HomeMy WebLinkAbout2024-2028 Capital Improvement Program
CAPITAL PROJECTS FUND
Fund Summary
Summary by Division
Summary by Funding Source
Annual Recurring Projects Project Summary by Name
Unfunded Projects
F
Y
2
0
2
4
CAPITAL PROJECTS FUND
The Capital Projects Fund accounts for the collection and disbursement of funds related
to capital improvements or significant capital equipment. The City annually updates and
issues a five-year capital improvement program (CIP). This program is the planning
guide for the City’s issuance of bonded debt and for the construction and replacement of
the City’s buildings and infrastructure. The first two years of the five-year capital
improvement program (CIP) are certified as part of the operating budget in the Capital
Projects Fund. The current five-year CIP is for years 2023-2027. Additional information
for the City’s five-year CIP program including maps and photos is available on the City’s
web page: https://www.icgov.org/budget under the Capital Improvement Program
heading.
Capital improvement projects involve the construction, purchase, or renovation of city
facilities or property. Most of the projects are specific, non-recurring major improvements
to the City's physical plant, are permanent in nature, and are greater than $25,000 and
have a useful life of three years or more. The City also budgets annually recurring
project funds for non-specified improvements of a specific nature; these funds are to be
spent on improvements that meet the same definition above. Funding sources for
capital improvement projects may be from operating funds, bond proceeds, grants,
donations, and a variety of other funding sources. The three largest sources of funds
are operating transfers in, bonded debt, and state and federal grants.
For the CIP for years 2023-2027, the total funding sources are $255,725,100, and the
total expenditures are $253,000,100. The difference between the total expenditures and
the total funding sources over the five-year period is a result of prior plan funding
sources that are being utilized to cover current plan expenditures such as engineering
and design.
The 2024 CIP expenditures of $65,737,220 will be certified as part of the fiscal year
2024 operating budget.
The 2024 CIP funding sources of $71,182,220 will also be certified as part of the fiscal
year 2024 operating budget. Budgeted fiscal year 2024 Capital Projects Fund revenues
and transfers in also include a transfer in from the TIF funds to reimburse for prior year
expenditures of $1,046, other local government funding of $30,000 to be used on a
future project and $75,000 of CDBG funds to be used on a project yet to be determined.
Total Capital Projects Fund fiscal year 2024 budgeted revenues and transfer in are
$71,288,266.
The changes to the 2023 CIP are amended into the fiscal year 2023 operating budget.
The fiscal year 2023 Capital Projects Fund expenditure budget also includes totals from
the carry forward of prior year projects that must be re-appropriated with the State. The
amounts being carried forward from prior years are not included in the five-year CIP
totals. The revised Capital Projects Fund expenditures for fiscal year 2023 are
$91,139,409; the revised budget includes the 2023 CIP expenditures of $44,277,970
and prior year project carry forwards of $46,861,439.
The revised fiscal year 2023 Capital Projects Fund revenues and transfers in budget
also includes totals from the carry forward of prior year projects. The amounts being
carried forward from prior years are not included in the five-year CIP totals. The revised
Capital Projects Fund revenues and transfers in for fiscal year 2023 are $45,955,282;
the revised budget includes the 2023 CIP funding sources of $39,946,058 and a transfer
in from the TIF funds to reimburse for prior year expenditures of $25,758, and prior year
project carry forwards of $5,983,466.
Fund balance in the Capital Projects Fund primarily represents unspent funding sources
from the current year and prior years. This balance fluctuates based on the timing of the
issuance of bonds and the timing of the project expenditures. The estimated ending
fund balance for fiscal year 2024 is $6,237,559.
2020 2021 2022 2023 2024 2025
Actual Actual Actual Revised Budget Projected
Fund Balance, July 1 37,683,022$ 38,062,482$ 42,097,081$ 46,226,581$ 686,513$ 6,237,559$
Revenues:
Use Of Money And Property
Interest Revenues 499,001$ 162,752$ 139,244$ -$ -$ -$
Intergovernmental
Federal Intergovernmental Revenue 1,044,497 1,458,355 4,153,774 7,769,445 420,000 21,885,000
Disaster Assistance - - - - - -
Other State Grants 4,961,896 1,643,322 1,276,345 3,429,900 850,000 9,400,000
State 28E Agreements 90,661 91,484 95,035 325,000 525,000 -
Local 28E Agreements 25,000 31,740 25,000 911,799 30,000 -
Charges of Fees & Services
Development Fees 93,462 355,368 - - - -
Miscellaneous
Contributions & Donations 25,000 6,495 52,367 235,183 - -
Printed Materials 885 525 570 - - -
Other Miscellaneous Revenue 121,490 288,162 634,881 200,000 - -
Other Financial Sources
Debt Sales 13,012,385 12,744,378 10,790,326 9,330,000 42,535,000 12,925,000
Sub-Total Revenues 19,874,276 16,782,581 17,167,542 22,201,327 44,360,000 44,210,000
Transfers In:Transfers-In from Governmental
Funds 4,751,737 4,456,604 6,381,585 8,587,805 6,954,516 15,493,470
Transfers-In from Enterprise Funds 8,020,378 7,447,763 6,843,773 14,066,150 12,298,750 13,406,500
Miscellaneous Transfers-In 3,335 35,351 1,081,114 - 75,000 -
Internal Service (Non-Budgetary):
Equipment Fund - - - 1,000,000 7,500,000 -
ITS Fund - - - 100,000 100,000 100,000
Sub-Total Transfers In 12,775,451 11,939,718 14,306,472 23,753,955 26,928,266 28,999,970
Total Revenues & Transfers In 32,649,727$ 28,722,299$ 31,474,014$ 45,955,282$ 71,288,266$ 73,209,970$
Expenditures:
Governmental:
General Government 1,060,808$ 2,827,102$ 231,848$ 923,566$ 415,000$ 525,000$
Culture & Recreation 5,556,924 2,482,195 2,643,138 13,971,483 2,520,000 14,585,000
Community and Economic Dvlpmnt 237,979 97,096 64,271 395,967 - -
Public Safety 768,914 1,895,807 636,140 4,992,110 - -
Public Works 16,948,609 11,031,324 16,102,880 37,237,822 28,243,470 24,105,470
Enterprise:
Parking Operations 70,266 61,616 725,851 3,189,596 1,000,000 650,000
Public Transportation 36,345 89,234 148,467 1,265,367 325,000 22,575,000
Wastewater Treatment 3,025,409 2,453,813 2,980,470 13,464,414 25,755,000 3,213,500
Water Operations 1,137,779 376,206 1,240,873 2,726,376 3,144,000 1,400,000
Refuse Operations - - 544,461 - - -
Landfill - 879,645 750,540 8,252,060 3,027,750 403,000
Storm Water 594,327 879,466 500,295 3,214,442 740,000 780,000
Airport 1,082,908 664,196 350,281 1,762,147 467,000 3,300,000
Internal Service (Non-Budgetary):
ITS Fund - - - 100,000 100,000 100,000
Sub-Total Expenditures 30,520,267 23,737,700 26,919,514 91,495,350 65,737,220 71,636,970
Transfers Out:
Miscellaneous Transfers Out 1,750,000 950,000 425,000 - - -
Sub-Total Transfers Out 1,750,000 950,000 425,000 - - -
Total Expenditures & Transfers Out 32,270,267$ 24,687,700$ 27,344,514$ 91,495,350$ 65,737,220$ 71,636,970$
Fund Balance, June 30 38,062,482$ 42,097,081$ 46,226,581$ 686,513$ 6,237,559$ 7,810,559$
Capital Projects Fund
Fund Summary
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa
CATEGORY SUMMARY
thru2023 2027
TotalCategory2023 2024 2025 2026 2027
Airport 843,000 467,000 3,300,000 1,400,000 1,170,000 7,180,000
Equipment 1,000,000 12,000,000 13,000,000
Finance Administration 100,000 100,000 100,000 100,000 100,000 500,000
Fire 3,495,000 2,050,000 9,500,000 15,045,000
Government Buildings 1,350,000 1,110,000 725,000 1,050,000 1,050,000 5,285,000
Landfill 6,005,000 3,027,750 403,000 540,000 9,975,750
Library 55,000 375,000 400,000 830,000
Parking Operations 840,000 1,000,000 650,000 500,000 500,000 3,490,000
Parks Maintenance 7,000,000 1,270,000 2,485,000 4,710,000 1,535,000 17,000,000
Police 110,000 110,000
Public Works Administration 400,000 650,000 1,050,000
Recreation 500,000 9,700,000 10,200,000
Senior Center 2,750,000 1,825,000 1,825,000 6,400,000
Stormwater 640,000 740,000 780,000 1,090,000 240,000 3,490,000
Street Operations 9,731,470 15,593,470 24,105,470 18,003,470 14,823,470 82,257,350
Transit Operations 475,000 325,000 22,575,000 75,000 75,000 23,525,000
Wastewater Treatment 8,471,000 25,755,000 3,213,500 3,593,500 3,667,500 44,700,500
Water Operations 1,067,500 3,144,000 1,400,000 1,800,000 1,550,000 8,961,500
44,277,970 65,737,220 71,636,970 37,136,970 34,210,970 253,000,100TOTAL
Airport, $7,180,000
Finance Administration,
$500,000
Fire, $15,045,000
Equipment, $13,000,000
Landfill, $9,975,750
Library, $830,000 Government Buildings,
$5,285,000
Parks Maint,
$17,000,000 Parking, $3,490,000
Police, $110,000
Public Works Admin,
$1,050,000
Recreation, $10,200,000
Senior Center,
$6,400,000
Stormwater, $3,490,000
Streets, $82,257,350
Transit, $23,525,000
Wastewater,
$44,700,500
Water, $8,961,500
Capital Improvement Program
by Division
2023-2027
$253,000,100
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa
PROJECTS BY CATEGORY
2023 2027thru
Total2023 2024 2025 2026 2027Category Project # Priority
Airport
A3465 150,000150,000Runway 7 Environmental Assessment 1
A3466 1,170,0001,170,000Runway 7 Extension (213') 2
A3471 650,000650,000Runway 12/30 Threshold Displacement/Relocation 1
A3473 1,250,0001,250,000Airport Apron Expansion 2
A3474 300,000300,000Runway 7/25 Pavement Repairs 2
A3475 167,000167,000Runway 12/30 Pavement Repairs 1
A3477 18,00018,000Airport Wayfinding 1
A3478 3,300,0003,300,000Terminal Building Remodel/Reconstruction 2
A3479 25,00025,000Airport Terminal Building Rehab 1
A3480 150,000150,000Terminal Building Space Needs Study 1
7,180,000843,000 467,000 3,300,000 1,400,000 1,170,000Airport Total
Equipment
P3953 13,000,0001,000,000 12,000,000Equipment Maintenance Facility replacement 2
13,000,0001,000,000 12,000,000Equipment Total
Finance Administration
I4721 500,000100,000 100,000 100,000 100,000 100,000Fiber Infill & Cameras 2
500,000100,000 100,000 100,000 100,000 100,000Finance Administration Total
Fire
Z4406 4,850,0003,300,000 1,550,000Fire Apparatus Replacement Program 1
Z4410 85,00085,000Fire Station #1 Carpet/Tile Flooring Replacement 2
Z4411 10,000,000500,000 9,500,000Fire Station #5 Construction and #3 Replacement 2
Z4412 110,000110,000Fire Station #2 Roof Replacement 2
15,045,0003,495,000 2,050,000 9,500,000Fire Total
Government Buildings
R4129 450,000250,000 50,000 50,000 50,000 50,000City Hall - Other Projects 1
R4194 1,250,000250,000 250,000 250,000 250,000 250,000Climate Action Facility Improvements 3
R4330 250,00050,000 50,000 50,000 50,000 50,000Annual Recreation Center Improvements 1
R4351 2,100,000700,000 700,000 700,000Recreation Center Improvements 1
R4381 950,000800,000 150,000Event Facility Improvements 2
R4388 285,00060,000 225,000ADA Elevator Improvements 1
5,285,0001,350,000 1,110,000 725,000 1,050,000 1,050,000Government Buildings Total
Landfill
L3328 3,500,000500,000 3,000,000Landfill Equipment Building Replacement 2
L3333 350,000350,000Compost Pad Improvements 2
L3335 600,00060,000 540,000Landfill Dual Extraction System Expansion 3
L3338 4,855,0004,855,000Future Landfill Cell 1
Total2023 2024 2025 2026 2027Category Project # Priority
L3347 300,000300,000Compost Turner 3
L3348 370,75027,750 343,000Site Flow Improvements 3
9,975,7506,005,000 3,027,750 403,000 540,000Landfill Total
Library
B4343 775,000375,000 400,000Carpet and Furnishings Replacement 2
B4347 55,00055,000ICPL Boardroom & Meeting Room E Renovation 2
830,00055,000 375,000 400,000Library Total
Parking Operations
T3004 2,500,000500,000 500,000 500,000 500,000 500,000Parking Facility Restoration Repair 2
T3021 50,00050,000Video Cameras for Parking Facilities 3
T3025 240,000240,000Replacement of LED fixtures in Parking Facilities 2
T3026 550,00050,000 500,000Tower Place Drainage Modifications 1
T3028 150,000150,000Tower Place Office Remodel 3
3,490,000840,000 1,000,000 650,000 500,000 500,000Parking Operations Total
Parks Maintenance
R4130 450,00090,000 90,000 90,000 90,000 90,000Parks Annual Improvements/Maintenance 1
R4132 120,00030,000 30,000 30,000 30,000Park Annual ADA Accessibility Improvements 2
R4206 200,00040,000 40,000 40,000 40,000 40,000Intra-city Bike Trails/Bridges 2
R4224 200,000200,000Hickory Hill Park Ecological Restoration 1
R4227 1,700,000200,000 1,500,000Hwy 6 Sidepath - Broadway to Fairmeadows 5
R4346 525,000250,000 275,000Palisades or Stone Bridge Park Development 2
R4358 600,000600,000Lower City Park Shelters & Restroom Replacement 2
R4359 350,000350,000Kiwanis Park Playground & Shelter Renovation 2
R4362 450,000450,000Napoleon Park Softball Fields 5-8 Renovation 3
R4363 600,00050,000 550,000Upper City Park Improvements 2
R4365 400,000400,000Hickory Hill Park Conklin St Imp & Master Plan Upd 2
R4371 200,000200,000Happy Hollow Playground Replacement 2
R4372 2,000,0002,000,000Terrell Mill Skate Park Redevelopment 2
R4374 1,050,0001,050,000Mercer Park Ball Diamond Improvements 3
R4375 300,000300,000Hunter's Run Park Playground & Shelter 2
R4380 500,000100,000 100,000 100,000 100,000 100,000Annual Contracted Tree Planting 4
R4384 135,000135,000Benton Hills Playground Replacement 2
R4385 325,000325,000College Green Park Playground 2
R4387 790,000790,000Willow Creek Trail Replacement 2
R4389 300,000300,000N. Market Square Playground Replacement 2
R4390 240,000240,000Reno Street Park Renovations 2
R4391 400,000400,000Tennis Court Renovations 5
R4392 700,000700,000Westside Park Land Acquisition 2
R4395 140,000140,000Calder Park Connection & Ada Accessible Trl 2
R4396 250,000250,000Waterworks Park Boat Ramp 2
R4397 200,000200,000Court Hill Trail Beech to Scott Replacement 2
R4398 300,000300,000Thornberry and Rita's Ranch Dog Park Improvements 2
R4399 600,000600,000Sturgis Ferry Boat Drop Improvements 2
R4400 150,000150,000Mercer Shelter Replacement 2
R4401 225,000225,000Parks Storage Building 2
R4403 1,900,000200,000 250,000 1,450,000Carson Lake Park 2
R4404 700,000100,000 600,000Iowa River Corridor Trail - Gateway Segment 3
17,000,0007,000,000 1,270,000 2,485,000 4,710,000 1,535,000Parks Maintenance Total
Police
Y4447 110,000110,000Animal Shelter Standby Generator 2
Total2023 2024 2025 2026 2027Category Project # Priority
110,000110,000Police Total
Public Works Administration
P3988 650,000650,000Entrance Way Improvements 4
P3989 400,000400,000American Legion Rd/First Ave Landscaping Project 5
1,050,000400,000 650,000Public Works Administration Total
Recreation
R4229 10,200,000500,000 9,700,000City Park Pool Replacement 3
10,200,000500,000 9,700,000Recreation Total
Senior Center
K1001 2,750,0002,750,000Senior Center Facility Exterior Improvements 4
K1002 3,650,0001,825,000 1,825,000Senior Center Interior Improvements Project 3
6,400,0002,750,000 1,825,000 1,825,000Senior Center Total
Stormwater
M3631 1,200,000240,000 240,000 240,000 240,000 240,000Annual Stormwater Improvements 2
M3634 450,00050,000 400,000Rundell Street Pump Station Vault Modifications 2
M3635 990,000140,000 850,000River Street Storm Sewer Improvements 2
M3637 450,000450,000Peterson Street Storm Sewer Improvments 1
M3638 400,000400,000Storm Sewer Asset Inventory 3
3,490,000640,000 740,000 780,000 1,090,000 240,000Stormwater Total
Street Operations
S3814 1,000,000200,000 200,000 200,000 200,000 200,0003
S3816 75,00015,000 15,000 15,000 15,000 15,0003
S3822 500,000100,000 100,000 100,000 100,000 100,0001
S3824 10,626,9402,125,388 2,125,388 2,125,388 2,125,388 2,125,3881
S3826 940,410188,082 188,082 188,082 188,082 188,0822
S3827 250,00050,000 50,000 50,000 50,000 50,0003
S3910 1,250,000250,000 250,000 250,000 250,000 250,0001
S3939 3,500,0003,500,0001
S3946 7,950,0001,100,000 6,850,0002
S3951 150,000150,0002
S3952 18,400,000158,000 18,242,0002
S3953 5,000,000425,000 4,575,0002
S3955 2,300,000265,000 2,035,0002
S3956 4,200,0004,200,0001
S3959 13,200,0001,000,000 12,200,0002
S3960 100,000100,0002
S3963 9,325,00025,000 325,000 800,000 2,450,000 5,725,0001
S3978 1,685,000110,000 1,575,0001
S3980 100,000100,0002
S3981 320,000320,0002
S3982 475,000475,0002
S3983 800,000800,0002
S3984 110,000110,0003
82,257,3509,731,470 15,593,470 24,105,470 18,003,470 14,823,470
T3055 23,000,000250,000 250,000 22,500,000
Annual Traffic Signal Projects
Traffic Calming
Curb Ramps-ADA
Annual Pavement Rehabilitation
Underground Electrical Facilities
Bicycle Master Plan Implementation
Annual Bridge Maintenance & Repair
Dubuque Street Reconstruction
Court Street Reconstruction
Hwy 1/Hwy 6 Intersection Improvements Study
Dodge Street Reconstruct - Governor to Burlington
Market St & Jefferson St Two-Way Conversion
N. Gilbert Street Reconstruction
Gilbert Street Bridge Replacement
Taft Avenue Reconstruct - Am Legion to Lwr West Br
Oakdale Blvd Extension - Alignment Study
Burlington Street Bridge Replacement
Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab
Kitty Lee Road SW - Functional Design
Camp Cardinal / Kennedy Parkway - Ped Accom
North Dodge St / ACT Circle - Signalization
Iowa Avenue Improvements
High Street & Southgate Ave Sidewalk Infill Proj
Street Operations Total
Transit Operations
Transit Maintenance Facility Relocation 2
Total2023 2024 2025 2026 2027Category Project # Priority
T3059 375,00075,000 75,000 75,000 75,000 75,000Transit Interchange and Bus Stop Improvements 2
T3068 150,000150,000Transit Bus Video System 2
23,525,000475,000 325,000 22,575,000 75,000 75,000Transit Operations Total
Wastewater Treatment
V3101 3,750,000750,000 750,000 750,000 750,000 750,000Annual Sewer Main Replacement 2
V3151 13,000,000900,000 12,100,000Digester Complex Rehabilitation 1
V3155 4,390,0004,390,000Rohret South Sewer 2
V3162 755,000155,000 600,000Benton Street Trunk Sewer Improvements 1
V3164 1,313,500105,000 1,208,500Return Activated Sludge Pump Replacement 2
V3165 2,038,000160,000 1,878,000Replacement of Influent Pump Station Pumps 2
V3169 2,825,000325,000 2,500,000Napoleon Lift Station Improvements 1
V3170 447,00097,000 350,000WWTP Roof Replacements 1
V3172 204,000204,000Highlander Lift Station Improvements 2
V3173 175,000175,000Jet Truck Replacement 1
V3177 743,00060,000 341,500 341,500HVAC Replacement 2
V3178 685,000685,000Primary Clarifier Repairs 2
V3181 299,000299,000Wastewater Division Master Plan 2
V3183 76,00076,000Effluent Water Pump Station Improvements 2
V3184 14,000,0001,800,000 12,200,000Wastewater Digester Gas Improvements 2
44,700,5008,471,000 25,755,000 3,213,500 3,593,500 3,667,500Wastewater Treatment Total
Water Operations
W3300 650,00050,000 600,000Bradford Drive Water Main Replacement 3
W3314 650,00050,000 600,000High Service Pump VFD Replacement 2
W3317 50,00050,000Water Front Meeting Room A/V Upgrades 3
W3320 661,50067,500 594,000Hwy 6 (Fairmeadows to Ind Park Rd) Water Main Repl 1
W3321 150,000150,000Treatment Technology Study 2
W3322 2,500,0002,500,000Collector Well #2 Cleaning and Upgrade 1
W3324 75,00075,000Water Plant HVAC Study 3
W3325 600,000600,000Roof Replacements 2
W3326 600,000600,000Treatment Process Update 2
W3327 600,000600,000Melrose Water Main Camp Cardinal to 218 2
W3328 225,000225,000Powerhouse Dam Rehabilitation 1
W3329 800,000800,000GSR Upgrade and Repairs 1
W3330 550,000550,000Water Plant Flowemeter Replacement 1
W3331 500,000500,000Water Storage 2
W3332 200,000200,000Peninsual Well Field Antenna 3
W3333 150,000150,000Relocate Bulk Water Station 3
8,961,5001,067,500 3,144,000 1,400,000 1,800,000 1,550,000Water Operations Total
GRAND TOTAL 253,000,10044,277,970 65,737,220 71,636,970 37,136,970 34,210,970
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa
FUNDING SOURCE SUMMARY
2023 thru 2027
TotalSource2023 2024 2025 2026 2027
AIRPORT FUND 566,65097,650 47,000 165,000 140,000 117,000
EMERGENCY LEVY 1,750,000350,000 350,000 350,000 350,000 350,000
EQUIPMENT FUND 8,500,0001,000,000 7,500,000
FACILITY REPLACEMENT RESERVE 23,500,000750,000 1,500,000 10,125,000 1,625,000 9,500,000
FEDERAL GRANTS 30,658,0002,020,000 420,000 21,885,000 5,280,000 1,053,000
GENERAL FUND 6,965,0002,465,000 1,285,000 1,210,000 1,070,000 935,000
GO BONDS-ESSENTIAL PURPOSE 59,200,0006,735,000 13,135,000 10,825,000 12,820,000 15,685,000
GO BONDS-GENERAL PURPOSE 8,755,0002,705,000 1,400,000 2,100,000 1,850,000 700,000
ITS FUND 500,000100,000 100,000 100,000 100,000 100,000
LANDFILL FUND 5,570,750600,000 4,027,750 403,000 540,000
LANDFILL REPLACEMENT RESERVE 4,855,0004,855,000
OTHER LOCAL GOVERNMENTS 160,000160,000
OTHER STATE GRANTS 12,075,3501,825,350 850,000 9,400,000
PARKING FUND 3,490,000840,000 1,000,000 650,000 500,000 500,000
REFUSE COLLECTION FUND 250,000250,000
REIMBURSEMENT OF EXPENSES 200,000200,000
REVENUE BONDS 28,000,00028,000,000
ROAD USE TAX FUND 13,900,0002,715,000 2,765,000 2,715,000 2,615,000 3,090,000
STORMWATER FUND 3,740,000640,000 990,000 780,000 1,090,000 240,000
TAX INCREMENT FINANCING 2,000,0002,000,000
TRANSIT FUND 8,525,000475,000 325,000 7,575,000 75,000 75,000
UNIVERSITY OF IOWA 2,175,0001,500,000 525,000 150,000
UTILITY FRANCHISE TAX 1,567,350313,470 313,470 313,470 313,470 313,470
WASTEWATER FUND 19,060,5006,131,000 2,455,000 3,213,500 3,593,500 3,667,500
WATER FUND 9,761,5001,067,500 3,944,000 1,400,000 1,800,000 1,550,000
39,384,970 71,182,220 73,209,970 33,911,970 38,035,970 255,725,100GRAND TOTAL
Utility Franchise Tax,
$1,567,350
Facility Replacement Reserve, $23,500,000
Federal Grants,
$30,658,000
University of Iowa,
$2,175,000
Other State Grants,
$12,075,350General Fund, $6,965,000Road Use Tax,
$13,900,000
Water, $9,761,500
Wastewater, $19,060,500
Parking, $3,490,000
Transit, $8,525,000
Airport, $566,650
Landfill, $10,425,750
Stormwater, $3,740,000
Tax Increment Financing,
$2,000,000
Emergency Levy,
$1,750,000
Refuse Collection,
$250,000
Equipment, $8,500,000 GO Bonds, $67,955,000
ITS, $500,000 Other Local
Governments, $160,000
Reimbursement of
Expenses, $200,000
Revenue Bonds,
$28,000,000
Capital Improvement Program
by Funding Source
2023-2027
$255,725,100
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa
PROJECTS BY FUNDING SOURCE
2023 2027thru
TotalSource Project # Priority 2023 2024 2025 2026 2027
AIRPORT FUND
A3465 15,00015,000Runway 7 Environmental Assessment 1
A3466 117,000117,000Runway 7 Extension (213') 2
A3471 65,00065,000Runway 12/30 Threshold Displacement/Relocation 1
A3473 125,000125,000Airport Apron Expansion 2
A3474 30,00030,000Runway 7/25 Pavement Repairs 2
A3475 17,00017,000Runway 12/30 Pavement Repairs 1
A3477 10,50010,500Airport Wayfinding 1
A3478 165,000165,000Terminal Building Remodel/Reconstruction 2
A3479 7,1507,150Airport Terminal Building Rehab 1
A3480 15,00015,000Terminal Building Space Needs Study 1
566,65097,650 47,000 165,000 140,000 117,000AIRPORT FUND Total
EMERGENCY LEVY
R4194 1,250,000250,000 250,000 250,000 250,000 250,000Climate Action Facility Improvements 3
R4380 500,000100,000 100,000 100,000 100,000 100,000Annual Contracted Tree Planting 4
1,750,000350,000 350,000 350,000 350,000 350,000EMERGENCY LEVY Total
EQUIPMENT FUND
P3953 8,500,0001,000,000 7,500,000Equipment Maintenance Facility replacement 2
8,500,0001,000,000 7,500,000EQUIPMENT FUND Total
FACILITY REPLACEMENT RESER
K1001 750,000750,000Senior Center Facility Exterior Improvements 4
K1002 2,250,0001,125,000 1,125,000Senior Center Interior Improvements Project 3
P3953 1,000,0001,000,000Equipment Maintenance Facility replacement 2
R4229 9,500,000500,000 9,000,000City Park Pool Replacement 3
Z4411 10,000,000500,000 9,500,000Fire Station #5 Construction and #3 Replacement 2
23,500,000750,000 1,500,000 10,125,000 1,625,000 9,500,000FACILITY REPLACEMENT
RESERVE Total
FEDERAL GRANTS
A3465 135,000135,000Runway 7 Environmental Assessment 1
A3466 1,053,0001,053,000Runway 7 Extension (213') 2
A3471 585,000585,000Runway 12/30 Threshold Displacement/Relocation 1
A3473 1,125,0001,125,000Airport Apron Expansion 2
A3474 270,000270,000Runway 7/25 Pavement Repairs 2
A3475 150,000150,000Runway 12/30 Pavement Repairs 1
A3478 3,135,0003,135,000Terminal Building Remodel/Reconstruction 2
A3480 135,000135,000Terminal Building Space Needs Study 1
TotalSource Project # Priority 2023 2024 2025 2026 2027
R4227 520,000520,000Hwy 6 Sidepath - Broadway to Fairmeadows 5
S3952 3,750,0003,750,000Dodge Street Reconstruct - Governor to Burlington 2
S3956 1,000,0001,000,000Gilbert Street Bridge Replacement 1
S3959 3,500,0003,500,000Taft Avenue Reconstruct - Am Legion to Lwr West Br 2
S3963 300,000300,000Burlington Street Bridge Replacement 1
T3055 15,000,00015,000,000Transit Maintenance Facility Relocation 2
30,658,0002,020,000 420,000 21,885,000 5,280,000 1,053,000FEDERAL GRANTS Total
GENERAL FUND
B4343 775,000375,000 400,000Carpet and Furnishings Replacement 2
B4347 55,00055,000ICPL Boardroom & Meeting Room E Renovation 2
P3988 550,000550,000Entrance Way Improvements 4
R4129 450,000250,000 50,000 50,000 50,000 50,000City Hall - Other Projects 1
R4130 450,00090,000 90,000 90,000 90,000 90,000Parks Annual Improvements/Maintenance 1
R4132 120,00030,000 30,000 30,000 30,000Park Annual ADA Accessibility Improvements 2
R4206 200,00040,000 40,000 40,000 40,000 40,000Intra-city Bike Trails/Bridges 2
R4330 250,00050,000 50,000 50,000 50,000 50,000Annual Recreation Center Improvements 1
R4346 525,000250,000 275,000Palisades or Stone Bridge Park Development 2
R4372 500,000500,000Terrell Mill Skate Park Redevelopment 2
R4374 350,000350,000Mercer Park Ball Diamond Improvements 3
R4381 150,000150,000Event Facility Improvements 2
R4384 135,000135,000Benton Hills Playground Replacement 2
R4387 155,000155,000Willow Creek Trail Replacement 2
R4388 285,00060,000 225,000ADA Elevator Improvements 1
R4391 400,000400,000Tennis Court Renovations 5
R4395 140,000140,000Calder Park Connection & Ada Accessible Trl 2
R4397 200,000200,000Court Hill Trail Beech to Scott Replacement 2
R4398 300,000300,000Thornberry and Rita's Ranch Dog Park Improvements 2
R4399 600,000600,000Sturgis Ferry Boat Drop Improvements 2
R4400 150,000150,000Mercer Shelter Replacement 2
R4401 225,000225,000Parks Storage Building 2
6,965,0002,465,000 1,285,000 1,210,000 1,070,000 935,000GENERAL FUND Total
GO BONDS-ESSENTIAL PURPOSE
