HomeMy WebLinkAbout2018-09-18 Public hearingNOTICE OF PUBLIC HEARING ON
PLANS, SPECIFICATIONS, FORM OF
CONTRACT, AND ESTIMATED COST
FOR IOWA CITY PUBLIC WORKS
PHASE 1 IN THE CITY OF IOWA CITY,
IOWA
TO ALL TAXPAYERS OF THE CITY OF IOWA
CITY, IOWA, AND TO OTHER INTERESTED
PERSONS:
Public notice is hereby given that the City
Council of the City of Iowa City, Iowa, will
conduct a public hearing on plans,
specifications, form on contract, and estimated
cost for the construction of the IOWA CITY
PUBLIC WORKS PHASE 1 Project in said City
at 7:00 p.m. on Tuesday, September 18,
2018, said meeting to be held in the Emma J.
Harvat Hall in City Hall in said City, or if said
meeting is cancelled, at the next meeting of the
City Council thereafter as posted by the City
Clerk.
Said plans, specifications, form of contract,
and the estimated cost are now on file in the
office of the city clerk in City Hall in Iowa City,
Iowa, and may be inspected by any interested
persons.
Any interested person may appear at said
meeting of the City Council for the purpose of
making objections to and comments concerning
said plans, specifications, contract or the cost of
making said improvement.
This notice is given by order of the City -
Council of the City of Iowa City, Iowa and as
provided by law.
KELLIE FRUEHLING, CITY CLERK
NPH -1
i1 t
I04., MM, �,,.
CITY OF IOWA CITY
Public Hearing Presentation: 9.18.2018
IOWA CITY PUBLIC WORKS - Master Plan Review
Master Plan Site Study I Iowa City
2000'-0" e0m'-0"
0' 4000'-0"
IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
Master Plan Site Study I Growth
1959-1966
1990-
1969-1975
1980
21
1839-1952: 3542 acres
1959-1966: 6752 acres
1969-1979: 3795 acres
1980-1989: 150 acres
1990-1999: 1515 acres
2000-2014 1113 acres
SOU -o• 2400•-0•
1/J1 IOWA CITY PUBLIC WORKS
o' 1200'- 0" _,
PHASEI
NEUMANN MONSON ARCHITECTS
Master Plan Site Study I Existing Facilities
•
LANDFILL
` ,
�"94 �r _a
. f1 rnili
101
�z
8
ea '
F
��1 f
e+
A, r
r CHH,10
D
BIG,TEN
GILBERT COURT
�6
NAPOLEON
0
600'-0" 6200'-0"
OWA CITY PUBLIC WORKS
6' 1600-0• FAIRGROUNDS PHASE
NEUMANN MONSON ARCHITECTS
Master Plan Site Study I Current Locations
- - - - - "-NTELRdSEAVE
1� ♦ 1
u ♦
♦�z8
LANDFILL ♦♦,
1
BIG TEN
BOW -o^ 6200 '6^�
0' 1600'-01•
U-191
0
FIRT/POLICE DEPT
/4 _ 1 ---/14
COURT
RIVERSa 11
1 d
1 /
1 +
1 �
FAIRGROUNDS
NAPOLEON
• EQUIPMENT/REPAIR
• LANDFILL
• SOLID WASTE
STREETS/TRAFFIC
• TRANSIT
• WATER
• FIRE/POLICE
OWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
1 161
Travel Path
Miles
Time
WATER WORKS
Landfill to Riverside
5.7
14min
Landfill to Napoleon
I
Fairgrounds to Riverside
1.8
5min
Napoleon to Riverside
1.7
5min
Fire/police to Big Ten
6.4
12min
Gilbert Ct to Napoleon
1.6
5min
- - - - - "-NTELRdSEAVE
1� ♦ 1
u ♦
♦�z8
LANDFILL ♦♦,
1
BIG TEN
BOW -o^ 6200 '6^�
0' 1600'-01•
U-191
0
FIRT/POLICE DEPT
/4 _ 1 ---/14
COURT
RIVERSa 11
1 d
1 /
1 +
1 �
FAIRGROUNDS
NAPOLEON
• EQUIPMENT/REPAIR
• LANDFILL
• SOLID WASTE
STREETS/TRAFFIC
• TRANSIT
• WATER
• FIRE/POLICE
OWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
Master Plan Site Study I Proposed
Travel Path Miles Tame'I`*^'iYt {I'tyr1 WgTER WORKS so
Landfill to Nappleon 6.$' r' S161.0n!4
i u you 41S^ Y{1' i��li r 'lR*" hr'✓'7 n: w�. iLw{�tl ti
Fire/police to Napoleon 2.1 8min t a �`L
A ! N i
�r, , !til�x�I�t'��,+e' 1 E,' a�' rc ufi dl ,, � t HA , 1 ,a" ��„• �l���P`�l�i`�pt,�
., like y+}91' i uI�N )`tl, 015 Klii Fil�Y� v FN i� x!PY� r
}p��'�P�rh,
„ �Y” F?t,f;Mraf" ppyryy?eda r.�k` ce .,k �Sfaplp \"1f
✓fir"R t{� jr ri-,a 6t{ 'l j?Mi,` U�jY \ F.'`I �t`U {!$} ,,,, rtrt "Y> `t?{�S�i ,
I��IN
r L. t ¢{jl h{U rj r. Nuay ,T ✓N.ry ra k !�!! hrY { r� ;y1
A(
v
, ,a' xe {
2✓r^1rt{,r J i i,r > {Rr } NF1
rtl� ,,V l�Y;, a i lh`.jtapv}�:
FIRJ/POL1q D A� a s 5uf
MELR 3S't kvE
M r'rn♦ � 1 iW iftry"* xr r'' st �'
HH1
( r oii psi } 4i
r1 � , P+ t ( `1 I � �<riY✓ ry f��'` Pim' ��``
f c u {4 Fp GILBERT COURT
LANDFILL
X,
RIVERSIDE i as
wiM/IE 111
dG w.. 6uc •r, r,r.. r �w'�r�r���Q r.
