER OPTIC I , I • FIBER OPTIC ! 1^ CONNECT TO EXISTING 12" WATER MAIN 680I i. (LUMEN) (AUREON) 12" VALVE o 12' CAP — 5.5 FT MIN. FO % w EXISTING 12" WATER MAIN \' I z HYDRANT ASSEMBLY PROPOSED 12" DI WATER MAIN FO n a BM01 GAS CROSSING e ELECTRIC CROSSING x FO % Fo 16" 45° ELBOW o GAS CROSSING FO FO x ' 16" X 112" REDUCER W X S2i SSx FO}\ O Gx 12" CUT -IN CONNECTION �6_= + 21 23 EXISTING 12" WATER MAIN 16" 45° ELBOW FIBER OPTIC CROSSING FO F O FOX — PROPOSED 16" DI WATER MAIN EXISTING 12" TEE AND VALVE O (TO BE ABANDONED) I 16" BUTTERFLY VALVE 12" CAP (PHASE 1) - CONNECT TO EXISTING 12" WATER MAIN c� 0 1a 20' z 0 675 w w CONNECT TO EXISTING 12" WATER MAIN 12" DI WATER MAIN 12"X6"TEE � i PROPOSED 12" DUCTILE IRON CONNECT TO EXISTING WATER MAIN 12" WATER MAIN 12' 45° ELBOWS 16" X 12 CROSS REMOVE 12" X 6" TEE REMOVE HYDRANT AND SALVAGE TO CITY CONNECT TO EXISTING 10 SANITARY SEWER OF IOWA CITY 12" WATER MAIN REMOVE CONNECT TO EXISTING 12" WATER MAIN 665 h 30+00 STATION 31+00 31+ 68` 68( z O j 67: w w 67C DUCTILE IRON WITH NITRILE GRIPPER GASKETS GAS (4") (TO BE RELOCATED EXISTING BY MID AMERICAN) SURFACE 12" CUT -IN CONNECTION I ELECTRIC FIBER OPTIC (UPN) GAS GAS i 5.5 FT MIN. VALVE 16" 45° ELBOWS 16" BUTTERFLY VALVE 16" X 12 CROSS 16" BUTTERFLY 10" SANITARY SEWER 16" X 12" REDUCER 665 20+00 w 0 o W J a LL a wwm v 3 O 3 d w 0 3 i z o Q z < U Q i J w o_ SHEET IDENTIFICATION 21+25 MWM.1 STATION n+uu wi z� D \� FO \ \\ — FO'x: FO x x FO FO \ x ss ss x ss x N W W FO x 68( 67! z 0 67( W w W 66! 660 18+00 FO x ROW (APPROX.) J I 4 FO Fox ROW (APPROX.) `�\\ I Ox FFCl x FO 12" RIPRAP, CLASS E ____--- FO x--- '-'---- Fox Fo x -r FO x'_------��5� x`___.-_-- -_—FO z FO x FO x'�— FO K 55 S x S x SS x SS x SS x SS x SS x FO-----�� FO FO FO FO x FO x x FO x FO x -�— x x PHASE 3 � 79+00 W WI - W —� Wvx W W 3 x W, Wx Wx wx wx Gz Oz Oz Ox x Gz Gx G. Ox\ REMOVE VALVE BOX (TYP) ' \ FO FO FO xx FO Fp x FOX FOX— FO x FOX x FIBER OPTIC CROSSING\_ GAS CROSSING PROPOSED 16" DI WATER MAIN / FO FFO EXISTING WATER MAIN CROSSING x p l x x FO x FO x FO x FO x FO x FO x FO x SS x -- SSA pu_,_ FO x-- FO x FOX DUCTILE IRON WITH NITRILE GRIPPER GASKETS EXISTING 16" WATER MAIN (TO BE REMOVED AS NECESSARY) 12" RIPRAP, CLASS E FIBER OPTIC GAS (LPN) 5.5 FT MIN. PROPOSED 16" DI WATER MAIN OPY8N 20+00 14 _ ES x _ — ES - FO I FO x FO 0 10' 2(Y F U W a W C J a LL ww O mw3 a >po� p agLL� ��03 Q ==Z U Q J W o a 3 m 5 CP02 H W CP01 ROW (APPROX.) ZI FO z FO x 0 13+00 WI � W FO x r x I w 0 N OLLu O w 0 N � I O I W � � I O I 0 LL% PS x i 0 RESTRAINED JOINT 685 PVC 680- Z 675 - O Q w J w 670 - 665- 660 15+00 FO Fo X FV FO 1 x 2 FO s — FO s _. FOX FO FO G x G x O' x G x G ` G x ° x—----� G F x FO 4E1 FO FOX FOX f— O M \ F O F-------- "— I' 12" CUT -IN CONNECTION Fox FOXFIBER OPTIC CROSSING Fo X X x x REMOVE 12" SERVICE VALVE 6" CAP SANITARY SEWER CROSSING REMOVE VALVE BOX ���II\ 11\\\\ '1 12" VALVE REMOVE VALVE BOX FO wx— wx wx WX 14+00 w 1 W W W — S$ X SS x wx A,,-w., w z 16" X 6" TEE x wX wx '^'x ��. � 15+ 0 16+00 17+00 W W W W w —+-- W I W W WATER MAIN CROSSING FO T FOX FO x , FOX FOX FO x FO x FO z F° x x HYDRANT ASSEMBLY P6" CAP ROPOSED 16" DI WATER MAIN m I 16" X 12" TEE 16" BUTTERFLY VALVE 1 16" PVC WATER MAIN (WEST OF VALVE) 1 L HWY 6 ZI Z rl FO ABANDON AND FILL WITH CLSM 3 m HWY _6_ 3` y N 3 SSx SSx SSx SSx SSx -1SSX SSx $$X $$ z SSx $$ x 3 IRON WITH NITRILE GRIPPER GASKETS - EXISTING SURFACE EXISTING 6" WATER MAIN (TO BE ABANDONED) FIBER OPTIC (LUMEN) 5.5 FT MIN. _> 16"X6"TEE 16" X 12" TEE -� 16" WATER MAIN 10" SANITARY SEWER J� 16" BUTTERFLY VALVE 18" MIN. CLEARANCE 16+00 STATION 17+00 18+00 :OX FO Fox — FO " FOx REMOVE EXISTING 90' ELBOW, INSTALL 6" TEE PLUG 6" TEE, (WEST) - OE _ OE — OE =OE Gx Gz DEAD END HYDRANT ASSEMBLY IOWA CITY FIGURE 5020.202 SSA___ O —�-- Fo x F x1 G Ow wx + — FOx— F 0 10, 20' 40' O ss x SDI N z 4) Z O 0 1 04 wjw utiN Z< 3?a awa O 2 W 0 . FO FOX .. FO.-FOX- ..0 a 2 X 3 e-4=,�------- FOX FOX a., 6" CAP 3 CONNECT TO EXISTING 6" WATER MAIN FRONTAGE RD CP324 EXISTING 6" WATER MAIN w o w OE W0E E w 0E w, OE —wvdE — OE a GX GX a O O O_ x G x x ago5 ROW (APPROX.) 3 a w Z S W O a Q o¢ 3 Yo Z f O J a sx. 3 SHEET IDENTIFICATION MWM.3 4 ROW (APPROX.) 71 31 wl z f//%�I ROW (APPROX.; ROW (APPROX_) p�l�g��fill F��Z, FOx ip/ FO x _S\ �- FO FOFo 17, � FOx--I}n-F—Ox— �\ FO x---I FOx SANITARY SEWER CROSSING wx vx wx Wl /— wx wx wx N`x wx 12+00 10+9)0 11+00 1M w —+1-- W. I W w w T W W -.4 w w— x PROPOSED 16" PVC WATER MAIN FO f0 x FO x FO x FO x Fox— FO x — FO x FO FO x , I 1 HWY 6 n if �x FO x //' f \ V FO x FO x FIBER OPTIC CROSSING 1 W. w, v X Wx wx wx W. w o + 114+00 15+ 0 w �w . �n �� W w I w FO — FO x 1 FC t FO x O FO x FO.— FO x x I w 0 wl z it G, 0 10' 29 4V 1u+uu 11+00 12+00 STATION 13+00 14+00 15+00 1 z 24 w16" I U w LL O J a LL Zu1�3 0 U 0 or O 3 Q S Z O Z U i J W 0_ w a 3 SHEET IDENTIFICATION MWM.4 31 4 1 5 G FO x co' /� w) 1FITG. - - ROW (APPROX.) cx cx cx / !� /�---- FO .-,� F<' , cx x o x cx cx cx xf o \` ox Fo FO FOa \ FO FO 11/raww" Fo - FO wx wx 5+I0 wx v,— w ww—� wx--B+00- W W---qcz:::7W ---F— -W I W PROPOSED 16" PVC WATER MAIN FO x FO xlr?--�— FO x FO x FO x o .aa I i Fo \� REMOVE VALVE BOXII;1"�\ , 16"X6"TEE wx wx wz _..r1x wx w 8+00 � W 1MW 9+00 10+Do � WW -�---- ---+�-- 16" BUTTERFLY VALVE �---- FO x-----�— FO x FO Y FO x FO x FO x FO x FO x FO x FO x FC . FO x HYDRANT ASSEMBLY ' HWY 6 0 10, 20' 40' �P 1 ( L RESTRAINED JOINT PVC 695; EXISTING SURFACE 690 Z 685 O -� H a w 5.5 FT MIN. w 680 PROPOSED 16' PVC WATER MAIN 16" BUTTERFLY VALVE 16' X 6" TEE 675 670 .+W 7,00 STATION 8+00 9+00 10+00 U W a W y. J a LL cow 3 0_ U 0 W?- 3 Q 2 Z O Z Q U Q f J W o_ 3 SHEET IDENTIFICATION MWM.5 4 I ROW (APPROX.) CP04 ss _ REMOVE VALVEBO -X 16" CAP ___x REMOVE HYDRANT _ llpwI ROW (APPROX.) 