P3989 400,000400,000American Legion Rd/First Ave Landscaping Project 5
R4227 1,180,0001,180,000Hwy 6 Sidepath - Broadway to Fairmeadows 5
R4358 600,000600,000Lower City Park Shelters & Restroom Replacement 2
R4359 350,000350,000Kiwanis Park Playground & Shelter Renovation 2
R4363 600,000600,000Upper City Park Improvements 2
R4365 400,000400,000Hickory Hill Park Conklin St Imp & Master Plan Upd 2
R4371 200,000200,000Happy Hollow Playground Replacement 2
R4375 300,000300,000Hunter's Run Park Playground & Shelter 2
R4385 325,000325,000College Green Park Playground 2
R4389 300,000300,000N. Market Square Playground Replacement 2
R4390 240,000240,000Reno Street Park Renovations 2
R4403 1,900,0001,900,000Carson Lake Park 2
R4404 700,000700,000Iowa River Corridor Trail - Gateway Segment 3
S3939 3,800,0003,800,000Dubuque Street Reconstruction 1
S3946 8,100,0008,100,000Court Street Reconstruction 2
S3952 5,500,0005,500,000Dodge Street Reconstruct - Governor to Burlington 2
S3953 5,000,0005,000,000Market St & Jefferson St Two-Way Conversion 2
S3955 2,500,0002,500,000N. Gilbert Street Reconstruction 2
TotalSource Project # Priority 2023 2024 2025 2026 2027
S3956 3,175,0003,175,000Gilbert Street Bridge Replacement 1
S3959 9,700,0009,700,000Taft Avenue Reconstruct - Am Legion to Lwr West Br 2
S3963 9,025,0009,025,000Burlington Street Bridge Replacement 1
S3978 635,000635,000Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab 1
S3981 160,000160,000Camp Cardinal / Kennedy Parkway - Ped Accom 2
S3983 800,000800,000Iowa Avenue Improvements 2
S3984 110,000110,000High Street & Southgate Ave Sidewalk Infill Proj 3
Z4406 3,200,0001,800,000 1,400,000Fire Apparatus Replacement Program 1
59,200,0006,735,000 13,135,000 10,825,000 12,820,000 15,685,000GO BONDS-ESSENTIAL PURPOSE
Total
GO BONDS-GENERAL PURPOSE
K1002 1,400,000700,000 700,000Senior Center Interior Improvements Project 3
P3953 700,000700,000Equipment Maintenance Facility replacement 2
R4229 700,000700,000City Park Pool Replacement 3
R4351 2,100,000700,000 700,000 700,000Recreation Center Improvements 1
R4362 450,000450,000Napoleon Park Softball Fields 5-8 Renovation 3
R4372 700,000700,000Terrell Mill Skate Park Redevelopment 2
R4374 700,000700,000Mercer Park Ball Diamond Improvements 3
R4381 300,000300,000Event Facility Improvements 2
R4387 700,000700,000Willow Creek Trail Replacement 2
R4392 700,000700,000Westside Park Land Acquisition 2
Y4447 110,000110,000Animal Shelter Standby Generator 2
Z4410 85,00085,000Fire Station #1 Carpet/Tile Flooring Replacement 2
Z4412 110,000110,000Fire Station #2 Roof Replacement 2
8,755,0002,705,000 1,400,000 2,100,000 1,850,000 700,000GO BONDS-GENERAL PURPOSE
Total
ITS FUND
I4721 500,000100,000 100,000 100,000 100,000 100,000Fiber Infill & Cameras 2
500,000100,000 100,000 100,000 100,000 100,000ITS FUND Total
LANDFILL FUND
L3328 3,500,0003,500,000Landfill Equipment Building Replacement 2
L3333 350,000350,000Compost Pad Improvements 2
L3335 600,00060,000 540,000Landfill Dual Extraction System Expansion 3
L3347 250,000250,000Compost Turner 3
L3348 370,75027,750 343,000Site Flow Improvements 3
P3953 500,000500,000Equipment Maintenance Facility replacement 2
5,570,750600,000 4,027,750 403,000 540,000LANDFILL FUND Total
LANDFILL REPLACEMENT RESE
L3338 4,855,0004,855,000Future Landfill Cell 1
4,855,0004,855,000LANDFILL REPLACEMENT
RESERVE Total
OTHER LOCAL GOVERNMENTS
S3981 160,000160,000Camp Cardinal / Kennedy Parkway - Ped Accom 2
TotalSource Project # Priority 2023 2024 2025 2026 2027
160,000160,000OTHER LOCAL GOVERNMENTS
Total
OTHER STATE GRANTS
A3477 7,5007,500Airport Wayfinding 1
A3479 17,85017,850Airport Terminal Building Rehab 1
L3347 50,00050,000Compost Turner 3
R4224 200,000200,000Hickory Hill Park Ecological Restoration 1
R4372 800,000800,000Terrell Mill Skate Park Redevelopment 2
R4381 500,000500,000Event Facility Improvements 2
R4396 250,000250,000Waterworks Park Boat Ramp 2
S3952 9,400,0009,400,000Dodge Street Reconstruct - Governor to Burlington 2
S3978 850,000850,000Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab 1
12,075,3501,825,350 850,000 9,400,000OTHER STATE GRANTS Total
PARKING FUND
T3004 2,500,000500,000 500,000 500,000 500,000 500,000Parking Facility Restoration Repair 2
T3021 50,00050,000Video Cameras for Parking Facilities 3
T3025 240,000240,000Replacement of LED fixtures in Parking Facilities 2
T3026 550,00050,000 500,000Tower Place Drainage Modifications 1
T3028 150,000150,000Tower Place Office Remodel 3
3,490,000840,000 1,000,000 650,000 500,000 500,000PARKING FUND Total
REFUSE COLLECTION FUND
P3953 250,000250,000Equipment Maintenance Facility replacement 2
250,000250,000REFUSE COLLECTION FUND Total
REIMBURSEMENT OF EXPENSES
S3956 200,000200,000Gilbert Street Bridge Replacement 1
200,000200,000REIMBURSEMENT OF EXPENSES
Total
REVENUE BONDS
V3151 14,000,00014,000,000Digester Complex Rehabilitation 1
V3184 14,000,00014,000,000Wastewater Digester Gas Improvements 2
28,000,00028,000,000REVENUE BONDS Total
S3814 1,000,000200,000 200,000 200,000 200,000 200,0003
S3816 75,00015,000 15,000 15,000 15,000 15,0003
S3822 500,000100,000 100,000 100,000 100,000 100,0001
S3824 10,000,0002,000,000 2,000,000 2,000,000 2,000,000 2,000,0001
S3827 250,00050,000 50,000 50,000 50,000 50,0003
S3910 1,250,000250,000 250,000 250,000 250,000 250,0001
S3951 150,000150,0002
S3960 100,000100,0002
S3980 100,000100,000
ROAD USE TAX FUND
Annual Traffic Signal Projects
Traffic Calming
Curb Ramps-ADA
Annual Pavement Rehabilitation
Bicycle Master Plan Implementation
Annual Bridge Maintenance & Repair
Hwy 1/Hwy 6 Intersection Improvements Study
Oakdale Blvd Extension - Alignment Study
Kitty Lee Road SW - Functional Design 2
TotalSource Project # Priority 2023 2024 2025 2026 2027
S3982 475,000475,000North Dodge St / ACT Circle - Signalization 2
13,900,0002,715,000 2,765,000 2,715,000 2,615,000 3,090,000ROAD USE TAX FUND Total
STORMWATER FUND
M3631 1,200,000240,000 240,000 240,000 240,000 240,000Annual Stormwater Improvements 2
M3634 450,00050,000 400,000Rundell Street Pump Station Vault Modifications 2
M3635 990,000140,000 850,000River Street Storm Sewer Improvements 2
M3637 450,000450,000Peterson Street Storm Sewer Improvments 1
M3638 400,000400,000Storm Sewer Asset Inventory 3
P3953 250,000250,000Equipment Maintenance Facility replacement 2
3,740,000640,000 990,000 780,000 1,090,000 240,000STORMWATER FUND Total
TAX INCREMENT FINANCING
K1001 2,000,0002,000,000Senior Center Facility Exterior Improvements 4
2,000,0002,000,000TAX INCREMENT FINANCING Total
TRANSIT FUND
T3055 8,000,000250,000 250,000 7,500,000Transit Maintenance Facility Relocation 2
T3059 375,00075,000 75,000 75,000 75,000 75,000Transit Interchange and Bus Stop Improvements 2
T3068 150,000150,000Transit Bus Video System 2
8,525,000475,000 325,000 7,575,000 75,000 75,000TRANSIT FUND Total
UNIVERSITY OF IOWA
P3988 100,000100,000Entrance Way Improvements 4
S3978 425,000425,000Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab 1
Z4406 1,650,0001,500,000 150,000Fire Apparatus Replacement Program 1
2,175,0001,500,000 525,000 150,000UNIVERSITY OF IOWA Total
UTILITY FRANCHISE TAX
S3824 626,940125,388 125,388 125,388 125,388 125,388Annual Pavement Rehabilitation 1
S3826 940,410188,082 188,082 188,082 188,082 188,082Underground Electrical Facilities 2
1,567,350313,470 313,470 313,470 313,470 313,470UTILITY FRANCHISE TAX Total
WASTEWATER FUND
P3953 1,000,0001,000,000Equipment Maintenance Facility replacement 2
V3101 3,750,000750,000 750,000 750,000 750,000 750,000Annual Sewer Main Replacement 2
V3155 4,750,0004,750,000Rohret South Sewer 2
V3162 755,000155,000 600,000Benton Street Trunk Sewer Improvements 1
V3164 1,313,500105,000 1,208,500Return Activated Sludge Pump Replacement 2
V3165 2,038,000160,000 1,878,000Replacement of Influent Pump Station Pumps 2
V3169 2,825,000325,000 2,500,000Napoleon Lift Station Improvements 1
V3170 447,00097,000 350,000WWTP Roof Replacements 1
V3172 204,000204,000Highlander Lift Station Improvements 2
V3173 175,000175,000Jet Truck Replacement 1
V3177 743,00060,000 341,500 341,500HVAC Replacement 2
V3178 685,000685,000Primary Clarifier Repairs 2
TotalSource Project # Priority 2023 2024 2025 2026 2027
V3181 299,000299,000Wastewater Division Master Plan 2
V3183 76,00076,000Effluent Water Pump Station Improvements 2
19,060,5006,131,000 2,455,000 3,213,500 3,593,500 3,667,500WASTEWATER FUND Total
WATER FUND
P3953 800,000800,000Equipment Maintenance Facility replacement 2
W3300 650,00050,000 600,000Bradford Drive Water Main Replacement 3
W3314 650,00050,000 600,000High Service Pump VFD Replacement 2
W3317 50,00050,000Water Front Meeting Room A/V Upgrades 3
W3320 661,50067,500 594,000Hwy 6 (Fairmeadows to Ind Park Rd) Water Main Repl 1
W3321 150,000150,000Treatment Technology Study 2
W3322 2,500,0002,500,000Collector Well #2 Cleaning and Upgrade 1
W3324 75,00075,000Water Plant HVAC Study 3
W3325 600,000600,000Roof Replacements 2
W3326 600,000600,000Treatment Process Update 2
W3327 600,000600,000Melrose Water Main Camp Cardinal to 218 2
W3328 225,000225,000Powerhouse Dam Rehabilitation 1
W3329 800,000800,000GSR Upgrade and Repairs 1
W3330 550,000550,000Water Plant Flowemeter Replacement 1
W3331 500,000500,000Water Storage 2
W3332 200,000200,000Peninsual Well Field Antenna 3
W3333 150,000150,000Relocate Bulk Water Station 3
9,761,5001,067,500 3,944,000 1,400,000 1,800,000 1,550,000WATER FUND Total
255,725,10039,384,970 71,182,220 73,209,970 33,911,970 38,035,970GRAND TOTAL
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa
PROJECTS BY DEPARTMENT WITH DESCRIPTIONS
2023 2027thru
FINANCE
Total2023 2024 2025 2026 2027Department Project # Priority
I4721 500,000100,000 100,000 100,000 100,000 100,000Fiber Infill & Cameras 2
500,000100,000 100,000 100,000 100,000 100,000FINANCE Total
Expansion of the City's fiber optic network. Creation of redundant fiber optic rings, placement of cable underground when opportunities
arise, expansion to unserved facilites. ITS always includes our original partners (Johnson County, ICCSD, University of Iowa) when
planning expansion and redundant routes. Additional video cameras.
I4721
Fiber Infill & Cameras
PARKS & RECREATION
Total2023 2024 2025 2026 2027Department Project # Priority
R4129 450,000250,000 50,000 50,000 50,000 50,000City Hall - Other Projects 2
R4130 450,00090,000 90,000 90,000 90,000 90,000Parks Annual Improvements/Maintenance 2
R4132 120,00030,000 30,000 30,000 30,000Park Annual ADA Accessibility Improvements 2
R4194 1,250,000250,000 250,000 250,000 250,000 250,000Climate Action Facility Improvements 2
R4206 200,00040,000 40,000 40,000 40,000 40,000Intra-city Bike Trails/Bridges 2
R4330 250,00050,000 50,000 50,000 50,000 50,000Annual Recreation Center Improvements 2
R4380 500,000100,000 100,000 100,000 100,000 100,000Annual Contracted Tree Planting 2
3,220,000810,000 580,000 610,000 610,000 610,000PARKS & RECREATION Total
City Hall Roof Replacement; FY23 Lower Level Restroom ADA Remodel; 2024 East ADA exterior entry stair and ramp; FY25 HVAC
System (AHU 2 and AHU-N) in mechanical room 2nd floor north court; FY2026 Employee Fitness Room ADA Remodel
R4129
City Hall - Other Projects
Annual funding for small capital projects and improvements throughout park system. Priorities per the 2017 Park Master Plan are: Park
Signs, Site Furnishings, Shelter/Facility Maintenance, Court Maintenance, Partner Opportunities for Small Projects and Emerging
Opportunities and Needs.
R4130
Parks Annual Improvements/Maintenance
Small projects in parks to improve and enhance physical accessility to park facilities and activity centers. 2022 - Oak Grove; 2023 - Kiwanis,
Hunter's Run and Ryerson's Woods; 2024 - Reno St; 2025 - Thornberry and Crandic; 2026 - Undetermined
R4132
Park Annual ADA Accessibility Improvements
An annual fund for sustainability projects to improve municipal building systems in regard to both energy savings and climate action
initiatives. Projects may include, but not be limited to, building insultation and envelopes, LED lighting upgrades, HVAC systems,
geothermal, solar panels and other infrastructure improvements that reduces the City's carbon footprint and greening of City structures.
R4194
Climate Action Facility Improvements
Annual appropriation for the construction or repair of bike trails.
R4206
Intra-city Bike Trails/Bridges
Annual Projects to maintain RALRC and Mercer/Scanlon Recreation Centers. 2023 Building Indoor Signage ($31,250- updated cost);
Acoustical ceiling grid and ceiling tile replacement ($27,681.25): 2023 RALRC total $58,931.25; 2024 RALRC vinyl flooring and mastic
removal replacement $77,232 updated; 2024 RALRC Craft Room Renovations; 2024 Renovate former Shooting Range and lowerlevel
storage; 2025 not yet designated.
R4330
Annual Recreation Center Improvements
Annual contracted tree program for additions to street trees, neighborhood infill and park tree plantings. Areas of emphasis include low
income neighborhoods as well as neighborhoods that lost trees to the Emerald Ash Borer or the 2020 Derecho storm.
R4380
Annual Contracted Tree Planting
PUBLIC WORKS
Total2023 2024 2025 2026 2027Department Project # Priority
M3631 1,200,000240,000 240,000 240,000 240,000 240,000Annual Stormwater Improvements 2
S3814 1,000,000200,000 200,000 200,000 200,000 200,000Annual Traffic Signal Projects 2
S3816 75,00015,000 15,000 15,000 15,000 15,000Traffic Calming 2
S3822 500,000100,000 100,000 100,000 100,000 100,000Curb Ramps-ADA 2
S3824 10,626,9402,125,388 2,125,388 2,125,388 2,125,388 2,125,388Annual Pavement Rehabilitation 2
S3826 940,410188,082 188,082 188,082 188,082 188,082Underground Electrical Facilities 2
S3827 250,00050,000 50,000 50,000 50,000 50,000Bicycle Master Plan Implementation 2
S3910 1,250,000250,000 250,000 250,000 250,000 250,000Annual Bridge Maintenance & Repair 2
V3101 3,750,000750,000 750,000 750,000 750,000 750,000Annual Sewer Main Replacement 2
19,592,3503,918,470 3,918,470 3,918,470 3,918,470 3,918,470PUBLIC WORKS Total
This is an annual project that will repair and/or improve storm water infrastructure throughout the City.
M3631
Annual Stormwater Improvements
This is an annual project to replace or add traffic signals at intersections with outdated traffic signal equipment or at dangerous and
uncontrolled intersections.
S3814
Annual Traffic Signal Projects
Annual appropriation for traffic calming projects
S3816
Traffic Calming
Annual appropriation for the construction of ADA accessible curb ramps.
S3822
Curb Ramps-ADA
Annual appropriation for resurfacing roadways and alleys including asphalt, concrete, and brick.
S3824
Annual Pavement Rehabilitation
This is an annual project to convert overhead electrical systems to underground.
Dubuque Street, Riverside Drive, and Gilbert Street are currently the priority corridors for undergrounding electrical facilities.
S3826
Underground Electrical Facilities
This is an annual project to implement the recommendations of the bicycle master plan. Improvement projects include construction of bike
lanes, bike boulevards, and other features that will improve streets to promote equal access and usability for all modes of transportation.
Projects also fund the conversion of 4-lane roads into 3-lane roads in certain areas that are highly used by all of the various modes of
transportation. Projects are scheduled as follows:
2023 - Sunset Bike Lanes (Benton to Highway 1); Oakcrest Bike Blvd; Emerald Bike Blvd; Arlington Bicycle Blvd; 2024 - Dover
/Westminster Bike Blvd; Highland Bicycle Blvd; 2025 - Church Street Bicycle Blvd; Broadway Bike Lanes (Sandusky to Highway 6);
Ridge/Broadway Bike Blvd; 2026 - Washington Street Bike Blvd (Scott Blvd to 1st Avenue); River Bike Blvd; Woolf Bike Blvd; Newton
Marked Route
S3827
Bicycle Master Plan Implementation
This provides for the biennial inspection and preservation of Iowa City's bridges including major repairs and restoration.
S3910
Annual Bridge Maintenance & Repair
This project consists of annual sanitary sewer repairs and preventive maintenance throughout the sewer system. Work include sewer lining,
spot reairs and manhole lining and replacement.
V3101
Annual Sewer Main Replacement
TRANSPORTATION SERVICES
Total2023 2024 2025 2026 2027Department Project # Priority
T3004 2,500,000500,000 500,000 500,000 500,000 500,000Parking Facility Restoration Repair 2
T3059 375,00075,000 75,000 75,000 75,000 75,000Transit Interchange and Bus Stop Improvements 2
2,875,000575,000 575,000 575,000 575,000 575,000TRANSPORTATION SERVICES
Total
This annual project includes concrete restoration, application of concrete sealants, repair of control and expansion joints in addition to other
parking facility specific repairs.
T3004
Parking Facility Restoration Repair
To improve pedestrian safety and traffic flow at the downtown interchange and improve amenities at transit stops throughout the community
as recommended through the 2019-2020 Transit Study planning process. This project will include annual bus stop repairs and amenity
installations including concrete pads, benches, trash containers, lighting, information amenities, and bike racks.
T3059
Transit Interchange and Bus Stop Improvements
Project
Airport
A3465 Runway 7 Environmental Assessment…........................537
A3466 Runway 7 Extension (213')…..........................................538
A3471 Runway 12/30 Threshold Displacement/Relocation…....539
A3473 Airport Apron Expansion…............................................. 540
A3474 Runway 7/25 Pavement Repairs….................................541
A3475 Runway 12/30 Pavement Repairs…...............................542
A3477 Airport Wayfinding…....................................................... 543
A3478 Terminal Building Remodel/Reconstruction…................ 544
A3479 Airport Terminal Building Rehab…................................. 545
A3480 Terminal Building Space Needs Study…........................546
Fire
Z4406 Fire Apparatus Replacement Program…........................547
Z4410 Fire Station #1 Carpet/Tile Flooring Replacement…...... 548
Z4411 Fire Station #5 Construction and #3 Replacement…......549
Z4412 Fire Station #2 Roof Replacement….............................. 550
Library
B4343 Carpet and Furnishings Replacement….........................551
B4347 ICPL Boardroom & Meeting Room E Renovation…....... 552
Parks Maintenance
R4224 Hickory Hill Park Ecological Restoration…..................... 553
R4227 Hwy 6 Sidepath - Broadway to Fairmeadows…............. 554
R4229 City Park Pool Replacement…....................................... 555
R4346 Palisades or Stone Bridge Park Development…............ 556
R4351 Recreation Center Improvements…............................... 557
R4358 Lower City Park Shelters & Restroom Replacement…...558
R4359 Kiwanis Park Playground & Shelter Renovation…......... 559
R4362 Napoleon Park Softball Fields 5-8 Renovation…............560
R4363 Upper City Park Improvements…................................... 561
R4365 Hickory Hill Park Conklin St Imp & Master Plan Upd….. 562
R4371 Happy Hollow Playground Replacement….....................563
R4372 Terrell Mill Skate Park Redevelopment…....................... 564
R4374 Mercer Park Ball Diamond Improvements…...................565
R4375 Hunter's Run Park Playground & Shelter….................... 566
Capital Project Funds
Project Listing
533
R4381 Event Facility Improvements…....................................... 567
R4384 Benton Hills Playground Replacement…........................568
R4385 College Green Park Playground…..................................569
R4387 Willow Creek Trail Replacement…................................. 570
R4388 ADA Elevator Improvements…....................................... 571
R4389 N. Market Square Playground Replacement…...............572
R4390 Reno Street Park Renovations…....................................573
R4391 Tennis Court Renovations…...........................................574
R4392 Westside Park Land Acquisition…..................................575
R4395 Calder Park Connection & Ada Accessible Trl…............ 576
R4396 Waterworks Park Boat Ramp…...................................... 577
R4397 Court Hill Trail Beech to Scott Replacement…............... 578
R4398 Thornberry and Rita's Ranch Dog Park Improvements…579
R4399 Sturgis Ferry Boat Drop Improvements…....................... 580
R4400 Mercer Shelter Replacement….......................................581
R4401 Parks Storage Building…................................................582
R4403 Carson Lake Park…........................................................583
R4404 Iowa River Corridor Trail - Gateway Segment….............584
Police
Y4447 Animal Shelter Standby Generator…..............................585
Landfill
L3328 Landfill Equipment Building Replacement…...................586
L3333 Compost Pad Improvements….......................................587
L3335 Landfill Dual Extraction System Expansion….................588
L3338 Future Landfill Cell…...................................................... 589
L3347 Compost Turner….......................................................... 590
L3348 Site Flow Improvements….............................................. 591
Stormwater
M3634 Rundell Street Pump Station Vault Modifications…........592
M3635 River Street Storm Sewer Improvements….................... 593
M3637 Peterson Street Storm Sewer Improvments…................594
M3638 Storm Sewer Asset Inventory…...................................... 595
Equipment
P3953 Equipment Maintenance Facility replacement….............596
Public Works Administration
P3988 Entrance Way Improvements…...................................... 597
P3989 American Legion Rd/First Ave Landscaping Project…... 598
534
Street Operations
S3939 Dubuque Street Reconstruction….................................. 599
S3946 Court Street Reconstruction…........................................ 600
S3951 Hwy 1/Hwy 6 Intersection Improvements Study…..........601
S3952 Dodge Street Reconstruct - Governor to Burlington…....602
S3953 Market St & Jefferson St Two-Way Conversion….......... 603
S3955 N. Gilbert Street Reconstruction…..................................604
S3956 Gilbert Street Bridge Replacement…..............................605
S3959 Taft Avenue Reconstruct - Am Legion to Lwr West Br… 606
S3960 Oakdale Blvd Extension - Alignment Study….................607
S3963 Burlington Street Bridge Replacement…........................ 608
S3978 Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab…...609
S3980 Kitty Lee Road SW - Functional Design….....................610
S3981 Camp Cardinal / Kennedy Parkway - Ped Accom….......611
S3982 North Dodge St / ACT Circle - Signalization…................612
S3983 Iowa Avenue Improvements…........................................613
S3984 High Street & Southgate Ave Sidewalk Infill Proj…........ 614
Wastewater Treatment
V3151 Digester Complex Rehabilitation…................................. 615
V3155 Rohret South Sewer….................................................... 616
V3162 Benton Street Trunk Sewer Improvements…................. 617
V3164 Return Activated Sludge Pump Replacement…............. 618
V3165 Replacement of Influent Pump Station Pumps…............619
V3169 Napoleon Lift Station Improvements…........................... 620
V3170 WWTP Roof Replacements…........................................ 621
V3172 Highlander Lift Station Improvements…......................... 622
V3173 Jet Truck Replacement…............................................... 623
V3177 HVAC Replacement….................................................... 624
V3178 Primary Clarifier Repairs…............................................. 625
V3181 Wastewater Division Master Plan…................................626
V3183 Effluent Water Pump Station Improvements…............... 627
V3184 Wastewater Digester Gas Improvements…....................628
Water Operations
W3300 Bradford Drive Water Main Replacement…....................629
W3314 High Service Pump VFD Replacement…....................... 630
W3317 Water Front Meeting Room A/V Upgrades…..................631
W3320 Hwy 6 (Fairmeadows to Ind Park Rd) Water Main Repl…632
W3321 Treatment Technology Study…...................................... 633
W3322 Collector Well #2 Cleaning and Upgrade….................... 634
535
W3324 Water Plant HVAC Study…............................................ 635
W3325 Roof Replacements….....................................................636
W3326 Treatment Process Update…......................................... 637
W3327 Melrose Water Main Camp Cardinal to 218…................ 638
W3328 Powerhouse Dam Rehabilitation…................................. 639
W3329 GSR Upgrade and Repairs…......................................... 640
W3330 Water Plant Flowemeter Replacement…........................641
W3331 Water Storage…............................................................. 642
W3332 Peninsual Well Field Antenna…..................................... 643
W3333 Relocate Bulk Water Station…....................................... 644
Senior Center
K1001 Senior Center Facility Exterior Improvements….............645
K1002 Senior Center Interior Improvements Project….............. 646
Parking Operations
T3021 Video Cameras for Parking Facilities….......................... 647
T3025 Replacement of LED fixtures in Parking Facilities….......648
T3026 Tower Place Drainage Modifications…...........................649
T3028 Tower Place Office Remodel….......................................650
Transit Operations
T3055 Transit Maintenance Facility Relocation…......................651
T3068 Transit Bus Video System…...........................................652
536
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Michael Tharp
2023 2027thru Department AIRPORT
Description
Runway 7 Extension (213') Environmental Assessment
Project #A3465
Priority Critical (1)
Justification
Runway extension to push the Runway 25 landing distance available to above 5000' a key metric for charter operators using the airport.