w2w,
BI TEN P 8 i h'. N OLEON wl T4
600-0'
3200 0" r
o' ,eoo'-o FAIRGROUNDS 'F
-µ IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
• EQUIPMENT/REPAIR
LANDFILL
qw'. ri
r
Lt
SOLID WASTE
N p
ld ��yN
STREETS/TRAFFIC
a
` ` �'.
• TRANSIT
lhyrk, a..
saF"•
WATER
• FIRE/POLICE
-µ IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
Master Plan Concept I Diagram
IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
Original Concept Master Planj Phasing Diagram
WASH \
RE
TOWER �� BAYYARD STORAGE
- - • .
j
EQUIPMENT
REPAIR
BUB
MAI TENANCE
yi
TRANSIT
�f
• UTURE\ ✓ _
PARCEL
101]A53013
I
BULK
�WAIER
McCOLLISTER
BOULEVARD
'
Phase
1
/
2
Phase
3
Phase
4
_;
Future
PARKING
0
4
- -
A
-
LT MI%BINS
o
SHOPS I
E
STORAGE
FUTURE
DEVELOPMENT
'CLICK
01NASTE
_•.
:IRE
V
WASH \
RE
TOWER �� BAYYARD STORAGE
- - • .
j
EQUIPMENT
REPAIR
BUB
MAI TENANCE
yi
TRANSIT
�f
• UTURE\ ✓ _
PARCEL
101]A53013
I
BULK
�WAIER
McCOLLISTER
BOULEVARD
'
Phase
1
Phase
2
Phase
3
Phase
4
_;
Future
IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
Original Concept Master Planj Phasing Diagram
• w • r\
• ww /
STAFF • '• ,
PARKING •
FUTURE
DEVELOPMENT
MCOOLLISTE2
WUIEVARD
L
113
'
Phase
1
Phase
2
Phase
3
_;
Phase
4
_;
Future
IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
IOWA CITY PUBLIC WORKS - Phase 1
Process) Design Team
Project Design Team
Streets & Traffic, Refuse, Water,
Transportation, and Maintenance
Departments
Neumann Monson Architects
MDG IHDR
Snyder Associates
Genus
Raker Rhodes Engineering
Modus
C -Wise
End Users and Administration
Architects
Maintenance Facility Consultant
Civil Engineers
Landscape Engineers
Structural Engineers
Mechanical / Electrical Engineers
LEED Consultant
IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
Project Site Study I Locations After Phase 1 is Complete
11 10-1
WATER WORKS
s'>
yr r Luiz°B'Irti-�`¢Rrl K� SIS
FPY
fi
a
` a
MELR6Rt''AVE s
f�
8
r
e
8
'BJG TEN
W d?
E:i9]
• EQUIPMENT/REPAIR
• LANDFILL
• SOLID WASTE
• STREETS/TRAFFIC
• TRANSIT
• WATER
FIRE/POLICE
Solid Waste
Moves to Gilbert Court
-e IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
ttF
,7'
r ,r
wN%�
r
LK1r �
V r r Im
LANDFILL
a
` a
MELR6Rt''AVE s
f�
8
r
e
8
'BJG TEN
W d?
E:i9]
• EQUIPMENT/REPAIR
• LANDFILL
• SOLID WASTE
• STREETS/TRAFFIC
• TRANSIT
• WATER
FIRE/POLICE
Solid Waste
Moves to Gilbert Court
-e IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
Process) Design Input
s�z
rc
IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
c
d
'..