6' CAP ss F X — FO X FO X + Gx x Gx 16" CUT -IN CONNECTION W. Wx WX W - FO x x 16" 45' ELBOW Fo FIBER OPTIC CROSSINGS 16" 45° ELBOW D LOWERTIMUSCATI E RD ICP03 ROW (APPROX.) HYDRANT ASSEMBLY Atk— ` s` ssx PHASE 4 STORM SEWER CROSSING ;.:.. = Y FOX FO x FO X F Fp ---- v x Fox Fox REMOVE EXISTING 12" SERVICE VALVE, CONNECT TON' MAIN Gx p x cx G x F �- c _ G x _. G X .. _. _X _ . �- FO x G x `- 16" CAP 16" CAP - Fo _R - O x FOX x FO x - FO X FOX �, rV F FOX x FO x FOX FOX FO X X F F FO FOX FO FOX FOX . _ .. FO x I 3 FT SEPARATION FROM SANITARY MANHOLE--- Wx 1+ 2+00, W _ wx—_---wx 3+00 wX Wx WX 4+00 Wx vfx �v" 5+�0 O W W W --�—� -- - FO �s x ` FOX -_�-- FOX --- SANITARY SEWER CROSSING SANITARY SEWER 16" BUTTERFLY VALVE Q 0 CROSSING 16" X 6" TEE W —ES," N 16" BUTTERFLY VALVE 2PHASE 4 PHASE 3 FIBER OPTIC CROSSING RELOCATE FIBER OPTIC (LUMEN) FROM 0+00 TO 1+10 �� x HWY 6 - - - - - 70C 695 Z 69C O a w w 685 680 NA W WW W I WW W VALVE PROPOSED 16" PVC WATER MAIN FOX- FO 16" X 12" TEE FO x FO x Fo 1r �x FOX FOX HWY 6 0 ,O 20' 40' RESTRAINED JOINT PVC FIBER OPTIC EXISTING 12" STORM SEWER FIBER OPTIC -- EXISTING SURFACE 18" MIN. CLEARANCE 5.5 FT MIN. 18" MIN. CLEARANCE 18- MIN. CLEARANCE 16' BUTTERFLY VALVE EXISTING 10" SANITARY SEWER 16" X 12" TEE 16" WATER MAIN 16" X 6" TEE EXISTING 10" SANITARY SEWER 16' 45" ELBOWS 16" BUTTERFLY VALVE I I 16" CUT CONNECTION 1 ' ! , +,fi - -IN <f 4t elJ 'L 675 0+00 �rw STATION 4+UU 5+00 U W o w K J a LL w w a o � W 3 a Qgo� z LDor 3 Q i z o z Q U Q i J W a 3 SHEET IDENTIFICATION MWM.6 02 February 2024 City Clerk's Office 410 East Washington Street Iowa City, Iowa, 52240 � r ®d� CITY OF IOWA CITY r,71 FLED_ - (NESCO CITY OF LITERATURE i30 410 East Washington Street Iowa City, Iowa 52240- 1826 (319) 356-5000 (319) 356-5009 FAX www,icgov.org Subject: Estimated Construction Cost for the Highway 6 East Water Main Replacement Project Dear City Clerk, The engineer's opinion of estimated construction cost for the upcoming Highway 6 East Water Main Replacement Project is $880,000. Sincerely, �/-- "73rz Marri VanDyke Civil Engineer Prepared by: Marri VanDyke, Engineering Division, 410 E. Washington St., Iowa City, IA 52240, (319)356-5044 yr` Resolution No. 24-34 Resolution setting a public hearing on February 20, 2024 on project manual and estimate of cost for the construction of the Highway 6 East Water Main Replacement Project, directing City Clerk to publish notice of said hearing, and directing the City Engineer to place said project manual on file for public inspection. Whereas, funds for this project are available in the Hwy 6 (Fairmeadows to Industrial Park Rd) Water Main Replacement Project, account #W3320. Now, therefore, be it resolved by the Council of the City of Iowa City, Iowa, that: A public hearing on the project manual and estimate of cost for the construction of the above - mentioned project is to be held on the 20th day of February, 2024, at 6:00 p.m. in the Emma J. Harvat Hall, City Hall, Iowa City, Iowa, or if said meeting is cancelled, at the next meeting of the City Council thereafter as posted by the City Clerk. 2. The City Clerk is hereby authorized and directed to publish notice of the public hearing for the above -named project in a newspaper published at least once weekly and having a general circulation in the City, not less than four (4) nor more than twenty (20) days before said hearing. 3. A copy of the project manual and estimate of cost for the construction of the above -named project is hereby ordered placed on file by the City Engineer in the office of the City Clerk for public inspection. Passed and approved this 6,-1, day of FPhruar3, , 2024 M Approved Attest: City Clerk City A orney's Office (Liz Craig - 02/01/2024) It was moved by Dunn and seconded by salih the Resolution be adopted, and upon roll call there were: Ayes: X X x x X Nays: Absent: Alter Bergus Dunn Harmsen Moe Salih Teague Loc&I'QR c�c�eNvtQ,v�' Iowa PO Box 631851 Cincinnati, OH 45263-1851 GANNETT PROF OF PUBLICATION NOTICE OF P0110 UBLIC HEARING NOTICE OF PUBLIC HEARING ON AshleyPlatz PROJECT MANUAL AND ESTI- City MATED COST FOR T,�-I,E HIGH - WAY 6 FAST WATER MAiIV City Of Iowa City REP CKCEMENT PROJECT —IN" 410 E Washington ST TO ALL TAXPAYERS OF THE Iowa City LA52240-1825 CITY OF IOWA CITY, IOWA, AND TO OTHER INTERESTED PERSONS: STATE OF WISCONSIN, COUNTY OF BROWN Public notice is hereby given that the City Council of the City of Iowa City, Iowa, will conduct a public The Iowa City Press Citizen, a newspaper printed and published in hearing on the Proiect Manual, the city of Iowa, Johnson County, State of Iowa, and personal including the plans, specifications, knowledge of the facts herein state and that the notice hereto contract, and estimated cost for the construction of the Highway East annexed was Published in said newspapers in the issue: i Water Main Replacement n said city at 6:00 p.m. on the 20th day of 02/12/2024 February, 2024, said meeting to be held in the Emma J. Harvat Hall in the City Hall, 410 East Washington and that the fees charged are legal. Street in said city, or if said meeting Sworn to and subscribed before on 02/12/2024 is cancelled, at the next meeting of the City Council thereafter as posted by the City Clerk. This project includes installation of approximately 2,100 LF of 16" ductile iron and PVC water main, with associated valves, hydrants, service connections, traffic control, pavement removal and surface restoration and is located at High- way 6 East between Fairmeadows Boulevard and Industrial Park Road. Said Proiect Manual and estimated cost are now on file in the office of the City Clerk in the City Hall in Legal C erk ' Iowa City, Iowa, and may be inspected by any interested persons. Any interested persons may appear Notary, State of WI, County of Brown at said meeting of the City Council for the purpose of making obiections .