Budget Impact/Other
The operating impact is negligible.
Useful Life 20 yearsProject Name Runway 7 Environmental Assessment Category Airport
Type One Phase
MATCH %10%
GRANTEE FAA
Total Project Cost:$150,000
TIF DISTRICT None
PLAN Airport Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
150,000150,000PLANNING/DESIGN
150,000 150,000Total
Total2023 2024 2025 2026 2027Funding Sources
15,00015,000AIRPORT FUND
135,000135,000FEDERAL GRANTS
150,000 150,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Michael Tharp
2023 2027thru Department AIRPORT
Description
Follow up project from Runway 7/25 Conversion. This is the Environmental Assessment required before constructing an approximately 213 feet
extension at the Runway 7 end of Runway 7/25.
Project #A3466
Priority Essential (2)
Justification
One of the primary comments from pilots was a concern of the landing distance on 7/25. This project is the second part of the 7/25 runway
categorical change and will extend the Runway 7/25 runway by approximately 213 feet.
Budget Impact/Other
This project will add additional runway to clear during inclement weather and to provide additional maintenance and repairs. The estimated
additional expenditures are less than $10,000 per year.
Useful Life 50 yearsProject Name Runway 7 Extension (213')Category Airport
Type One Phase
MATCH %10%
GRANTEE FAA
Total Project Cost:$1,170,000
TIF DISTRICT None
PLAN Airport Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
235,000235,000PLANNING/DESIGN
935,000935,000CONSTRUCTION
1,170,000 1,170,000Total
Total2023 2024 2025 2026 2027Funding Sources
117,000117,000AIRPORT FUND
1,053,0001,053,000FEDERAL GRANTS
1,170,000 1,170,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Michael Tharp
2023 2027thru Department AIRPORT
Description
This project creates a 500' displaced threshold on the Runway 12 end and adds approxiamately 300' of additional pavement to the Runway 30 end.
Project #A3471
Priority Critical (1)
Justification
Runway 12 displaced threshold removes a number of trees from the NW neighborhood from of the airport's obstruction/hazard database without
having to physically remove them. The additional pavement to the Runway 30 end maintains current runway functionality for airport traffic.
Budget Impact/Other
Minor increase due to additional lighting fixtures and pavement on ground
Useful Life 20 yearsProject Name Runway 12/30 Threshold Displacement/Relocation Category Airport
Type One Phase
MATCH %10%
GRANTEE FAA
Total Project Cost:$650,000
TIF DISTRICT None
PLAN Airport Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
80,00080,000PLANNING/DESIGN
570,000570,000CONSTRUCTION
650,000 650,000Total
Total2023 2024 2025 2026 2027Funding Sources
65,00065,000AIRPORT FUND
585,000585,000FEDERAL GRANTS
650,000 650,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Michael Tharp
2023 2027thru Department AIRPORT
Description
This project adds additonal apron space for aircraft parking.
Project #A3473
Priority Essential (2)
Justification
High traffic events and large jets require parking aircraft on closed runway or other areas of the airport. This will expand the parking apron near
the terminal to accommodate traffic
Budget Impact/Other
Minor increase for snow removal and pavement maintenance
Useful Life 20 yearsProject Name Airport Apron Expansion Category Airport
Type One Phase
MATCH %10%
GRANTEE FAA
Total Project Cost:$1,250,000
TIF DISTRICT None
PLAN Airport Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
150,000150,000PLANNING/DESIGN
1,100,0001,100,000CONSTRUCTION
1,250,000 1,250,000Total
Total2023 2024 2025 2026 2027Funding Sources
125,000125,000AIRPORT FUND
1,125,0001,125,000FEDERAL GRANTS
1,250,000 1,250,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Michael Tharp
2023 2027thru Department AIRPORT
Description
Runway joint and crack sealing and pavement repairs to the west half of runway 7/25
Project #A3474
Priority Essential (2)
Justification
Project would route and seal joints as well as perform any panel repairs as needed to maintain the runway.
Budget Impact/Other
Extends the life of the runway and reduces annual budget needs for short term maintenance
Useful Life 20 yearsProject Name Runway 7/25 Pavement Repairs Category Airport
Type One Phase
MATCH %10%
GRANTEE FAA
Total Project Cost:$300,000
TIF DISTRICT None
PLAN Airport Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
30,00030,000PLANNING/DESIGN
270,000270,000CONSTRUCTION
300,000 300,000Total
Total2023 2024 2025 2026 2027Funding Sources
30,00030,000AIRPORT FUND
270,000270,000FEDERAL GRANTS
300,000 300,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Michael Tharp
2023 2027thru Department AIRPORT
Description
Runway joint and crack sealing and pavement repairs to the west half of runway 12/30
Project #A3475
Priority Critical (1)
Justification
Project would route and seal joints as well as perform any panel repairs as needed to maintain the runway.
Budget Impact/Other
Extends the life of the runway and reduces annual budget needs for short term maintenance
Useful Life 20 yearsProject Name Runway 12/30 Pavement Repairs Category Airport
Type One Phase
MATCH %10%
GRANTEE FAA
Total Project Cost:$167,000
TIF DISTRICT None
PLAN Airport Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
20,00020,000PLANNING/DESIGN
147,000147,000CONSTRUCTION
167,000 167,000Total
Total2023 2024 2025 2026 2027Funding Sources
17,00017,000AIRPORT FUND
150,000150,000FEDERAL GRANTS
167,000 167,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Michael Tharp
2023 2027thru Department AIRPORT
Description
Project will install a new wayfinding monument sign along entrance road, replacing the existing old "Hertz" company sign and location. Will also
replace minor signage inside the terminal building.
Project #A3477
Priority Critical (1)
Justification
Expansion of parking lot options and desire to direct users to ultimate destinations (long-term/short-term parking, rental car dropoffs, etc) as well
as direct drivers to appropriate buildings (terminal, OPL, Care Ambulance)
Budget Impact/Other
Minor increase in expense due to time to maintain signage
Useful Life 10 yearsProject Name Airport Wayfinding Category Airport
Type One Phase
MATCH %
GRANTEE IDOT
Total Project Cost:$18,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
3,0003,000PLANNING/DESIGN
15,00015,000CONSTRUCTION
18,000 18,000Total
Total2023 2024 2025 2026 2027Funding Sources
10,50010,500AIRPORT FUND
7,5007,500OTHER STATE GRANTS
18,000 18,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Michael Tharp
2023 2027thru Department AIRPORT
Description
This project would take the information from the terminal space study to either remodel the existing structure, or construct a new terminal building
at the Iowa City Airport.
Project #A3478
Priority Essential (2)
Justification
The current terminal building was built in 1951. It no longer has space for existing companies/users to grow or to allow for additional companies
to operate. The energy efficiency of the building is also unable to be updated without significant investments. This project would target BIL
Terminal program funds with a 95% FAA match if awarded. The numbers included here are placeholders assuming the extreme end of the
replacement spectrum
Budget Impact/Other
Energy efficiencies in either a remodel or reconstruction could reduce maintenance and utility costs.
Useful Life 50 yearsProject Name Terminal Building Remodel/Reconstruction Category Airport
Type One Phase
MATCH %
GRANTEE FAA
Total Project Cost:$3,300,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
300,000300,000PLANNING/DESIGN
3,000,0003,000,000CONSTRUCTION
3,300,000 3,300,000Total
Total2023 2024 2025 2026 2027Funding Sources
165,000165,000AIRPORT FUND
3,135,0003,135,000FEDERAL GRANTS
3,300,000 3,300,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Michael Tharp
2023 2027thru Department AIRPORT
Description
This project will perform maintnenace to the area around the old baggage claim door facing the aircraft apron by replacing the existing plywood
coverings with glass simliar to the east side central tower as well as other minor maintnenace.
Project #A3479
Priority Critical (1)
Justification
Plywood covers wear over time due to weather and fuel exhaust exposure. Glass will be a more permanent fix reducing maintenance costs.
Budget Impact/Other
Minor reduction of maintenance costs.
Useful Life 10 yearsProject Name Airport Terminal Building Rehab Category Airport
Type One Phase
MATCH %
GRANTEE IDOT
Total Project Cost:$25,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
5,0005,000PLANNING/DESIGN
20,00020,000CONSTRUCTION
25,000 25,000Total
Total2023 2024 2025 2026 2027Funding Sources
7,1507,150AIRPORT FUND
17,85017,850OTHER STATE GRANTS
25,000 25,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Michael Tharp
2023 2027thru Department AIRPORT
Description
This is to study the terminal building area for future space needs.
Project #A3480
Priority Critical (1)
Justification
The current terminal building was built in 1951 and is unable to accomadate growth of current businesses at the airport, or accomdate any new
uses. The study will look at the building, airport entrance, and adjacent parking to plan for future growth and use. A future project targeting
Bipartisan Infrastructure Law dollars dedicated to airport terminal building projects would help fund construction (if awarded).
Budget Impact/Other
Useful LifeProject Name Terminal Building Space Needs Study Category Airport
Type One Phase
MATCH %
GRANTEE FAA
Total Project Cost:$150,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
150,000150,000PLANNING/DESIGN
150,000 150,000Total
Total2023 2024 2025 2026 2027Funding Sources
15,00015,000AIRPORT FUND
135,000135,000FEDERAL GRANTS
150,000 150,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Scott Lyon
2023 2027thru Department FIRE
Description
To ensure an operational fleet of frontline and reserve fire response vehicles
Project #Z4406
Priority Critical (1)
Justification
This revision realigns the CIP with the ICFD's replacement program. The replacement program uses a wear-based scoring algorythm, and by
department policy assumes a life of fifteen years for heavy apparatus. Fire engines serve in frontline capacity for 9 years, and reserve staus for 7
years. The aerial ladder apparatus which is currently scheduled for replacement in FY24 remains in good condition and can be delayed until FY26;
the Fleet Manager and ICFD request the replacement of 3 fire engines in FY24. It should be noted that apparatus manufacturing timelines have
recently been extended to two years from time of specification. Fire engines ordered in FY24 likely will not be received until FY25. While new
market parameters for apparatus purchase are uncertain, the City should prepare for conveying payments across two fiscal years - likely when the
chassis is paid for, and finally when the apparatus is received.
Budget Impact/Other
The operating expenses for the City should decrease due to the replacement of older equipment with newer equipment. The estimated decrease in
operating expenses is less than $10,000.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 16 yearsProject Name Fire Apparatus Replacement Program Category Fire
Type Multi-Phase
MATCH %VARIES
GRANTEE U OF I
Total Project Cost:$7,171,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
4,850,0003,300,000 1,550,000EQUIPMENT
3,300,000 1,550,000 4,850,000Total
Prior
2,321,000
Total
Total2023 2024 2025 2026 2027Funding Sources
3,200,0001,800,000 1,400,000GO BONDS-ESSENTIAL
PURPOSE
1,650,0001,500,000 150,000UNIVERSITY OF IOWA
3,300,000 1,550,000 4,850,000Total
Prior
2,321,000
Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Scott Lyon
2023 2027thru Department FIRE
Description
This project will replace the carpet and tile flooring throughout Fire Station 1.
Project #Z4410
Priority Essential (2)
Justification
The flooring is nearing the end of its useful life and is fade and developing worn/torn spots.
Budget Impact/Other
The impact on the operating budget is negligible.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 15 yearsProject Name Fire Station #1 Carpet/Tile Flooring Replacement Category Fire
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$85,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
5,0005,000PLANNING/DESIGN
66,90066,900CONSTRUCTION
5,0005,000ADMINISTRATION
8,1008,100CONTINGENCY
85,000 85,000Total
Total2023 2024 2025 2026 2027Funding Sources
85,00085,000GO BONDS-GENERAL
PURPOSE
85,000 85,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Scott Lyon
2023 2027thru Department FIRE
Description
The project is to construct a new Fire Station #5 and construct a new replacement Fire Station #3.
Project #Z4411
Priority Essential (2)
Justification
The City is continuing to grow and expand which increases to need to add fire stations and reposition them for the changes in the City coverage
areas in order to meet demand and maintain appropriate response times.
Budget Impact/Other
Fire Station #5 will require new staffing, equipment, and facilities which will require considerable additional annual expenditures. The
replacement of Fire Station #3 will most likely also increase annual operating expenditures even though it may be more efficient, it will require
more costly insurance coverage and operating costs. The estimated increase in annual operating expenditures is $600,000 per year.
Useful Life 40 YearsProject Name Fire Station #5 Construction and #3 Replacement Category Fire
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$10,000,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
500,000500,000PLANNING/DESIGN
9,500,0009,500,000CONSTRUCTION
500,000 9,500,000 10,000,000Total
Total2023 2024 2025 2026 2027Funding Sources
10,000,000500,000 9,500,000FACILITY REPLACEMENT
RESERVE
500,000 9,500,000 10,000,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Scott Lyon
2023 2027thru Department FIRE
Description
Design and replace the 2009 pitched standing seam metal roof above common area living quarters.
Project #Z4412
Priority Essential (2)
Justification
A poorly engineered and installed interlocking metal roof system has been failing for the past several years, allowing significant leaks throughout
the kitchen, living room, and office areas of the fire station. The system consists of hundreds of crimped seams which cannot be patched as part of
a repair project. Recommendation is a weathertight overlay of the existing roof system.
Budget Impact/Other
No impact. The roof replacement is to an existing structure.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 10 yearsProject Name Fire Station #2 Roof Replacement Category Fire
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$110,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
9,0009,000PLANNING/DESIGN
83,00083,000CONSTRUCTION
4,0004,000INSPECTION
6,0006,000ADMINISTRATION
8,0008,000OTHER
110,000 110,000Total
Total2023 2024 2025 2026 2027Funding Sources
110,000110,000GO BONDS-GENERAL
PURPOSE
110,000 110,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Elsworth Carman
2023 2027thru Department LIBRARY
Description
A multi-year project to replace carpeting and some furnishings in large areas of the Library. First floor has 31,000 square feet of carpet and second
floor has 39,000. Project includes updates for carpet, demo and floor prep, moving, GC, insurance, fees, bonds, and contingency. In addition,
some of the original furnishings, including casual seating and gallery furnishings will be replaced. An emphasis on sustainable, durable materials
and flexible space-making will steer this project.
Project #B4343
Priority Essential (2)
Justification
Since the building opened in 2004, more than 9,500,000 people have come through the doors. The Library is a heavily visited public space in the
heart of downtown; ongoing investment in the building is necessary to ensure a safe and attractive space is maintained. While this project falls
under the "Aesthetic Improvement" priority right now, failure to complete this work in a timely manner will result in safety and efficiency issues in
the future, which could lead to more costly unplanned repairs.
Budget Impact/Other
Neutral impact on staffing and maintenance expected. No additional revenue generated.
Useful Life 15 yearsProject Name Carpet and Furnishings Replacement Category Library
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$775,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
775,000375,000 400,000CONSTRUCTION
375,000 400,000 775,000Total
Total2023 2024 2025 2026 2027Funding Sources
775,000375,000 400,000GENERAL FUND
375,000 400,000 775,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Elsworth Carman
2023 2027thru Department LIBRARY
Description
Necessary improvements are required in the Boardroom and Meeting Room E at the Iowa City Public Library. Renovations we wish to complete
include installing a hearing augmentation system, replacing 49 chairs, replacing 2 flat screen monitors, resurfacing the Boardroom table, painting
both rooms, resurfacing cabinets in the Boardroom, and implementing a web conferencing hub in Meeting Room E.
Project #B4347
Priority Essential (2)
Justification
Meeting Room E and the Boardroom are very popular meeting spaces that see regular use. Upgrades mentioned in the project description are
necessary to maintain quality services to our patrons. A hearing augmentation system and technology upgrades would enable us to more equitably
serve our patrons. After nearly 20 years of use, furniture upgrades are required to maintain a clean and safe environment for patrons.
Budget Impact/Other
Useful Life 20 yearsProject Name ICPL Boardroom & Meeting Room E Renovation Category Library
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$55,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
15,00015,000CONSTRUCTION
40,00040,000OTHER
55,000 55,000Total
Total2023 2024 2025 2026 2027Funding Sources
55,00055,000GENERAL FUND
55,000 55,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
This project will include the use of existing plans and new consultant plans for the re-development of the park and trail system. The project will
also include wayfinding, amenity placement, and ADA opportunities within the park.
Project #R4224
Priority Critical (1)
Justification
The project will be something that can develop the park for a long term solution of trails, bridges and ammenities for use by the public.
Budget Impact/Other
This project will improve the current trails and bridges allowing for more efficient maintenance of the park. Project is budget nuetral for the
operating budget.
Useful Life 40 YearsProject Name Hickory Hill Park Ecological Restoration Category Parks Maintenance
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$800,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
200,000200,000CONSTRUCTION
200,000 200,000Total
Prior
600,000
Total
Total2023 2024 2025 2026 2027Funding Sources
200,000200,000OTHER STATE GRANTS
200,000 200,000Total
Prior
600,000
Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Kent Ralston
2023 2027thru Department PARKS & RECREATION
Description
Construction of sidepath extension along Hwy 6 between Broadway Street and Fairmeadows Blvd and along First Avenue from the south side of
Hwy 6 to Lower Muscatine Road.
Project #R4227
Priority Non-essential (5)
Justification
This project is an extension of the Hwy 6 sidepath and is an integral piece of the planned trail network. The project appears in MPOJC documents
as a 'future' sidewalk and also appears in the adopted 2017 Iowa City Bicycle Master Plan. This project also meets the Council's Strategic Plan
goal of 'Enhancing Community Mobility' by substantially improving the sidewalk network. This is the last major segment of missing Hwy 6 trail
and connects to the 2021 CIP funded segment between Heinz and Fairmeadows.
Budget Impact/Other
This project will add 4,800 feet of sidepath to the Parks & Recreation Department snow plowing, mowing, and general maintenance expenses.
Additional operating expenditures are estimated to be approximately than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 40 YearsProject Name Hwy 6 Sidepath - Broadway to Fairmeadows Category Parks Maintenance
Type One Phase
MATCH %VARIES
GRANTEE TRAILS GRANT
Total Project Cost:$1,700,000
TIF DISTRICT None
PLAN Bike Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
200,000200,000PLANNING/DESIGN
1,500,0001,500,000CONSTRUCTION
200,000 1,500,000 1,700,000Total
Total2023 2024 2025 2026 2027Funding Sources
520,000520,000FEDERAL GRANTS
1,180,0001,180,000GO BONDS-ESSENTIAL
PURPOSE
1,700,000 1,700,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Replace City Park Pool with new outdoor swimming pool and bathhouse.
Project #R4229
Priority Efficiency Improvement (3)
Justification
City Park Pool is an Iowa City landmark and tradition. However, due to its advancing age it will need to be replaced with a more modern facility.
Budget Impact/Other
This project will increase annual operating expenditures for insurance and utilities, but will also require lower maintenance and upkeep. The net
increase in operating expenditures is estimated between $15,000 and $25,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 40 YearsProject Name City Park Pool Replacement Category Recreation
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$10,200,000
TIF DISTRICT None
PLAN Recreation Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
500,000500,000PLANNING/DESIGN
9,200,0009,200,000CONSTRUCTION
500,000500,000CONTINGENCY
500,000 9,700,000 10,200,000Total
Total2023 2024 2025 2026 2027Funding Sources
9,500,000500,000 9,000,000FACILITY REPLACEMENT
RESERVE
700,000700,000GO BONDS-GENERAL
PURPOSE
500,000 9,700,000 10,200,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Funding to develop a new neighborhood park in an emerging or underserved location. The City owns several parcels designated for parks and
developments are completed.
Project #R4346
Priority Essential (2)
Justification
The 2017 Park Master plan points to a districts with deficiencies in park land. This project will be designed to develop a new neighborhood park
in a growing or underserved neighborhood as the opportunity becomes available.
Budget Impact/Other
This project will increase operating expenditures due to the addition of new park amenities and finished park land. The estimated increase in
operating expenditures is $20,000 per year.
Useful Life 20 yearsProject Name Palisades or Stone Bridge Park Development Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$525,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
60,00030,000 30,000PLANNING/DESIGN
425,000200,000 225,000CONSTRUCTION
10,0005,000 5,000INSPECTION
10,0005,000 5,000ADMINISTRATION
20,00010,000 10,000CONTINGENCY
250,000 275,000 525,000Total
Total2023 2024 2025 2026 2027Funding Sources
525,000250,000 275,000GENERAL FUND
250,000 275,000 525,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Costs for 2023 RALRC Roof replacement [based on 2009 roof replacement $280,349 add construction cost calculator add design fees,
contingency]; FY24 Mercer Scanlon Roof [based on 2007 roof replacement was $310,170, add construction cost calculator, design fees,
contingency]; FY25 Upper Level RALRC ADA compliant single user public restrooms, ADA compliant offices, door and signage needs. FY26
Renovate RALRC Lower Level Locker Rooms. FUTURE: Renovate Mercer/Scanlon Lobby, R/R and Meeting Rooms. Renovate Mercer/Scanlon
Locker Rooms and RALRC former Racquetball Court and adjacent space
Project #R4351
Priority Critical (1)
Justification
These renovations address necessary roofing replacement from facilities studies and long known ADA access issues and improve use of the
community recreation centers for the public. Request additional $700,000 in 2025. Though Mercer roof is 2007 vs RALRC 2009, having more
moisture and leaking issues with RALRC roof system.
Budget Impact/Other
These updates replace aging structures and will allow for more effective uses of the space. No change is anticipated in revenue, staffing or
maintenance costs.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 25 yearsProject Name Recreation Center Improvements Category Government Buildings
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$2,100,000
TIF DISTRICT None
PLAN Facilities Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
180,00060,000 60,000 60,000PLANNING/DESIGN
1,800,000600,000 600,000 600,000CONSTRUCTION
120,00040,000 40,000 40,000CONTINGENCY
700,000 700,000 700,000 2,100,000Total
Total2023 2024 2025 2026 2027Funding Sources
2,100,000700,000 700,000 700,000GO BONDS-GENERAL
PURPOSE
700,000 700,000 700,000 2,100,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
This project will demolish six picnic shelters and one restroom in Lower City Park and replace these with one large and two small shelters and
restroom facility. The remaining facilities will be in locations outlined in Lower City Park Master Plan.
Project #R4358
Priority Essential (2)
Justification
The shelters and restrooms in Lower City Park are quickly reaching the end of their serviceable life. Some are in areas that are prone to regular
flooding. This project follows recommendations of the 2016 Lower City Park Master Plan and 2017 Park Master Plan while repositioning and
resizing the shelters to meet current and future use patterns.
Budget Impact/Other
No impact on operating budget as these are replacements for current facilities.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Lower City Park Shelters & Restroom Replacement Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$600,000
TIF DISTRICT None
PLAN Lower City Park Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
50,00050,000PLANNING/DESIGN
490,000490,000CONSTRUCTION
10,00010,000INSPECTION
50,00050,000CONTINGENCY
600,000 600,000Total
Total2023 2024 2025 2026 2027Funding Sources
600,000600,000GO BONDS-ESSENTIAL
PURPOSE
600,000 600,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Renovate Nature Play Area, replace shelter, add accessible paths and opportunities for creek access at Kiwanis Park.
Project #R4359
Priority Essential (2)
Justification
Kiwanis playground was installed in 1999. The 2017 Park Master Plan prioritizes renovation of the nature play area, shelter and accessible paths.
Budget Impact/Other
No impact on operating budget as these are replacements for current facilities.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Kiwanis Park Playground & Shelter Renovation Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$350,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
30,00030,000PLANNING/DESIGN
280,000280,000CONSTRUCTION
5,0005,000INSPECTION
5,0005,000ADMINISTRATION
30,00030,000CONTINGENCY
350,000 350,000Total
Total2023 2024 2025 2026 2027Funding Sources
350,000350,000GO BONDS-ESSENTIAL
PURPOSE
350,000 350,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
This project will renovate and enhance fields 5-8 at the Napoleon Park Softball Complex. The project will include the laser grading infields, the
addition of drainage tile, and new outfield turf.
Project #R4362
Priority Efficiency Improvement (3)
Justification
In 2013 we completed this process on fields 1-4 at Napoleon. Fields 5-8 currently have water retention and playbility issues that present
maintenance and play challenges thus limiting their use.