'.. '..
i
a. c y c
a �
c
w
0 Q;it a' �' .N W
Z F
Y C
C
O U
W C 7O
N
Q
Y d
7 C 3 0 In_
7 N
N'O 7
Y O
00
1 0r
o -
r
m .�
m
o,
Program
0 4) E
°
a v
Schematic
11
3 w
O m
y v
O W
Design///
Q U
Y
Mobilization Construction
+
0
d(12-16
onths)
m
N m
W
E
m
ULd
O
IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
Phase -11 Opinion of Probable Costs
$15,000,000
$14,000,000
$13,000,000
$12,000,000
$11,000,000
$10,000,000
$9,000,000
$8,000,000
Schematic Design Design Development Redesign Construction Document
....Estimates Construction Budget
Influencers
• Labor Shortage
• Tariffs
• Demand for Construction
is Strong
• Stronger Inflation Since
Master Plan
• Providing Major Grading
for Future Yard Areas
IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
Revised Concept Master Plansl Phase 1 Scope Diagram
SHE
NPpOEEDN. ��
f
MPo
SNE�SE
j
dr
FVAE P
OSE
S �
i
�\
ADMIN BUILDINGTO E
REMAIN WORK - - - -
,
SHOW IS FUTURE \i`
PHASE
i � � •`� i` aJE�\cE0
t t` S�OQSS
IC
V
FUTURE
PHASE �
i � 1
i
UE(
t�p`an
�.
FUTURE
� PHASE
� til
LANDSCAPING ALONG
M CCOLLISTER BLVD
QUONSET HUTS `! �.
REMAIN IN PHASE 1
tt\\
Phase 1- Building
Phase 1 - Fence
Future Phases
IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
FUTURE
'
PAVING
'
PHASE
'
UE(
t�p`an
�.
FUTURE
� PHASE
� til
LANDSCAPING ALONG
M CCOLLISTER BLVD
QUONSET HUTS `! �.
REMAIN IN PHASE 1
tt\\
Phase 1- Building
Phase 1 - Fence
Future Phases
IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
Revised Concept Master Plansl Phase 1 Scope Diagra
UE(
t�p`an
LANDSCAPING ALONG
M CCOLLISTER BLVD
\\
Phase 1- Building
Phase 1 - Fence
Future Phases
IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
/
ADM IN BUILDING TO
A'
REMAIN WORK
0\,NL
-
\1
SHOW IS FUTURE
NppO`EO
PHASE
�t��N�Q1
A
ZOoG,
5 5
��
mv�
V
!
FUTURE
W,
I
PHASE
,
Y/ f pC
QUONSET HUTS
'
REMAIN IN PHASE 1
4
FUTURE
bb
PAVING
PHASE
t
FUTURE
f !�
PHASE
i
UE(
t�p`an
LANDSCAPING ALONG
M CCOLLISTER BLVD
\\
Phase 1- Building
Phase 1 - Fence
Future Phases
IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
Revised Concept Master Plansl Phasing Diagram
SHE
NPpDEEDN ..
GPSE
fJSJpE
PPR,J� � i � PpiO A
fPGE GE \
SSOS \r'AS i GPSE JEN \
\\ \
AUCTIO FUTURE
N VEHICLES Al
COVEREDSTORAGE
FUEL
JSJRE \
� � F
' NCE i
D \
\ fJfJ <
GATE
FUTURE
PARKIN \\ 010
LOT
FUTURE '
PARKING
LOT
LANDSCAPING ALONG
M CCOLUSTER BLVD
Phase 1
Phase 2
Phase 3
Phase 4
Future
IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
Concept Design) Sustainable Features
Site Features
• Bike Racks and Bike Storage Containers
• Storm Water Quality
• Waste Water Sand Oil Separators
• Native and Diverse Plantings and Landscape
• No Additional Parking — Reuse of existing Lots
• Electrical Vehicle Charging Stations
• Low Emitting and Car Pool Parking Spaces
Building Features
Daylight Harvesting
• Translucent Walls
• Skylights
• Light Reflective Materials
• Occupancy, Vacancy, and Daylight Harvesting Sensors
Envelop and Mechanical Efficiencies and Safety
• High Speed Coiling Doors
• Roof structure designed for future PV system
• Life Cycle Cost Analysis of Building Materials Performed
• (HPD) Health Product Declarations and (EPD) Environmental
Product Declarations Materials / Social Equity and sourcing
• Durable Precast Structure
• Destratification Fans
• Low Air Return
• Energy Recovery Unit
• Zoned Comfort Controls
• Mechanical Purge/ Fresh Air
Water Efficiency
• Low Flow Fixtures
Fire Pump Test Pits
• Water Reclamation at Wash Bays
• Fire Pump Test Pits
IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
Phase -11 Floor Plan
l ELECTRICAL
I I ENTRANCE
STREETS+
TRAFFIC
M EZZ. j
IT CLOSET
SIGN SHOP
FORKLIFT ZONE
AIR COMP.
EQUIPMENT
ELEVATOR
WATER OPEN TO
MEZZ-. BELOW
ELECTRICAL
MEZZANINE FLOOR PLAN
MAIN LEVEL FLOOR PLAN
Office / Shared
Water
Streets / Traffic
Parking / Ancillary
IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
Phase -11 Conceptual Rendering
IOWA CITY PUBLIC WORKS
PHASE
NEUMANN MONSON ARCHITECTS
Phase -11 Project Highlights
Overall Project Budget:
Overall Construction Budget:
Overall Square Feet:
Anticipate Construction Completion
Anticipated LEED Certification
Alternate 1
Alternate 2
$12,000,000
$10,900,000
74,250 SF
Nov. 2019
Silver
$715,000
$270,000
IOWA CITY PUBLIC WORKS
PHASE