— to and comments concerning said Proiect Manual or the cost of Mycommisionexpires making said improvement. Publication Cost: $41.80 This notice is given by order of the City Council of the City of Iowa City, Order No: 9833959 # of Copies: p Iowa and as provided by law. Kellie K. Grace, City Clerk Customer No: 1249729 1 PO #: THIS IS NOT AN INVOICE! Please do not use this form Jor pgvment remittance r KATHL_EEN ALLEN NotarY Public it 01 1!isc nnin Page 1 of 1 Prepared by: Marri VanDyke, Engineering Division, 410 E. Washington St., Iowa City, IA 52240, (319) 356-5044 Resolution No. 24-49 Resolution approving project manual and estimate of cost for the construction of the Highway 6 East Water Main Replacement Project, establishing amount of bid security to accompany each bid, directing City Clerk to post notice to bidders, and fixing time and place for receipt of bids. Whereas, notice of public hearing on the project manual and estimate of cost for the above - named project was published as required by law, and the hearing thereon held; and Whereas, the City Engineer or designee intends to post notice of the project on the website owned and maintained by the City of Iowa City; and Whereas, funds for this project are available in the Hwy 6 (Fairmeadows to Industrial Park Rd) Water Main Replacement Project, account #W3320. Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa that: 1. The project manual and estimate of cost for the above -named project are hereby approved. 2. The amount of bid security to accompany each bid for the construction of the above - named project shall be in the amount of 10% (ten percent) of bid payable to City of Iowa City, Iowa. 3. The City Clerk is hereby authorized and directed to post notice as required in Section 26.3, not less than 13 days and not more than 45 days before the date of the bid letting, which may be satisfied by timely posting notice on the Construction Update Network, operated by the Master Builder of Iowa, and the Iowa League of Cities website. 4. Sealed bids for the above -named project are to be received by the City of Iowa City, Iowa, at the Office of the City Clerk, at the City Hall, before 3:00 p.m. on the 121 day of March, 2024. At that time, the bids will be opened by the City Engineer or his designee, and thereupon referred to the City Council of the City of Iowa City, Iowa, for action upon said bids at its next regular meeting, to be held at the Emma J. Harvat Hall, City Hall, Iowa City, Iowa, at 6:00 p.m. on the 19t' day of March, 2024, or at a special meeting called for that purpose. Passed and approved this 20th day of Attest: )- 44 J City C erk February 2024. Ma r Approved by G City Attor y's Office (Sara Hektoen - 02/14/2024) Resolution No. 24-49 Page 2 It was moved by Bergus and seconded by adopted, and upon roll call there were: Ayes: E� Nays: Salih the Resolution be Absent: Alter Bergus Dunn Harmsen Moe Salih Teague AL ; I I IOWA LEAGUE QfCITIES CERTIFICATE The Iowa League of Cities an entity organized under the laws of Iowa as an instrumentality of its member cities, with its principal place of business in Des Moines, Polk County, Iowa, does hereby certify that I am now and was at the time hereinafter mentioned, the duly qualified and acting Executive Director of the Iowa League of Cities, and that as such Executive Director of the League and by full authority from the Executive Board, I have caused a NOTICE TO BIDDERS Highway 6 East Water Main Replacement Project Classified ID: 111708526365 A printed copy of which is attached and made part of this certificate, provided on 02/22/2024 to be posted on the Iowa League of Cities internet site on the following date: 2024-02-22 I certify under penalty of perjury and pursuant to the laws of the State of Iowa that the preceding is true and correct. 02/22/2024 Alan Kemp, Executive Director 0100 NOTICE TO BIDDERS HIGHWAY 6 EAST WATER MAIN REPLACEMENT PROJECT Sealed proposals will be received by the City Clerk of the City of Iowa City, Iowa, until 3:00 P.M. on the 12th day of March 2024. Sealed proposals will be opened immediately thereafter. Bids submitted by fax machine shall not be deemed a "sealed bid" for purposes of this Project. Proposals received after this deadline will be returned to the bidder unopened. Proposals will be acted upon by the City Council at a meeting to be held in the Emma J. Hanrat Hall at 6:00 P.M. on the 19th day of March, 2024, or at special meeting called for that purpose. The Project will involve the following: This project includes installation of approximately 2,100 LF of 16" ductile iron and PVC water main, with associated valves, hydrants, service connections, traffic control, pavement removal and surface restoration and is located at Highway 6 East between Fairmeadows Boulevard and Industrial Park Road. All work is to be done in strict compliance with the Project Manual prepared by Watersmith Engineering, of Muscatine, Iowa, which has heretofore been approved by the City Council, and are on file for public examination in the Office of the City Clerk. Each proposal shall be completed on a form furnished by the City and must be submitted in a sealed envelope. In addition, a separate sealed envelope shall be submitted containing a completed Bidder Status Form and a bid security executed by a corporation authorized to contract as a surety in the State of Iowa, in the sum of 10% of the bid. The bid security shall be made payable to the TREASURER OF THE CITY OF IOWA CITY, IOWA, and shall be forfeited to the City of Iowa City in the event the successful bidder fails to enter into a contract within ten (10) calendar days of the City Council's award of the contract and post bond satisfactory to the City (in the form shown in Section 0510) ensuring the faithful performance of the contract and maintenance of said Project, if required, pursuant to the provisions of this notice and the other contract documents. The City shall retain the bid security furnished by the successful bidder until the approved contract has been executed, the required