Budget Impact/Other
The operating budget for this facility will remain the same.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 10 yearsProject Name Napoleon Park Softball Fields 5-8 Renovation Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$450,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
50,00050,000PLANNING/DESIGN
380,000380,000CONSTRUCTION
5,0005,000INSPECTION
15,00015,000CONTINGENCY
450,000 450,000Total
Total2023 2024 2025 2026 2027Funding Sources
450,000450,000GO BONDS-GENERAL
PURPOSE
450,000 450,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
In 2023, a Upper City Park master plan will be developed. In 2024, Upper City Park improvements will be constructed which may include
demolition of four picnic shelters and one restroom in Upper City Park and replacement with one large and two small shelters and restroom facility.
Project #R4363
Priority Essential (2)
Justification
The shelters and restrooms in Upper City Park are quickly reaching the end of their serviceable life. This project follows recommendations of the
2017 Park Master Plan while repositioning and resizing the shelters to meet current and future use patterns.
Budget Impact/Other
No impact on operating budget as these are replacements for current facilities.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Upper City Park Improvements Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$600,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
50,00050,000PLANNING/DESIGN
500,000500,000CONSTRUCTION
5,0005,000INSPECTION
5,0005,000ADMINISTRATION
40,00040,000CONTINGENCY
50,000 550,000 600,000Total
Total2023 2024 2025 2026 2027Funding Sources
600,000600,000GO BONDS-ESSENTIAL
PURPOSE
600,000 600,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Replace picnic shelter and restrooms at Conklin Street entrance to Hickory Hill Park. Add replacement of parking lot and driveway. This project
will also include an upgrade to the master plan.
Project #R4365
Priority Essential (2)
Justification
The rest rooms and shelter at this location were noted as poor condition with a number of accessibility concerns in the restrooms by the 2017 Park
Master Plan. The plan recommended replacement of these facilties. This also follows recommendations of the 2016 Hickory Hill Park Master
Plan.
Budget Impact/Other
No impact on operating budget as these are replacements for current facilities.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Hickory Hill Park Conklin St Imp & Master Plan Upd Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$400,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
45,00045,000PLANNING/DESIGN
335,000335,000CONSTRUCTION
20,00020,000CONTINGENCY
400,000 400,000Total
Total2023 2024 2025 2026 2027Funding Sources
400,000400,000GO BONDS-ESSENTIAL
PURPOSE
400,000 400,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Playground replacement at Happy Hollow Park.
Project #R4371
Priority Essential (2)
Justification
The playground is scheduled for replacement in the 2017 Park Master Plan due to age and condition.
Budget Impact/Other
No impact on operating budget as these are replacements for current facilities.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Happy Hollow Playground Replacement Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$200,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
5,0005,000PLANNING/DESIGN
180,000180,000CONSTRUCTION
2,5002,500INSPECTION
2,5002,500ADMINISTRATION
10,00010,000CONTINGENCY
200,000 200,000Total
Total2023 2024 2025 2026 2027Funding Sources
200,000200,000GO BONDS-ESSENTIAL
PURPOSE
200,000 200,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Renovation of skatepark and access paths. Addition of bicycle pump track.
Project #R4372
Priority Essential (2)
Justification
The skatepark is nearing an age where replacement is necessary for it to continue to draw skaters as well as for improved maintenance and safety.
The addition of the pump track will bring even more users to the facility.
Budget Impact/Other
The budget impact of this project is negligible as it replaces outdated infrastructure and adds a minimal amount of new infrastructure.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Terrell Mill Skate Park Redevelopment Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$2,000,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
150,000150,000PLANNING/DESIGN
1,500,0001,500,000CONSTRUCTION
350,000350,000CONTINGENCY
2,000,000 2,000,000Total
Total2023 2024 2025 2026 2027Funding Sources
500,000500,000GENERAL FUND
700,000700,000GO BONDS-GENERAL
PURPOSE
800,000800,000OTHER STATE GRANTS
2,000,000 2,000,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
First phase will implement field playability enhancements, safety improvements, and increased accessibility. The second phase will include new
fence lines, shade structures and complex amenities. This includes the concession area, entrance and plaza area.
Project #R4374
Priority Efficiency Improvement (3)
Justification
Hitchcock Design has been contracted to evaluate the complex for draining, safety and access priorities. Mercer Park Ball Diamond 1 is the
premier large field in our system. It is used primarily by City High for varsity baseball and adult baseball league rentals. The proposed
improvements will improve field drainage, player safety, and accessibility limitations.
Budget Impact/Other
The conversion to synthetic turf would decrease continuing maintenance costs and allow for increased play through a longer season. The effect on
the operating budget would be positive, and is expected to be between $10,000 and $20,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 15 yearsProject Name Mercer Park Ball Diamond Improvements Category Parks Maintenance
Type Multi-Phase
MATCH %VARIES
GRANTEE NONE
Total Project Cost:$1,150,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
55,00055,000PLANNING/DESIGN
910,000910,000CONSTRUCTION
45,00045,000ADMINISTRATION
40,00040,000CONTINGENCY
1,050,000 1,050,000Total
Prior
100,000
Total
Total2023 2024 2025 2026 2027Funding Sources
350,000350,000GENERAL FUND
700,000700,000GO BONDS-GENERAL
PURPOSE
1,050,000 1,050,000Total
Prior
100,000
Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Replace playground and one shelter, and adds additional access paths from street and sidewalk.
Project #R4375
Priority Essential (2)
Justification
Project is prioritized in the 2017 Park Master Plan based on age and condition of current structures.
Budget Impact/Other
No impact on operating budget as these are replacements for current facilities.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Hunter's Run Park Playground & Shelter Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$300,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
25,00025,000PLANNING/DESIGN
250,000250,000CONSTRUCTION
2,5002,500INSPECTION
2,5002,500ADMINISTRATION
20,00020,000CONTINGENCY
300,000 300,000Total
Total2023 2024 2025 2026 2027Funding Sources
300,000300,000GO BONDS-ESSENTIAL
PURPOSE
300,000 300,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
On-going repairs and improvements at Terry Trueblood Lodge, Terry Trueblood concession building, Ashton House Event Facility and Riverside
Festival Stage. 2023 Renovate Riverside Festival Stage. FY24- ADA update to Ashton House remove and replace back stair from upper floor.
Critical repairs needed to Riverside Festival Stage.
Project #R4381
Priority Essential (2)
Justification
These facilities are maintained for city events and private event rentals. Renovations are needed as they buildings age.
Budget Impact/Other
This project should have a minimal impact on the annual operating budget.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Event Facility Improvements Category Government Buildings
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$1,000,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
85,00075,000 10,000PLANNING/DESIGN
835,000700,000 135,000CONSTRUCTION
5,0005,000ADMINISTRATION
25,00020,000 5,000CONTINGENCY
800,000 150,000 950,000Total
Prior
50,000
Total
Total2023 2024 2025 2026 2027Funding Sources
150,000150,000GENERAL FUND
300,000300,000GO BONDS-GENERAL
PURPOSE
500,000500,000OTHER STATE GRANTS
800,000 150,000 950,000Total
Prior
50,000
Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
This project replaces the playground at Benton HIll Park. Site constraints keep this as a smaller piece of equipment.
Project #R4384
Priority Essential (2)
Justification
Playground replacement following Park Master Plan. Playground reaching end of servicable life.
Budget Impact/Other
No impact on operating budget as this replaces current infrastructure.
Useful Life 20 yearsProject Name Benton Hills Playground Replacement Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$135,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
5,0005,000PLANNING/DESIGN
125,000125,000CONSTRUCTION
5,0005,000CONTINGENCY
135,000 135,000Total
Total2023 2024 2025 2026 2027Funding Sources
135,000135,000GENERAL FUND
135,000 135,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
This project replaces the playground at College Green Park.
Project #R4385
Priority Essential (2)
Justification
Playground replacement following Park Master Plan. Playground reaching end of servicable life.
Budget Impact/Other
No impact on operating budget as this replaces current infrastructure.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name College Green Park Playground Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$325,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
25,00025,000PLANNING/DESIGN
260,000260,000CONSTRUCTION
15,00015,000INSPECTION
25,00025,000CONTINGENCY
325,000 325,000Total
Total2023 2024 2025 2026 2027Funding Sources
325,000325,000GO BONDS-ESSENTIAL
PURPOSE
325,000 325,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
The Willow Creek trail spanning 0.8 miles from Benton St to Willow Creek Dr including a spur of the trail connecting to Aber Ave is in need of
replacement.
Project #R4387
Priority Essential (2)
Justification
This trail is crumbling in many locations and will soon be unsafe to use. Patching has occurred as a temporary fix but a complete replacement is
necessary. Project inlcudes a 10-ft wide trail on nearly the same footprint as the existing 0.9 miles of trail.
Budget Impact/Other
This project will slightly lower the operating budget to less maintenance and upkeep from replacing older infrastructure with newer infrastructure.
The estimated annual cost savings is less than $10,000.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Willow Creek Trail Replacement Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$855,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
75,00075,000PLANNING/DESIGN
590,000590,000CONSTRUCTION
25,00025,000INSPECTION
25,00025,000ADMINISTRATION
75,00075,000CONTINGENCY
790,000 790,000Total
Prior
65,000
Total
Total2023 2024 2025 2026 2027Funding Sources
155,000155,000GENERAL FUND
700,000700,000GO BONDS-GENERAL
PURPOSE
855,000 855,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Elevators in City Hall, Senior Center, Robert A. Lee Recreation Center need ADA operating system updates including braille, visible and verbal
signals to indicate which elevator car is available, its direction, and when it has reached a designated floor.
Project #R4388
Priority Critical (1)
Justification
Presently these elevators do not meet the current ADA standards. These recommendations were cited in the 2012 Space Needs Study and Master
Plan and the Facility ADA study.
Budget Impact/Other
This project will lower annual operating expenditures due to the replacement of older equipment with new equipment. The estimated annual
savings is less than $10,000 per year.
Useful Life 10 yearsProject Name ADA Elevator Improvements Category Government Buildings
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$285,000
TIF DISTRICT None
PLAN Facilities Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
60,00060,000PLANNING/DESIGN
225,000225,000CONSTRUCTION
60,000 225,000 285,000Total
Total2023 2024 2025 2026 2027Funding Sources
285,00060,000 225,000GENERAL FUND
60,000 225,000 285,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Replace playground at North Market Square Park. This includes replacing rubber mat surface with engineered wood fiber. Adjacent elementary
school playground has poured in place surfacing.
Project #R4389
Priority Essential (2)
Justification
This replacement follows recommendatation of 2017 Park Master Plan. Playground components are aging and becoming difficult to repair and
replace.
Budget Impact/Other
This replaces existing equipment. No increased expenditures.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name N. Market Square Playground Replacement Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$300,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
20,00020,000PLANNING/DESIGN
250,000250,000CONSTRUCTION
10,00010,000INSPECTION
20,00020,000CONTINGENCY
300,000 300,000Total
Total2023 2024 2025 2026 2027Funding Sources
300,000300,000GO BONDS-ESSENTIAL
PURPOSE
300,000 300,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Replace playground at Reno Street Park. Add ADA compliant paths, park furnishings and fence to community garden.
Project #R4390
Priority Essential (2)
Justification
This replacement follows recommendatation of 2017 Park Master Plan. Playground components are aging and becoming difficult to repair and
replace. This park lacks ADA compiant paths.
Budget Impact/Other
There will be slightly less maintenance costs due to the replacement of older equipment. The expected annual savings is less than $5,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Reno Street Park Renovations Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$240,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
20,00020,000PLANNING/DESIGN
200,000200,000CONSTRUCTION
5,0005,000INSPECTION
15,00015,000CONTINGENCY
240,000 240,000Total
Total2023 2024 2025 2026 2027Funding Sources
240,000240,000GO BONDS-ESSENTIAL
PURPOSE
240,000 240,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Tennis Court renovations - City Park resurface courts, replaces fences, and add hitting practive wall at both ends. Mercer Park resurface courts and
add hitting practive wall. Updated budget amounts reflect replacement of the pickleball courts due to cracking court surface at Mercer Park.
Project #R4391
Priority Non-essential (5)
Justification
The court surfaces, fencing and practice walls are deteriorating and require renovation for continued use. Priority in Recreation Facilities &
Program Master Plan.
Budget Impact/Other
The tennis courts are deteriorating to a point in which they will soon not be suitable for play. This project will not have impact on operating
budget as the courts do not require much on-goin maintenance.
Useful Life 15 yearsProject Name Tennis Court Renovations Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$400,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
15,00015,000PLANNING/DESIGN
375,000375,000CONSTRUCTION
10,00010,000ADMINISTRATION
400,000 400,000Total
Total2023 2024 2025 2026 2027Funding Sources
400,000400,000GENERAL FUND
400,000 400,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Geoff Fruin
2023 2027thru Department PARKS & RECREATION
Description
This project is to acquire property in the future growth and annexation areas west of Highway 218 between Rohret Road and Highway 1.
Project #R4392
Priority Essential (2)
Justification
The future growth area west of Highway 218 includes a 196-acre potential annexation which will require ameneties for parks and recreation to
serve the anticipated population growth.
Budget Impact/Other
The future west park would require additional maintenance such as mowing and natural areas management. It also has the potential to include
other amenities in the future such as park shelters, trails, restroom facilities, pavilions, playgrounds, sport fields, etc. The estimated increase in
annual operating expenditures due to the land acquisition not including future amenities is $50,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 75 yearsProject Name Westside Park Land Acquisition Category Parks Maintenance
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$700,000
TIF DISTRICT None
PLAN Park Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
700,000700,000LAND/ROW ACQUISITION
700,000 700,000Total
Total2023 2024 2025 2026 2027Funding Sources
700,000700,000GO BONDS-GENERAL
PURPOSE
700,000 700,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Paved trail entrance to park from Hickory Trail and connecting to new bridge in Monuments Estates Development.
Project #R4395
Priority Essential (2)
Justification
Trail provides ADA accessibility to playground, shelter and fire ring. It also connects to trail through new development to Rochester.
Budget Impact/Other
Trail will likely be cleared of snow in winter and will take regular park maintenance throughout the year.
Useful Life 20 yearsProject Name Calder Park Connection & Ada Accessible Trl Category Parks Maintenance
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$140,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
10,00010,000PLANNING/DESIGN
110,000110,000CONSTRUCTION
20,00020,000CONTINGENCY
140,000 140,000Total
Total2023 2024 2025 2026 2027Funding Sources
140,000140,000GENERAL FUND
140,000 140,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
This project is to add a boat ramp to access the Iowa River in the northeast corner of Waterworks Park. Improvements include a boat ramp, boat
trailer parking, a boat dock, and an access road.
Project #R4396
Priority Essential (2)
Justification
This project will contribute to the overall Iowa River paddle network and supports a state tourism grant application to establish the Iowa City Area
as the Pedal Paddle Destination of the Midwest. This spot serves as the first publicly accessible access point along the Iowa River south of the boat
access at the Coralville Reservoir dam. The project also connects paddlers to a 200-acre park with 3-miles of paved paths around ponds and
prairies perfect for peddling or walking and the trail system along Dubuque Street and a pedestrian bridge over I-80 and connecting directly into
Iowa City, the riverside location of the planned skate park, bike pump track, and singletrack trail, and the Iowa River Corridor trail network.
Budget Impact/Other
xpected operating expenses is $2,000 pear year based on in-house staff time and materials to conduct basic annual maintenance.
Useful Life 20 yearsProject Name Waterworks Park Boat Ramp Category Parks Maintenance
Type Unassigned
MATCH %
GRANTEE
Total Project Cost:$250,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
250,000250,000CONSTRUCTION
250,000 250,000Total
Total2023 2024 2025 2026 2027Funding Sources
250,000250,000OTHER STATE GRANTS
250,000 250,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Replacement of the 1/4 mile segment of Court Hill Trail from Beech St to Scott Blvd. Current 10 ft wide asphalt trail to be replace with 10 ft wide
concrete trail.
Project #R4397
Priority Essential (2)
Justification
Replacement of the 1/4 mile segment of Court Hill Trail from Beech St to Scott Blvd. Current 10 ft wide asphalt trail to be replace with 10 ft wide
concrete trail.
Budget Impact/Other
Replacement of the asphalt trail with a concrete surface will reduce the amount of ongoing maintenance.
Useful Life 20 yearsProject Name Court Hill Trail Beech to Scott Replacement Category Parks Maintenance
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$200,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
10,00010,000PLANNING/DESIGN
180,000180,000CONSTRUCTION
10,00010,000CONTINGENCY
200,000 200,000Total
Total2023 2024 2025 2026 2027Funding Sources
200,000200,000GENERAL FUND
200,000 200,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
This project will replace and or improve trails, fencing and other amenities at Thornberry and Rita's Ranch Dog Parks. Thornberry will include trail
resurfacing and fencing repairs. Rita's Ranch will include a new loop trail and fencing repairs. Both parks may include other site amenity updates.
Project #R4398
Priority Essential (2)
Justification
The trail surface at Thornberry is reaching the end of it's life and fencing repairs would make gates and existing fences safer and more user friendly.
Rita's Ranch does not currently have interior paths or routes to the shelters. Addition of paths would make the location more accessible and fencing
repairs would improve gate access points. Both locations would also benefit from updates to aging site amenities.
Budget Impact/Other
Updates to proposed elements would reduce repair costs currently needed on a regular basis as features deteriorate.
Useful Life 20 yearsProject Name Thornberry and Rita's Ranch Dog Park Improvements Category Parks Maintenance
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$300,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
10,00010,000PLANNING/DESIGN
280,000280,000CONSTRUCTION
10,00010,000CONTINGENCY
300,000 300,000Total
Total2023 2024 2025 2026 2027Funding Sources
300,000300,000GENERAL FUND
300,000 300,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Improve boat drop facilities at Sturgis Ferry Park. This includes paving, signage, and construction of a shelter.
Project #R4399
Priority Essential (2)
Justification
The project will improve the quality and safety of the current boat ramp at Sturgis Ferry Park. Sturgis Ferry is the only existing river access south
of the Burlington Street Dam between Riverfront Crossings Park and Terry Trueblood Recreation area. Sturgis Ferry river access is a small parcel
created on a former unregulated landfill site that is difficult for first-time visitors to navigate and lacks amenities. Improvements would enhance the
boat drop and seek additional opportunities for bank-edge fishing. This project would also incorporate pedestrian access for future connection to
Iowa City’s existing extensive bike and pedestrian trial network. This project is part of a regional state grant proposal.
Budget Impact/Other
Expected operating expenses is based on in-house staff time and materials to conduct basic annual maintenance. The estimated increase in annual
operating expenses is $2,000.
Useful Life 20 yearsProject Name Sturgis Ferry Boat Drop Improvements Category Parks Maintenance
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$600,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
45,00045,000PLANNING/DESIGN
400,000400,000CONSTRUCTION
40,00040,000INSPECTION
75,00075,000ADMINISTRATION
40,00040,000CONTINGENCY
600,000 600,000Total
Total2023 2024 2025 2026 2027Funding Sources
600,000600,000GENERAL FUND
600,000 600,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Replacement of Shelter #2 at Mercer Park.
Project #R4400
Priority Essential (2)
Justification
This shelter is deteriorating and reaching end of life. Replacement with a shelter of similar size will maintain service levels at this popluar shelter
rental location.
Budget Impact/Other
This is a replacement and little budget impact is expected.
Useful Life 20 yearsProject Name Mercer Shelter Replacement Category Parks Maintenance
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$150,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
5,0005,000PLANNING/DESIGN
135,000135,000CONSTRUCTION
10,00010,000CONTINGENCY
150,000 150,000Total
Total2023 2024 2025 2026 2027Funding Sources
150,000150,000GENERAL FUND
150,000 150,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Juli Seydell-Johnson
2023 2027thru Department PARKS & RECREATION
Description
Construction of 50'x60' pole building with concrete floor for Parks equipment storage. Location is planned for south end of the soccer park.
Project #R4401
Priority Essential (2)
Justification
Equipment storage, especially in winter, is maxed out at current facilities and our fleet is expanding as our acreage of parks increases. This storage
facility would consolidate storage and increse efficiency of operations. Current storage at the old Mercer Park pool building that has limited
functionality could be eliminated with addition of this new facility. Our historic use of winter storage at the County Fairgrounds has been
eliminated by the fair board operations further constraining storage during critical months when equipment needs protection.
Budget Impact/Other
While the buliding will require upkeep and maintenance the cost are expected to be offset by increases in efficiency and longevity of equipment
stored out of the elements.
Useful Life 50 yearsProject Name Parks Storage Building Category Parks Maintenance
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$225,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
10,00010,000PLANNING/DESIGN
200,000200,000CONSTRUCTION
15,00015,000CONTINGENCY
225,000 225,000Total
Total2023 2024 2025 2026 2027Funding Sources
225,000225,000GENERAL FUND
225,000 225,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Joe Welter
2023 2027thru Department PARKS & RECREATION
Description
This project will construction a new lake west of Highway 218, south of Rohret Road.
Project #R4403
Priority Essential (2)
Justification
This park is part of the Southwest District Development Plan.
Budget Impact/Other
There will be regular maintenance of the lake, landscaping, shelter, and sidewalks/trails. The estimated increase in annual operating expenditures
is less than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful LifeProject Name Carson Lake Park Category Parks Maintenance
Type Unassigned
MATCH %
GRANTEE
Total Project Cost:$1,900,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
400,000200,000 200,000PLANNING/DESIGN
1,000,0001,000,000CONSTRUCTION
100,000100,000INSPECTION
100,00050,000 50,000ADMINISTRATION
300,000300,000CONTINGENCY
200,000 250,000 1,450,000 1,900,000Total
Total2023 2024 2025 2026 2027Funding Sources
1,900,0001,900,000GO BONDS-ESSENTIAL
PURPOSE
1,900,000 1,900,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Kent Ralston
2023 2027thru Department PARKS & RECREATION
Description
Construction of a 10' trail extension east of the Iowa River between Park Road and the University of Iowa pedestrian bridge.
Project #R4404
Priority Efficiency Improvement (3)
Justification
This project is an extension of the Iowa River Corridor Trail and is an integral piece of the trail network. The project does not appear in the
adopted 2017 Iowa City Bicycle Master Plan due to past property acquisition issues. The project is shown in the University's Master Plan for the
riverfront and meets the Council's Strategic Plan goal of 'Enhancing Community Mobility' by substantially improving the trail network. The
connection to Dubuque Street was constructed as part of the Gateway Project.
Budget Impact/Other
This project will add an additional 1,275 feet of trail (approximate) to the Parks & Recreation Department snow plowing, mowing, and general
maintenance expenses.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 40 YearsProject Name Iowa River Corridor Trail - Gateway Segment Category Parks Maintenance
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$700,000
TIF DISTRICT
PLAN Transportation Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
100,000100,000PLANNING/DESIGN
24,57424,574LAND/ROW ACQUISITION
433,031433,031CONSTRUCTION
43,05043,050ADMINISTRATION
99,34599,345CONTINGENCY
100,000 600,000 700,000Total
Total2023 2024 2025 2026 2027Funding Sources
700,000700,000GO BONDS-ESSENTIAL
PURPOSE
700,000 700,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Denise Brotherton
2023 2027thru Department POLICE
Description
This project provides a natural gas generator at the Animal Shelter which would be able to provide a safe and comfortable environment for
the animals during any kind of power outage.
Project #Y4447
Priority Essential (2)
Justification
Currently the Animal Center loses the ability to provide heat or cooling during any kind of power outage. The Animal Center was built to be
climate controlled which does not allow us to have any possibility to open any of the windows. Some rooms with animals have no ability to
have access to outside air. Extended periods of time exposed to extreme heat or cold has the potential to cause physical distress and/or death to
an animal.
Budget Impact/Other
This project would increase the operating budget due to maintenance and inspection costs of the generator. The estimated annual increase in
operating expenditures is less than $5,000.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 25 yearsProject Name Animal Shelter Standby Generator Category Police
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$110,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
10,00010,000PLANNING/DESIGN
100,000100,000CONSTRUCTION
110,000 110,000Total
Total2023 2024 2025 2026 2027Funding Sources
110,000110,000GO BONDS-GENERAL
PURPOSE
110,000 110,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jen Jordan
2023 2027thru Department PUBLIC WORKS
Description
The project consists of creating a Landfill Master Plan in 2021 and 2022, and the design and replacement of the landfill equipment storage
buildings, currently known as buildings A and B, in 2022 and 2023. The Master Plan component will determine where on the site the new building
will be constructed in addition to assessing overall traffic flow, potential compost facility changes and potential future methane use infrastructure
locations.
Project #L3328
Priority Essential (2)
Justification
These buildings are in poor condition and can not currently fit our equipment in them. This leaves our equipment exposed to the elements causing
unneccessary wear and excessive downtime.
Budget Impact/Other
The new building will be more energy efficient, allow for better equipment maintenance and accommodate storing landfill equipment indoors.
Potential grant funding.
Useful Life 30 YearsProject Name Landfill Equipment Building Replacement Category Landfill
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$3,750,000
TIF DISTRICT None
PLAN Facilities Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
500,000500,000PLANNING/DESIGN
3,000,0003,000,000CONSTRUCTION
500,000 3,000,000 3,500,000Total
Prior
250,000
Total
Total2023 2024 2025 2026 2027Funding Sources
3,500,0003,500,000LANDFILL FUND
3,500,000 3,500,000Total
Prior
250,000
Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jen Jordan
2023 2027thru Department PUBLIC WORKS
Description
The landfill six-acre compost pad will be backfilled in multiple areas to fill large pits. An asphalt layer will be added to cover the rock and a seal
coat will be applied to prevent liquids from seeping. A seal coat will be added to cover the raw millings on the eastern half of the pad that has not
been sealed in the past.
Project #L3333
Priority Essential (2)
Justification
The landfill six-acre compost pad and wood processing pad is in need of significant repair. Deferred maintenance over many years has resulted in
the need for repair to ensure customer safety and regulatory compliance. The pad must meet the Iowa Department of Natural Resources'
requirements for impermeability and for stormwater control.
Budget Impact/Other
An improved surface will reduce equipment repair costs and reduce customer safety issues/potential liability claims. The estimated annual savings
is less than $10,000 per year.
Useful Life 20 yearsProject Name Compost Pad Improvements Category Landfill
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$350,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
350,000350,000PLANNING/DESIGN
350,000 350,000Total
Total2023 2024 2025 2026 2027Funding Sources
350,000350,000LANDFILL FUND
350,000 350,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jen Jordan
2023 2027thru Department PUBLIC WORKS
Description
This project includes the design and installation of an expansion of the Landfill Dual Extraction System, which was originally constructed in 2018.
This project will expand the current system (13 pnuematic pumps and 4 solar pumps) to include pumps in 8-9 additional wells and add SCADA
monitoring to the proposed new and existing pumps. This revision pushes the project two years into the future.
Project #L3335
Priority Efficiency Improvement (3)
Justification
The expansion will continue to improve landfill gas extraction as well as limit potential efffects of landfill gas, leachate migration, and odor, and
positively impact groundwater. Adding SCADA greatly improves monitoring capabilities and efficiencies for landfill staff.
Budget Impact/Other
Adding SCADA monitoring to the new and existing pumps will increase staff efficiency by allowing central monitoring.