Performance, Payment, and Maintenance Bond (as shown in Section 0510) has been filed by the bidder guaranteeing the performance of the contract, and the contract and security have been approved by the City. The City shall promptly return the checks or bidder's bonds of unsuccessful bidders to the bidders as soon as the successful bidder is determined or within thirty days, whichever is sooner. The successful bidder will be required to famish a Performance, Payment, and Maintenance Bond in an amount equal to one hundred percent (100%) of the contract price and in the form shown in Section 0510, said bond to be issued by a responsible surety approved by the City, and shall guarantee the prompt payment of all materials and labor, and also protect and save harmless the City from all claims and damages of any kind caused directly or indirectly by the operation of the contract, and shall also guarantee the maintenance of the improvement for a period of five (5) year(s) from and after its completion and formal acceptance by the City Council. Project Page 1 of 2 The following limitations shall apply to this Project: Late Start Date: April 29, 2024 Substantial Completion Date: July 22, 2024 Final Completion Date: September 30, 2024 Liquidated Damages: $500 per day All of the bid items listed in Section 0400 — Proposal shall be completed by the Substantial Completion Date except seeding. The Project Manual may be examined at the office of the City Clerk. Copies thereof and blank forms may be secured at the office of Technigraphics, a division of Rapids Reproductions, 415 Highland Ave, Suite 100, Iowa City, Iowa 52240, Phone: (319) 354-5950, Fax: (319) 354- 8973, Toll -Free: (800) 779-0093. Prospective bidders are advised that the City of Iowa City desires to employ minority contractors and subcontractors on City projects. A listing of minority contractors can be obtained from the Iowa Department of Inspections and Appeals at (515) 281-5796 and the Iowa Department of Transportation Contracts Office at (515) 239-1422_ Bidders shall list on the Proposal the names of persons, firms, companies or other parties with whom the bidder intends to subcontract. This list shall include the type of work and approximate subcontract amount(s). The Contractor awarded the contract shall list on the Contract its subcontractors, together with quantities, unit prices and extended dollar amounts. By virtue of statutory authority, preference must be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa Statutes. The Iowa reciprocal resident bidder preference law applies to this Project. The City reserves the right to reject any or all proposals, and also reserves the right to waive technicalities and irregularities. Posted upon order of the City Council of Iowa City, Iowa, KELLIE GRACE, CITY CLERK Project Page 2 of 2 Ashley Platz From: Cindy Adams <CAdams@mbi.build> Sent: Thursday, February 22, 2024 9:08 AM To: Ashley Platz Subject: Certificate for Notice to Bidders Attachments: We sent you safe versions of your files; 02.22.24 Notice to Bidders.tiff A RISK ** This email originated outside of the City of Iowa City email system. Please take extra care opening any links or attachments. ** Mimecast Attachment Protection has deemed this file to be safe, but always exercise caution when opening files. Certificate The undersigned, being first duly sworn on oath, states that The Construction Update Plan Room Network ("CU Network") is a corporation duly organized and existing under the laws of the State of Iowa, with its principal place of business in Des Moines, Polk County, Iowa. The undersigned also states that he is now and was at the time hereinafter mentioned, the duly qualified and acting President / CEO of the CU Network, and that as such President / CEO of the CU Network and by full authority from the Executive Board, he caused a NOTICE TO BIDDERS Iowa City — Highway 6 East Water Main Replacement Project A printed copy of which is attached and made part of this certificate, to be posted in the Construction Update Network Plan Room, a relevant contractor plan room service with statewide circulation and a relevant contractor lead generating service with statewide circulation, on the following date(s): February 22, 2024 I certify under penalty of perjury and pursuant to the laws of the State of Iowa that the preceding is true and correct. February 22, 2024 Date President/CEO of The Construction Update Plan Room Network Cindy ect Information damslist Master Builders of Iowa P (515) 402-9858 E CAdams@MBI.Build I W www.MBI.Build DAILY NOTICE construction update 0100 NOTICE TO BIDDERS HIGHWAY 6 EAST WATER MAIN REPLACEMENT PROJECT Sealed proposals will be received by the City Clerk of the City of Iowa City, Iowa, until 3:00 P.M. on the 12th day of March 2024. Sealed proposals will be opened immediately thereafter. Bids submitted by fax machine shall not be deemed a "sealed bid" for purposes of this Project. Proposals received after this deadline will be returned to the bidder unopened. Proposals will be acted upon by the City Council at a meeting to be held in the Emma J. Harvat Hall at 6:00 P.M. on the 19th day of March, 2024, or at special meeting called for that purpose. The Project will involve the following: This project includes installation of approximately 2,100 LF of 16" ductile iron and PVC water main, with associated valves, hydrants, service connections, traffic control, pavement removal and surface restoration and is located at Highway 6 East between Fairmeadows Boulevard and Industrial Park Road. All work is to be done in strict compliance with the Project Manual prepared by Watersmith Engineering, of Muscatine, Iowa, which has heretofore been approved by the City Council, and are on file for public examination in the Office of the City Clerk. Each proposal shall be completed on a form furnished by the City and must be submitted in a sealed envelope. In addition, a separate sealed envelope shall be submitted containing a completed Bidder Status Form and a bid security executed by a corporation authorized to contract as a surety in the State of Iowa, in the sum of 10% of the bid. The bid security shall be made payable to the TREASURER OF THE CITY OF IOWA CITY, IOWA, and shall be forfeited to the City of Iowa City in the event the successful bidder fails to enter into a contract within ten (10) calendar days of the City Council's award of the contract and post bond satisfactory to the City (in the form shown in Section 0510) ensuring the faithful performance of the contract and maintenance of said Project, if required, pursuant to the provisions of this notice and the other contract documents. The City shall retain the bid security furnished by the successful bidder until the approved contract has been executed, the required Performance, Payment, and Maintenance Bond (as shown in Section 0510) has been filed by the bidder guaranteeing the performance of the contract, and the contract and security have been approved by the City. The City shall promptly return the checks or bidder's bonds of unsuccessful bidders to the bidders as soon as the successful bidder is determined or within thirty days, whichever is sooner. The successful bidder will be required to furnish a Performance, Payment, and Maintenance Bond in an amount equal to one hundred percent (100%) of the contract price and in the form shown in Section 0510, said bond to be issued by a responsible surety approved by the City, and shall guarantee the prompt payment of all materials and labor, and also protect and save harmless the City from all claims and damages of any kind caused directly or indirectly by the operation of the contract, and shall also guarantee the maintenance of the improvement for a period of five (5) year(s) from and after its completion and formal acceptance by the City Council. Project Page 1 of 2 The following limitations shall apply to this Project: Late Start Date: April 29, 2024 Substantial Completion Date: July 22, 2024 Final Completion Date: September 30, 2024 Liquidated Damages: $500 per day All of the bid items listed in Section 0400 — Proposal shall be completed by the Substantial Completion Date except seeding. The Project Manual may be examined at the office of the City Clerk. Copies thereof and blank forms may be secured at the office of Technigraphics, a division of Rapids Reproductions, 415 Highland Ave, Suite 100, Iowa City, Iowa 52240, Phone: (319) 354-5950, Fax: (319) 354- 8973, Toll -Free: (800) 779-0093. Prospective bidders are advised that the City of Iowa City desires to employ minority contractors and subcontractors on City projects. A listing of minority contractors can be obtained from the Iowa Department of Inspections and Appeals at (515) 281-5796 and the Iowa Department of Transportation Contracts Office at (515) 239-1422. Bidders shall list on the Proposal the names of persons, firms, companies or other parties with whom the bidder intends to subcontract. This list shall include the type of work and approximate subcontract amount(s). The Contractor awarded the contract shall list on the Contract its subcontractors, together with quantities, unit prices and extended dollar amounts. By virtue of statutory authority, preference must be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa Statutes. The Iowa reciprocal resident bidder preference law applies to this Project. The City reserves the right to reject any or all proposals, and also reserves the right to waive technicalities and irregularities. Posted upon order of the City Council of Iowa City, Iowa. KELLIE GRACE, CITY CLERK Project Page 2 of 2 Prepared by: Marri VanDyke, Engineering Division, 410 E. Washington St., Iowa City, IA 52240 (319)356-5044 Resolution No. 24-63 Resolution awarding contract and authorizing the Mayor to sign and the City Clerk to attest a contract for construction of the Highway 6 East Water Main Replacement Project. Whereas, B.G. Brecke, Inc. of Cedar Rapids, Iowa has submitted the lowest responsive, responsible bid of $559,565.94 for construction of the above -named project; and Whereas, funds for this project are available in the Hwy 6 (Fairmeadows to Industrial Park Rd) Water Main Replacement Account #W3320. Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that: 1. The contract for the construction of the above -named project is hereby awarded to B.G. Brecke, Inc. of Cedar Rapids, Iowa, subject to the condition that awardee secure adequate performance and payment bond, insurance certificates, and contract compliance program statements. 2. The Mayor is hereby authorized to sign and the City Clerk to attest the contract for construction of the above -named project, subject to the condition that awardee secure adequate performance and payment bond, insurance certificates, and contract compliance program statements. 3. The City Engineer and City Manager are authorized to execute change orders according to the City's Purchasing Policy as they may become necessary in the construction of the above -named project. Passed and approved this 19th day of March 12024 Attest: 1� L C ' !4 ao-� City Clerk MWi r CJ Approved by G ' City At rney's Office (Sue Dulek — 03/13/2024) It was moved by Harmsen and seconded by adopted, and upon roll call there were: Ayes: M Nays: Alter the Resolution be Absent: Alter Bergus Dunn Harmsen Moe Salih Teague CITY OIL IOWA CITY 410 East NVinghiaatau Street Iowa City, Iowa522,40 -1826 (319) 356 - 500D (319) 356 - $009 VAX ENGINEER'S REPORT v "/.1atouare October 28, 2025 City Council Iowa City, Iowa Re: Highway 6 Water Main Replacement Project Dear City Council: I hereby certify that the Highway 6 Water Main Replacement Project has been completed by B.G. Brecke, Inc. of Cedar Rapids, Iowa, in substantial accordance with the Project Manual developed by Watersmith_Engineeri.ng,.