Useful Life 30 YearsProject Name Landfill Dual Extraction System Expansion Category Landfill
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$600,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
55,00055,000PLANNING/DESIGN
485,000485,000CONSTRUCTION
10,0005,000 5,000ADMINISTRATION
50,00050,000CONTINGENCY
60,000 540,000 600,000Total
Total2023 2024 2025 2026 2027Funding Sources
600,00060,000 540,000LANDFILL FUND
60,000 540,000 600,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jen Jordan
2023 2027thru Department PUBLIC WORKS
Description
This project includes the preliminary design and studies, detailed design, construction, construction observation, and regulatory compliance
associated with implementing the next landfill cell.
Project #L3338
Priority Critical (1)
Justification
The current rate of landfilling and compaction allows for approximately 2-3 years in the current cell, Cell FY18. New cells take 2-3 years to
design, construct, permit, and complete the initial landfilling. The cost increases in construction and contingency reflect the estimates provided by
our engeineering consultatnt, SCS.
Budget Impact/Other
Expediting this project will reduce rock purchases, because operations will allow for using existing interior roads and rainy day pads instead of
building new. The annual estimated reduction of expenditures is $25,000 per year.
Useful Life 10 yearsProject Name Future Landfill Cell Category Landfill
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$5,170,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
100,000100,000PLANNING/DESIGN
4,300,0004,300,000CONSTRUCTION
25,00025,000ADMINISTRATION
430,000430,000CONTINGENCY
4,855,000 4,855,000Total
Prior
315,000
Total
Total2023 2024 2025 2026 2027Funding Sources
4,855,0004,855,000LANDFILL REPLACEMENT
RESERVE
4,855,000 4,855,000Total
Prior
315,000
Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jen Jordan
2023 2027thru Department PUBLIC WORKS
Description
This machine would be used to more efficiently turn compost windrows.
Project #L3347
Priority Efficiency Improvement (3)
Justification
Compost is currently turned by an endloader, which takes approximately 40 hours per month. A turner would reduce this by about half; staff
would have time to turn the piles more frequently. Increased turning reduces processing time, allowing more material to be processed in the same
amount of time or less. This results in increased diversion from the landfill and the additional compost would yield additional revenue.
Budget Impact/Other
Quicker processing would allow for more material to be processes, resulting in additional compost for sale. Assuming a 25% increase would result
in approximately $10,000 additional revenue per year. Grant assistance is feasible for this purchase.
Useful Life 10 yearsProject Name Compost Turner Category Landfill
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$300,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
300,000300,000OTHER
300,000 300,000Total
Total2023 2024 2025 2026 2027Funding Sources
250,000250,000LANDFILL FUND
50,00050,000OTHER STATE GRANTS
300,000 300,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jen Jordan
2023 2027thru Department PUBLIC WORKS
Description
Site traffic flow improvements include a second scale, electrical connectivity to the scale, additional software, improved wayfinding signage,
improvements to concrete near the scale, and the relocation of the oil shed for increased efficiency in traffic flow.
Project #L3348
Priority Efficiency Improvement (3)
Justification
The current site configuration was designed and constructed in the early 2000s; traffic flow across the scale has increased by 52% in that time.
Customers often have to wait for service, and occasionally have signficant delays. A second scale would handle commercial customers separately
and reduce idling times for all customers, which could result in reduced greenhouse gas emissions.
Budget Impact/Other
Grant assistance is likely for this purchase based on greenhouse gas reductions from reduced idling.
Useful Life 25 yearsProject Name Site Flow Improvements Category Landfill
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$370,750
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
27,75027,750PLANNING/DESIGN
277,500277,500CONSTRUCTION
27,75027,750INSPECTION
10,00010,000ADMINISTRATION
27,75027,750CONTINGENCY
27,750 343,000 370,750Total
Total2023 2024 2025 2026 2027Funding Sources
370,75027,750 343,000LANDFILL FUND
27,750 343,000 370,750Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Ben Clark
2023 2027thru Department PUBLIC WORKS
Description
This project will modify the top of the vault and hatches in order to accommodate ADA compliant sidewalks. It will also include replacement of
the trash rack screen and other associated pump station components.
Project #M3634
Priority Essential (2)
Justification
The location of the vault and hatches creates a maintenance issue and prohibits the installation of ADA compliant sidewalks. This pump station
was installed 36 years ago and some of the components are in need of replacement.
Budget Impact/Other
There is no anticipated impact to the operating budget.
Useful Life 50 yearsProject Name Rundell Street Pump Station Vault Modifications Category Stormwater
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$450,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
40,00040,000PLANNING/DESIGN
350,000350,000CONSTRUCTION
25,00025,000INSPECTION
10,00010,000ADMINISTRATION
25,00025,000CONTINGENCY
50,000 400,000 450,000Total
Total2023 2024 2025 2026 2027Funding Sources
450,00050,000 400,000STORMWATER FUND
50,000 400,000 450,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Ben Clark
2023 2027thru Department PUBLIC WORKS
Description
This project will install storm sewer pipe in an open ditch along the west side of River Street, north of the lower Lincoln School parking lot. A
five-foot-wide compliant sidewalk will replace the existing walk.
Project #M3635
Priority Essential (2)
Justification
The existing open channel storm water drainage ditch is deteriorating and is susceptible to blockage from debris. Utility services have been
exposed to the surface due to erosion along the bottom of the ditch. Further erosion will potentially impact the sidewalk and street. A compliant
sidewalk will facilitate pedestrian traffic to the school.
Budget Impact/Other
There is no anticipated impact to operating budget.
Useful Life 50 yearsProject Name River Street Storm Sewer Improvements Category Stormwater
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$990,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
90,00090,000PLANNING/DESIGN
50,00050,000LAND/ROW ACQUISITION
700,000700,000CONSTRUCTION
60,00060,000INSPECTION
30,00030,000ADMINISTRATION
60,00060,000CONTINGENCY
140,000 850,000 990,000Total
Total2023 2024 2025 2026 2027Funding Sources
990,000140,000 850,000STORMWATER FUND
140,000 850,000 990,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Ben Clark
2023 2027thru Department PUBLIC WORKS
Description
This project will replace approximately 430 linear feet of corrugated metal pipe with reinforced concrete pipe.
Project #M3637
Priority Critical (1)
Justification
The existing storm sewer was constructed approximately 40 years ago using corrugated metal pipe that is now severely corroded and past the end
of its useful life.
Budget Impact/Other
Impact to operating budget is expected to be less than $10,000 annually.
Useful Life 50 yearsProject Name Peterson Street Storm Sewer Improvments Category Stormwater
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$450,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
50,00050,000PLANNING/DESIGN
350,000350,000CONSTRUCTION
10,00010,000INSPECTION
5,0005,000ADMINISTRATION
35,00035,000CONTINGENCY
450,000 450,000Total
Total2023 2024 2025 2026 2027Funding Sources
450,000450,000STORMWATER FUND
450,000 450,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Ben Clark
2023 2027thru Department PUBLIC WORKS
Description
Locate with survey grade accuracy all storm sewers, manholes and intakes and deliver in a geographic information system geographic network with
associated metadata for asset management functions.
Project #M3638
Priority Efficiency Improvement (3)
Justification
Asset management requires an accurate asset inventory to reliably know the number, location and information regarding assets. Updated
and accurate mapping is also a requirement of the City's National Pollution Discharge Elimination System (NPDES) Permit .
Budget Impact/Other
This project will have a negligible impact on the operating budget.
Useful Life 10 yearsProject Name Storm Sewer Asset Inventory Category Stormwater
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$400,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
400,000400,000OTHER
400,000 400,000Total
Total2023 2024 2025 2026 2027Funding Sources
400,000400,000STORMWATER FUND
400,000 400,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Ron Knoche
2023 2027thru Department PUBLIC WORKS
Description
Construct a new Equipment Maintenance Facility on the public works campus to replace the old and dated facility at the corner of Highways 1 & 6.
Project #P3953
Priority Essential (2)
Justification
The current Equipment Maintenance Facility is outdated, inefficient, and a poor working environment for the employees.
Budget Impact/Other
A new facility will be more energy efficient which will save costs on utilities; however, a newer facility will add square footage and increase
insurance, cleaning, and similar expenses. The estimated annual increase in operating expenditures is $50,000 to $100,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 40 YearsProject Name Equipment Maintenance Facility replacement Category Equipment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$13,000,000
TIF DISTRICT None
PLAN Facilities Master Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
1,000,0001,000,000PLANNING/DESIGN
12,000,00012,000,000CONSTRUCTION
1,000,000 12,000,000 13,000,000Total
Total2023 2024 2025 2026 2027Funding Sources
8,500,0001,000,000 7,500,000EQUIPMENT FUND
1,000,0001,000,000FACILITY REPLACEMENT
RESERVE
700,000700,000GO BONDS-GENERAL
PURPOSE
500,000500,000LANDFILL FUND
250,000250,000REFUSE COLLECTION FUND
250,000250,000STORMWATER FUND
1,000,0001,000,000WASTEWATER FUND
800,000800,000WATER FUND
1,000,000 12,000,000 13,000,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Ron Knoche
2023 2027thru Department PUBLIC WORKS
Description
This project improves the landscaping at the City entrance ways on North Dubuque Street and North Dodge Street including entrance signage on
North Dubuque.
Project #P3988
Priority Aesthetic Improvement (4)
Justification
The entrance ways to the city provide an important impression of the community to visitors. North Dubuque Street and North Dodge Street are
primary entrances to the City off Highway 80 and serve as the front doors to the city.
Budget Impact/Other
This project will slightly increase the annual operating expenditures due to the additional maintenance required on the landscaping and signage.
The estimated increase in operating expenditures is less than $10,000 per year.
Useful Life 20 yearsProject Name Entrance Way Improvements Category Public Works Administration
Type One Phase
MATCH %VARIES
GRANTEE U OF I
Total Project Cost:$650,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
650,000650,000CONSTRUCTION
650,000 650,000Total
Total2023 2024 2025 2026 2027Funding Sources
550,000550,000GENERAL FUND
100,000100,000UNIVERSITY OF IOWA
650,000 650,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Scott Sovers
2023 2027thru Department PUBLIC WORKS
Description
This project will install plantings within the American Legion Road and Scott Boulevard and the First Avenue and Scott Boulevard roundabouts as
well street trees along American Legion Road from Scott Boulevard to Taft Avenue.
Project #P3989
Priority Non-essential (5)
Justification
This project will install street trees and roundabout plantings that were considered during project designs. Landscaping was not included due to the
desire to have it be a separate project, which typically leads to more successful life expectancy of trees and plants.
Budget Impact/Other
The impact to the operating budget is difficult to determine. It is estimated to be less than $5,000.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name American Legion Rd/First Ave Landscaping Project Category Public Works Administration
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$400,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
45,00045,000PLANNING/DESIGN
255,000255,000CONSTRUCTION
25,00025,000INSPECTION
25,00025,000ADMINISTRATION
50,00050,000CONTINGENCY
400,000 400,000Total
Total2023 2024 2025 2026 2027Funding Sources
400,000400,000GO BONDS-ESSENTIAL
PURPOSE
400,000 400,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Geoff Fruin
2023 2027thru Department PUBLIC WORKS
Description
This project is part of the downtown streetscape master plan. This project reconstructs Dubuque Street from Washington to Iowa Avenue. The
project also improves sidewalk pavement, addresses critical utility updates, and enhances the retail environment with streetscape components.
Project also includes alley improvements, lighting, and wayfinding.
Project #S3939
Priority Critical (1)
Justification
Dubuque Street is an important link in Downtown as is often the entry way for visitors into the area. The project will narrow the road creating a
more pedestrian friendly environment and allowing for enhanced retail areas.
Budget Impact/Other
This project should reduce operating expenditures due to the replacement of infrastructure in poor condition. The anticipated annual savings is less
than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name Dubuque Street Reconstruction Category Street Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$3,800,000
TIF DISTRICT City-University
PLAN Downtown Streetscape Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
2,900,0002,900,000CONSTRUCTION
200,000200,000INSPECTION
400,000400,000CONTINGENCY
3,500,000 3,500,000Total
Prior
300,000
Total
Total2023 2024 2025 2026 2027Funding Sources
3,800,0003,800,000GO BONDS-ESSENTIAL
PURPOSE
3,800,000 3,800,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Scott Sovers
2023 2027thru Department PUBLIC WORKS
Description
This project will reconstruct Court Street from Muscatine Avenue to 1st Avenue.
Project #S3946
Priority Essential (2)
Justification
Court Street is an important collector street that connects the east side of Iowa City to the Downtown area. The project will replace aging street
and sidewalk pavement that is in poor condition and upgrade public utilities as needed.
Budget Impact/Other
Replacing aged infrastructure will lower the City's operating expenditures through decreased maintenance costs. The estimated decrease in
operating expenses is less than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name Court Street Reconstruction Category Street Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$9,000,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
100,000100,000PLANNING/DESIGN
6,200,0006,200,000CONSTRUCTION
200,000200,000INSPECTION
150,000150,000ADMINISTRATION
300,000300,000CONTINGENCY
1,000,0001,000,000OTHER
1,100,000 6,850,000 7,950,000Total
Prior
1,050,000
Total
Total2023 2024 2025 2026 2027Funding Sources
8,100,0008,100,000GO BONDS-ESSENTIAL
PURPOSE
8,100,000 8,100,000Total
Prior
900,000
Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jason Havel
2023 2027thru Department PUBLIC WORKS
Description
This project will study the south Hwy 1/Hwy 6 intersection and adjacent City owned properties and provide a functional design for the preferred
future improvements.
Project #S3951
Priority Essential (2)
Justification
This area is likely to redevelop in the future, and it is important to have an understanding of the anticipated roadway improvments/needs when
considering possible changes to the surrounding area. This project will also provide a plan for future trail connections and other associated
improvements.
Budget Impact/Other
The proposed study and functional design is not expected to have any operating budget impacts.
Useful Life 50 yearsProject Name Hwy 1/Hwy 6 Intersection Improvements Study Category Street Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$150,000
TIF DISTRICT Riverside Drive
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
150,000150,000PLANNING/DESIGN
150,000 150,000Total
Total2023 2024 2025 2026 2027Funding Sources
150,000150,000ROAD USE TAX FUND
150,000 150,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jason Havel
2023 2027thru Department PUBLIC WORKS
Description
Reconstruction of Dodge Street from Governor Street to Burlington Street. This will be a joint project with the DOT, and will include new street
pavement, sidewalk, utility improvements and other associated work.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Project #S3952
Priority Essential (2)
Justification
This section of Dodge Street is in poor condition and requires significant ongoing maintenance.
Budget Impact/Other
Replacing aged infrastructure will lower the City's operating expenditures through decreased maintenance costs. The estimated decrease in
operating expenses is less than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name Dodge Street Reconstruct - Governor to Burlington Category Street Operations
Type One Phase
MATCH %35%
GRANTEE IDOT
Total Project Cost:$19,767,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
158,000158,000PLANNING/DESIGN
150,000150,000LAND/ROW ACQUISITION
13,950,00013,950,000CONSTRUCTION
400,000400,000INSPECTION
400,000400,000ADMINISTRATION
3,342,0003,342,000CONTINGENCY
158,000 18,242,000 18,400,000Total
Prior
1,367,000
Total
Total2023 2024 2025 2026 2027Funding Sources
3,750,0003,750,000FEDERAL GRANTS
5,500,0005,500,000GO BONDS-ESSENTIAL
PURPOSE
9,400,0009,400,000OTHER STATE GRANTS
18,650,000 18,650,000Total
Prior
1,117,000
Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jason Havel
2023 2027thru Department PUBLIC WORKS
Description
Conversion of Market Street and Jefferson Street from one-way to two-way corridors. The project cost includes new traffic signals, pavement
markings and signage necessary to implement the conversion. The conversion is intended to generally take place betweenn Madison Street and the
eastern termini of the one-way streets - exact limits subject to further evaluation.This project will also add electrical outlets to each of the
pedestrian level light poles on Linn Street from Jefferson Street to Bloomington Street.
Project #S3953
Priority Essential (2)
Justification
The feasibility of the project was initially evaluated as a part of the Downtown Iowa City Traffic Modeling Study completed in 2015.
Budget Impact/Other
Operating budget impacts are assumed to be negliable as the corridors already exist and require rountine maintneance activities. The conversion
will only change how the facilities are used by the traveling public.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 30 YearsProject Name Market St & Jefferson St Two-Way Conversion Category Street Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$5,000,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
400,000400,000PLANNING/DESIGN
25,00025,000LAND/ROW ACQUISITION
3,825,0003,825,000CONSTRUCTION
100,000100,000INSPECTION
100,000100,000ADMINISTRATION
550,000550,000CONTINGENCY
425,000 4,575,000 5,000,000Total
Total2023 2024 2025 2026 2027Funding Sources
5,000,0005,000,000GO BONDS-ESSENTIAL
PURPOSE
5,000,000 5,000,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Melissa Clow
2023 2027thru Department PUBLIC WORKS
Description
Reconstruction of N. Gilbert Street from the construction limits of the Gateway project just south of Kimball Road to and including the intersection
with Brown Street. Improvements to inlcude new sanitary sewer, adjustment and replacement of minor sections of water main and fire hydrants,
new stormsewer extensions, PCC roadway paving on the main corridor of N Gilbert Street, reconstruction of the brick Brown Street and N Gilbert
Street intersection, sidewalks on both sides of the street, and private utility undergrounding.
Project #S3955
Priority Essential (2)
Justification
Gilbert Street requires full reconstruction at this time. There are no storm sewers between Brown Street and the new intakes installed with the
Gateway project. Sidewalks are located only at the top of the hill, near Brown Street and residents have requested that pedestrian connectivity be
provided to them with the roadway improvements.
Budget Impact/Other
Replacing aged infrastructure will lower the City's operating expenditures through decreased maintenance costs. The estimated decrease in
operating expenses is less than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name N. Gilbert Street Reconstruction Category Street Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$2,500,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
65,00065,000PLANNING/DESIGN
1,885,000200,000 1,685,000CONSTRUCTION
100,000100,000INSPECTION
100,000100,000ADMINISTRATION
150,000150,000CONTINGENCY
265,000 2,035,000 2,300,000Total
Prior
200,000
Total
Total2023 2024 2025 2026 2027Funding Sources
2,500,0002,500,000GO BONDS-ESSENTIAL
PURPOSE
2,500,000 2,500,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Melissa Clow
2023 2027thru Department PUBLIC WORKS
Description
This project will replace the existing Gilbert Street Bridge over Ralston Creek. In addition, the project will include removal and replacement of
slope protection, sidewalk, storm sewer, water main, roadway paving and other related work.
Project #S3956
Priority Critical (1)
Justification
The Biennial Bridge Inspection Program identified advanced deterioration of the bridge deck and superstructure on the existing Gilbert Street
Bridge. The Program recommended that the bridge be scheduled for significant repair or replacement.
Budget Impact/Other
Replacing aged infrastructure will lower the City's ongoing expenditures through decreased maintenance costs. The estimated decrease in
operating expenses is less than $10,000 / year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name Gilbert Street Bridge Replacement Category Street Operations
Type One Phase
MATCH %60%
GRANTEE IDOT
Total Project Cost:$4,375,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
85,00085,000PLANNING/DESIGN
260,000260,000LAND/ROW ACQUISITION
3,022,0003,022,000CONSTRUCTION
150,000150,000INSPECTION
100,000100,000ADMINISTRATION
300,000300,000CONTINGENCY
283,000283,000OTHER
4,200,000 4,200,000Total
Prior
175,000
Total
Total2023 2024 2025 2026 2027Funding Sources
1,000,0001,000,000FEDERAL GRANTS
3,175,0003,175,000GO BONDS-ESSENTIAL
PURPOSE
200,000200,000REIMBURSEMENT OF
EXPENSES
4,375,000 4,375,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jason Havel
2023 2027thru Department PUBLIC WORKS
Description
Reconstruction of Taft Avenue from American Legion Road to Lower West Branch. Design of this project would begin in 2022 with construction
to begin in 2025.
Project #S3959
Priority Essential (2)
Justification
The properties west of Taft Avenue between Lower West Branch Road and American Legion Road are now fully developed. With the construction
of the new Hoover School and the upcoming American Legion Road and Scott Boulevard trunk sewer extension projects, the area will likely
experience growth in the next five to ten years necessitating improvements to Taft Avenue.
Budget Impact/Other
This project will add infrastructure into the City which will incrementally increase the City's operating costs. The estimated increase in operating
expenditures is less than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name Taft Avenue Reconstruct - Am Legion to Lwr West Br Category Street Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$13,200,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
1,000,0001,000,000PLANNING/DESIGN
350,000350,000LAND/ROW ACQUISITION
9,750,0009,750,000CONSTRUCTION
300,000300,000INSPECTION
300,000300,000ADMINISTRATION
1,500,0001,500,000CONTINGENCY
1,000,000 12,200,000 13,200,000Total
Total2023 2024 2025 2026 2027Funding Sources
3,500,0003,500,000FEDERAL GRANTS
9,700,0009,700,000GO BONDS-ESSENTIAL
PURPOSE
13,200,000 13,200,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Kent Ralston
2023 2027thru Department PUBLIC WORKS
Description
Obtain consultant services to perform an alignment study for the Oakdale Boulevard extension east of Highway 1.
Project #S3960
Priority Essential (2)
Justification
This project will conduct an aligment study for the Oakdale Boulevard extension east of Highway 1. The existing alignment study was completed
in 2003 and changes in land use, ownership and travel patterns nessesitate revisting the appropriate alignment for the road extension. This project
also meets the Council's Strategic Plan goal of 'Investing in Public Infrastructure' by initiating a planning effort to prepare for future expansion of a
critical public facility.
Budget Impact/Other
This project will not have an impact on the operating budget.
Useful Life 10 yearsProject Name Oakdale Blvd Extension - Alignment Study Category Street Operations
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$100,000
TIF DISTRICT Northgate Corporate Park
PLAN Transportation Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
100,000100,000PLANNING/DESIGN
100,000 100,000Total
Total2023 2024 2025 2026 2027Funding Sources
100,000100,000ROAD USE TAX FUND
100,000 100,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jason Havel
2023 2027thru Department PUBLIC WORKS
Description
This project will replace both the eastbound and westbound Burlington Street bridges with one new bridge over the Iowa River. In addition, the
project will include repair or replacement of the existing pedestrian overpass at Riverside Drive, realignment of Grand Avenue west of Riverside
Drive, reconstruction of portions of Grand Avenue, Byington Road and Melrose Avenue, and investigation of the feasibililty of eliminating the
existing dam. This project will be a joint project with the DOT.
Project #S3963
Priority Critical (1)
Justification
The 2019 and 2021 biennial bridge inspection programs identified advanced detorioration of the sub and super structures on the Burlington Street
Bridges. The programs recommended the bridge to be scheduled for replacement.
Budget Impact/Other
Operating expenses are expected to be minimal or decrease, as this will be replacing aged infrastructure that has reached the end of its useful life.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name Burlington Street Bridge Replacement Category Street Operations
Type One Phase
MATCH %VARIES
GRANTEE STP
Total Project Cost:$30,150,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
3,200,000300,000 750,000 2,150,000PLANNING/DESIGN
5,675,0005,675,000CONSTRUCTION
200,00025,000 25,000 50,000 50,000 50,000ADMINISTRATION
250,000250,000CONTINGENCY
25,000 325,000 800,000 2,450,000 5,725,000 9,325,000Total
Future
20,825,000
Total
Total2023 2024 2025 2026 2027Funding Sources
300,000300,000FEDERAL GRANTS
9,025,0009,025,000GO BONDS-ESSENTIAL
PURPOSE
300,000 9,025,000 9,325,000Total
Future
20,825,000
Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Melissa Clow
2023 2027thru Department PUBLIC WORKS
Description
This project will provide repairs to the existing pedestrain overpass, including removal of loose and delaminated material and the application of a
corrosive inhibiting coating to protect the exposed areas and match the appearance of the surrounding concrete. New light fixtures, expansion
jointing, walkway surfacing and handrails will be provided. The walkway to the Iowa Avenue Pedestrian underpass will be reconstructed to meet
current ADA requirements.
Project #S3978
Priority Critical (1)
Justification
A condition assessment of the Pedestrian Bridge was completed in the Spring of 2021 and a rehabilitation project was recommended. Widespread
areas of deterioration exist along the outside edges of the carousel deck and bridge deck. Expansion joints are not functioning well, there are
exposed electric wires at the light pole blisters, and areas of the railing are damaged. Loose material causing immediate concern was removed in
cooperation with the Iowa DOT.
Budget Impact/Other
This project will reduce the maintenance costs through the rehabilitation of an older structure. This project is expected to extend the life of the
pedestrian bridge from 10 to 30 years. The annual savings is less than $10,000 / year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 10 yearsProject Name Riverside Dr. Pedestrian Bridge at Iowa Ave Rehab Category Street Operations
Type One Phase
MATCH %25%
GRANTEE IDOT
Total Project Cost:$1,910,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
100,000100,000PLANNING/DESIGN
1,440,0001,440,000CONSTRUCTION
30,00030,000INSPECTION
65,00010,000 55,000ADMINISTRATION
50,00050,000CONTINGENCY
110,000 1,575,000 1,685,000Total
Prior
225,000
Total
Total2023 2024 2025 2026 2027Funding Sources
635,000635,000GO BONDS-ESSENTIAL
PURPOSE
850,000850,000OTHER STATE GRANTS
425,000425,000UNIVERSITY OF IOWA
1,910,000 1,910,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Kent Ralston
2023 2027thru Department PUBLIC WORKS
Description
This project will obtain consulting services to provide a functional design for the reconstruction of Kitty Lee Road between Highway 1 and its
northern terminus - including the Hwy 1 intersection.
Project #S3980
Priority Essential (2)
Justification
This project is necessary to provide an adequate secondary access for the future Carson Farms development currently in the planning phase. The
design will be for approximately 3,500 feet of roadway and intersection improvments necessary at the intersection of Kitty Lee Road / Hwy 1.
Budget Impact/Other
No impact as this project is for design only.
Useful LifeProject Name Kittly Lee Road SW - Functional Design Category Street Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$100,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
100,000100,000PLANNING/DESIGN
100,000 100,000Total
Total2023 2024 2025 2026 2027Funding Sources
100,000100,000ROAD USE TAX FUND
100,000 100,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Kent Ralston
2023 2027thru Department PUBLIC WORKS
Description
This project will remove existing right turn bays and install pedestrian refuge islands on Camp Cardinal Boulevard at Kennedy Parkway.
Project #S3981
Priority Essential (2)
Justification
This project is necessary to improve the safey and comfort of bikes and pedestrians crossing Camp Cardinal Boulevard. With Borlaug Elementary
School to the east of the corridor and numerous recent developments to the west, the current configuration is not adequate. This project is intended
to be a mid-term (10-20 year) improvment until which time construction of a full roundabout may be warranted. This project will need to be
coordianted with the City of Coralville as half of the intersection is in their municpal boundary.
Budget Impact/Other
This project will have no impact on operating budgets.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 40 YearsProject Name Camp Cardinal / Kennedy Parkway - Ped Accom Category Street Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$320,000
TIF DISTRICT
PLAN Transportation Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
30,87030,870PLANNING/DESIGN
5,0005,000LAND/ROW ACQUISITION
212,100212,100CONSTRUCTION
20,58020,580INSPECTION
20,58020,580ADMINISTRATION
30,87030,870CONTINGENCY
320,000 320,000Total
Total2023 2024 2025 2026 2027Funding Sources
160,000160,000GO BONDS-ESSENTIAL
PURPOSE
160,000160,000OTHER LOCAL
GOVERNMENTS
320,000 320,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Kent Ralston
2023 2027thru Department PUBLIC WORKS
Description
This project will install traffic signals for motorists/pedestrians at the North Dodge Street / ACT Circle intersection.