-LLC.._ The project was bid as a unit price contract, and the final contract price is $663,717.67, There were four (4) change orders on this project as follows: 1. Storm sewer at the intersection of Fairmeadows Boulevard and Highway 6 $47,845.50 2. Exploratory excavation and concrete removal $5,014.00 3. Pavement removal and PCC pavement, 7-inch with 3-inch HMA overlay $12,748.00 4. Provide support for a traffic signal pole while excavating adjacent to it $10,151.54 TOTAL $75,759.04 1 recommend that the above -referenced improvements be accepted by the City of Iowa City. Sincerely, e­..navel, PE City Engineer Prepared by: Alin Dumachi, Sr. Engineer, Public Works, 410 E. Washington St., Iowa City, IA 52240 (319) 356-5143 Resolution No. 25-261 Resolution accepting the work for the Highway 6 Water Main Replacement Project. Whereas, the Engineering Division has recommended that the work for construction of the Highway 6 Water Main Replacement Project, as included in a contract between the City of Iowa City and B.G Brecke, Inc. of Cedar Rapids, Iowa, dated February 2"d, 2024, be accepted; and Whereas, the Engineer's Report and the Performance, Payment and Maintenance Bond have been filed in the City Clerk's office; and Whereas, funds for this project are available in the Highway 6 Water Main Replacement Project account # W3320; and Whereas, the final contract price is $663,717.67. Now, therefore, be it resolved by the City Council of the City of Iowa City, Iowa, that said improvements are hereby accepted by the City of Iowa City, Iowa. Passed and approved this 3rd day of V Attest: L �. City Clerk November .2025 Mayor It was moved by Salih and seconded by adopted, and upon roll call there were: Ayes: Nays: Approved by L City Attorn s Office (Liz Craig—10/30/2025) Moe the Resolution be. Absent: Alter Bergus Harmsen Moe Salih Teague Weilein Bond #54259092 0510 PERFORMANCE, PAYMENT, AND MAINTENANCE BOND Ci T`{, HIGHWAY 6 EAST WATER MAIN REPLACEMENT PROJECT CITY OF IOWA CITY Know All by These Presents: That we, B.G. Brecke Inc. , as Principal (hereinafter the "Contractor" or "Principal°) and United Fire & Casualty Com2any , as Surety are held and firmly bound unto City of Iowa City, Iowa, as ❑bllgee (hereinafter referred to as "the Jurisdiction"), and to all persons who may be injured by any breach of any of the conditions of this Bond In the penal Slim of five hundred Tifl -»ine thousand five lxuulred sixt -five and 941100 dollars ($ 559,565.94 ), lawful money of the United States, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, legal representatives and assigns, Jointly or severally, firmly by these presents. The conditions of the above obligations are such that whereas said Contractor entered into a contract with the Jurisdiction, bearing date the day of , , (hereinafter the "Contract") wherein said Contractor undertakes and agrees to construct the following described improvements: Installation of approximately 2,100 LF of 16" ductile iron and PVC water main, with associated valves, hydrants, service connections, traffic control, pavement removal and surface restoration and is located at Highway 6 East between Falrmeadows Boulevard and Industrial Park Road. To faithfully perform all the terms and requirements of said Contract within the time therein specified, in a good and workmanlike manner, and In accordance with the Contract Documents, It Is expressly understood and agreed by the Contractor and Surety in this bond that the following provisions are a part of this Bond and are binding upon said Contractor and Surety, to -wit: Performance: The Contractor shall well and faithfully observe, perform, fulfill, and abide by each and every covenant, condition, and part of said Contract, by reference made a part hereof, for the above referenced Improvements, and shall Indemnify and save harmless the Jurisdiction from all outlay and expense incurred by the Jurisdiction by reason of the Contractor's default of failure to perform as required. The Contractor shall also be responsible for the default or failure to perform as required under the Contract and Contract Documents by all Its subcontractors, suppliers, agents, or employees furnishing materials or providing labor in the performance of the Contract. 2, Payment: The Contractor and the Surety on this Bond hereby agreed to pay all Just claims submitted by persons, firms, subcontractors, and corporations furnishing materials for or performing labor In the performance of the Contract on account of which this Bond Is given, including but not limited to claims for all amounts due for labor, materials, lubricants, oil, gasoline, repairs on machinery, equipment, and tools, consumed or used by the Contractor or any subcontractor, wherein the same are not satisfied out of the portion of the contract price the Jurisdiction is required to retain until completlon of the improvement, but the Contractor and Surety shall not be liable to said persons, firms, or corporations unless the - ------ Highway 6 East Water Main Replacement Project 0510 — Page 1 of 4 :,T dla—1 r s df` said"cialmants against said portion of the contract price shall have been established as provided by law. The Contractor and Surety hereby bind themselves to the ' ' ` obligations ,and conditions set forth in Chapter 573 of the Iowa ode, which by this tj geferefte' is made a part hereof as though fully set out herein. Maintenance: The Contractor and the Surety on this Bond hereby agree, at their own expense: A. To remedy any and all defects that may develop in or result from work to be performed under the Contract within the period of five year(s) (5) from the date of acceptance of the work under the Contract, by reason of defects In workmanship or materials used in construction of said work; B. To keep all work In continuous good repair; and C. To pay the Jurisdiction's reasonable costs of monitoring and inspection to assure that any defects are remedied, and to repay the Jurisdiction all outlay and expense incurred as a result of Contractor's and Surely's failure to remedy any defect as required by this section. 4. General: Every Surety on this Bond shall be deemed and held bound, any contract to the contrary notwithstanding, to the following provisions: A. To consent without notice to any extension of time to the Contractor in which to perform the Contract; B. To consent without notice to any change in the Contract or Contract Documents, which thereby increases the total contract price and the penal sum of this bond, provided that all such changes do not, in the aggregate, involve an increase of more than 20% of the total contract price, and that this bond shall then be released as to such excess Increase; and C. To consent without notice that this Bond shall remain in full force and effect until the Contract is completed, whether completed within the specified contract period, within an extension thereof, or within a period of time after the contract period has elapsed and the liquidated damage penalty is being charged against the Contractor. D. That no provision of this Bond or of any other contract shall be valid that limits to less than five year(s) (5) after the acceptance of the work under the Contract the right to sue on this Bond. E. That as used herein, the phrase "all outlay and expense" Is not to be limited In any way, but shall include the actual and reasonable costs and expenses incurred by the Jurisdiction including interest, benefits, and overhead where applicable. Accordingly, "all outlay and expense"would include but not be limited to all contract or employee expense, all equipment usage or rental, materials, testing, outside experts, attorneys fees (including overhead expenses of the Jurisdiction's staff attorneys), and all costs and expenses of litigation as they are incurred by the Jurisdiction. It is Intended the Contractor and Surety will defend and indemnify the Jurisdiction on all claims made against the Jurisdiction on account of Contractor's failure to perform as required in the Contract and Contract Documents, that all agreements and promises set forth In the Contract and Contract Documents, in approved change orders, and in this Bond will be fulfilled, and that the Jurisdiction will be fully Indemnified so that It will be put into the position It would have been In had the Contract been performed in the first Instance as required. Highway 6 East Water Main Replacement Project 0510 — Page 2 of 4 In the event the Jurisdiction in�8r; any'°ouJla)Oiihd expense" in defending Itself against any claim as to which the Contractor or Surety should have provided the defense, or in the enforcement of the promises given by the Contractor, in the Contract, Contract [Documents, or approved change orders, or in the enforcement of the promises given by the Contractor and Surety in this Bond, the Contractor and Surety agree that they will make the Jurisdiction whole for all such outlay and expense, provided that the Surety's obligation under this bond shall not exceed 125% of the penal sum of this bond. In the event that any actions or proceedings are initialed regarding this Bond, the parties agree that the venue thereof shall be Johnson County, State of Iowa. If legal action is required by the Jurisdiction to enforce the provisions of this Bond or to collect the monetary obligation incurring to the benefit of the Jurisdiction, the Contractor and the Surety agree, jointly, and severally, to pay the Jurisdiction all outlay and expense incurred therefor by the Jurisdiction. All rights, powers, and remedies of the Jurisdiction hereunder shall be cumulative and not alternative and shall be in addition to all rights, powers, and remedies given to the Jurisdiction, by law. The Jurisdiction may proceed against surety for any amount guaranteed hereunder whether action is brought against the Contractor or whether Contractor Is joined In any such action(s) or not. Now therefore, the condition of this obligation Is such that If said Principal shall faithfully perform all the promises of the Principal, as set forth and provided in the Contract and in this Bond, then this obligation shall be null and void, otherwise it shall remain in full force and effect. When a work, term, or phrase is used In this Bond, It shall be interpreted or construed first as defined in this Bond and the Contract; second, if not defined In the Bond or Contract, it shall be interpreted or construed as defined in applicable provisions of the Iowa Code; third, if not defined in the Iowa Code, it shall be interpreted or construed according to its generally accepted meaning in the construction industry; and fourth. If it has no generally accepted meaning in the construction industry, it shall be interpreted or construed according to its common or customary usage. Failure to specify or particularize shall not exclude terms or provisions not mentioned and shall not limit liability hereunder. The Contract Is hereby made a part of this Bond. Highway 6 East Water Main Replacement Project 0510 — Page 3 of 4 PRINCIPAL: B.G. Brecke, Inc. Printed Name of Contractor Officer 1 By � Signature ❑ ontractor Officer Tille of Contractor Officer SURETY: United Fire SyCasualty Company S ty Company Name ature of Attorney -in -Fact Officer Anne Crowner Aqt t -In-Fact ICORPOOTE Printed Name of Attorney -in -Fact Officer !!!l171R5L551111 _11olmes,Murp and Associates LLC Company Name of Attomey-In--Fact - 2727 a' ' e Parkway Company Address of Attorney -in -Fact _Waukee IA 50263 City, State, Zip Code of Attorney -in -Fact Telephone Number of Attorney -in -Fact Highway 6 East Water Main Replacement Project 0510 — Page 4 of 4 >e UNITED FIRE & CASUALTY COMPANY, CEDAR RAPIDS, ]A Inquiries: Surety Department UNITED