Project #S3982
Priority Essential (2)
Justification
The intersection is currently only stop controlled for ACT Circle and has limited sight distance due to the vertical curvature of Dodge Street. The
intersection currently meets applicable traffic signal warrants. Project approval will need to be obtained from the Iowa DOT.
Budget Impact/Other
This project will add costs to the Streets Department operating budget for general maintenance of signal equipment.
Useful Life 30 YearsProject Name North Dodge St / ACT Circle - Signalization Category Street Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$475,000
TIF DISTRICT
PLAN Transportation Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
43,71843,718PLANNING/DESIGN
5,0005,000LAND/ROW ACQUISITION
295,129295,129CONSTRUCTION
29,14529,145INSPECTION
29,14529,145ADMINISTRATION
72,86372,863CONTINGENCY
475,000 475,000Total
Total2023 2024 2025 2026 2027Funding Sources
475,000475,000ROAD USE TAX FUND
475,000 475,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Scott Sovers
2023 2027thru Department PUBLIC WORKS
Description
This corridor is a part of the downtwon streetscape master plan. The scope of thie project is the reconstruction of Iowa Avenue from Clinton Street
to Gilbert Street. The project also includes replacement of sidewalks and curb ramps, utility upgrades and streetscape amenities.
Project #S3983
Priority Essential (2)
Justification
Iowa Avenue is an important corridor within the downtown area that is lined with the retail on the south side and the University of Iowa Campus
on the north. The public infrastructure and streestcape amenities are starting to show signs of detoration and are in need replacement. Addtionally,
the electrical system is in need of upgrading to provide adequate power during festivals and events.
Budget Impact/Other
This project is replacing existing infrastructure and should reduce future street maintenance costs. The anticipated annual savings is less than
$10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50Project Name Iowa Avenue Improvements Category Street Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$800,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
800,000800,000CONSTRUCTION
800,000 800,000Total
Total2023 2024 2025 2026 2027Funding Sources
800,000800,000GO BONDS-ESSENTIAL
PURPOSE
800,000 800,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Scott Sovers
2023 2027thru Department PUBLIC WORKS
Description
The project will involve the construction of sidewalk along High Street between 1801 High Street and Morningside Drive as well as along
Southgate Avenue between 303 and 367 Southgate Avenue.
Project #S3984
Priority Efficiency Improvement (3)
Justification
This project improves the City's multimodal transportation system for pedestrians and bicycles by filling in portions of the sidewalk network that
have missing segments.
Budget Impact/Other
Sidewalks are maintained by the adjoining property owners and will not increase the City's operating expenses.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 30 YearsProject Name High Street & Southgate Ave Sidewalk Infill Proj Category Street Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$110,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
75,00075,000CONSTRUCTION
10,00010,000INSPECTION
10,00010,000ADMINISTRATION
15,00015,000CONTINGENCY
110,000 110,000Total
Total2023 2024 2025 2026 2027Funding Sources
110,000110,000GO BONDS-ESSENTIAL
PURPOSE
110,000 110,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Tim Wilkey
2023 2027thru Department PUBLIC WORKS
Description
This project will have multiple phases to rehabilitate and improve the digester complex. The phases will include new process related structures and
equipment to mitigate struvite formation and improve sludge quality. General building and equipment improvements include heat exchanger
replacements, digester cover repairs and/or replacement, sludge recirculation pumps and piping, electrical, instrumentation and controls upgrades.
Project #V3151
Priority Critical (1)
Justification
Biological nutrient removal as part of the 2014 project captures phosphorous (P) and creates struvite in the digesters. It collects on piping,
equipment and in structures. Current struvite management uses extensive maintenance resources. Additionally, the digester complex was
constructed in 1989/2002 and the facility and equipment are at various stages of wear, nearing the end of their useful life.
Budget Impact/Other
This project will reduce operating and maintenance cost through the rehabilitation of older equipment and adding new equipment. The annual
savings is less than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Wastewater fund, and the City reasonably expects to
reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Digester Complex Rehabilitation Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$14,000,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
900,000900,000PLANNING/DESIGN
10,300,00010,300,000CONSTRUCTION
200,000200,000INSPECTION
100,000100,000ADMINISTRATION
1,500,0001,500,000CONTINGENCY
900,000 12,100,000 13,000,000Total
Prior
1,000,000
Total
Total2023 2024 2025 2026 2027Funding Sources
14,000,00014,000,000REVENUE BONDS
14,000,000 14,000,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Joe Welter
2023 2027thru Department PUBLIC WORKS
Description
This project would extend the 30-inch sanitary sewer pipe along Abbey Lane from Burry Drive to the west side of US Highway 218.
Project #V3155
Priority Essential (2)
Justification
This project will allow development within the watershed west of US Highway 218 and south of Rohret Road.
Budget Impact/Other
This will bring additional revenue along with additional maintenance costs. The estimated maintenance costs are less than $10,000 per year. The
estimated amount of additional revenue is unknown.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Wastewater fund, and the City reasonably expects to
reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 50 yearsProject Name Rohret South Sewer Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$4,750,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
60,00060,000PLANNING/DESIGN
130,000130,000LAND/ROW ACQUISITION
3,500,0003,500,000CONSTRUCTION
175,000175,000INSPECTION
175,000175,000ADMINISTRATION
350,000350,000CONTINGENCY
4,390,000 4,390,000Total
Prior
360,000
Total
Total2023 2024 2025 2026 2027Funding Sources
4,750,0004,750,000WASTEWATER FUND
4,750,000 4,750,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Tim Wilkey
2023 2027thru Department PUBLIC WORKS
Description
Reroute the Benton Trunk sewer from Emerald Street to Westgate Street through green space and a parking lot. This will allow access for future
maintenance and removes the sewer from under and close proximity to an apartment complex. The project will increase the sewer capacity at
Emerald Street and remove a capacity restriction (pipe diameter) at Emerald Street.
Project #V3162
Priority Critical (1)
Justification
Previous rerouting of the trunk and upstream sanitary sewer left undersized piping creating a bottle neck and limited maintenance access to the
sanitary sewer on private property. The bottle neck has caused potential project to be routed to the west or not pursued. Making improvements will
allow better access and not be a bottleneck, which limits future growth north of Melrose Avenue.
Budget Impact/Other
This project will have a minimal impact on the operating budget.
Useful Life 75 yearsProject Name Benton Street Trunk Sewer Improvements Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$755,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
82,00082,000PLANNING/DESIGN
73,00073,000LAND/ROW ACQUISITION
455,000455,000CONSTRUCTION
27,00027,000INSPECTION
27,00027,000ADMINISTRATION
91,00091,000CONTINGENCY
155,000 600,000 755,000Total
Total2023 2024 2025 2026 2027Funding Sources
755,000155,000 600,000WASTEWATER FUND
155,000 600,000 755,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Tim Wilkey
2023 2027thru Department PUBLIC WORKS
Description
The project would include the replacement of return activaterd sludge pumps (RAS) 7121A, 7122A, 7123A, 5301A and 5401A along with
associated equipment. This includes all pumps, valves, sludge and any piping/structural modifications required to fit the pumps.
Project #V3164
Priority Essential (2)
Justification
These pumps and valves have been in service since 2002 and are nearing the end of their useful working life. The maintenance repair frequency for
these pumps has been increasing in the past year. Failure to replace these pumps in a timely manner could cause diminished operation and
treatment of the wastewater resulting in violations of our NPDES discharge permit.
Budget Impact/Other
New pumps and associated equipment would increase pump efficiency, and lower energy consumption and maintenance costs. The estimated
reduction in operating expenditures is less than $10,000 per year.
Useful Life 20 yearsProject Name Return Activated Sludge Pump Replacement Category Wastewater Treatment
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$1,313,500
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
105,000105,000PLANNING/DESIGN
1,070,0001,070,000CONSTRUCTION
21,00021,000INSPECTION
10,50010,500ADMINISTRATION
107,000107,000CONTINGENCY
105,000 1,208,500 1,313,500Total
Total2023 2024 2025 2026 2027Funding Sources
1,313,500105,000 1,208,500WASTEWATER FUND
105,000 1,208,500 1,313,500Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Tim Wilkey
2023 2027thru Department PUBLIC WORKS
Description
Replacement of the influent pump station pumps 1301A, 1302A, and 1303A, Variable Frequency Drive's (VFD's) for these pumps, and the VFD's
for pumps 1304A, 1305A, and 1306A. This is inclusive of any piping/electrical modifications that will be required.
Project #V3165
Priority Essential (2)
Justification
There are 6 influent pumps and drives currently installed. The 3 pumps listed were installed in 2002 and are at the end of their design life. The
pumps have had significant repairs over the past 5-years but they have not extended their design life. They are close coupled centrifugal pumps and
be replaced by dry pit submersible pumps that match existing style of the remaining pumps. All drives were part of the original 2002 install and
will be replaced with the project. Other work includes piping mods, controls, installation, and SCADA integration.
Budget Impact/Other
The existing pumps have increasing maintenance cost and operation costs when they are OOS. New pumps and drives will improve pump
efficiency of all pumps, lower power cost and reduced maintenance cost. The current pumps are rated at 10 milllion gallons per day, the newer
pumps will be 12 MGD.
Useful Life 25 yearsProject Name Replacement of Influent Pump Station Pumps Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$2,038,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
160,000160,000PLANNING/DESIGN
1,680,0001,680,000CONSTRUCTION
20,00020,000INSPECTION
10,00010,000ADMINISTRATION
168,000168,000CONTINGENCY
160,000 1,878,000 2,038,000Total
Total2023 2024 2025 2026 2027Funding Sources
2,038,000160,000 1,878,000WASTEWATER FUND
160,000 1,878,000 2,038,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Tim Wilkey
2023 2027thru Department PUBLIC WORKS
Description
Rehabilitate selected equipment at the Napoleon Lift Station including the bar screen crawler assemblies with electric drive units, provide
screening washer compactors, role off, air handling system and rebuilding of the NPPS Pumps #1 and #6 pumping assembly’s and replacing
associated electrical or mechanical appurtenances as necessary.
Project #V3169
Priority Critical (1)
Justification
Napoleon lift station was constructed in 2000 and is the primary lift station for approximately 2/3 of the wastewater flow to the WWTP. The Bar
screen crawler, pumps #1 and #6 and air handling system have operated consistently since its coming into operations and show wear and tear
consistent with 20 years of operations and are nearing the end of their useful design life. Improvements in crawler, adding a washer/compactor with
roll off, and pump design will offer operation and efficiency improvements.
Budget Impact/Other
Napoleon Lift Station is the City's primary lift station conveying 2/3 of the daily total flow to the WWTP. If any of this equipment were to fail it
would limit the operation of the lift station until repairs could be made.
Useful Life 20 yearsProject Name Napoleon Lift Station Improvements Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$2,825,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
325,000325,000PLANNING/DESIGN
2,237,0002,237,000CONSTRUCTION
33,00033,000INSPECTION
14,00014,000ADMINISTRATION
216,000216,000CONTINGENCY
325,000 2,500,000 2,825,000Total
Total2023 2024 2025 2026 2027Funding Sources
2,825,000325,000 2,500,000WASTEWATER FUND
325,000 2,500,000 2,825,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Tim Wilkey
2023 2027thru Department PUBLIC WORKS
Description
Replace rooves on the following buildings: IPS, SABS, SSPUS, SSPRS, SDSB, SSDA1, SSDS2 and the gas house. This project was originally to
start in 2022 but delays in the building roof evaluations, we proposed to move this to start in 2023.
Project #V3170
Priority Critical (1)
Justification
These roofs were identified by City staff as being deficient. The bulk of these buildings are part of the original WWTP project from 1988 with the
others from the 2000 project. They have outlived any warranty’s given at the time of construction and are in need of replacement.
Budget Impact/Other
These roof's cover multiple buildings with critical infrastructure in them. Should any building suffer water damage that impedes the division staff
from performing their job function or causes equipment failure, that could cause the WWTP to not meet its NPDES permit required discharge
limits and put the City in environmental liability.
Useful Life 40 YearsProject Name WWTP Roof Replacements Category Wastewater Treatment
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$747,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
20,00020,000PLANNING/DESIGN
375,00097,000 278,000CONSTRUCTION
10,00010,000INSPECTION
10,00010,000ADMINISTRATION
32,00032,000CONTINGENCY
97,000 350,000 447,000Total
Prior
300,000
Total
Total2023 2024 2025 2026 2027Funding Sources
447,00097,000 350,000WASTEWATER FUND
97,000 350,000 447,000Total
Prior
300,000
Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Tim Wilkey
2023 2027thru Department PUBLIC WORKS
Description
Replace and rehabilitate the pumps, power and electrical controls, and mechanical appurtenances.
Project #V3172
Priority Essential (2)
Justification
The Highlander lift station has been in place since 1984 with a one original pump and one replacement pump(2018), mostly original controls and
mechanical appurtenances. The area serviced by the lift station has grown considerably and is projected to continue to grow with the installed
pumps nearing their max pumping capacity. The project includes replacing the pump with an upsized capacity, change out the controls for PLC/
VFD's , replace all mechanical equipment and install a standby genset. The 2018 pump will be repurposed.
Budget Impact/Other
The Highlander Lift Station is the farthest outlying station in the City. It was installed in 1984 with a single pump replacement in 2018. With the
past and potential growth in the area, capacity and reliability is becoming an issue. Rebuilding and increasing the pumping capacity will add
longevity to the station to meet future needs.
Useful Life 20 yearsProject Name Highlander Lift Station Improvements Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$204,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
20,00020,000PLANNING/DESIGN
160,000160,000CONSTRUCTION
2,0002,000INSPECTION
2,0002,000ADMINISTRATION
20,00020,000CONTINGENCY
204,000 204,000Total
Total2023 2024 2025 2026 2027Funding Sources
204,000204,000WASTEWATER FUND
204,000 204,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Tim Wilkey
2023 2027thru Department PUBLIC WORKS
Description
Moving the replacement schedule to 12 years from 15. These are additional funds supplementing the City Equipment Replacement funds required
to complete the purchase.
Project #V3173
Priority Critical (1)
Justification
The jet truck was purchased in 2011 and was scheduled for a 15 years replacement. The jet-vac has been having frequent mechanical and electrical
issues for the past 2 years which has caused our cleaning activities to cease while repairs are made. We do not anticipate that this maintenance
history will change and will likely increase. We want to move up the replacement to 2023, this will make for a 12 year replacement. Monthly
replacement fees would be increased to reflect a 12 year replacement in the future.The jet truck is vital in the WWD's collection system
maintenance cleaning program. Cleaning the sewer helps to reduce backups, Sanitary Sewer Overflows (SSO's) and limits the City's liability. By
moving up the replacement date, we can stay on schedule with cleaning program and avoid increased liability.
Budget Impact/Other
These projects should lower operating expenditures through the earlier replacement of equipment, but it will increase operating expenditures
through increased replacement charges. The estimated net increase in annual operating expenditures is $25,000 per year.
Useful Life 12 yearsProject Name Jet Truck Replacement Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$175,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
175,000175,000EQUIPMENT
175,000 175,000Total
Total2023 2024 2025 2026 2027Funding Sources
175,000175,000WASTEWATER FUND
175,000 175,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Tim Wilkey
2023 2027thru Department PUBLIC WORKS
Description
Replace the heating/ventilation/air conditioning (HVAC) for the Influent Pump Station (IPS), Sludge Processing Building (SSPRS), Motor
Vehicle Storage Building (MVSB), Administration Building (ADMIN), and Grit Building (GRIT)
Project #V3177
Priority Essential (2)
Justification
The HVAC systems for the buildings listed above are all original to them. They age from 20 to 35 years old and have had significant repair work in
the past 5 years but that has not extended the useful life of these systems. Due to the nature of the facility, building ventilation is critical to the
work that is being performed and provides a safe work environment for the employees.
Budget Impact/Other
The estimated impact on the operating budget is less than $10,000.
Useful Life 25 yearsProject Name HVAC Replacement Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$743,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
60,00060,000PLANNING/DESIGN
600,000300,000 300,000CONSTRUCTION
15,0007,500 7,500INSPECTION
8,0004,000 4,000ADMINISTRATION
60,00030,000 30,000CONTINGENCY
60,000 341,500 341,500 743,000Total
Total2023 2024 2025 2026 2027Funding Sources
743,00060,000 341,500 341,500WASTEWATER FUND
60,000 341,500 341,500 743,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Tim Wilkey
2023 2027thru Department PUBLIC WORKS
Description
This project will replace the rake mechanisms for Calrifiers C3300 and 3400 that were new in 2002 and part of WWTP upgrades.
Project #V3178
Priority Essential (2)
Justification
They both have the original zinc plated carbon steel mechanisms that are severly corroded and are in need of replacement and/or repair. These
repairs were identified during recent inspections of the clarifiers. These repairs are necessary to avoid untimely equipment failure..
Budget Impact/Other
This project repairs existing equipment which should reduce maintenance and repairs costs. The estimated impact on the operating budget is less
than $10,000.
Useful Life 25 yearsProject Name Primary Clarifier Repairs Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$685,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
32,00032,000PLANNING/DESIGN
585,000585,000CONSTRUCTION
6,0006,000INSPECTION
3,0003,000ADMINISTRATION
59,00059,000CONTINGENCY
685,000 685,000Total
Total2023 2024 2025 2026 2027Funding Sources
685,000685,000WASTEWATER FUND
685,000 685,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Tim Wilkey
2023 2027thru Department PUBLIC WORKS
Description
Perform a master plan for the Wastewater Division looking forward for the next 20 years. The study will include the wastewater treatment plant, all
sanitary lift stations, and the sanitary sewer collection system.
Project #V3181
Priority Essential (2)
Justification
Perform a master plan for the Wastewater Division looking forward for the next 20 years. The study will include the wastewater treatment plant, all
sanitary lift stations, and the sanitary sewer collection system.
Budget Impact/Other
Guidance provided by the update planning documents will help with future project to maximize City investments.
Useful Life 15 yearsProject Name Wastewater Division Master Plan Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$299,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
260,000260,000PLANNING/DESIGN
13,00013,000ADMINISTRATION
26,00026,000CONTINGENCY
299,000 299,000Total
Total2023 2024 2025 2026 2027Funding Sources
299,000299,000WASTEWATER FUND
299,000 299,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Tim Wilkey
2023 2027thru Department PUBLIC WORKS
Description
Install a fourth Effluent Water Pump to serve the in plant distribution system and soccer park irrigation system. Work includes rebuilding of the
Amiad filtration system.
Project #V3183
Priority Essential (2)
Justification
There are 5 pumps installed at the effluent water pump station. Three are rated at 900-GPM and two are rated at 500-GPM. We are seeing the three
900-GPM pumps running at capacity and need an additionla pump as a standy pump.
Budget Impact/Other
The estimated impact on the operating budget is less than $10,000
Useful Life 30 YearsProject Name Effluent Water Pump Station Improvements Category Wastewater Treatment
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$76,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
60,00060,000CONSTRUCTION
5,0005,000INSPECTION
5,0005,000ADMINISTRATION
6,0006,000CONTINGENCY
76,000 76,000Total
Total2023 2024 2025 2026 2027Funding Sources
76,00076,000WASTEWATER FUND
76,000 76,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Tim Wilkey
2023 2027thru Department PUBLIC WORKS
Description
This project includes a new process to treat the digester gas to pipeline quality and infrastructure necessaryto transport conditioned gas to
the pipeline network. Additionally, a High Strength Receiving Station will be installed for additional biogas feedstock.
Project #V3184
Priority Essential (2)
Justification
The 2022 Digester Complex Facilities Plan identified pipeline injection as a potential revenue generating alternative for biogas reuse. Funding
may be available through the Infrastructure and Jobs Investment Act.
Budget Impact/Other
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 20 yearsProject Name Wastewater Digester Gas Improvements Category Wastewater Treatment
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$14,000,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
1,800,0001,800,000PLANNING/DESIGN
10,850,00010,850,000CONSTRUCTION
100,000100,000INSPECTION
50,00050,000ADMINISTRATION
1,200,0001,200,000CONTINGENCY
1,800,000 12,200,000 14,000,000Total
Total2023 2024 2025 2026 2027Funding Sources
14,000,00014,000,000REVENUE BONDS
14,000,000 14,000,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jonathan Durst
2023 2027thru Department PUBLIC WORKS
Description
This is a water main replacement project on Bradford Dr, Louise St, and Wayne Ave. Approximately 1950 feet of 6-inch cast-iron pipe (vintage
1956) will be replaced with 2,500 feet of 8-inch PVC. The scope of the project will replace or install water main on Bradford Dr from Arthur St to
1st Ave, on Louise St from Bradford Dr to Wayne Ave, and on Wayne Ave from Wade St to Arthur St.
Project #W3300
Priority Efficiency Improvement (3)
Justification
The existing water main has been subject to 18 water main breaks and has reached the end of its useful life. This project would also make the
distribution system more robust by adding an additional looped feed to the system. This water main feeds Southeast Junior High School, and ranks
in the top ten of the water main replacement matrix.
Budget Impact/Other
This water main replacement project will reduce operations and maintenance cost associated with emergency/after hours repairs. The estimated
decrease in operating expenditures is less than $10,000 per year.
Useful Life 70 yearsProject Name Bradford Drive Water Main Replacement Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$650,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
50,00050,000PLANNING/DESIGN
600,000600,000CONSTRUCTION
50,000 600,000 650,000Total
Total2023 2024 2025 2026 2027Funding Sources
650,00050,000 600,000WATER FUND
50,000 600,000 650,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jonathan Durst
2023 2027thru Department PUBLIC WORKS
Description
Replace the (4) four variable frequency drives (VFDs) on our high service pumps.
Project #W3314
Priority Essential (2)
Justification
The VFD's servicing our high service pumps will have been in operation for approximately 21 years when this project reaches construction. This
is a typical life span for VFD's. The VFD's have begun to show signs of deterioration with the loss of communications due to worn electronics
components and the new SCADA system was modified to accommodate the out-moded communications protocols utilized by these drives. We
anticipate continued and more frequent repair activities as these drives reach the end of their useful life.
Budget Impact/Other
Potential cost savings derived from decreased power usage, less wear on the pumps, and less repair or reactive maintenance.
Useful Life 20 yearsProject Name High Service Pump VFD Replacement Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$650,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
50,00050,000PLANNING/DESIGN
600,000600,000CONSTRUCTION
50,000 600,000 650,000Total
Total2023 2024 2025 2026 2027Funding Sources
650,00050,000 600,000WATER FUND
50,000 600,000 650,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jonathan Durst
2023 2027thru Department PUBLIC WORKS
Description
**Revised to add $50,000 in 2023 to the previous 2022 allocaton fo $65,000 and 2021 allocation of $45,000.**
Upgrade the audio and visual equipment in the Water Front Meeting Room with new flat panel screens, associated computer controls, audio for
the use by City Staff to conduct training events and meetings, and to improve the meeting room acoustics.
Project #W3317
Priority Efficiency Improvement (3)
Justification
The Water Front Meeting Room has two broken overhead screen, no mounted projector, and an antiquated audio system. The room was originally
designed to be able to host two separate meetings, but has since been adapted to use a large front projector screen that impedes the use of the
divider wall and a projector set upon a collapsable table in the middle of the aisle. This setup has proved to be adequate and cumbersome.
Additionally, the room was identified by those with hearing issues as having too much echo making it difficult for them to hear. The goal is to
update the room to include better room usage and data display functionality.
Budget Impact/Other
The operational budget will be impacted by increased chargebacks for the IT equipment program.
Useful Life 20 yearsProject Name Water Front Meeting Room A/V Upgrades Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$160,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
50,00050,000EQUIPMENT
50,000 50,000Total
Prior
110,000
Total
Total2023 2024 2025 2026 2027Funding Sources
50,00050,000WATER FUND
50,000 50,000Total
Prior
110,000
Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jonathan Durst
2023 2027thru Department PUBLIC WORKS
Description
Replace approximately 2,000 feet of 1964 16-inch ductile iron water main along the north side of Highway 6 from Fairmeadows Blvd. to Industrial
Park Rd. with 16-inch PVC water main.
Project #W3320
Priority Critical (1)
Justification
This water main has had five (5) water main breaks since the year 2000, four (4) of which have happened in 2018/2019. The type of break have
been majority corrosion related and it is expected to continue to have main breaks on this main until it is replaced due to corrosive soils. Due to
the size and relative location of the water main in the distribution system the breaks on this line are very disruptive - large pressure swings that
cause other water quality and integrity issues as well as loss of service to critical customers.
Budget Impact/Other
Main breaks on average cost approximately $10,000 each to repair. The main breaks on this stretch of Hwy 6 are significant enough to cause
cascading effects such as more main breaks or the need to flush the distribution system which increases costs. Therefore the replacement of this
main will have a direct impact on the operational budget lessening main break repairs and indirectly by increasing system integrity overall.
Savings is anticipated to average $10,000 to $20,000 per year.
Useful Life 70 yearsProject Name Hwy 6 (Fairmeadows to Ind Park Rd) Water Main Repl Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$661,500
TIF DISTRICT Lower Muscatine/Ind Park Rd
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
67,50067,500PLANNING/DESIGN
540,000540,000CONSTRUCTION
54,00054,000INSPECTION
67,500 594,000 661,500Total
Total2023 2024 2025 2026 2027Funding Sources
661,50067,500 594,000WATER FUND
67,500 594,000 661,500Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jonathan Durst
2023 2027thru Department PUBLIC WORKS
Description
An engineering study of dissolved nutrient removal from source water (nitrates, polyfluoroalkyl compounds, mycrositins, etc...), the long-term
financial and environmental sustainability of lime softening, and filter system valving and build-out based on the study results.
Project #W3321
Priority Essential (2)
Justification
Regulations on dissolved ions in source and finished water are changing with federal administrations and increasing evidence of chemical toxicity
which will result in a need to have treatment technologies capable of ionic removal. Further quicklime and lime solids management costs have
continued to increase yearly and a cost/benefit analysis of lime softening is warranted while investigating treatment technologies. The filters may
need modification to accommodate new technologies. This is a study and will inform future CIP, including five projects on the unfunded list -
Nutrient Removal, WTP Filter #6 Buildout, Water Plant Softener Improvements, Soda Ash Replacement, and Lime Lagoon Outlet Structure
Modifications.
Budget Impact/Other
The impact on the operating budget will be negligible.
Useful Life 10 yearsProject Name Treatment Technology Study Category Water Operations
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$150,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
150,000150,000PLANNING/DESIGN
150,000 150,000Total
Total2023 2024 2025 2026 2027Funding Sources
150,000150,000WATER FUND
150,000 150,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jonathan Durst
2023 2027thru Department PUBLIC WORKS
Description
Clean and cap portions on the existing laterals of Collector Well #2 and install new 12-inch laterals to increase the production capacity of this raw
water well.
Project #W3322
Priority Critical (1)
Justification
Collector Well #2 has degraded specific capacity (amount of water yield per foot of well height) and will continue to decline as the pore spaces in
the surrounding geologic formations plug with fines. Therefore to maintain the usefulness of this high quality water source and to increase its yield
capacity lateral cleaning and lateral installation are necessary.
Budget Impact/Other
The impact to the operating budget is negligible.
Useful Life 70 yearsProject Name Collector Well #2 Cleaning and Upgrade Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$2,600,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
2,500,0002,500,000CONSTRUCTION
2,500,000 2,500,000Total
Prior
100,000
Total
Total2023 2024 2025 2026 2027Funding Sources
2,500,0002,500,000WATER FUND
2,500,000 2,500,000Total
Prior
100,000
Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jonathan Durst
2023 2027thru Department PUBLIC WORKS
Description
Evaluate and make recommendations to include cost estimates for the removal, repair, and upgrade of environmental systems at the Water
Treatment Facility. [Would precede unfunded project #75]
Project #W3324
Priority Efficiency Improvement (3)
Justification
The Water Treatment Facility was originally designed to have a heated process area and basement storage. Heating the building in the winter or
cooling in the summer is not practical with the existing systems due to the volume of water passing through the processes. Providing for this is not
the intent of the project but to remove unused dilapidated systems and to improve existing air handing to better conform to reality. Additionally
the administrative spaces suffer from humidity intrusion and malfunctioning controls due to improperly situated and sized equipment, and obsolete
building controls systems.
Budget Impact/Other
The impact to the operating budget is negligible.
Useful Life 10 yearsProject Name Water Plant HVAC Study Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$75,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
75,00075,000PLANNING/DESIGN
75,000 75,000Total
Total2023 2024 2025 2026 2027Funding Sources
75,00075,000WATER FUND
75,000 75,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jonathan Durst
2023 2027thru Department PUBLIC WORKS
Description
Replace the roofs on the Water Plant garage, chemical storage rooms, 5 collector wells, 3 deep wells, and emergency generator building.
Project #W3325
Priority Essential (2)
Justification
The existing roofs are showing signs of failure due to age. The roof material is degrading causing leaks inside the buildings. The roofs will need
replacement.
Budget Impact/Other
The operating impact of these improvements will be negligible.
Useful Life 20 yearsProject Name Roof Replacements Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$600,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
100,000100,000PLANNING/DESIGN
500,000500,000CONSTRUCTION
600,000 600,000Total
Total2023 2024 2025 2026 2027Funding Sources
600,000600,000WATER FUND
600,000 600,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jonathan Durst
2023 2027thru Department PUBLIC WORKS
Description
Update treatment processes to better conform with pending regulation. The scope of this project will be informed by the Treatment Study (CIP
W3321)
Project #W3326
Priority Essential (2)
Justification
Forecasted regulations include PFAS, Magenese, stricter lead and copper rules, continued intrusion of nutrient runoff, and heavy metal reductions.
Climate change will also continue to cause carbon producing processes to increase operating costs. Due to these factors a treatment study will be
commissioned in 2024 to evaluate the existing unit processes employed by the treatment plant and make recommendations for changes to better
conform with climate change and new regulation. Our expectation is to move away from lime softening and employ membrane filtration.
Budget Impact/Other
The impact to the operating budget may increase or decrease depending on the results of the Treatment Study.
Useful Life 20 yearsProject Name Treatment Process Update Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$600,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
100,000100,000PLANNING/DESIGN
500,000500,000CONSTRUCTION
600,000 600,000Total
Total2023 2024 2025 2026 2027Funding Sources
600,000600,000WATER FUND
600,000 600,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jonathan Durst
2023 2027thru Department PUBLIC WORKS
Description
Replace approximately 1,900 feet of 12-inch, 1984 ductile iron water main with 16-inch PVC water main.
Project #W3327
Priority Essential (2)
Justification
The existing water main has four corrosion-related water main breaks and signs of continued corrosion within the surrounding wet soils.
Replacing the existing with 16-inch PVC will remove the corrosion hazard and mitigate velocity headloss identified during the 2018 water
distribution system future growth study.
Budget Impact/Other
This project has minimal impact on the operating budget.
Useful Life 70 yearsProject Name Melrose Water Main Camp Cardinal to 218 Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$600,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
600,000600,000CONSTRUCTION
600,000 600,000Total
Total2023 2024 2025 2026 2027Funding Sources
600,000600,000WATER FUND
600,000 600,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jonathan Durst
2023 2027thru Department PUBLIC WORKS
Description
Repair defects found during an underwater inspection of the Iowa River powerhouse dam located below the pedestrian bridge connecting the Iowa
River Power Restaurant to the Peninsula Well Field area.
Project #W3328
Priority Critical (1)
Justification
The powerhouse dam maintains the Iowa River elevation in the tract extending from the Coralville Dam to the powerhouse dam. This pool
elevation directly impacts the production of the water treatment facility collector wells #1 and #2 by providing hydrostatic pressure above the well
laterals. The dam's failure would also negatively impact the pedestrian bridge and other surrounding infrastructure. The inspection work has been
completed. The repair design and construction remain.
Budget Impact/Other
This project will have a neutral impact on the operating budget as it is the replacement of existing infrastructure.
Useful Life 70 yearsProject Name Powerhouse Dam Rehabilitation Category Water Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$225,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
225,000225,000CONSTRUCTION
225,000 225,000Total
Total2023 2024 2025 2026 2027Funding Sources
225,000225,000WATER FUND
225,000 225,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jonathan Durst
2023 2027thru Department PUBLIC WORKS
Description
Replace and elevate rotting electrical panels in the Rochester (ROC), Emerald (EME), and Sycamore (SYC) ground storage reservoirs (GSR).
Make repairs to the pump house structures, roofs, and replace doors. Evaluate the addition of a third pump to ROC or EME. Add a third pump to
application GSR.
Project #W3329
Priority Critical (1)
Justification
The City's drinking water system is controlled by the operation of pumps at the treatment facility and GSRs. These GSRs have been in operation
since the 1970's operating 24 hours-a-day. With the creation of the east pressure zone and the continued development to the west it is imperative
to keep the ROC and EME GSR's capable of being water pressure generators by improving their pumpage and electrical systems. The SYC GSR is
in need of electrical and building repairs.
Budget Impact/Other
This project will have a neutral impact on the operating budget as it is the replacement of existing infrastructure.
Useful Life 20 yearsProject Name GSR Upgrade and Repairs Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$800,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
80,00080,000PLANNING/DESIGN
720,000720,000CONSTRUCTION
800,000 800,000Total
Total2023 2024 2025 2026 2027Funding Sources
800,000800,000WATER FUND
800,000 800,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jonathan Durst
2023 2027thru Department PUBLIC WORKS
Description
Part of Unfunded Project #84. Replacement of (1) 12-inch, (2) 20-inch, (3) 30-inch, and (2) 36-inch magnetic flow meters at the Water Treatment
Plant.
Project #W3330
Priority Critical (1)
Justification
Flow meters are used to control unit operations of the water treatment system. Magnetic flowmeters are currently installed to control the softeners,
chlorine contact tanks, and high service pumps to the Emerald, Rochester, and Plant Service Water transmission lines. The existing magnetic
flowmeters are at end-of-life and are malfunctioning. Operations and maintenance teams have developed work around to avoid the costly
replacements. These work arounds are beginning to fail as well. Therefore replacement is necessary with new equipment more applicable to the
application.
Budget Impact/Other
This project will have a neutral impact on the operating budget as it is the replacement of existing infrastructure.
Useful Life 30 YearsProject Name Water Plant Flowemeter Replacement Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$550,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
50,00050,000PLANNING/DESIGN
500,000500,000CONSTRUCTION
550,000 550,000Total
Total2023 2024 2025 2026 2027Funding Sources
550,000550,000WATER FUND
550,000 550,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jonathan Durst
2023 2027thru Department PUBLIC WORKS
Description
Evaluate the installation of a new water storage device (ground or elevated tank) and associated pumping, valves, and pipes for the Slothower, Taft,
or alternative site on the east or west side of the City's limits to sustain service level flows and pressures to new development. After the study,
move into design of the selected improvements. Will provide direction on unfunded projects #52, 68, & 71.
Project #W3331
Priority Essential (2)
Justification
The Carson Farms and HiPoint areas on the west and east side of the City will create water system demand distant from existing water system
pressure sustaining devices. This distance during peak demand hours will increase the velocity headloss in the piping thereby reducing pressures
to customers farther out. To mitigate the headloss larger looped pipes surrounding the new developments will be required during construction and
a new storage device with pressure boosting equipment is recommended.
Budget Impact/Other
This project will have a neutral impact on the operating budget as it is the replacement of existing infrastructure.
Useful Life 50 yearsProject Name Water Storage Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$500,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
500,000500,000PLANNING/DESIGN
500,000 500,000Total
Total2023 2024 2025 2026 2027Funding Sources
500,000500,000WATER FUND
500,000 500,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jonathan Durst
2023 2027thru Department PUBLIC WORKS
Description
Install a new antenna at the Rocky Shore Dr. lift station by Crandic Park and decommission the antenna at the N. Dodge St. HyVee.
Project #W3332
Priority Efficiency Improvement (3)
Justification
The Peninsula Well Field is integrated with the Water Treatment Plant SCADA system. The well field communication is via radio to the HyVee
antenna and then fiber from the antenna to the Water Plant. Resilient and timely communication with the Peninsula Well Field is necessary to
effectively monitor raw water production during all weather events. Both the existing and proposed sites have backup power generation. The
installation of reliable fiber to the Rocky Shore Dr. lift station is anticipated to occur with S3958 - Park Rd Reconstruction in 2025.
Budget Impact/Other
This project will have a neutral impact on the operating budget as it is the replacement of existing infrastructure.
Useful Life 40 YearsProject Name Peninsual Well Field Antenna Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$200,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
40,00040,000PLANNING/DESIGN
160,000160,000CONSTRUCTION
200,000 200,000Total
Total2023 2024 2025 2026 2027Funding Sources
200,000200,000WATER FUND
200,000 200,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Jonathan Durst
2023 2027thru Department PUBLIC WORKS
Description
The relocation of the bulk water fill station from the Equipment & Transit Division site to the Public Works campus coincident with the build out
of the Equipment & Transit Division expansion to the Public Works campus. The new bulk water fill station is intended to be designed with better
access for large vehicles and with more climate control to allow the use of the station into the colder months. Unfunded project #72
Project #W3333
Priority Efficiency Improvement (3)
Justification
Bulk water fill stations are used by contractors and Johnson County residents for large quanitity water purchases. In order for the City to
effectively abandon the existing Equipment & Transit division site, the bulk water fill station will need to be removed and relocated.
Budget Impact/Other
This project will have a neutral impact on the operating budget as it is the replacement of existing infrastructure.
Useful Life 30 YearsProject Name Relocate Bulk Water Station Category Water Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$150,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
20,00020,000PLANNING/DESIGN
130,000130,000CONSTRUCTION
150,000 150,000Total
Total2023 2024 2025 2026 2027Funding Sources
150,000150,000WATER FUND
150,000 150,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact LaTasha DeLoach
2023 2027thru Department SENIOR CENTER
Description
Necessary building envelope repairs include rebuilding the stone parapets and cornices, roof flashing improvements, stone façade pointing and
sealing, painting and sealing exterior wood, and refurbishing historic wood framed windows. The Improvements are based on recommendations
from the 2020 Accessibility Study and the 2021 Master Plan.
Project #K1001
Priority Aesthetic Improvement (4)
Justification
The building is in dire need of tuckpointing and the entrances historically restored. The Senior Center will require a full building assessment to
determine the scope of work and facility master plan over the next ten years.
Budget Impact/Other
There are no additional operating impacts at this time. There are cost savings for reducing building maintenance and repairs. The estimated
operating expenditure savings is less than $10,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 15 yearsProject Name Senior Center Facility Exterior Improvements Category Senior Center
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$4,265,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
170,000170,000PLANNING/DESIGN
2,580,0002,580,000CONSTRUCTION
2,750,000 2,750,000Total
Prior
1,515,000
Total
Total2023 2024 2025 2026 2027Funding Sources
750,000750,000FACILITY REPLACEMENT
RESERVE
2,000,0002,000,000TAX INCREMENT FINANCING
2,750,000 2,750,000Total
Prior
1,515,000
Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact LaTasha DeLoach
2023 2027thru Department SENIOR CENTER
Description
This project will include American Disabilities Act (ADA), code, architectural, mechanical, electrical, cosmetic, wayfinding, kitchen, and signage
improvements to all floors of The Center, including a new (ADA) accessible vestibule on East Washington Street. The interior building
improvement projects will focus on sustainable and life cycle cost improvements, with a goal to reduce The Center's carbon foot print. The
Improvements are based on recommendations from the 2020 Accessibly Study and the 2021 Master Plan. Lower level fitness rooms will be
realigned to better accommodate equipment and to provide adequate space for classes. The first floor will be converted to a social floor that can be
used for public events. Offices will be centrally relocated on the second floor for better collaboration. The third floor includes a reception area for
patrons that park in the ramp and includes realigning classrooms to better accommodate lifelong learning activities. Energy efficiency
improvements and building code upgrades be incorporated into the project.
Project #K1002
Priority Efficiency Improvement (3)
Justification
This project will allow for program and event needs to continue mission work of lifelong learning, connection and community engagement of
residents 50 plus. This will provide adequate office space and classrooms, increase customer service capacity, improve wayfinding, provide
improved lighting and design for older adults, aging eyes and decreased capacity which occurs when serving older adults. This project will address
sustainability needs, and provide more access to community members for rental space. It will also address aging infrastructure, sustainability
needs, and provide more access to community members for rental space.
Budget Impact/Other
Renovating the Senior Center will increase revenue by creating a space where more community members will have events for weddings, small
conferences, retirement events, etc. Improved wayfinding and tailored design for older adults will allow for longevity of The Center for older adults
for generations to come. There will be a need for a new staff to assist with additional programs needed. The estimated net additiona cost to the
operating budget is approximately $75,000 per year.
This serves as a declaration of official intent under Treasury Regulation 1.150-2 that it is reasonably expected that capital expenditures will be
made in respect of the above-described project, such expenditures to be advanced from the Capital Projects fund, and the City reasonably expects
to reimburse all or a portion of the expenditures with the proceeds of bonds, notes or other indebtedness to be issued or incurred by the City in the
future.
Useful Life 30 YearsProject Name Senior Center Interior Improvements Project Category Senior Center
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$3,650,000
TIF DISTRICT None
PLAN Senior Center Facility Study
Status Active
Total2023 2024 2025 2026 2027Expenditures
3,650,0001,825,000 1,825,000CONSTRUCTION
1,825,000 1,825,000 3,650,000Total
Total2023 2024 2025 2026 2027Funding Sources
2,250,0001,125,000 1,125,000FACILITY REPLACEMENT
RESERVE
1,400,000700,000 700,000GO BONDS-GENERAL
PURPOSE
1,825,000 1,825,000 3,650,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Darian Nagle-Gamm
2023 2027thru Department TRANSPORTATION SERVI
Description
This project involves the installation of additional high-definition cameras in parking facilities.
Project #T3021
Priority Efficiency Improvement (3)
Justification
The cameras will aid in securing facilities, following up on incidents, and evaluating parking demand. Additional cameras were installed on the
rooftop of the Capitol Street Parking ramp in 2021. These have been extremely useful tools to investigate issues and monitoring vehicle
occupancies. The additional funding request will allow for similar installation in the remaining facilities.
Budget Impact/Other
This project will increase the operating expenditures due to the maintenance of the new equipment. The estimated impact on the operating budget
is less than $10,000 per year.
Useful Life 10 yearsProject Name Video Cameras for Parking Facilities Category Parking Operations
Type Multi-Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$250,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
50,00050,000EQUIPMENT
50,000 50,000Total
Prior
200,000
Total
Total2023 2024 2025 2026 2027Funding Sources
50,00050,000PARKING FUND
50,000 50,000Total
Prior
200,000
Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Darian Nagle-Gamm
2023 2027thru Department TRANSPORTATION SERVI
Description
Project to replace all LED fixtures in the Court Street Transportation Center, Capitol Street ramp, Dubuque Street ramp, Tower Place ramp,
Chauncey Swan Ramp, and fixtures in other facilities as they age out of production.
Project #T3025
Priority Essential (2)
Justification
LED technologies have evolved since our early adoption in our parking facilities nearly a decade ago. Many of the early-style fixtures need to be
replaced. During 2021 the fixtures in the Court Street Transportation Center were replaced. This project will allow the replacements of the Capitol
Street and Dubuque Street facilities in 2023, and Tower Place and Chauncey Swan facilities in 2024.
Budget Impact/Other
It will cost approximately $10,000 in staff time to replace all fixtures in the Capitol Street facility. The impact on the operating budget is negligible.
Useful Life 10 yearsProject Name Replacement of LED fixtures in Parking Facilities Category Parking Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$440,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
240,000240,000CONSTRUCTION
240,000 240,000Total
Prior
200,000
Total
Total2023 2024 2025 2026 2027Funding Sources
240,000240,000PARKING FUND
240,000 240,000Total
Prior
200,000
Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Darian Nagle-Gamm
2023 2027thru Department TRANSPORTATION SERVI
Description
This project will modify the existing drainage pipe network and divert storm water from the upper decks to the exterior of the structure rather than
routing it through the lower level.
Project #T3026
Priority Critical (1)
Justification
The lower level of Tower Place Parking Ramp repeatedly floods during high intensity rain events causing significant property damage. Several
spaces in the lower level are closed to prevent future property damage until this project is completed. These vehicles are utilizing visitor parking
spaces in the upper levels of the ramp resulting in loss revenue.
Budget Impact/Other
Twelve revenue generating spaces in the upper levels of the Tower Place Parking Ramp are currently being used for this relocation. The revenue
impact is $12,000 annually in addition to less available parking to accommodate visitor parking.
Useful Life 50 yearsProject Name Tower Place Drainage Modifications Category Parking Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$550,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
100,00050,000 50,000PLANNING/DESIGN
375,000375,000CONSTRUCTION
30,00030,000INSPECTION
15,00015,000ADMINISTRATION
30,00030,000CONTINGENCY
50,000 500,000 550,000Total
Total2023 2024 2025 2026 2027Funding Sources
550,00050,000 500,000PARKING FUND
50,000 500,000 550,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Darian Nagle-Gamm
2023 2027thru Department TRANSPORTATION SERVI
Description
Design and remodel of Customer Service and Administrative Support office areas of the Tower Place parking ramp.
Project #T3028
Priority Efficiency Improvement (3)
Justification
Administrative office space demand has greatly changed at our Tower Place location. This remodel will provide dedicated workspaces for three
Customer Services Representatives who currently share two work stations in an open office space. The remodel will also provide dedicated office
space for Supervisory staff including Operations Supervisors, Director, Associate Director, and a Data Analyst. Currently the Supervisory staff
operate in an open workspace room with very limited privacy. Upgraded funiture will also be part of this project.
Budget Impact/Other
There is no anticipated impact to the operating budget.
Useful Life 20 yearsProject Name Tower Place Office Remodel Category Parking Operations
Type One Phase
MATCH %NONE
GRANTEE NONE
Total Project Cost:$150,000
TIF DISTRICT None
PLAN None
Status Active
Total2023 2024 2025 2026 2027Expenditures
12,00012,000PLANNING/DESIGN
138,000138,000CONSTRUCTION
150,000 150,000Total
Total2023 2024 2025 2026 2027Funding Sources
150,000150,000PARKING FUND
150,000 150,000Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Darian Nagle-Gamm
2023 2027thru Department TRANSPORTATION SERVI
Description
This project involves the construction of a new transit facility for maintenance operations and storage. As part of this project, the storage area will
be expanded allowing for an increase in fleet size and the maintenance facility will be upgraded. The relocation will address the environmental
issues that exist at the current facility and allow for the redevelopment of a major commercial site at the corner of Highway 6 and Riverside Drive.
Project #T3055
Priority Essential (2)
Justification
The current tranist maintenance facility has outlived its useful life and is in need of replacement. The facility has structural issues from the
surrounding area, and a new facility will improve the delivery of service. The new facility would be eventually be consolidated with Equipment
Services into one facility to better utilize space and be more cost effective. Grants are being sought to assist in the construction.
Budget Impact/Other
The replacement of transit maintenance facility should be to a newer and more energy efficient facility, however, the new facility will be larger and
contain more operational functionality. The additional size and capability of the facility will most likely offset the potential savings from a newer
and more efficient facility. Additional savings/cost from this facility has not been determined.
Useful Life 40 YearsProject Name Transit Maintenance Facility Relocation Category Transit Operations
Type One Phase
MATCH %20%
GRANTEE FTA
Total Project Cost:$23,200,000
TIF DISTRICT None
PLAN Transportation Plan
Status Active
Total2023 2024 2025 2026 2027Expenditures
500,000250,000 250,000PLANNING/DESIGN
22,500,00022,500,000CONSTRUCTION
250,000 250,000 22,500,000 23,000,000Total
Prior
200,000
Total
Total2023 2024 2025 2026 2027Funding Sources
15,000,00015,000,000FEDERAL GRANTS
8,000,000250,000 250,000 7,500,000TRANSIT FUND
250,000 250,000 22,500,000 23,000,000Total
Prior
200,000
Total
Capital Improvement Plan 2023-2027
City of Iowa City, Iowa Contact Darian Nagle-Gamm
2023 2027thru Department TRANSPORTATION SERVI
Description
This project will replace the video recording system in the 27 fixed route transit buses. The camera system is used for security monitoring as well
as investigating incidents on and off the buses and is very useful during employee on-going training.
Project #T3068
Priority Essential (2)
Justification
The current system is at the end of it's useful life and is not reliable. Having clear and available recordings is necessary for a safe and secure transit
system.
Budget Impact/Other
This project will not increase operating expenditures.
Useful Life 10 yearsProject Name Transit Bus Video System Category Transit Operations
Type One Phase
MATCH %
GRANTEE
Total Project Cost:$150,000
TIF DISTRICT
PLAN
Status Active
Total2023 2024 2025 2026 2027Expenditures
150,000150,000EQUIPMENT
150,000 150,000Total
Total2023 2024 2025 2026 2027Funding Sources
150,000150,000TRANSIT FUND
150,000 150,000Total
Project Name Description Unfunded Amt
1 - Bridges
1 Iowa Avenue Culvert This project will include the removal and replacement of the
existing reinforced concrete box culvert with a new three-
sided arch culvert. The project will also include removal and
replacement of slope protection adjacent to the bridge on
Ralston Creek, removal and replacement of street pavement
and sidewalk, and site restoration.
$3,500,000
2 F Street Bridge This project involves the removal and replacement of the
existing corrugated metal arch bridge with a larger bridge.
$773,000
3 Fourth Avenue Bridge This project will replace the bridge over the South Branch of
Ralston Creek at Fourth Avenue and will include sidewalks.
Possibility of approximately $75,000 state funding.
$773,000
4 Sixth Avenue Bridge This project involves the removal and replacement of the
existing twin box culvert with a larger bridge.
$773,000
5 Third Avenue Bridge This project will include the removal and replacement of the
existing concrete bridge with a new single-span reinforced
concrete box culvert. The project will also include removal
and replacement of slope protection adjacent to the bridge
on Ralston Creek South Branch, removal and replacement
of street pavement, and storm sewer improvements.
$650,000
6 First Avenue Bridge This project will be a comprehensive concrete rehabilitation
of the Iowa Ave Bridge over the Iowa River. Additional
repair items will include sidewalks, approach pavement,
expansion joints, pedestrian handrails and painting.
$2,250,000
2 - Streets
7 Benton Street - Orchard To
Oaknoll
This is a capacity related improvement identified by the
Arterial Street Plan.
$5,150,000
8 Brookland Park Drive
Rehabilitation
This project will include reconstruction of Brookland Park
Drive and updates to utilities.
$1,450,000
9 Dodge St - Burlington To Bowery Street reconstruction and storm sewer improvements. This
is a joint project with the IDOT.
$13,250,000
10 Dubuque Rd Paving - Bristol To
Dodge
Reconstruct and upgrade to urban cross sections. $1,339,000
11 Dubuque Street Access Road
And Traffic Signal
This project will construct an access drive from the north end
of Laura Dr to Dubuque Street, south of the Interstate 80 /
Dubuque St interchange. May also facilitate a second
means of access from the Peninsula area to Dubuque St.
$2,000,000
12 Emerald Street Diamond Grinding This project will diamond grind all of Emerald Street to
remove the slab warping that interferes with the use of this
street by fire trucks.
$212,000
13 Gilbert / Us 6 Intersection Left
Turn Lanes
Reconstruct the intersection of Gilbert & US 6 to include dual
left turn lanes on Gilbert St.
$4,840,000
14 Gilbert St Iais Underpass This project relocates the sidewalks of the Gilbert St.
underpass at the IAIS Railroad. The sidewalks are moved
further from the street and existing erosion problems are
addressed.
$327,000
15 Old Hwy 218 Streetscape Streetscape improvements on Old Hwy 218 entrance -
Sturgis Ferry Park to US Hwy 6. This project includes
landscaping, lighting and sidewalk improvements. The
project should be coordinated with Sturgis Ferry Park
upgrade and /or Riverside Drive Redevelopment project.
$812,000
16 Highway 965 Extension This project will be initial phase of constructing Hwy 965
extended from the south side of Hwy 218 to Melrose Avenue
to arterial standards.
$9,167,000
17 Mccollister - Sycamore St To
Scott Blvd
Extend proposed McCollister Boulevard from Sycamore
Street to Scott Boulevard.
$9,088,000
18 Muscatine Avenue
Reconstruction, Iowa To First Ave
This project will reconstruct Muscatine Avenue from Iowa
Avenue to 1st Avenue.
$10,510,000
City of Iowa City
Capital Improvement Program
Unfunded Projects
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
19 Oakdale Blvd This project would construct an extension north across I-80
to a new intersection with Iowa Hwy 1.
$15,000,000
20 Oakdale Blvd-Hwy 1 To Prairie
Du Chien Rd
This project would construct Oakdale Blvd from Hwy 1, west
to Prairie Du Chien Road.
$8,240,000
21 Peninsula Secondary Access
Road
This project will establish a more reliable access to the
Peninsula neighborhood by either elevating Foster Rd from
Laura Dr to No Name road by creating a secondary access
to the area. This project will not be necessary if the Taft
Speedway Levee Project is constructed.
$2,883,000
22 Riverside Drive Streetscape Phases II to V of the South Riverside Drive Streetscape
Master Plan, which includes improvements to the west side
of Riverside Drive from Benton to Hwy 6 and the east side of
Riverside from Myrtle to Hwy 6. Project includes
consolidation of driveways, undergrounding of utilities, and
installation of sidewalks and landscaping.
$2,650,000
23 Rohret Rd Improvements-
Lakeshore To Limits
Project will reconstruct Rohret Rd to urban standards. $1,813,000
24 South Gilbert Street
Improvements
Reconstruction from Benton Street to Stevens Drive. This
project does not include improvements to the Gilbert St. /
Highway 6 intersection.
$4,326,000
25 South Arterial And Bridge, Us218
To Gilbert Street
Construction of a south arterial street and bridge over the
Iowa River, connecting from Old Hwy 218/US 218
interchange on the west side of the Iowa River to Gilbert
Street/Sycamore 'L' intersection .
$15,987,000
26 Sycamore-Hwy 6 To Highland This project involves additional lanes to improve capacity
and storm sewer improvements.
$750,000
27 Sycamore Street - East-West Leg
From "L" To South Gilbert
This project will reconstruct Sycamore Street to arterial
standards using the Complete Streets Policy. This phase
will be the east-west leg of Sycamore Street.
$3,040,000
28 Taft Avenue – Herbert Hoover
Hwy To Lower West Branch
Reconstruct Taft Avenue from Herbert Hoover Hwy to Court
Street.