FIRE & INDEMNITY COMPANY, WEBSTER, TX 118 Second Ave SE FINANCIAL PACIFIC INSURANCE COMPANY, LOS A'NGELES, CA Cedar Rapids, IA 52401 CERTIFIED COPY OF POWER OF ATTORNEY IN5.URANCL (original on file at Home Office of Company - See Certification) KNOW ALI, PERSONS BY THESE PRESENTS, That United Fire & Casualty Company, a corporation duly organized and existing under die laws of the State of Iowa; United Fire & Indemnity Company, a corporation duly organized and existing under the taws of die State of Texas; and Financial Pacific Insuranee.Compaly, a corporation duiy organized and existing wider Ilia laws of the State of Califomiin (herein collectively called the Companies), and having their corporate headquarters in Cedar Rapids, State of Iowa, does make, constitute and appoint CRAIG E. HANSEN, JAY D. FREIERMUTH, BRIAN M. DEIMERLY, CINDY BENNETT, ANNE CROWNER, TIM MCCULLOH, DIONE R. YOUNG, MICHELLE GRUIS, JOE TIERNAN, KATHLEEN BREWER, SETH D. ROOKER, SARA HUSTON, SHELBY GREINER, GINGER HOKE, JOHN CORD, JENNIFER MARINO, BEN WILLIAMS, KATE ZANDERS, LUKAS SCHRODER, JAMIE GIFFORD, EACH INDIVIDUALLY Weir true and lavflst Attomey(sy-its-Pact with power and authority hereby conferred to sign, seal and execute in its behalf all lawful bonds, undeitakirigs and other obligaloty instruments of similar nature provided that no single obligation shall exceed $100, 000, 000.00 and to bind the Cotsnp�nies thcttefiy as fully and to the same extent as if such instwnents were signed by tine duly authorized officers of die Companies and all of die acts o#'said Attorney, pursuant to the authority hereby given and hereby ratified and confirmed. The Authority heroy,gratted is -conlinuous and shall remain ur fiill force and effect until revoked by United Fire & Casualty Company, United Fire & Indemnity Compmtl ,,"turd Financial Pacific Insurance Company. This Power of Atlonney is rniade and executed pursues t to and by authority of the following bylaw duly adopted by the Boards of Directors of United Fire & Casualty C"uy, United Fire & Indemnity Company, and Financial Pacific Insurance Company. "Article VI — Sureh,Bondsnud tindertakinEs" Section 2, Appointment of Anorueyin-Fact. "The Presidom or any Viet President, or my other officer of the Companies piny, from lima to tint, appoint by tvrilten cell ifiicatas nttotngri-in-Cast to act in behair or the Companies in the execution of policies of insurance, bonds, undadakings yid oilier obligatory hislru+ntnts of like nature. 'Elie signature of any officer audimized hereby. mid the Coiporato seat, inay be uffixod by facsim ilt no any pornver orattorrsey or sPecial Power of nttamay Or cartifneatiou of either atithorixed hereby; stich signmure and wal, whoa so used. being adopted by die Companies as the original signature of sucis officer asd the original seal of the Companies, to be valid and binding Upon rite Companies with ilia sanity f=o and effect as dioupin manually affixed. Stich attorneys -in -fact, subject to the limitations set of forth in their respeetive Ceti iReatas of authority shalt have hill power io bind the Companies by theirsignatirmwrd execttion of any such uismlmeats and to Am& the seal tine Coritpsnies thereto. The President or airy Vice Presided, the Hoard of Directors or any ashen officer of she coin panio niay at any time invoke all potrer and authority previously given to any attorney -in -fact. IN WITNESS WHEREOF, the COMPANIES have each caused these presents to be signed by its i,+m+n niuwurfu maul =a• .�r,^,,, ny�„u<•�k ,sZAI r�'� ,.•s" vice president and its corporate seal to be hereto affixed this 1 St h day of March, 2022 raawure wxPaR+reuhrzz �'" UNITED FIRE & CASUALTY COMPANY • `' —•— '- R:_ UNITED FIRE & INDEMNITY COMPANY y sE"`_ Se''r FINANCIAL PACIFIC INSURANCE COMPANY g+9ftH f1WA ro � f7q ,IIIN��Cr �ynr u1� lama �f By: �G Stale of Iowa, County of Limr, ss: - Vice President On 18th day of March, 2022, before me personally Caine Kyanna M. Saylor to nic known, who being by one duly sworn, alid depose and say; that site resides in Cedar Rapids, State of Iowa; That site is a Vice President of United Fire & Casualty Company, a Vice President of United Fire & Indemnity Comparty, said a Vice President of Financial Pacific Insurance Company the cou7narations described in and which executed the above instrument; dial slue ktno►vs lie seal of said corporations; drat die seal affixed to the said instrument is such corporate seal; dial it was so affixed pursuant to atnlltority given by the Boars! of Dueclots of said corpora lions and that site signed her nanie thereto pursuant to like authority, and acknowledges same to be the act and deed of said corporations. r Patti Waddell Iowa Notarial Seal Commission number 713274 Wahp-,Notaiy Public o N My Commission Expires 10/2612026 My commission expires: 10/26/2025 I, Mary A. Betisclt, Assistarnt Secretary of United Fire & Casualty CDdtpalry mid Asslslatli Secretary of United Fire & lndemnity Conipmy, and Ass'istasit Secretary of Financial Pacific Iusurance Company, do hereby certify that I have compared We foregoing copy of the Power of Attorney and affidavit, and the copy of fhe Section of We bylaws aid resolutions of said Cor porntions as set forth ii1 said Power of Attorney, with the ORIGINALS ON FILE IN THE HOME OFFICE OF SAID CORPORATIONS, and that the same are correct transcripts therxof, and of the whole of the said originals, mud that the said Power of Attorney bas not been revoked and is now hn frill force and effect. In testimony whereof I have hereunto subscribed my name and affixed the corporate seat of the said Corporations this day of , 2024 . WIN ,'DNS ,CMf ` 16 ,in°'SNofyyin, 2T L,,�p $ 3 � yt COa :vAYE � fF CuaP.RAr[ y„ �S"� jtjLY 21 �i0 y• A ry, sent: ' sent Assistant Secretary, ':f�4iRaarios F}i� ��;,�+,+i•,E+ a " `" OF&C & OF&] & FPIC %fr7f1ll155t�ti 111f11i15111151 �f�4lYllltih BPOAC 049 1217