$3,300,000
29 Taft Avenue – American Legion
Road To 420th Street
Reconstruct Taft Avenue from American Legion Road to
Herbert Hoover Hwy.
$8,200,000
30 Laura Drive Reconstruction Reconstruction of entire length of Laura Drive to standard
two lane width with curb, storm sewer and sidewalk.
$2,000,000
31 Linn Street Reconstruction,
Burlington To Iowa
This project is part of the downtown streetscape master
plan. This project reconstructs Linn Street from Burlington
Street to Iowa Avenue. Project also improves sidewalk
pavement, addresses critical update to water main, replaces
and relocates storm sewer between Washington & Iowa.
$1,935,000
32 Clinton Street Streetscape Improve Clinton Street Streetscape south of Burlington
Street consistent with the Riverfront Crossings Plan. Minor
pavement improvements and lane striping a part of project.
$1,500,000
33 Kimball Road Reconstruction Reconstruct Kimball road from N. Gilbert Street to N.
Governor Street. Project includes 22 foot wide PCC street
and a 5 foot wide sidewalk on one side of the street, new 8"
DIP water main, new storm sewer, and sanitary service
improvements.
$3,480,000
34 Interstate 80 Aesthetic
Improvements
Landscaping and aesthetic treatments in the Interstate 80
corridor. The objective of this project is to mitigate the visual
impact of the addition of a third lane to I-80 and to provide
cohesive and pleasing feel to the Iowa City corridor.
$300,000
35 Towncrest Drive Reconstruction A private street that the property owners would dedicate the
right of way to the City, and the City will reconstruct. Parking
along and adjacent to the right of way will be reconfigured to
better facilitate vehicle movement and pedestrian safety.
$600,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
36 Gilbert Street Functional Design -
Hwy 6 To Kirkwood
Obtain consulting services to provide a functional design of
Gilbert Street between Hwy 6 & Kirkwood Avenue. The
functional design should take into account all previous
design work completed for the corridor.
$60,000
37 Foster Road Elevation This project will reconstruct and elevate Foster Road from
No Name Street to Dubuque Road.
$7,800,000
38 Camp Cardinal Blvd / Kennedy
Parkway - Roundabout
This project will construct a roundabout at Camp Cardinal
Boulevard / Kennedy Parkway. This project is intended for
the unfunded list of projects.
$2,058,839
39 Kirkwood Ave to Capitol Street
Connection
The extensions of these streets plays an important part in
the overall development of the Riverfront Crossings area. It
will also imporve access and the traffic cirulation in this area.
This project does not include any costs necessary for the
property acquisitions.
$3,100,000
40 Gilbert Street Lighting &
Landscaping Improvments
This project will provide landscaping and street/pedestrian
lighting on Gilbert Street from College Street to the Gilbert
Street Bridge over Ralston Creek
$975,000
41 Washington Stree Recon -
Madison to Clinton
This project will reconstruct Washington Street from
Madison Street to Clinton Street and will include new street
pavement, sidewalk, curb ramps, utility
repairs/improvements and other associated work.
$2,700,000
42 Friendship Sidewlk Infill - 5th Ave
to 7th Ave
This project will construct a 5' wide ADA sidewalk on
Friendship Street between 5th Ave and 7th Ave
$210,000
43 Herbert Hoover Highway - Turn
Lanes
This project will construct dedicated left-turn lanes (or a
center left-turn lane) on Herbert Hoover Highway at
American Pharoah Drive, Hanks Drive and Thunder Gulch
Road. This project is intended to be placed on the unfunded
list of projects until the pending traffic study is complete.
$6,400,000
44 Lakeside Drive Crosswalk
Improvements
This project generally includes the construction of a raised
midblock crosswalk on Lakeside Drive between Aniston
Street and Amber Lane at the Sycamore Greenway Trail
$240,000
45 Linn Street Reconstruction This project includes the reconstruction of three blocks of
brick street along Linn Street from Bloomington Street to
Church Street
$3,650,000
46 Park Road Reconstruction -
Rocky Shore to Riverside
Reconstruction of Park Road from Rocky Shore Drive to the
west project limits of the Gateway Project, approximately
Riverside Drive. This project will include new street
pavement, sidewalk, utility improvements and other
$7,500,000
3 - Transportation Services
47 Rock Island Railroad Depot
Restoration
Preparation of Old Rock Island Railroad Depot for Amtrak
service, including platform construction, lighting, utilities,
passenger information display, ticketing kiosks, canopy,
warming shelter, signage, parking, and accessibility
improvements.
$5,381,000
48 Capitol & Dubuque Street Parking
Ramp Façade Improvements
To construct façade improvements on the Capitol Street and
Dubuque Street parking ramps to improve their aesthetic
appearance in these high profile, high traffic areas.
$1,000,000
4 - Ped & Bike Trails
49 Iowa River Trail, Highway 6 To
Sturgis Ferry Park
This project will extend the Iowa River Trail from just north of
Highway 6 to Sturgis Ferry Park on the west side of the Iowa
River.
$1,180,000
50 Iowa River Trail, Gateway
Segment
Construction of a trail extension adjacent to (east) of the
Iowa River between Park Road and the University of Iowa
pedestrian bridge.
$500,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
51 Windsor Ridge Trail Extension The project includes the extension of a 10' wide trail along
north Branch of Snyder Creek from Scott Boulevard to
American Legion Road.
$1,200,000
52 Old Highway 218 Trail/Wide
Sidewalk
This project will construct an 8' wide sidewalk adjacent to
Old Highway 218 between Sturgis Ferry Park and
McCollister Boulevard.
$550,000
53 Crandic Railroad Rails-To-Trails
Project
The project removes the existing Crandic tracks and
repurposes the existing corridor for a 10' multi-use trail
approximately between Oakdale Boulevard in Coralville to
Gilbert Street in Iowa City (approximately 6.1 miles). Iowa
City's portion of the project is approximately 1.75 miles.
$1,575,000
54 Myrtle Ave Sidewalk Infill The project will construct sidewalk along the north side of
Myrtle Avenue between Greenwood Drive and Olive in order
to fill in a gap in the City’s sidewalk network.
$155,000
55 Southgate Ave Iowa River Trail
Connector
This project will construct a trail connection along Southgate
Avenue from Gilbert Street to the Iowa River Trail.
$250,000
56 Willow Creek Trail - Phase Iii Construct a trail from Willow Creek Drive, under Highway
One, around perimeter of airport, to connect with Iowa River
Corridor (IRC) Trail.
$870,000
57 Willow Creek Trail-West Connect Willow Creek Trail from its current west terminus
via a tunnel under Highway 218, to connect with the trail in
Hunters Run Park and further west.
$2,814,000
58 Fairmeadows Trail Addition of a loop trail and connections to the bikeways in
the surrounding neighborhood.
$125,000
59 Southgate Ave - Iowa River Trail
Connector
This project will construct a cul-de-sac a the west terminus
of Southgate Ave as well as 8' wide trail connection from
Soutgate Ave to the Iowa River Trail.
$400,000
60 Napoleon-Riverfront Crossings
Trail Segment Repl
Replacement of the asphalt trail from Napoleon Park to
Riverfront Crossings Park with a 10' wide concrete trail (1.25
miles). This will include a new spur connecting the trail to
Southgate Ave
$720,000
61 Whispering Meadows Trail
Improvements
Current trail infrastructure is reaching end of life and needs
replaced in order to continue to serve park users.
$250,000
5 - Wastewater
62 North Branch Dam Trunk Sewer This project extends easterly along Ralston Creek from the
North Branch Dam to Scott Boulevard.
$3,860,000
63 Northeast Trunk Sewer Reconstruction of an under-sized sewer through the
northeast neighborhoods.
$5,221,000
64 Sanitary Sewer Extension - Scott
To Hickory Trail
This project includes the design and construction of a
sanitary sewer trunk extension between Scott Boulevard and
Hickory Trail.
$790,000
65 New Cold Storage Building Construct 90' by 40' covered roof area with open side similar
to the Sludge Storage area. Building to be the same
dimension of the existing cold storage building.
$360,000
66 Geo-Thermal Hvac Conversion Project would include the conversion of the HVAC system to
Geo-Thermal. Installation of Geo-thermal loops, new pump
systems, new chiller, and improved controllers required to
operate the system.
$300,000
67 Secondary Calrifier 5300-5400
Repairs
This project will replace the rake mechanisms and drives for
Calrifiers C5300 and 5400 that were new in 2002 and part of
WWTP upgrades.
$864,000
68 Heat for Cold Storage Building Project would require the addition of natural gas fired area
heaters. Initially the heat load would be enough to keep the
building above freezing. When the digester rehabilitation
project proceeds, glycol heating from the digester boilers
would be included that project. Glycol piping would be routed
under the parking lot and drive to the building to new heating
units.
$123,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
69 Aeration Eqiuipment
Improvements Phase 1
Replace the remaining mixers in the aeration trains 1 - 4 with
high efficiency mixers matching those placed in Cell 9 of
trains 1-4 and replace mixers in the high strength tank. This
would be total of 30 mixers.
$2,978,000
70 Aeration Eqiuipment
Improvements Phase 2 (Lamson)
Replace Lamson 300 HP Centrifugal Blower with a High-
Speed Turbo Blower including any ancillary equipment, pipe
modifications and PLC programing. We currently utilize
service contract for yearly maintenance for two existing high-
speed blowers installed. We would want to require service
contract for hte new high speed blowers once the warrenty
period had expired.
$1,911,000
71 Hawkeye Lift Station Rehabilitation includes demolishing the existing building,
converting the station to a wet-well valve vault with surface
hatches for pump access, basket screening, new standby
generator, replace 20 year old pump, new controls, valve
vault with bypass capacity, new security fence, landscaping
and access road improvements. The station would be
plumbed for future expansion, but would not include
additional pumps.
$1,645,000
72 Rotating Drum Thickener
Replacement 1 & 2
Replace RDT 1 and 2 with in-kind process equipment or a
more efficient process equipment. This will include all
ancillary equipment required to make this an operational and
a direct replacement for the existing RDTs 1 and 2 and all of
their ancillary equipment.
$1,662,000
73 Peninsula Control Panel and
Pump Improvement
The project includes the replacement of the control panel
and aquisistion of a redundent pump.
$130,000
74 UV Building and Storage Build a 40' x 60' structure over Ultra Violet disifection
structure for protection and for storage of the UV bank
modules during the off season. Project will include buildng
heat and electical supply.
$1,000,000
75 Effluent Water Pump Station
Improvements
Install a fourth Effluent Water Pump to serve the in plant
distribution system and soccer park irrigation system. Work
includes rebuilding of the Amiad filtration system.
$76,000
6 - Water
76 West Side Ground Storage
Reservoir
Construction of a two million gallon ground or elevated
storage reservoir with associated pumping station and
generator west of US-218. Current land acquired for this
reservoir is southeast of the Slothower Rd at Hebl Ave
$4,000,000
77 Nutrient Removal Project This project will be for the reduction of dissolved nutrients
(i.e. nitrates) in the source water. The project is preceded
by a study. The study will review treatment technology
options (i.e. reverse osmosis, biological treatment) and the
long-term viability of continued lime softening.
$700,000
78 Collector Well #1 Rehabilitation Clean two of the existing laterals and cap one existing lateral
of Collector Well #1. Install two new 12-inch laterals to
increase the production capacity of this raw water well.
$1,000,000
79 Water Treatment Plant Filter #6
Buildout
Add underdrains, granular media, controls, and
instrumentation to filter bay #6. This bay was left unfinished
to allow for future expanded production. The project will also
repair or replace a number of filter control valves. The
project will be informed by the Treatment Study.
$1,500,000
80 Well Field Electrical Cable
Replacement
Replace aging medium voltage (13,200V) cabling and install
communication fiber to wells at the Water Plant and
Peninsula sites.
$1,000,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
81 Lee/Highwood Street Water Main
Replacement
This is a water main replacement project with respective
street and sidewalk replacement at Lee Street and
Highwood Street. Approximately 550 feet of 6" cast-iron
pipe (vintage 1951) will be replaced with 6" PVC pipe.
Approximately 300 feet of PVC will be installed where no
pipe has existed previously.
$195,500
82 Deforest Ave Water Main
Replacement
Approximately 500 feet of 6-inch cast-iron pipe (vintage
1958) will be replaced with 500 feet of 8-inch PVC on the
900 block of Deforest Avenue.
$350,000
83 Giblin Drive Water Main
Replacement
This is a water main replacement project with respective
street and sidewalk replacement. Approximately 620 feet of
6-inch cast-iron pipe (vintage 1953) will be replaced with 8"
PVC.
$246,350
84 Sixth Avenue Water Main
Replacement
This is a water main replacement project with respective
street and sidewalk replacement. Approximately 650 feet of
6-inch cast-iron pipe (vintage 1974) will be replaced with 8"
PVC.
$340,000
85 Water Plant Softener
Improvements
Automate manual operating procedures, motorize
concentrator adjustment and motorized valve adjustor for
the
small influent valve. This project will be informed by the
$75,000
86 Well House & Generator Building
Roof Replacement
Replace the roofs on the 5 collector wells, 3 deep wells, and
emergency generator building.
$500,000
87 Lime Lagoon Outlet Structure
Modifications
Modify the lagoon outlet structure to an open channel
design. This project will be informed by the Treatment
$500,000
88 Market Street Water Main -
Madison To Clinton
Extend 20-inch water main from Madison to Clinton on
Market St. Tie in 12-inch on Clinton St. to 16-inch at
Bloomington St. This project will be preceded by the
abandonment of the 20-inch main along the old Davenport
St right-of-way between dormitories.
$1,400,000
89 Bloomington Gsr
Decommissioning
Decommission the Bloomington ground storage reservoir
within the University of Iowa Campus Parking Ramp and
return the space to the University of Iowa per the associated
28E agreement. The 28E agreement expires on December
31, 2038. (Resolution No. 88-176)
250,000$
90 Soda Ash Replacement Remove the existing soda ash and ammonia chemical feed
systems. Replace the existing powdered soda ash feed
system with a liquid soda ash feed. The use of soda ash is
to increase alkalinity of the source water for lime softening
purposes. This is necessary if drawing from the river. This
project will be informed by the Nutrient Study.
1,000,000$
91 Sand Pit Pumping Station
Rehabilitation
Clean and inspect the laterals of the Sand Pit Pumping
Station. Replace and repair the lateral isolation valves and
operators.
250,000$
92 East Side Water Tower Construct a two million gallon ground or elevated storage
reservoir within the East Pressure Zone.
4,000,000$
93 Sycamore Gsr Replacement Replace the two million gallon ground storage reservoir
located on Sycamore Street with a ground or elevated two
million gallon storage tank along McCollister Blvd.
4,000,000$
94 Emerald And Rochester Gsr
Improvements
Upgrade or expand the buildings at the Emerald and
Rochester ground storage reservoirs. Add a third pump to
both ground storage reservoirs. Replace the backup
generators at both ground storage reservoirs.
1,500,000$
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
95 Melrose & Westgate 16-Inch
Water Main
Install 16-inch water main parallel to the existing water main
on Melrose Ave from Dublin Rd to Westgate St and on
Westgate St from Melrose Ave to Benton St. This project
would reduce velocity headloss from the Emerald ground
storage reservoir to customers west of US-218, increasing
service pressure. This project will be evaluated by hydraulic
modeling after the West Side GSR project is completed.
4,000,000$
96 Bulk Water Station At Public
Works Facility
Construct a new bulk water filling station on the Public
Works Campus to replace the station to be demolished at
the existing Equipment / Transit site.
150,000$
97 Lighting Upgrades To Led Upgrade aging water treatment facility lighting to LED's 250,000$
98 Construct New Collector Well #3 Add an additional radial collector well for high quality source
water production. The project will need to be a
hydrogeologic study and cost/benefit analysis between
adding collector laterals to existing collector wells or
constructing a new collector well.
4,000,000$
99 Hvac System Replacement &
Remove Process Area Heaters
Replace and upgrade aging HVAC equipment and controls
at the water treatment facility. Remove gas overhead
heaters and associated gas lines, electrical, and exhaust
piping. The heaters are not used and in time pose a safety
hazard.
1,000,000$
100 Shop And Chemical Storage Roof
Replacements
Replace the adhered membrane roof on the water treatment
facility garage and chemical storage sections.
300,000$
101 Teeters Ct Water Main
Replacement
Replace approximately 410 linear feet of 6-inch 1950 cast
iron water main on Teeters Ct. The water main has
experienced three main breaks and services Lincoln
Elementary.
125,000$
102 Hwy 6 (Industrial Park Rd To
Riveria)
Replace approximately 1,400 linear feet of 12-inch 1971
ductile iron water main on Highway 6. The water main has
experienced two water main breaks. Due to the size of the
water main, it's proximity to the Sycamore reservoir, and 16-
inch water main on the north side of Highway 6, breaks tend
to cause large system disruptions.
450,000$
103 Reseal Water Treatment Plant
Exterior
Reseal the concrete exterior of the water treatment plant
facility.
100,000$
104 Southlawn Dr Water Main
Replacement
Replace approximately 1,100 linear feet of 6-inch 1962 cast
iron water main on Southlawn Dr (800-900 blk). The water
main has experienced 10 main breaks and services Lucas
Elementary.
400,000$
105 Melrose Water Main Camp
Cardinal To Us-218
Replace approximately 1,900 feet of 12-inch, 1984 ductile
iron water main with 16-inch PVC water main.
600,000$
106 Pwf Water Material Outdoor
Covered Storage
Installation of paving and covered outdoor material storage
structures to protect water distribution materials from the
elements
100,000$
107 Water Plant And Gsr Gate
Replacement
Replace the (3) water plant site gates and the (3) GSR gates
(Rochester, Emerald, and Sycamore).
100,000$
108 Process Flow Meter And Valve
Replacements
Replace (14) flow meters within the treatment plant and
wells. Replace process valves coincident to the flow meters
and filters.
1,200,000$
109 Water Plant And Peninsula Well
Field Fiber Optic Cable
Install fiber optic communication cable to all wells and
remove existing radio telemetry.
1,000,000$
110 Highway 1 from Miller Ave to
Hudson Ave Water Main
Replacement
Replace approximately 400 feet of 1984 12-inch water main
on Highway 1 between Miller Ave and Hudson Ave. The
work would also simplify the utility network in the area.
700,000$
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
111 Hwy 6 from Rocky Shore Dr to
Newton Rd & Rocky Shore Dr
from Hwy 6 to Dill St Water Main
Replacement
Replace approximately 800 feet of 1994 16-inch water main
on Hwy 6 between Rocky Shore Dr and Newton Rd &
replace 400 feet of 1967 12-inch on Rocky Shore Dr from
Hwy 6 to Dill St.
1,000,000$
112 Pleasant St from Cedar St to
Davenport St Water Main
Replacement
Replace approximately 350 feet of 1948 2-inch water main
on Pleasant St from Cedar St to Davenport St
400,000$
7 - Stormwater
113 Carson Lake Regional Storm
Water
Construction of a regional storm water management facility
on the middle branch of Willow Creek immediately west of
Highway 218. This facility will serve development west of
Highway 218 and south of Rohret Road.
$1,160,000
114 Riverfront Crossings Storm Sewer Storm sewer improvements in the Central Crossings Sub-
District.
$1,375,000
115 Iowa Avenue Culvert Repairs This project will repair a box culvert that carries Ralston
Creek under Iowa Avenue.
$348,000
116 N. Branch Basin Excavation Aerial mapping done for the update to the flood plain maps
revealed that sedimentation has consumed a portion of the
capacity of the facility. This basin is located in Hickory Hill
Park.
$135,000
117 Olympic Court Storm Water Storm sewer retrofit to relieve localized flooding from storm
water runoff.
$464,000
118 Sunset Street Storm Sewer The area just north and south of Kineton Green, east of
Sunset, has experienced back yard flooding and drainage
problems.
$440,000
119 Riverside Drive & Arts Campus
Storm Sewer
This will be a joint project with the University of Iowa to
upgrade the Riverside Drive / Arts Campus storm sewer and
lift station to perform better during future floods.
$1,000,000
8 - Parks & Recreation
120 Recreation / Aquatic Center As recommended in the Parks and Recreation Master Plan,
construct a major new Recreation & Aquatic Center,
probably in the western part of Iowa City.
$16,000,000
121 Mercer Park Pool Improvements This project would include the replacement of the two pool
bulkheads, deck tile, dive stands, and the renovation of the
women's locker room from a shared shower space to two
separate shower spaces.
$500,000
122 Waterworks Park Boat Ramp This project is to add a boat ramp to access the Iowa River
in the northeast corner of Waterworks Park. Improvements
include a boat ramp, boat trailer parking, a boat dock, and
an access road.
$250,000
123 Riverfront Crossings Park -
Phase 4
Phase 4 of the Riverfront Crossings Park master plan adds
a new river access, an amphitheater, a kayak launch, and
new river trails.
$1,353,000
124 Riverfront Crossings Park
Restroom & Bridge
Construction of second restroom/shelter by Nature Play and
second bridge to 2nd Street; also includes removing an
abandoned trunk sewer line.
$910,000
125 Gilbert Street/Park Maint Shop
Boat Ramp
Addition of an accessible boat access to the Iowa River from
the parking lot at the Park Maintenance Shop.
$245,000
126 Iowa River Trail, Benton To
Highway 6
This project will extend the Iowa River Trail from Benton St
to Highway 6, on the west side of the Iowa River. Future
phases of the trail could extend to Sturgis Ferry Park and on
top of the west side levee to McCollister Blvd.
$1,700,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
127 Ralston Creek Trail Under Iowa
Interstate Railroad
The project would involve constructing a trail connection
under the Iowa Interstate Railroad that connects the existing
trail along the west side of Ralston Creek, north of the Iowa
Interstate Railroad, to the proposed trail that will be
constructed along the west side of Ralston Creek as part of
a development located south of the Iowa Interstate Railroad.
$1,700,000
128 Sand Prairie Enhancement Take steps to clear, re-seed and perform low impact
development on the 38 acre sand prairie and adjacent
McCollister property acquired in 2004/05.
$273,000
129 Mercer Park Ball Diamond #4
Renovation
This project would reconfigure ball diamond #4 at Mercer
Park to realign the field to a NW orientation. This would
include the removal of the existing field, fencing, and
$374,000
130 Kicker's Park Playground
Replacement
Replace playground #1 at Kickers Athletic Complex as it is
reaching the end of projected serviceable life. Project also
adds ADA compliant paths.
$185,000
131 Calder Park Playground
Replacement
Replace the playground at Calder Park. Site constraints
keep this as a smaller piece of equipment.
$135,000
132 Second Parking Lot At Ashton
House
Provides for additional parking on the north side of the
Ashton House to support larger events at the facility.
$300,000
133 Lower City Park Master Plan
Improvements
Implement changes to make the park more resilient to
flooding. Follows from the 2015 master plan.
$23,268,522
134 East Side Sports Complex
Improvements
Build out of a new 73 acre park on the City’s east side. The
park includes expansion of various field sports as well as
serves as a neighborhood amenity. Follows from the 2015
master plan.
$14,034,794
135 Terry Trueblood Recreation Area
Parking Expansion
Expansion of the parking areas with addition of 100 parking
spaces at the Terry Trueblood Recreation Area lodge and
lake.
$225,000
136 Wetherby Park Entrance And
Parking Lot Improvements
Connect Broadway sidewalks to the trail system in Wetherby
Park. Resurface the parking lot and basketball court
adjacent to parking lot. A trail extension will also be made to
the Community Garden area in order to provide ADA
$100,000
137 Scott Park Driveway and Parking Replace the chipseal driveway and parking area at Scott
Park with a concrete surface and reconfigure the lot to more
effeciently serve additional parking
$275,000
138 Benton Hill Park Sidewalk Addition of sidewalk along the Benton St right-of-way of
Benton Hill Park along with necessary retaining wall
elements.
$175,000
139 Brookland Park Playground Replace the aging playground at Brookland Park with a
similar small size playground and swings. Update other site
amenities as needed.
$200,000
140 Robert A. Lee Recreation Center
Pool Filter & HVAC
Post 2021 Recreation Master Plan- moved RALRC pool and
HVAC project to FY27, updated costs to replace RALRC
existing pool filtration system, add a UV disinfectant system,
upgrade deteriorated iron piping under deck, surge tank
replacment and add dehumidication HVAC system to bring
facility to current building code compliancy for air quality.
$4,060,000
141 Oak Grove Park Improvements Replacement of the playground, basketball court surfacing,
hl d i ii
$300,000
9 - Other Projects
142 Burlington Street Median Construct the Burlington Street median from Gilbert Street to
Madison Street. Project includes relocation of water and
sewer utilities. This project will require a traffic signal
preemption system. (Part of the Riverfront Crossings
amendment to City-University URA).
$1,973,000
143 Cemetery Columbarium Construction of a columbarium. $405,000
Project Name Description Unfunded Amt
City of Iowa City
Capital Improvement Program
Unfunded Projects
144 City Hall Relocation Relocate and expand / modernize City Hall and City Council
Chambers.
$12,000,000
145 Police Evidence Storage Facility Construction of a permanent evidence storage facility. $929,000
146 Central Police Station Relocation Relocate and expand / modernize Central Police Station. $19,000,000
147 Fire Station #1 Relocation Relocate and expand / modernize Central Fire Station #1. $11,593,000
148 Fire Station #5 Construction of Fire Station #5 in the South Planning District. $2,898,000
149 Fire Station #6 Construction of Fire Station #6 in the Southwest Planning
District.
$2,898,000
150 Flood Buyouts This project will provide funds for the purchase of houses in
designated flood hazard buyout areas after FEMA and
CDBG buyout programs have ended.
$530,000
151 Riverside Drive Redevelopment This project includes methane abatement, excavation, and
fill at the 7 acre site owned by the City at Riverside Dr. and
Hwy 6. This site preparation would allow for marketing of
this property for commercial development.
$2,527,000
152 Airport Equipment Shelter Snow removal equipment was previously stored in United
Hangar. Equipment Shelter would provide enclosed storage
for equipment.
$337,500
153 Airport Perimeter Road Construction perimeter road for maintenance and fueling
vehicles to travel to south development area.
$267,700
154 South Airport Site Development South General Aviation area site development with access
roadway and utilities.
$2,125,100
155 Hangar A Door Replacement Hangar A door replacement; hangar A has 10 doors to be
replaced.
$200,000
156 Summit Street Historic Plan Streetscape and intersection elements through Summit
Street Historic District.
$302,000
157 Traffic Signal Pre-Emption
System
This project will install a city-wide Geographic Information
System based traffic signal pre-emption system for
emergency vehicles. This system is necessary if the
Burlington St Median Project is constructed between
Madison St and Gilbert St.
$1,221,000
158 Iowa Interstate Railroad Quiet
Zones
The Quiet Zones project would be for design and
implementation of required upgraded warning devices and
physical infrastructure (medians and gates) for four at-grade
street crossings. The upgrades would improve safety at
each crossing and reduce the need for trains to sound their
horns
$1,000,000
159 Burlington Street Dam Modification of the Burlington Street Dam to address public
safety concerns, improve riverbank stability, improve fish
habitat, and create recreational opportunities.
$6,435,000
160 Excavator for compost operations This machine would be used primarily in the compost and
wood chip facility at the landfill to assist in safely grinding
incoming materials.
$280,000
Total - Unfunded Projects
392,540,305$